Loading...
Hartley Dirtworks~?L HUB OF TREASURE VALLEY MAYOR A God Place to Live LEGAL DEPARTMENT Robert D Come (208) 288-2499 • Fax 288-2501 . CITY OF MERIDIAN PUBLIC WORKS CITY COUNCIL MEMBERS BUILDING DEPARTMENT Keith Bird 33 EAST IDAHO (208) 887-2211 • Fax 887-1297 Tammy deWeerd MERIDIAN, IDAHO 83642 Cherie McCandless (208) 888-4433 • FAX (208) 887-4813 PLANNING AND ZONING City Clerk Office Fax (208) 888-4218 DEPARTMENT William L.M. Nary (208) 884-5533 • FAX 888-6854 CERTIFICATE OF ZONING COMPLIANCE* Date: February 3, 2003 Owner: Greg Hartley Applicant: Big D Builders, Contact: Crai Durrant 888-2068) Project Address: 276 N. Baltic Place, Meridian. Idaho 83642 Proposed Use: Small office with warehouse, and contractor's yard in rear portion for Hartley Dirtworks Zoning: 1-L Comments: Conditions of Approval: Project is subject to all current City Ordinances. The City's failure to specifically identify requirements in this Certificate of Zoning Compliance does not relieve owner of responsibility for compliance with these documents. Si~nage: No signs are approved with this CZC. All signs will require a separate sign permit in compliance with the sign ordinance. Landscaping: The Landscape Plan is approved per the plan stamped 2/3/03. The approved landscape plan is not to be altered without prior written approval of the Planning & Zoning Department. No field changes to site plan permitted; prior written approval of all material changes is required. Irri ag tion: An underground, pressurized irrigation system must be installed to all landscape areas per the specifications provided. Fencin :Perimeter chain link fencing shall be slatted (see red-line note) per ordinance 11-12-3J. C bing: Per Ordinance 12-13-7-9, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Protection of Existing Trees: Any existing trees on site must be protected in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per Ordinance 12-13-13-4, coordinate with the Parks Department Arborist (Ekoy Hui for approval of protection measures prior to construction. Any severely damaged tree must be replaced incompliance with Ordinance 12-13-13-6. Parkin: Off-street pazking is approved as shown on the approved site plan. All standazd pazking stalls must be 9 x 19 minimum and drive aisles must be at least 25 feet wide. Project engineer/architect shall certify that the number and size of handicap-accessible spaces conforms to the Americans with Disabilities Act. Sidewalks: All sidewalks shall be constructed as submitted and in accordance with the Meridian City Code requirements. Sidewaks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with the Meridian City Code. Liahtin: Lighting shall not cause glaze or impact the traveling public or neighboring development. Trash Enclosure: All dumpsters must be screened from view and not be visible by the public or from adjacent properties. Trash enclosure must be built in the location and size as approved by SSC. Handicap-Accessibility: The structure, site improvements and parking must be in compliance with aU federal handicap-accessibility requirements. ACHD Acceptance: Applicant shall be responsible for meeting the requirements of ACHD as they pertain to this development. All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACRD requirements, a new site plan shall be submitted to the City of Meridian Planning and Zoning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. No occupancy will be granted until the final plat for the property is recorded. Plan Modifications: The approved Site/Landscape Plan, stamped 2/3/03 is not to be altered without prior written approval of the Planning & Zoning Department. No significant field changes to the site or landscape plans aze permitted; prior written approval of all changes is required. ,(' ~~c~. So ya en Planner I *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. CITY OF MERIDIAN Planning & Zoning Department 660 E. Watertower Ln., Ste. 202, Meridian, ID 83642 (208)884-5533 Phone / (208)888-6854 Fax CF.RTiFiCATF, nF 7.nNiNG C'nMPi.iANCF. 4C7.C1 APPi.iCATinN (Section l 1-19-1, Zoning and Development Ordinance) PROJECT NAME: I ~-~u~or °a~ APPLICANT: ~lJ~~'1 ~ ~I (C~2r5 ADDRESS: oIQ~ 1~! . ~~c",~~ I C~ 1~~. ~ t~ ~ ~Q~ 1 ~ I C~-i°1 , ~ ~ - PHONE: ZJV~ " 01~~0~ FAX: ~~ - 0 5 35 E-MAIL: OWNER(S) OF RECORD: ADDRESS: 13~~~ ~nrlabra~k Qr• ~15e-, ~-D• PHONE:-13$ `~'d~~ FAX: E-MAIL: ARCHITECT (IF DIFFERENT THAN APPLICANT): ~C~.Q~Ure. Y GL.I ~~~ ~ r1 G~~ Y12.P~J ADDRESS: ~ ~ ~'1 Ca-~d l~2-~ ~ u~ Vd PHONE: `~' ~3 b 3~~ rep ~-lo.~'~I FAX: ~~03- ~-~ ~ E-MAILY'~N(1(~ I f2Q5u11;.' ~Q.~~e~~i f1P~5 .CAM ADDRESS, GENERAL LOCATION OF SITE: "~~ ~ ~ • '~-"'~~ ~ ~~ • ~~1 ~ 1 a~ DESCRIPTION OF USE: ~~~-~1 ~~t CtX ZhC7 PRESENT ZONE CLASSIFICATION: ~ ' I-- 1, ~ /~i9~1~7 ®U12fL4N7 , do hereby affirm that I will agree to pay any additional sewer, water or trash fees or charges, if any, associated with the use that Uwe have applied for, whether the use be residential, commercial or industrial in nature. Furthermore, I have read the information contained herein and certify that the information is true and correct. (Applicant's Signature) (Date) Rc't~ ~ 1 I)? ~~ O W O O O ~ r Z ~ ~ o ~ N 0 0 z c v C ~' ~^ ~ ~ ~v ~ _. wo oy 0 LOCUST GROVE RD Hartley Concrete C O N S T R U C T I O N To Whom It May Concern: A R T L E Y ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ DI RTWORKS January 27, 2003 This letter is to describe in detail the purpose of property owned by Greg and Tamara Hartley, at lot 6, in Block 2 of Meridian Business Park, also known as 276 N. Baltic Place, Meridian, Idaho. The building will be used for office, and warehouse space. The rear portion of property will be used for a construction yard. The construction yard will be used to store forms, tools, trailers and equipment. Sincerely, Greg artley woa.wa44~B~a'W W>m We r~ X11 ZO-PZii T 7D IT f~ Q~ gi Y o1Nno B o0B-BE' [BO2) oe 9aP[ ...m+^®. o.w w.w,. ~ a~sr~WC~mo ~ i, ' b7~ 'IJ[ 6l! ~'d88 ~ 811®0108 1a9 HHd 88181 WWf HO/W~iB @R B 8 . '+U xaa+Qa~' BHB6T [a7Neg eats ' 830Z-BBB a~u1o ~ axi ~nsa~ne no .{7~ a ug -~~~ `~./ ~ ® 44 6959 ® ~ uem ~ ~Wu 9ILWid- 8Hl 8888 dT en 1 4L8iH ~ 68fI011.L~0 .[8 ~ meo im ~~ 8®OYJ~B 38'L1fliH 80d 918Q888 18N NOLLAND880 8SY0 EH OAI ~88N80 ~80J~JYNY80] y° H®~a®~ CBiiYY II~~ .87y1J, W° ~-~~ ~~ /~ a °~ ~s ~, a' ~~~ /~-- y ~ ~ ~ ~ W ~ ~ ~ ~ ~ ~ <~ m ai~ ~~~~~~~~pa~ ~€~ ~ ~ ~ ~ ~~~~~~ ~3~~~ ~q~g ~ W ~W~x ~ ~R~~°1~~ ~ ~ rW B~ 2 SS~ ~~F~~ ~8~736~ F~~ (! ~ d Ai ddridd 6~Nd id d ~d hd ~ N ~ €€ ~ 3 5 ~ - ~~ ~ o a F W A W W '.7 O r'~ d Q i W~ A ~~ ~ ~ ~ ~~~~ ~ ~~~ ~ hl ~ F ~Q . ~~ ~, ~ ~~~~ H `~ ~ ~ ~~~~~ ~ F ~~ ~ ~~~~~ E w i. w R h h ~.~..aaH.~.~,.. oo.m ®e m aaw~ ~ zo-~-,N;,~ c m n >s~ 8H09-HC8 (BOH) m m.. ~~1R191 lI Humour>u,HHa a .~ n~ +alawv esHSr e?oa-eeeyuro~•~ ~.~.w~~ s9zse~.+r>oa•~o gm~ og ~®~ ~m ,~~~ a ea TBOHHEHH HHIHi QHHT 90/80/10 eR H LaMeg eai.~ m+~w~ a ~$ 1 ~ ~~ ~~1J~1II 6 9 S 9 7f60Bdd- 800 HO681 80/81/8[ 1H! 1 ~ SFYOILL~Q EBZIflYH 'x~ .aea,ine a o~ ma sao 9/m ry~p~q~n7A11 ~~6 ®OIILIDH 1~W8P9 90d 9lQH'QfIB ~1 NOiZdIN0850 SSYO dH'ON :~0 ~HOJ.7YH,W0~ z>_H~aOO EHII, HUIII~ :~y~,~, SI~~~S7~aZ~ I; !'~I ~ ~ il~~~ ~~~!~~ ~~ I! ~ a2a4 3.9a[cf'R, a°2 _ ~g \J Ll ra¢ 1]]9 t] Ii ;}Jji a 4 ~ P~~ ~ - ~ ~ _ ~~ _ ___ _ O ----- - o ~~---. `-- -' I r~ 4 ~~ ~oP ~ ~ ~ ~ _ , ~. ~ ,. \s c~ ~ ~ ~ ~ t, l ~ - ~ ~~ , T '- `'^~ §§ n AL Al w ~{ ~'i.. i ihr ~ aA ~~~~ S ~ m ~ & ~ .d~ F - J m ~~~~ ~~ w ~ ,f~ A ~ r. a~ ~ ~ ~ m~~~ ~~ ~ ~ ~ _~§ s~ ~ a `w ; c t c o,i i 3 ~ ~ 1 rla~ @~ ~ m ~ ~ q ff$a ~ Jy ~ r' ~® Y y~ ~ O O -T ~ WW ~` W Jm 1Z-~ ~ ___ AA yU ~ ~~~ ~ ~ € a O ~ ~ ~ ~8~~a ~ m~-.~ ~ ~ W -- ----- ~J(~, ~ - a w - ~I 3 M ~ -x a ~ ~ c°~ ~ ~ ~ a ~ ~ ---- ~ z " J o H / , ~ ~ m \~~~I ~ ~~k -~ - a ~- ~~ ~ o~ // U 00 ~ N ~ J m // Y ~ Op /~/ Jm ti ~~~~ ~ ~ ~ ' W ~3B ~ ~G{ N ^ i ~d 7 ~~~ ~ ~ea~ ~ ~ ~~`~ ~~~ ~ i . etec ~ ~ 8~~~ ~ €~~xl~ € ~~~ ~ ~ ; ~ Y ~~ ~~ U z 9 a~ ~ ~ ~ ¢ ~ ~ - J 4F 3 ~~ ~H g i ~ ~ ~ ~a~g~h~~~~~~3l~ ! ~ ~ ~~~~~~ s ~~~~~I~~~~~~~~~~i~~~I~ ~ ~ ~ ~°~~~~~ ~ ~. o I H I II ~~iiiiil E 660 E. Watertower Lh., Suite 202 Meridian, ID 83642 Ph: (208)884-5533 Fx: (208) 888-6854 To: Art Schultz From: Sonya Allen Fax: 463-4391 Pages: 1 Phone: 463-0305 Date: 1/9/2003 Re: Hartley Dirtworks - CZC CC: ^ Urgent ^ For Review ^ Please Comment ^ Please Reply ^ Please Recycle Art, I reviewed the Certificate of Zoning Compliance application for the above-mentioned project. There are a couple of incomplete and/or missing items that were required on the application form. Below is a list of the outstanding items: • `~ Submit a warranty deed for the subject property • /Submit a written statement detailing the proposed use(s) of the property. Please list as many details as possible. `~ iC5 • submit a new site plan showing: ~ 'landscaping in the right-of-way (grass) --''fequired parking spaces (6 + 1 waving ~ trash enclosure and any other rea that has vehicular traffic /- 6' chain link perimeter fencing needs to be slatted if rear portion is used as a contractor's yard (if it's not used as a contractor's yard the trash enclosure must be screened on three sides). • / Please submit an 81/2"' x 11"reduction of the site/landscape plan ~ /1-'~^iaJa-lion PerForrv~anu Sp~c's. If you have any questions please don't hesitate to call, 884-5533 ~~ CERTIFICATE OF ZONING COMPLIANCE & PLAN REVIEW CHECKLIST City of Meridian I ~S~o3 Submi++{d Dir+wprKS Contact• Ar+ Schu I+i -Treasure ~1~. Ehgir~rS Zone Site Review/Conforming Elements Comments Com~~plete * Project must comply with adl approved permits, plats or Development. Agreements associated with the lot or arcel. 1. Zoning District (permitted use, CUP, AUP, variance, etc. CheckD/A, FF/CL 2. Flood lain District Z L - ~rrhi +~It~ is-Must cow+ I w ~taod ord i v~ / 3. Landsca in ' ~tted -Fv lands Q.o~n! Must be in compliance with the Landsca a Ordinance 4. Off-Street Parkin S ~ 81Z u~.~hovse: 3,38o s~ a # of Stalls dimensions, etc tz . + I r vthick usrd in bvsirlPtS b) Handicap Stalls (van accessible - 8' aisles - 8', si e I - /ctn acc~ssibk c) Aisles (width - 25' new, 20' min. existin ,location Z5 ~ '~ 5. Trash Areas C~r~ or QK'd a Location .dr~~e, rnu;+ 6t d -lo -tr~st+ ehclos `~ b) 3-Side Screenin wilt be enclo~l 6 •in~e+[r -Fence .~ 6. Unde round Irri ation 2 `~ 7. Sidewalks/Paths `~ 8. Lot Requirements a) Lot Area (note restrictions on use of undevelo ed ortion o lot ~' b) Street Frontage .~ c) Setbacks .~ d) Coverage 9. Fencing ' ch •hk„- S -b 1,c scrceneo~ .. 10. Fee of $60.00 ~' ACHD approval letter required for curb cuts, road widening, for all new projects. ' Trees must not be planted fn City water or sewer easements. z Pressurized irrigation can be waived by City Council only if no water rights exist to subject property or developer deeds land to City for a well. City will permit one hook-up to municipal water for irrigation per site. IZc>v. 12,%10,712 WARRANTY DEED For value received, Meridian Industrial Park, an Idaho general partnership, the grantor, does hereby grant, bargain, sell and convey unto Greg Hartley and Tamara Hartley, husband and wife, the grantee, whose _ ~:`~ current address is 698 E Cloverhill Ct, Eagle, Idaho 83616, the following real property located in Ada ', County, Idaho: All of Lot 6 in Block 2 of Meridian Business Park, a subdivision, according to the official plat thereof as filed in the records of Ada County, Idaho. To have and to hold said premises, with their appurtenances, unto the grantee, its heirs and assigns forever. And the grantor does hereby covenant to and with the grantee that it is the owner in fee simple of said premises, that they are free from all claims except current taxes and assessments; recorded easements, rights-of-way, and restrictions; restrictions established by jurisdictional agency; and other matters apparent or of record, and that it will warrant and defend the same from all other lawful claims whatsoever. ~ , Dated: ~..~Ll_~ ~ ~- ~ ~ - ~~ ~~. ~1-~C MERIDIAN INDUSTRIAL PARK Winston H. Moore, neral partner Jeff W. oore, his attorney in fact State of Idaho ss. County of Ada ) `~ ~ . On this -.,~, - day of November, 2002, before me, the undersigned, a Notary Public in and for said State, personally appeared Jeff W. Moore, known or identified to me to be the same person whose name is subscribed to the within instrument as the attorney in fact of Winston H. Moore, and he duly acknowledged to me that he executed the name of Winston H. Moore as principal on behalf of Meridian Industrial Park, a partnership in which said principal is a partner, and his own.,name as. attorney in fact, and that said partnership executed the same. ~~ ~ ! •'~~•,.•°""•••.,~~':, Notary Public for/ daho • Q ~ ~ s ~ Residing at ---~~it~ ~oT~Ry, '~ ~, • Comm Expire ~ ID ° * • .~.. ~. ~ * _. 05-04-2006 :~ AtlBL~G :~ 9 •....• ~ ~,• ' F lO • AFFIDAVIT OF LEGAL INTEREST STATE OF IDAHO ) COUNTY OF ADA ) (name (address) ,~ ~ ~~ being first duly sworn upon oath, depose and say: city) (state) 1. That I am the record owner of the property described on the attached, and I grant my permission to: (name) (address) to submit the accompanying application pertaining to that property. 2. I agree to indemnify, defend and hold the City of Meridian and it's employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property, which is the subject of the application. Dated this c~~ day of ~a-r.~' , 200 S' t e) SUBSCRIBED AND SWORN to before me the day and year first above written. CRYSTAL WHIPPLE l~/~r "~ NOTARY PUBLIC Notary u~tc fir Idaho STATE OF IDAHO Residing at / ~'~~~ r~a~ C~ My Commission Expires:` ~ ~~ Rev. 3,' 1 '~ JAN 0 6 2003 ~~ District H Ada County Highway 318 East 37th Street David E. Wynkoop, President Garden City ID 83714-6499 Dave Bivens, 1st Vice President Phone (208) 387-6100 Judy Peavey-Derr, 2nd Vice President FAX (208) 387-6391 Susan S. Eastlake, Commissioner E-mail: tellusCa~ACHD.ada.id.us Sherry R. Huber, Commissioner January 3, 2003 Treasure Valley Engineers, Inc Attn: Art Schultz 1117 Caldwell Blvd Nampa, ID 83651 RE: MSPR-21-02 / 598 Franklin /Memorial Monuments Addition PLANS ACCEPTANCE The District has reviewed the plans for the above referenced project and they are accepted for construction. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The District will not assess an impact fee for this project. Standard Requirements: 1, The District requires a set of stamped construction plans that are signed, dated, and approved by the District to be located on site at all times for inspection and reference purposes. 2, Utility street cuts in new pavement less than five years old are not allowed unless approved in writing by the District. 3, All required street improvements shall be completed and inspected by District staff prior to receiving occupancy. Variances and waivers to this requirement must be specifically and previously approved by the District in writing. 4. All irrigation facilities must be located outside the public right-of--way unless otherwise approved by the District in writing. 5. Replace any damaged or broken sidewalk, curb, and gutter with new curb, gutter, and sidewalk to match existing improvements. 6. Replace any cracked or damaged sidewalk, curb, or gutter resulting from construction activity. 7, All facilities to be constructed with a proposed development, and to be owned and maintained by the District, must be constructed according to the latest edition of I.S.P.W.C. and the District's Supplemental Standard Specifications. g, If applicable, submit to Idaho Department of Water Resources a Shallow Injection Well -Notice of Construction /Inventory Form at least thirty days prior to construction of the facility. The District will require a copy of the completed form prior to granting of final occupancy. 9, Any work in the public right-of--way requires a permit from AC1•-ID Construction Services. 10. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. If you have any questions or concerns, please feel free to contact me at 387-6181. Sincerely, ,~~-~..~ Scott Rudel Development Review Division Cc: Memorial Monuments 598 W Franklin Rd Meridian, ID 83642 JAN 0 ~ 2003 . ,-1 ~ f ~~~ ~~ C Ada County Highway District David E. Wynkoop, President 318 East 37th Street Dave Bivens, 1st Vice President Garden City ID 83714-6499 Judy Peavey-Derr, 2nd Vice President Phone (208) 387-6100 Susan S. Eastlake, Commissioner FAX (208) 387-6391 Sherry R. Huber, Commissioner E-mail: tellusCa)ACHD.ada.id.us December 30, 2002 Treasure Valley Engineers, Inc. Attn: Lance Warnick 1117 Caldwell Blvd Nampa, ID 83651 RE: MSPR-24-02 /Baltic Place / Hartley Dirtworks PLANS ACCEPTANCE The District has reviewed the plans for the above referenced project and they are accepted for public street construction. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The District will assess the following impact fee for this project. The impact fee must be paid prior to issuance of a building permit. Total Impact Fee Due: $5,982.00 Effective July 1, 2002, the Ada County Highway District amended its development impact fee ordinance, in accordance with House Bill No. 607. As a fee payer, you may be entitled to an additional credit on your impact fee assessment and a corresponding reduction in the impact fee itself. Application for this credit must be made at the ACRD offices. Standard Requirements: 2. 3. 4. 5. 6. 7. The District requires a set of stamped construction plans that are signed, dated, and approved by the District to be located on site at all times for inspection and reference purposes. Utility street cuts in new pavement less than five years old are not allowed unless approved in writing by the District. All required street improvements shall be completed and inspected by District staff prior to receiving occupancy. Variances and waivers to this requirement must be specifically and previously approved by the District in writing. All irrigation facilities must be located outside the public right-of--way unless otherwise approved by the District in writing. Replace any damaged or broken sidewalk, curb, and gutter with new curb, gutter, and sidewalk to match existing improvements. Replace any cracked or damaged sidewalk, curb, or gutter resulting from construction activity. All facilities to be constructed with a proposed development, and to be owned and maintained by the District, must be constructed according to the latest edition of I.S.P.W.C. and the District's Supplemental Standard Specifications. 8. If applicable, submit to Idaho Department of Water Resources a Shallow Injection Well -Notice of Construction /Inventory Form at least thirty days prior to construction of the facility. The District will require a copy of the completed form prior to granting of final occupancy. 9. Any work in the public right-of--way requires a permit from ACHD Construction Services. 10. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. If you have any questions or concerns, please feel free to contact me at 387-6181. Sincerely, Scott Rudel Development Review Division Cc: Greg Hartley 13696 Annabrook Dr Boise, Idaho 83713 f t~~ ~"~` '"' Ada County Highway District David E. Wyn 318 East 37th Street nave f3ivens, 1st Vice President Garden City ID 83714-6499 Judy Peavey-Derr, 2nd Vice President Phone (208) 387-6100 Susan S. Eastlake, Commissioner FAX (208) 387-6391 Sherry R. Huber, Commissioner E-mail: tellus(a~ACHD.ada.id.us December 30, 2002 MSPR-24-02 /Baltic Place / Hartley Dirtworks IMPACT FEE CALCULATION Building Type Cost per Unit (per 1,000 SF) Area (SF) Total Cost Light Industrial $1,427.00 4,192 $5,982.00 Total Impact Fee Due: $5,982.00 O1/_~dfl ~~~ ~ 'U~~~ ~ ~~ 5P~1888~854 D~,kI1ll1~lV YlkL y~;rr. NO , OU?3 P , ~uaiuua IRRIGATION PERFORMANCE SPECIF'ICATYONS 1P]p~ ORDLNANiC1E X2-13-8 Norte subr~lt 3 copies of [1~s completed jarrw wl/h my applicoliort for C'emf' +ca1e ojZo-~tg CompliarrCe {CZC). Project Name: Specidcxtions; Available Crallons per.' Minute: Available ViV'ater Pressure: Poir~ ofCounection (desadbe and/or subunit a site plan): • P1rim$ry Connection: • Soeondar}- Connection- landscape Area: Ijtir~ irrigation system is hooked to City weer as a pri or secondary water source, submit the ,r~r~are footage d~'landtcape areas to be imgateaf_ v .£ Backtlow Prevention A backtlow prevention device must be installed as required. by City Ordinance 9-3_ Coverage The irrigation system must be designed to provide 100°lo coverage with lxead to head spaciang or triangular spacing as appxopriate: IVlatCl~ed C1pItatlOII R.ateS Sprinkler beads must blavc matched precipitation rates vvlrhin each control valve circuit. Irrigation 7,o~es Sprinkler heads irrigatiII~ lawn or other }riglrwater-demand areas must lac circuited so ~L&i they are on a separate zone or ~neS $om those irrigating tm„~, shrubs, or other redured- wateT-demand areas. Overspray Sprinkler l~cads mint be adjusted to reduce overspray onto imupervious surfaces such as sidewa]ks, dziveways, and Parking azess. Received Time Jan.1D. 3'13PM OX/1J a f`,V~~) ~ 1 J~~3 .n,,,1 5PM8886854 1tERIDZnr1 P&Z DEPT. NO ~ u~ -?3 P ~ X03/008 Additional Ir~rigglaon Notes: lrrigation. Require All landscape areas regulated by the City' .C,andscape Ordinance (12-13) shall. be served with an automatic underground irrigation system. Additional 1equirEments affecting premed irrigatioo. systems can be faund in City Ordinance 9~ 1-28. ]rogation Water >~ L7se of non potable irrigation water is required when determined to be available bq the City Public Works DepartmemR as regulated by City Ordinance 9~1-2$. If city potable water is used, a sepazate water meter is recommended so the owner can avoid paying sewer fees for irrigation grater. potable water sha]1 not be used as a primary irrigation water source on zw~ residential lots w~'tth more them Yz acre of landscapist- Rear Round water availability is also required by conneetimg ~ cu'S' potable water or an on-srte well aS a secondary som-ce_ Certification: I, wK , do hereby affIIm that any irrigation system installed for the project meIIiioned above will be designed and installed ~ compliance with the specifications and notes stated in this form- Applieaut's Signatiu~e ~~G ~ ~~c~es , .~cr- J~~ ~~ Date Received Tlme Ja~~l~. 3~13PM ~ ,~ Q M ~~so a- !~ ~° c L O v. w M '~ F •~ M~ !~~ Z - - -- -- -- -- -- -- --- -- -- --- --- -- --- U `V ~~~ ~j a ~ a a z a x ~ ~ X Q ~ ~ FQ- O ~ L LL ~- a o Y U W -;v o F Q m `~ ``~' ~ ~ ~ A U ~ ~ LL Q I ~ W ~~ LL V ~ ~ z U i R '~-' )` ~ , r ~y w U c~ .; Q \\~Q _ ~ r` Y V U W a U a V _ ~~ ~ p m i ~.\ ~ ` U 1 11Y~ _ Z F a~i >, [C m ~f ~ V r \ U Z ~ ~ ~! Q U W o O Lf) F- ~} U N Z ~ .Q d Q ~ Q ` p~ ~\ °m jxr_#S ""~n'" Ada County Highway District Sherry R. Huber, President 318 East 37th Street Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 John S. Franden, Commissioner FAX (208) 387-6391 David E. Wynkoop, Commissioner E-mail: tellus®ACHD.ada.id.us TO: Big D Builders 200 N. Baltic, Suite 101 Meridian, Idaho 83642 February 17, 2003 RECEIVED SUBJECT: MCZC-03-004 Office, wazehouse, contractors yazd 276 North Baltic Place ~~L~ ~ ~ ;_~JJ City of Meridian City Clerk Office In response to your request for comment, the Ada County Highway District (ACRD) staff has reviewed the submitted application and site plan for the item referenced above. It has been determined that the Right-of--Way and Development Services Department does not have any site specific requirements for you at this time due to the fact that: • Roadway improvements currently exist adjacent to the site If the site plan or use should change in the future, ACRD will review the site plan and may require improvements to the transportation system at that time. Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACRD. In addition to any costs associated with a permit or license agreement, a roadway impact fee will be assessed by ACRD and will be due prior to the issuance of a building permit. ]n accordance with ACFID's standazd requirements, the applicant shall: • Meet District drainage requirements, - • Replace or repair any damaged curb, gutter and sidewalk (as determined by Construction Services), • Beaz all costs for the relocation of utilities associated with improving street frontages, • Contact the District's Utility Coordinator or Construction Services Department in regazd to all utility street cuts to determine if the pavement is less than five years old. These provisions aze in accordance with the Ada County Highway District Policy Manual, ISPWC Standards, Construction Services policies and procedures as well as all applicable ACRD Ordinances. If you should have any questions in regazd to the standard requirements please feel free to contact out Construction Services Department at 387- 6280 or our Drainage Department at 387-6250 (with file number) for details. If you have any questions, p~e feel free to contact the Right-of--Way development Services Department at (208) ~ 387-6170. Sincerely, De lopment Analyst Right-of--Way and Development Services Cc: Planning ~ Development/Chron/Project File Planning & Development Services: City of Meridian Construction Services Greg Hartley 13696 Annabrook Drive Boise, Idaho 83642 Treasure Valley Engineers 1117 Caldwell Blvd., Caldwell, Idaho 83651 C _. _ ~• ~ ~. ~ ~. - ~~ ~v ~ _. ~~ ~g wo o° cn