ACHD Comments.,,# ~ ~~ Ada C ' HD ounty Highway District 31 B East 37th Street Susan S. Eastlake 1st ~ce President Garden City ID 83714-6499 Dave Bivens, 2nd Vice President Phone (208) 387-6100 David E. Wynkoop, Commissioner FAX (208) 387-6391 John S. Franden, Commissioner E-mail: tellus~CHD.ada.id.us Apri13, 2003 TO: Meridian Fire Department 540 E. Franklin Road Meridian, ID 83642 SUBJECT: MCZC03-014 Fire Department Safe-House/Education Facility East of Locust Grove/Leigh Field On November 6, 2002, the Ada County Highway District Commissioners acted on MPP02-023/MCUP02- 035/Education Campus Subdivision. The conditions and requirements also apply to MCZC03-014. If you have any questions, please feel free to contact this office at (208) 387-6170. Senior Developm~nt~nalyst Planning & Development Cc: Planning & Development/ChronlProject File Planning & Development Services City of Meridian Construction Services Drainage/L7tilities Joint School District #2, 911 Meridian Road, Meridian, ID 83642 Ada County Highway District Right-of-Way & Development Department Planning Review Division This application requires Commission action due to the fact that it generates large volumes of traffic and is located within the north Meridian Planning Area. This item is scheduled to be on the consent agenda on November 6, 2002. Tech Review for this item was held with the applicant on October 18, 2002. Please refer to the attachment for request for reconsideration guidelines. Staff contact: Andrea N. Tuning, 208-387-6177, atuning@achd. ada. id. us File Numbers: Education Campus Subdivision / MPP02-023 / MCUP02-035 Site address: 3800 North Locust Grove Road Owner/Applicant: Meridian Joint School District #2 911 Meridian Road Meridian, Idaho 83642 Representative: JUB Engineers, Inc. 250 Beechwood Avenue, Suite 201 Boise, Idaho 83709 Application Information The applicant is requesting conditional use and preliminary plat approval fora 3-lot commercial subdivision on 39.23-acres. The applicant is proposing to construct a new Meridian School District Educational Campus that will include one elementary school, two senior high charter schools, two senior high professional technical high schools and one District administration building. This project is anticipated to be phased beginning with the elementary school and ending with the Administrative building. The elementary school is planned to be operational in September of 2003. Acreage: 39.23 Current Zoning: R-4 Proposed Zoning: R-4 Proposed buildable lots: 2 Proposed common lots: 1 Vicinity Map A. Findings of Fact 1. Trip Generation: This development is estimated to generate 2,816 additional vehicle trips per day (0 existing) based on the submitted traffic study. 2. Impact Fees: The impact fee rate from the fee tables for these uses are: There is no impact fee associated with elementary and senior high schools at this time. The impact fee for the administrative office has been classified as Government Office, which is $2,505.00 per thousand square feet of gross building area. The impact fee determination is based on the impact fee ordinance in effect at this time. 3. Trafffc Impact Study: A traffic impact study was required with this application. The following is a summary of the findings: ^ The proposed development is projected to generate an average daily traffic (ADT) of 2,816 vehicles per day (vpd), of which the peak hour traffic (PHT) is 621 vehicles per hour (vph). ^ As a result of the site build-out, traffic on the vicinity roadways is expected to increase as follows: traffic on Ustick Road west of Locust Grove Road may increase by 300 vpd: traffic on Ustick Road east of Locust Grove Road may increase by 800; McMillan Road west of Locust Grove Road may increase by 200 vpd: McMillan Road east of Locust Grove may increase by 700 vpd: Locust Grove may increase by 2,700 vpd. ^ The overall intersection of Locust Grove Road and Ustick Road is currently operating at a LOS C with a delay of 22 seconds in the PM peak hour, and a LOS B with a delay of 20 seconds in the AM peak hour. At build-out of the educational campus site, the intersection will continue to operate at LOS C with a delay of 35 seconds in the PM peak hour, and at a LOS C with a delay of 31 seconds in the AM peak hour. ^ The overall intersection of Locust Grove Road and McMillan Road is currently operating at a LOS B with a delay of 14 seconds in the PM peak hour, and a LOS B with a delay of 11 seconds in the AM peak hour. At build-out of the educational campus site, the intersection will continue to operate at LOS F with a delay of 155 seconds in the PM peak hour, and at a LOS F with a delay of 80 seconds in the AM peak hour. ^ The south site access intersection on Locust Grove operates at an acceptable level of service with acceptable vehicular delays with atwo-way stop controlled intersection. The south access on Locust Grove Road should be designed with an exclusive left-turn lane, and aright-turn lane. ^ The north site access intersection on Locust Grove is anticipated to operate at an LOS F with a delay of 130 seconds in the PM peak at the site access approach with atwo-way stop controlled intersection. This site access intersection is anticipated to operate at a LOS D with a delay of 30 seconds in that AM peak at the site access approach. ^ The intersection of Ustick Road/Locust Grove Road meets the peak hour signal warrant for the 2012 background traffic conditions. The intersection will continue to meet the peak hour signal warrant for the 2012 site build-out traffic conditions. Based on the data available at the time of this study, the existing signal and intersection configuration will have adequate capacity for the 2012 build-out conditions. 2 ^ The intersection of Locust Grove Road/McMillan Road meets the peak hour signal warrant for the 2012 background traffic conditions. The intersection will continue to meet the peak hour signal warrant for the 2012 site build-out traffic conditions. A detailed analysis will be needed when the projected traffic volumes are reached before installing a signal. ^ Locust Grove Road requires left-turn and right-turn deceleration lanes for traffic turning into the site at both access intersections. Both site access intersections should have an exclusive left-turn lane with a through and right-turn lane. ^ Locust Grove Road, McMillan Road, and Ustick Road have adequate existing capacity to handle the traffic from the educational campus at build-out. These roads will not have adequate capacity to handle the build-out of the 12-square mile North Meridian Planning Area at 2020. Any improvements on these roadways should be based on the recommendations of the North Meridian Traffic Study. ^ The McMillan Road/Locust Grove Road intersection needs to be improved with widening of all four approaches for acceptable operation in 2012 for both build-out and non-build out conditions. The widening should include left-turn lanes on all approaches. Additional right-turn lanes are' optional, but will further improve the intersection operation. ^ The intersection of Locust Grove Road/North Access intersection meets the peak hour signal warrant for the 2012 build-out scenario. With the installation if a signal at this intersection, and no geometric modifications the intersection will be under capacity. A detailed analysis will be needed when the projected traffic volumes are reached before installing a signal. • The anticipated traffic volume at the south approach is 1,100 vpd, while the traffic volume at the northern approach is 3,000 vpd. The roadway leading to the northern approach should be classified as a collector street, and built to Collector Street Standards to the eastern elementary school approach. The roadway should be built to Local Street standards east of the elementary school. Access should be designated in accordance with the ACHD's access requirements. ^ All site access locations meet the ACHD's policy requirements. Roadway Capacity Analysis on Vicinity Roadways: 3 Grove Site Arterial Locust Grove S/ Ustick 11,300 11,700 14,000 2-Lane Minor Arterial Under Intersection Capacity: * -Currently Signalized In addition to the submitted traffic impact study for this site, staff has included the executive summary of Washington Group International's regional (North Meridian) traffic impact study. EXECUTIVE SUMMARY OF THE NORTH MERIDIAN TRAFFIC STUDY The proposed 12-square mile study area between US 20/26 and Ustick Road and between McDermott Road and Eagle Road (Sections 25-28, 33-36 of T4N R1 W and sections 29-32 of T4N R1 E), is selected Ada County Highway District (ACRD) for anticipated development build out. The following are the principal findings and recommendations of the study: • By the year 2020 the study area is anticipated to develop an additional 17,599 dwelling units, 2,744,000 sq. ft of office buildings, 1,929,000 sq.ft. of retail buildings, 12 elementary schools, 2 senior high schools, 2 junior high schools, 38,260 sq. ft of church buildings, and approximately 60 acres of park. • The build out scenario of the study area is projected to generate an average daily traffic (ADT) of 276,764 vehicles per day (vpd), of which the peak hour traffic (PHT) will be 28,206 vehicles per hour (vph). Out of these trips approximately 10% of the trips remain internal within each section, and 6% of the trips are pass-by trips. • The distribution of the traffic from all of the study area sections indicate that approximately 30% traffic directed towards south, 27% of the traffic directed towards east, 21 % of the traffic directed towards west and north. The remaining 22% of the traffic is distributed within the study area. • At build out, traffic on the arterials is expected to significantly increase (see Table 4). • All of the arterial intersections in the study area are currently operating at acceptable level of service of "C" or better. • By the year 2020, the majority of study intersections are projected to meet the peak hour traffic signal warrant. • A proportionate share of the impacts of the individual sections at each of the study area arterial intersections is summarized in Table 6. • Several mid-mile intersections may warrant traffic signals due to the heavy left turn traffic volume. 4 • Chinden Boulevard is forecasted with 5-lane section in the study area. Right turns lanes may be required at some access and arterial intersections. • McMillan Road is forecasted with a 5-lane section east of Black Cat. McMillan Road is forecasted with a 3-lane section west of Black Cat. At arterial intersections and at access intersections right turns lanes may be necessary. • Ustick Road is forecasted with a 5-lane section east of Black Cat. Ustick Road is forecasted with a 3-lane section west of Black Cat. At arterial intersections and at access intersections right turns lanes may be necessary. • Linder Road forecasted with a 5-lane section in the study area. At arterial intersections and at access intersections right turns lanes may be required. • McDermott Road is forecasted with a 3-lane section in the study area. At arterial intersections and at access intersections turn lanes may be required. • Black Cat Road is forecasted with a 3-lane section in the study area. At arterial intersections right turn lanes may be required. • Ten Mile Road is forecasted with a 5-lane section in the study area. At arterial intersections and at access intersections tum lanes may be required. • Meridian Road requires a 3-lane section north of McMillan and 5-lane section south of McMillan in the study area. At arterial intersections right turn lanes may be required. • Locust Grove Road requires a 3-lane section in the study area. At arterial intersections right turn lanes may be required. At Ustick Road a 5-lane section is forecasted. Staff recognizes that the amount of right-of-way dedicated with these improvements is overwhelming, and that ACRD may not have the funds to purchase such a large amount of right-of--way. In this situation it is likely that impact fee offset agreements will be utilized to offset the amount of money that ACRD will pay out-of-pocket to acquire the right-of-way. 4. Site Information: The site is currently vacant 5. Description of Adjacent Surrounding Area: a. North: Heritage Subdivision b. South: Summerfield Subdivision c. East: 102-acre vacant parcel d. West: Heritage Commons Subdivision 6. Impacted Roadways Locust Grove Road Frontage: Functional Street Classification Traffic count: Level of Service: Speed limit: Mc Millan Road Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: 980-feet Minor arterial South of McMillan Road was 4,719 on 6/28/01 North of Ustick Road was 5,709 on 6/20/01 Better than "C" 35 MPH 0-feet Minor arterial West of Locust Grove Road was 3,598 on 6-20-01. East of Locust Grove Road was 5,135 on 6-20-01. Better than "C" 35 MPH 5 Ustick Road Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: 0-feet Minor arterial West of Locust Grove was 6,510 on 6-20-01. East of Locust Grove was 7,640 on 6-20-01. Better than "C" 35 MPH 7. Roadway Improvements Adjacent To and Near the Site Locust Grove Road is improved with 24-feet of pavement with no curb, gutter or sidewalk abutting the site. Locust Grove Road will have a 5-foot detached sidewalk constructed on the west side of Locust Grove Road as a part of the Heritage Commons Subdivision. McMillan Road is improved with 2-traffic lanes with no curb, gutter or sidewalk abutting the site. Ustick Road is improved with 2-traffic lanes with no curb, gutter or sidewalk abutting the site. 8. Existing Right-of-Way Locust Grove Road currently has 50-feet of right-of-way abutting the site (25-feet from centerline). 9. Site History The District has not previously reviewed this site. 10. Five Year Work Program There are not any roadway projects that are scheduled within this area that have been programmed in the District's Five Year Work Program. 11. Other Development in Area Staff has recently been receiving large amounts of inquiries from developers in the northwest Meridian area. Many developers are prepared to plat entire section-miles, and have site plans developed. The preliminary plans generally include upwards of 700 to 900 residential lots, schools, office/commercial lots, and city and neighborhood parks. Some of the large developments within the North Meridian Planning area include: Bridgetower Subdivision, Keltic Heights Subdivision, Baldwin Park Subdivision and Utility Subdivision. • On October 17, 2001, the Commission approved a rezone application and a sketch plat for Keltic Heights Subdivision. Keltic Heights Subdivision is proposed to be 1,522 lots. The applicant proposed 929 residential lots, 8 commercial lots and a 585-unit multi-family subdivision on 452.16-acres. • On October 17, 2001 the Commission approved a rezone and preliminary plat application for an 8-lot industrial subdivision on 34.6-acres (Utility Subdivision). • On November 7, 2001 the Commission approved rezone and annexation application for 370.55 acres. The Commission also approved a preliminary plat for 336 lots on 175.91 acres and conditional use approval for a total of 692 single-family residences, 59 senior housing units, 17 office lots, 10 commercial lots, and an elementary school (Bridgetower Subdivision). • On February 6, 2002, the Commission approved a preliminary plat application fora 272-lot residential subdivision on 78-acres (Baldwin Park). • On April 17, 2002, the Commission approved a preliminary plat application fora 285-lot subdivision on 75.4 acres (Heritage Commons Subdivision). • On May 22, 2002, the Commission approved a preliminary plat application for an 876-lot mixed- use subdivision. The subdivision consisted of 862 single-family dwellings, 171 multi-family 6 dwellings, 11 office buildings, 1 commercial building, 1 fire station, 1 city park and 1 private park (Lochsa Falls Subdivision). • On July 17, 2002, the Commission approved a request for approval for an annexation and rezone fora 135,000 square foot Middle School within the Meridian School District. • On August 21, 2002, the Commission approved a preliminary plat application fora 144•lot residential subdivision on 43-acres (Sundance Place Subdivision). • On August 28, 2002, the Commission approved a preliminary plat application fora 12-lot residential subdivision on 5-acres (Drawbridge Subdivision). • On September 11, 2002, the Commission approved a preliminary plat application fora 49- lot residential subdivision on 7.30-acres (Tully Cove Subdivision). • On October 23, 2002, the Commission approved an 89-lot residential subdivision on 15.4- acres (Cobblefield Crossing Subdivision). Due to the large number of inquiries and submitted development applications in this area, staff and the development community realized that the potential for development in this area is extreme and the traffic impact studies that each individual developer was submitting did not include the major surrounding developments that are "in the works". If staff examines each development individually, the roadway system appears adequate, but when staff begins to add in a second or third large-scale development, the traffic capacities of these roadways (Ustick Road, McMillan Road, Ten Mile Road, Linder Road) reach their 2020 planning thresholds. Based on development patterns in this area, and the concern surrounding the abutting roadways, ACRD hired Washington Group to conduct a traffic impact study of the northwestern Meridian area from Ustick Road to Chinden Boulevard, and from Meridian Road to one-half mile west of Black Cat Road. One option for funding improving these roadways is the implementation of an extra-ordinary impact fee overlay district. Education Campus Subdivision may also be subject to any extraordinary fees that the District may impose. The second phase of the study, the economic phase has been initiated and will focus on the cost of the improvements deemed necessary by the study, including right-of-way costs. The outcome of the economic study has provided the District with an estimate of the costs to improve the roadways in the North Meridian Planning Area to handle the traffic generated by the proposed developments in the area. This final estimated cost is not yet available, as staff is still reviewing street section options that may reduce the right-of-way costs. B. Findings for Consideration Right-of-Way District policy requires 96-feet of right-of--way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. As a part of the North Meridian Traffic Plan, it was noted that a 3-lane roadway with curb, gutter, 5- foot concrete detached sidewalks and bike lanes within 70-feet of right-of-way would be adequate to accommodate the projected traffic volumes on Locust Grove Road. Due to the fact that the North Meridian Traffic Plan recommended a 70-foot right-of--way on Locust Grove Road and the Commission has supported the recommendations in the past, staff is recommending that the 7 applicant dedicate 70-feet of right-of--way (35-feet from centerline) as opposed to 96-feet of right-of- way (48-feet from centerline). 2. Sidewalk District policy requires 5-foot wide (minimum) concrete sidewalk on all collector streets (7204.6.5). The applicant should construct 5-foot concrete sidewalk abutting the site on Locust Grove Road. The sidewalk should be located 2-feet within the new right-of--way. If the sidewalk should meander outside of the right-of--way, the applicant should provide the District with an easement. 3. Roadway Offsets District policy 7204.11.6 states that the optimum spacing for collector intersections along arterial roadways is 1,700-feet to allow adequate signal spacing. The minimum spacing that is acceptable for collector intersections along arterials is 1,300-feet. The applicant is proposing to construct East Heron's Crossing Drive at the north property line (at the half mile). This roadway location meets District policy and should be approved with this application. 4. Roadway Street Sections District policy 72-F1 B requires collector roadways to be constructed as a 46-foot street section within 70-feet of right-of--way. This right-of--way width would allow for two 11-foot travel lanes, an 11-foot center-turn lane, 6-foot bike lanes, curb, gutter, 5-foot planter strip with a 5-foot detached concrete sidewalk. The Commission has recently reviewed and approved an alternative collector roadway. The collector roadway is a reduced street section that has a 33-foot street section with curb, gutter, 5-foot detached sidewalk and bike lanes with no parking. According to the submitted traffic impact study, East Heron's Crossing Drive should be constructed as a collector roadway. The applicant is proposing to construct East Heron's Crossing Drive as a 3-lane collector roadway that tapers to a 2-lane collector roadway. The applicant is proposing to construct East Heron's Crossing Drive (from Locust Grove Road to the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road) as a 46-foot street section with three travel lanes, curb, gutter, 5-foot bike lanes, and 5-foot concrete sidewalk within 56-feet of right-of--way. The applicant has proposed that the sidewalk located on the south side of East Heron's Crossing Drive be detached and placed within an easement. The proposed street section meets District policy and is approved with this application. The applicant is proposing to construct East Heron's Crossing Drive (from the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road to the east property line) as a 36-foot street section with curb gutter and 5-foot concrete sidewalk within 50-feet of right-of-way. The proposed street section is the standard street section for a local residential roadway. Due to the fact that East Heron's Crossing Drive is proposed to stub to the east property line to a vacant 102- acre parcel, staff recommends that the roadway be constructed as a 2-lane collector roadway. Staff recommends that the 2-lane collector roadway be constructed as a 33-foot street section with curb, gutter, 5-foot detached sidewalk and bike lanes with no parking on either side. This alternative street section will accommodate future traffic volumes traveling from the east, will reduce the pavement 8 width of the road, will allow the construction of striped bike lanes, and will remain within the proposed right-of-way (50-feet). Any costs associated with the construction of East Heron's Crossing Drive should be borne by the applicant due to the fact that the Education Campus Subdivision requires the construction of the roadway to accommodate traffic volumes throughout the development. 5. Stub Streets District policy 7203.5.1 and 7205.5 requires stub streets to provide intra-neighborhood circulation and to provide access to adjoining parcels. District policy also requires temporary turnarounds with a temporary easement provided to the District at the end of stub streets that serve more than one lot, or are greater than 150-feet in length with a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". The applicant is proposing to construct East Heron's Crossing Drive as a stub street that will extend to the east property line approximately 610-feet south of the north property line. Staff is supportive of this location. Due to the fact that this roadway will be greater than 150-feet in depth, the applicant should construct a temporary turnaround at the terminus of the roadway and install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 6. Driveways District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 20 to align or offset a minimum of 105-feet from any existing or proposed driveway. District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 25 to align or offset a minimum of 105-feet from any existing or proposed driveway. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35-feet. Most commercial driveways will be constructed as curb-cut type facilities if located on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. The applicant is proposing to construct one driveway to intersect Locust Grove Road approximately 570-feet south of the north property line. This driveway is proposed to align with East Heritage Place (a roadway that was approved on April 17, 2002 with the Heritage Commons Subdivision). This driveway meets District policy and should be approved with this application. The applicant is proposing to construct five driveways on East Heron's Crossing Drive. The applicant is proposing to construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 290-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 40-foot wide driveway on the south side of East Heron's Crossing Drive approximately 630-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. 9 The applicant is proposing to construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 920-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 1,060-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 2,020-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 2,300-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. 7. Turnarounds District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of 45-feet. The applicant should also be required to provide a minimum of a 29-foot street section on either side of any proposed center islands within the turnarounds. The medians should be constructed a minimum of 4-feet wide to total a minimum of a 100-square foot area. 8. Turn Lanes According to the submitted traffic impact study, Locust Grove Road requires left-turn and right-turn deceleration lanes for traffic turning into the site at both access intersections. Due to the lack of right-of--way that the District currently owns, the applicant should not be required to construct an exclusive left tum lane on Locust Grove Road for either access. The applicant should construct a right turn deceleration lane on Locust Grove Road at the East Heron's Crossing Drive intersection. The applicant should coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. The applicant should construct a right turn deceleration lane on Locust Grove Road at the driveway proposed to be located approximately 570-feet south of the north property line. The applicant should coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. 9. No Other Access Other than the access points specifically approved with this application, direct lot access Locust Grove Road and East Heron's Crossing Drive is prohibited. These restrictions should be noted on the final Plat. 10. Special Notification to the Applicant and the City of Meridian "ACRD has approved the proposed preliminary plat in accordance with the Site Specific Requirements. At the time of the approval, the Commission found that the current roadways are adequate to accommodate the projected traffic from this development. ACHD is concerned that the cumulative effect of the number of trips generated from this development in combination with several other new development applications will result in a substantial increase in future traffic on the existing infrastructure. ACHD anticipates that future development applications in this related area may require 10 system improvements. In addition, ACHD anticipates that there will be significant delay in making any such system improvements because there is a lack of known funding sources." It appears that the internal parking configuration as it is proposed, will promote cut through traffic. District staff is concerned that traffic will utilize the drive aisle that is within the parking lot to travel from Locust Grove Road to East Heron's Crossing Drive. To eliminate the potential for cut through traffic, the applicant should redesign the parking lot configuration. C. Site Specific Conditions of Approval Dedicate 35-feet of right-of--way from the centerline of Locust Grove Road abutting the parcel by means of a warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of--way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #195). 2. Construct 5-foot concrete sidewalk abutting Locust Grove Road located 2-feet within the right-of--way. If the sidewalk meanders outside of the right-of--way, provide an easement for the sidewalk. 3. Construct East Heron's Crossing Drive at the north property line (at the half mile), as proposed. 4. Construct East Heron's Crossing Drive (from Locust Grove Road to the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road) as a 46-foot street section with three travel lanes, curb, gutter, 5-foot bike lanes, and 5-foot detached concrete sidewalk (or 7-foot attached concrete sidewalk) within 56-feet of right-of--way, as proposed. Provide the District with an easement for the sidewalk on the south side of East Heron's Crossing Drive. 5. Construct East Heron's Crossing Drive (from the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road to the east property line) as a 33-foot street section with curb, gutter, 5-foot sidewalk and bike lanes with no parking on either side. 6. Construct East Heron's Crossing Drive as a stub street that will extend to the east property line approximately 610-feet south of the north property line, as proposed. Construct a temporary turnaround at the terminus of the roadway and install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 7. Construct a driveway to intersect Locust Grove Road approximately 570-feet south of the north property line, as proposed. 8. Construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 290-feet east of Locust Grove Road, as proposed. 9. Construct a 40-foot wide driveway on the south side of East Heron's Crossing Drive approximately 630-feet east of Locust Grove Road, as proposed. 11 10. Construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 920-feet east of Locust Grove Road, as proposed. 11. Construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 1,060-feet east of Locust Grove Road, as proposed. 12. Construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 2,020-feet east of Locust Grove Road, as proposed. 13. Construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 2,300-feet east of Locust Grove Road, as proposed. 14. Pave the driveways their full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. 15. Provide a minimum turning radius of 45-feet for all turnarounds. 16. Construct a right turn deceleration lane on Locust Grove Road at the East Heron's Crossing Drive intersection. Coordinate the design of the lanes with the District's Traffic Services Department, 387- 6140. 17. Construct a right turn deceleration lane on Locust Grove Road at the driveway proposed to be located approximately 570-feet south of the north property line. Coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. 18. Other than the access points specifically approved with this application, direct lot access Locust Grove Road is prohibited. These restrictions shall be noted on the final Plat. 19. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of--way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 12 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of--way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACRD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the-law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACRD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines 13 Request for Reconsideration of Commission Action Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 14 Meridian Education Campus 15