Loading...
Eagle Concrete Pumping CZC 00-060HUB OF TREASURE VALLEY MAYOR LEGAL DEPARTMENT Robert D. Corrie A Good Place to Live (208) 288-2499 • Fax 288-2501 CITY OF MERIDIAN PUBLIC WORKS CITY COUNCIL MEMBERS Ron Anderson 33 EAST IDAHO BUILDING DEPARTMENT (208) 887-2211 • Fax 887-1297 Keith Bird MERIDIAN, IDAHO 83642 Tammy deWeerd (208) 888-4433 • Fax (208) 887-4813 PLANNING AND ZONING City Clerk Office Fax (208) 888-4218 DEPARTMENT Cherie McCandless (208) 884-5533 • Fax 888-6854 CONDITIONAL CERTIFICATE OF ZONING COMPLIANCE* Date: July 21, 2000 Owner: Contact: Cornel Larson. Architect, 376-4665 Address: 265 N. Baltic Place G~1'er0r9 ,. ~~d Proposed Use: Eagle Concrete Pumping Zoning: I- COMMENTS: CUP & Variance: The project is subject to all requirements of the Conditional Use Permit (CUP) and Variance that have been submitted for the project (CUP-00-044, VAR-00-015). If any of the requirements of those applications conflict with any portion of this Certificate, the CUP and Variance shall take precedence. The CUP and Variance must be completed prior to issuance of a building permit. Signag_e~. All signage is subject to design review and requires separate permits. No signage is permitted in ACHD right-of--way. No portable signs or temporary signage permitted (such as A-Frames). Parkinu: Dimensions of all nine parking stalls shall conform to minimum dimensions as per city ordinance and ADA. City ordinance requires 9 X 19 standard stalls and 25-foot-wide minimum driveways. ADA requires the van-accessible handicap-accessible stall to have a striped aisle separate from the stall (typically an 8-foot stall and an 8-foot aisle). The handicap parking space must have van-accessible signage per ADA standards. Handicap-Accessibility: The structure and site improvements must be in compliance with all federal handicap-accessibility requirements. Landscaping: Based on the total square-footage of asphalt on site (shown as 12,273 s.f.) nine 3"- caliper trees are required by City Ordinance. If the applicant cannot provide the required number of 3" caliper trees and wishes to use smaller trees, standard policy is that 110% of the total caliper-inches required (9 trees X 3 inches X 110% = 29.7 total caliper-inches) must be provided by adding trees to the site. The rootball of the proposed 3" Hawthorn along the west property line will likely not fit in the proposed 3-foot planter. Either the planter width should be increased (the proposed arborvitae will also eventually be 4-5 feet wide) or the tree should be shifted closer to the trash enclosure, where there is more room for the tree to be planted. Staff also requests changing the proposed gray cinder mulch to bazk mulch and or other vegetative groundcover. Irri ag tion: An underground, pressurized irrigation system must be installed to all landscaped azeas as per note 11, sheet LA-1. Li htin :Lighting shall not cause glaze or impact the traveling public or neighboring development. Drainage: A proposed site drainage plan must be approved by the City Public Works Department prior to construction. Trash: All trash enclosures must be screened from view and not be visible by the public or from adjacent properties, as per proposed plan. Provide a letter of approval for the trash enclosure location from Sanitary Services Corp. (SSC) prior to issuance of building permits. Floodplain: Sewer and water systems must be flood-proofed as per City Ordinance. The P&Z Commission and City Council may require additional floodproofing measures through the CUP process. Materials that are buoyant, flammable, noxious, toxic or otherwise potentially injurious if transported by floodwaters are prohibited. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the required improvements (including paving, striping, landscaping, and irrigation). A bid must accompany any request for Temporary Occupancy. Any Temporary Occupancy will not exceed 60 days to complete the required improvements. Plan Modifications: The Site Plan/Landscape Plan is not to be altered, except to comply with the comments noted above, without prior written approval of the Planning & Zoning Department. No field changes to the site or landscape plans are permitted; prior written approval of all changes is required. The Site Plans dated 5-22-00 (stamped 7-21-00) aze approved with the comments noted above. G. ing & Zoning *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) yeaz from the date of issuance if work has not begun. M ~ r. ~l.L~lsL ~OGLf'L~ ~J~"G ~LUGh- G~~NLCt .1udv Peavey-Derr, President 318 East 37th Street Dave Bivens, Vice President Garden City, Idaho 83714-6499 Marlyss Meyer, Secretary Phone (208) 387-6100 Sherry R. Huber, Commissioner Fax (208) 387-6391 Susan S. Eastlake, Commissioner a-mail: tellusQachd.ada.id.us. June 7, 2000 Larson Architects Cornet. Larson.. 210 Murray Street Boise, Idaho 83714 RE: MSPR-18-00 /Baltic Place / Tagle Concrete Pumping PLANS ACCEPTANCE The District has reviewed the plans for the above referenced project, and they are accepted for public street construction. By stamping and signing the improvement plans, the Registered Engineer ensures the District that the plans conform to all District policies and standards. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the District does not relieve the Registered Engineer of these responsibilities. The District will assess the following impact fee for -this project. The impact fee must be paid prior to issuance of a building permit. Total Impact Fee due: $5886.00 Standard Requirements: 1. Utility street cuts in new pavement less than five years old are not allowed unless approved in writing by the .District. 2. All irrigation facilities must be located outside the public right-of-way unless otherwise approved by the District. 3. Replace damaged curb, gutter, and sidewalk with new curb, gutter, and sidewalk to match existing improvements. 4. All facilities to be constructed with a proposed development, and to be owned and maintained by the District, must be constructed according to the latest edition of LS.P.W.C. and the District's Supplemental Standard Specifications. 5. Any work in the public right-of--way requires a permit from ACRD Construction Services. 6. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. If you have any questions or concerns,. please feel free to contact me at 387-6181. Sincerely, Scott Rudel Planning and Development CC: Pinnacle Engineers .n ~. ~ 1 ~ ~~ N • • • quay reavey-uerr, rresident 318 East 37th Street Dave Bivens, Vice President Garden City, Idaho 83714-6499 Marlyss Meyer, Secretary Phone (208) 387-6100 Sherry R. Huber, Commissioner Fax (208) 387-6391 Susan S. Eastlake, Commissioner _ _ e=mail: tellus{cz~achd.ada.id.us June 6, 2000 _ + . ., NfSPR-18=00 /Baltic Place /Eagle Concrete Pumping IlVIPACT FEE CALCULATION Building Type Cost per Unit Area (SF) Total Cost Light Industrial $1427 4125 $5886.00 Total Impact Fee Due $5886.00 CERTIFICATE OF ZONING COMPLIANCE & PLAN REVIEW CHECKLIST City of Meridian Planning & Zoning Dept. Project: c Con~r~~ ` C rg Review Date: ~l ~b l coo Contact: Co~n.c l i-rws,a.~ ~ Az ~- Zone : L~ t~- ^ 3 copies of site plan submitted ^ Calculations table, including asphalt area, parking, landscaping, and building s.1" ^ Copy of ACRD approval letter (if applicable*) - G. Inselman/J. Lowe Site Review/Conforming Elements Comments O.K. ~ 1. Zoning District (permitted use, CUP, AUP, variance, etc. ~-~ ~ ~^`a"' °f"' (~"'`~'`~ ~""'~ ~q~`v''""~' ~'`'~ /~~'r• 2. Flood lain District lob load .;., - ~ ~"` ~~~ ~~ 3. Landsca in a) # of Trees (1, 3" cal. per 1,500 s.f. of as halt b Plant S ecies Listed c Re aired Stri s/Screens o' µn. , 3.Off-Street Parkin a) # of Stalls (dimensions, etc I~~ j~ Sa'~."? f 3 ~Y ~ ~^''• 3 ~'""P ~~L, ~+ki7 l,~ v~ rti~ o,c b) Handicap Stalls (van accessible, aisles, s' ns) 1 n~2a.~c ~~~ , yv~ vtwa.c e.,Jr c Aisles ' s c • ,~, b 4. Trash Areas a Location „~,~.. b 3-Side Screenin ~ 5. Underground Irrigation** ~~ ~ ~ 6. Sidewalks/Paths ~1 7. Roadways (R-O-W dedications, etc) 8. Lot Requirements a) Lot Area ,i b) Street Frontage ,/ c) Set-backs / d) Coverage / ~ACHD approval letter required for curb cuts, road widening arty new projects. ~/Y' S~ ~z ~~ * * Pressurized irrigation can be waived only if no water rights exist to subject property or developer deeds to Ciry land for a well. ** City permits a 1-time hook-up to municipal water for irrigation per site. ** Trees must not be planted in sewer easements. C:\P&ZadminlForms\CZC Checklist