Loading...
Craft WarehouseHUB OF TREASURE VALLEY C ~ ,~ CaP~ MAYOR A Good Place to Live LEGAL EPARTMENT Robert D. Corrie (208) 288-2499 • Feu 288-2501 Cri'YCOUNCILMEMBERS CITY OF MERIDIAN PUBLIC WORKS 33 EAST IDAHO BUILDING DEPARTMENT I{~ Bird (208) 887-2211 • Fax 887-1297 T~,„y a~Wee~ MERIDIAN, IDAHO 83642 Cherie McCandless (208) 888-4433 • FAX (208) 887-4813 PLANNING AND ZONING City Clerk Off oe Fax (208) 888-4218 DEPARTMENT William L.M. Nary (208) 8845533 -FAX 888-6834 CERTIFICATE OF ZONING COMPLIANCE* Date:_Febru~y 19.2003 Owner: Developers Diversified Address: 1160 N Eagle Road Proposed Use: The construction and oReration of a 22,825 ~~uare foot Craft Warehouse store within the Meridian Crossroads Shopping Center on Eagle Road Zoning: I L (J ~,ht Industrial with an approved Conditional Use Permit to allow retail sales Comments: scope of Development: The issuance of this Certificate of Zoning Compliance is valid only for the construction and operation of a 20,825 square foot retail establishment located at 1160 Eagle Road, within the Meridian Crossroad Shopping Center. Approved Plan: The Site Plan, date stamped "approved" 02/19/03, are approved as submitted. Sienese: No new signs are approved by the issuance of this certificate. All new signs require a sign permit from the City of Mendian prior to installation. Temporary signs are prohibited, and shall be removed within three days notice. This property is subject to a planned sign program approved by the City of Meridian. All new signage shall be incompliance with the approved sign program. Parkinsa: Off-stmt parking is approved as depicted on the submitted and approved site plan(s). All handicap parking, signage, striping and ramps must be designed and constructed to current ADA standards. r~nditional Use Permit: The issuance of this permit does not release the holder of the permit from complying with all of the conditions of approval of the original Conditional Use Permit. Existine Ln~rovements: All existing site improvements shall be retained and protected during construction. Li t :All new lighting, whether attached to the building or placed within the parking area, shall not cause glare for or otherwise impact the traveling public or neighboring developments, as determined by the City. ACRD Acceptance: Applicant shall be responsible for meeting the requirements of ACRD as they pertain to this type of development. All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACRD requirements, a new site plan shall be submitted to the City ofMeridian Planning and Zoning Stafffor approval prior to the issuance of a building permit. Plan Modifications: The Site Plan is not to be altered without prior written approval of the Planning & Zoning Department. No field changes to the site plan are permitted; prior written approval of all changes is required. City's failure to specifically identify requirements in this Certificate of Zoning Compliance does not relieve owner of responsibility for compliance. The site plan(~stampe~,i O;J19/03 are approved with the comments noted above. ~~~u~' David McKinnon Planner II *Receipt of a Certificate of Toning Compliance does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, etc. This certificate shall expire one (1) year from the date of issuance if work has not begun. CTTX OF lyIERIDjAN Planuittg & Zpuing Dep i - ~C/~ b60 E. Watertower Ln., Ste. 202, Mee iD 83b42 {24884-5533 Phone / (208)88&, 6$5~'Fax (Section 11-19-1, Zoning and Development Ordinance) F1tOJECT NAME: APPLICANT:~~ c,/o AnDx~ss:. S, ,DEV~oPmF^1r` se,~ ,r ,~LaYSF,.. ~ Z GLG _ ...; Pr-~oNE: ~ 's~2 - s ,S?3~~ FAx:,3'~ 2' y9S- /2/y E-1~L: T~uu~''"s ~',oae~. corm _~ owl~l~(s) of R~col~n: ~ 6t o~etas ,~ivs,~srFi~ e.~~ ry ~ix~a A.iaDx.ESS= yss ~sr saa svr'ti ~~+,evev LevEZ S.~crL.~trr~- C/ry, yT ~s'i// ~/-.~63 -SS.SS" FAX: ~ - 3Cy-~F~~ E ;vI:A:IL - - - -. ARCHITECT {IF DIFFEI~,NT THAN .APPI.,ICANT)= ~~A ~ GtJ /~'~~/7Z='r75 .~i~C. ADDRESS:S`L6 3 Sou'~l+ ~o rnlrJe~eGe' 1~~¢. %77vRR~9~/, U.T S~Y~Q7 FharrE: gol, Z6G - y6~ 9 FAx: S~~ - 26 z -~ ~~ Z lrlviAiL CRR~i 9 ~1°~Aty -/~,ec~r`r~z~ . ADDRESS, GENERAL LOCATION Ok' SiTE: l ~~OD J/ Ef~6« ~o/9v -- I3ESCR]pTTON OF USL: ^? ~ g Z r ~ fir' CR.~FT ~y/~,¢E~s~'O+~s~' .5~~ W/7?i/N ~~°R.IO//AN ~ROS.r'~0 LAS .Sls /N ~ENt~iY. - PRESENT ZONE cLAS5TFICATION: Z" ~ GcJ~(,~,/o~risN.v~ v,~ Pe.~m/T" ~ do hereby affirm that I will agree to pay ~r_aadtional sewer, water.: ~r trash o ar8es, if any, associated with the uS~'• that Uwe have applied for, whether tlce use be residential, :that the Col~merciai ar industrial iII nature. Fvrtherm~, i have read the intormatian contained herein and certify iniormatian is true and correct.. __ _. (pp ~csnt's Signature) a~ L. /,3~ vu~~.t/s .~ ~.,~~E~ac~s ,Dives' ~ 2 ~ jo ~ 4r3 clx~~) ~tti, ~,•~ :"ll3 T.L.B. Consulting & Development Services, L.L.C. 400 S. Granite Way Boise, Idaho 83712 208-426-9695 February 10, 2003 Mr. Dave McKinnon Planning Department City Of Meridian 660 Watertower Street Suite 202 Meridian, Idaho 83642 RE: Meridian Crossroads Shopping Center -Craft Warehouse Building Certificate Of Zoning Compliance Application Dear Dave: Enclosed for your review and approval is a Certificate Of Zoning Compliance application for the new Craft Warehouse building being constructed in the Phase II area, within the Meridian Crossroads Shopping Center. Also enclosed is an updated master site plan and parking stall and tree count for the entire Shopping Center. Call if you have any questions. Thank you for your cooperation. Sincerely, Tom Bauwens Enclosures Cc: Mr. C. Trottier -DDRC w/enclosures Mr. J. Blair -DDRC w/enclosures Mr. C. Ames -PGA&W Architects w/enclosures W 0 0 0 w 0 0 0 0 N Eagle Rd C C~~ W 0 0 e,. $ Y~~ ~° i I~ --- , w'•wi :`::i~r".'.", :I I aI < aI c g g~~~ ~ sadoassoao Nviaiasw ~~~ ""° Q z` ~~~_- ~SfIOH~~JdM l~b'~I~ I i ,::~:P~, _ , I ~ ~m ~~ ~ o ~ ', ~ ~ 'orn 'anoao arm aru• ~ ~~ •-i m 114 _ ~~ ~~ ~` i=f I ~ ~ g ~~ _ _' c - - _- - _ _ 3E[ E fr 1:~ _ ?:A~, n ~~ __ - -_ _ - _--- `3c _ L - ''cE ~ M E - a 5 > '- c r. _ _ - _ - 5 E k W € c _ Q _ _u~io 9 YE - ~ -- '-=B~K -= y4 a.6- y_ w - _ - - ~E `_ _ - __ __ U 3, E ~ E ~oaEfr °z s° - ~ --3 3 €a Q ~E ~' ~ - ---- ~-- ~_ --~- E_~.__. Ox ~~~~b ~~wa .Hs~~~g '~p" ~~ oui o WP~~,. w~.~ Z~ --_ ~A .~F J~._ ~~ ti'C- - - ~~: *il 4, ..---__ ~ 7AL' -__# ~ lr ----- ~ ~~ ; i~ _-- ~ Z~!~.~ i -- - ~ ~~ _ _ ~ I. ~~~~~_: I_~, ±~ ,~ ~~~ r=~,i; ~~ ` p ~ I" '~ i j ! I 1 ~ I J ' ~ `r ~ , 4 ~ I It ~ ~e ~ 1 4 ~ '.f ! 7 .rL ° l II,, I ,4 ~ k~.l~i ;~ ~ ~~~ ~`al i~, j -- - - ~ -- - -- i i ro1'~~-' ~ '. ,~ z J zl ~ 'I III ~~ Q, J ~; ~ ~a~ ~ a ~ ~~ L .. ~ i ; ~o ~'y cv Y a St / ~~ 3x ~~ y ~x ~ o i op r / ~ ~ ~ ~ o m =r ~ Q Pa Cn~ i~e ~ te, ~' ~n-. - ~- -- - w w ~ ~ . t ~~r `~~ a~~ ~ e ; I ~ ! f= ~ , 1 i. f~~,~ - ~ J ~ ass rg ~1 , a ~~~3 ~1.~ J ~' ~ ~ ~y w,~ ~~_ x ~~ itwg-3 ~ ~' F- g ~u a m x~G u~.Y ytW ~ . Y~ ~ Y:VL+qY I,'~ I•, ~ ~. o ~ ' ~~i F ~i W O 1, N W Z I I _. a it 11 "i ~~ ~ J r J Q W :.. ~ i ~1 i- ~ C7 Z r; ~ r~ n.l _ J ~ J { w p] ~ ¢ r ' ~ t ~ ,: Q uuwvxnr ro Nd sonau caoaicaiao uwp ac-iei ,oZ - ,t XY1 seoo-ric (WLI 31DItl tr0o-srC (WL1 3YWN 31Li ONNIVt10 'ON 19'Otld mnv ww 'ape 90S NN@ VW YIroB AOY 0~ NYNNYIII •~ U ~ '6 U !}~ n S U 0 ~ NVId 3115 7Y1111YHl1S JNINOZ !0 31YJIjllM3~ ~ ~uoap~n~:: 2131N3~ 9NIddOHS SOVO?/55021~ NVIaR13W ~~ ~ ~ro 3S~OH321t/M l~t/210 '"" ~"" ;~~ ~~ i;, -=- ~ ( -_ _ ~ ~ ~„ a N~ ~ ~i ~ j ~ w} '-'-' ~ a ° a, z '~. , / J ~~.ye ~ ~N Z R ~ i ~~j ~ ~ - ~OJCAQg$m~a. z~-.-Q ~ e S~ p~ /~ wWw~s~aLL~ ~ `9 Q ~ § ~~ ~ a E r ~ g~~~ ~ $e N Hi A - N06NgBf16 SaVO .., x....~ A1Y3d0 =~ - - i _ r / ~ - ~ ,. /. _.. - .,_..-...-. n ~ . -.,.-. , 0 ,~ ' 02f:,; 2003 4fi: 30 FAQ 20888813854 MERIDIAN P&Z DEPT. ~uu~ YtGA4TYC`N ~'IE~U~C~ SPEC~TI~,t~TIONS PER ORDINANCE ~,2-13-5 NOTF_: submit 3 copies of this completed form wish any a,~Flication for Cerlificact~ of Zoning C~i-+Qliarrce (CSC). Project 1~a,oc~i: /~~C //~~ oss~ os' S/5'` iv CE'.v'zr~i Sge~.itpcr~as: _ ..... .... ... ZOO _. . _ ._ :~eail~ie Grelions per lyrnnute: ~- Available Water Pressure: _ 7~ ~S~ ' point oft ;onnection (descnbe and/or submit a site plan): I~il ~ vATt y P " Connection: - m=' .D 3'~,eov Seto ~ Co ~ / /A Tt W v.. ~.~'' ~ ~ S~ o.v Lavds~ape Area: If the irrigation system is hooked to City water ds a prana,"y ar secondary h;csr~r sora~ce, submit the .square footage 4f landscape areas to be irrigated: /V s.~ Fsa w Prp ention ~ Ordinance 9-3. A hacl~ow sevention devicx, must be installed ss uired by City C.lo ver e irrigation system must be designed to provide 100% cavezage-with head to head[ spaciu~ or uiangulaz spacing as apPzopriate. l~tc red Precipitation Rates. Sprinl+:lez heads pnust have matched precipitation rates within each control valve circuiC. ~gaiYOn Zones Spci~akler heads irrigating lawn or other high-water-demand areas must be circuited . so that they are an a separate zone or zones from those irrigating trees, shrubs, or otb~er reduced- watex-demand areas_ QtiTersvraS ~p~der heads must be adjusted to reduce overspray onto impervious surfaces such as sidewalks, drivevvags, and parking ~- .. :. U.'5::.•u/EUU;S 05:3J t'A1 LUtftStirit3~f54 ffir:1{11.~iA1V Y&Z DEPT. Acl:~Qe~aual lC~igst~ion Notes: Ig OU5 7rngadoa3 , AJl iands~ape areas regulated by tl~ City landscape 4rdinauce (12--13) shall be served with an auwc underground irrigation system. Additional requirements a$ectmg presswri~d irrigation systems can ~ found ~ City Ordman~ce 9-I-28. Irri~atior~ W Source Usa of ran potable irrigation water is required when determined to be available by the City Public VJarks Department as regulated by ~ .4rdinance.9-I-28. Yf city potable water is used, a separate water meter is recommended so the owner can avoid paying sewer fees for irririgatiou water. Potable water-shall not lye used as a Primary irrigation water source on noon residential lots with more than '/s acre of landscaping. Year round water availability is also required by conz~ectina to city potable water or anon site well as a secondary source. Cek-tiuFru~~on: r ~~ L, a vKl~ •/ S do hereby alum that any ~n system installed for the projzet n~nxiowed above w~l be desig~d a~ in cam with the specifications and motes stated in this form. A~rpli~nt's Signature ~~ ~c v~~r.~r~aeas ~~ v~s~~F~-v aeq~ry ~aXP• z/~a fi 3 Date _ .. _ _ .. ~`dfi~s~ VU~7 O/yC " Ada County Highway District Sherry R. Huber, President 318 East 37th Street Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellus@ACHD.ada.id.us March 11, 2003 RECEIVED TO: Developers Diversified Realty Corp. C/O TLB Consulting Development Services, LLC MAR 13 2003 400 S. Granite Way Boise, ID 83712 City of Meridian City Clerk Office SUBJECT: MCZC03-008 Craft Warehouse 1160 N. Eagle Road The Ada County Highway District (ACRD) staff has received and reviewed the application and site plan for the item referenced above and is submitting this no review letter in response to the lead agency's request for comment. Based on the submitted information, it has been determined that planned improvements adjacent to the site have been approved by ACRD. Attached is a copy of the "plans acceptance" letter for the subject site. ACRD has no additional site improvement requirements attributable to this application. ACRD policy requires that before any improvements of any kind are constructed or installed within the public right-of- way, apermit orlicense agreement permitting the improvements must be obtained. All future design plans and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Ordinances unless specifically waived in writing by the District. Meet District drainage requirements per section 8000 of the ACRD Development Policy Manual. Contact District staff at 387-6170 for details. Please contact the office for determination of possible road impact fees, prior to obtaining a building permit. These fees are collected in accordance with Ordinance #197, the Ada County Highway District Road Impact Fee Ordinance. If you have any questions, please feel free to contact me at (208) 387-6170. 'ncerel , Craig d Senior Development Analyst Planning & Development Cc: Planning & Development/Chron/Project File Planning & Development Services ~eridia~ Construction Services PGA & W Architects, Inc., 5263 S. Commerce Drive, Murray, UT 84107 • • w 0 0 M II r ~_ .?' ._ C t~- ~ p2i alBe~ N 0 0 m 0 0 M O O O M ~ Ada County Highway District Sherry H. Huber, President 318 East 37th Street Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellus®ACHD.ada.id.us February 26, 2003 T.L.B. Consulting & Development Services 400 S Granite Way Boise, ID 83712 RE: MSPR-03-03 / s/e% Eagle Rd and Fairview Rd Intersection (Meridian Crossroads) /Crafts Store PLANS ACCEPTANCE The District has reviewed the plans for the above referenced project and they are accepted for public street construction. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The District will assess the following impact fee for this project. The impact fee must be paid prior to issuance of a building permit. Total Impact Fee Due: $26,240.00 Effective July 1, 2002, the Ada County Highway District amended its development impact fee. ordinance, in accordance with House Bill No. 607. As a fee payer, you may be entitled to an additional credit on your impact fee assessment and a corresponding reduction in the impact fee itself. Application for this credit must be made at the ACHD offices. Standard Requirements: 1. The District requires a set of stamped construction plans that are signed, dated, and approved by the District to be located on site at all times for inspection and reference purposes. 2. Utility street cuts in new pavement less than five years old are not allowed unless approved in writing by the District. 3. All required street improvements shall be completed and inspected by District staff prior to receiving occupancy. Variances and waivers to this requirement must be specifically and previously approved by the District in writing. 4. All irrigation facilities must be located outside the public right-of--way unless otherwise approved by the District in writing. 5. Replace any damaged or broken sidewalk, curb, and gutter with new curb, gutter, and sidewalk to match existing improvements. 6. Replace any cracked or damaged sidewalk, curb, or gutter resulting from construction activity. 7. All facilities to be constructed with a proposed development, and to be owned and maintained by the District, must be constructed according to the latest edition of I.S.P.W.C. and the District's Supplemental Standard Specifications. 8. If applicable, submit to Idaho Department of Water Resources a Shallow Injection Well -Notice of s Construction /Inventory Form at least thirty days prior to construction of the facility. The District will require a copy of the completed form prior to granting of final occupancy. 9. Any work in the public right-of--way requires a permit from ACRD Construction Services. 10. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. If you have any questions or concerns, please feel free to contact me at 387-6181. Sincerely, .~~,~° Scott Rudel Development Review Division MERIDIAN CROSSROADS PHASE 1 CONDITIONAL USE COMPLIANCE REQUIRED PARKING COUNT 3-IN DIA BUILDING AREA PARKING (EA) TREE SITE PLAN (SF) COUNT COUNT (EA) TOTAL STANDARD COMPACT HANDICAP HANDICAP-VAN (EA) ORIGINAL CU SUBMITTAL 616,418 3,082 3,052 2,991 - 54 7 830 SHOPKO PLAN SUBMITTAL 614,203 3,071 3,055 2,992 - 56 7 830 SHOPKO & TEXAS ROAD 613 447 3,067 3,057 2,994 - 54 9 830 HOUSE SUBMITTALS , SHOPKO & TEXAS ROAD HOUSE, 1-G, 1-H 8 1-I 613,505 3,068 3,057 2,994 - 54 9 830 SUBMITTALS SHOPKO & TEXAS ROAD HOUSE, 1-G, 1-H & 1-I 559,945 2,800 3,011 2,932 - 66 13 865 SUBMITTALS, SPORTSMAN'S WAREHOUSE SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, 556,746 2,784 3,017 2,937 - 68 12 864 SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, 558,016 2,790 2,999 2,919 - 67 13 864 SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, 557,715 2,789 2,997 2,917 - 67 13 864 SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, 555,262 2,776 2,983 2,904 - 66 13 873 SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & 555,729 2,779 2,988 2,907 - 68 13 873 BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S, CARL'S JR. FILENAME: MC CU COMPLIANCE22.xls QUADRANT CONSULTING, INC. TAB: SUMMARY PAGE 1 OF J PRINTED: 2/5/2003 REQUIRED PARKING COUNT 3-IN DIA SITE PLAN BUILDING AREA PARKING (EA) TREE (SF) COUNT COUNT (Eq) TOTAL STANDARD COMPACT HANDICAP HANDICAP-VAN (EA) SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAW, 1-I, SPORTSMAN'S WAREHOUSE , SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, 555,021 2,775 2,986 2,905 - 67 14 873 APPLEBEE'S, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, PANDA SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAW, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH 8 BEYOND, OFFICE DEPOT, 554,422 2,772 2,984 2,903 - 66 15 873 APPLEBEE'S, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, PANDA, ROSS SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAW, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, 554,819 2,774 2,981 2,882 18 66 15 873 APPLEBEE'S, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, PANDA, ROSS, GOODWOOD SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAW, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, 554,819 2,774 2,958 2,875 3 63 17 873 APPLEBEE'S, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, PANDA, ROSS, GOODWOOD, SYRINGA BANK SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAW, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S, 546,530 2,733 2,946 2,863 3 63 17 873 CARL'S JR., MACKENZIE RIVER PIZZA, PANDA, ROSS, GOODWOOD, SYRINGA BANK, FASHION BUG, MARSHALL'S, PEDERSEN'S, ALL-A-DOLLAR SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAW, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S, 546,490 2,732 2,948 "2,844 "23 63 18 873 CARL'S JR., MACKENZIE RIVER PIZZA, PANDA, ROSS, GOODWOOD, SYRINGA BANK, FASHION BUG, MARSHALL'S, PEDERSEN'S, ALL-A-DOLLAR, BAJA FRESH FILENAME: MC CU COMPLIANCE22.xls QUADRANT CONSULTING, INC. TAB: SUMMARY PAGE 2 OF 3 PRINTED: 2/512003 REQUIRED PARKING COUNT 3-IN DIA SITE PLAN BUILDING AREA PARKING (EA) TREE (SF) COUNT COUNT (EA) ,TOTAL STANDARD COMPACT HANDICAP HANDICAP-VAN (EA) SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE , SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S, CARL'S JR., MACKENZIE 545,796 2,729 2,947 "'2840 "'26 62 19 873 RIVER PIZZA, PANDA, ROSS, GOODWOOD, SYRINGA BANK , FASHION BUG, MARSHALL'S, PEDERSEN'S, ALL-A-DOLLAR , BAJA FRESH, JOHNNY CARINO'S SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S EXPANSION, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, 546,380 2,732 2,949 2,842 "'26 62 19 g73 PANDA, ROSS, GOODWOOD, SYRINGA BANK, FASHION BUG, MARSHALL'S, PEDERSEN'S, ALL-A-DOLLAR, BAJA FRESH, JOHNNY CARINO'S SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S EXPANSION, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, 546,380 2,732 2,949 2,842 "'26 61 20 g73 PANDA, ROSS, GOODWOOD, SYRINGA BANK, FASHION BUG, MARSHALL'S, PEDERSEN'S, ALL-A-DOLLAR, BAJA FRESH, JOHNNY CARINO'S, P-7 SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, APPLEBEE'S EXPANSION, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVER PIZZA, 494,129 2,471 2,942 2,835 "'26 61 20 875 PANDA, ROSS, GOODWOOD, SYRINGA BANK, FASHION BUG, MARSHALL'S, PEDERSEN'S, ALL-A-DOLLAR, BAJA FRESH, JOHNNY CARINO'S, P-7, CRAFT WAREHOUSE NOTE: CITY OF MERIDIAN REQUIRES 1 PARKING STALL PER 200 SF OF GROSS BUILDING AREA. "NOTE: COPAPACT PARKING STALL COUNT REVISED TO INCLUDE ALL PARKING STALLS THAT MEASURE LESS THAN 9' X 19' INSIDE DIMENSIONS, STANDARD PARKING STALL COUNT REDUCED TO REFLECT CHANGE (4/25/02). "'NOTE: THREE ADDITIONAL COMPACT STALLS ADDED DUE TO AN ARCHITECTURAL REVISION MADE TO BAJA FRESH BUILDING, STANDARD STALL COUNT ADJUSTED ACCORDINGLY (7/15/02). FILENAME: MC CU COMPLIANCE22.xls QUADRANT CONSULTING, INC. TAB: SUMMARY PAGE 3 OF 3 PRINTED: 2/5/2003 W H 2 W ,U^ V Z a a Q Q G ~ ~ LL (~ W d °a a a O = LL O.' d u C U Q ^_ W D N O N O q n N 0 0 Mb A OQ f ~ N COD r pml A~ ~ V ~ tpp N O A r N O m Q ~ W N M b 'V' ~ O ~ r O m R b eF + t"y O N O N b t• G ^ N ~ O CO N CO b r W m M^ H !•l N O W N M b N Q ~ C ^ tD p1 ~} O f N^ 4D trl' M m tN.. O a ^ J h1 ~ N e~ V a O V W N b N N ' N A N O O b ' ~} ~ ~ N S Q W ~~ O a } '~ b tNry O ~ W p O H p a M o Q b M tQ0 N ' y N p) V' b S {7 O N O N 4D O N E O tp N N vy r: W ~ M N P! N d' W N M b M O aD O ^ m f O O ' N b nl M b C D try tp" a D Q~ S O ' N P b 7 N N V N A b (~ N b O O eMp M O N ~ ' ' r N O 0 m N Q N m py m M r r< M O N m O W aa O N b M b N O M O W O b r Ol r O pl ' N N O M 0 m try p o Q b N t R ^ O M O N VD ^ N ri O ~ N O M CO tCl N r` ~(> h tr! V N N O ^ 4D V VD a7 b tp a J ^ O a Y1 W aD M t b N ND lbrl O V W pry N tNp y NO tMtpp M O ty r ~ 7 r « r N O m Q N {p t m +~ r r~ O N 01 y O O r b N M 0 n Ory N O pbj f. p~ pp O ~ N ' N V ~ O N VD C N M O W N N ' W p M N M tt W N' r lp V V W O ^ V1 m O l N D M M b r j a n y 0 ~ tmO t7 N INCI m M N Q n m N b ~mOy N {Mp S N ' V ' r O 0 N tf N b m M~ M O O Q O O n b N O S O b N 0 S N O p m p~ Y 1 }} p N ' N O ~ O ~ b G M S OD' F A O D Q l ^ (j lrl N V C D tV eF V ^ to V O h t+f C 'y b ' V tp' a a G b M N N N A N O O tMp ' c ~ r O O N tl' b M 1~ r O O O O m N O b r O O N p H ~ b M Q ' V N m V' b M O N O b W N W t ry ~ h i N ' m N r I p C ? O p l O E M tMjy ' p a O t D N ~ N C N S N r ~ v V Y O ^ V V A M b tp ~ I ~ O F m b M b N N b b M O m V m r m N N m b N M O O b M O N r 'R " r ' r N O V aa00 O O O b b C m W y r r M M 0 N 0 m 0 0 r b C N O '~ O b r O O O m N 0 O N m ~ V 1 C D N ~ r Q {}} { ~ N m O N M m N ~ V Y ^ 1 M V W N r b V O m O ^ b p1 V O '- A M M try b y pa ~ 7 My t C S N H b n N O O m ~ y W N b M r 0 0 0 0 N O b O O N py V yby M ry ' < N O 'st b ~ M O N ~ H m ~- N ^ O C O ~ ~ H !7 N O W N T Imo O R V i O ^ CD prl V O r t r l Ory m d 0 ~ t ~ 0 N M N ~ n b b ~ W ~' A N N M N O n Ol N b ~ty+y 0 0 {p M 0 N AA A pp b N p O O q W A lrry M ~- O N S m A 10 r b C M O ? O h 0' O m p '~ O 1 yy p N ~ ~ ~ M ~ N m O N M N a N t•1 V N V V ^ b pl V O A a7 M Cp b ~} a ^+ ~ y N O p Q A N N p W b r N N b N O O b r ~ V r ~ O b b T b r ~ O O m O O r b N O M O b r O O 0' N O N ^~ as a O a v N bN ~ N V ^ v ~ O N b ^N A o l0 N O t'y O m vi a 0 vi O N O V ^ to . i r th b a Yf ~ ~ ~ b 0 W o l m b h m N N b M po W N r Q A N t N b p N {ry 0 0 fp M O {~ r r ^ ~i N b M p m b b y r m m r M 0 ^ N 0 W m 0 0 r b r C N O M O b r O O O N N^ O N I- Q p o 6 .- V pp b N, ' N V ~ O N m O N Cr0 p V ^ !•1 O N b 'Q V ~ O ^ tti m O V r ^ trl M p b~ N W b N b N b O m b r N N N 0 N M 0 b r r V b M b b O r r M 0 0 m 0 0 O b O O N m M b M p py b M 0 N ~ N W W T ^ ^ N m r 0 r N O O r o A O t(t ^ O ty M r p m p }} Q 1 0 N ' N V t ~ +~ O N m o N W by ? Nl O N O h ~ b O I ~ M b yj ~ b N M b ~Nfl M op 1f e 9 A r Ot N O b M O Cm9 O N ~ ^ ~ N m 00 T n W W M ^ A r m m ~ O r N O O n O W O N ^ O b M pp O~ tmV ,~ V ~ 'O tmV m O N arD a V di t+l N V f•• ~ VD O A M b N 6 u~ ~ _ N b 0 W t mp N N pp b (t n ~y N O O lorry ~ ~ M O ml n S n m ~ 0 O A O N O m OQ N a w t ry b Q~ M ry C ' O V N 7 D M ~ O O N N b ^ o N H W ~ m N ~ a b } N r M m N r N V r ~ O O 1D O Q A ^ M Ol b ^ r N l] 0 W b b N y b N b M O y o m t r f py N ~ m N 0 b M N b 0 M O N r r ^ ~ N b M w W b b r p C N y b 0 r 1: m W O O r 0 r N O r O r O N O 0 O oo N N O ~- M ~p p Q ul 0 0 V m to N ~ N V 0 O ' N tD r• tD r N O N M N' O f` ~ {p N n Cl b eo ?~ ^ M ^ N O N m y N N N pp m A ry N O O ~ A y b imrl S A T O A O O O n O S p W tm w] b try V ' N m O b M O O N m ^ N W W W b f N C r m l D m N f ~ O N p O M ~ r p try ~ ~ O ID N ~ N O N Cr0 bQ o tr N C I ~ t0 Y 'i I~ t+f b tp N m b N 1ppp~ O r W b b O O O O O r O O N b 2 N N Q O 2 M W O yp lrJ N y O N~ n ~ b N N m ~ r N W T N r am D N O n O N O ~ {O~ y Q ~i0 'tl ' b N ~ P M O O V O N M N wi lD N A of b pi y F W ~ ^ b m a~ a ,~ 3 CW F 2 tm MM p N b N M N o O p f O Mi ~ y u b O p: N ~ v b b S ^ n O m f N r W r m O O y N O r O N O O N O ^ M y 0 O J a a p Q yy 1p ry ' N N 0'l• ~ N m p CND ' ' ' ` t N trf N of A~ ~O N A !•1 b y y ~+i ~ U J a 10 N N 10p O pM O j N M N O T O o g O b b ' b r 0 m 0 0 r m O 0 o 0 O r o r 0 o 0 0 m Z f C7 D] M V b iQp M tbt) t e r } O r 1r+ m 1 ^ N m N C h ~ t9 ' S m O m N r m !•1 N b N t'1' r ~ O N ' t0 N O P N tr! r O b Q ~ y O iD p a a. m Y U Q 'i LL g T T 7 Y J ~ f 2 Q a N M Q ad b ai mi r C0 m 0^ a a aaa aa ~ 4a W O y ~ U J Q J O f^~y W y Z ~ ~ Q d a ' U C'J d W N W O p O N S m f LL J Q N m y ~ y Z Y Z W W J 3 ~ F ~ t/Q ~ ~ f/Q p~ Z ~ W f Q ~ ' W d W N X ' W Q yQ K F j Q W Q W y W O O ~ F S yyu .m W W } U' y QLL W O dr O K O LLN y d' 00 0 p 1Ka d UOZZ ~~ = K ~ U m ~ OLLN a Qr aN d~ Uro p , ~a ~ ~ y ~ y OK 1 i L (7 Q Q = ~= ti e ~'a 3u~ a 'a u~ 7 a u s ~~ MERIDIAN CROSSROADS PARKING SUMMARY SERIES TOTAL H/C H/C-V COMPACT STND 1 10 10 2 g 6 SUMMARY TOTAL H/C H/C-V COMPACT STND 2,942 61 20 26 2 835 STARTING Qa PRESIDENTIAL 8 WORKING GENERALLY CLOCKWISE ALONG EAGLE IE OF GOODWOOD BBO RBY'S EXTENSION i, N-SIDE & CLOSING TO START EXTENSION, N-SIDE 4RL'S JR. CARL'S JR. 3AJA FRESH 3AJA FRESH JA FRESH AP NW, N OF FLORENCE AND W OF 2' ISLAND SECOND ACCESS RD, N OF SHOPKO FAIRVIEW FAIRVIEW FAIRVIEW RD Q MATCH B 8 N OF STORES RD Q MATCH B & N OF STORES JNY CARINO'S =AIRVIEW FILENAME: MC CU COMPLIANCE22.xls TAB: PARKING COUNT PAGE 7 OF 2 QUADRANT CONSULTING, INC. PRINTED: 214/2003 75 32 32 76 20 20 77 4 1 3 78 46 46 79 44 4 40 80 6 6 81 30 30 82 50 50 83 32 32 84 12 12 85 6 2 2 2 86 46 46 87 44 3 1 40 88 46 46 89 44 4 40 90 46 46 91 44 3 1 40 92 46 46 93 21 21 ' 94 37 37 ' 95 37 37 I 96 12 12 97 3 3 ; 98 8 8 99 16 16 : 100 16 16 : 101 16 16 102 16 16 ; 103 16 16 ; 104 12 12 105 10 10 106 18 18 107 10 10 108 20 20 109 20 20 ; 110 29 29 ; 111 7 7 E 112 16 16 113 22 22 E TOTALS 2,942 61 20 28 2,835 PARALLEL TO FAIRVIEW PARALLEL TO FAIRVIEW WEST OF 1-P 10 W OF THIRD FAIRVIEW ACCESS E OF THIRD FAIRVIEW ACCESS PARALLEL TO FAIRVIEW PARALLEL TO FAIRVIEW PARALLEL TO FAIRVIEW rXRDHS_REV1 fXRDHS_REV1 N OF RECORDS OF SPORTSMAN'S & W OF RECORDS =SIDE SPORTSMAN'S WAREHOUSE i OF SPORTSMANS'S WAREHOUSE i OF 1-M AND 1-N i OF 1-M AND 1-N i OF 1-M AND 1-N i OF 1-M AND 1-N i OF 1-M AND 1-N i OF ROSS i OF ROSS i OF ROSS i OF OFFICE DEPOT iOUTH OF 1-J (SHOPKO) iOUTH OF 1-J (SHOPKO) iOUTH OF 1-J (SHOPKO) iOUTH OF 1-J (SHOPKO) LOUTH OF 1-J (SHOPKO) :AST OF 1-E LOUTH OF 1-E :AST OF 1-D FILENAME: MC CU COMPLIANCE22.><Is QUADRANT CONSULTING, INC. TAB: PARKING COUNT PAGE 2 OF 2 PRINTED: 2/4/2007 1=~s - "~ ""'~~'' Ada County Highway District Sherry R. Huber, President 318 East 37th Street Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellus@ACHD.ada.id.us March 11, 2003 TO: Developers Diversified Realty Corp. C/O TLB Consulting Development Services, LLC 400 S. Granite Way Boise, ID 83712 SUBJECT: MCZC03-008 Craft Warehouse 1160 N. Eagle Road The Ada County Highway District (ACRD) staff has received and reviewed the application and site plan for the item referenced above and is submitting this no review letter in response to the lead agency's request for comment. Based on the submitted information, it has been determined that planned improvements adjacent to the site have been approved by ACRD. Attached is a copy of the "plans acceptance" letter for the subject site. ACRD has no additional site improvement requirements attributable to this application. ACRD policy requires that before any improvements of any kind are constructed or installed within the public right-of- way, apermit or license agreement permitting the improvements must be obtained. All future design plans and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACRD Ordinances unless specifically waived in writing by the District. Meet District drainage requirements per section 8000 of the ACRD Development Policy Manual. Contact District staff at 387-6170 for details. Please contact the office for determination of possible road impact fees, prior to obtaining a building permit. These fees are collected in accordance with Ordinance #197, the Ada County Highway District Road Impact Fee Ordinance. If you have any questions, please feel free to contact me at (208) 387-6170. 'ncerel , Craig d Senior Development Analyst Planning & Development Cc: Planning & Development/Chron/Project File Planning & Development Services City of Meridian Construction Services PGA & W Architects, Inc., 5263 S. Commerce Drive, Murray, UT 84107 • O O M II ~- .?' .~ .v- P2i alBe~ N 0 0 m 0 0 M O O O M ~ ~ ~~~ Ada County Highway District Sherry R. Huber, President 318 East 37th Street Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellusC~?ACHD.ada.id.us February 26, 2003 T.L.B. Consulting & Development Services 400 S Granite Way Boise, ID 83712 RE: MSPR-03-03 / s/e% Eagle Rd and Fairview Rd Intersection (Meridian Crossroads) /Crafts Store Pi,ANS ACCEPTANCF. The District has reviewed the plans for the above referenced project and they aze accepted for public street construction. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standazds. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The District will assess the following impact fee for this project. The impact fee must be paid prior to issuance of a building permit. Total Impact Fee Due: $26,240.00 Effective July 1, 2002, the Ada County Highway District amended its development impact fee ordinance, in accordance with House Bill No. 607. As a fee payer, you may be entitled to an additional credit on your impact fee assessment and a corresponding reduction in the impact fee itself. Application for this credit must be made . at the ACHD offices. Standard Requirements: 1. The District requires a set of stamped construction plans that aze signed, dated, and approved by the District to be located on site at all times for inspection and reference purposes. 2. Utility street cuts in new pavement less than five yeazs old aze not allowed unless approved in writing by the District. 3. All required street improvements shall be completed and inspected by District staff prior to receiving occupancy. Variances and waivers to this requirement must be specifically and previously approved by the District in writing. 4. All irrigation facilities must be located outside the public right-of-way unless otherwise approved by the District in writing. 5. Replace any damaged or broken sidewalk, curb, and gutter with new curb, gutter, and sidewalk to match existing improvements. 6. Replace any cracked or damaged sidewalk, curb, or gutter resulting from construction activity. 7. All facilities to be constructed with a proposed development, and to be owned and maintained by the District, must be constructed according to the latest edition of I.S.P.W.C. and the District's Supplemental Standard Specifications. 8. If applicable, submit to Idaho Department of Water Resources a Shallow Injection Well -Notice of j P Construction /Inventory Form at least thirty days prior to construction of the facility. The District will require a copy of the completed form prior to granting of final occupancy. 9. Any work in the public right-of--way requires a permit from ACRD Construction Services. 10. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. If you have any questions or concerns, please feel free to contact me at 387-6181. Sincerely, G~..~+° Scott Rudel Development Review Division -- APPIEBEE'B -- GOOOWO00 PANDq E%PRE56 I BARBECUE CO. MBY'3 CARL'S JR. MACNENZIE RNER PIZZA CO. RAJA FREBH NORTH EAGLE ROAD ~ it I' a ~ u_ ~. F'~'''I'''',, y .. 1 I -' RIII111~ ~ P" I1 P6A,I L_I .. m 7.1 H m n O pi 1 m ~ q.. I N ..__...... _ _._ ~ e~J '..m- I~'I I I b... „~~ o ..~ I lml_ L' ~ ~ I I -- ` IP lows sF ~Illlllll~jjj~il (I (j 111 ~ t~ ~ pA FUTURE RETAIL I ~~gh m'*~mIiM V~IIIII~NIIIII rI~1J1U Z `4 1J: AP SF ~ FUT'RnPRETAIL I11111•n ~nEN ~~~ti 7n I ~ i yy ^~O I'1II1111111111U ~~ I ~..... O~ ~~} '~~~~1{I{ICI'II''~I(~I'II'II''~~'~{''II''~{n' / I(W~(TITVtTIITII'1TI1F1'~I11''I~II II II ~I}I}I~I ~I}~IM(V~~ / I I 8.261 BF i I ~---_ 1J V""x""'11'1111111 LJ i 1 1, ~~. I ~I ~~. VVIYI 11111111111 I I I I I I U I ~ 11i I1111111111111111111V .. ..... ... .... ~ • VYw•11111111I1111111111V ~~;~ ~ n~ninnnnnnnnun :. . ~ $~~ DI ~ I -- ~ ._ .1I _< ~ ,..~ A $~* VIIIIII IIIIII III +~ M1~~~~~~Lu11~~~ m - ~~~~~~~~ If~TTffITTrfff~lTIIIITfU \ Z ~ ~ g. ~ m o ~ < ~ - I ~AlfTfffl ~~~~ 11~drrTllllllU I~TI711Tt1 _ ® m = , o~ v O x r V! O ~ FA6HION BUG ~ •~ n Y / /r^^ o ® a o - _ rn 1 " ~~ u~ ~ ~ ~ \\\\ .._... ~ 603]Sf I WL'~IIIIIIIIIIIIIIIIIILf ~ N • • ~ ~ N~ .... ~I.LLIlL~ PEOFA6EN3 I ..... ~III1I1IIIII1'IIIII'IIn ].U1J SF 11111111111111111~IIIII IIU Z ® I ~ uL aooLIAR+ ~(~~fMMI~d}'~I{I}I1I1~1IIIµ11}1µII~ ... +c sn6 Gr ~1'I1IIIII IIIIIIIIIU ....... .. I O ~~ WIIIIIIIIIIIIIIII IIIIIU u I„ m _ __ _ I ~ °~~' ~~ b ~ ~,I I I I~ I I I :IIIIII l ~I° > I~TITfTmRTT r ',ICY I r,- ' - ~ RECORDS AVENUE ~-e-»Z ~~, r....__. _~...... ,1,~.,,1 In ~nl'~nl lul.ll. ~.III,~, lEll MLLE ~ ~~ Q ~ v -I r -~ -~ 1T1 m mmm_-• Z < L~R ~ mDVDiDc ~ s zZrnz m n NE61R,N1 3 1- v o v, Z LDEUST GRBVE Z Ul (A ~ Z ~N.E 1 ~O~Dm J m v• AZ II ~ ELDVm96LE ~ FNENRE m m ~1 ~ ~ m ~~ ~ ~~ ~ 6aPLE c9BVE ° T ~ ~ µ m _ n y DESIGNED BY: CHECKED BV: J DRAWN BY: NAN MERIDIAN CROSSROADS ^^ o~ DATE BY RENBION cN'D APPR. COMPLIANCE WITH CONDITIONAL USE PERMIT ^~Quadrant BUILDING FOOTPRINTS AND PARKING C o n s u Iti n g, I n c. MERIDIAN Ip w9 SoutA 91n, Sell. 293 SCALE: PROJECT N0. DRAWING FILE NAME: • Bolae. leaho en02 (209) J12-0091 PHONE (209) JII-0092 FAX ~ - 2~ f (91-99 CU_COMPL22.dBg z-DA-03 14116129 OP1 CIML ENGINEERING-SUR1~E'YINC-CONBIRUCRON YANACEMEN]