Idaho Heating and Air Conditioning Office Warehouse CZC 99-029Mayor
ROBERT D. CORRIE
~pcil Members
CHARLESROUNTREE
GLENN BENTLEY
RON ANDERSON
KEITH B[RD
HUB OF TREASURE VALLEY
A Good Place to Live
CITY OF MERIDIAN
33 EAST IDAHO
MERIDIAN, IDAHO 83642
Phone (208) 888-4433 • Fax (208) 887-4813
LEGAL DEPARTMENT
(208)884-4264
PUBLIC WORKS
BUILDING DEPARTMENT
(208)887-2211
PLANNING AND ZONING
DEPARTMENT
(208)884-5533
CERTIFICATE OF ZONING COMPLIANCE*
Date: Mazch 10, 1999
Owner: Idaho Heating and Air Conditionin~~ C~i(°-'qq' ~~
Address: Lot 4 Block 3 Layne Industrial Pazk Subdivision 7i~~ ~ ~ ~.~0'1V1,tVl.P,t.Ct~Q. cS{•
Proposed Use: 9 850 S F Office/Wazehouse Building
Zoning: I-
Comments: All signa eg is subject to design review and requires separate Hermits. No portable signs
or tem~orazy si~-aue___permitted A minimum of seventeen (17) three-inch (3"1 cahHer trees aze to
be provided on the pro~ert~and served by an under rg ound sprinklins? system. LandscaHe Hlan not
to be altered without prior written approval of the Planning & Zonins? DeHartment. No field c es
to site~lan Hermitted• Qrior written approval of all changes required All drau~aee to be retained on
site All tenants to obtain Certificate of Occ~ancy prior to use of bu>Idine.
< ~
;. Shari Stiles
Planning & Zoning Administrator
*Receipt of a Certificate of Zoning Compliance does not indicate compliance with requirements
of other departments/agencies, including, but not limited to, Ada County Highway District,
Central District Health Department, affected irrigation district(s), Meridian Sewer, Water,
Building or Fire Departments, etc. This certificate shall expire one (1) yeaz from the date of
issuance if work has not begun.
61~ ~U~d •LLy~CI~G •
~~~Y 1
.~~~,
~:~?~°u~
s` ~'$.
~ ~ , a . ~n n~~~ S ~ .~i, ~
•.¢vn.~ ~ f)K.vR.l~c
~~ ~R~.1vsrn~rssroN s~~~~r
Hate: ~ - g ~ ~~ ~iine:
From: ~~ ~
k'a~ IV'umber: - 12 q ~
Number of pages (including covex page):
Remarks
CV : l l bbr~~Ip~,^~
1 r'' l w --{{~~rV~'/
MAR 0 8 1999
p II, N ING & ZONING
Y
_ll : S~
Treasure Valley $ngineers Offrce: (208) 4630305
1117 Caldwell Blyd, Suite $, Navnpq 1'daho S3U~! Fax: (208) 463-7794
T0'd b6LL£9b80Z S3Q 213WWt~H i1tiA 3ZIfISt~3211 Wl~ ££= Z i NOW 66-80-211yW
z0 "~~Jtid ~L~9bB0z 8b : i i 66 ~ 80 Jt1W
f~ // y
a ou~.t~ cc~i
~ GUGCG~ C~~r''LC~
Sherry R. Huber, President
Judy Peavey-Derr
Vice President 318 East 37th Street
,
Marlyss Meyer Routson, Secretary Garden City, Idaho 83714-6499
Dave Bivens
Commissioner Phone {208) 387-6100
,
Susan S. Eastlake
Commissioner Fax (208) 387-6391
, a-mail: tellus@achd.ada.id.us
Treasure Valley Engineers March 3, 1999
attn: Art Schultz
11 l7 Caldwell Blvd., STE B
Nampa, Ydaho 83651
RE: MSPR-07-99// 2390 E. Conaniercial St. / Tdaho Heating & Air Conditioning
PLANS ACCEPTANCE
The District has reviewed the plans for the above referenced project, and they are accepted for public
street constn~ction. By stamping a7td signing the improvement plans, the Registered Engineer ensures
the District that the plans conform to all District policies and standards. Variances or waivers must be
specifically and previously approved by the District in writing. Acceptance of the improvement plans
by the District does not relieve the Registered Engineer of these responsibilities. The District will
assess the following impact fee for this project. The impact fee must be paid prior to issuance of a
building permit.
NOT>Er: Please provide two additional sets (signed and stamped by engineer) of civil drawings.
Total Impact Fee due: $10,924.00
Standard lZequirements:
I. Utility street cuts in new pavement less than five years old are not allowed unless
approved in writing by the District.
Il. A11 irrigation facilities must be located outside the public right-of--way unless otherwise
alproved by the District.
III. Replace dantaged curb, gutter, and sidewalk with new curb, gutter, and sidewalk to match
existing improvements.
IV. All facilities to be constructed with a proposed development, and to be owned and
maintained by the District, must be constructed according to the latest edition of
LS.P.W.C. and the District's Supplemental Standard Specifications.
V. Any work in the public right-of--way requires a pent~it from ACIrID Constivction
Services.
~'I. An engineer registered in the State of Idaho shall prepare and certify all improvement
plans.
Z0'd b6LLF9b80Z S3Q 2l3WWtiH i1Cl~ 321f1Sty3211 WC ~~': TZ NOW 66-80-2lCW
~0 ' 3~Jtid
6b : I L 66 ~ 80 ~IdW
R
S'nce
~.
e o
Platuiing and Development
if you have any questions or concei~s, please feel free to contact me at 387-6176.
cc: Idaho Heating
Medical Design Group
£O'd b6ttE9b8OZ S3Q 2l3WWtlH i1tlA 321f1Stl3211 Wtl b£: t i NOW 66-80-21tlW