Blackstone Subdivision No. 2 TE-10-026BEFORE THE MERIDIAN CITY COUNCIL
C/C November 3, 2010
IN THE MATTER OF THE
REQUEST FOR A TWO YEAR
EXTENSION TO OBTAIN THE
CITY ENGINEER'S SIGNATURE
FOR BLACKSTONE SUBDIVISION
N0.2, LOCATED IN THE
NORTHWEST 1/a OF SECTION 10,
T.3N., R.1W, MERIDIAN, IDAHO
CASE NO. TE-10-026
ORDER GRANTING A TWO YEAR
TIME EXTENSION FOR
BLACKSTONE SUBDIVSION N0.2
BY: PROJECT WEST, INC.
APPLICANT
This matter coming on regularly before the City Council on November 3, 2010, upon the
Applicant's submittal of a final plat time extension application for a two year time extension within
which to obtain the City Engineer's signature on the Blackstone Subdivision No. 2 final plat, which
was originally approved on April 1, 2008, as provided in § 11-6B-7C, and good cause shown.
IT IS HEREBY ORDERED AND THIS DOES ORDER THAT:
The above named Applicant is granted a two year extended period of time, until October 1,
2012, of this Order within which to obtain the City Engineer's signature on the final plat,
subject to the conditions of approval as shown in the attached Staff Report for the hearing
date of November 3, 2010 incorporated by reference.
Attached: Staff Report for the hearing date of November 3, 2010
ORDER GRANTING A TWO (2) YEAR TIME EXTENSION FOR BLACKSTONE SUBDIVISION
NO. 2 (TE-10-026)
Page 1 of 2
~• _
By the actin of the City Council at its regular meeting on the day of
2010.
DATED this ~ day of , 2010.
`\\\`~~~uirurrrrrr,~, Pi
;~ ~•c~rFO Mayor T de Weerd
Attest: = SERI' ~,
9~ ~~
O
~~~~%,, ~~Ori~lTY~~~~~,~`~~
aycee man, City Clerk
Copy served upon Applicant, Planning Department, Public Works, and the City Attorney.
BY: Dated: ~ 1 "1 ~ _ o~ Otp
ORDER GRANTING A TWO (2) YEAR TIME EXTENSION FOR BLACKSTONE SUBDNISION
NO. 2 (TE-10-026)
Page 2 of 2
STAFF REPORT E IDIAN~--
Hearing Date: November 3, 2010 I D A H O
TO: Mayor and City Council
FROM: Bill Parsons, Associate City Planner
(208) 884-5533
SUBJECT: TE-10-026 -Blackstone Subdivision No. 2
1. APPLICATION SUMMARY
The Applicant, Landmark Engineering and Planning, Inc. has requested approval of a time extension
to obtain the City Engineer's signature on a final plat for Blackstone Subdivision No. 2. The
Applicant has been unable to meet the time requirements specified in Unified Development Code
(UDC) 11-6B-7. The applicant attributes the delay to the downturn in the real estate market.
2. STAFF RECOMMENDATION
Staff recommends approval of a 24 month time extension to obtain the City Engineer's signature on
the final plat for Blackstone Subdivision No. 2 to expire on October 1, 2012.
3. PROPOSED MOTION
Approval
After considering all Staff, Applicant, and public testimony, I move to approve File Number TE-10-
026, as presented in the staff report for the hearing date on November 3, 2010.
Denial
After considering all Staff, Applicant, and public testimony, I move to deny File Number TE-10-026,
as presented during the hearing on November 3, 2010, for the following reasons: (You should state
specific reasons for denial.)
Continuance
After considering all Staff, Applicant, and public testimony, I move to continue File Number TE-10-
026 to the hearing date of (insert continued hearing date here) for the following reason(s): (you
should state specific reason(s) for continuance)
4. APPLICATION AND PROPERTY FACTS
A. Site Address/Location:
The subject property is located at 4700 W. Aspen Creek Street (Lot 5, Block 1 of Blackstone
Subdivision No. 1) in Section 10, Township 3 North, Range 1 West.
B. Owner/Applicant:
Projects West, Inc.
2014 Meridian Street
South Puyallup, WA 98371
C. Representative:
Landmark Engineering and Planning, Inc.
332 N. Broadmore Way,
Blackstone Subdivision No. 2 TE - 1 -
Nampa, ID 83687
D. Applicant's Statement/Justification: Please see applicant's narrative for this information.
5. PROCESS FACTS
A. The subject application is a request for a final plat time extension. Per Meridian City Code, a
public hearing is required before the City Council on this matter.
B. Newspaper notifications published on: October 11, and 25, 2010
C. Radius notices mailed to properties within 300 feet on: October 7, 2010
D. Applicant posted notice on site by: October 13, 2010
6. LAND USE
A. Existing Land Use(s): A vacant residential lot zoned R-8.
B. Character of Surrounding Area and Adjacent Land Use and Zoning:
1. North: Mill Iron Place Subdivision, zoned R-4
2. East: Single family residential (Blackstone Subdivision), zoned R-4
3. South: Single-family residential homes (Coral Creek Subdivision and Blackstone
Subdivision), zoned R-4
4. West: Single family residential /Pasture land, (Crestwood Subdivision), zoned RUT (Ada
County)
C. History of Previous Actions:
• The subject site was platted as Lot 5, Block 1, with the Blackstone Subdivision (fka.
English Gardens Subdivision).
7. UNIFIED DEVELOPMENT CODE
Per UDC 11-6B-7A, approval of a preliminary plat shall become null and void if the applicant fails to
obtain the City Engineer's signature on the final plat within two (2) years of the approval of the
preliminary plat.
Per UDC 11-6B-7C, upon written request and filing by the applicant prior to the termination of the
allowed time period, the Director may authorize a single extension of time to obtain the City
Engineer's signature on the final plat not to exceed two (2) years. Additional time extensions up to
two (2) years as determined and approved by City Council may be granted. With all extensions, the
Director or City Council may require the plat to comply with current provisions of the UDC.
8. STAFF ANALYSIS
On February 17, 2009, an 18-month time extension was granted by the Director but has now expired.
Thus, the applicant is requesting another approval of another extension by City Council. The
Applicant has met the necessary deadline by filing a written request for a time extension before the
final plat expired.
A development agreement (DA) for this project was approved that limited the number of home sites
to three and bound elevations to the DA. The approved elevations are attached as Exhibit A.3 below.
Staff is of the opinion that the recorded DA adequately addresses future development (density and
design) of the site. Therefore, staff is not recommending any new conditions of approval with the
subject application. The applicant shall comply with all previous conditions of approval for this site.
Blackstone Subdivision No. 2 TE - 2 -
9. EXHIBITS
A. Drawings
1. Vicinity Map
2. Approved Final Plat
3. Approved Landscape Plan
4. Approved Elevations
B. Conditions of Approval
Blackstone Subdivision No. 2 TE - 3 -
A. Drawings
1. Vicinity Map
a~p'~b, bbv 2~'3 d OWN
N
~ASy
OR I' ggg0
~~'
.~ N
Z r pq
C
a
4542 '.. _:..
4516
--- -
1g2~°w
1804
~ '1~az F
3$~~
7 ~1
7 I `_ Ifl
r '1716 ^~
r ~ r'
.o
~4S\6S {
i SITE ~
4973
507
I 4997
1435
W SUNFISh
331
_- 1299
1293 R-2
- --
i
~
~..,, ~. ~ P W ASPEN CR EEK ST -
- ---
~O$ I ~ i 1512
1500 Q 1 ~ ~ N ~
-
1 v i v v
I
1476
~ 1472 1477
_ _ gy~pp- - -
11446 :4574
-'- --- W -T ORN G
h ~ N ~ u 1._~~ 1 I~_-L ~.~'- f
r. !fix
~ ....~.._ ~ ~_ ~ ~ P V c
REI
~ p v ',
=K S
'R ~
T
--
I ~
- - ~BLL~E GREE ST_
-- - ~.~
_.._
v v v r v ~ os
i __-~ -.. ~ ___- _-+_ _ 11
J~~ ~ ~ MI~,~I
a c v ; W1-BI~ CR ~K ST i a ( ~-~-~.
Exhibit A - 1 -
2. Approved Final Plat
~ a ~ ~i
#~f ~ , ~ ~,
5 ~ x~ ~` ~ ~ ~~ ~ ~ ~
' I ~a rr "1~ ~~
a ~ ~ ~~~gg ~ ~~a~ ~ ~ ~ ~~
R,: ! ".t
III
x ` ~ ~
O ~ I ~k
,..
,,
+,, ~ y
~ ~~j, , 4
~#~ ~:~~ -
~ ~ I ~ ~ ~
~ ~~ its I ~ I~' ED-$ ~`~ ~ ~ ~ ~
0.^
.~ ~, ~-
r
C! ~~ I ! ~ ~) /.
,. v
~y ..
_ ~ ~ -~
~~~ ~ ~ --_
l
E f h .a ~
P. rv ~~ _¢g
I ~~! f ~ ~~
x ~ '~
~ 4
~~~~a.~~ _ ~~
,~
w~ i~
- s
~~ i o.oe axa •K _ ~_
re.m~-a+~mna
Exhibit A - 2 -
3. Approved Landscape Plan
~'~ ~- rr .~nro.~sx~vre
moo. ,u ~ r.zoro:,
q,a, „~„ K03 kY'Id EdY~541~:Y'I oN lxan„~d
~a
~~~~ ~
&~c~~5
-Q
~i
s
~~ ~_
~~ ~~
ti~ ~~
a ."~
,~ ..2
~.
~~
~.~~`~
f
{ P~~~ .I
~_~ ~ O
~ ~~
t :::.t
-1
(' ''r __
W_ ~ ~I.
~~- e
AC
~~.~~~
ifs -- - -_~=- ~ =_,----~j
,..: ~ ~-
::-:
,' a' .
~ ~~ ,, figg..
E~Bi a..oa LR~ sy.®
~ Y'i
~~
°1~
~ ~ y ~~
~ ~ ~ ~ &{$~~~~~
E
~ c~2i
~~~~
~
~~ 4 ~
~
~ ~ ~ ~~
~~~y S
~~~~~~
~
~ h~~ ~ ~~ ~ ~~~
'
~
5~ c g$ a
,~
;~p
y :s
~
~
~'e3
¢
G
~~~ p
4
~
y
3~
~ k~y~y qNqkM{ ~~ ~« K~~
/
S
~
~ ~~ ~
~ Y~~s
~a~ SL L
+'I
~
~.
4
. ~¢~
~Q
F
i '+
k ~ ? 7 .' S
k k
~~~
~ ~~~~~
~~ ~~~R~
N h h
~ ~~~~
- ~~
f:
$~
€ ~ i
~~ a~ a ~,
~~ ~~ ~~ ~~
~ - -- _:, \
~ G _
~
~~ ~ ~
P { ~...
~.....
\~
._.._
e
.
J
`S~
~~S _
$R
F
,!' ~
~"
n
~~ 1 ~~a ~~
Exhibit A - 3 -
4. Approved Elevations
,, ,' ,~~ .
~~'~+tr
,d~;as ,~
~.
y~
Exhibit A - 4 -
B. Conditions of Approval
SITE SPECIFIC CONDITIONS
1. The applicant is to meet all terms of the approved rezone (RZ-07-023), development agreement (Inst.
#108059796), preliminary plat/final plat (PFP-07-004).
2. The applicant shall have 24 months, until October 1, 2012, to obtain the city engineer's signature on the
final plat, satisfy the applicable requirements set forth in the conditions of approval, and begin the process
of acquiring building permits and commencing construction of permanent footings or structures.
Exhibit B - 1 -