Loading...
Great West Casualty _ __: ~ MAYOR A Good Place to hive LEGAL DEPARTMENT Robert U. Corrie CITY OF MERIDIAN (20R) 466-9272 • Fax 466-4401 CITY COUNCIL MEMBERS PIrBLIC WOR(:S Keith Bird 33 EAST IDAHO BUILDING DEPARTMENT (20R) 887-2211 ~ Fax R87-1297 Tammy deWeerd MERIDIAN, IDAHO 83642 Cherie McCandless (208) 888-4433 • FAX (208) 887-4813 PLANNING AND 7_ON[NG William L.M. Nary City Clerk Office Fax (208) 888-4218 DEPARTMENT (208) 884-5533 • FAX 888-6854 CERTIFICATE OF ZONING COM~PLIANCEx Date: April 9, 200 ~ _ Owner: Kimball Properties Limited Partnerslli~__ _ ____ __ Applicant: W. H. Moore Compal~ ____ Project Name: Great West Casualty ~+~ ~ /~ I Project Address:_ SWC of Eagle Rd. and Overland Rd. %~''l'"v" ~ "~(~ dS~DY~e ~V Proposed Use: 29,840 s.f_ Office Buildin~~ ____ _ ____ Zoning: ~ ~i' ~i __ Comments: Conditions of Approval: Project is subject to all current City Ordinances and conditions of approval for Bonito Subdivision fka EI Dorado Business Campus. The issuance of this permit does not release the applicant from any requirements of the approved Conditional Use Permit (File No. CUP-O1-0 37), Preliminary Plat (File No. PP-O1-020) and Final Plat (File No. FP-0 ~-010) issued for this development. Si na e: No signs are approved with this CZC. All signs will require a separate sign permit in compliance with the sign ordinance. Landscaping The Landscape Plan is approved per red-line notes on the plan stamped 4/9/03. 'hie approved landscape plan is not to be altered without prior written approval of the Planning & Zoning Department. No field changes to site plan permitted; prior written approval of all material changes is required. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the specifications provided. Curbil~: Per Ordinance 12-13-7-9, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Protection of Existing Trees: Any existing trees on site must be protected in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per Ordinance 12-13-13-4, coordinate with the Parks Department Arborist (Elroy Huff) for approval of protection measures prior to construction. Any severely damaged tree must be replaced in compliance with Ordinance 12-13-1 ~-6. ~~I~l;iilti~ Ilii=cirer.~ il~ilkli'l~~ iv allfll'11Vt',(1 iC .~h~lwli u11 (hc' iillllr~lvrii ~itr ui~ln r~li ~inn~i~ril ii~iKl~~L' ~INiI~ 11111AI iYt', 7 x 17 Illlflll~llUfil hn(1 lI1~IVF' 711AIC1 IIIIl~I Ilf7 AI irilsf ~,"~ (CCs- Wi(1C r~ii ~'~~i(i(inl',I .inii~ nnisl i~~e e;leariv iai~rle~l i n~irci r,n~rirn:r;ri~n~~;iiiire;i chaii c.irii~~' iii~ii lilt nuiriiirr aiui ~tiiie of handicap-accessible spaces coniirrms ro the Nmericans «~irh i~isnhiiiiies Nei i,r~i~r'~ j Handicap accessible stasis must have si~na,e in accordance r~er r~~DA. Sidewalks: Ail sidewalks shall be constructed as submitted and in accordance witi~ the ivieridian City Code requirements. Sidewalks shall be constrt.rcted prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than ;: i_ shah be firiiy vegetated, and shall be designed in compliance with the Meridian City Code. Lighting: Lighting shall not cause glare or impact the traveling public or neighboring development. Trash Enclosure: All dumpsters must be screened from view and not be visible by the public or from adjacent properties. Trash enclosure must be built in the location and size as approved by SSC _Handicap-Accessibility: The structure, site improvements and parking mr~rst be in compliance with all federal handicap-accessibility requirements. ACRD Acceptance: Applicant shall be responsible for meeting the requirements of ACHD as they pertain to this development. All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACRD requirements, a new site plan shall be submitted to the City ofMeridian Planning and Toning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a. Letter of Credit or cash in the amount of 110° o of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. No occupancy will be granted until the final plat for the property is recorded. Plan Modifications: The approved Site Plan and Landscape Plan, stamped 4/9/0 ~ are not to be altered without prior written approval of the Planning & 7_oning Department. No signifiicant field changes to the site or landscape plans are permitted; prior written approval ofall changes is required. ~~~ ~_ Sonya Al en Planner [ *~lhis Icacl' does not indicate curnpliance ~~ith requirements ofolhcr department./agencies-including, but nt~r limited (o. nda C'ount~~ Fligh~~~av District, Central District I lualth Departmen(. affected irrigation dis[rict(~), Meridian Sc~.ver, V/arer, F3uilding or ,fire; Departments, Sanita~~~ Sen~ices Co., etc. ~i11is letter shall expire oni; (I j }ear li-om ll~te date of issuance il'~~'ork has not begun. CERTIFICATE OF ZONING COMPLIANCE & PLAN REVIEW CHECKLIST Zone: 4-7-03 7D Site Review/Conforming Elements Comments Complete (,~ * Pro ect must com lv with all a roved ermitc, lats or I~evelo mentA reements associated with the lot or arcel. 1. Completed & signed application form ~. 2. Warranty decd 3. Affidavit of Legal Interest (notarized) .~- 4. Site Plan -scale not less than 1"=~0' (~) copies + (4} 8 '/ "~l l" reductions 5. Vieinit Ma (scalable) v G. Landscape Plan -scale not less than 1"=50' (3) co ies + (3) 8 '/z"sll'~ reductions ~ 7. Irrigation Performance Specifications (3) co ies in com Hance w/ Landsca e Ord. ,/ K. Sanitary Service approval for trash enclosure & access drive 9. Calculations table listing # of parking stalls. biulding size, lot size, landscaping, open s ace, setbacks,fencin ,screenin & coves e / 10. Statement of proposed use of property / 11. Zoning District (permitted use, CUP, AUP, variance, etc.)Check v 9, FF%CI GG-~ - rrr+i ~~ ude, ,i. 12. Flood lain District ~} 3. Landsca in 1 P ~ Must be in compliance with the Landsca e Ordinance ~fC 1~. Off-Street Parkin T / a) # of Stalls (dimensions, etc) __ 1 / b) Handicap Stalls (van accessible - 8 ' aisles - 8 ', si na c) c) Aisles (width - 25' nex~, 20' »ain. existing, location) 15. Trash Areas .~ a) Location ~ b) 3-Side Screenin= / 16. Under round Irri Iation z 17. SidewalksiPaths .~ 18. Lot Re uirements / a) Lot Area (note restrictions on use of u~zdevelo ed onion of lot) .i b) Street Fronta e ~ c) Setbacks ~ d) Covera e v 1). Fencing 20. Fee of b(O.OU J AZ-Ol-018`~ CuP~~I-03~1. PP-t7~-off -~P-03-~~0 .9 CI°ID approval letter required for ca~rb cuts, road i~rir~eixilxg, for all new pro~`ects. 1 Trees must not be pla~xted in Citv water or setit~er easements. Pressurized irrigatio~l can be waived by City Council only if no water rights exist to subject property or dei~eloper deeds land to Citl~.Tor a well. City will permit o~xe hook-up to municipal water, for irrigation persite. 7 Rc~~. l i7-l; (1; ~ o ° o p ~ o z O Q ' w :~ Q :Z !~ iN o N 1 (C 0 . _ ,~ :~ .Q M O i I'.N W 1 N a ~ n 9oY ~ 1 L (6 i mZ ~ i ;pOm i ram ¢~~ ''~w° o ;Nmw --0~ om v 0 N N 0 r` c~ ao 0 L W } ~ {,.,y/ a N z ~ O OQ ~m a ooh S U aNO ~ `- ¢ XN •- m C'0 O ¢ON M ~ N C CV N ~ C Q M ~ O~ L •~ ~ ~' W 'a, Uc~i~ w~ =W ~o ¢OQLL a 1-00 ^ .~ .~ 11J 0 a ~~ IL N f'11 ~. .~ 141 ru .-i ~= c~ N 0 0 crrv or ~" erl~icn 33 E. Idaho Ave. % Meridian, ID 83642 T c~ ~eR ° ~ TRE.ISURE ~r~~V SINCE 1909 ~~'~ ~ a Date `1 " y~~.3 C~.~ I Address P ~ ~Znr Q ~~ f~°!1_LQ`P ~u ~~7p" Phone • 1 CASH CHECK # NAME ON CHECK IF DIFFERENT THAN APPLICANT ~ • • C~-G C ~ T- I I I I I I I I I I I I I I I I I I I I I I I I I I I I PAYMENT DOES NOT INDICATE ACCEPTANCE OF APPLICATION TAX I 1151 Received ey TOTAL ~~ I -- 94760 ~~~~ ~~~ O~ ~~ J Vj! \ / y j. y ~' ~ r ~~~ - T ~r -i ~---1 -„ ~ ~ - ~, O's ;' ~ O i, ~ ' ~. !~ ~- ~ __ '- I __- ~ I % - ~ -- 1 _ ' 1 _.. -~ , L III-- I1 -~ ~ ~~ ~ - ~-~~~ ~~ ~_-~~~ - -, ~~ ,1 _ , ,, N,, 1 ,_ ., ~ ~ . -~ ~- o - -_ -;, - , ~ _~~ ~ ~~ _ _, ` ~,I ~ I'~ 'Li! ~ ! '~- __ ~ _----~ ~ I ~. . i 1 \,`\ i~_-~~- ~' - __ ,I i ._ _i ____ -~ , , ~ ~:~~, , ~__ ~~. \~~ ~ ~. ~ ~ L -`~ - I ~ --~ - ~I Y! <m C7 D z -~ ~g ~m ~~ n~ ~n -~ ~ we ;o n O ~ NVId 3dvJSONn L 51~311H ~atl WHU~ M1UW3w b31N3J 553NISNB OQVa00 l3 9 •= 0@&9FI ~ 7CYd ~ ~ - ~1 3_ oW Jff ~Rl •~ l~.~dns~.7 .I.s>3/,C1 .I.d'3~.~ Il • y J ~aoa 1N3wdoJ3n3a a3sodoad a ~N ~ Q i ~~ ~ ~ ~~ ~~~a ~ ~ ~~ a~ !I P ~ C= ~Y~ 3 ~~~"~ ~~Q~Fp ~_ ~B ~ ® ~ ~ s rid ~ ~. _ ii #i:.. Q ~,.~e~`£~ 9j ~ € _ - _- ~ , , ® eggg°gt~~& ~ I ~ ~ ~' ~y~ >: -._ g "~ ~ ~~ ~ 1 1 ~ ~ rti~T~ - a ~ ~? ~~~~ T; _ ~ ~ ~. a~ ~ 9 >ig~/ ~ ~r ~ ~ ~ ~ $p ~~a ~ ~~~$~~ ~ g ~~ ~" ~~ a ~ ~~~ ~ ~~~g~g~Y ~ F$e$s~ ~~ ~~/ i- /'..~ n >~ ~ ~ ~ .. o~ , , .. ----a J %~, .~ i ~~ ~~ _ ~ ~ Y ~~ ~ s -- ~ __ _-_, ~-- _ r_ -_-_- -_ -~_ _- J dgg .A ~ _ _- _- _ a ~ E ( ~1 r~ rl ~ ~ ~ ~t y pp`` _ ~ j yp ¢¢ sp~py9 ~~~~ ypayp ~~ _ 4 I i ~~ a ~ ~°~ #yf' 4~ 4 eel J a .~~a ~EY~x~~~ $§$$$ $ 9 t' I ~ ~~ -_~ ~~ ~~~ ~ _ ~ i<_ - I r, Yl '~ ~ w ~ 3~ ~- l°-) ~L u~ ~$ ~ ~' ~ ~ ~ ~ ~ o ~ _ l I o :~~. €~~ z .. ~'~~ i' ~ ~ ~ er e>seae s ~o age{i c ~gs ~ ~ ~ s~.o9 - __„_. 8ti~$ ~~ ~ ~ '_~ ~` ~~/ J~~ ~ e$ C k 8 S~~b~~ 1 l} ~ 87~ l,',~s ' .: ~~ Y a} - ~ F !Y :~~ I-`~. i ~ ~~ ! ~ f3 a Eg 8; ~~~ Y~~t ys 4Pa~!'~ j ~ i - !' P 8' ~ a - . -k b ~e. ~ ~ ~ P $_ ~ j!e :g ~ oE$=~' 4 j a~ ~,~5~~~ fY e ' S . ~~. ~fi8 a I!L 3 ~+ 3.c~2 cci ~ i~i ~ cq ; ; 9y '~~ I s ~ - -__ aa~ Grp ~ ~ a 3$ - , _ € E j$ q`^ a~ag ~9 ~ '@`~~3 ~~4 ~! ~,~3$! ~~ fi--~ 3 s $ - $ ~ -- ~~~ ~; 118 ~ "" 1 ] ~ 9~"c s3 '& ~! e~'° :~ ¢gmi z ~ ' s ~ ~ 4 _~ g ~ 3: 4" ~ _ I .b5 3$ 3af $$9: ~t $9=atg ~ r ;i s~ Y~? ': a'' ' f g E ~~ _ - _ _ ~ ' ~ ~ § ~~ 3F° yEe~Y•° $4 fi Y~°5~~4 pc ~ pge S: 64 Y 2j~yE ` ~ '. a ~./~ - ? g Ea~ eE 999q F'!$ ;5 ~ ~~a?g~F~s~ ~p~ E~'~S9dEi ag~ ~i;~~c~fi fi~~t -----~ ~ l _ - --- ~ni ~g fi 9 ~,•Yg$ o! ~P~y~~d~~~' S;~ez ~i e5g 46690~~' 8.~• - ~ a#; aM s ~ ~, $ E a'€ ;! ~ PYr ~j9'i `~3=~4 ~~;$sit ;~ e~,' ~ $e°~ ~° ~ a a~° a°~96 i E eg eil~_yi_ 305 E~ `~ 3 ~ ---~ ~ ~;~ ~4~;48;8 t~!;9 $; ' 39~3j `~8 ~E~4s°;=3~~P~ ttEs~~d'~$~a~b~a tq~ ~3f y ;4~ 3 ~!!8 ~3~a ~- Ea3=Y'-•f£ 3s t ~ zi~P EF- pie-~~s ~i ~ ~ S ~ v"b c ! g a E' :E; a~:i 7a~~e=5i:-~~.>!i~S~ i4.~=..iE' i.-r $ a °;. ~ ~~P9_ ~ Bi iy fie e'p fi~~: y$ Ei ~F`a t~e e 3x~ ~~~ ~ ~ ..' ~ ®~~~ 9~~$. - ~. a ~~ ~' ~. 8 o 4 ,~~' ~ g q ~ ~iaa~ eFi'=! i;_7~ $~$ i~:sai E; yt~ ~~~ ~ia~~~d~,3 ~'] - ~~ - ~~ Q ~~ ~jttfi9E<&a i yG #3~s' d° 4r x~ S yP.d r'~ 333 ~~ d .a:§;>3: e1:..9{. %n~~s~~~56d E~7-e<7 a t~3~~~ie nn i=~ 9Cn~k4.- _.____ 1 i. ARCHITECTS ` BRS Architects, A.LA. 1010 S. Allante Place, Suite 100 Boise, Idaho 83709 Telephone 208 336-8370 Fax 208 336-8380 www.brs¢rchtitects.com Aprll 2, 2003 City of Meridian Planning & Zoning 660 f. Watertower, Suite 202 Meridian, ID 83642 Attn: Brad-Hawkins Clark Dear Mr. Clark: Re: Great West Casualty BRS Project NO. 02126 The applicant, W. H. Moore Company, respectfully requests the approval of their application for a Certificate of Zoning Compliance for the Great West Casualty project in the new EI Dorado, Business Park. As a regional hub for the insurance carrier, the project will consist of a 29,840 s.f. building and parking for 125 vehicles. The building's use will be solely a professional office space with conference and training facilities. I trust that this application will meet with your approval. However, should you have any questions or concerns, please do not hesitate to call. Respectfully, BRS ARCHITECTS Andrew Davis AD:cw Encl. cc. W. H. Moore Company ~' ,~: iKltilJA~iIUIV rl;lt.l+UK1V1A1Vl:~ jYl:l:12+11;A'l~'1U1V5 ~~' ~ V1;UJAIVAPII.:r. lG-~3-a ~%6fit:_` submit 3 copies of thi.t completed jor~n with any appltcation,for (:'ertjicate of Loniitg Complunee (CLC). r lr+I~j:;:;i ie17n1lTiic G ~~, ~ Gas,, / fi, W~ s t ~~ee~iiicaiiiai,~s Hvai.lap:ie ~ai~o~ns per Minute: 5o GPM nval2l''ric `vvai6r rfe~iSiiie: bS ~.t CUIIII Ul l.UnrICGUUn ~(ICSCIiDG' SIlu/OI S1]t)IIlli d Slte p en i°riijrldry onneccon: Plenw/L~d /r•,gafl'e., sl,s>~e... dssi~h.d /ec Q/-~iP~ BDac.~e, Landscape .yrea: ij the irtz~,~ati,un system is Hooked- io t: fry wafer as a primary or secondary _~_-,-- __-. _.- r____. _r,_ wuie~suurc, su~mtt tRe syuureyuolubre o~ carluscape tzTeas io ~e Irt`i~~ased: 6 5-i'. iv$C1u'sivw iic~8iluinl fi baclti'iow prcvcnil~n ucvice milli tic ins talleu as requ~reu oy ~.ny vralnance >-~ ~~ itL'Tax;e l I3G llll~$11U11 s~'JIV=Ir1 IiIUJI UG i1LJ1~[1lU l(J ~I1o V1Ul: vv O LDVGra~G W11I1f 1CCLL-1C111C~1C1 S~alall~ OI' iiiaii~;iiai SYaCii1~ a5 a~A~rlv~3tiai8. lvxa-~icu r1c~1,p~.~auVI1 aie~ Spriniuer-Heads muse nave maccnea precipicacion races wicnin eaci~ concroi va'tve circuit. Y.r -_a..__-_ rY__ _._ lIl'll,'dLIUII LUIICJ JpIIIIKiFir [1et111J llIlgi~llll~ li1Wl1 Vr LLI1eI tIIg11-H't1iGr-u~illcllliJ itIGi~ lLl,l:l l UC GLIC:lllletl JV LII:#t L_- 1__._._ _ L.-.L_ L_- ~____1 they are u~r d Se~/dl dt0 LUIIG 111 LU1IG~ 71 Vfll t11V5C I~~QUIi~+ tIGGJ, SIIIUUJ, vI UU1C1 ICUUGCIl- water-demand areas. vyersrrray Sprinider heads must be adjusted to reduce averspray onto impervious. surfaces -such- as sidewalks, driveways, and parking areas.' S0i c0" d S1~3i I`i-+~~lti Seia bF~ :'7'L L1~6G'-b L-tlbW i~,c~uition~ii Ir~ig~t'iwr~ i~v~s irriaauon ixeauireu A_ 1. lr _- __ _ _ _ _l._a_ J __ aL_. ~~.L._ T _ ._ ~ _ _ _ _ /l .~•._ _ ____._ /1_/'1 1. n.\_ _/- ,l. l_ _ _ _ ,_ __ •__I_ ___ rn#1 ~a11.l~Jl.tipe dLCiJ Gb'liiiilCll ply ulc L1ly i_,anust~apc vrtunance ~1 G-1.7 J SIAatt De 5ervea Wlin an auioi~iaio uil ~i~IOUiIU it=t-igauuii sy~~cni. r~ucul~atrai rc;~utr~menis aiecii,n,g pressulZZea $ii~diloll JyJIGIIIJ i:iill UG iC7i1IlU IYl l.lty ~(LnaI1GC 7-1-Lg. ii~:tLtU~ ~VV~atC[ ~Ul1I -IJSG Gl IiOII- uld[LSLC lili dlltlli wdtCi lS iCC1CUtCI1 Wfltlll UC[C.l7IliI1C(1 tV -Vt~ aVdll~lOle oy lne l..lly i?~t3a-i '~'voixs uct~aluliclii as rcgilrale~i oy ~,uy vruinance y-r-LAS. it city poidote -water is used, a ~epsru~e weier meteir is recozruriendea so the owner can avoid paying sewer lees r"or imgacion .-_-o-~ ~Ll-. ...~~--.-L-U__.,a -_-- _ __ _- _ _ -_ ___. _. _. _. _. waici: oiawu waici Tai, ,~vi i - uairu da ~priiiialy ili7gauoii water a~uru; on non-resruenTiai c7~s wiu- iuuic iiian z acre of iandscdping. ear rouna water' avaiauiiity is aiso requires oy connecting to city potable water or an on-site weir as a secondary souzce. Certification: - -• ~, ~~ ~ , do itcrc'vy aiiirm iihni any imgduun sysiem m5[~~eo . ~~ ii for t~'ie pal-i~eL'L UIGnUV11CU aVVVG VVI.i ve c~CSlgtlGU anu trlsiu:itca iff coinp118r1GC: w1m me specliicauons ana notes scared in this form. iippiicain'~ ~i~raiure 03 Date ftrty. I/'4i~~' S0i~0'd S1~31 I HJ2lt9 S21H 60:91 X002-6i-21EiW j:~~. eu~~TY ~~co~oEl~ When Recorded Please Return to: ~• `~?~V~D hI~,VAf~RO .., ._, Ila, ~} i Givens Pursley LLP ~~~, ~~ ~ ~ ~ ~; ~`1 277 North 6t" Street, Suite 200 Boise, ID 83702 Attn: David R. Lombardi RECORCED-RECUEST OF /~ti~c~~ ~DEPU~~. f EE / 1 'C1.~L~0~1E GRANT DEED FOR VALUE RECEIVED, James F. Griffin, a single man ("Grantor"), whose address is 705 North 9t" Street, Boise, ID 83702, does hereby GRANT, BARGAIN, SELL and CONVEY unto KIMBALL PROPERTIES LIMITED PARTNERSHIP, an Idaho limited partnership ("Grantee"),whose address is P.O. Box 8204, Boise, Idaho 83707, the real property in Ada County, State of Idaho, more particularly described on Exhibit A attached hereto and made a part hereof ("Property"). Grantor hereby covenants to and with Grantee and Grantee's heirs, successors and assigns, that Grantor is lawfully seized in fee simple of the Property, subject only to the matters described on Exhibit B, attached hereto and made a .part hereof. TO HAVE AND TO HOLD, the Property with its appurtenances, together with any and all water rights or entitlements to receive water for beneficial use upon the Property, including, but not limited to, ditch or canal company shares, and ditch rights associated with any irrigation or water delivery ditch, canal, lateral or pipeline, unto the Grantee, and Grantee's heirs and assigns forever. And the said Grantor hereby binds himself and his successors to warrant and defend the title as against all acts of the Grantor herein and no other, subject to the matters set forth herein. Dated effective the 1~~day of December, 2001. GRANTOR: r ames F. Griffi GRANT DEED - 1 S1CUENTS\25151321Fina1 Documents\Grant Deed (12.71-01).doc STATE OF IDAHO ) ss. County of Ada ) On this i2~day of December, 2001, before me, a Notary Public in and for the State of Idaho, personally appeared JAMES F. GRIFFIN, known or identified to me to be the person whose name is subscribed to the within instrument, and acknowledged to me that he executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. .,~~ ~4, LOM89A 4~ ~pTAR~,~~~' * ~ ~ pUBL1G ~°A?- $~ •~'•~ Tg OF 19 .•~•r Notary Public for Idaho Residing at F~is~' My commission expires: ~ 3d ~ GRANT DEED - 2 S:\CLIENTS12515132\Final DocumentslGrant Deed (12-11A1).doc PARCEL 1 A parcel of land located in the Northeast Quarter and Southeast Quarter of Section 20, Township 3 North, Range 1 East, Boise Meridian, Ada County, Idaho, the same being depicted on Record of Survey No. 5447 recorded July 2, 2001 as Instrument No. 101065642, Records of Ada County, Idaho, more particularly described as follows: Commencing at the Northeast corner of said Section 20, of which the Southeast corner of said Northeast Quarter bears South 00° 14' 45" West, 2651.89 feet, thence along the Northerly line of said Northeast Quarter, South 89° 46' 18" West, 1328.41 feet to the POINT OF BEGINNING and the Northwest corner of the East %2 of the Northeast Quarter of said Section 20; thence along the Westerly line of said East %i, South 00° 19' S2" West, 55.00 feet; thence along a line parallel with and 55.00 feet southerly of said Northerly line of Section 20, North 89° 46' 18" East 1273.49 feet to a point 55.00 feet Westerly of the Easterly line of said Northeast Quarter, thence along a line 55.00 feet Westerly of and parallel with said Easterly line, South 00° 14' 45" West, 594.66 feet, thence North 89° 56' 06" East, 55.00 feet to a point on the Easterly line of said Northeast Quarter; thence along said line South 00° 14' 45" West, 2002.07 feet to the Southeast corner of said Northeast Quarter; thence along the Easterly line of the Southeast Quarter of said Section 20 South 00° 00' O1" West, 196.19 feet; thence North 68° 20' 09" West 26.90 feet to the Northeast corner of Lot 34, Block 4 of Thousand Springs Subdivision No. 1 as shown on the official plat thereof recorded in Book 78 at Pages 8248 through 8249, Ada County Records; thence along the Northerly boundary of said Subdivision the following courses: North 68° 20' 09" West 339.38 feet to the beginning of a tangent curve; thence Along said curve to the left having a radius of 250.00 feet, an arc length of 222.33 feet, a central angle of 50° 57' 18", and a chord bearing and distance of South 86° 11' 12" West, 215.08 feet; thence tangent from said curve South 60° 42' 33" West, 121.50 feet to the beginning of a tangent curve; thence Along said curve to the left having a radius of 200.00 feet, an arc length of 116.45 feet, a central angle of 33° 21' 36", and a chord bearing and distance of South 77° 23' 21" West, 114.81 feet; thence tangent from said curve North 85° 55' S 1" West, 561.11 feet to the Westerly line of the East %2 of the Southeast Quarter of said Section 20; thence leaving said Subdivision line, along said Westerly line North 00° 11' 26" East, 118.03 feet to the Southwest corner of the East %2 of the Northeast Quarter of said Section 20; thence along the Southerly line of the West % of the Northeast Quarter South 89° 54' 44" West, 84.07 feet; thence leaving said line North O1 ° 42' S2" East, 2649.75 feet to the Northerly line of the Northeast Quarter of said Section 20; thence along said line North 89° 46' 17" East, 20.10 feet to the POINT OF BEGINNING. PARCEL2 A parcel of land located in the Southwest Quarter of Section 13, Township 3 North, Range 1 West, Boise Meridian, Ada County, Idaho, the same being depicted on Record of Survey No. 5446 recorded July 2, 2001 as Instrument No. 101065643, Records of Ada County, Idaho, more particularly described as follows: Beginning at the Northwest corner of said Southwest Quarter, of which the Southwest corner of said Southwest Quarter bears South 00° 00' 26" East, 2651.35 feet, thence along the Northerly line of Southwest Quarter and the Southerly Boundary line of The Landing Subdivision No. 7, as shown on the official plat thereof recorded in Book 69, at Pages 7085 through 7086, Ada County Records; thence North 89° 59' 42" East, 1326.84 feet to the Northeast corner of the Northwest Quarter of said Southwest Quarter; thence South 00° O1' 40" East, 1326.16 feet to the Northerly right-of--way line of Interstate Highway No. 84 as shown on Federal Aid Project No. I-80N-1 (12) 37 on file at the offices of the Idaho Transportation Department, Boise, Idaho, thence along said right-of- way line North 89° 53' S5" West, 1327.32 feet to the Westerly line of said Southwest Quarter; thence along said Westerly line North 00° 00' 26" West, 1323.70 feet to the POINT OF BEGINNING. Z0'd ~t1101 STATE OF IDAHO, } COUNTY OF ADA k~;,.~~ ~wrp~es AFFIDAVIT OF LEGAL INTEREST I,. ~i btu. S /ate 1'~• N'~OOKt` .O. $.2a _.._.., (name) (address) being first duly sworn upon - ~ tSc~ ~ ~---~ ~°~ -- oath, depose and say: (City) (State) That I am the record owner of the property described on the attached, and I grant ray permission to: Gad -K~1~w l.~r~v ~ .s c I~ (name} (address) to submit the accotr~anying application pertaining to that property. 2. I agree to indemnify, defend and hold the City of Meridian and it's employees harmless from any claim or liability resulting from any dispute as to the statements contained hereir- or as to the ownez'ship of the property, which is the subject of the application. Dated this a U day of ~ c~ K L ~ , ,200 3 (Signa re} SUBSCRIBED AND SWORN to before me the day and year first above written. * ~OTwR~ «s~• • e A '~' v- UB L1G ; ~.` ~ '. ~~'•eT~ OF IU ~'~.•'~ Notary Public or Idaho Residiung at My Commission Expzres:_ l0' 31, ~ 0(p ~~tr~~. r~~~~ir~ Z0f~0'd 51831IH8dd S~IH 80:'91 ~00Z-6Z-~l~JW 3-25-203 18:56AM FROM W.H. MOORE COMPANY 208 323 7523 P. 2 ;~~~~ ''"`~'' Ada County Highway District Sherry R. Huber, President 318 E~ct 37th sr.aar ~.---- ^ v..van v. ~waaw, Boa vnc rws+4t711~ Garden City ID 83714-64.99 Dave Givens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellus~A HD,~da-d us R~CEI V~p February 18, 2003 Scott Kaufman Quadrant Consulting, Inc. FEe 2 ~ 1003 405 South 8"' St. Ste 295 Boise, ID 83702 RE: EI Dorado Business Campus ~~~S~EPTALI.~E. The District has reviewed the plans for the above referenced project, and they aze accepted for public street construction, with the following stipulations. / Striping and Signage Plan: Delete the stop bars and crosswalks at the interior intersections and provide aknife-edge strip at the end of these island noses. Delete Key Note 14 {sign R3- 5) Just need sign R3-7R. Provide 50-foot double yellow, typical at all island noses. Delete taro arrows in center turn lane on Bonito Way appmx. sta. 29+15 and sta. 29+30. / Provide (2) Barricades Type IlI at the terminus of Blue HHorizon Dr. z3y stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Variances or waivers must be specifically and previously approved in writing by the District. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The fees and surety amount are attached. Please provide original drawings to be stamped and signed, then provide three copied sets of plans, plus an additio>aaI set of plans for each contractor, arrange for an inspection agreement to be signed, pay the inspection fee deposit, and schedule apse-con when these items h:~~e been accomplished. All fees must be paid and the following documents received two weeks prior to scheduling for the signature of the final plat. / Please provide an 8 %x" x 11" reduction of the plat, a vicinity map. / The right of-way purchase agreement for the right-of way to be dedicated along Eagle Road must be completed and signed by the applicant. / Provide a Temporary Turnaround Easement for the turnaround at the west end of Blue Horizon Dr. / Provide a storm drainage easement to provide a 10-foot perimeter around the seepage trenches Provide Iegal description, site plan highlighting easement areas, proof of ownership, name, address and title of signatory. 3-25-203 10:56AM / Enter into a license agreement for the azchways over Bonito Way and Goldstone Dr. / Enter into a three way written agreement with the District for the cost and specific location of the traffic signal on Eagle Rd. / The District will proceed with this project without further review of Eagle Road improvements. If ongoing negotiations for these improvements don't come about we will require plans for the improvements for review at that time. Required Post COIIStrUCtion Submittals: Record Drawings and Engineer's Storm Drainage )<nspection Certificate The following submittals acre required after construction and prior to District acceptance of the public street improvements within the subdivision: 1. An electronic record of the as-bui t construction drawings and final plat of the subdivision. 2. The engineer of record's certification that the storm drainage system has been constructed in conformance with the accepted constriction plans and that this system f~anctaens as designed. The District cannot accept the street and drainage improvements for public maintenance or release the developer's financial surety until these requirements have been met:, Tf you have any questions you may contact me at 387-6184 Sincerely, ~f'~' 1~--•'.,o, ~ Dennis Cline Development Review Division 3 cc: WH Moore Company 600 N. Steelhead Way, Suite 144 Boise, ID 83704 A P~ .~. p w ~_ w J ~ O Q lr..l ~ p Z W Z Q ~ p O ~ d r. Z g ~ w w v ~ o ~ Q 0 ~~ W I ~ w N O Q Z Z N \ O O ~ O .. li .-~ ~ ~ U ~ (n N ~ w I ci I + U w p ~ ~ m - Q U Q I ~ = F- 00 a? W O U O ~ d ~ a N X p O ~ O jNr 0 ~ ~ N Om N ~ ~ o_ o0N N 000 O)N~~ r-00~0 N I O I I o O NCO ~ ~~~~ ~ W }a Q ~ ~~ W ~ N N W W (n Y ~ (~ z o ~ N W p a U U U Y ~Qa Q m a w 0 o r ~Jw ~ o Q > w Q ~NNU m ~ m J z ~m U U p J W ~ Q N ~ m ~~~ d N vacn W W O N W N_ Z U J d~(nY ONNZ O (~j d Q C~ QQU ZWpQ Z 2 S ~~~~ ~ U 2 = HF-F- N W ~ (n ~ a.W ~(n Qp U ZOO UO~d O UC9cn Z Y Q d U p Z Y _ Q~Z~ ~OQO p (/')U F- ~N~(n 0Q OW ZWN~ N p ~N~(n 0 OW z~cn3 ~ (n o Q ~ (n j m Q W O U Q 2 Q d ? m z Q w d Q U N p Z g MRR-31-2003 11:438 FROP1:Sanitary Seruices~ I 208-888-5052 TO:3368380 P:1~4 Y • ~JVO • •. y - .. •. r .. v ua .wn. r r • ~ ..w~ ww •r uvr~ F~cCouerP~ge 1~e: MarCh 31,2003 Prom: Andrew Devil To: unitary Senrioe Company ~~' Biq Gregory # Paws 2 ind. Dover Fau ~ 898-5052 Re: Great West Casualty Job #: 0212fi ^ For Your Uae X for Review i] Plead Contm~rnt X A~ R®qu®sted • Coin? Attached is a plan of the twit endvs~ure with the clear opening dimension stKw-m, as requested. Please let me lmow if you need anything els+a to sign offi on this design. Thenlc you. C ~ - 3 1- 0 3~ ~ ~~. -4-rr..a c~.~ ~ ~ ~~.~.~s ~'2 u~,a~r~Sze,ir ~S ~~~~~~J ~~~r ~~~~ ~~ 44PPR.od~ , ooamen~ Z'0it0'd S1,~31IFI~~ Sa8 St:tiT £®0z-T£-21hW ARCHITECTS 1010 S. AI1gNf E PLACB SUi1Ts 100 ~19fi , O~AHQ 037'09 1'E[,FPF10~T@2083368370 FA7C ~Q®388136D I`1RR-31-2003~~11:43A FROM:Sanitara Ser~ices~ I 208-888-5052 70:3368380 P:2~4 C~~VVV J41 'OVJ-IIJ~ a.+r~ ~uv5:U1 I~J['~.:1~ V~ ~d-`Jd-~1 T//- a~ 4~ ~~ ~R ~~ L~ 0 L ~o ~bM p~-Np8 -- e-- N `~ y V' £0~0'd S..W31IFi~tl S21H zb:9T s~~-ar_~Ni.~ 1`1RR-31-2003 11:43A FROM:Sanitary Sercices~ I 208-888-5052 T0: 3368380 P:3~4 ~=~~~ ,.,.~ -oo..,~,..~ .,..~,,,.~5~ut wd~~ve u~i~ znaoc-7c-aow F0 "d '1ki101 1 .g ~s r"•- ~~~ i ~~ 1 1 1 r' r~_ - -~.~_ ~ _, I 1 ~ ~9`.L ~ ..s-, I 1 w r Dy S) ns'.ZI 4 r~ ~ ` £0/£0 ' d SJ.~31 I F~CkJd SZ1H Zd : 9 T ~~-9?-?IHW f`1RR-31-2003 11:438 FROM:Sanitara Ser~ices~ I 208-888-5052 T0: 3368380 P:4~4 ~! O~ ~ p~ ~O~ n ,c~i~ ~1 ~~? r~~t~ ~ o ~~ ~ a~ ~~ ~ ~ m ~ vi ~~ r o c~ ~. `~ ~ ` ~ ~ 1 4~:~T. ~ ~ r r ~ ~ SLOPE ~• r~ ~ ~ A ~~ ~ k..~ ~/ ~ ~~_ ~ ---- ~ i .~ ~ {Is i' v N ~~ r TOTAL P.02 MAR-31-2003 MOrJ 11:12AM ID:Sanslare S~rvtces. Tnc pq(.~e2 Sonya Allen To: Karie Glenn; smithm@meridiancity.org Cc: Jonathan Seel Q.seel cLDworldnet.att.net) Subject: Great West Casualty Great West Casualty located in EI Dorado Subdivision has completed their landscaping and irrigation as of March 15, 2004. Thanks, Soynya .~~en CITY OF MERIDIAN Planning & Zoning Dept. 660 E. Watertower Ln., Ste. 202 Meridian, Idaho 83642 Phone: (208)884-5533 Fax: (208)888-6854 3/16/2004 i ~~ BONITO ~yqy ~- N ~' __ __ ___-__ ~ m ~ _ u ~ I ~ ' ~' ° c tl 1 a d ~ ° ° _ Is)er_e yy d e m++ y z / / ~1 d s I / a o~ a ~i ~' ' 0- a D ~ ~ 1 O ~r ~ O~ i ~~ Y 6 Y A YI I ~e o -o _ - ~! L__-__-__-_ _-_____ -_____-__- _-________ ___-__-__- I ~~ pp gR I>:1 ,-~ ~ g~ ~~~fff"' ~\ ~~ S ~ lv ~~ A bd ~ p m RCR 8 a Y ~ p /~ ~ p ~ ~B_ e ~ A ` ~ / E .~ $€4 Y °o v Rx °~ ~~~ Y y~ ° ~ R e ' ~~ ! ~ C~1 e g ~ # fi ro a ~ ~ ,~~ ~~~ ~g ~ Il~~t ~ ~i! ~ /~ ®® s PROPOSm DE~MOPMEM FOR: ~ @ 3 ~ ^ ~ ' , ; ~ AND 8 ALL1N78 31'. n N GREAT WEST CASUALTY ~ ~ ~~~ ~ ~ I ~ ~ FNC (7D~ ii6-fl80 Y--1 EL OORRDO BUSINESS CEMER MERIDIAN, IpPHO ARCHIT ACTS SIZE PIAN __._. CITY OF MERIDIAN ~' Planning & Zoning Department 660 E. Watertower Ln., Ste. 202, Meridian, ID 83642 .ZC-03-~/q (208)884-5533 Phone./ (208)888-6854 Fax CERTIFICATE OF ZONING COMPLIANCE (CZC) APPLICATION (Section 11-19-1, Zoning and Development Ordinance) PROJECT NAME: _ Great West Casualty APPLICANT: W • H . Moore Company ADDRESS: 600 N. Steelhead Way #144 Boise, ID 83704 PHONE: 3 2 3 -1919 =: ~~FAX: 323-7523 E-MAII.: OWNER(S) OF RECORD: Kimball Properties Limited Partnership ADDRESS: P. 0. Box 8204, Boise, ID 83707 PHONE: 3 2 3 -1919 Fes: 3 2 3- 7 5 2 3 E-MAIL: ARCHITECT (IF DIFFERENT THAN APPLICANT): BRS Architect s ADDRESS: 1010 S. Allante Place, Suite 100, Boise, ID 83709 PHONE: 336-8370 FAX: 336-8380 E-MAIL andrew@brsarchitects.com ADDRESS, GENERAL LOCATION OF S DESCRIPTION OF USE: O f f i c e Southwest corner of Eaale Rd. and Overland C-G~ PRESENT ZONE CLASSIFICATION: Mixed-use Regional ~~ I, , do hereby affirm that I will agree to pay any additional sewer, water or-trash fees or charges, if any, associated with the use that Uwe have applied for, whether the use be residential, commercial or industrial in nature. Furthermore, I have read the information contained herein and certify that the information is true and correct. ~~ ~~~~ ~/~/ b3 (Applicant's Signature) (Date) 1 Ie~i-. If2~It?:~ Ada County Highway District annrr~ - -- 318 East 37th Street Susan Garden City ID 83714-6499 Dave Bivens, 2nd Vice Presidem Phone (208) 387100 John S. Frenden, Commissioner FAX (208) 387-639 David E. Wvnkooo, Commissioner E-mail tellus~ACHD ada id us April 17, 2003 TO: W.H. Moore Company b60 N. Steelhead Way, Suite 144 Boise, Idaho 83704 SUBJECT: MCZC03-019 Great West Casualty Office Southwest corner of Eagle Road and Overland Road On January 16, 2002 the Ada County Highway District Commissioners acted on Bonito Subdivision (Eldorado Business Park MCUP01-037/MAZ01-018). The conditions and requirements also apply to MCZC03-019. Special notification to the Applicant and the City of Meridian, upon the receipt of a developmenbconstruction plans to ACHD the following District policies shall apply to the review of development applications ,within this subdivision. • District policy F2-F4 (1) and 72-F4 (2), requires driveways located on commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet (measured near edge to near edge). • District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. • District policy 7203.6 requires the applicant of a proposed development to make.. improvements to existing damaged sidewalk; curb and gutter construction or replacement; replacement of unused driveways with standard curb, gutter and sidewalk; installation of pedestrian ramps; pavement repairs; signs; traffic control devises; and other similar items in order to correct deficiencies or replace deteriorated facilities. If you have any questions, please feel free to contact this office at (208) 387-6170. Sincerely, ~~ ~ Development Analyst Right-of-way & Development Services Planning Division Cc: Planning & Development/Project File Planning & Development Services: City of Meridian Construction Services Drainage/Utilities Kimball Properties Limited Partnership P.O. Box 8204 Boise, Idaho 83707 BRS Architects 1010 S. Allante Place, Suite 100 Boise, Idaho 83709 • • J Q r~ v / Q V ~- W Q W C~ O O M II r a a Z U_ uu .~ ~v v ~ v d ~.~. 0 0 N O O 0 0 N r O O tD O O .-. • ADA COUNTY HIGHWAY DISTRICT Planning and Development Division Development Application Report Preliminary Plat -Eldorado Business Campus s/w/c Overland Road/Eagle Road 15-lots MCUPOI-037 / MAZO1-018 The application has been referred to ACHD by the City of Meridian for review and comment. The Eldorado Business Campus is a 32-lot office/commercial subdivision on 85.36-acres. The applicant is requesting rezone approval from R-1 to C-C/C-G, annexation approval, as well as preliminary plat approval for the 85.36 acre subdivision. The site is located at the southwest corner of Overland Road and Eagle Road. This development is estimated to generate 8,262 additional vehicle trips per day based on the submitted traffic impact study. Roads impacted by this development: Overland Road Eagle Road Interstate 84 ACHD Commission Date -January 16, 2002 -12:00 noon. Facts and Findings: A. General Information Owner -Winston Moore Applicant - W.H. Moore Company R-1 -Existing zoning (low-density residential) C-C/C-G -Proposed zoning (general commercial) 85.36 -Acres 32 -Proposed building lots 17 -Proposed common lots 4,950 -Total lineal feet of proposed public streets 285 -Traffic Analysis Zone (TAZ) West Ada -Impact Fee Service Area Meridian -Impact Fee Assessment District Eldorado.cmm Page 1 • Eldorado.cmm Page 2 N 1000 0 1000 2000 Feet • Overland Road Minor arterial with bike lane designation Traffic count of 13,551 on 11-30-99 (e/o Eagle Road) Traffic count of 11,422 on 11-30-99 (w/o Eagle Road) D -Existing Level of Service Greater than E -Existing plus project build-out Level of Service 1,300-feet of frontage 50-feet existing right-of--way (25-feet from centerline) 54 to 48-feet required right-of--way from centerline Overland Road is improved with 2-lanes with no curb, gutter or sidewalk abutting the site. There is a southbound turn lane on Overland Road at the Eagle Road intersection. The Overland/Eagle Road intersection currently operates at a level of service F. Eagle Road Minor arterial with bike lane designation Traffic count of 19,790 on 11-30-99 (n/o Overland Road) Traffic count of 7,498 on 2-2-00 (s/o Overland Road) Traffic count of 44,397 on 10-19-99 (n/o I-84) C -Existing Level of Service D -Existing plus project build-out Level of Service 2,700-feet of frontage 50-feet existing right-of--way (25-feet from centerline) 52 to 48-feet required right-of--way from centerline Abutting the site Eagle Road is improved with two travel lanes with no curb, gutter or sidewalk. North of Overland Road Eagle Road widens to 5-lanes. North of I-84 Eagle Road is under the jurisdiction of ITD. Interstate 84 Traffic count on I-84 was not available 0-feet of frontage Interstate 84 is three lanes eastbound and three lanes westbound. There is an "ON" and "OFF" ramp at Eagle Road. B. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. Eldorado.cmm Page 3 C. The Overland Road /Eagle Road intersection is in the Five Year Work program. With the reconstruction of this intersection, the level of service for Eagle Road, Overland Road and the intersection are anticipated to improve. D. On March 14, 2001, the Commission approved the original Silverstone Corporate Center located directly across from the proposed Eldorado Business Campus. The Silverstone Corporate Center was estimated to generate approximately 9,629 vehicle trips per day. The Eldorado Business Campus is estimated to generate approximately 8,262 vehicle trips per day. On November 7, 2001, the Commission considered and allowed the Silverstone Corporate Center to have a fourth access point on Eagle Road due to the fact that the Silverstone Corporate Center had an extraordinary circumstance before them. Staff supported a fourth access on Eagle Road because of three key major components: 1. The Silverstone Corporate Center did not anticipate ownership of the newly acquired parcel, 2. They placed the access point (a public street) in a safer location than if they had not been approved with this request and 3. The applicant did not request direct access to Eagle Road when a formal application was filed for the newly acquired parcel (Silverstone II) with the City of Meridian or the District. On January 9, 2002, the Commission formally acted on Silverstone II, the newly acquired parcel. Silverstone II did not request a new access point to Eagle Road. Rather, they subdivided the 7.83 acre site into 31-lot commercial subdivision and took access from the fourth access point that was approved on November 7, 2001. E. The formal application that was submitted to the City of Meridian and the District showed three access points on Eagle Road. Since the District received the formal submittal, the applicant has requested a fourth access point located on Eagle Road approximately 1,150-feet south of Overland Road. On January 16, 2002, the Commission formally acted on the Eldorado Business Campus and granted the fourth access point to Eagle Road. This access point was proposed to be a driveway located on Eagle Road approximately 1,150-feet south of Overland Road. The following report reflects the Commissions formal action. F. The applicant hired Earth Tech Traffic Engineering to perform a traffic analysis of this site. The analysis has identified the following conclusions, and this information has been verified by District staff: ^ The proposed development is projected to generate an average daily traffic (ADT) of 8262 vehicles per day (vpd), of which the PM peak hour traffic (PHT) is 1085 vehicles per hour (~h)• At build-out, the project will add 5,420 vehicles per day to Eagle Road north of the site, of these trips 727 will take the westbound I-84 ramp, 2,148 will travel eastbound on I-84, and the remaining 2,545 will continue to the north. An additiona1942 vehicles per day will travel south of the site on Eagle Road. The project will also add 1,182 vehicles per day to Overland Road east of the site and 727 vehicles per day on Overland Road west of the site. Eldorado.cmm Page 4 ^ The intersection of Eagle Road and Overland Road is currently operating at Level Of Service (LOS) F. It will operate at a LOS F under background conditions with or without the site traffic. This Development should be required to participate in improvements to this intersection to bring it up to an acceptable level of service. ^ 'The intersection of Eagle Road and the Eastbound and Westbound off ramps of I-84 will function at an acceptable LOS with the addition of the site traffic. This assumes that the proposed signal in the Eastbound off-ramp is constructed by ITD. ^ The intersection of Eagle Road and Franklin Road will operate at LOS F with or without the project. Improvements to this intersection will require additional right-of--way and coordination with the other projects. Since the majority of the traffic will be coming from other growth in the area, widening of this intersection should be considered by ACRD and TTD. ^ The intersection of Overland Road and Meridian Road will operate at LOS F with or without the project. Additional lanes are required to make this intersection operate at an acceptable LOS D. This intersection is within the limits of a proposed project by ACRD. The site traffic should be included in the planning of the ACRD improvement project. ^ The intersection of Overland Road and Cloverdale Road will operate at LOS E under background traffic. This site traffic will reduce the operation to LOS F. Additional lanes are required to make this intersection operate at an acceptable LOS E. This area will probably see development in the coming years. ^ The intersection of Eagle Road and Victory Road will operate at LOS D under background traffic. The intersection operation will reduce to LOS F with the addition of site traffic. Adding a southbound left turn lane to this intersection would increase the operation to an acceptable LOS C. ^ Eagle Road south of the project will operate at an acceptable level of service after build out of the project. The site should contribute right-or-way for future roadway expansion. Since Eagle Road is on a section line, it is assumed that the future roadway will be afive-lane road. ^ Eagle Road north of the site will operate at an acceptable level of service after build out of the project. ^ Overland Road west of Eagle Road will operate at an acceptable level of service for athree-lane road. A three-lane road is proposed to be built by ACRD on this section of roadway. ^ Overland Road east of Eagle Toad will operate at a poor level of service after build out of the project. The Silverstone Corporate Center Traffic Impact Study suggests that right-of--way should be dedicated for afive-lane future roadway. ^ The project should be required to construct a signal at the south main entrance to the site on Eagle Road. ^ The on-site roadways will operate above LOS C. ^ The signalized entrance to El Dorado, along Eagle Road, will operate at a LOS C. ^ The north unsignalized entrance, along Eagle Road, will operate at a LOS E. ^ The south-unsignalized entrance, along Eagle Road, will operate at a LOS C. ^ The west unsignalized entrance along Overland Road will operate at a LOS C. ^ The middle unsignalized entrance, along Overland Road, will operate at a LOS C. ^ The east unsignalized entrance, along Overland Road, will operate at a LOS B. ^ The signalized entrance to El Dorado along Eagle Road will operate at a LOS C. Eldorado.cmm Page 5 Pending projects assumed to be built by build-out and included in the analysis. ^ Locust Grove Overpass, and associated projects (RD157, RD157B, F201-O1, F201-O1B). These projects are all either unfunded or pending and are not scheduled to begin acquiring R/W .until at least 2004 for the overpass. ^ Overland Rd, Eagle Rd/Cloverdale Rd (RD072) -Reconstruct and widen to 5-lane urban section. (unfunded) ^ Overland Rd, Locust Grove Rd/Eagle Rd (RD266) - 4/5-lane rural section. (2005) Project not included in the traffic analysis that will affect the impact area. ^ Project RD201-02, on Cloverdale Road between Overland Road and the I-84 overpass. This project includes widening the overpass to three lanes and will also include intersection work at Cloverdale and Overland that will widen all four approaches to a 5-lane rural section. This intersection. This project is scheduled to begin in Oct. 2002 and be completed by Summer 2003. G. The applicant should be required to construct a 5-foot wide detached concrete sidewalk on Eagle Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk H. The applicant should be required to construct a 5-foot wide detached concrete sidewalk on Overland Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk I. District policy 7204.7.3 states that access points on arterials are based on the following: • One access point for less than 150-feet of frontage • Two access points for 150-600-feet of frontage • Three access points for greater than,600-feet of frontage. Access points are considered to be both public streets and driveways. Due to the fact that this parcel has approximately 1,300 feet of frontage, they are allowed a maximum of three access points to Overland Road. The applicant is proposing three access points on Overland Road. The access points are proposed to be located in the following locations: • The applicant is proposing to construct a driveway on Overland Road approximately 240-feet west of Eagle Road • The applicant is proposing to construct a driveway on Overland Road approximately 550-feet west of Eagle Road • The applicant is proposing to construct a public road on Overland Road approximately 950-feet west of Eagle Road Eldorado.cmm Page 6 ~ ~ District policy requires driveways on arterial roadways to align or offset a 150-feet from any existing or proposed street. These Spacing requirements are illustrated in Figure 72-F5. If the driveway is proposed to be located at or near a signalized intersection, the driveway should align or offset a minimum of 440-feet for a full access driveway or 220-feet for aright- in/right-out driveway. These spacing requirements are illustrated in Figure 72-F3. The driveway that is proposed to be located on Overland Road approximately 240-feet west of Eagle Road meets District policy as aright-in/right-out driveway only. Because it meets District policy, it should be approved with this application. The driveway that is proposed to be located on Overland Road approximately 550-feet west of Eagle Road meets District policy as afull-access driveway. Because it meets District policy, it should be approved with this application. District policy 7204.11.6 restricts access to collector and arterial roadways. Due to the fact that access is restricted on collector and arterial roadways the applicant should construct the new public streets entering onto the arterial public roadway system to align or offset a minimum number of feet from any existing or proposed street. These spacing requirements are listed on in policy number 7204.11.6 and states, "the optimum spacing for collector intersections along arterials is 1,700-feet to allow adequate signal spacing. The minimum spacing for collector intersections along arterials is 1,300-feet." The public roadway access point that is proposed to be located on Overland Road approximately 950-feet west of Eagle Road is a collector roadway. This specific location does not meet District policy. Earth Tech, the applicants Traffic Engineer, states, and "the internal roadways will adequately handle projected traffic volumes at a LOS C or greater according to the Ada County Roadway Capacity Guidelines. These roads should be constructed to an ACRD standard for a collector road in a business district." Due to the fact that the District approved a similar design on the east side of Eagle Road and the applicants Traffic Engineer feels that a collector roadway is warranted with this development, District staff believes that a modification of policy 7204.11.6 is, both, warranted and justifiable. J. District policy 7204.7.3 states that access points on arterials are based on the following: • One access point for less than 150-feet of frontage • Two access points for 150-600-feet of frontage • Three access points for greater than 600-feet of frontage. Access points are considered to be both public streets and driveways. Due to the fact that this parcel has approximately 1,300 feet of frontage, they are allowed a maximum of three access points to Overland Road. The applicant is proposing four access points on Eagle Road. The access points are proposed to be located in the following locations: Eldorado.cmm Page 7 • The applicant is proposing to construct a public roadwa on Eagle Road approximately 700-feet south of Overland Road • The applicant is proposing to construct a driveway located on Eagle Road approximately 1,150-feet south of Overland Road. • The applicant is proposing to construct a public roadwa on Eagle Road approximately 1,700-feet south of Overland Road • The applicant is proposing to construct a public roadwa on Eagle Road approximately 2,400-feet south of Overland Road District policy 7204.11.6 restricts access to collector and arterial roadways. Due to the fact that access is restricted on collector and arterial roadways the applicant should construct the new public streets entering onto the arterial public roadway system to align or offset a minimum number of feet from any existing or proposed street. These spacing requirements are listed on in policy number 7204.11.6. The public roadway access point that is proposed to be located on Eagle Road approximately 700-feet south of Overland Road is a collector roadway. This specific location does not meet District policy. Earth Tech, the applicants Traffic Engineer, states, "the internal roadways will adequately handle projected traffic volumes at a LOS C or greater according to the Ada County Roadway Capacity Guidelines. These roads should be constructed to an ACRD standard for a collector road in a business district." Due to the fact that the District approved a similar design on the east side of Eagle Road and the applicants Traffic Engineer feels that a collector roadway is warranted with this development, District staff believes that a modification of policy 7204.11.6 is, both, warranted and justifiable. The driveway that is proposed to be located on Eagle Road approximately 1,150-feet south of Overland Road was approved as a modification of policy by the District Commission on January 16, 2002. The public roadway that is proposed to be located on Eagle Road approximately 1,700-feet south of Overland Road meets District policy. Because it meets District policy, it should be approved with this application. The public roadwa access point that is proposed to be located on Eagle Road approximately 2,400-feet south of Overland Road is a collector roadway. This specific location meets District policy and should be approved with this application. K. The applicant is proposing to construct a spine road through the site with connections at Overland Road and Eagle Road. This roadway (Copper Point Way) is proposed to align with the roadway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicant's proposed site plan, the applicant should construct this roadway as a 46-foot street section with curbs, gutters and sidewalks: The street should be constructed within 70-feet Eldorado.cmm Page 8 • ofright-of--way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. L. The proposed roadway on Eagle Road located approximately 1,700-feet south of Overland Road is proposed to align with the roadway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicants proposed site plan, the applicant should construct this roadway as a 46-foot street section with curbs, gutters and sidewalks. The street should be constructed within 70-feet ofright-of--way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. M. The proposed roadway on Eagle Road located approximately 700-feet south of Overland Road is proposed to offset a driveway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicants proposed site plan, the applicant should construct this roadway as a 46-foot street section with curbs, gutters and sidewalks. The street should be constructed within 70-feet ofright-of--way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. N. The Silverstone Corporate Center has a comparable impact on the public roadway system. The Silverstone Corporate Center was required to construct center turn lanes on Eagle Road and Overland Road. To promote consistency and mitigate traffic in the area, the applicant should be required to construct center turn lanes on Overland Road and Eagle Road for the proposed public street intersections and for full access driveways. O. The applicant's site plan indicates a traffic signal on Eagle Road located approximately 1/3-mile south of Overland Road. According to the, submitted traffic study that was submitted by the Eldorado Business Campus' and the Silverstone Corporate Center's traffic impact studies, at full build-out, the projects should be required to construct the signal, and the necessary site improvements associated with the signal. The Eldorado Business Campus' traffic impact study specifically addresses the proposed signalized intersection and states that the Eldorado Business Campus should construct a left turn bay at the main entrance on Eagle Road. Based on ACRD Commission action, traffic signals cannot be installed at these intersections until there is a warrant. The applicant's traffic engineer should work with ACRD Traffic Services staff to determine when the warrant is met, or is close to being met. The developer should be financially responsible for the cost of one-half of the signal due to the fact that the Silverstone Corporate Center was required to contribute the half of the signal. This applicant should enter into a three way written agreement with the District for the cost and specific location of the traffic signal. P. The applicant is proposing to construct several landscape islands throughout the site. Any proposed landscape islands/medians within the public right-of--way dedicated by this plat should Eldorado.cmm Page 9 be owned and maintained by a homeowners association. Notes of this should be required on the final plat. Q. The applicant is proposing to construct a stub street to the west property line. District staff recommends that a stub street be constructed to the west property line to provide connectivity throughout the area. District policy requires temporary turnarounds at the end of stub streets that serve more than one lot, or are greater than 150-feet in length. The applicant should be required to provide a paved temporary turnaround at the west end of the stub street with a temporary easement provided to the District. The applicant should be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround (if necessary) with District staff. R. The turnarounds should be constructed to provide a minimum turning radius of 55-feet. S. Any existing irrigation facilities should be relocated outside of the right-of--way. T. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. U. If utility relocation is necessary to construct improvements required with this development, then all utility relocation costs associated with improving street frontages abutting the site should be borne by the developer. V. ACHD's Park & Ride Division Staff have indicated the need for a park and ride location at the applicant's site. The District requests that applicant grant the District an easement fora 10 to 12- space Park & Ride area at this site. Commuteride staff will contact the applicant to coordinate the location of the Park & Ride area. W. In order to reduce trips to and from this development it is recommended that Tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACRD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Pat Nelson at 387-6160. X. In order to reduce trips to and from this development, it is recommended that the tenants occupying the proposed building(s) be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. A Transportation Management Association (TMA) or Transportation Management Organization (TMO) is formed with a coordinator that works as a liaison between businesses and private and public transportation providers to increase the use of alternative transportation and other trip reduction measures (shuttle buses, bus pass programs, vanpools, carpools, bicycle and walking Eldorado.cmm Page 10 ~ ~ enhancements). An annual survey will be required of the TMA/TMO to monitor participation in alternative transportation programs and forwarded to the ACHD Commuteride Office. Y. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will not be adequate to accommodate additional traffic generated by this proposed development at accepted levels of service without modifications to Eagle Road and Overland Road, and the intersection. Special Recommendation to City of Meridian: 1. In order to reduce trips to and from this development it is recommended that tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Ms. Pat Nelson at 387-6160. 2. In order to reduce trips to and from this development, the tenants occupying the proposed building(s) should be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. 3. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. 4. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will not be adequate to accommodate additional traffic generated by this proposed development at accepted levels of service without modifications to Eagle Road and Overland Road, and the intersection. The following Site Specific Requirements and Standard Requirements must be met or provided for prior to ACHD approval of the final plat: Site Specific Requirements: Dedicate 54 to 48-feet ofright-of--way from the centerline of Overland Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of--way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of--way dedicated which is an addition to existing ACHD right-of--way. The applicant shall coordinate the dedication ofright-of--way on Overland Road with District staff. Eldorado.cmm Page 11 2. Dedicate 52 to 48-feet ofright-of--way from the centerline of Eagle Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of--way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of--way dedicated which is an addition to existing ACRD right-of--way. The applicant shall coordinate the dedication ofright-of--way on Eagle Road with District staff. 3. Construct a 5-foot wide detached concrete sidewalk on Eagle Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk 4. Construct a 5-foot wide detached concrete sidewalk on Overland Road located 2-feet within the new right-of--way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk 5. Construct the proposed driveway on Overland Road approximately 240-feet west of Eagle Road. This driveway meets District policy as aright-in/right-out driveway only and is approved with this application. The applicant shall coordinate with the Districts Traffic Services Division to determine a mean to restrict this driveway to a right-in/right-out driveway only (ie raised median, internal island, etc.). 6. Construct the proposed driveway on Overland Road approximately 550-feet west of Eagle Road as a fixll-access driveway. This driveway meets District policy and is approved with this application. 7. Construct the proposed public roadway access point located on Overland Road approximately 950-feet west of Eagle Road is a collector roadway. This location is granted a modification of policy and is approved with this application. 8. Construct the proposed public roadway on Eagle Road approximately 700-feet south of Overland Road as afull-access roadway. This roadway meets District policy and is approved with this application. 9. Construct the proposed driveway on Eagle Road located approximately 1,150-feet south of Overland Road. This driveway was granted as a modification of policy by the District's Commission on January 16, 2002. 10. Construct the proposed public roadwa on Eagle Road approximately 1,700-feet south of Overland Road. This roadway meets District policy and is approved with this application. 11. Construct the proposed public roadwa on Eagle Road approximately 2,400-feet south of Overland Road as a full access roadway. This roadway meets District policy and is approved with this application. Eldorado.cmm Page 12 ~ ~ 12. Construct the proposed spine road with connections at Overland Road and Eagle Road, as proposed. This roadway shall be constructed as a 46-foot street section with curbs, gutters and sidewalks within 70-feet ofright-of--way, as proposed. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 13. Construct the proposed roadway on Eagle Road located approximately 1,700-feet south of Overland Road to align with the roadway that was approved with the Silverstone Corporate Center. This roadway shall be constructed as a 46-foot street section with curbs, gutters and sidewalks within 70-feet ofright-of--way. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 14. Construct the proposed roadway on Eagle Road located approximately 700-feet south of Overland Road is proposed to offset a driveway that was approved with the Silverstone Corporate Center. This roadway shall be constructed as a 46-foot street section with curbs, gutters and sidewalks within 70-feet ofright-of--way. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 15. Construct center turn lanes on Overland Road and Eagle Road for the proposed public street intersections and for all of the full access driveways. 16. Construct a left turn bay at the main entrance on Eagle Road. 17. Enter into a three way written agreement with the District for the cost and specific location of the traffic signal on Eagle Road. 18. Any proposed landscape islands/medians within the public right-of--way dedicated by this plat shall be owned and maintained by a homeowners association. Notes of this shall be required on the final plat. 19. Construct a stub street to the west property line. The applicant has proposed that the stub street be located approximately 450 feet north of the south property line. Staff is supportive of this location or any location that is located south of the proposed Lot 11. The applicant shall construct the stub street and provide a paved temporary turnaround at the west end of the stub street with a temporary easement provided to the District. The applicant shall be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WII,L BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround (if necessary) with District staff. 20. The turnarounds shall be constructed to provide a minimum turning radius of 55-feet. 21. Any existing irrigation facilities shall be relocated outside of the right-of--way. Eldorado.cmm Page 13 22. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 23. If utility relocation is necessary to construct improvements required with this development, then all utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer 24. Other than the access points specifically approved with this application, direct lot or parcel access to Eagle Road and Overland Road is prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. Standard Requirements: A request for modification, variance or waiver of any requirement or policy outlined herein shall be made in writing to the ACHD Planning and Development Supervisor. The request shall specifically identify each requirement to be reconsidered and include a written explanation of why such a requirement would result in a substantial hardship or inequity. The written request shall be submitted to the District no later than 9:00 a.m. on the day scheduled for ACHD Commission action. Those items shall be rescheduled for discussion with the Commission on the next available meeting agenda. Requests submitted to the District after 9:00 a.m. on the day scheduled for Commission action do not provide sufficient time for District staff to remove the item from the consent agenda and report to the Commission regarding the requested modification, variance or waiver. Those items will be acted on by the Commission unless removed from the agenda by the Commission: 2. After ACRD Commission action, any request for reconsideration ofthe Commission's action shall be made in writing to the Planning and Development Supervisor within six days of the action and shall include a minimum fee of $110.00. The request for reconsideration shall specifically identi each requirement to be reconsidered and include written documentation of data that was not available to the Commission at the time of its original decision. The request for reconsideration will be heard by the District Commission at the next regular meeting of the Commission. If the Commission agrees to reconsider the action, the applicant will be notified of the date and time of the Commission meeting at which the reconsideration will be heard. 3. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #193, also known as Ada County Highway District Road Impact Fee Ordinance. 4. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. Eldorado.cmm Page 14 5. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 6. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of--way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of--way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 9. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless awaiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Conclusion of Law: 1. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Should you have any questions or comments, please contact the Planning and Development Division at 387-6170. Submitted bv: Commission Action: Planning and Development Staff Eldorado.cmm Page 15