Loading...
Applicant response to staff report 052411Page 1 of 2 Jaycee Holman From: Bill Parsons Sent: Tuesday, May 24, 2011 5:42 PM To: Jacy Jones; Jaycee Holman Subject: FW: Kingsbridge Side Setback Variance Staff Report Response Attachments: Set Backs.jpg To All, Here is the applicant's response to the variance staff report. Bill From: Scott Noriyuki [mailto:scott@northsidemgt.com] Sent: Tuesday, May 24, 2011 5:30 PM To: Bill Parsons Subject: Kingsbridge Side Setback Variance Staff Report Response Bill - With regard to the Kingsbridge Phase II & III Side Setback Variance Staff Report, I would first like to thank you and the City of Meridian for your professional work, analysis and efforts. Please consider this email as formal response and acceptance of the Conditions of Approval less those listed below. Page 1, Item II.: We request that stafYs recommendation be change from denial to approval. Page 2, Item VIII.: We request further consideration regarding Staff's stance of non hardship. Additionally, we have had two (non required) Neighborhood meetings that this request was discussed. Negotiations and agreements have been made that we believe Protects and satisfies adjacent neighbors while relieving us of a hardship. Summary of these agreements include; All Phase II & III perimeter lots as depicted on the preliminary plat will adhere to the City of Meridian R-2 dimensional Standards. Reduction of Phase II & III interior lots to receive relief and reduction of the second story side setback Of 15' to 7.5'. See attached exhibit. All constructed homes utilizing this relief will incorporate Architectural modulation and interest to ensure esthetics and quality as submitted and incorporated into the Development Agreement (examples of product). Hardships include: 1) Neighbors to provide parameter lots sizes at an increased Square 12,000 square foot minimum per the R-2 dimensional standard. Agreements with the City and That averages well above the These increased square footages 5/24/2011 Page 2 of 2 has resulted in a loss of roughly 20 potential building lots. 2) Development Agreement provided an R-3 zoning with reduced no longer existed resulting in an entire redesign of the are more stringent regarding front lot widths. while ensuring financial viability. Simply deleting lots substantially increased costs. The original Entitlements and Dimensional standards. The R-3 zoning Project. The R-2 dimensional standards Every effort has been made to conform Would result in a failed project due to to provide six (6) perimeter lots designated as single and potential buyers. 4) specifically requested this variance so enclosed RV Storage can spaces. This is important to the Neighbors, ourselves 3) Agreements with the City and Neighbors Story only. This has limited our options At the request of Neighbors we Be built rather than outdoor parking And the long term quality of the project. with Neighbors, contributed $30,000 +/- to the Boise Hunter Homes through agreements 5) Existing Phase I HOA in cash and improvements. We have paid several past due billings. These debts resulted in complete shut off of the irrigation system, swimming pool and clubhouse as well as lacking landscape maintenance. Thank you for your understanding and support regarding this request. Please feel free to call or email anytime with questions. Scott Noriyuki (208) 230'-1202 5/24/2011