Loading...
Agency CommentsVI~~ l a ~1ru<d~~a.~ ~v~ga~o~ a~a~iet 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX # 208-463-0092 Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466-0663 City of Meridian City Clerk's Office Jaycee Holman 33 E Broadway Avenue Ste 102 Meridian, ID 83642-2619 RE: MFP 10-005/Hacienda Subdivision (FP OS-031) Dear Jaycee: Nampa & Meridian Irrigation District has no comment on the above-referenced application as it lies outside of our district boundaries. Please contact Nathan Draper with Settlers Irrigation at 344-2471 or at PO Box 7571, Boise, ID 83707. All laterals and waste ways must be protected. All municipal surface drainage must be retained on-site. If any surface drainage leaves the site, Nampa & Meridian Irrigation District must review drainage plans. The Developer must comply with Idaho Code 31-3805. It is recommended that irrigation water be made available to all developments within the Nampa & Meridian Irrigation District. Sincerely, ,,~j ~' / Andy Madsen MGT Nampa & Meridian Irrigation District AM/dbg C: File -Office/Shop APPROXIMATE IRRIGABLE ACRES RIVER FLOW RIGHTS - 23,000 BOISE PROJECT RIGHTS - 40,000 5 January 2011 .. DISTRICT CENTRAL DISTRICT HEALTH DEPARTMENT Retum to: HEALTH Environmental Health Division ^aoise DEPARTMENT ^ ~9~ Re2one # F/J D _~ S ^ Garden City /~~ l Meridian Conditional Use # ^~~ Preliminary /Final /Short Plat ^ACZ a _: w ~ ~ ~. ^ Star ~-- We have No Objections to this Proposal. ^2. We recommend Denial of this Proposal. ^3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ^4. We will require more data concerning soil conditions on this Proposal before we can comment. ^5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ^ high seasonal ground water ^ waste flow characteristics ^ bedrock from original grade ^ other ^6. This office may require a study to assess the impact of nutrierits and pathogens to receiving ground waters andlor surface waters. ^7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ^8. After written approval from appropriate entities are submitted, we can approve this proposal for: ^ central sewage ^ community sewage system ^ community water well ^ interim sewage ^ central water ^ individual sewage ^ individual water ^9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ^ central sewage ^ community sewage system ^ community water ^ sewage dry lines ^ central water ^10. Run-off is not to create a mosquito breeding problem. ^11. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ^12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ^13. We will require plans be submitted for a plan review for any: ^ food establishment ^ swimming pools or spas ^ child care center ^ beverage establishment ^ grocery store ^14. Please see attached stormwater management recommendations ^ 15. Reviewed By: `/'~~ ®`-- Date ~/~/ /CJ Review Sheet 15726-001EH0904