Loading...
Montvue Spinal InstituteMAYOR Robert D. Corrie CITY COUNCIL MEMBERS Keith Bird Tammy deWeerd Cherie McCandless William L.M. Nary 0 HUB OF TREASURE VALLEY A Good Place to Live CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, IDAHO 83642 (208) 888-4433 • FAX (208) 887-4813 City Clerk Office Fax (208) 888-4218 CERTIFICATE OF ZONING COMPLIANCE* Date: 10-28-03 Project Name: Montview Spinal Institute Project Address: 360 E. Montvue Drive Proposed Use: Medical Office Owner: SJJV LLC 333 N J." Street Ste 160 Boise ID 83702 Applicant: Pinnacle Engineers Inc 887-7760 Zoning: L -O Conditions of Approval: LEGAL DEPARTMENT (208) 466-9272 -Fax 466-4405 PUBLIC WORKS BUILDING DEPARTMENT (208) 887-2211 • Fax 887-1297 PLANNING AND ZONING DEPARTMENT (208) 884-5533 • FAX 888-6854 Project is subject to all current Meridian City Code (MCC) and conditions of approval for the Montvue Medical Center Annexation/Zoning and the associated development agreement. The issuance of this permit does not release the applicant from any requirements of the approved Annexation/Zoning (AZ -O2-011) permit or development agreement approval for this site. Landscaping: The landscape plan prepared by Pinnacle Engineers, Inc., on 10-15-03, labeled LS -1 and stamped "approved" on 10-28-03 by the Meridian Planning & Zoning Department, is approved with the following changes: 1) the addition of one (1) tree (minimum 2" caliper) within the southern perimeter landscape buffer as required by MCC 12-13-11-2.C, and 2) the addition of one (1) approved tree (2" minimum caliper) in each ofthe two (2) proposed landscape planters/islands in the parking area, just east of the proposed building as required by MCC 12-13-11-3.E. The approved landscape plan is not to be altered without prior written approval of the Planning & Zoning Department. No field changes to landscape plan are permitted; prior written approval of all material changes is required. Site Plan: The site plan prepared by Lombard -Conrad Architects, Inc., on 10-6-03, labeled C 1. 1, and stamped "approved" on 10-28-03 by the Meridian Planning & Zoning Department with the following change: 1) increasing the size of the internal planters/islands within the parldng area to contain a minimum of fifty (50) square -feet and to be a minimum of five (5) feet in width (measured inside of curbs) as required by MCC 12-13- 11-3.B.. The approved site plan is not to be altered without prior written approval of the Planning & Zoning Department No field changes to site plan are permitted; prior written approval of all material changes is required. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved specifications and in accordance with MCC 12-13-8 and MCC 9-1-28. Com: Per MCC 12-13-7-9, all landscape areas adjacent to driveways, parldng lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Protection of Existing Trees: The Applicant has asked for a reduction of caliper inches of mitigation trees required for the site through the Alternative Compliance section of the Landscape Ordinance (MCC 12-13-18). As part of the approval for an alternative landscape plan, the Applicant shall be required to protect and preserve the trees that are to be retained on site (as shown on the landscape plan prepared by Pinnacle Engineers, Inc., on 10-15-03, labeled LS -1 and stamped "approved" on 10-28-03 by the Meridian Planning & Zoning Department). Per MCC 12-13-13-4, coordinate with the Parks Department Arborist (Elroy Huff) for approval of protection measures prior to construction. Any severely damaged tree must be replaced in compliance with MCC 12-13-13- 6. Parking: Off-street parking is approved as shown on the approved site plan. In accordance with MCC 11-13-5, all standard parking stalls must be constructed 9 -feet x 19 -feet minimum and drive aisles must be at least 25 -feet wide. The project engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA. The applicant shall be responsible for meeting the requirements ofACHD as they pertain to this development Sidewalks: All sidewalks shall be constructed as submitted and in accordance with MCC 12-5-2.K. Sidewalks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with the MCC. Li tin : Lighting shall not cause glare or impact the traveling public or neighboring development. Signage: No signs are approved with this CZC. All signs will require a separate sign permit in compliance with the sign ordinance. Trash Enclosure: Any dumpster(s) must be screened in accordance with MCC 11-12-1.C. Trash enclosures must be built in the location and to the size approved by Sanitary Services Company. Handicap -Accessibility: The structure, site improvements and parking must be in compliance with all federal handicap -accessibility requirements. ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City of Meridian Planning and Zoning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. Plan Modifications: The approved Site Plan and Landscape Plan, stamped "approved" on 10-28-03 are not to be altered without prior written approval of the Planning & Zoning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required. i i Craig Hood Planner R *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. Engineers, Inc. CITY OF MERIDIAN • Planning & Zoning Department 660 E. Watertower Ln., Ste. 202, Meridian, ID 83642 (208)884-5533 Phone/(208)888-6854 Fax F-1 CERTIFICATE OF ZONING COMPLIANCE (CZC) APPLICATION (Section 11-19-1, Zoning and Development Ordinance) PROJECT NAME: Montvue Spinal Institute APPLICANT: Pinnacle Engineers, Inc. — Dave McKinnon ADDRESS: 12552 W. Executive Drive, Ste. B, Boise, Idaho, 83713 PHONE: (208) 887-7760 FAX: (208) 887-7781 E-MAIL: davemgpinnacle —engineers.com OWNER(S) OF RECORD: SJJV, LLC ADDRESS: 333 N. 1st, Ste. 160, Boise, ID 83702 PHONE: FAX: E-MAIL: ARCHITECT (IF DIFFERENT THAN APPLICANT): Lombard Conrad Architects — Scott Wendell ADDRESS: 1221 Shoreline Lane, Boise, ID 83702 PHONE: (208) 345-6677 FAX: (208) 344-9002 E-MAIL: ADDRESS, GENERAL LOCATION OF SITE: 360 E. Montvue Drive, Meridian, Idaho DESCRIPTION OF USE: Medical Office/Clinic Building PRESENT ZONE CLASSIFICATION: L -O G do hereby affirm that I will agree to pay any additional sewer, water or trash fees or charges, if any, associated with the use that I/we have applied for, whether the use be residential, commercial or industrial in nature. Furthermore, I have read the information contained herein and certify that the information is true and correct. V" �p 17-Y10-3 (Applicant's Signature) (Date) 1 Rev. 1/24/03 169fr0 N \ rralLombard -Conrad Architects, P.A. 1221 Shoreline Ln Boise, ID 83702 PAY Sixty and 00/100 Dollars TO City of Meridian Planning and Zoning No 046516 Key Bank of Idaho 700 Wesf Idaho Slreel Boise, Idaho 83701 92-155/1241 CHECK DATE October 17, 2003 110049 5 16,15 1: L 2 4 LO L 5 5 9:0 L 0 3 LO 26 8 115YWO SIGNATURES REQUIRED OVER $2,000.00 a o v a -a N CD w. CG m U N Z I -s 0 O n D � V m(D Z O z _ G�I M CD l v S M n3 n M m D Z• (7 D O n y Q z , O CD m� zm g � ,m, M m I o :3 m � D D X = D Z D �\ l I z i PINNACLE Engineers, Inc. 12552 W. EXECUTIVE DR., SUITE B, BOISE, ID 83713 PH (208) 887-7760 (208) 887-7781 FAX TO: LETTER PF TRANSMITTAL DATE:�D � JOB NO: ATTENTI N: RE: Z'Blueprints ❑ SepiasNellums ❑ 11 x 17 drawing(s) ❑ 3 1/2" disk WE ARE SENDING YOU Attached ❑ Under separate cover via ❑ Shop drawings Z'Blueprints ❑ SepiasNellums ❑ 11 x 17 drawing(s) ❑ 3 1/2" disk ❑ Mylar/Ammonia Mylar ,a -Copy of letter ❑ Change Order ❑ Calculations ❑ Specifications ❑ Field Report LI the following items ❑ 8-1/2 x 11 Drawing(s) �� DESCRIPTION MIOEr. I CS 1IVA ❑ Make corrections noted ❑ As requested ❑ Revise and Resubmit .J THESE ARE TRANSMITTED as checked below: /0 For review ❑ No exceptions taken ❑ For your use ❑ Make corrections noted ❑ As requested ❑ Revise and Resubmit ❑ For review and comment ❑ ❑ FORBIDS DUE REMARKS ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US 10/13/03 08:14 FAX 2083449002 ` 0 i LOMBARD CONRAD AGA YCOIOYI [�iA M J, *6 NAYARRG - --- I= 111MMM 03570M 811'MY r9cAinat mer RECCa M—noulSTOF �a�t„ 11AVUJU111IIA�11llIdII1DllMI�Illpl WARRANTY DEED For Value Received pATAICTA Rurr, elao ehown eC record s0 Patriots A_ Ruyf, s aYapla Vernon Ute GrAgtor b—tly grana. batgaina, aeM, W flvt ya and warrtnts utao Sd.TV, LLC, e Limited Liability Cemiauy q SdabtO the: Grante4 Whose current addneee is: 4344 X. Rlazi; R=DOE r,Atrs, 80i9l, = 03702 the following described plranizee, in -wit: LOT 2 Gibb Tt3R EAST 40 8ttdf OF EM 3 22t RLOatc 5 08 X=TV= PARK, "M oYr=CZAL PLAT TBRRROF, PIL= XX ROM 17 OF PIAT AT phACCORDING TO 1107, .1107, p1PICIAr, RECORDS OF ADA COUMn, YOU0. Psrcei Number: as7n500191 5 1J I"L7 TO; Curreatt General TL -A, a lien in the process of assessment, not yet due or payable_ 2anemesns, res"'a"ons, reservations, Pmvisio,ts of sword, and aesMmenta, if any. TO HAVE AND TO HOLD the acid premises, with heir hPP anew tmto the Graetee. they heirs and assigns forever. And the said Gratnor dace hereby edvenant to ate with the said Gmlee, that h is the owner in fee simple of said Pra11tises; that said pnm11laea am tree frotasll encumbruces and that he will warant and defend the same from all Iawlbl claims whatsoever_ Dat6d: lfelrob 24, 2009 aATRICSA aurF State of IDAHO So. County of AOA On this 25th day of sees ch 2003 undersiltaed, a Notary Publ{c. is and for said State, before me, the peraonatlyappeared FATRYCZA RtIYy known to Me. and/or identified to the on the basis of satisfactory evtde0ce, to be the peraon(s) whose 11011111 ia/araa ibarAbed to the within instrument And acknowledged tome" *he executed the Saute. WITNESS MY HAND AND OFPICIAL SEAL. ,,.,, ) �ND is G= MWONA119 aoT4Ring Rolex, ABOmtnissi ]3xpires: Aaguat 12, 2003 �t/gtl,tC 1r I or TD1% rs,aro. asbb22p&{t� m 7142- w�aaANTvls �n.td,,.p Ito.en a11Ny�J OI 1 121002/002 P.02 TOTAL P.02 2083999002 LOMBARD CONRAD 0002/002 • 0 AFFIDAVIT OF LEGAL INTEREST STA'L'E OF IDAHO COUNTY OF ADA I, p4 VA_ Vtvsk4 33 3 W . 1-��s� Sal• (name) (address) LS& being first duly sworn upon (city) (stakeoath, depose and say: ) 1. That I am the record owner of the property described on the attached, and I grant my permission to: I L552 i C 1Eltsx- .171& (name) (address) 12X>(pe r4p. 3;.113 to submit the accompanying application pertaining to that property: 2. I agree to indemnify, defend and hold the City of Meridian and it's employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property, which is the subject of the application. Dated this day of �p' �/�:.�•• , 200 lb 7 i afore) SUBSCRIBED AND SWORN to before me the day and year first above written. Expires: N494 ,•� .•om•0G9080••4P •i y S ,oTAJt P U B L�G.�•�• ••'•qT� OFA.•`•• My Commission 1 Rei. 1!24103 OCT -13-2003 01:48P FROM:Sanitaru Services, I 208-888-5052 TD:8877781 EXISTING, U -' ` tBUILDING � � r 1 (11,.7-t5 P: 213 IRRIGATION PERFORMANCE SPECIFICATIONS PER ORDINANCE 12-13-8 NOTE: Submit 3 co ies o this completed form with any application for Certificate of Zoning Compliance (CZQ. Project Name: Specifications: Available Gallons per Minute: �sg RM Available Water Pressure: 66- P•,5, /', Point of Connection (describe and/or submit a site plan): • Primary Connection: 0W ggZ 6/y SF 00t2"42- vF st�c • Secondary Connection: 61rM Wk -$C_01 Landscape Area: If the irrigation system is hooked to City water as a primary or secondary water source, submit the square footage of landscape areas to be irrigated: I11000 s.f. Backflow Prevention A backflow prevention device must be installed as required by City Ordinance 9-3. Coverage The irrigation system must be designed to provide 100% coverage with head to head spacing or triangular spacing as appropriate. Matched Precipitation Rates Sprinkler heads must have matched precipitation rates within each control valve circuit. Irrigation Zones Sprinkler heads irrigating lawn or other high -water -demand areas must be circuited so that they are on a separate zone or zones from those irrigating trees, shrubs, or other reduced -water -demand areas. Overspray Sprinkler heads must be adjusted to reduce overspray onto impervious surfaces such as sidewalks, driveways, and parking areas. f Additional Irrigation Notes: • Irrigation Required All landscape areas regulated by the City Landscape Ordinance (12-13) shall be served with an automatic underground irrigation system. Additional requirements affecting pressurized irrigation systems can be found in City Ordinance 9-1-28. Irrigation Water Source Use of non -potable irrigation water is required when determined to be available by the City Public Works Department as regulated by City Ordinance 9-1-28. If city potable water is used, a separate water meter is recommended so the owner can avoid paying sewer fees for irrigation water. Potable water shall not be used as a primary irrigation water source on non-residential lots with more than acre of landscaping. Year round water availability is also required by connecting to city potable water or an on-site well as a secondary source. Certification: do hereby aficirm that any irrigation system installed for the project mentioned above will be designed and installed in compliance with the specifications and notes stated in this form. Applicant's Signature Date PP75886854 MERIDIAN P&Z DEPT. Montvue Office Vicinity Map r L-0 L ST LUKES ii MAGIC—VIVY I C -G R1 L-0 30 0 300 0 ACLIE Feet Engineers, Inc. , 1 inch equals 300 feet 12582 W. EW,** D. Sd)* & boiK Who 93713 0002 Legend Zoning Boundaries Parcels -SITE N This map is for general planning + purpose,, only, PinnacleEng,neoa claims no reponsibility for the W C accuracy of the information shown: Drawn: G8 12/30/2002 S 4CO26Z91 > DEOOVIniW m bard --Conrad Architects, n� SPINE INSTITUTE � cwre�ruAc . Pu��l�� . I�,Eaoa oEs�x n OF IDAHO 9 �e MERIDIAN, IDAHO" g �_ CIVIL SITE PLAN s I "__ ___ -------- ---------------- --- - - ,: -�_ ______________ -_ - - Ag` ra- a v € a C - - - -2664.. ti _.___ � J_ 266fi.-.__...__.___ -_-265/-- 2.6E8-- _ F n G G) z zr YE �A V F d � _ N � z -App pp .� 9 -- P 6 6 % P y D _ � n � a € � A 2 � � 8 � � n � � � t � A��m m Rcgg#a y �..y y LTJ x £ e ry`Z z o� p _� a 20 � m � � O > DEOOVIniW m bard --Conrad Architects, n� SPINE INSTITUTE � cwre�ruAc . Pu��l�� . I�,Eaoa oEs�x n OF IDAHO 9 �e MERIDIAN, IDAHO" g �_ CIVIL SITE PLAN s FG fi fR&firs n G �mrte'' e�f9 3 pptt i fl ��fiFE� �6�F VN€ 6'9Sl 3 Z400AON R�j� — /aO L 49 49 T 111 WRIVATE ROAD dia -C,3 is e w u . r if c g iF4.Kit ;^dAd a96dR 10 6ji Q t ai gg �€ r \�•/o € FR MMI -oke, Xc; I& a%zi is pl. `[I is.[ I'i`$$ 8yg I� 3q� i��s ,' �� � If 77�y� � � r ��!ad �$3P €3� t� i� �t.��}�P #�a� fp§#g 1:;�� oYo D a p a§ yF i€yf !_ €RyF g1.d 8 gP. a•,l $; a Y,eBg 4! .P 3q}aj$ !'. 9€ eR o gpe i m �g ¢ d !x 1 f9 i''a g Fad{ $8 ¢d€ f is ��F 5 Sg• £ Px•= gP a £ :;. g P.y°° ,i TZ Z 6s€BF ITg € m °§ § F $ P` i e� 1 ''i e § Ee i 1 w �'llsfEE pps;4i .3t �$€ g!�9 5! gla g € tia i= ➢^t n,� YP ag& gge i 6 fi� g�! �� °' � of 9�9¢a $ i]!aPs" iP S�gs §rt ly ¢ 98=Fc �k� l¢:,.a! d PdEdE Ib `�e9 sc ae=%31 �� �i9 33E .p sa- i!4 3; �s4B ! f! !ii F $y3 3 )y ay Sjj$ ei q §S -§ $ iiyy $F= 6 ig gi a 3P@'@F SF $! !� P €e 9� !i !} S�Hi, ERSlf�l PP:. s$. ![R Z !g_ 8a PSP da i[e H '$� _ er P Y! ��d RY jfY lei £ 6 REmg -0 ae� M, C (F�om�"'F'625�gi Nan'gn?a91L{1,L{Fn a'�Om E^33 �'aF� ^ C7 l 4§4 I•F P"i i P.3 !! 3 P( ¢• eP6 3ePi 31 9 e.lP` d ! k EC X vd Fs" D a.$g c$�6 v°ffs 5' � 21H 4's7P aR�g° �3;9 GgF nR E� y (n !I `P 3 4 !e 6 8 9e •.,d $ } ! u iI f4$ -fes y ; n? S ggF gi'e5 t eene'4 § z xx 54 `� $-N¢g9 ai:g FFs�i�' 14 Wr H �$p �f ie $fs 3eg� ° g43• a$ gNu i e k 3i 3.g }iPd�z :5 fF� FsCs y�b'FYf�l3a yy"� $a gfgqe . 1 8 3a s¢6¢ V! `¢ a 5 s WIN § a aA MONTVIEW SPINAL INSTITo1TE PINNACLE me �• - g A_A !�➢ !E-- C A F— F- F- L— Engineers, In mri LOMBARD CONRAD ARCHITECTS T ACHD Ada County Highway District Sherry R. Huber, President 318 East 37th Street Susan S. Eastlake, 1st Vice President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellus@ACHD.ada.id.us November 18, 2003 To: Pinnacle Engineers, Inc./ Clint Boyle 12552 W. Executive Drive, Ste. B Boise, Idaho 83713 Subject: - tMorn�tvueSpinal �Drivte n vue On November 18, 2003, the Ada County Highway District acted on your application for the above referenced project. The attached report lists site-specific requirements, conditions of approval and street improvements, which are required. If you have any questions, please feel free to contact me at 208-387-6174. Sincerely ZLori Den Hartog Senior Development Analyst Right-of-way & Development Services Planning Division CC: Planning & Development project file City of Meridian Construction Services Drainage Utilities SJJV, LLC 333 N 1st, Ste. 160 Boise, Idaho 83702 Lombard Conrad Architects, Scott Wendell 1221 Shoreline Drive Boise, Idaho 83702 Ada County Highway District ruagnz-oJ-way cry Development Department Planning Review Division This application does not require Commission action and is approved at the staff level on November 18, 2003. Tech Review for this item was held with the applicant on November 14, 2003. Please refer to the attachment for appeal guidelines. Staff contact. Lori Den Hartog, Phone: 387-6174, E-mail. Idenhartog a)-achd. ada. id. us File Number: MAZ03-004, Annexation and Rezone Site address: 360 E. Montvue Drive, Meridian Applicant: Pinnacle Engineers, Inc. C/O Clint Boyle 12552 W. Executive Drive, Ste. B Boise, ID 83713 Owner: SJJV, LLC 333N. 1st, STE 160 Boise, Idaho 83702 Application Information The applicant is requesting a certificate of zoning compliance from the City of Meridian to construct a medical office and clinic building in an L -O zone. The site is located on the south side of Montvue Drive, just east of Eagle Road in Meridian. Acreage: Current Zoning Vicinity Map 1.37 -acres L -O (Limited Office) A. Findings of Fact 1. Trip Generation: This development is estimated to generate 452 additional vehicle trips per day (10 existing) based on the Institute of Transportation Engineers Trip Generation Manual. 2. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of a building permit for this site. The assessed impact fee will be based on the impact fee ordinance that is effect at that time. 3. Traffic Impact Study: A traffic impact study was not required with this application. 4. Site Information: There is currently a single-family home on the site that will be demolished. 5. Description of Adjacent Surrounding Area: a. North: Single-family homes (Montvue Park) b. South: St. Luke's Medical Center c. East: Approved Touchmark Subdivision (mixed-use development) d. West: Single-family homes (Montvue Park) 6. Impacted Roadways: Montvue Drive: Frontage: Functional Street Classification: Traffic count: Speed limit: Nearest intersection: Eagle Road: Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: Nearest intersection: Franklin Road: Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: Nearest intersection: 135 -feet Local No current count available 20 MPH Eagle Road, an uncontrolled intersection None Principal Arterial 42,307 south of Franklin Road on 2-20-02 Exceeds LOS "E" (37,000 VTD) 50 MPH Franklin Road, a signalized intersection None Principal Arterial 15,018 east of Eagle Road on 2-20-02 LOS "E" 35 MPH Eagle Road, a signalized intersection 7. Roadway Improvements Adjacent To and Near the Site Montvue Drive is currently improved with 2 -lanes (approximately 25 -feet of pavement) with no curb, gutter or sidewalk. 8. Existing Right -of -Way There is currently 40 -feet of right-of-way (20 -feet from centerline) for Montvue Drive abutting the site. 0 • 9. Existing Access to the Site Access to this site is currently provided from Montvue Drive via a 35 -foot wide paved driveway located near the site's north property line. 10. Site History The Ada County Highway District Commission acted on a request for rezone and annexation on this site on February 19, 2003 (MAZ03-004). Anticipated site-specific conditions were identified in the staff report and are incorporated in this report. 11. Five Year Work Program Franklin Road, from Eagle Road to Meridian Road, is currently in the Five Year Work Program for roadway improvements in 2004. Franklin Road, from Eagle Road to Cloverdale Road, is in the Five Year Work Program for roadway improvements in 2007. 12. Other Development in Area/Miscellaneous Development in the Area: • On April 10, 1996, the Commission approved Porkey Park Subdivision, a 19 -lot industrial/commercial subdivision on 64 -acres located at the northeast corner of Franklin Road and Eagle Road. That development was estimated to generate 8,000 additional vehicle trips per day. As a condition of approval the applicant was required to construct a public street (Kentfield Way) approximately one- third of a mile east of Eagle Road. The development has not been completed and this road is not yet available for use. The Kentfield Way/Franklin Road intersection is scheduled for signalization in the future. • On July 1, 1998, the Commission reviewed MSPR-10-98, a proposal to construct a 100,000 -square foot home furnishings showroom and a 50,000 -foot warehouse for furniture. That development was estimated to generate 1,700 additional vehicle trips per day. As a condition of approval the applicant was required to construct a north/south public street, Gaudians Avenue, on the north side of Franklin Road abutting their east property line. Gaudians Avenue connects with Lanark Street north of Franklin Road and forms a loop. • On September 23, 1998, the Commission reviewed MCU -17-98, a request for conditional use approval for an 848,000 -square foot retail shopping center. The 74.74 -acre site is located at the southeast corner of Eagle Road and Fairview Avenue in Meridian. That development was estimated to generate 26,950 -additional vehicle trips per day, and was required to make major modifications to three intersections (Eagle Road/Fairview Avenue, Eagle Road/Pine Avenue, Fairview Avenue/Records Drive). • On December 30, 1998, the Commission reviewed MCU-43-97/MA-13-97, a request for conditional use approval to construct a 5,000 -square foot Idaho Power Credit Union with a drive-thru window, a 5,359 -square foot convenience store/fast food restaurant with a drive-thru window, and an 854 - square foot carwash facility. The 4.13 -acre site is located on the northwest corner of Magic View Drive and Eagle Road approximately 720 -feet north of 1-84. This development was estimated to generate 7,500 additional vehicle trips per day based on the Institute of Transportation Engineers Trip Generation manual. As part of this action, the Commission determined that development of the area west of Eagle Road would constitute an extraordinary impact and imposed an overlay impact fee on all developments in the Magic View Subdivision. • On January 27, 1999, the Commission reviewed Midvalley Business Park, a 5 -lot commercial subdivision, along with a request for a conditional use to construct a 24,560 -square foot office building. The 5.4 -acre site is located at the southwest corner of Magic View Drive and Allen Street, approximately 500 -feet west of Eagle Road. That development was estimated to generate 918 additional vehicle trips per day. This application was approved subject to the overlay impact fee imposed by the Commission on December 30, 1998 as part of the action on MCU-43-97/MA-13-97. K 0 • • On January 27, 1999, the Commission reviewed MCU-14-98/MA-3-98, a conditional use requesting approval for to construct a 60 -unit motel. The 1.66 -acre site is located at the northwest corner of Eagle Road and 1-84, also on the south side on Gentry Way and the east side of Allen Street. That development was estimated to generate 282 additional vehicle trips per day. • On July 28, 1999, the Commission reviewed MCUP99-24/MAZ99-14, a request for conditional use approval to construct a 60,000 -square foot medical office building. The applicant requested annexation from Ada County to the City of Meridian and a rezone from RT to CG. The 4.34 -acre site is located on the west side of Allen Street west of Eagle Road, and approximately 700 -feet south of Magic View Drive. This development was estimated to generate approximately 1,200 additional vehicle trips per day. • On July 28, 1999, the Commission reviewed MAZ-99-008/MCUP99-0026, a request for conditional use approval for a 32,000 -square foot office building. The 3.77 -acre site is located at the northwest corner of Eagle Road and 1-84, north of Gentry Way and east of Allen Street. This development was estimated to generate approximately 1,120 additional vehicle trips per day. This application was approved subject to the overlay impact fee imposed by the Commission on December 30, 1998 as part of the action on MCU-43-97/MA-13-97. • On August 11, 1999, the Commission reviewed MCUP99-23, a request for conditional use approval for phase three of the St. Luke's Medical center (see St. Luke's Driveway below). That 37.5 -acre site is located at the northeast corner of 1-84 and Eagle Road, adjacent to the subject site's southern boundary. The total square footage of phases one thru three is 450,600 -square feet, which was estimated to generate a total of 5,200 vehicle trips per day. A further indicator of the rapidity of growth in this area is that St. Luke's did not anticipate the construction of this phase for several more years, according to their staff. On November 17, 1999, the Commission reviewed Woodbridge Subdivision, which is a 283 -lot residential subdivision on 80.83 -acres, located east of Locust Grove Road approximately'/ of a mile south of Franklin Road. The development was estimated to generate 2,871 additional vehicle trips per day. On January 5, 2000, the Commission reviewed Touchmark Living Center, a 19 -lot mixed-use subdivision consisting of 8 residential lots, assisted care facilities, commercial and office space. The 113 -acre site is located on the south side of Franklin Road approximately'/ of a mile east of Eagle Road. This development was estimated to generate 9,024 additional vehicle trips per day. Two street connections to Franklin Road, located at 1/3 mile intervals were approved with this application. These intersections aligned with previously established intersection locations. A public stub street was constructed on the east side of Montvue Subdivision with this development. This stub was constructed with the thought that Montvue Subdivision would redevelop into non-residential uses in the future and needed better access to Franklin Road. The stub street is approximately 250 -feet north of the subject parcel. A private street connection between the Touchmark site and St. Luke's site was constructed with the development. On November 29, 2000, the Commission reviewed MCUP00-049, a request for conditional use approval to construct a 5,260 -square foot bank with drive-thru window. The 0.95 -acre site is located on the west side of St. Luke's Drive (private)/Allen Street extended, and north of Magic View Drive. This development was estimated to generate 1,400 additional vehicle trips per day. This application was approved subject to the overlay impact fee imposed by the Commission on December 30, 1998 as part of the action on MCU-43-97/MA-13-97. On November 29, 2000, the Commission reviewed MCUP00-053, a request for a conditional use approval to construct an 87 -room hotel within the Midvalley Subdivision. The 2.66 -acre site is located at the northeast corner of Magic View Drive and Allen Street. This development was estimated to generate 716 additional vehicle trips per day based on the Institute of Transportation Engineers Trip Generation manual. The Commission previously reviewed and approved this site as MAZ99- 0022/MCUP99-0040, a rezone and conditional use application for an office and restaurant. 4 In January of 2001, ACHD reviewed an application requesting conditional use approval to construct a 1,743 -square foot fast food restaurant with a drive-thru. The 0.97 -acre site is located on the northeast corner of Magic View Drive and Allen Street in Boyd Subdivision. This development is estimated to generate 866 additional vehicle trips per day (0 existing) based on the Institute of Transportation Engineers Trip Generation Manual. In August of 2001, ACHD reviewed a preliminary plat for a 3 -lot commercial subdivision (Treasure View Subdivision recorded as Boyd Subdivision) on 2.85 -acres. The site is located on the west side of Eagle Road approximately'/4 of a mile south of Franklin Road. This development is estimated to generate 264 additional vehicle trips per day. On September 26, 2001, the Commission reviewed Mystery View Subdivision, a preliminary plat for a 3 -lot commercial subdivision on 5.21 -acres. The site is located on the northwest corner of South Allen Street and Magic View Drive. This development was estimated to generate 164 additional vehicle trips per day (1,828 existing) based on the Institute of Transportation Engineers Trip Generation Manual. St. Luke's Driveway: The construction of St. Luke's Regional medical complex has become a major traffic generator/attractor. When St: Luke's requested a driveway and traffic signal on Eagle Road, the requested location was opposite Magic View Drive. District staff collaborated with ITD District 3 staff to recommend denial of the signal and denial of a full access driveway opposite Magic View on the basis of its proximity to the 1-84 ramps. St. Luke's was allowed to construct a full access, signalized driveway at the north boundary of the St. Luke's property. The St. Luke's driveway opposite Magic View Drive was approved as a right-in/right-out driveway. When the District reviewed the application for the second phase of St. Luke's development, ACHD staff recommended that the approved signalized driveway be made a public street and extended east to St. Luke's Property boundary. The basis for this recommendation was the anticipated related development of the adjoining property and the need for access to a signalized intersection with Eagle Road. Both St Luke's and the residents of Montvue Subdivision, a large lot residential subdivision immediately north of St. Luke's, opposed this recommendation. As a result of that opposition, the ACHD Commission allowed St. Luke's to proceed with a private driveway. Subsequent to the Commission action on the second phase, the residents of Montvue Subdivision perceived that their property was now more valuable as commercial property than residential and access to St. Luke's Driveway would be beneficial. They asked the District to require St. Luke's to dedicate the driveway as a public street a sufficient distance to allow a full access driveway or street connection between Montvue Subdivision and Eagle Road. Both the District Commissioners and the Meridian City Council declined the request. St. Luke's advised District staff and the Commission that St. Luke's would allow access to their driveway from Montvue Subdivision for residential uses only and would provide up to $100, 000 to construct a connection. The residents of Montvue Subdivision declined this offer and attempted to convince both the City of Meridian and ACHD to require St. Luke's to allow unrestricted access to the driveway. Both the City and ACHD declined this request again. Some residents of Montvue Subdivision sued the City of Meridian in an attempt to overtum the City's approval of the St. Luke's expansion. In 1999, an application was made to develop the 130 -acres east of St. Luke's as a retirement community. St. Luke's was in collaboration with the developer (Touchmark Subdivision) and entered into an agreement with Touchmark that allowed traffic to flow back and forth between the two properties. While reviewing the Touchmark application, the District retained Six Mile Engineering to evaluate the Franklin Roa&Eagle Road intersection and the Franklin Road corridor to identify improvements that would be needed to accommodate various levels of traffic volume. Six Mile's 5 recommendations included added turn lanes to the intersection and added lanes to both the 1-84 westbound ramp and Eagle Road from 1-84 to Franklin Road. The report from Six Mile also concluded that a connection from Touchmark to St. Luke's signalized intersection would defer the need for the improvements to the Franklin Road/ Eagle Road intersection for a short time. The report from Six Mile also estimated that about 60,150 additional trips in the Eagle Road/Franklin Road area could be expected in the next several years as development built out. Staff's report recommended that Touchmark either construct the improvements to the intersection or obtain an agreement with St. Luke's to allow access to Eagle Road at St. Luke's signalized intersection. St Luke's agreed to this requirement and a development agreement was prepared and entered into between the ACHD and Touchmark describing the various conditions and requirements imposed by ACHD. Most if not all of the property in the Montvue Subdivision will ultimately be developed for office or commercial uses and they need better access to both Franklin Road and Eagle Road. As a part of the Touchmark conditions, Touchmark constructed a public road to the eastern boundary of Montvue Subdivision. It is anticipated that this public road will be extended into the Montvue Subdivision and provide the lots within the development with access to Franklin Road. B. Findings for Consideration 1. Montvue Drive Right -of -Way District policy requires 54 -feet of right-of-way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3 -lane roadway with curb, gutter and 5 -foot wide concrete sidewalks. In accordance with District policy, the applicant should be required to dedicate an additional 7 -feet of right-of-way for Montvue Drive. Street Section District policy 7202.8 and 72-F1 B, requires roadways abutting commercial developments to be constructed as a 40 -foot street section with curb, gutter and 5 -foot concrete sidewalk within 54 -feet of right-of-way. Roadway Improvements District policy 7203.4 states that the developer is responsible for improving all street frontages abutting the site, regardless of whether access is taken to all of the abutting streets. If a proposed development abuts a paved local street, or streets, the developer shall widen the existing pavement to one-half the required street width and construct improvements, curb, gutter and sidewalk abutting the development, unless these improvements already exist. The District requires dedication of additional right-of-way to accommodate one-half of the required street width according to District Standards (District policy 7203.4.1). In addition, District policy 7203.6 requires the applicant of a proposed development to make improvements to existing damaged sidewalk; curb and gutter construction or replacement; replacement of unused driveways with standard curb, gutter and sidewalk; installation of pedestrian ramps; pavement repairs; signs; traffic control devises; and other similar items in order to correct deficiencies or replace deteriorated facilities. In accordance with District policy, the applicant should be required to widen Montvue Drive to one-half of a 40 -foot street section and construct curb, gutter and sidewalk abutting the site. 9 2. Access Points Location District policy F2 -F4 (1) and 72-F4 (2), requires driveways located on commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50 -feet (measured near edge to near edge). Width District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35 -feet. Most commercial driveways will be constructed as curb -cut type facilities if located on local streets. In accordance with District policy, any driveways on Montvue Drive should be constructed to be a maximum of 35 -feet. Construction Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave any driveways) abutting public streets to their full width and at least 30 -feet into the site beyond the edge of pavement of the roadway. 3. Private Streets District policy 7205.6 requires other jurisdictions in Ada County to establish the requirements for private streets. The District retains authority and will review the proposed intersection of a private and public street for compliance with District intersection policies and standards. 4. New Industrial Commercial/Local Streets District policy 7202.8.3 states that through traffic in industrial and commercial developments is permitted. However, District policy 7202.8.3 also states that through traffic to or from residential areas will normally not be allowed. District policy 7202.2.3 states that new developments shall be designed so as to avoid increasing through traffic on existing local streets, unless those streets have been previously designed for extension. Due to the location of St. Luke's Drive (a private driveway), abutting the south side of the site, Montvue Drive should not be extended to the south via a public street. If Montvue Drive were connected to St. Luke's Drive, staff anticipates that additional through traffic would increase in the existing Montvue Subdivision. C. Anticipated Site -Specific Conditions Dedicate an additional 7 -feet of right-of-way for Montvue Drive abutting the site and widen Montvue Drive abutting the site to one-half of a 40 -foot street section and construct curb, gutter and sidewalk. 2. Construct any driveways on Montvue Drive a minimum of 50 -feet from any intersection. Any driveways on Montvue Drive should be constructed to be a maximum of 35 -feet wide. Pave any driveway(s) abutting public streets to their full width and at least 30 -feet into the site beyond the edge of pavement of Montvue Drive. 3. Comply with all Standard Conditions of Approval. 7 • D. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #197, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACRD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. L 0 0 E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Appeal Guidelines I Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 10 • MAYOR Robert D. Corrie CITY COUNCIL MEMBERS Keith Bird Tammy deWeerd Cherie McCandless William L.M. Nary October 24, 2003 HUB OF TR A Good CITY OF Mr. David McKinnon C/O Pinnacle Engineers 12552 W. Executive Drive, Ste. B Boise, ID 83713 33 EAST MERIDIAN, I (208) 888-4433 • F) City Clerk Office R Re: Alternative Compliance for Spine Institute Dear Mr. McKinnon: This letter is in response to your request for Alternati Landscape Ordinance for the property located at 360 asked for a reduction of caliper inches of mitigation t: � Tsz (oe� k\T coMp RE VALLEY to Live LEGAL DEPARTMENT (208) 466-9272 • Fax 466-4405 /� ERIDIANPUBLIC WORKS BUILDING DEPARTMENT )AHO (208) 887-2211 • Fax 887-1297 !SHO 83642 (208) 8874813 PLANNING AND ZONING 208) 888-4218 DEPARTMENT (208) 8845533 • FAX 888-6854 Compliance to the City of Meridian's Montvue Drive. In your application, you required for the site. After reviewing your submittal, the City of Meridian has accepted your proposal for alternative landscaping for the site. The landscape plan prepared t y Pinnacle Engineers, Inc., on 10-15-03 and labeled LS -1, is approved with the following changes: 1) the addition of one (1) tree (minimum 2" caliper) within the southern perimeter landscape buffer as required by MCC 12-13-11-2.C, 2) the addition of one (1) approved tree (minimum 2" call*) in each of the two (2) proposed landscape plantersrslands in the parking area, just east ofthe pro sed building as required by MCC 12-13-11- 3.E, and 3) increasing the size of the internal plant islands to contain a minimum of fifty (50) square -feet and be a minimum of five (5) feet in width ( ensured inside of curbs) as required by MCC 12-13-11-3.B. The approved landscape plan is not to b altered without prior written approval ofthe Planning & Zoning Department. No field changes to si a plan permitted; prior written approval of all material changes is required. Feel free to call me at 884-5533 if you have any approval in this letter. Zorc , lbe ers Powell, AICP Zoning Administrator City of Meridian Planning and Zoning Department Cc: Montview CZC File or concerns regarding the conditions of Lo mbard -Conrad Architects, P.A. 1221 Shoreline Ln Boise, ID 83702 PAY Sixty and 00/100 Dollars To City of Meridian, Planning and Zoning • Key Bank of Idaho N2 046515 700 West Idaho Street Boise, Idaho 83701 82-155/1241 CHECK DATE October 17, 2003 II8 0 4 6 5 1 5 III 1: L 2 4 L O L S S S 1: 0 L 031026 B IINFµ O SIGNATURES REQUIRED OVER $2,000.00 V --- --- -- --- --- -- --- --- -- --- --- -- --- --- -- � . Q z Q M F- x F V O is cw N ,� 0 L I o z O W 0 = Ud J cif Z Q D O w. �t O LU • Z � Q a Lu U O � C U Cr m l z ra�i u� Nw z Z LU cy) Q COG cv ` a a 0 PINNACLE Engineers, Inc. 12552 W. EXECUTIVE DR., SUITE B, BOISE, ID 83713 PH (208) 887-7760 (208) 887-7781 FAX • LETTER & TRANSMITTAL �M.:. ,. • ATTENTION: 1 i WE ARE SENDING YOU dAttached ❑ Under separate cover via ❑ Shop drawings ❑ Blueprints ❑ SepiasNellums ❑ 11 x 17 drawing(s) ❑ 3 1/2" disk ❑ Mylar/Ammonia Mylar ❑ Copy of letter ❑ Change Order ❑ Calculations the following items ❑ Specifications ❑ 8-1/2 x 11 Drawing(s) ❑ Field Report • • DESCRIPTION ■-lvm= ir�I/ L/.ill / • THESE ARE TRANSMITTED as checked below: ❑ For review For your use ❑ As requested For review and comment ❑ FORBIDS DUE nC§Awn1tc ❑ No exceptions taken ❑ Make corrections noted ❑ Revise and Resubmit ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US T PINN i Engineers, Inc. TO: Anna Powell, Director of Plannng'�and'Zoning, MeridianPlanning and Zoning o 660 E. Waterto we 'St 2 Meridian, ID 83642=2600 DATE: October 17, 2003 RE: Alternative compliance request for'th'e Spine Institute of Idaho Dear Anna: In ,accordance with section 12-13-18 ('Alternative'Compliange) of the City of Meridian s - Landscape Ordinance, 'Pinnacle Engineers, Inc. is' requesting' a'r,eduction in the mitigation trees required for the Spine Institute of Idaho development, (fka Montvue ' Spinal' Institute). The above-mentioned development is the first commercial, project in the Montvue Subdivision and the conversion of the subdivision from residential to commercial will' � require the , removal of much of the existing residential landscaping There ar' e many- mature trees located on the Spine Institute of Idaho property that will, need to be removed for the construction of the new facility, with several of the trees being 24' -30" in caliper, inches. When calculating the number of inches of trees to be mitigated it became apparent that we would not be able to plant anequal number ofcalipers as -required, by _ section 12-13-13-6 of the Landscape Ordinance. In�total there'are well over200�caliper_ inches of trees'that need to bemitigate& for,;_excluding those;,trees that Elroy Buff the,, City Arborist deemed as hazard dying or nuisance trees. On the positive side, we are able: to retain at least 72 caliper inches of trees onsite: i Thesubject property is less than one acre in size, and it will not be possible for us to' - incorporate an additional 1100+ two inch caliper trees, or 70+ three inch caliper trees, ,or 50+ four inch caliper trees etc.'..' 'therefore we are in need of a reduction of landscaping requirements s-thg p through alternative compliance. IThe alternative compliance lienee section of the code 'requires that, one ormore of the conditions of 12-134872 are met and,'the proposed, project meets at least two of them; (B), the site involves space limitations ,and (C) due to the change of use, on an existing site the required landscaping cannot be provided. The intent of the mitigation of mature trees is to provide an incentive for saving'as_ man ` y mature trees as possible' and a disincentive for,'removing existing trees., Unfortunately, the change of this neighborhood from residential to commercial will; re quire, the removal. of many mature trees. The number of trees being,planted for this project 'exceeds the number, of trees being ren%oved,; although the caliper inch,, of trees will not, be equal. EXE 55 CUTIVE' DRIVE ITE B BOISE, IDAHO A _ Hos i 20 3Z 3 ( 8) �887� 7760 FAX (�b8)_ 887 7781 ' C036201 Altemative compfiance letter101703 • MAYOR Robert D. Corrie CITY COUNCIL MEMBERS Keith Bird Tammy deWeerd Cherie McCandless William L.M. Nary October 24, 2003 0 HUB OF TREASURE VALLEY A Good Place to Live CITY OF MERIDIAN Mr. David McKinnon C/O Pinnacle Engineers 12552 W. Executive Drive, Ste. B Boise, ID 83713 33 EAST IDAHO MERIDIAN, IDAHO 83642 (208) 888-4433 • FAX (208) 887-4813 City Clerk Office Fax (208) 888-4218 Re: Alternative Compliance for Spine Institute of Idaho Dear Mr. McKinnon: LEGAL DEPARTMENT (208) 466-9272 - Fax 466-4405 PUBLIC WORKS BUILDING DEPARTMENT (208) 887-2211 • Fax 887-1297 PLANNING AND ZONING DEPARTMENT (208) 884-5533 • FAX 888-6854 This letter is in response to your request for Alternative Compliance to the City of Meridian's Landscape Ordinance for the property located at 360 E. Montvue Drive. In your application, you asked for a reduction of caliper inches of mitigation trees required for the site. After reviewing your submittal, the City of Meridian has accepted your proposal for alternative landscaping for the site. The landscape plan prepared by Pinnacle Engineers, Inc., on 10-15-03 and labeled LS -1, is approved with the following changes: 1) the addition of one (1) tree (minimum 2" caliper) within the southern perime landscape buffer as required by MCC 12-1.3-11-2.C, 2) the addition of one (1) approved tree (2" minimu caliper) in each of the two (2) proposed landscape planters/islands in the parking area, just—e-a—srurthe proposed building as required by MCC 12-13-11- 3.E, and 3) increasing the size of the internal planters/islands to contain a minimum of fifty (50) square -feet and b�aininimum of five (5) feet in width (measured inside of curbs) as required by MCC 12-13-11-3.B. The approved landscape plan is not to be altered without prior written approval ofthe Planning & Zoning Department. No field changes to site plan permitted; prior written approval of all material changes is required. Feel free to call me at 884-5533 if you have any questions or concerns regarding the conditions of approval in this letter. Sincerely, Anna Borchers Powell, AICP Zoning Administrator City of Meridian Planning and Zoning Department Cc: Montview CZC File