St. Luke's Regional Medical Center CZC 01-020 •
•
HUB OF TREASURE VALLEY
MAYOR LEGAL DEPARTMENT
Robert D. Corrie A Good Place to Live (208) 288-2499 • Fax 288-2501
CITY OF MERIDIAN PUBLIC WORKS
CITY COUNCIL MEMBERS
Ron Anderson 33 EAST IDAHO BUILDING DEPARTMENT
(208) 887-2211 • Fax 887-1297
Keith Bird
MERIDIAN, IDAHO 83642
Tammy deWeerd (208) 888-4433 • Fax (208) 887-4813 PLANNING AND ZONING
City Clerk Office Fax (208) 888-4218 DEPARTMENT
Cherie McCandless (208) 884-5533 • Fax 888-6854
CERTIFICATE OF ZONING COMPLIANCE*
~~~
Date: September 14, 2001 C;zG-o--o14
Owner: St. Luke's Regional Medical Center
Address: 520 S. Eagle Road
Proposed Use: Boulevard Road Extension (private driveway internal to project)
Zoning:
Comments: The original plan/concept for the subiect boulevard was approved as Hart of the
Touchmark of the Treasure Valle COUP _ap~lication. It was not shown on the St Luke's Phase 3 CUP
Site Plan. Although the property ownership has since changed from Touchmark to St Luke's Medical
Center land swap), the boulevard is shown in the same location as it was on the original Touchmark
plans. The boulevard is still shown on Touchmark's Phasin P~(approved by City Council on May
15, 2001 as part of the Amended Development Agreement but only as a point of reference The
boulevard is entirely on St. Luke's parcel. It is in alignment with Street "I" at Roundabout #4 in the
Touchmark plan.
(NOTE: This Certificate does not approve any of the future parking, curbs or planters shown
adjacent to the boulevard in faded copy. It approves only the boulevard itself and associated
landscaping. All future buildings, landscaping and any site work done beyond the Scope of
Work of Phase 3 will require a future Conditional Use Permit.)
Approved Plan: The Landscape Plan (Sheet L.1.1), dated 9-12-01 and stamped 9-14-01, is approved.
The landscape plan is not to be altered without prior written approval of the Planning & Zoning
Department. No field changes to site plan permitted; prior written approval of all changes required.
Irri ag tion: An underground, pressurized irrigation system must be installed to all landscape areas.
Shari Stiles
Planning & Zoning Administrator
*Receipt of a Certificate of Zoning Compliance does not indicate compliance with requirements of other
departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department,
affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, etc. This certificate shall expire
one (1) year from the date of issuance if work has not begun.
~~ Roylance & Associates P.A. LETTER OF TRANSMITTAL
~ ~ ~ Engineers • Surveyors • Landplanners
~~ ~ 391 W. State Street, Suite E, Eagle, Idaho 83616
C ~ Telephone (208) 939-2824 Fax (208) 939-2855
Attention: BRAD HAWKENSCLARK
Company: CITY OF MERIDIAN
PLANNING AND ZONING
DATE 09/11/01 JOB NO. 2123
RE: ST. LUKE' S MERIDIAN PHASE 3
BLVD ROAD EXTENSION
WE ARE SENDING YOU: (X) Attached ()Under separate cover via
the following:
()Blueprints ()Originals (vellums) ()Copies ()Specifications (X) Blacklines
COPIES DATE # OF
PAGES DESCRIPTION
5 8/21/01 2 CIVIL CONSTRUCTION PLANS
5 9/10/01 3 LANDSCAPE PLANS
TRANSMITTED AS CHECKED BELOW:
(X) For approval
(X) For your use
() As requested by
() For review and comment
REMARKS:
()Prints returned after loaned to us
()Returned for corrections
()Plans revised per letter dated
O
COPY TO: PROJECT FILE: 2123 SIGNED: JOHN E. RENNISON, E.I.T.
,~
()Approved as submitted
()Approved as noted
X:\PROJECTS\St Luke's\Meridian Campus\2123 RoadWDMIN\Transmittals\citymeridian p&z 9-11-Ol.doc
• •
CITY OF MERIDIAN
PLANNING & ZONING DEPARTMENT
LETTER OF TRANSMITTAL
February 23, 2001
To: Bruce Freckleton
Public Works
From: Brad Hawkins-Clazk
P&Z
Subject: St. Luke's Boulevazd Road Extension -CZC
Enclosed are the followin
COPIES DATE DESCRIPTION
1 9-14-01 CZC
1 9-12-01 Civil and Landscape Plans for Boulevazd
These are transmitted:
^ For your ^ For action -~ For review ^ For your use ^ As requested
information specified below and comment
Remarks:
Bruce,
I didn't want this CZC to get confused with our standard process since Building Department
doesn't have any review approval on just a street (right?). So, I'm sending this directly to you.
I've already sent a copy to John Rennison and told him I would get our stamped approved copy
to Public Works. He understands that this is only P&Z approval only and that Public Works still
has some pending issues with water, etc.
Brad
Copy to: File Signed: l3 t~G