Loading...
Mackenzie River Pizza & Panda Express CZC 00-051 • HUB OF TREASURE VALLEY MAYOR A Good Place to Live LEGAL DEPARTMENT (2pg) 2gg-2499 • Fax 288-2501 Robert D. Cowie CITY OF MERIDIAN PUBLIC WORKS CITY COUNCIL MEMBERS BUILDING DEPARTMENT Ron Anderson 33 EAST IDAHO (208) 887-2211 • Fax 887.1297 Keith Bird MERIDIAN, IDAHO 83642 (208) 888-4433 • Fax (208) 887-4813 PLANNING AND ZONING Tammy deWeerd City Clerk Office Fax (208) 888-4218 DEPARTMENT Cherie McCandless (208) 884-5533 • Fax 888-6854 CERTIFICATE OF ZONING COMPLIANCE* Date: November 14, 2000 Project: Address: -Qp-aS"1 o~/Slo N. , 4e ~' Proposed Use: Restaurants with Outdoor Seatin Zoning: I-L PUD COMMENTS: Conditions of Approval: Pad is subject to all terms and conditions of existing C.U.P. for The Family Center (as approved on 10-20-98) for the site. City's failure to specifically identify all requirements of the C.U.P. in this Certificate of Zoning Compliance does not relieve owner of responsibility for compliance. Use of Structure: The structure is approved for two restaurants (Mackenzie River Pizza & Panda Express) and associated outdoor seating as shown on the approved site plan. No outdoor seating shall extend into the required 20-foot landscape buffer, beyond Eagle right-of--way, nor into the required five-foot wide sidewalks. Si na e: All signage is subject to design review and requires separate permits. No signage is permitted in ACHD right-of--way. No portable signs or temporary signage permitted (such as A-Frames). Parkin :Minimum parking requirements are met by the plan. Dimensions of all parking stalls shall conform to minimum dimensions as per city ordinance and ADA. City ordinance requires 9 X 19 min. standard stalls. Refer to ADA requirements to determine if the location of handicapped spaces meet federal standards in relation to the orientation of the proposed structure. A grade break exists in the planting area south of the van-accessible stall; the curb cut and ramp must be designed to ADA standards. Handicap-Accessibility: The structure and site improvements must be in compliance with all federal handicap-accessibility requirements. Existing Landscaping: All landscaped areas surrounding the buildings are regulated by the revised landscape plans dated 8/25/99 and must be protected; any existing trees relocated to accommodate the proposed new sidewalk must remain on site and be approved by the Planning & Zoning Department. The trees cannot be placed in the ACHD right-of--way. New Landscaping: The eight (8) new trees proposed on site shall be planted as per the approved landscape plan. The southern-most tree in the parking area planter does not have acall-out, but must be planted as one of the tree species shown on the plan. All tree sizes are to be 3" caliper as per the plan, unless substitutions are approved in writing by the Planning and Zoning Department. All mulch is to be 3" deep bark chips as per note 6 on the plan. Gravel, rock, or "permabazk" will not be accepted. Sidewalks: No portion of the existing sidewalk connecting from Eagle Road shall be removed. All sidewalks must be 5 feet wide minimum at all locations. This will require widening the sidewalks along the north and east sides of the building and west of the trash enclosure. (Note, on the north side of the building, if the ewalk must be ahleast fbve feet wide) ewalk and the eating area, the azea designated as sid Inip,ation: An underground, pressurized irrigation system must be installed to all landscaped areas as per notes 12-16 on the approved landscape plan. Li htin :Lighting shall not cause glaze or impact the traveling public or neighboring development. Drainage: A proposed site drainage plan must be approved by the City Public Works Department prior to construction. Trash Enclosure: All dumpsters must be screened from view and not be visible by the public or from adjacent properties. Coordinate the location and size of the trash enclosure with Sanitary Services Corp. (SSC). Parking spaces shall not encroach in front of the enclosure gates. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements (in tl for Temavorary O ccupancYdscaping, and/or irrigation). A bid must accompany any reques p Plan Modifications: The approved Site Plan and Landscape Plan are not to be altered without prior written approval of the Planning & Zoning Department. No field changes to the site or landscape plans are permitted; prior written approval of all changes is required. Sh ' S files Planning & Zoning Administrator *This Letter does not indicate compliance with requ a m~ De arhnent affec ed irrigation district(s), Meridian Sewe r to, Ada County Highway District, Central Dtstrs N ces Co., etc. This letter shall expire one (1) year from the date Water, Building or Fire Departments, Sanitary of issuance if work has not begun. • • 200 E. Carlton Ate., Ste. 201 AAeridian, ID 83642 Phone: (208)884-5533 Fax (208)886-6854 To: ~ ~ ~~ /~~~ From Steve Siddowdy Fax: "?tl 7 - Dates Page:: /~ ci~t,a~ cover> ^ Urgent O For Review ^ Pleaso Comment ~ As Requested •Comments C~H ~ ~ CA~e, ~ dLQ 1'-1Yt l.(3h~ ~ ~ ~l Vt c-C, , Sent By: *; C_ /~~/~ GU . ~~ PIS 208 343 4954; Nov- 00 A:41; Page 2/3 ~G - _~tda ~ou~t ~~ti hove aLJi~tNict ~ ~ ~ Judy Peavey-Derr, President 318 East 37th Street cave Givens, Vice President Garden City, Idaho 83714-6499 Marlyss Meyer, Secretary Phone (208) 387-6100 Sherry R. Huber, Commissioner Fax (208) 387-6391 Susan S. Eastlake, Commissioner a-mail: tellusCa~achd.ada.id.us November 1, 2QOp Dakota Company, Inc. Tom Rauwcns _ _-- 38U L. Parkcentcr t_~Ivd, Suite lUU ~q,/~ RF:: :1'ISl'R-33-UO / Fairview ~c Eagle (.Vlcridian Crossroads Shnppi C:entcr) / Paada )express & Mackenzie River Pizza PLANS Af:C;EI'7'ANf:E The T)istrict has reviewed the plans for the above referenced project, and they are accepted for public stref:t construction. Dy stamping and signing the inlpXOVCmcnt plans, the Registered ingineer ensures the District that the plans eurtfUrrr~ la all District policies and standards. Variances or waivers must be specifically and previously approved by the District in writing. Acceptance of the improvement plans by the Listrict does not relieve the Registered Enginc;cr of t.hcse responsiUilities. The District will ases~ the fi~llowing impact fee for this prujcct.. Thy impact tee must he paid prior to issuance of a building permit. ~fota) Impact Fee duce: $25,741.4 Standard Requircu~cnts: 1. Utility strict cuts in new pavement less than five ycun uld d,~ not allowed unless approved in writing by the District. 2. All in i~;al.iun !'acililies must be located outside the public right-ot=way unless otherwise approved by the District. 3. Rc:plai;c iiamaged curb, gutter, and sidewalk with new curb, gutter, and sidewalk to match existing improvements. 4. All facilities to be constructed with a praPnsccl development, and to be owned and maintained b~~ the T)iarict, must be ci,nsu•ucted according to the latcsf edition of)<.S.P.W.C. and the Uistrivt'a~'~~: Supplemental Standard Specircalions. S. Any work in the public right-of--way requires a permit from ACHT) (`onstruction Services. 5. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. it you have any questions or concerns, please feel free to contact me at. 3R7-fit R1. Sincerely, ~ot~- .. Scott ltudel Planning and Development. Sent By: *; ,_ • 208 343 4954; Nov ~00 8:41; Page 3/3 ~da ~ou~tt .~J~i ~ctva ~lJi ri ~ ~ ~ ~ ~t c Judy Peavey-Derr, President 318 East 37th Street Dave Givens, Vice President Garden City, Idaho 83714-6499 Marlyss Meyer, Secretary Phone (208) 387.6100 Sherry R, Huber, Commissioner Fax (208) 387-6391 Susan S. Eastlake, Commissioner a-mail: tellusCO_achd.ada.id.us November 1, 2000 I~TSPR-33-00 / Fair~~ie~v & Eagle (11~tieridiau Crossroads 5hoppin~ Center) / Panda N:xprc,s dr. Mackenzie kiver Yix~a IMPACT FF..E CALCULATION Huil~ling Type Cost per Unit Area (SF) Total Cost (per 1,000 SF) Restaurant-High $3,aG5.UU b,492 $25,741.Q0 'Turnover Total Impact Fee Due $25,741.UU • • MERIDIAN CROSSROADS PHASE 1 CONDITIONAL USE COMPLIANCE REQUIRED PARKING COUNT 3-IN DIA SITE PLAN BUILDING AREA PARKING (EA) TREE (SF) COUNT HANDICAP- COUNT (EA) TOTAL STANDARD HANDICAP VAN (EA) ORIGINAL CU SUBMITTAL 616,418 3,082 3,052 2,991 54 7 830 SHOPKO PLAN SUBMITTAL 614,203 3,071 3,055 2,992 56 7 830 SHOPKO 8 TEXAS ROAD HOUSE SUBMITTALS 613,447 3,067 3,057 2,994 54 9 830 SHOPKO & TEXAS ROAD HOUSE, 1-G, 1-H & 1-1 613,505 3,068 3,057 2,994 54 9 830 SUBMITTALS SHOPKO 8 TEXAS ROAD HOUSE, 1-G, 1-H & i-I SUBMITTALS, SPORTSMAN'S 559,945 2,800 3,011 2,932 66 13 865 WAREHOUSE SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, 556,746 2,784 3,017 2,937 68 12 864 SHEPLERS, BED BATH 8 BEYOND, OFFICE DEPOT SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & 558,016 2,790 2,999 2,919 67 13 864 BEYOND, OFFICE DEPOT, APPLEBEE'S SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-1, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH 8 557 715 2,789 2,997 2,917 67 13 864 BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH 8 555,262 2,776 2,983 2,904 66 13 873 BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S SHOPKO,TEXAS ROAD _ HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & 555,729 2,779 2,988 '`2,907 68 13 873 BEYOND, OFFICE DEPOT, APPLEBEE'S, IHOP, ARBY'S, CARL'S JR. SHOPKO,TEXAS ROAD HOUSE, 1-G, OLD NAVY, 1-I, SPORTSMAN'S WAREHOUSE, SHEPLERS, BED BATH & BEYOND, OFFICE DEPOT, 555,021 2,775 2,986 2,905 67 14 873 APPLEBEE'S, IHOP, ARBY'S, CARL'S JR., MACKENZIE RIVE PIZZA, PANDA NOTE: CITY OF MERIDIAN REQUIRES 1 PARKING STALL PER 200 SF OF GROSS BUILDING AREA. FILENAME: MC CU COMPUANCE12.xls pUADRANT CONSULTING, INC. TAB: SUMMARY PAGE 1 OF 1 PRINTED: 10I2U7000 Q O Z a W G a w Q ~ W W m Q = W a J O C7 ~ • ~~ O ~. ? o cr M G W° ~ M N co ~ c N a 00 n N N 1n 0 N 0 M tD t~ n d' {n co M ~? O O> ~ rn n M 0 ~ a00 ao O P O t0 N M o o O 1~ o o ~ ~ N O •- N ~ G o 7 ~ ~ N 07 <O M O N r N n o OD ~ r N nj ti <D ~ c0 O r tM ~"~ O a~ st (O N ~ ~ M O N O O N ~ M ~ ~ ~ ~ ~ CO ~ ~ ~ O W coo N ~ ~ O N to N M h et rOi ° to ~ n O m O n O 0 p t0 h °o 0 ° N 0 O F - ~ M p o ~ co ,cj v nj h O N <D 0 M 0 O t0 N I~ r O N O n W 01 00 rn ~ M ~ r N ao nj n N , o ca Of ~ ~ rj M ~ ~ a O N ~ ~ ~ O 1f'~ t0 1~ t0 1{9 M ~ er n ~ t0 ~ a a~ ~ M ~ N O N ~ p ~ ~ O ~ N ~ ~ O N N N tD 1~ d' ' c`'> ° t0 ~ n O ~ O n O 0 p t0 h p ,~ N O N p W o ~~ cy o ~o v ch ui v ~i h Of N t0 O M O O M N h r 1f > N ~ n Oa 00 rn ,~ M ~ n t ~ a0 nj n N , o co ~ o n ~ c'7 M N V O N ~ ~ M ~ N O O N W ~ M M ~! h ~ t0 d iD ~ ~ 0 O ~ N N O O N M N <D 1~ d' co'~ t0 ~ 0 0 ~ 0 0 p tC O ~ N N W O M c O- M a N n Oa N tD O M O O M N n ~ tC! N a0 ~ Cf 00 rn a Oa p N p ao nj -~ ti O N , o cfl h O o E M O ~"~ ~ ~ Q~ a i v ~ N ~ r M ~ N O O N ~ ~ M ~ 1~ ~ t0 ~ p ~ ~ O c°DO N ~ ~ 00 N O N tC h ~ m ch t0 ~ O O a00 O O p 1~ O uo'l N t~ W o Q N co o to a ch f v cv n Os N t0 O eh O O M N n r to N o ~ O 00 rn ~ O IA n 1 ~ O ~j n n 0 N , O cc 1~ N o 1~ ~ vi 0 ~"~ ~ O O N v c0 N ~ ~ M N O O N N M d' P ~ <O ~ ~ ~ ~ ~ ~ O Q O o ~ N N ~ O ~ O n N N 11Y O N O tG M n 1~ ~ 11> M aD c0 Of co n O 07 O n O 0 O 0 O 0 O O I~ ~ O O O ~ N O ~p ~ H~ M co co v T t0 M O N ~ N r O Q? to t' a0 cA N ~ N ~ n '"' c') M ti Q N cp N ~ p O ~ {n M N M n ~ co ~ t~ o a ~ ~ M ~ N O N ~ p ~ ~ ~, ~ M ao o ~ N O O 0 M 0 N n ~ h ti o~ tD O to ~ 0 07 0 1~ 0 X 0 0 0 0 0 0 !~ ~ o p o ~ N 0 to ~ Z iA N j cv ~ M ~ O 1n M 07 N r N 00 Ln I~ tp N 0 N ~ M T Q' z B O O O ~ co ~ N N - W! ti O ~ t0 ti ~ 11Y ~ ~ M N M ~ t0 tCj n M tD rn N v . ~ M ~ N O ~ ~ ~ tff e- to Q W O ~ a~ N O ao M '~ m N M o v O O M O eN0 M ~ C'1 ~ N 1~ n O t0 N ~ co ~ 0 W 0 1~ 0 X 0 0 0 0 o 0 ti ~ o p o ~ N 0 to 0 W M o v i O In O er <D r lp - v tp I ~ c~i to N c0 N r. ri M to Q Z a O u N ~ ~ M ~ N O N M , to M M P ~ Ip c0 ~ o ~ ~ O co a 7 ~ ,J O co ~ N N try o u) O O M T N M 07 ~ 0 O 0 ~ 0 ~D ~ co ~ 0 O 0 n 0 ~ 0 0 0 0 O p ti n O p O ~ O r pp ~ F- o v iri ~i O O O c0 E N O _ v p ~ c~i ~ N cD N n ri N et Q F- Z a m N c ~ ~ h r N Oi N e7 ' . In M M h ~ 4") n t0 ~ _ ~ r M O 00 ~ CO U' m r ~~ O w o Q m U O W tL (~ x - ? Y ~ ~ z O a e. a a a Q ~c m ~o a a a ° a •- a Q r T W O U O 2 w a w ~ O a w ~ ~, N m ~ w O Z Q N W a ~ W x v i W Q to W O W ~ x w m N W X W O ~' a Q m ~ z .~ a W v ~ fn r N ~ B Y O N Q w o ~ 0 ~ 0 ~ o m ~ a v z ao ~ f- x w O .~ O x u. a m Q a Q Q w 0 v~ m u. O w tn o v~ a cs Q u a = F- F- Z Q ~ ~ ~~ 2 ~ ~ LL W ~ ~ _ Z U O W J_ _ ~ ~ CD 0 } ~ LL _~ ~ ~ W Na a ~ o~ J m LL W F O Z 0 Z C7 F~ J N W OZ V ~ i a ga Q C 0 w O as a W v Z a 0 U U U ao Z.. J m LL f MERIDIAN CROSSROADS PARKING SUMMARY SUMMARY TOTAL H/C H/C-V STND 2,986 67 14 2,905 SERIES TOTAL H/C H/C-V STND 1 10 10 2 6 g 3 12 12 4 54 54 5 53 53 6 50 50 7 50 50 8 50 50 9 56 2 54 10 48 4 44 11 48 48 12 25 25 13 20 20 14 26 26 15 26 26 16 1 - 1 - I 17 - _ 18 13 13 f 19 18 1 1 16 / 20 5 5 21 ~7 7 22 25 2 23 23 27 27 / 24 15 15 F 25 30 30 26 28 4 24 27 5 5 E 28 4 2 2 E 29 30 30 30 16 16 31 28 28 32 20 1 19 33 8 g 34 28 2g 35 24 3 1 20 36 27 27 37 13 1 12 38 3 3 1. 39 2 2 40 26 2g 41 10 10 42 11 1 1 9 N 43 26 2g 44 16 1g 45 26 2g 46 9 2 7 Si 47 26 26 48 19 1 1 17 49 25 25 50 37 37 51 39 39 CI 52 10 2 8 G 53 42 42 y 54 42 42 55 40 3 1 36 56 11 11 57 42 42 58 42 4 3g STARTING @ PRESIDENTIAL 8 WORKING GENERALLY CLOCKWISE ALONG EAGLE =AST OF ARBY'S =LORENCE EXTENSION ALONG 1-D, N-SIDE ALONG 1-A 8 CLOSING TO START LORENCE EXTENSION, N-SIDE :AST OF CARL'S JR. AST OF CARL'S JR. •P4 ORTH 1-P5 - RUTH 1-P6 ~RNER WRAP ~MPLETES NW, N OF FLORENCE AND W OF 2' ISLAND ISLAND TO SECOND ACCESS RD, N OF SHOPKO FILENAME: MC CU COMPLIANCE12.xls QUADRANT CONSULTING, INC. TAB: PARKING COUNT PAGE 7 OF 2 PRINTED: 10/24/2000 59 38 2 36 60 64 64 61 32 32 62 44 44 63 44 3 1 40 64 46 46 65 23 23 66 23 23 67 44 3 1 40 68 8 2 6 69 46 46 70 44 4 40 71 46 46 72 44 3 1 40 73 34 34 I 74 42 42 I 75 28 28 I 76 8 2 6 77 46 46 78 44 4 40 1 79 6 6 E 80 30 30 F 81 50 50 F 82 32 32 F 83 12 12 l 84 6 2 2 2 l 85 46 46 86 44 3 1 40 87 46 46 88 44 4 40 89 46 46 90 44 3 1 40 91 46 46 92 21 21 V 93 37 37 E 94 37 37 E 95 12 12 S 96 5 5 S 97 11 11 S 98 18 18 S 99 18 18 S 100 18 18 S 101 18 18 S 102 16 16 S 103 12 12 S 104 10 10 S 105 18 1g S~ 106 10 10 S~ 107 20 20 S~ 108 20 20 Si 109 29 29 S! 110 8 8 E 111 16 16 S! 112 22 22 E/ TOTALS 2,986 67 14 2,905 • PARALLEL TO FAIRVIEW PARALLEL TO FAIRVIEW PARALLEL TO FAIRVIEW W OF ACCESS RD @ MATCH B & N OF STORES E OF ACCESS RD @ MATCH B & N OF STORES E OF 1-P9 'ARALLEL TO FAIRVIEW 'ARALLEL TO FAIRVIEW 'ARALLEL TO FAIRVIEW N OF THIRD FAIRVIEW ACCESS OF THIRD FAIRVIEW ACCESS 'ARALLEL TO FAIRVIEW 'ARALLEL TO FAIRVIEW 'ARALLEL TO FAIRVIEW 'XRDHS REV1 -XRDHS REV1 V OF RECORDS OF SPORTSMAN'S & W OF RECORDS SIDE SPORTSMAN'S WAREHOUSE OF SPORTSMANS'S WAREHOUSE OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N OF 1-K THROUGH 1-N DUTH OF 1-J (SHOPKO) DUTH OF 1-J (SHOPKO) DUTH OF 1-J (SHOPKO) DUTH OF 1-J (SHOPKO) DUTH OF 1-J (SHOPKO) 4ST OF 1-E DUTH OF 1-E aST OF 1-D FILENAME: MC CU COMPLUUJCE12.xls QUADRANT CONSULTING, INC. TAB: PARKING COUNT PAGE 2 OF 2 PRINTED: 10/20/2000 ACRD PLANNING ~~ / / ~ ~` ~ 'rHUt 01 / 01 09/19/2000 15:46 208-3893 Ada Count Hi hwa District INTER-OFFICE MEMO rrafiic oepartment P/ann/ng & Development Division September 19,2000 TO: Daunt Whitman . Building Offici I City of i FROM: S Su sor P n ¢rl4errt-Division SUBJECT: Crossroads Shopping Center Please be advised that the District and the developer of the Crossroads Shopping Center have entered into development agreements identifying the responsibilities of the developer with regard to the construction of improvements to the transportation system specified by the District in its original approval. This assures the completion of the improvements required by the City and the District. With this assurance, the District no longer has a reason to request the City to withhold issuance of building permits. If you have any questions, please feel free to call me at 387-6172 for clarification. cc: Chron Project File Gary Inselman Christy Richardson Terry Little :~ Fax Note 7671 Post ~~ Q oay~e~ ~ y T b I O LJ From L SA <.. ,~ CoJDePt- ~ Co. ~ C ~ F~hort~ ~ ~~ x Fax r 3 y _ c~/ q .~' Fax « ~ ~ ~ ' ~ 3 9 Ostech~m~ s c~xroad s450ksfrelea se~ doc JAN-12-2001 14 36 QUADRANT CONSULTING INC. MEMORANDUM TO: Steve Siddoway, Meridian Planning and Zoning FROM: Nick Kra~adrant Consulting DATE: January 12, 2001 208 342 0092 P.01i01 ^^ ^^ quadrant Consulting.lnc. SUBJECT: Mackenzie River Pizza/Panda at Meridian Crossroads Subdivision This is in response to your question concerning the placement of four trees in the patio area on the north side of the building a.~ is shown on landscape plan Sheet L-1 by the Land Group, Inc. dated January 9, 2001. After a discussion with Mr. Wayne Relka of PGABcW Architects, we have ascertained that the aforementioned landscape plan is correct, and the four trees in question will be placed in the patio area. Mr.l3elka has also ensured us that the developer and the contractor have been made aware of this infornnation. i trust that this memo provides the necessary clarification for this issue. If you have any questions or concerns regarding this matter, please feel free to call at 342-0091_ ec: Wayne IIelka, PGA&W Architects Tom Bauwens, Dakota Company, Inc. 405 S. 8th Street, Ste. 295 • Base. ID 83702 • Phone (208) 342-0091 • Fax (208) ~'~ ' Irrternet: quadrant~rnicron.net Civil Englneering • Surveyh9 • Cor~shuction Iv-ona®ement