Hawkins-Smith CZC 00-015
HUB OF TREASURE VALLEY
MAYOR LEGAL DEPARTMENT
Robert D. Come A Good Place to Live (208) 288-2499 • Fax 288-2501
CITY OF MERIDIAN PUBLIC WORKS
CITY COUNCIL MEMBERS BUILDING DEPARTMENT
Ron Anderson 33 EAST IDAHO (208) 887-2211 • Fax 887-1297
Keith Bird MERIDIAN, IDAHO 83642
(208) 888-4433 • Fax (208) 887-4813 PLANNING AND ZONING
Tammy deWeerd City Clerk Office Fax (208) 888-4218 DEPARTMENT
Cherie McCandless (208) 884-5533 • Fax 888-6854
CERTIFICATE OF ZONING COMPLIANCE*
Date: March 15 2000
Owner: HawKms-~miui cuiu nain~. L~~ ~ ---- - -
Address: Northwest corner Fairview Avenue/Locust Grove Road
Proposed Use: Wal reens
Zoning:
COMMENTS:
Conditional Use Permit: Project is subject to all conditionnsen~ to reemeint The Crty's failuret)o
approved February 15, 2000, and the Develop g
specifically identify all requirements of the CUP in this Certificate of Zoning Compliance
does not relieve the owner of responsibility for compliance.
Si na e: All signage is subject to design review ale siens or temporary sig ge pe~rtted (such
permitted in ACHD right-of--way. No portab g
as A-Frames). No north-facing illuminated signs are permitted. The new sign shall be no
larger than 72-square feet (total).
Parkin :Standard and handicap accessible parking requi ~hme latsnareDNOe n?onb of allpparking areas
total are required, and only two (2) are shown on p
shall conform to minimum dimensions as per city ordinance and ADA. Handicap parking
spaces must have signage per ADA standards.
Landscaping: All trees, shrubs, and lawn areas must be plan hd i es astshown on the plan. a Written
The 59 trees shown on the plan must be planted.
approval of any changes is required; no field changes permitted.
Irri^ation: An underground, pressurized irrigation system must be installed to all landscaped areas.
Li htin :Lighting shall not cause glare or impact the traveling public or neighbo~nd and fr e from
Undeveloped Property: The undeveloped portion of the property must be kept mo
weeds over 8" in height until such time it is built out. No parking, storage or other use is
permitted on the undeveloped portion of the lot.
Future Pad: The future pad is not approved by this CZC. A separate CZC will be required for
the future pad.
~ • •
Warranty Deed: Submit a copy of the recorded Warranty Deed showing the new right-of--way
dedication prior to issuance of the Building Permit.
Roadway Improvements: Construct sidewalk on Fairview Avenue abutting the parcel in compliance
with ACHD plans and specifications, prior to obtaining a Certificate of Occupancy.
Construct curb, gutter, sidewalk and pavement widening on Carol Street abutting the parcel,
in compliance with ACHD plans and specifications, prior to obtaining a Certificate of
Occupancy. Provide an $8,000 deposit to the ACHD Public Rights-of--Way Trust Fund for
the cost of constructing sidewalk on Locust Grove Road abutting the parcel, prior to
obtaining a Certificate of Occupancy.
Lot Line Adjustment: The new lot line adjustment must be recorded prior to obtaining a Certificate
of Occupancy.
Block Wall: The Applicant shall construct a decorative, split-face block wall with a row of colored
block on the north side before construction of any buildings is started. (Per FF/CL 2.18 of
CUP)
Right-of--Way Maintenance: The Applicant will maintain the unfinished right-of--way on Locust
Grove Road and Fairview Avenue (approximately 20-feet) and will not allow it to be weed
infested. (Per FF/CL 2.5 of CUP)
Existing Buildings: The existing building now on site which currently houses a chiropractic clinic
will be removed within 60 days after the multi tenant building is ready for occupancy. (Per
FF/CL 2.23 of CUP)
Plan Modifications: The Site Plan and the Landscape Plan are not to be altered without prior written
approval of the Planning & Zoning Department. No field changes to the site or landscape plans are
permitted; prior written approval of all changes is required.
The landsca a lan dated 3/1/00 and the site lan dated 3/15/00 area roved with the comments
noted above.
~ 0 L t~- roZ
.,.~, y~
Shari Stiles
Planning & Zoning Administrator
*Receipt of a Certificate of Zoning Compliance does not indicate compliance with requirements of other
departments/agencies, including, but not limited to, Ada County Highway District, Central District Health
Department, affected irrigation district(s), Meridian Sewer, Watet, Building or Fire Departments, etc. This
certificate shall expire one (1) year from the date of issuance if work has not begun.
• •
Memo
To: Walgreen's CUP and CZC Files
From: Brad Hawkins-Clark'~~~-
CC: Shari
Date: 10/13/00
Re: Site Sign Conditions
The approved Walgreen's CUP and Annexation conditions state that free-standing signage on the site
is restricted to one new, 72 s.f. sign for Walgreens at the SEC and that the existing chiropractic sign on
Fairview may remain. However, Gentry Chiropractic moved into the 7,000 s.f. multi-tenant retaiUoffice
building and his old building has been demolished. A representative from AIM Signs came in today to
request that the chiropractic sign be replaced with a new monument sign for the entire multi-tenant
building. Since the Council-approved conditions stated that the chiropractic sign could remain -
essentially meaning that the site could have two (2) free-standing signs - I told AIM that a new sign
could replace the chiro sign but it would have to be located in more-or-less the same location as the old
chiro sign and that the new sign would be restricted to a maximum size of 72 s.f. and be outside the
sight triangle.
• Page 1
- 03/13/00 16:21 FA% 2083704
03/16!200@ 14: 2a 208- 87-6393
~~ co~~t
~ 002
PAGE @2
c~ tv~rct
.1udy Peavey-Derr, President 318 East 37tH 5trset
Dave givens. Vice President Gartlen City, Idaho 83714-6.99
Marlyss Meyer, Secretary Phone (208) 387-6t 00
Sherry R. Huber, Commissioner r=ax (208) 387-8,.91
Susan S. Eastlake, Commissioner E-mail: tellusQachd.ada.id.us
.o ....e -
March 10, 2000
I`~r. Clizat $oyle
Hawkins -Smith
5645 W. Fraztlclin Road
Boise, Idaho 83709
RE: MCUP-99-0034
Meridia,u Walgreens )E+'si~rview/Locust Grove
PLANS R>?,V~W CO]Nly>(F1YTS
For The Ada County Highway pisttlct to accept the plans for the above referenced project; please
complete the following requirements:
1. Provide a pavement sccbion fot' the driveway approach pavement repairs in the Fairview Avenue
and Locust Grove right-of--way. As a guideline, the accepted design for the Locust Grove Road
project uses 4 inches of pavement, 9 inches of eruslaed aggregate base, .and 15 inches of
uncrushed aggregate base over a prepared subgrade.
2. Revise the Locust Grove Road driveway width to comply will! the District's Site Specific
Requirements (24- to 30-foot throat width). l'tovide for construction of the median curb on
Locust Grove Road in accordance with the Site Specific Requirements.
3. Relocate the Carol Street curb. gutter, and sidewalk imprrovements so that the required
improvements (half o£ a 3~6-foot street section) aze south of the existing centerline of Carol Street.
pcdicate an additional 5 fzet of right-of--way to the District, or provide an easement for a~~y
improvctnents located outside the existing right-of--way.
4. Widening of the existing driveway that serves the parcel west of the site was not considered as
part of the development application- If the applicant and the adjoining property owner wish to
widen tl~.e driveway, they mast apply to the District for consideration. Generally, 40-foot
driveway widths are only allowed in industrial areas.
5. Construct a o avel shoulderlborraw ditch section in the Locust Grove right-of--way between the
new right-of-~vay line Ind the roacl~vay pave~l~ent. Refer to iSPWC standard drawing SD-302
for general guidelines- The entire area shall receive at least 4-inches of compacted '/,-inch
cnished aggregate base over a prepared subgrade.
6. Install Type C pedestrian ramps ai the ne~v driveway ,on Fairview Avenue (1SPWC Standard
Drtwing SD-712C). if the pedestrian iatnps extend beyond the required ri;ht-of-LVay dedication:
the applicant shall gr'tctt a permanent casement to the District for the maintenance and public use
of the additional rarc)p area. Provide tl legal desct~ption for any required easco7ents, along with
the name and title of the grantor's signatory.
7. Please provide a recorded cross-accc55 agreement tliut provides access from the site to the parcel
immediately ti~est ofthe site.
HAWKINS SMITH
ACRD PLANNING
03/10/2000 14:24 2~7-6393
[1Knl111vJ JAll~l~tl
ACRD PLANNIN~
[~ oos
PAGE 03
8. Complete the dedication-sf'48 feet oftight-of-way from the ceittez~,me of Locust Grove Road as
set forth in the Site Specific Requirements.
9. provide an $8,000.00 deposit to the public Ri~hts.,of-bVay Trust Fund for the cost of constntctinS
a 5-foot wide concrete sidewalk on Locust Grove Road abutting the parcel.
10. Provide a recorded cross access easement for the parcel to the west to use this parcel for access
to the public streets prior to issuance of a building pern~it or other requited pel~nits.
11. Please provide Four copies of the revised civil drawings.
Standard lteggiremeats:
1- Utility street cuts in new pavement less than five years old ate pot allowed unless approved in
welting by tI'ae District.
?• ~. All irrigation facilities mast be located outside the Public right-of--way unless otherwise approved
by the District.
~. RepIace damaged curb, otttter> and sidewalk with new curb, gutter, and sidewalk to match existing
improvements.
4• All facilities to be constructed with a proposed development, and to be owned quid maintained by
the pistrict, must 6e constructed accorditlg to the latest edition of I.S.P.W.C. and the District's
Supplerrlcntal Standard Specificarions.
5. Any work in the public ri~,t-of--way requires a pernrat frorrl ACRD Construction Services.
6. An engineer registered in the State of Idaho shall prepare and certify all improvement plans.
if you have any questions or concerns, please feel free to contact me at 387-6181.
Sincerely,
.~-~
oss Oyet1
Planning acid Aevelopment
i •
CERTIFICATE OF ZONING COMPLIANCE
& PLAN REVIEW CHECKLIST
City of Meridian
Project:
Contact:
Review Date: _/ /
Zone
~~ ~~~
~~~
~.
Required Application Items:
i.l~3 copies of site plan and landscape plap
~L3'Calculations table, including asphalt area, parking (standard and handicap), landscaping, and building s.f.
~p Copy of ACRD approval letter or ACHD-stamped copy of Site Plan (if applicable')
Site Review/Conforming
Elements Comments Complete
~
* Project must comply with all approved permits, plats or Development. Agreements
associated with the lot or arcel.
1. Zoning District (permitted
use, CUP, AUP, variance, etc.
/~
2. Flood lain District /
3. Landsca in
a) # of Trees (1, 3" cal. per
1,500 s.f. of as halt
b Plant S ecies Listed
c) Re uired Stri s/Screens
3.Off-Street Parkin
a) # of Stalls (dimensions,
etc)
b) Handicap Stalls (van
accessible, aisles, si ns ~ _~~
_ k ~ ~ ~~`~ ~~ `'~ '~ ~"
`'~
c Aisles (width, location) v'.-
4. Trash Areas
a) Location
b) 3-Side Screenin
5. Underground Irrigation
\.~
6. Sidewalks/Paths
r %~
,.
7. Streets (Rt'W dedications,
etc. 3
8. Lot Requirements
a) Lot Area (note restrictions on
use o undevelo ed ortion o lot ~
~
b) Street Frontage
/"
c) Set-backs ~
d) Coverage
~~~~ .u:.at+~~
~<..~t.<<~.rr ~,a-1~~
,~~ ~--~c~~~.~ s
~:-~~ ~ ~~J ~~~1~
~YE~-4c ~, ~ t~ r,_^
(,~~ ~.'}
~= ~,~~ ,a _ ~~3 (~. t3~
J
~ tom. c~c~.
_~ L ~-~ L~
~ ACHD approval letter required for curb cuts, road widening, arty new projects.
z Pressurized irrigation can be waived only if no water rights exist to subject property or developer deeds to City land for a well.
z City permits a 1-time hook-up to municipal water for irrigation per site.
a Trees must not be planted in City water or sewer easements.
3 Applicant must submit a copy of recorded warranty deed or plat as evidence of the road dedication prior to CZC issuance.
C:\P&Zadmin\Forms\CZC Checklist
200 E. Carlton
Suite 201 • ~ ,
Meridian, ID 83642 ~
Ph: (208) 884-5533 . ~ ~ ~
Fx: (208) 887-1297
To: Bruce Poe, Cole Associates From: Brad Hawkins-Clark
Fax: 331-3244 Pages: 4
Phone: bate: 03/30/00
Re: Revised Walgreen's Certificate CC:
^ Urgent ^ For Review ^ Please Comment , ^ Please Reply ^ Please Recycle
BR1Ce,
Per our conversation, attached is the original Certificate of Zoning Compliance for the
Walgreen's site (which omitted the 7,000 s.f. pad) and the revision incorporating the future
pad. Both of these documents should accompany your building permit application to the
Building Department.
Brad
GENERIC TRANSMITTAL SHEET
TO: ~rad ~~~inS DATE: LF -8-cz~
FROM:
COMPANY: Na ~,,~ khs -- 5,,,,,;
SUBJECT: ~ ova i v~ a Ce r ~;-~, t ~-t-e
CONTENTS: - ~ 5 e~t-S o-~ -~~.c ~,~ c ~> ~ ~ ~~ f~, , . ~ ;
COMMENTS:
GJe e_ -~- ~ c~ i ce ~F ~ t
e i
C
Gt. L '1'Y'~e
- o`er ~ ~e aF S
` ~P p ~ l ,.
a +-~
_ f.~. ~ _ I - ~ r!
K7C°! /.f t 1C~ t.. SP I~PP~~ M-in ~_ 7~i ~n c /~~r~h.
e
SIGNATURE:
• HUB OF TREASURE VALLEY •
MAYOR
Robert D. Come
CITY COUNCIL MEMBERS
Ron Anderson
Keith Bird
Tammy deWeerd
Cherie McCandless
January 12, 2001
A Good Place to Live
CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, IDAHO 83642
(208) 888-4433 • Fax (208) 887-4813
City Clerk Office Fax (208) 888-4218
Mr. Brian Huffaker
Hawkins Companies
8645 W. Franklin Road
Boise, ID 83709
Re: Certificate of Occupancy for Walgreens at 1550 E. Fairview Avenue
Dear Mr. Huffaker:
LEGAL DEPARTMENT
(208) 288-2499 • Fax 288-2501
PUBLIC WORKS
BUILDING DEPARTMENT
(208) 887-2211 • Fax 887-1297
PLANNING AND ZONING
DEPARTMENT
(208) 884-5533 • Fax 888-6854
Per your request, this letter is to summarize the status of the Planning & Zoning Department's
signature on the Certificate of Occupancy for the subject property. As you know, a final
condition of the Decision and Order as approved by the Meridian City Council was to
construct afive-foot wide sidewalk along the Locust Grove Road frontage (approximately
3701ineal feet) prior to final occupancy. When I inspected the site for occupancy on
November 9th, the sidewalk was not yet constructed. Temporary occupancy for the building
was issued after the City received a cash bond in the amount of $1,902.73 for the sidewalk.
The City's policy is that no final occupancy will be issued until all required site improvements
are constructed. Bonding is held until such time as all site improvements are inspected and
signed-off.
Temporary occupancy was issued on the Walgreens site for 60-90 days. However, a time
extension may be granted when weather or other factors are involved. The City was informed
by the Ada County Highway District yesterday that the construction schedule for the Locust
Grove Road expansion project is Summer 2001. At that time, a permanent, attached sidewalk
is planned for construction along the full Locust Grove frontage. The City will hold the surety
bond for the temporary sidewalk along Locust Grove Road until August 1, 2001 and allow
continued operation of the store. At that time, if the ACHD construction project has not
commenced, we will require the temporary sidewalk to be constructed on Walgreen's
property (outside the right-of--way). If the ACRD construction project has begun by August 1,
2001 and there have been no modifications to the sidewalk in the design plans, the City will
release the $1,902.73 bond and our department will sign the final C.O. The cash bond and
temporary C.O. will not expire prior to the August 1, 2001 date.
•
Note that this letter pertains only to the Planning & Zoning site improvement requirement for
a sidewalk. It does not grant temporary occupancy until July 1, 2001 for any other outstanding
signatures from other departments or agencies on the CO card (if any apply).
Let me know if you have any further questions or require any other details regarding this
matter.
Sincerely,
~..oa,a -cam
Brad Hawkins-Clark
Planner
NOV-10-2000 11 11
RUBBLE ENGINEERING
LJ
208 378 0329
~. ~ F~~~
P.02i0
RUBBLE ENGINEERING, INC.
701 S. Allen St., Suite 102 ^ Meridian, ID 83642 28/322-8992 ^ Fax 208/37&032
November 10, 2000
Attn: Brad Watson, P.E.
Public Works Department
CITY QF MERIDIAN
200 E_ Carlton, Sui#e #100
Meridian, ID 83642
via fax: 887-9297
Re: Projec#: Meridian Walgreens
C~eveloper: Wawkins Companies
Item: Locust Grove Asphalt Path Cost Opinion for Banding
HEI#: 98-189-02
Dear Brad,
Per your request to our Client and the Developer, Hawkins Companies, I am
forwarding our Construction Cast Opinion for the addition of the Asphalt Path
along Locust Grove.
Attached is the itemized CCO for 370 Lineal Feet of path showing the
recommended Bonding Amount of $1,902.73.
if you I~r~ any questions, please contact me at 322-8992. Thank you.
gent A. Claibom, P.E. &''S.P.M.
RUBBLE ENGINEERING, INC.
Cc: David Slye, Hawkins Companies
Steve Slagel, ESI
File: 99-163-02
Atkachment: Construction Cost Opinion
~. ~. •
c~'\NEFgs
HUBBl.E ENGINEERING, INC.
~2.
~
701 S Allsn St .Suite 102 • Mendisn, ID 93642
~
SS• 208.322.0992•Fak 209-473-032rJ
208 378 032 P.03i03
r:of°cr~ ~ ~ Y~ ~~ VJ~i6 IBS
rv9mo _ no -----
Caic 9v ~ pA~~t~ S Date f ` ~ 0 -. --. Scs%e---~-• -
f;hec*r.C By Oytc_ // ~~ ~e Shrnr of
LOCUST GROVE ASPHALT PATH
HEt+~ 99-163-01
Oate: 11/10/2000 By JSO
Cost Opinion for an Asphalt path along Locust Grove Street
Provide 8. Int3tall:
1 Asphalt path along Locust Grove Stn~et
2
3
4
SSUBTOTAL
6 C.ontingency, 10%
7 TOTAL, Construction Coot
8
9 BONA AMOUNT, ~ 110% of Const. Cost
$ 1.572.50
10% $ 157.25
$ 1,729.75
110% S 1,902.73
i .~~- i e.+-er~r~r~ 1 1 • C10 I-rUtiCl.t tNU 1 Nttt< 1 NU
370 Lineal Ft 5 4.25 S 1,572.50 ~
TOTA_ P. a3
NOU 10 '00 11 28 208 378 0329 'AGE_03
11/13/40 16:27 FAX 3757303
~- •
,~,~ rs 7 ~r ~'
IFA-2p-aa
T.3N., R. 1 E„ Section B
FATCO SEARCH
;,LA C~1l;'ITY i'~COR!)ER
WARRANTY DEED
FAT
~ 002
RECORDEiJ - F3E~~ilE 0 '
i"EE~DEPU
~aao~~2~i
FlF~TAMEPoCAp
THIS INDENTURE, made: this ~ j ~+~ day of hl~very~~e,f 20pb,
HAVYKINS-SMITH & WALKER, L.L.C., an ldaha Limited Liability Company, the
"GRANTOR," and ADA COUNTY' HIGHWAY Dl5'rR1CT, a body politic and corporate of
the State ofi Idaho, the "GRANTEE";
WITNI=SSETH:
FOR VALUE RECEIVED, the GRANTOR has granted, conveyed, bargained and
sold, and does hereby grant, bargain, sell, Convey and confirm fio the GRANTEE, and its
successors and assigns forever, that certain real properly situated in the COUNTY OF
ADA, STATE OF IDAHO, more }aarticularly described on Exhibit "A" attached hereto and
by this reference made a part hereof,
TOGETHER with all and singular the buildings, structures, improvements and
fixtures thereto, the tenomenis, l~sreditamenfs and appurt+enanoes thereunto tyelonging or
in anywise appertaining, the r~ev~arsion and reversions, remainder and remainders, and
rents, issues and profits thereof Ith® "Premises");
SUBJECT TO those exc~l~tions to GRANTOR'S title as are set forth on Exhibit "l~"
attached hereto and by this reference made a part hereofi.
SUBJECT TO those exeel>tions to title to which this conveyance ~s expressly made
subject and those made, suffered or done by the GRANTEE: (a} the GRANTOR
covenants to the GRANTEE, its +~ucoessors and assigns, that the GRANTEE shall enjoy
fire quiet and peaceful passessum of the Premises; and (b) GRANTOR warrants to the
GRANTEE, its su~coessars and assigns, that GRANTOR is the owner of said Premises in
five simple and has the right and authority to convey the same to GRANTEE, and
GRANTOR will defend the GRArJTEE's title from all lawful claims whatsoever.
The current address of thi: GRANTEE is:
Ada Gaunty Highway District
318 East 37th Stmt
Garden City, ldaho 83714~d99
WARRANTY bEED -Page 1
11/13/44 16:27 FAg 3757303 FATCD SEARCH FAT ~ 003
r ~`
ie ~ ~~•`•+N ~~
~ ~ ~o ~ ~
~~ ~ ~
O "~~` ~
~~~a
S'x'ATE OF )
ss
CbUNTY bF ADA )
HAWKINS-SMITH & HALKER~ L.L.C.
Gary t(~~kins by Jeffery L.
t
~t
o~ tbis f - day of Nas-ember is the year zooo, be#ore mc, a Notary Pablic is and for said State,
personally appeared Je~ely L. Hens :wd Jason Havvldns, Ioaown os identified to me to be the persons whose
mamas are subs®'bed to the witf~ia In~strnateat as the attorney-ia-fact of GARX R FIAWKY1~iS as o~ae of the
~liana~ng Members of 1;I~41i~I~NS-SMI.'I'H & uei. ~R LLC, wbicbi i& lmoavn or identified to me to be the
entity whose name is sulfsc-iibed to the within instrument and acirnawle~d to me that they execnred the same
as 5a~,d MapaHmg Member, lII said Lnmted L[a6ahty Company's naflae-
1N WITNESS WHEREOF, this WARRANTY DEED has been duly executed by
GRANTOR, the day, month and year herein first above writt$n.
Public alxo
Rrsiding at: ~~ 1
Commission Fxp~ires: r,L
WARRANTY DEED - Page 2
11/13/00 16:27 FAg 3757303
FATCO SEARCH
FAT
~ 004
11/oi/fl0 17:4 FA7[ 2058 655$ RESU ~ X005
2~6 3?B 0329 p.0~/06
u~.i-~~--~ raki=aj 1.11 Aap F EI~iIF~FiIT~a
~~~p~~ HUB~LE ~NC~NE~R~NC~ ~NCr
~- ~ sae-e~z . r-~ ~
F ~Sp B~thal ~rt . Boiee, Idahc 8a7r7B
'qS.
Project No. s~~ s~o~ . ~ ~ r~ Janua~Y 19, 2000
~: k ~ ~ ~ ~ ~' Revised ,tune i5, 2000
PROP~Srt:d RIQHT~RaIVAY TAKE
ILOCU$T GIVE ROAp
IYIBR.IDIAN WALr3REENS
A parcel al' land baing a portion of 1~ 8 and Lot 9, 81odt 1 0# pons SubdiYisirsn
as recorded in Baoic i 6 of Pik at Page t~~ of Ads County nec~arals. lyir~ in the SE114
at the SE7/4 of Section B, T.3N., R.9 E., B.M., Ada County, Idaho and being rrwre
particularly described as foilaw:~: ,
Commencing srt a btaas~ cap monument marking the southeast eomer aE said
S+e~cggn B from which a bras cap monurl~rrt marking the E1/4 comes` of said Section s
bears North 00°00'01" Vliest (fiarrnetly descrr~ied a~ Northj 213~4D.75 f+se~ thenrae sting
the irast bQUndery Ilr~e of eases SecdiOn B North 00°00'07" IAfest, 432.20 feet; thence
Mortil" B9°S®'11" Vilest, 25.00 feet to the northeast comer of sad Lot 9, the REAL POINT
OF BEL~1NlVING; .
thence South 0[1°00'09" Est, 18"1.00 fleet formerly described as South, '181.00
feetj to the easterly comer corranon 14a said Lobs 1 and 8;
t'i+ence along #he~ time ~aoramon to said Lobs 1 s~ncl $ North 89°59.11" West,
{tarmeriy described as 1Nast)1~5-00 fib
thence leaving ~Id line South OQ°0q'Q1" East, 708.00 feet to the North tight-of-
wsy line afi Fairview Avenue;
ther~cer N~octh B9°59'11"'West, along said cight~o~f~vay line 29.13 fleet;
tt1~nC8' IVortil 44'$8'59" fit. ~~.88 ~ .
~h~c : Norttr oo°oao~- wept, soz.a~ t~et;
thence North 45°00'09" West, 25.48 .
thence South 139*59'11" ~$6't, '! 8.02 fleet;
tf,ence North oo°o0'Di" West. 5.00 feet th tf~ North boundary of said Let 7 ;
Psge 1 of 2
11/13/00 16:28 FA% 3757303
FATCO SEARCH
D(HIBIT °a°
FAT
1. General and Special Taxes for the year 2000, an accruing lien not due or
payable.
~. Easements, reservations, restrictions and dedications, if any, as shown on the
official plat of said Subdi+ri~on.
3, Reservations in U.S. Pat~:nt, recorded in Book 3 of Patents at Page 73, Offiaal
Records.
4. An Easement over said I~~nd In favor of IDAHO POWER COMPANY, a corporation;
for power line and inadentai purposes as set forth In an instn~ment recorded
Otto>ier 22, 1921, in B~ik 152 of Miscellaneous Records at Page 588, Oflidal
Reconis. (Appears to lie within the easements shown on the plat)
5. Covenants, gondRtons and restrictions in an instrument retor~ded September ii,
1959, as Instrument No. 4fi3012; ANp AMENDED BY an instrument redor~ded
March 7, 1961, as Instrument No. 498227; AND FUiYTHER AMENDED BY an
instrument recorded ]ur4e 5, 1986, as instrument No. 8630022, and re-recorded
]one 2C, 1986, as Instrument No. 8634843, and re-re-recorded Tune 27, 1986,
as instrument No. 8635CIi6, AND FURTHER AMi=fVdEd 6Y an Instrument
recorded Fe}~ruary 24, 21790, as Instrument No. 100013863, Official Regards, but
deleting arty covenant, condition or n~rittion indicating a preference, limitation
or discrimination based cm race, color, religion, sew handicap, familial status, or
national origin ba the extent such toVenant5, conditions ar nastrictions violate 42
USC 3604(8).
6. Dedaration of Easements, Covenants, Conditions and Restrictions, recorded
Marsh 29, 2000, as Instrument Na. 10007.3499, Offiaa! Reaor:ds.
~ 005
ENp
i •
Memo
Ta Walgreen's CUP File
From Brad Hawkins-Clari~~~
CC: Daunt Whitman, Clint Boyle (Hawkins-Smith)
Dabse 03/22/00
Re: Revision to 3-15-00 Certificate of Zoning Compliance
By this memo, I am revising the "Future Pad" comment on the Certificate of Zoning Compliance (CZC)
dated March 15, 2000 for Walgreens. The comment currently states that a separate CZC will be
required for the 7,000 s.f. future pad shown in the NWC of the Walgreen's site. However, the Site Plan
approved by City Council under the Conditional Use Permit indudes the future pad and Sheet C-3,
Striping & Dimension Plan, of the construction set is in compliance with the approved CUP.
« ,~
Therefore, this Future Pad comment should be deleted. The 7,000 s.f. (max) building with no drive
through is permitted under the sut~ect CZC. A separate CZC is not required for this building.
• Page 1