Agency CommentsCENTRAL
• • DISTRICT
WHEAL
D E PARTM
"To irnp
developing purtn
11-07T3
TH
ENT MAIN OFFICE • 707 N. ARMSTRONG PL. • BOISE, ID 83704-0825 • (208) 375-5211 • FAX 327-8500
rove the kealt/r of orrr communities by identifying sustainab/e solutions !o community lreaith issues,
erslrips for impleu:entution of strategies, and demonstrating our success tGrougb measurement of outcomes. "
August 15, 2011
Christopher D. Rich
Ada County Recorder
200 West Front Street
Boise, ID 83702
RE: Kingsbridge Subdivision Phase 2
Dear 1V1r. Rich:
Central District- Health Department .has reviewed and does approve the final plat for this
subdivision for central water and central sewer facilities. Finale-approval was given August 15,
2011.
Sanitary restrictions as required by Idaho Code, Title 50, Chapter 13 have been satisfied based
on a review by a Qualified Licensed Professional Engineer (QLPE) representing the City of
Meridian and the QLPE approval of the design plans and specifications. and the conditions
imposed on the developer for continued satisfaction of the sanitary restrictions. Buyer is
cautioned that at the time of this approval, no drinking water extensions or sewer extensions
were constructed. Building construction can be allowed with appropriate building permits if
drinking water extensions or sewer extensions have since been constructed or if the developer
is simultaneously constructing those: facilities. If the developer fails to construct facilities hen `
sanitary restrictions may be reimposed, in accordance with Section 50-1326, Idaho Code, by
the issuance of a certificate of disapproval, and no construction of any building or shelter
requiring drinking water or sewer/septic facilities shall be allowed.
Serving Valley, Elmore, Boise, and Ada Counties
Ada / .Boise. County Office
707 N.'Armstrong PL
Boise; ID 83704
Enviro. Health: 327-7499
Reproductive Health: 327-7400
Immunizations: 327-7450
.Senior Nutrition: 327-7460
WIC: 327-7488
FAX: 327-8500
Elmore County Office
520 E: 8th St. North
Mountain Home,-ID 83647
Enviro. Health: 587-9225
Family Health: 587-4407
WIC: 587-4409
FAX: 587-3521
Valley County Office.
703 N. 1st St.
McCall, ID 83638
Ph. 634-7194
FAX: 634-2174,
If you have any questions, please ca11327-8517.
Sincerely,
~-'".
...~
Michael H. Reno, R.E.H.S.
Supervisor
Land Based Programs
cc: Department of Housing and Urban Development
City of Meridian
BHH Kingsbridge, LLC
Landmark Engineering & Planning, Inc.
MHR:bm
G LEE SISCO
CHAIRMAN OF THE BOARD
DEREK VERMEER
VICE CHAIRMAN OF THE BOARD
PAUL J. DEVEAU
PROJECT MANAGER
TIMOTHY M. PAGE
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY-TREASURER
JERRIFLOYD
ASSISTANT SECRETARY-TREASURER
BOISE PROJECT BOARD OF CONTROL
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO 83705.3155
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL: (208) 344-1141
FAX: (208)344-1437
09 May 2011
City of Meridian
Attn: Jaycee Holman, City Clerk
33 E. Broadway Ave.
Meridian, Idaho 83642
RE: Kingsbridge Sub. No. 2
Nampa Meridian Irrigation District
New York Irrigation District
McDonald Lateral 08+50
Ten Mile Feeder 210+'70
Sec. 28, T3N, R1E, BM.
FP11-004, MDAll-004, VAR11-001
NM-1101-2-11,
NY-611-001-00
Jaycee Holman, City Clerk:
The United States' Ten Mile Feeder Canal and the United States' McDonald Lateral lie
within the boundary of the above-mentioned location. The easements for these laterals
are held in the name of the United States through the Bureau of Reclamation under the
authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain these facilities.
We assert this federal easement 35 feet north and 25 feet south of the Ten Mile Feeder
Canal's centerline and we assert 22 feet west and south of the McDonald lateral's
centerline and 20 feet east and north of the McDonald lateral's centerline. Whereas this
area is for the operation and maintenance of our facility,. no activity should hinder our
ability to do so.
The Boise Project Board of Control has many locations within the Project where our
asserted easements overlap property boundaries. It is essential to be able to enter these
easements on both sides of our canals, laterals, pipelines and existing facilities.
Therefore, the proposed fencing must be constructed just outside of the canal easement
and cannot be constructed so that it crosses the canal preventing ease of access for our
personnel.
The construction of any roadway crossings must be conducted only during the non-
irrigation season when the lateral is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities, which plan to cross irrigation facilities in order to service this development,
must do so only in accordance with the master policies now held between the Bureau of
Reclamation and each utility. In any case no work shall take place within the easement
before the proper crossing agreements have been secured through both the Bureau of
Reclamation and the Boise Project Board of Control.
Crossing agreements must be secured and signed by all parties prior to March 1St of each
year. A time schedule for the construction to be done during the non-irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March 15th of each year. However, on a case by case, overhead
utilities and utilities boring underneath a Project facility may be allowed after March 15tH
if reviewed and approved by the Boise Project.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into the live irrigation system is permitted.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statutes, Title 42-1209.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right to review plans and require changes when our easements and/or
facilities are affected by unknown factors.
If you have any further questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Sincerely,
Bob Carter
Urbanization Specialist- BPBC
bdc/bc
cc: Phil Comegys, Watermaster, Div; 2 BPBC
John Anderson, Nampa & Meridian Irrigation District
Velta Harwood -Secretary -Treasurer, NYID
File
~~~~
~la~a ~ z12ur~aK 9~gau~.~ D~a~cr
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
City of Meridian
City Clerk's Office
Jaycee Holman
33 E Broadway Avenue Ste 102
'_Vlendian, ID :83642-26? 9
RE: FP 11-004, VAR 11-001, & MDA 11-004/Kingsbridge Subdivision
Dear Jaycee:
Nampa & Meridian Irrigation District has no objections to the proposed changes to this
development providing all storm drainage is retained onsite.
There are two (2) irrigation facilities this project boarders and that are responsible for water
delivery within this area. These facilities are under the jurisdiction of the Boise Project Board
of Control. Please contact Bob Carter, Boise Project -Board of Control, at 344-1141 or 2465
Overland Rd., Room 202, Boise, Idaho 83705-3173 for any comments regarding these issues.
Any further questions, please feel free to give me a call at 466-0663.
Sincerely,
~~
Greg C. C1Aris
Asst. Water Superintendent
Nampa & Meridian Irrigation District
GC/dbg
C: File
Office
Water Superintendent-Anderson
Boise Project Board of Control -Carter
it ,
.. ~
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
9 May 2011
Page 1 of 1
Machelle Hill
From: Larry Strough [Larry.Strough@itd.idaho.gov]
Sent: Tuesday, May 03, 2011 9:11 AM
To: Machelle Hill
Cc: Pam Golden
Subject: FP 11-004
Attachments: img-503081207-0001.pdf
ITD has no comment on the enclosed notice.
Thank You
Larry Strough
334-8924
5/3/2011
CENTRAL CENTRAL DISTRICT HEALTH DEPARTMENT
•• DISTRICT Retum to: ~
HEALTH Environmental Health Division ^Boise
DEPARTMENT
^ ~9~
Rezone #
Conditional Use #
Preliminary /Final /Short Plat ~P /IrODy __
,,
v ..~i, i.4o dl/.s" : ~i~Se> yr .S`i~/ ~/o . L _ , .- > ~;~ `° ~ ;
^ Kuna
^ACZ
^~
`~
^1. We have No Objections to this Proposal.
^2. We recommend Denial of this Proposal.
^3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
^4. We will require more data concerning soil conditions on this Proposal before we can comment.
^5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
^ high seasonal ground water ^ waste flow characteristics
^ bedrock from original grade ^ other
^6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
^7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
®8. After written approval from appropriate entities are submitted, we can approve this proposal for:
I~central sewage ^ community sewage system ^ community water well
^ interim sewage central water
^ individual sewage ^ individual water
®9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
~. central sewage ^ community sewage system ^ community water
^ sewage dry lines ~ central water
~10. Run-off is not to create a mosquito breeding problem.
^11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
^12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
^13. We will require plans be submitted for a plan review for any:
^ food establishment ^ swimming pools or spas ^ child care center
^ beverage establishment ^ grocery store
^14. Please see attached stormwater management recommendations
~ 15. ~Ld~r.C s-vgnrr ,may s3y f.'!>L~oN ~a~-- Reviewed By: ~-s
i,~~f_.~-r,~.y fir,~A-rs ~o GDs~e Date: S/ Z /~
Review Sheet
15726.001EH0904