CERTIFICATE OF ZONING COMPLIANCE*
Date: February 22, 2001
Project: The Printin~Press G'LC r 0 ~ '' 0 ~~
Address: 1868 E. Commercial Street
Proposed Use: 20,000 sQ.ft. Printin Facility
Zoning: I-
COMMENTS:
Signage: All signage is subject to design review and requires separate permits. No signage is
permitted in ACRD right-of--way. No portable signs or temporary signage permitted (such
as A-Frames).
Parkin: Minimum parking requirements are met by the plan. Dimensions of all parking stalls on
the submitted site plan, 9'x20', are one foot longer than the minimum dimensions for
parking stalls listed in the city parking ordinance (9'x19'). The driveway aisle width depicted
on site plan is 24', one foot less than required by city's parking ordinance. Therefore, the
parking lot dimensions can accommodate 9'x19' stalls and provide fora 26' driveway aisle
width (see red-line on site plan). Please paint the stalls to reflect the 9'x19'dimensions. The
site plan depicts two ADA parking stalls that meet Federal requirements for location
dimension and number.
Handicap-Accessibility: The structure and site improvements must be in compliance with all federal
handicap-accessibility requirements.
Landscaping: All landscaping trees shall be 2" caliper minimum. The approved landscape plan
meets the minimum requirements as set forth in the landscape ordinance.
Irri ation: An underground, pressurized irrigation system must be installed to all landscaped areas
as noted on the approved landscape plan.
Li tin : All lighting shall be down-shielded, and shall not adversely impact the surrounding
properties and right of way.
Trash Enclosure: The location and screening of the trash enclosure, as noted on the approved site
plan, meets or exceeds the minimum requirement for trash enclosures and has been approved
as noted by SSC (attached).
Certificate of Occupancy: All required improvements must be complete prior to obtaining a
•
•
Certificate of Occupancy. A Temporary Certificate of Occupancy may be obtained by
providing surety to the City in the form of a Letter of Credit or cash in the amount of 110%
of the cost of the remaining improvements (including paving, striping, landscaping, and/or
irrigation). A bid must accompany any request for Temporary Occupancy.
Plan Modifications: The approved Site Plan and Landscape Plan are not to be altered without prior
written approval of the Planning & Zoning Department. No field changes to the site or
landscape plans are permitted; prior written approval of all material changes is
required.
The Site Plan & Landscape Plan stamped 02/22/01 is approved with the comments noted abdve.
`'~ ~-~
Shari Stiles
Planning & Zoning Administrator
*This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited
to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer,
Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date
of issuance if work has not begun.
George R. Blecha, AIA
Architecture and Planning
507 Hillview Drive
Boise, Idaho 83712
Phone: (208) 344-2796 Fax: (208) 344-4686
•
February 21, 2001
Subject Project:
Project Location:
Project Ref. No.
THE PRINTING PRESS
Michael L. Peters (Owner)
Phone: (208) 344-1117
1868 East Commercial Street
Layne Industrial Park Subdivision
Meridian, Idaho
Permitted Use -City of Meridian Zoning Ordinance
SITE CRITERIA SUMMARY
SITE AREA: 65,650 Sq. Ft. 1.51 Acres 100°~
BUILDING AREA: 20,000 Sq. Ft. 30
PAVED AREA: 22,290 Sq. Ft. 34
LANDSCAPING: 19,470 Sq. Ft. 30
HARDSCAPE: 3,890 Sq. Ft. 6
BUILDING AREA:
OFFICE AREA:
SHOP (Print Shop) AREA:
20,000.00 Sq. Ft.
6,609.29
13,390.72
,Ovc-05-00 08x414 G®orgp R. Bloc1•~a AIA 208 344 4686 P.Ol
•
George R. Blecha, AIA
ARGh{iTECTUgE ANO PLJINNIN(;
5137 HIt_LVIEYV DRIVE
80lSE, IUAFIO 83712
PH: (2Qa)3,4-27913
FAX: (208)344-4888
Vt:lr
AStentton: Steve Stdlacek
5aaicary Service Compaai
Lul~rid{an. Idaho
Delto: D acmDer 4. 2000
Pro}. No.: 0008
REF.. ~r,,,~-ti~ ..
Alew tle¢ Fx~illr,~ tY,,,~, _
Moridiaa, •Id abo
VIA: FAXED
MAIlEO
DEUVEAEI~
PICKEQ-UP ^
_~~ O
' ' ~ Georga K. ~l~h~
Plew~e f;ri1 a cote of a t-soeosed R~Eux* Enclosure relocation far your re~-iew and eornmaat.
.w ~~
p~grse respond to tbiR most recent cluinRa at your earlua poseibie eonvenfence. Thanks.
Please do noe hesitate to call it wu skouW C~arc wny Eurthor queitieas.
VWtixiJdt~lUlrVLt') (i!E'! p~li ULN~i(ii~SU = '' ~ :1Lt'Ja
[] FOR YOUR USE ^ FOR APPROVAL ^ DISTRIBUTION
(~ INFORMATION Q REVIEW i COMMENT ~ APPFipVEp A9 NOTED
As AEOuESt~o O _~~~ ~u / ~ ~=~~~~~~o-~--
Gtu-N'fi'lY OF PAQES IN~DEp 7M8 COVEp 2
PLFJISE RIEPOAT INC.OwfPi„F!'E TAANpiAtSGON TO Q0o39e4-27v6
Doc-05-op 08:41A George R. Blsecha AIA
208 ,aa a686 P.02
~_
-a t - '.
\p w ~,~
'O ~-~ "' i
Y !`
Y'~ ~...
. W , ~
1I
V
~ R `r J ~ l~
g ~ ~ ~ ~ ~ ~
.~, , v N
. .
~~ ~aiw
•~~"~"~f M~ ~ ~ ~ i ~v4
i~w d..r..~,,.;,~ ~ h0
ur.:~.,~ ~ . 1
~ ~
~~~~ ~ CH ~ ~~~~ Ada Count Hi hwa District
,~ y g y
Judy Peavey-Derr, President s,:s tast sim street
Dave Bivens, 1st Vice President Garden City 10 83714-6499
Sherry R. Huber, 2nd Vice President Phone (208) 387-6100
Susan S. Eastlake, Commissioner FAX (208) 387-6391
David E. Wynkoop, Commissioner E-mail: tellusr7a ACHD.ada.id.us
February 16, 2001
(irorgr Rlecha
507 l~illview Urivc
Boise. Idaho 83712
RE: MSPR-01-04 / 1868 E. C'ommerrial /The Printing Press
PLANS ACCEPTANCE
~I•he District has reviewed the plans for the abo~~r referenced project, and they are accepted for public street
construction. E3y stamping and signing the impro~•ement plans. the Registered lingineer ensures the District that the
plans conform to all DisU•ict },olicies and standards. Variances or ~~-aivers must br specifically and prey iously
approved by the District in writing. Acceptance of the improvement plans by the District does not relie~~e the
Registered I:nginerr of these responsibilities. The District will assess the following impact tee for this project. The
impact Ire must br paid prior to issuance of a building permit.
"Total Impact lee Duc: x,7,700.00
Standard Requirements:
I . L)tility street cuts in new pavement less than live years old are not allowed unless approved in ~a•riting
by the District.
2. /111 irrigation facilities must be located outside the public right-of=~~ay unless othrr~~ ise approved by
the Uish-ict.
3. Replace damaged curb. gutter. and side~~alk ~~ ith nc~•~ curb, gutter, and sidr~~~alk to match existing
improvrnnnts.
4. /111 facilities to br constructed ~~~ith a proposed deg rlopmcnt. and to be u~~~ncd and maintained by the
District. must he constricted aecording to the latest edition ofI.S.P.4L'.('. and the t)isu-ict's
Supplemental Standard Specifications.
~. Submit to Idaho 1)rpartmrnt ul'~1%ater Keunn-rrs a Shalk+~~ Injection 1Ve11 -Notice uf('onstruction ,
Im~entory Dorm at Icast thirty davs prior to consu-uction of the laeilit~~. ~I hr 1)isu-ict ~~ ill rccluire a copy
ol'the completed lixm prior to ~~ranum~ of linal ucrupanc~~.
l-. nny ~~ork in the public --itht-of-~~a~~ rryuirrs a permit loom A(~III) ('onarurtion tirr~ irr~.
7. An engineer rr~~istcrrd in the State ol~Idaho shall l,rrparr and rrrtil~ all impru~rn,rnt plan.
~.~F~'~DJED
F ~ ~'. ~ i
Mores R. f~l~cha~ AIA
11 you haec any yurstiuns ur cuncern~. please liel fire to contact me at ?R7-61 S 1.
Sinrrrcly.
Scott Rudel
Planning and i)cvclopmei~t
~.F~'F,TVED
~• -.. ~1 ~~.~•
GeOr~e R. d1~Gha. /UA
•
~.~,.
?•t
~ ,•'L3 ~.
H
Ada County Highway District
Judy Peavey-Derr, President
Dave Bivens, 1st Vice President
Sherry R. Huber, 2nd Vice President
Susan S. Eastlake, Commissioner
David E. Wynkoop, Commissioner
s i u tast s itn greet
Garden City ID 83714-6499
Phone (208) 387-6100
FAX (208) 387-6391
E-mail: tellusCa~ACHO.ada.id.us
February 16, 2001
MSPR-O1-04 / 1868 E. Commercial /The Printing Press
IMPACT FEE CALCULATION
Building Type Cost pcr Unit
(per I ,U00 SF) Area (SF) Total Cost
Specialty Retail $1,885.UU 20,000 $37,7UO.0U
Total Impact Fee Due
$37,700.00
RE' CEIVED
1. •} .- `J ~J~'.
6vor~ R. BNcho~ AIA
~ • ~ ~ EcE
TKO cc ~ D
~1n 1n ~~VV FEB 2 8 7001
~zaadity P~in~iytg Si~ace 1985 CITY 8F NIg1tIDIAN
PLANNING & ZONING
February 23, 2001
George Blecha
Architecture and Planning
507 Hillview Drive
Boise, Idaho 83712
Dear George,
Please allow me to clarify the number of employees and their duties at the new facility. In
the front office, there will be a total of 14 full-time employees and one part-time
employee. Duties performed are sales, management, typesetting, estimating,
bookkeeping, and prepress activities.
In the production area, including the pressroom and bindery, there will be a total of 13
full-time employees including printing press operators, bindery equipment operators,
packaging, shipping and delivery.
The entire workforce is day shift, working from approximately 6:30am to 5:30 pm We
are -not anticipating an immediate increase in personnel, even though we will have more
capacity. In the future, if the need arises, we plan to add a second shift to better utilize
our equipment and space.
I hope this helps to clarify our mix of employees.
Thank you for your help.
Sincerely,
Michael L. Peters
Owner, The Printing Press
325 Grove Street ~ Boise, Idaho 83702 • P.O. Box 9243 • Boise, Idaho 83707-3243 • Phone 208-344-1117 • 800-342-6507 • Fax 208-384-1664
Feb-27-O1 O9:18A Ge~ge R. Blecha AIA
'~rinting_
February 23, 2001
George 131echa
1lrchilecture and Planning
SU7 Hillview 1:)rivc
$oisc, Idaho Ra712
()ear George,
2~ 344 4686
~~~~
Please allow me to clarify the number of employees and their duties at the new >theility. In
the li-imt etfficc, there will he a total of 14 full-time employees and c)ne part-time
employee. Dukes performed arc sales, n,anafemcni, typesetting, estunating,
bookkeeping, and rrepress activities.
!n the production arcs, including the pressroom anti bindery, there will be a te,tal of 13
full-time cmplciyees including printing press operators, bindery eyuipment operators,
rackaging, shipping and delivery.
The entire workforce is day shift, working from approximately G:3Uam to 5:30 pm. We
arc not anticipating an itnmcdiatc increase in persotu>Icl, even though we will have more
capacity. In the lulure, if the need arises, we plan to add a second shill tc) better utilize
our eyuipment and space.
T hope this helps to clarify c)ur mix ofentployces.
Thank you li-r your. help.
Sincerely, ../
~ d• r~
Michael f., Peters
Uwncr, The Printing Press
P.O2
325 Cu•~wr ~trcct li<~i,:c, I~I,ih~~ ,ti i j(Y~ I'.(1. li~~~ ~)2~3 13i~is.•, 1Jah~~ `; i i~~i-3.13 f'h~mr :!li~-~44.1 1 I'r ;iU(t i4!. (~jili IStx 'ZPh 'i54 Ihh~t
Feb-27-O1 09: 18A Gee R. Blecha AIA 2~ 344 4686 P.O1
George R. Blecha, AIA
ARCHITECTURE AND PLANNING
507 HILLVIEW DRIVE
BOISE, IDAHO 83712
PH: (208)344-2796
FAX: (208)344-4686
tlUd
David McKinnon, Planner
City of Meridian
P in and Zonin De artment ~i
(-~[~(J~d C'=eor a 1~. Blecha
L13tttilL~L~ L1V 1u'l~L~li~L~Jl;~ti'LL,
Dat@; February 27, Zo01
Proj. No.: oooR
REF.: 'I`hP Printing Press
New Facility
Meridian, Idaho ~~
VIA: FAXEb [x
MAILED
DELIVERED
PICKED-UP
1~WL DULL' UL~IUWL~f;
(1) Letter rFquested of Michael L, Peters, The Printing Press rel;ardinR employee
base for the New 1+aciltiy.
~~~w~~~~~~V ~~ ~V~~~~~~ ~LaV~b
(~ FOR YOUR USE
® INFORMATION
AS REQUESTED
FOR APPROVAL [] DISTRIBUTION
[] REVIEW & COMMENT ~ APPROVED AS NOTED
D
~uWU~~ tub
QUANTITY OF PAGES INCLUDED THIS COVER 2
PLEASE REPORT INCOMPLETE TRANSMISSION TO (208)344-2796