Loading...
ApplicationE ID1ZIANC-- • IDAHO TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN Mayor Tammy de Weerd City Council Members: Keith Bird Brad Hoaglun Charles Rountree David Zaremba To ensure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission please submit your comments and recommendations to Meridian City Hall Attn: Jaycee Holman, City Clerk, by: August 11, 2010 Transmittal Date: July 22, 2010 File No.: PP 10-001 Hearing Date: August 19, 2010 Request: Public Hearing - Preliminary Plat approval for 214 residential building lots and 16 common lots on approximately 86.66 acres in an R-2, R-8 and R-15 zoning district for Spurwing Greens By: Spurwing Greens, LLC Location of Property or Project: north of Chinden Boulevard, approximately 1/4 mile east of Black Cat Road and west of Spurwing Subdivision Joe Marshall (No FP) Scott Freeman (No FP) Wendy Newton-Huckabay (No FP) Michael Rohm (No FP) Tom O'Brien (No FP) Tammy de Weerd, Mayor Charlie Rountree, C/C Brad Hoaglun, C/C Keith Bird, C/C David Zaremba C/C Sanitary Services (No VAR, VAC, FP) Building Department / Rick Jackson Fire Department Police Department City Attorney City Public Works/Scott Steckline City Planner Parks Department Economic Dev. (CUP only) Your Concise Remarks: Meridian School District (No FP) Meridian Post Office (FP/PP/SHP only) Ada County Highway District Ada County Development Services Central District Health COMPASS (Comp Plan only) Nampa Meridian Irrig. District Settlers Irrig. District Idaho Power Co. (FP,PP,CUP/SHP only) Qwest (FP/PP/SHP only) Intermountain Gas (FP/PP/SHP only) Idaho Transportation Dept. (No FP) Ada County Ass. Land Records Downtown Projects: Meridian Development Corp. Historical Preservation Comm. South of RR / SW Meridian: NW Pipeline New York Irrigation District Boise -Kung Irrigation District City Clerk's Office • 33 E. Idaho Avenue, Meridian, ID 83642 Phone 208-888-4433 *Fax 208-888-4218 • www.meridiancity.org • Hearing Date: August 19, 2010 Project Name: Spurwing Greens File No: PP -10-001 Request: Preliminary plat approval for 214 residential building lots and 16 common lots on approximately 86.66 acres in an R-2, R-8 and R-15 zoning district by Spurwing Greens, LLC. File No: VAR -10-001 Request: Variance to UDC 11-6C-3BA to exceed the maximum cul-de-sac length allowed in a residential district for Block 24 by Spurwing Greens, LLC. Location: North of Chinden Boulevard; approximately %4 mile east of Black Cat Road and west of Spurwing Subdivision in the S %2 of Section 22, Township 4 North, Range 1 West. • E IDIAN*-- IDAHO of Review Requested (check all that ap] ❑ Alternative Compliance ❑ Annexation and Zoning ❑ Comprehensive Plan Map Amendment ❑ Comprehensive Plan Text Amendment ❑ Conditional Use Permit ❑ Conditional Use Permit Modification ❑ Design Review ❑ Final Plat ❑ Final Plat Modification ❑panned Unit Development reliminary Plat ❑ Private Street ❑ Rezone ❑ Short plat ❑ Time Extension (Commission or Council) ❑ UDC Text Amendment ❑ Vacation (Council) 'FLkVariance Other Applicant Information Planning Department COMMISSION & COUNCIL REVIEW APPLICATION 4Qr STAFF USE ONLY: File number(s): PP. -1 o -00 1 ; U 14 •!0 - O vl Project name: Date filed: �..13" 10 Date co Tete: Assigned Planner: a ; U.S Related files: 49 *aW . 42-,9-9b; &Aua Ff -07-o . SQA - /o -ooh Hearing datel • i4- t D 16 Commission 11 Council Applicant name: 1/lJI/J(-T, C_!!Td&EV TrJ I- L -L- Applicant address: G. OVCW,10 U 17 ED I G9 - Applicant's interest in property: AOwn ❑ Rent ❑ Optioned ❑ Other Owner name: :,-'zb1 r;21 JJ Aff-,— 6 1•S L1L' Phone: 3Z Z'7:yd Owner address: 15!:K5* 0 [ LG,�UIib �D 150 �2(D N� Zip: `e! 3 15!:K5*(04-7-- Agent name (e.g., architect, engineer, developer, representative): ROD4CI�SiE� Firm name: Phone: 37/y ' Zjj Z Address: 1I X1&0 W - EXEC'° Ut OF A'Z . I ZO F56t1 = Zip: A!!&12> Primary contact is: ❑ Applicant ❑ OwnerWAgent ❑ Other p Contact name: R&V L n�` � n Phone: E-mail: YVJMaC:k_�Egt1 (D Fax: V** M Ve►r&IeC, �,IjWe*_o+I-P•C,40. Subiect Property Information 3?$- Y06o Township, range, section: Total acreage: • }7% • �7� * , / Current land use: A(�, TPE:E7 fWUJ Res . Current zoning district: 7 F V 4-YA J- 4'L jOCA 33 E. Broadway Avenue, Suite 210 a Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 1 Description Project/subdivision name: General description of proposed project/request: 1YiQV1RGC1+if&1Q Proposed zoning district(s): � 4-F Acres of each zone proposed: Type of use proposed (check all that apply): Residential ❑ Commercial ❑ Office ❑ Industrial ❑ Other Amenities provided with this development (if applicable): ,t�1 L� r?x7p5 , , LA,A GC'At+PED cx 7t k.6 Who will own & maintain the pressurized irrigation system tot is development? S Which irrigation district does this property lie within? D� Primary irrigation source: N&2tg StbU 4 (At—WMAt-Secondary: UMIEZ Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): Residential Project Summary (if applicable) _/. Number of residential units: 2� Number of building lots: 3G.& awr,. P'i't`'etwm to Number of common and/or other lots: /LtDbt- V . - L49tr=- PLUS JA4K,2. scams F, � Proposed number of dwelling units (for multi -family developments only): p 1 Bedroom: W/4 2 or more Bedrooms: rte/ Minimum square footage of structure(s) (excl. garage): 1L4150 0-1, Z Proposed building height: Minimum property size (s.f): Average property size (s.f.): Gross density (DU/acre-total land): 2 • Net density (DU/acre-excluding roads & alleys): Percentage of open space provided: 2 • J7(0 010 Acreage of open space: '-3 10. 07 Percentage of useable open space: 100 2/D (See Chapter 3, Article G, for qualified open space) Type of open space provided in acres (i.e., landscaping, c, common, etc): 3 R. &,I Type of dwelling(s) proposed: Single-family ❑ Townhomes []Duplexes ❑ Multi -family Non-residential Project Summary (if applicable) /Um Number of building lots: Other lots: Gross floor area proposed: Hours of operation (days and hours): Percentage of site/project devoted to the following: Landscaping: Total number of employees: Building: Existing (if applicable): Building height: Paving: Maximum number of employees at any one time: Number and ages of students/children (if applicable): Seating capacity: Total number of parking spaces provided: Number of compact spaces provided: Authorization Print applicant name; Applicant signature: 33 E. Broadway Avenue, Suite 210 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 2 • July 13, 2010 SPURWING G R E E N S Anna Canning, Director City of Meridian Planning Department City Hall Meridian, ID 83642 Re: SpurWing Greens Subdivision Dear Anna, • Over the past few months we have had many discussions with your staff concerning "SpurWing Greens", the development annexed and zoned as "Tree Farm" (AZ -06-004), and preliminary platted as "Jayker Subdivision" (PP -06-058) with 277 building lots. The first development phase, recorded as Jayker Subdivision No. 1 (FP -07-026), contained 140 building lots. SpurWing Greens LLC and Brighton Investments are submitting a new, overall preliminary plat for all of the property in our ownership or control as detailed in the enclosed application. The area is generally described as beginning one-quarter mile east of Black Cat Road and extending easterly to Spurwing Golf Course, between Chinden Blvd. and the Phyllis Canal. The area depicted in the attached "SpurWing Greens Concept Plan " modification, and other reference exhibits, encompasses just over 176 acres and, with an additional 35+/- acres of higher -density and commercial property still to be platted in the future, comprises approximately 58.5% of the area originally annexed. This preliminary plat submittal modifies and expands the previous pre -plat approval in the following ways: Description Original Pre -Plat (PP -06-058) Modified/ Expanded Pre -plat Area 142.97 acres 176.58 acres Building Lots 277 354 Common Lots 27 38 Gross Density 1.94 d.u./ac. 2.00 d.u./ac. Common Area / Percentage 39.1 ac. / 27.3% 38.07 ac. / 21.6% Platted Lots (Jayker Sub No. 1) 140 of 277 140 of 354 Modified Pre -plat Area ---- 287 "New" lots (expanded area) ---- 67 Total Modified / "New" Preliminary plat Lots ---- 214 Total Modified / "New" Common Lots 16 The Proposal • The overall project area for the SpurWing Greens preliminary plat and future development is approximately 210 acres, just less than 60% of the 358 acres originally annexed to the City of Meridian. • The number of lots proposed in the modified / expanded project, at 354 is 77 more than approved in the original Jayker Subdivision Phase 1 preliminary plat; primarily the result of the addition of two new estate areas (29 lots) and a 38 -lot single-family area to the west. • There is a net gain of 10 lots within the previously -approved preliminary plat area, including the deletion of two lots for the tennis court complex on the easterly boundary common to Spurwing Country Club—a facility to be accessible to both developments. • There are 214 building lots and 16 common lots in the modified / expanded preliminary plat area of the project which, when combined with the 140 previously final -platted lots brings the project total to 354, as noted above. • Common area proposed for the expanded plat area -38.07 acres—is one acre less than the original pre -plat, primarily the result of modifications to platted open space abutting Chinden Blvd. • At 21.6%, the amount of open space exceeds the City's requirements, particularly when the amenities of a future community center and pool, tennis courts, ponds, pathways and "greens" are considered. "Amenities" will be enhanced by the social membership to the Spurwing Country Club that each SpurWing Greens homeowner will receive. While there have been area reductions in un -platted open space corridors, connectivity has been maintained in general conformance with the original concept plan and preliminary plat. • Roadway stubs are proposed to all adjacent properties in compliance with the previous conditions of approval. • The prior commitment / requirement for the extension of a north / south residential collector street (Jayker Way) to serve Teco One, Aldape, and other properties to the north has been maintained. Jayker Way is stubbed to the alignment of Basco Lane between the two Teco One parcels. • The easterly Teco One parcel will be able to access that residential collector. A stub street is proposed to the westerly Teco One parcel from "Whistling Straits" a local residential street, formerly a residential collector extension of Jayker Way. 9 Requested Variance 11 A variance is requested for one local residential street—"Pinseeker Place"—which, at approximately 650 feet in length, exceeds the City's 450 -foot cul-de-sac length requirement. That street serves twelve (12) estate lots, all of which exceed 20,000 square feet in area. There is insufficient room to loop the street or to connect to the west due to an already developed estate home site. The property to the east is under separate ownership. There is no current plan for that parcel, thus, no assurance that its density and character would be compatible with the Pinseeker Place estate homes. Conformance The SpurWing Greens preliminary plat application is in full compliance with the previous Tree Farm / Jayker Subdivision approvals: ■ The land uses proposed in the concept plan remain the same; ■ the density has increased slightly to two units per acre (from 1.94); ■ open space, plus amenities, exceed City requirements; ■ the landscaped common areas will be, with one minor exception, maintained in their already fully -developed condition—but with several significant enhancements, including the project entrance at Chinden, the "Old Gold Drive" entrance to the estate area, and the tennis court addition. If you, or your staff, have questions, please let me know so that I can expedite a response to assure that we are able to be heard by the Planning & Zoning Commission on August 5, 2010. For SpurWing Greens LLC gac)5�ee Rod Blackstead For Brighton Investments /,U� David Turnbull iF J ADA COUNTY RECORDF" DAVID NAVARRO AMOUNT 33.00 11 IDAHOBONE DEPITTYVICW IA S ,,..,8 PM RECORDED -REQUEST OF 109101979 Title One a0'rj7C,4T? SGJL_S0 SPECIAL WARRANTY DEED FOR VALUE RECEIVED, the receipt and sufficiency of which is hereby acknowledged, TREEHAVEN, LLC, an Idaho limited liability company (the "Grantor") does hereby grant, bargain, sell, and convey unto SPURWING GREENS, LLC, an Idaho limited liability company, whose address is'trtc 61",r?":5L, W 10'�15-�,113 Y37e,11 ("Grantee"), all of Grantor's right, title and interest in and to that certain real propertylocated in Ada County, Idaho, legally described on Exhibit A, attached hereto and incorporated herein (the "Premises"). TO HAVE AND TO HOLD the Premises, with its appurtenances unto Grantee, and Grantee's successors and assigns forever. Grantor does hereby covenant to and with Grantee, that Grantor is the owner in fee simple of the Premises; that the Premises are free from all encumbrances created or suffered by Grantor, except those made, suffered or done by Grantee, and except (a) general taxes and assessments, including utility assessments for the current year, which are not yet due and payable, and will be prorated between Grantor and Grantee as of the date of execution of this deed; (b) any easements, restrictions and conditions of record or shown on the recorded plat, if any, for the Premises; (c) building, zoning and other applicable ordinances and regulations of the County of Ada, State of Idaho; and (d) the easements, rights of way and other matters listed on Exhibit B attached hereto and incorporated herein, and that Grantor will warrant and defend the same forever from all other lawful claims. [End of Text] SPECIAL WARRANTY DEED -1 GP 7690.18 647263.1 IN WITNESS WHEREOF, Grantor has caused its name to be hereunto subscribed this day of August, 2009. GRANTOR: TREEHAVEN,LLC, an Idaho limited liability company RV: Peter S. O'Neill, Manager By: Douglas K. Camahan, Manager SPECIAL WARRANTY GEED - 2 GP 7M-18 609165-1 :N WITNESS WHEREOF, Grantor has caused its name to be hereunto subscribed this r? day of August, 2009. GRANTOR: TREEHAVEN, LLC, an Idaho limited liability company By: Peter S. O'Neill, Manager By: Douglas K. Carnahan, Manager SPEclAL WARRANTY DEEo State of Idaho ) ss. County of Ada ) On this day of August, in the year of 2009, before me, a Notary Public in and for said State, personally appeared Peter S. O'Neill, known or identified to me to be a manager of Treehaven LLC, a limited liability company, the manager or one of the managers who subscribed said limited liability company name to the f regoing instrument, and acknowledged to me that he executed the same in said limited liabili ompany name. Notary Public for Idaho Residing at My Commission expires 4 State of Pdvhtr- ) ss. County of Ada ) On this day of August, in the year of 2009, before me, a Notary Public in and for said State, personally appeared Douglas K. Carnahan, known or identified to me to be a manager of Treehaven LLC, a limited liability company, the manager or one of the managers who subscribed said limited liability company name to the foregoing instrument, and acknowledged to me that he executed the same in said limited liability com ny name. zlz ' NotaryPublic for WabQ,. 4L f...«..« ......................................: Residing at 2v DONALD PAULI Z My Commission expires 7 Z3 t I S COMM. #1755390 g P r 5 NOTARY PUBLIC --CALIFORNIA P -«, NEVADA COUNTY 1 M Comm Fixp,July 3, 2011 SPECIAL WARRANTY DEED - 3 GP 7NO-18 647265.1 State of Idaho ss. County of Ada l } On this day of August, in the year of 2009, before me, a Notary Public in and for said State, per onally appeared Peter S. O'Neill, known or identified to me to be a manager of Treehaven LLC, a limited liability company, the manager or one of the managers who subscribed said limited liability company name to th forego) ig4nsument, and acknowledged to me that ,��e7�'same in said limited liab co any y�arjie.; SW.JKr�Rt 0% Notary Public for I Residing at , My Commission expires._ State of Idaho } ss. County of Ada ) On this day of August, in the year of 2009. before me, a Notary Public in and for said State, personally appeared Douglas K. Carnahan, known or identified to me to be a manager of Treehaven LLC, a limited liability company, the manager or one of the managers who subscribed said limited liability company name to the foregoing instrument, and acknowledged to me that he executed the same in said limited liability company name. Notary Public for Idaho Residing at My Commission expires SPECIAL WARRANTY DEED - 3 GP 7690-16 • Parcel is Exhibit A Legal Description 0 All of Jayker Subdivision - Phase 1, according to the official plat thereof, filed in Book 101 of Plats at Pages 13341 through 13352, and amended by Affidavit recorded January 12, 2009 as Instrument No. 109003074, official records of Ada County, Idaho, EXCEPT: Lot 2 in Block 15; Lots 7 and 8 in Block 8; Lot 1 in Block 1, 2, 3, 4, 8, 9, 10, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23; Lots 1A, 1B and 1C in Block 11; Lot 2 in Block 23; Lot 18 in Block 11; Lots 5,12A, and 12B in Block 12; and Lot 33 in Block 16 of Jayker Subdivision - Phase 1, according to the official plat thereof, filed in Book 101 of Plats at Pages 13341 through 13352, official records of Ada County, Idaho. SPECIAL WARRANTY DEED — EXHIBIT A cN �hsx�i s 0 0 Permitted Exceptions Exhibit -B- I. Taxes, including any assessments collected therewith, for the year 2009 which are a lien not yet due and payable. 2. Real property taxes which may be assessed, levied and extended on any "subsequent and/or occupancy roll" with respect to improvements completed during the current tax year and previous tax years, which escaped assessment on the regular assessment roll, which are not yet due and payable. 3. Special assessments, if any, for the City of Meridian. 4. Liens, Levies and Assessment of any and all irrigation districts, including but not limited to the Settlers Irrigation District. 5. Liens, Levies, and Assessments of the Tree farm Community Association, Neighborhood Association and/or Recreation Facility Association. b. Easements. reservations, restrictions, and dedications as shown on the official plat of said subdivision. 7. Right-of-way for Phyllis Canal and the rights of access thereto for maintenance of said canal. 8. An easement for the purpose shown below and rights incidental thereto as set forth in a document. Granted to: Idaho Power Company Purpose: Public Utilities Recorded: March 28, 1938 Instrument No.: 185142 The exact location and extent of said easement is not disclosed of record. 9. Terms, provisions, covenants, conditions, and, restrictions, contained in a Right -of -Way Deed. Recorded: September 11. 1939 Instrument No.: 192137 Book 238 of Deeds, at Page(s) 41 10. An easement for the purpose shown below and rights incidental thereto as set forth in a document. Granted to: Idaho Power Company Purpose: Public Utilities Recorded: October 13, 1948 Instrument No.: 280515 SPECIAL WARRANTY DEED - EXHIBIT B OP 7690-1 % Book 21 at Page(s) 187 The exact location and extent of said easement is not disclosed of record. 11. An easement for the purpose shown below and rights incidental thereto as set forth in a document. Granted to: Idaho Power Company Purpose: Public Utilities Recorded: May 1, 1991 Instrument No.: 9122464 12. An easement for the purpose shown below and rights incidental thereto as set forth in a document. Granted to: Idaho Power Company Purpose: Public Utilities Recorded: August 15, 1994 Instrument No.: 94075155 13. An easement for the purpose shown below and rights incidental thereto as set forth in an Easement. Granted to: Douglas K. Carnahan and Meredith A. Carnahan, husband and wife Purpose: Driveway Recorded: September 30, 1994 Instrument No.: 94088252 14. Terms, provisions, conditions, and, restrictions contained in Development Agreement by and between City of Meridian, Treehaven West LLC, and Treehaven LLC. Recorded: September 21. 2006 Instrument No: 106151218 Addendum to Development Agreement Recorded: February 22, 2007 Instrument No.: 107025555 Second Addendum to Development Agreement Recorded: October 16, 2007 Instrument No.: 107141993 15. An easement for the purpose shown below and rights incidental thereto as set forth in a document. Granted to: Idaho Power Company, a corporation Purpose: Public Utilities Recorded: August 6, 2007 Instrument No.: 107111404 SPECIAL WARRANTY DEED - EXHIBIT B GP 7(,'40, i 3 Gd??hi-t 16. Terms, provisions, conditions, and, restrictions contained in Easement Agreement for N. Jayker Way by and between Aldape Properties, LP, an Idaho limited partnership, Teco, One, LLC, an Idaho limited liability company and Rex Earl Everist and Peggy L. Everist, husband and wife, and Treehaven, LLC, an Idaho limited liability company. Recorded: September 21, 2007 Instrument No: 107132 383 17. An easement for the purpose shown below and rights incidental thereto as set forth in a Sanitary Sewer Easement. Granted to: City of Meridian Purpose: Sanitary sewer easement Recorded: December 6, 2007 Instrument No.: 107161978 18. Terms, provisions, conditions, and, restrictions contained in License Agreement for Jayker Subdivision by and between North Slough Lateral Users Association, Harrell Lateral Water Users Association, Treehaven, LLC, an Idaho limited liability company, and Chester Properties, LLC, an Idaho limited liability company. Recorded: March 18, 2008 Instrument No: 108031 180 19. An easement for the purpose shown below and rights incidental thereto as set forth in a Public Right -of -Way Easement. Granted to: Ada County Highway District Purpose: Sidewalk Recorded: March 20, 2008 Instrument No.: 108031936 20. An easement for the purpose shown below and rights incidental thereto as set forth in a Right -of -Way Easement. Granted to: Ada County Highway District Purpose: Temporary turnaround Recorded: March 20, 2008 Instrument No.: 108031937 21. An easement for the purpose shown below and rights incidental thereto as set forth in a Temporary Storm Water Drainage Easement. Granted to: Ada County Highway District Purpose: Storm water drainage easement Recorded: March 20, 2008 Instrument No.: 108031938 22. Terms, provisions, conditions, and, restrictions contained in Traffic Signal Agreement by and between Treehaven, LLC, Ada County Highway District and Idaho Transportation Department. Recorded: May 1. 2008 SPECIAL WARRANTY DEED - EXHIBIT B GP ?6wi.18 c>a�265-2 0 • Instrument No: 10805 1629 23. Covenants, Conditions, and Restrictions, and, Easements but omitting any covenant or restriction based on race, color, religion, sex. handicap, familial status, or national origin, unless and only to the extent that said covenant (a) is exempt under Chapter 42, Section 3607 of the United States Code or (b) relates to handicap but does not discriminate against handicapped persons as set forth in the document. Recorded: August 29, 2008 Instrument No: 108098132 (Affects Entire Project - Parcels I and II) Amendments. Supplements, or Modifications of said Covenants, Conditions, and Restrictions: Recorded: August 29, 2008 Instrument No: 108098134 (Affects Lots 2 - 15 / Block 15, Lots 2 - 33 / Block 16: and Lot 2 / Block 23) Amendments, Supplements, or Modifications of said Covenants, Conditions, and Restrictions: Recorded: August 29, 2008 Instrument No.: 108098135 (Affects Lots 2 - 17, 19 - 251 Block I I ; Lots i - 4, 6 - IL 13 - 16 / Block 12: and Lots I - 4 / Block 13) Amendments, Supplements, or Modifications of said Covenants, Conditions. and Restrictions: Recorded: August 29, 2008 Instrument No.: 108098136 (Affects Lots 2 - 22 / Block 2; Lots 2 - 4 / Block 4; Lots 1 - 3 / Block 5; Lots 1 - 3 / Block 6; Lots 2 - 24 /Block 8 and Lot 1 / Block 7) Amendments. Supplements, or Modifications of said Covenants, Conditions, and Restrictions: Recorded: August 29, 2008 Instrument No.: 108098137 (Affects Common Area) 24. Terms, provisions, covenants, conditions, and, restrictions contained in a Central District Health Letter. Recorded: August 29, 2008 Instrument No.: 108098138 25. An easement for the purpose shown below and rights incidental thereto as set forth in a Sanitary Sewer Easement. Granted to: The City of Meridian Purpose: Construction, operation and maintenance of a sanitary sewer line SPECIAL WARRANTY DEED - EXHIBIT B C?P 7690-! 8 b -0726$-C • ADA COUNTY RECORDP DAVID NAVARRO AMOUNT 39,00 13 BOISE IDAHO - " ! DEPUTY YI W Allen ..,BPM RECORDED -REQUEST OF III IIIIIIIIIIIIIIIIIIIIIIIIIIII III III Title One 109101980 SPECIAL WARRANTY DEED FOR VALUE RECEIVED, the receipt and sufficiency of which is hereby acknowledged, TREEHAVEN, LLC, an Idaho limited liability company (the "Grantor") does hereby grant, bargain, sell, and convey unto LION LAND, LLC, an Idaho limited liability company, whose address is "tr 61e f~ 0 C. D � i7 ('� ("Grantee"), all of Grantor's right, title and interest in and to that o6rtain real property located in Ada County, Idaho, legally described on Exhibit A, attached hereto and incorporated herein (the "Premises"). TO HAVE AND TO HOLD the Premises, with its appurtenances unto Grantee, and Grantee's successors and assigns forever. Grantor does hereby covenant to and with Grantee, that Grantor is the owner in fee simple of the Premises; that the Premises are free from all encumbrances created or suffered by Grantor, except those made, suffered or done by Grantee, and except (a) general taxes and assessments, including utility assessments for the current year, which are not yet due and payable, and will be prorated between Grantor and Grantee as of the date of execution of this deed; (b) any easements, restrictions and conditions of record or shown on the recorded plat, if any, for the Premises; (c) building, zoning and other applicable ordinances and regulations of the County of Ada, State of Idaho; and (d) the easements, rights of way and other matters listed on Exhibit B attached hereto and incorporated herein, and that Grantor will warrant and defend the same forever from all other lawful claims. [End of Text] SPECIAL WARRANTY DEED -1 847283.1 IN WITNESS WHEREOF, Grantor has caused its name to be hereunto subscribed this 94 day of August, 2009. GRANTOR: TREEHAVEN, LLC, an Idaho limited liability company By: Peter S. O'Neill, Manager Douglas K: Carnahan, Manager SPECIAL WARRANTY DEED - 2 647289.1 0 0 ✓j IN WITNESS WHEREOF, Grantor has caused its name to be hereunto subscribed this day of August, 2009. GRANTOR: TREEHAVEN, LLC, an Idaho limited liability company By: 1 Peter S. O'Neill, Manager Bv: Douglas K. Carnahan, Manager SPECIAL WARRANTY DEED 0 0 State of Idaho } } ss. County of Ada ) On this day of August, in the year of 2009, before me, a Notary Public in and for said State, personally appeared Peter S. O'Neill, known or identified to me to be a manager of Treehaven LLC, an Idaho limited liability company, the manager or one of the managers who subscribed said limited liability company name to the foregoing instrument, and acknowledged to me that he executed the same in said limited liability company name. Notary Public for Idaho Residing at My Commission expires O,A- State ofd ) ss. County of -Ada 0 s f� ) On this 0.-4 day of August, in the year of 2009, before me, a Notary Public in and for said State, personally appeared Douglas K. Carnahan, known or identified to me to be a manager of Treehaven LLC, an Idaho limited liability company, the manager or one of the managers who subscribed said limited liability company name to the foregoing instrument, and acknowledged to me that he executed the same in said limited liability compan ame. DONALD ON `1waYeWMererws.rawa �+cra� DONALDRPAULI Z S COMM. #1755390 g NOTARY PUBLIC - CAUFORMIA P Notary Public for4dehe 1 , , NEVADA COUNTY Residing at vC. aq my t;osnni Expo. July 3, 2011 .•,«°••�••� *•..,.«�»'«» My Commission expires SPECIAL WARRANTY DEED - 3 647269-t State of Idaho ss. County of Ada ) Onthi day of August, in the year of 2009, before me, a Notary Public in and for said State, p rr�sonally appeared Peter S. O'Neill, known or identified to me to be a manager of Treehaven LLC, an Idaho limited liability company, the anager of,pne of the managers who subscribed said limited liability company name to the fbr g rfg trLIment, and acknowledged to me that he executed the same in said limited liabiljtji c¢mir) ny,rfarfie.,,f State of Idaho ) ss. County of Ada ) Notary Public for IdTi Residing at �,tiVe My Commission expires- '1! On this day of August, in the year of 2009, before me, a Notary Public in and for said State, personally appeared Douglas K. Carnahan, known or identified to me to be a manager of Treehaven LLC, an Idaho limited liability company, the manager or one of the managers who subscribed said limited liability company name to the foregoing instrument, and acknowledged to me that he executed the same in said limited liability company name. Notary Public for Idaho Residing at My Commission expires SPECIAL WARRANTY DEED - 3 647263-t C� Parcel If: Exhibit A Legal Description • A parcel of land situated In the South half and in the South half of the South half of the North half of Section 22, Township 4 North, Range 1 West, Boise Meridian, City of Meridian, Ada County, Idaho, more particularly described as follows: Commencing at the Southeast corner of said Section 22, from which point the South quarter corner of said Section bears North 89°17'35" West 2647.29 feet; thence along the South tine of said Section North 89°17'35' West 1293.74 feet to the Southerly prolongation of the Westerly line of Westwing Estates Subdivision recorded In Book 70 of Plats at Pages 7200-7201, Ada County records; thence along said prolongation North 00°2545" East 40.00 feet to a point on the Northerly right-of-way line to Highway 20/26 and the Point of Beginning; thence along said Northerly line through the following courses: North 89°17'35" West 1353.45 feet; thence North 89017'17' West 1323.72 feet to a point on the Westerly line of the East half of the West half of said Section 22; thence along said Westerly line North 00°30'43' East 1939.85 feet; thence South 89°28'42" East 437,50 feet; thence North 00°30'43' East 1030.35 feet to a line parallel with and 25.00 feet Southerly of the centerline of Phyllis Canal; thence along said parallel line South 81 °24'58" East 441.72 feet to the Northerly prolongation of the Westerly line of that certain 6.00 acre parcel of land as shown on Record of Survey No, 2006, Ada County records; thence along said prolongation and Westerly line South 00°27'37" West 536.62 feet to the Southwesterly corner of said parcel; thence along the Southerly line and the Easterly prolongation of said Southerly line thereof South 89°30'12' East 778.15 feet; thence North 00630'35" East 85.11 feet to a point on the Southwesterly line of Record of Survey Instrument No. (continued on next page) SPECIAL WARRANTY DEED -- EXHIBIT A 647263-1 0 E 7908890, Ada County records, said point also shown on Record of Survey No. 5232, Ada County records; thence along the exterior boundary of said survey through the following courses: South 42°17'23" East 18.11 feet; thence South 00013'10' West 80.96 feet; thence South 86930'59" East 189.75 feet; thence South 47°25'06" East 249.20 feet; thence North 00928'32" East 607.88 feet to a non tangent point on a curve on a line parallel with and 25.00 feet Southerly of the centerline of said Phyllis Canal; thence along said parallel line through the following courses: Southeasterly along said curve to the left having a radius of 1525.00 feet, an arc length of 145.71 feet, through a central angle of 06°28'28", and a chord bearing and distance of South 89°45'28' East 145.65 feet; thence tangent from said curve North 87°30'18" East 331.42 feet to the beginning of a tangent curve; thence Northeasterly along said curve to the left having a radius of 1025.00 feet, an arc length of 310.83 feet, through a central angle of 17°22'290, and a chord bearing and distance of North 78°49'03" East 309.64 feet; thence tangent from said curve North 70007'49' East 209.16 feet to the beginning of a tangent curve; thence Northeasterly along said curve to the right having a radius of 975.00 feet, an aro length of 197.27 feet, through a central angle of 11 °35'33", and a chord bearing and distance of North 75055'35" East 196.94 feet; thence tangent from said curve North 81 °4322" East 409.49 feet to the beginning of a tangent curve; thence Northeasterly along said curve to the left having a radius of 775.00 feet, an arc length of 85.13 feet, through a central angle of 06017'36', and a chord bearing and distance of North 78°34'34' East 85,08 feet; thence tangent from said curve North 75°25'46" East 277.73 feet to a point on the Easterly line of said Section 22, said point being on the Westerly line of Spurwing Subdivision recorded in Book 69 of Plats at Pages 7104 through 7108, Ada County records; thence along said Easterly line through the following courses: South 00°29'19" West 468.19 feet to the East quarter comer of said Section; thence South 00°20'38" West 1317.45 feet to the Northeasterly corner of the above described Westwing Estates Subdivision; thence along the Northerly and Westerly lines of said subdivision through the following courses: North 89018'37" West 1291,68 feet; thence South 00025'45" West 1276.93 feet to the Point of Beginning. EXCEPT: All of Jayker Subdivision - Phase 1, according to the official plat thereof, filed in Book 101 of Plats at Pages 13341 through 13352, and amended by Affidavit recorded January 12, 2009 as Instrument No. 109003074, official records of Ada County, Idaho, SPECIAL WARRANTY DEED - EXHIBIT A 647x67 -i • ADA COUNTY RECO f DAVID NAVARRO AMOUNT 15.00 5 BOISE IDAHO 04/15/10 4:26PM DEPUTYNikola RECORDED -REQUEST IIIIIIIIVIIIIII@IIIIINIIIIII��III�InIIIIIIIIIBINIIIII OF TITLEONE BOISE 110034594 When recorded, please return to: Brighton Investments, LLC Attention: Amanda K. Schaus 12601 W. Explorer Drive, Suite 200 Boise, ID 83713 A 1D90GT7/LSQ SPECIAL WARRANTY DEED (Jayker Subdivision) FOR VALUE RECEIVED, the receipt and sufficiency of which is hereby acknowledged, SPURWING GREENS, LLC, an Idaho limited liability company (the "Grantor"), whose address is 3405 E. Overland Road, Suite 150, Meridian, Idaho 83642, does hereby grant, bargain, sell, and convey unto BRIGHTON INVESTMENTS, LLC, an Idaho limited liability company whose address is 12601 W. Explorer Drive, Suite 200, Boise, Idaho 83713 ("Grantee"), all of Grantor's right, title and interest in and to that certain real property located in Ada County, Idaho, legally described on Exhibit A, attached hereto and incorporated herein (the "Premises"). TO HAVE AND TO HOLD the Premises, with its appurtenances unto Grantee, and Grantee's successors and assigns forever. Grantor does hereby covenant to and with Grantee, that Grantor is the owner In fee simple of the Premises; that the Premises are free from all encumbrances created or suffered by Grantor, except those made, suffered or done by Grantee, and except (a) general taxes and assessments, including utility assessments for the current year, which are not yet due and payable, and will be prorated between Grantor and Grantee as of the date of execution of this deed; and (b) the easements, rights of way and other matters listed on Exhibit B attached hereto and incorporated herein, and that Grantor will warrant and defend the same forever from all other lawful claims. [End of Text] SPECIAL WARRANTY DEED -1 OF 5 (Recorded Electronic 11 County When recorded, please return to: Date �Tme Brighton Investments, LLC Simpli le.com 800.460.5657 Attention: Amanda K. Schaus 12601 W. Explorer Drive, Suite 200 Boise, ID 83713 R locogi- -rGILSO SPECIAL WARRANTY DEED (Jayker Subdivision) FOR VALUE RECEIVED, the receipt and sufficiency of which is hereby acknowledged, SPURWING GREENS, LLC, an Idaho limited liability company (the "Grantors), whose address is 3405 E. Overland Road, Suite 150, Meridian, Idaho 83642, does hereby grant, bargain, sell, and convey unto BRIGHTON INVESTMENTS, LLC, an Idaho limited liability company whose address is 12601 W. Explorer Drive, Suite 200, Boise, Idaho 83713 ("Grantee"), all of Grantor's right, title and interest in and to that certain real property located in Ada County, Idaho, legally described on Exhibit A, attached hereto and incorporated herein (the "Premises"). TO HAVE AND TO HOLD the Premises, with its appurtenances unto Grantee, and Grantee's successors and assigns forever. Grantor does hereby covenant to and with Grantee, that Grantor is the owner in fee simple of the Premises; that the Premises are free from all encumbrances created or suffered by Grantor, except those made, suffered or done by Grantee, and except (a) general taxes and assessments, including utility assessments for the current year, which are not yet due and payable, and will be prorated between Grantor and Grantee as of the date of execution of this deed; and (b) the easements, rights of way and other matters listed on Exhibit B attached hereto and incorporated herein, and that Grantor will warrant and defend the same forever from all other lawful claims. [End of Text] SPECIAL WARRANTY DEED -1 OF 5 T' • IN FITNESS WHEREOF, Grantor has caused its name to be hereunto subscribed this day of April, 2010. GRANTOR: SPURWING GREENS, LLC an Idaho limited liability company By: G0 Name:,7M EL t4 - h/ Title: MEMMP- M /k -i• &6EE- s-- State of Idaho ss. County of Ada ) On this day f April, in the yee�q of 2010, before me the undersigned notary public, personally ape ed RI PH known or identified to me to be the rt fiftas:0 ?n'1RnJf1l5F2 of Spu ng Greens LLC, the limited liability company that executed the instrument or the person who executed the instrument on behalf of said limited liability company, and acknowledged to me that such limited liabilityexe— Ae he same. ® TA :'r Notaty Public for r ILIC of R "lith! SPECIAL WARRANTY DEED - 2 OF 5 • EXHIBIT A "Premises" • Lots 9,10,11,12,13,14,15,16,17,18,19, 20, 21 and 22 in Block 2; Lots 2, 3, 4, 5, 6, 9,10,11,12,13,14,15, 16,17,18,19, 20, 21, 22, 23 and 24 in Block 8; Lots 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 and 15 in Block 15; and Lots 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 and 32 in Block 16 of Jayker Subdivision - Phase 1, according to the official plat thereof, filed In Book 101 of Plats at Pages 13341 through 13352, and as amended by Affidavit recorded January 12, 2009, as Instrument No. 109003074, official records of Ada County, Idaho. SPECIAL WARRANTY DEED - 3 OF 5 EXHIBIT B "Permitted Exceptions" Taxes, including any assessments collected therewith, for the year 2010 which are a lien not yet due and payable. Easements, reservations, restrictions, and dedications as shown on the official plat of said subdivision. Right-of-way for Phyllis Canal and the rights of access thereto for maintenance of said canal. An easement for the purpose shown below and rights incidental thereto as set forth in an Easement. Granted to: Douglas K. Carnahan and Meredith A. Carnahan, husband and wife Purpose: Driveway Recorded: September 30, 11994 Instrument No.: 94088252 Terms, provisions, conditions, and, restrictions contained in Development Agreement by and between City of Meridian, Treehaven West LLC, and Treehaven LLC. Recorded: September 21, 2006 Instrument No: 108151218 Addendum to Development Agreement Recorded: February 22, 2007 Instrument No.: 107025555 Second Addendum to Development Agreement Recorded: October 16, 2007 Instrument No.: 107141993 Terms, provisions, conditions, and, restrictions contained In Easement Agreement for N. Jayker Way by and between Aldape Properties, LP, an Idaho limited partnership, Teco, One, LLC, an Idaho limited liability company and Rex Earl Everist and Peggy L. Everist, husband and wife, and Treehaven, LLC, an Idaho limited liability company. Recorded: September 21, 2007 Instrument No: 107132383 Terms, provisions, conditions, and, restrictions contained In License Agreement for Jayker Subdivision by and between North Slough Lateral Users Association; Harrell Lateral Water Users Association; Treehaven, LLC, an Idaho limited liability company, and Chester Properties, LLC, an Idaho limited liability company. Recorded: March 18, 2008 Instrument No: 108031180 An easement for the purpose shown below and rights incidental thereto as set forth in a Public Right -of -Way Easement. Granted to: Ada County Highway District Purpose: Sidewalk Recorded: March 20, 2008 Instrument No.: 108031936 SPECIAL WARRANTY DEED - 4 OF 5 An easement for the purpose shown below and rights incidental thereto as set forth In a Right -of -Way Easement. Granted to: Ada County Highway District Purpose: Temporary turnaround Recorded: March 20, 2008 Instrument No.: 108031937 Terms, provisions, conditions, and, restrictions contained in Traffic Signal Agreement by and between Treehaven, LLC, Ada County Highway District and Idaho Transportation Department. Recorded: May 1, 2008 Instrument No: 108051629 Covenants, Conditions, and Restrictions, and, Easements but omitting covenants or restrictions, if any, based upon race, color, religion, sex, sexual orientation, familial status, marital status, disability, handicap, national origin, ancestry, or source of income, as set forth in applicable state or federal laws, except to the extent that said covenant or restriction is permitted by applicable law. Recorded: August 29, 2008 Instrument No: 108098132 (Affects Entire Project) Amendments, Supplements, or Modifications of said Covenants, Conditions, and Restrictions: Recorded: August 29, 2008 Instrument No,: 108098134 Amendments, Supplements, or Modifications of said Covenants, Conditions, and Restrictions: Recorded: August 29, 2008 Instrument No.: 108098135 (Affects Lots 2 -17 and Lots 19 - 25 in Block 11; Lots 1- 4, 6 -11, and 13 -16 In Block 12; and Lots 1- 4 in Block 13) Amendments, Supplements, or Modifications of said Covenants, Conditions, and Restrictions: Recorded: August 29, 2008 Instrument No.: 108098136 (Affects Lots 2 - 22 in Block 2; Lots 2 - 4 in Block 4; Lots 1- 3 in Block 5; Lots 1- 3 in Block 6; Lots 2 - 24 In Block 8; and Lot 1 In Block 7) Terms, provisions, covenants, conditions, and, restrictions contained In a Central District Health Letter. Recorded: August 29, 2008 Instrument No.: 108098138 Terms, conditions, easements and, obligations, if any, contained in License Agreement by and between The Tree Farm Community Association, Inc., and the Ada County Highway District. Recorded: May 17, 2009 Instrument No: 109052776 SPECIAL WARRANTY DEED - 5 OF 5 0 0 AFFIDAVIT OF LEGAL INTEREST STATE OF IDAHO COUNTY OF ADA I, 5191,5T6PHEk L AAJbEPS6AJ) 017� 6P(-)kt01A16 C-9E-E-1JS1 a- C� n6 Duct��lo b (5 D , = (city) (state) being first duly sworn upon, oath, depose and say: I That I am the record owner of the property described on the attached, and I grant my permission to: 1,02 6LqLV--,5TQ ��D (name) (address) to submit the accompanying application(s) pertaining to that property. 2. 1 agree to indemnify, defend and hold the City of Meridian and its employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property which is the subject of the application. 3. 1 hereby grant permission to City of Meridian staff to enter the subject property for the purpose of site inspections related to processing said application(s). Dated this day of 20 6J, � � � � (Signature) SUBSCRIBED AND SWORN to before me the day and year first above written. Residing at: �%OTAp),-. My Commission Expires: 051101P-01.3 %A IJ B L I Z-1 0 F 71"111111110N AFFIDAVIT OF LEGAL INTEREST STATE OF IDAHO COUNTY OF ADA I� L' Y v� b tit- U— , Z L 6 I �, yL (� ry �� z G (name) (address) (city) (state) being first duly sworn upon, oath, depose and say: That I am the record owner of the property described on the attached, and I grant my permission to: (name (address) to submit the accompanying application(s) pertaining to that property. 2. I agree to indemnify, defend and hold the City of Meridian and its employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property which is the subject of the application. 3. I hereby grant permission to City of Meridian staff to enter the subject property for the purpose of site inspections related to processing said application(s). Dated this 2�4—day of -{.� , 20 10 Z/ (Signature) SUBSCRIBED AND SWORN to before me the day and year fq�Aove written. -10 oT �'t. (P S Not Public for Idaho) ;: A�,��G •' siding at: q• . ,, .! ,S My Commission E pires: F OF tv31 . (10A City of Meridian Pre -application -Meeting Notes Date: 6 -V() Project/Subdivision Name: r�r ul Applicant/Contact: Rlacks�«d , City Staff: 9 -f 11 e 4 -Y-A J Location: (1,,4- Existing Zoning: C -C c- A) t ' Proposed Zoning: NG Property Size: -�L 112, Surrounding Uses: Ups-,% Sace • S; Comprehensive Plan esignation(s): Street Buffers and/or Land Use Buffers: 3 'Open Space/Amenities/Pathways: Street System/Stub Streets/Access: ,�7ecE raw h G SM.4 M . ke tJ�r�llp /1,; F-2 Contiguous and Within •AOI (AZ only):... Number`of Units and/or Lots: -:42 2-1 Dwelling Type (if residential): Tao r� e. �-Q_ Zo o C a a zr . /6 �c 4 ST'Y �p " L4-60 if //- Sewer and Water Service: Topography/Hydrology/Floodplain Issues: //f1 Canals/Ditches/Irrigation and/or Hazards:a 1h4' d r 46 History: A2 - 06 -oo -/,, /,?-66-6.f 0 (64 z s lor,/5i2 Additional Meeting Notes: Lo � 1 � SK �''�JJl'.,�,` s Ion 7�1ThvIOU M-e/'e iP1,J0J fiM cb��G4-J>>• Tyl�o(kd44 1 9f CbM✓I/�/ ' ` /, C6riC ep/ N�a/'WIV de4to✓,nir �y/ ,0,1¢' /U6/5/2/F. -VZ'.-) C'u.1 p 2 54 c /,- �s f N r c 4,. wr��eQ 1 ;�rD n uh6 .1-66 - 3.'/. i t••V, la fiovi a�2 o- ha nK, /QA., W 1,1c -L4, an Su6�„ :ssJY�►. Additional Pre -Application Conference (circle one): Required Anticipated Submission Date: ParksDe ar ment ff DepBing Departmen . Other: Short Plat Time Extension UDC Text'Amendment Vacation Variance Other: Anticipated Hearing Date: S,-aff 91A Not Require NOTES: 1) Applicants are required to hold a neighborhood meeting, 1i accordance with UDC 11 -5A -5C, prior to submittal of an application requiring a public hearing. 2) Except for UDC Text Amendments, Comprehensive Plan Text Amendments and Vacation applications, all other applications requiring a public hearing shall be posted- in accordance with UDC 11-5A-5 A 3) The information provided during this meeting is based on current City Code and Comprehensive Plan. Any subsequent changes.to City Code and/or the Comprehensive Plan may affect your . submittal and/or application. This pre -application meeting shall be valid for 4 months. Other Agencies/De artments to Contact (circle): a Cour Hi way District Nampa and Meridian Irrigation Idaho Transportation Department Settlers Irrigation Sanitary Services Corporation Fire Department Central District Health Police Department Applications Required (circle all that apply): '. Accessory Use Design Review Alternative Compliance Final Plat Modification Annexation Misc. (DA Modification)" Certificate of Zoning Compliance Pl d Unit Development Comp Plan Map Amendmentrehpiinary Plat Comp Plan Text Amendment Private Street Conditional Use Permit Rezone Additional Pre -Application Conference (circle one): Required Anticipated Submission Date: ParksDe ar ment ff DepBing Departmen . Other: Short Plat Time Extension UDC Text'Amendment Vacation Variance Other: Anticipated Hearing Date: S,-aff 91A Not Require NOTES: 1) Applicants are required to hold a neighborhood meeting, 1i accordance with UDC 11 -5A -5C, prior to submittal of an application requiring a public hearing. 2) Except for UDC Text Amendments, Comprehensive Plan Text Amendments and Vacation applications, all other applications requiring a public hearing shall be posted- in accordance with UDC 11-5A-5 A 3) The information provided during this meeting is based on current City Code and Comprehensive Plan. Any subsequent changes.to City Code and/or the Comprehensive Plan may affect your . submittal and/or application. This pre -application meeting shall be valid for 4 months. b ti a c- LAt, uv cc� V 1 els r Q � � h pn COMMITMENT OF PROPERTY POSTING Per Unified Development Code (UDC) 11 -5A -5D, the applicant for all applications requiring a public hearing (except for a UDC text amendment, a Comprehensive Plan text amendment and/or vacations) shall post the subject property not less than ten (10) days prior to the hearing. The applicant shall post a copy of the public hearing notice of the application(s) on the property under consideration. The applicant shall submit proof of property posting in the form of a notarized statement and a photograph of the posting to the City no later than seven (7) days prior to the public hearing attesting to where and when the sign(s) were posted. Unless such Certificate is received by the required date, the hearing will be continued. The sign(s) shall be removed no later than three (3) days after the end of the public hearing for which the sign(s) had been posted. I am aware of the above requirements and will comply with the posting requirements as stated in UDC 11-5A-5. Qc,*%- %L.ac-KS ",�- 'lu w I;% -46(0 Applicant/agent signature Date �� 6Yi ti. W t� , LL�- Ada County Reserved Sub Names 0 • Page 1 of 4 OFFICIAL ADA COUNTY RESERVED SUB NAMES LIST Enter the first letter or letters of a subdivision name below to search existing names. SpurWing Greens[ -Search The following subdivision names were found containing or were similar to "SpurWing Greens" Sub Name Reserved Recate orded ate Applicant Surveyor Comments SPURWING GREENS 5/19/2010 TEALEYS LAND Parcel number is SO422417650 SUB SURVEYING AVERY SPRINGS THE 7/17/1990 7/17/1990 CLARK JOHN BAYHILL SPRINGS NO BRIGGS 11/16/1990 11/16/1990 O1 BAYHILL SPRINGS NO 11/16/1990 1/29/1992 NO 01 ENGINEERING BRIGGS INC 02 INC CEDAR SPRINGS SUB 6/9/2003 7/16/2003 ENGINEERING INC BAYHILL SPRINGS NO 11/16/1990 9/8/1992 10/21/2002 BRIGGS 03 NO 03 INC ENGINEERING INC BAYHILL SPRINGS NO 11/16/1990 7/30/1993 BRIGGS INC 04 10/21/2002 12/29/2004 J -U -B ENGINEERS NO 05 ENGINEERING INC BAYHILL SPRINGS NO 11/16/1990 5/11/1994 J -U -B ENGINEERS BRIGGS NO 06 05 INC INC CEDAR SPRINGS SUB 10/21/2002 ENGINEERING INC J -U -B ENGINEERS NO 07 INC TOOTHMAN- CEDAR SPRINGS SUB 10/21/2002 BENELLI SPRINGS SUB 4/5/2006 ORTON INC INC CEDAR SPRINGS 5/30/2006 1/7/2008 1 -U -B ENGINEERS J -U -B ENGINEERS ENGINEERING INC INC CIMARRON SPRINGS 8/19/1999 3/15/2001 COMPANY PINNACLE REQUESTED BY BOB UNGER SUB BODILY & BUNDERSON 2/28/1992 2/28/1992 BRIGGS SPRINGS NO 01 ENGINEERING INC BODILY & BUNDERSON 2/28/1992 6/29/1992 BRIGGS SPRINGS NO 02 ENGINEERING INC CEDAR SPRINGS PLACE J -U -B ENGINEERS SUB INC CEDAR SPRINGS PROFESSIONAL J U B ENGINEERS CENTER SUB INC The property is located off of Locust Grove south of Victory In Meridian. The property address is 3420 S. Locust Grove. Street Name Eval Prelim 10/28/04 PP 04-039 Street Name Eval 1/8/04 PP 03-044 CEDAR SPRINGS SUB 10/21/2002 1/9/2003 J -U -B ENGINEERS NO 01 INC CEDAR SPRINGS SUB 6/9/2003 7/16/2003 3 -U -B ENGINEERS NO 02 INC CEDAR SPRINGS SUB 10/21/2002 4/19/2004 J -U -B ENGINEERS NO 03 INC CEDAR SPRINGS SUB 10/21/2002 10/21/2004 J -U -B ENGINEERS NO 04 INC CEDAR SPRINGS SUB 10/21/2002 12/29/2004 J -U -B ENGINEERS NO 05 INC CEDAR SPRINGS SUB 10/21/2002 4/13/2005 J -U -B ENGINEERS J -U -B ENGINEERS NO 06 INC INC CEDAR SPRINGS SUB 10/21/2002 10/11/2005 J -U -B ENGINEERS J -U -B ENGINEERS NO 07 INC INC CEDAR SPRINGS SUB 10/21/2002 1/3/2006 J -U -B ENGINEERS J -U -B ENGINEERS - NO 08-- INC INC CEDAR SPRINGS 5/30/2006 1/7/2008 1 -U -B ENGINEERS J -U -B ENGINEERS TOWNHOMES SUB INC INC CIMARRON SPRINGS 8/19/1999 3/15/2001 PINNACLE PINNACLE REQUESTED BY BOB UNGER SUB ENGINEERS INC ENGINEERS INC TOOTHMAN- CONDO AT HIDDEN 9/25/2002 11/20/2002 ORTON SPRINGS THE ENGINEERING COMPANY DURANGO SPRINGS STANLEY Meridian App. # 05-046 Street Name Evaluation NORTH SUB CONSULTANTS 9/29/2005 http://www.adaweb.net/content/adasubs/default.asp?search=SpurWing+Greens 7/9/2010 Engineering North West, LLC 13601 W. McMillan Rd., Ste. 102-248 Boise, Idaho 83713 (208) 376-5000 • Fax (208) 376-5556 Project No. 09-027-01 Date: June 18, 2010 SPURWING GREENS SUBDIVISION PRELIMINARY PLAT DESCRIPTION A parcel of land located in Section 22, T. 4 N., R. 1 W., B.M., Meridian, Ada County, Idaho, more particularly described as follows: Commencing at the section corner common to Sections 22, 23, 26 and 27 of said T. 4 N., R. 1 W.; Thence North 89°17'35" West, 1293.74 feet on the section line common to said Sections 22 and 27; Thence leaving said section line, North 00°25'45" East, 40.00 feet to the southeast most corner of Lot 1, Block 16 of Jayker Subdivision, as same is shown on the plat thereof recorded in Book 101 of Plats at Page 13341 of Ada County Records, said point also being the southwest corner of Westwing Estates, as same is shown on the plat thereof recorded in Book 70 of Plats at Page 7200 of Ada County Records, said point also being the REAL POINT OF BEGINNING; Thence on the exterior boundary line of said Jayker Subdivision for the following courses and distances: 'Thence North 89°17'35" West, 1353.45 feet; Thence North 89°17'17" West, 55.22 feet; Thence North 00°30'34" East, 78.84 feet to a point of curve; Thence 111.78 feet on the arc of a curve to the left, said curve having a radius of 380.00 feet, a central angle of 16°51'12" and a chord distance of 111.37 feet which bears North 07055102" West to a point of reverse curve; Thence 176.88 feet on the arc of a curve to the right, said curve having a radius of 225.00 feet, a central angle of 45°02'28" and a chord distance of 172.36 feet which bears North 06°10'36" East; Thence North 28°41'50" East, 73.67 feet; Thence North 61"18'10" West, 20.67 feet to a point of curve; Thence 38.98 feet on the arc of a curve to the left, said curve having a radius of 72.50 feet, a central angle of 30°48'14" and a chord distance of 38.51* feet which bears North 76°42' 17" West; SpurWing Greens Preliminary Plat Desc.doc Page 1 of 4 • Thence South 87°53'36" West, 107.74 feet to a point of curve; Thence 144.13 feet on the arc of a curve to the right, said curve having a radius of 187.50 feet, a central angle of 44°02'35" and a chord distance of 140.61 feet which bears North 70°05'07" West; Thence North 48°03'49" West, 184.22 feet to a point of curve; Thence 185.06 feet on the arc of a curve to the right, said curve having a radius of 227.50 feet, a central angle of 46°36'27" and a chord distance of 180.00 feet which bears North 24°4535" West; Thence North 01°27'21" West, 152.21 feet to a point of curve; Thence 117.85 feet on the arc of a curve to the left, said curve having a radius of 372.50 feet, a central angle of 18107'37" and a chord distance of 117.36 feet which bears North 10'31'10" West; Thence North 19°34'58" West, 160.78 feet; Thence leaving the exterior boundary line of said Jayker Subdivision, South 60°39'26" West, 608.47 feet to a point of curve; Thence 193.37 feet on the arc of a curve to the right, said curve having a radius of 485.54 feet, a central angle of 22°49'07" and a chord distance of 192.10 feet which bears South 72°03'59" West to a point on the north -south 1/16 th section line of the SW 1/4 of said Section 22; Thence North 00°30'43" East, 1119.46 feet on said 1/16 th section line to the southwest corner of that parcel of land as described in Warranty Deed Instrument Number 94010662 of Ada County Records; Thence leaving said 1/16th section line, South 89028'42" East, 437.50 feet on the southerly boundary line of said Warranty Deed Parcel to the southeast corner of said Parcel; Thence North 00°30'43" East, 1030.35 feet, a portion of said line being on the easterly boundary line of said Warranty Deed Parcel; Thence South 81024'58" East, 441.72 feet; Thence South 00027'37" West, 536.62 feet; Thence South 89°30' 12" East, 778.15 feet; Thence North 00°30'35" East, 85.11 feet; Thence South 42'17'23" East, 18.11 feet; Spuffing Greens Preliminary Plat Desc.doc Page 2 of 4 Thence South 00°13'10" West, 80.96 feet; Thence South 86°30'59" East, 189.75 feet; Thence South 47°25'06" East, 249.20 feet; Thence North 00°28'32" East, 507.89 feet (formerly described as 507.88 feet) to a point on a curve on the southerly right-of-way line of the Phyllis Canal; Thence on the southerly right-of-way line of the Phyllis Canal, said line being 25.00 feet southerly of and parallel with the centerline of the Phyllis Canal, for the following courses and distances: Thence 145.71 feet on the arc of a curve to the left, said curve having a radius of 1525.00 feet, a central angle of 05°2828" and a chord distance of 145.65 feet which bears South 89°45'28" East; Thence North 87°30' 18" East, 331.42 feet to a point of curve; Thence 310.83 feet on the arc of a curve to the left, said curve having a radius of 1025.00 feet, a central angle of 17°22'29" and a chord distance of 309.64 feet which bears North 78°49'03" East to a point on the northerly boundary line of said Jayker Subdivision of Ada County Records; Thence on the northerly boundary line of said Jayker Subdivision for the following courses and distances: Thence North 70°07'49" East, 209.16 feet to a point of curve; Thence 197.27 feet on the are of a curve to the right, said curve having a radius of 975.00 feet, a central angle of 11°35'33" and a chord distance of 196.94 feet which bears North 75°55'35" East; Thence North 81°43'22" East, 409.49 feet to a point of curve; Thence 85.13 feet on the arc of a curve to the left, said curve having a radius of 775.00 feet, a central angle of 06'17'36" and a chord distance of 85.08 feet which bears North 78°34'34" East; Thence North 75°2546" East, 277.73 feet to a point on the section line common to said Sections 22 and 23; Thence leaving said canal right-of-way line, South 00°29'19" West, 468.19 feet on the section line common to said Sections 22 and 23 to the 1/4 Section Corner common to said Sections 22 and 23; SpurWing Greens Preliminary Plat Desc.doc Page 3 of 4 Thence South 00°20'38" West, 1317.45 feet on the section line common to said Sections 22 and 23, a portion of said line being on the easterly boundary line of said Jayker Subdivision, to the northeast corner of said Westwing Estates of Ada County Records (from which point the section corner common to said Sections 22, 23, 26 and 27 bears South 00°20'38" West, 1317.34 feet distant); Thence from said northeast corner and leaving said section line, North 89° 18'37" West, 1291.78 feet (formerly described as 1291.76 feet) on the northerly boundary line of said Westwing Estates to the northwest corner of said Westwing Estates; Thence South 00°25'45" West, 1276.93 feet on the westerly boundary line of said Westwing Estates to the real point of beginning. Said parcel contains 176.58 acres more or less. PREPARED BY: Engineering Northwest, LLC -N e V 7880 LG' t8 -?-Pl A, James R. Washburn, PLS SpurWing Greens Preliminary Plat Desc.doc Page 4 of 4 • a G64�NGgKEAB FIELD REPoRT n* Nwba:12434-MI-04 1525 SOUTH DAvID LANs Jayker Subdivision, phase 1 10/10/08 Friday BOISE, ID 83705 o�M10C7inwolAntwk (248) 433.8098 Treehaven, LLC 1:30 pm 184 D. Zimmerman Loolum Meridian, ID Time 2:30 pm 1 of 3 P'fqMPXM" IOXF >tot Weather: Trate Wirk lam . W1Mle' led 1rltrtf�M 1 hr Cloudy approximately 45 degrees to " GVAtapesaadpsraorrl as ar bsM► AWrand &ft HUN& Ylkfa Aft** d by: ® MtWft Abd b Can*wft and E¢tpnrrd a W= O ofm (&soft) Today our field representative arrived to take water level readings in the monitoring wells throughout the jobsite. Monitoring well El was still not accessible, presumably because it was located under the sidewalk. The water levels are presented in the attached spreadsheet. O THIS FIELD REPORT is PRELmwARy REPRI MATAM DATE AobsafraMaa «dar'°"'°'°. M.la ... partomistt. "..'sport � �"`!'�"' I n-(o-off miry w.y .� Ialta praoadanas► Mfoaa kdkand �.,,,,� ,. t • THIS FIELD REPORT 13 FINAL RlNIE M BY DATE A IYW rspod Is an Nr6vlMnf d DrofaNNNW aarNoa ArOr corldMdwa trran boar IN$ row elrotW bs dsauaed wMr and avak�lad by tlr ploiasstprW kndwd TMST paaanb opkJau tanwd as a result d w oburadm of wmm rwwq tow WAou G* We my an so oanbrror tomer wMi tlN plus and pa�c�tluf Mrou R poixl kraepaWua d M» prrssnca d orr reProsarlalba Outwork does McYrM nol aporWdw or diaodon der work d 0ftro. Orr f rm wit nes h Rob Of eks 0" of ours on MIS pops. DOCtAUR Any eawaric km makrdb or h" oopy or Mr alprrl do-'Wd (0-K Wes, stbk wxft ftmI M prawideq ardsnd SW aaaarrrna w ady a Dopy dtlr arlpkW donarrard TM ar pnd doalanad h stead by GaoErp rmm Ire ane 1si aarw es dr aMatsl doanrarrt dramN Attachments: water level measurements spreadsheet Distribution: • ��■ERIE■�■E■��■■�� ISE■��11�■�■HE 'L■�� • 0 IF E t@G■�E�Et� E�t�: - -------- - -- --------------- - ----------- ------------- APPENDIX I GEOTECHNICAL REPORT • I asnw - MOISLAMOM Imu vc CIIIIIIII IM� • June 19, 2007 RiveRidge Engineering Company 3046 South Down Way Boise, Idaho 83706 Attention: Barry Semple, PE • GEOENGINEER� Subject: Addendum Report Geotechnical Engineering Services Jayker Subdivision Meridian, Idaho File No. 12434-001-01 'INTRODUCTION GeuEugineers. Inch. has completed the requested additional field and laboratory testing for Jayker Subdivision in Meridian, Idaho. GeoEngineers, Inc. previously completed a Preliminary Geotechnical Report of the site dated November 1, 2005 (GEI ,File No. 12434-001-00), an addendum to the preliminary report dated October 12, 2006, a Geotechnical Engineering Services Report dazed April 27, 2007 (GEI File No. 12434-001-01), and a Phase 1 Environmental Site Assessment dated January 23, 2007 (GEI File 146.12434-001-02). The additional services were requested by RiveRidge Engineering Company in order to obtain additional information regarding allowable infiltration rates at selected areas of the site, the sbrieWswell factor for on- site nsite native silt soils to be used as structural fill, recommendations regarding the suitability of on-site soils for use as granular subbase for road const action, and clarification on our estimate of thre static groundwater level at the site. SCOPE OF ADDITIONAL SERVICES Out services have been completed in general accordance with our Change Order dated dd June 5, 2007. Our study was authorized by RiveRidge Engineering Company on June 5, 2007. Specifically, we completed the following scope of services: 1. Excavated a new test pit (TP -1a) approximately 50 feet north of the location of test pit TP -1 as presented in our April 27, 2007 report 2. Excavated four test pits in order to perform four percolation tests according the EPA (1980) test procedure. 3. Performed one in -Place nuclear densometer test on the silt soil present near the ground surface of test Pit TP -7 and obtained a sample of the soil and performed one modified Proctor moisture -density relationship test on the sample. FIELD INVESTIGATION We excavated a total of five test pits with a rubber -tire backhoe subcontracted to GeoEngineers on June 8, 2007. Four of the test pits were excavated at the approximate locations of test pits TP -3, TP -5, TP -7, and TP -9, which were excavated during the field investigation for our April 27, 2007 report. Test pit TP -la was RiveRidge Engineering Company June 19, 2007 Page 2 excavated approximately 50 feet north of the location of test pit TP -1 from our April 27, 2007 report. This test pit was relocated at your request. SUBSURFACE INVESTIGATION In general, the subsurface soils in test pit TP -la consisted of fine=grained silt to a depth of approximately 6 feet- The silt was lightly to moderately cemented below 2 feet. The silt was stiff to verystaff and moist in place. Below the silt, we encountered coarse-grained soil consisting of gravel with sand and cobbles. The gravel was dense and dry in place. The excavations for test pits were performed for the sole purpose of completing percolation tests. We attempted to excavate the test pits for the percolation tests in the approximate locations of the test frits excavated during the field investigation for the April 27, 2007 report. Soil conditions were assumed to be similar to those logged for our geoteehaical investigation; however, the following notable changes were observed: • The caliche or eomentcd soil layer that caused termination of the excavation of test pit TP -1 at an approximate depth of 5y2 feet was not significant in the location of tort pit TP -la. • We intended to perforin a'peroolation test in test pit TP -3 at a depth of approximately 6 feet, but cemented soil layers were present in our test pit to a depth of approximately 10 feet. • Silt was encountered to a depth of 3 feet and was underlain by lightly cemented silty sand to a depth Of 8K feet in test pit TP -5 for our April 27, 2007 geotechnical investigation. At the location of our Percolation test performed for this area, silt was encountered at our percolation last depth of 4 feet below the ground surface. CONCLUSIONS AND RECOMMENDATIONS PERCOLATION TESTS We performed percolations tests on soils encountered at various depths in four best pits located new the locations of our previous test pits. We could not determine the exact locations of our previous test pits because the fields had been plowed. The percolation tests were performed in general co4formance with the Environmental Protection Agency (EPA) 1980 testing procedure. An approximately 6 -inch diameter bole was dug at the depth of our test to an approximate depth of 8 inches. We placed a 6 -inch diameter polyvinyl chloride (PVC) pipe apprgxiimately 14 inches long in the hole, and placed approximately 2 incises of pe* gravel in the bottom. The PVC pipe was filled approximately 12 inches with water and the soils were "pro -soaked" prior to performing the tests. For the granular soils, pre-soaking consisted of the percolation of two 12 -inch columns of water in 10 minutes or less each. The silt soils were pre-soaked under a column of water at least 12 inches high for four hours. The results of our percolation tests and approximate depth and type of soils the tests were performed in are presented in Table 1 below. Mk No. 12434-001-01 GEoENGtNEEmuo RiveRidge Engineering Company June 19, 2007 Page 3 Table 1. Percolation Test Results Test Pit Number ApprcWma% Depth {� TP -3 10 TP -5 4 TP -7 7 1'P-9 4 The silt encountered at a depth of approximately 4 feet in the area now TP -5 excavated for our percolation tests is similar to the silt encountered at approximately 2 feet in the location of test pit TP -5 during our investigation for the April 27, 2007 report. The Ada County Highway District (ACRD) Design Manual (February 2003) states "In no event will a rate exceeding 15 inches per hour be allowed." Based upon tho soils encountered in our test pits and the results of our percolation test results, the recommended infiltration rates for best pits TP -1, TP -3, TP -5, TP -7, and TP -9 are provided in Table 2 below. Table 2. Allowable -Infiltration Rates Infiltration Rale % to 8 Silt with sand Not suitable for mistral 8 to 9 feet Gravel whh sarin 15 Inches tier four Recommendation: Discharge water to the gravel below 6feet at 15 bwjas per hosa: Test Pit Depth Sots T Allowable IrMation Rate TP -3 %to 6% fed Set Not suitable for InfAftdm 5% to a My sand hardpan Not suitable for inlntration 6 to 8 feet sand weh an 2 ind►es per hour e to 10'f, feet Gravel with sand 16 Inches per how Recommendation: Dischmge water to the silty gravel below 8 feet at 15 inches per hour. Test Pit De soil Typs Allowable Infiltration Rate TP -5 % to 3 feet Silt With sand Not suitable for inti tradan 3 to 8% feet Sifty sand 1 loch pE hour 8% to 12 feet Fme sand 4 inches per tour Recommendation: Discharge water to the fine sand below 8'/s feet at 4 inches per hour. File No. 12434-001-01 GEoEmGiKK S� RiveRidge Engineering Company June 19, 2007 Page 4 Test Pit Depth Soli T Allowable Infiltration Rats TP -7 'r4 to 3 feet Silt Not suitable for infhaUon 3 to 4 feet Sand with silt Not suitable for infiftrafion 3 to 4 feet an Not sui�ble for irtiNhation 4 to 6% feet Sand with sift 1 inch per hour 6% to 7 bet Cel sand with sit Not suitable for inlflUatlon 7 to 934 feet Gravel with sand 15 indtes per hots' Recommendation: Discharge water to the gravel with sand below 7 feet at 15 inches per hour: Test Pit Depth Soil Allowabb IuMiltraiioe Rats TP -9 %to 1% feet SR Not suitable for kAftation f 3Se to 3 feet Sartdy slit % inch per hour 3 to 4 feet Sand with gravel an Not sui�ble for irtiNhation 4 to 734 feet (3raysl with sand I 15 inches W hour Recommendation: Discharge water to the sand with gravel below 4 feet at 15 inches per how: We encountered local variations in the type and depths of soils during our investigations both for our April 27, 2007 report and for this report. We believe the depths to suitable infiltration soils may vary across the infiltration basins designed for this subdivision. We recommend a representative from GeoEngineers be present during construction of the infiltration galleries to verify the proper depth has been attained, and to verify the gallery has penetrated. the proper soil type. SHPJNKISWELL CONSIDERATlON8 We removed the topsoil from the surface near the location of test pit TP -7 from our April 27, 2007 report, and performed an in-place field density test on the near surface silt soils using a nuclear densometer. We understand similar soil is to be used as structural fill. The in-place wet density was approximately 95 pounds Per cubic foot (pot), and the moisture content was approximately 6.8 percent. We obtained a bulk sample of the soil and brought it back to our laboratory and performed a modified Proctor density test (per ASTM D- 1557) on the sample. The maximum modified Proctor density of the soil was 118.1 pef, and the optimum moisture content was 10.8 percent. Assuming a minimum dry density of 95 percent of the maximum modified density (hSID), we estimate a shrinkage factor of 22 percent. Stated another way, 1.27 cubic feat of cut soil will be required per cubic foot of structural fill. DEPTH TO GROUNDWATER We stated in our April 27, 2007 geotechnical engineering services report that we measured groundwater in test pit TP -5 from the preliminary geotechnical investigation at a depth of approximately 7%z feet on August 28 and September 25, 2006. Test pit TP -5 was located near Chinden Boulevard in the southwest courser of the property. We estimated high groundwater elevations to be as high as 7 feet in our April 27, 2007 report. We reviewed the Idaho Department of Water Resources (IDWR) web site for on-line well information. For wells located in Section 22 of Township 4N, Range IW, the static groundwater elevation ranged from 15 to File No. 12434-001-01 /� C7EOENGINEERS /// RiveRidge Engineering Company June 19, 2007 Page 5 37 feet below the ground surface, with most of the well logs indicating a static groundwater depth of greater than 20 feet. We indicated 'in our previous geotechnical investigations for this site that we estimate seasonal high groundwater levels will occur in late summer as a result of irrigation recharge. We have also encountered cemented soils, caliche and relatively impermeable silt and clay soils at this site. We believe the water measured at 7'/s feet in test pit TP -7 on August 28 and September 25, 2006 may have been, present due to irrigation recharge or indicative of a perched layer of water and did not indicate the static groundwater elevation. We estimate that static groundwater levels will likely be deeper than 15 feet at this site, however, perched groundwater levels may develop due to irrigation and precipitation. SUITABILITY OF ON-SITE SOIL FOR UsE A$ GRANULAR SUBBASE We were asked to provide recommendations on the suitability of the on-site soils for use as aggregate subbase material for the construction of roads at the site. The Idaho Transportation Department Stordard SPectcatforrs- for Mghway Construction, 2004, provides a table for acceptable particle size distribution for Aggregate for Granular Subbase (Section 743.11). The maximum acceptable percentage of fine-grained motorial (that portion passing the No. 200 U.S. standard sieve) is 15 percent. 'the minimum acceptable R value for granular subbase is 60. We believe that relatively clean sand and gravel similar to that encountored in test pits TP -la, TP -3, and Tp -8 at depths ranging from 6 to 10 feet below tho ground surfarx are suitable for use as granular subbase. Please refer to the above referenced section of the Standard Specfflcatfons for the acceptable grain size distribution range. Ada County Highway District (ACRD) may require that these soils be certified by means of laboratory tasting prior to their approval. On-site soils other than those mentioned above may also be suitable for use as granular subbase. It is unlikely that any on-site soils would conform to the "3/4-vnch minus aggregate road base" criteria specified in Section 703.04 of the Standard Speci, ficadons. File No. 12434-001-01 GEoENGINEER RiveRidge Engineering Company June 14, 2007 Page 6 LIMITATIONS We have prepared this report for use by the R.iveRidge Engineering Company for design of the Jayker Subdivision located in Meridian„ Idaho. This report is not intended for reliance by others and the information contained herein is not applicable to other sites. Our conclusions and recommendations described herein are based on our site observations and experience in the aim Within the limitations of scope, schedule and budget, our selvices have been executed in accordance with generally accepted practices in the field of geotechnical engineering in this area at the time this report was prepared. No warranty or other condition, express or implied, should be understood. Any electronic form or hard copyof this document (email, text, table, and/or figll l if providod, and any attachments are only a copy of a master document The master hard copy is stored by GwEngineers, Inc. and will serve as the official document of record. Sincerely, GeoEngineers, Inc. Daniel P. Zimmerman, PE ProjectEngineer Attachments; Log of Test Pit TP-ls Three copies submitted Steven B. Richey, PE Principal M—SBRmih Boise:1121124340011011Fimb%124340D101R_ADD.doc Disclaim: Amy elecftudc fom% 9csimile or hard copy of the original document (email, tact, fable, and/or figureX if provided, and my adechmmu are wdy, a copy of the migoal docammt The original document is aomd by GeoEnginoers, lac. and wN sena as the official documeM of record CopydghtO 2007 by GwEnginecrs, lnc. AU rights reserved. File No. 12434--WI-01 GEOENGwEEAS October 12, 2006 RiveRidge Engineering Company 405 West Myrtle Street Boise, Idaho, 83702 Attention: Barry Semple, PE Subject: Addendum Report Preliminary Geotechnical Investigation, High Groundwater Estimates Proposed Treehaven Subdivision Meridian, Idaho File No. 12434-001-01 0 GEOENGINEERi. GeoEngineers, Inc. has completed the groundwatw. level monitoring for 1ho proposed Tvachaven Subdivision in Meridian, Idaho. The site is bounded on the south by Chinden Boulevard; on the oast by North Basco Lane and Ten Mile Road; on the north by the Phyllis Canal; =&on the wast by an unnamed road approximatoly'/, east of Black Cat Road. GeoEnginocrs, Inc. previously completed a Gootechnical Report of the site dated November 1, 2005 (GEI File No. 12434-001-00). These servicers have been complete as requested by you. During our preliminary geotechnical investigation, we installed four piezometers at the site to measure the depth to groundwater. We did not observe any groundwater at the time of our site exploration on September 1, 2005. We returned to the site on October 14, 2005, August 28, 2006, and September 25, 2006 and measured the depth to groundwater in the piezometers. The groundwater level measurements arb shown in Table 1 below. Measurements made in the piezometers are accurate for the date they were acquired. T81340 I. Depth to Groundwater Representative groundwater measurements for TP -1 could not be taken on August 28 and September 25, 2006 due to standing water around the piezometer from flood irrigations. tirounclwater Depth Measured October 14, 2005 Au ust 28, 2006 September 25,2006 Test PR TP -1 Dry Not Measured Not Measured TP -2 Dry Dry TP -3 DY 0 ry TP -5 Dry 7.5 1 7.5 Representative groundwater measurements for TP -1 could not be taken on August 28 and September 25, 2006 due to standing water around the piezometer from flood irrigations. RiveRidge Engineering Company October 12, 2006 Page 2 We anticipate that the seasonal high groundwater level should occur in the late summer as a result of recharge from irrigation. We reviewed groundwater level measurements in nearby water wells obtained from the Idaho Department -of Water Resources (IDWR). We estimate" groundwater depths will range from 7 feet below ground surface near the southern portion of elle site, and increase to 15 feet below ground surface at the northern end of the site. We understand that the current land tenant is actively irrigating the site, which may account for local areas of shallow groundwater perched above the bardpaa layers encountered throughout our investigation. If we can provide any additional information, please don't hesitate to tx Respectfully submitted, QeoEngineers, Inc. e R. Thomas, E1T Staff Engineer I &U J, James B. , PE Senior Principal IRf:DZP:JBH:ml Boise:112U2434001101iFhnMI243400101R oW.doa Daniel P. Zimmerman, PE Project Engineer Disclainw. Any dlectronk fom�llscsimile or hsM COSY of the original doemnait (email, text. tabk W. �X if provider, and W doewnea b = 0 = � �� Te °d°M dommwt is stomd by (iooEagi =, Ina. and win serve as the efadd CopYAAW 2006 by (laoEaginee% lora. Ail rights reserved. Three copies submitted Fik No. 12434-001-01 Gr;oENGiNEER5/_.---__.__ ,_., R M 3 s s s m x w w U Q a N 2 W a 0 V) Z W Z W O C� (n Z D �m V) CL N V b'10 skt;,5At A433p "00443441ta .w' a ,ocooN !'t3AkkkWtAt SettWM--t _ A_tt_t MMM--- � i "sRBp ARKS RRRB 841Kc&4£O�F� �ktp "_tR k'Akr Y,t Wt4_649C4 1 C �SEZ�E�'aSd'se 8 8 A e a 2gggWg�$ lWIP a. r g gg q3 'k o 'Jig . 109��ii nqtt 66 [44$ ■ EE E3 T� ffL [C ___ _-_ --- __JillI Jill I • 0 • r oa< z a I / oa Oi a OI 07 O! / �9 I Z 09 \ 1 U S 1 � \ Ln \ / \ \\ �\ f \ ; so \ 1 \ � S \ 1 \ \ I \ \ 5 9 �go 'g *42 c� 11 Ll 11 L� i —8 9 01 7 o J w x .— � \ to S N2 N&= � '1k n•''y'.A�]jCM: it Z •1 _ u '�S 8 < Dz, % < ZO W� Z ffi z La a 0 X03 z a_ R 0 wmz U W w Y in pw w 0� m 0 0 ;� ��' Q) 0 cn cn Is ba 64, S2 J---------- P, -Pit gay . I jgw;� 41'l !jx t2 R A, 't, .syr. •. - .I i • •,� t a r f 't, .syr. •. - i • •,� t a r 0 0 a to Fi 140 0 0 I \�� � w . > d ► ■| .49 �.. .. { £ { ? � I \�� • 0 N C4 e3 �.v � � � t 1 J Fes} ,�; � �i, RBKWCL GROTECH14CAL ENG*UMF4NG SBAVN= JAYKER SU ODMSX% "ES I AND 11 MERUM, IDAHO ApmL.27,2007 FOR RNERME EMMUNNG COWANY I 0 Report Geotechnical Engineering Services • Jayker Subdivision, Phases I and II Meridian, Idaho File No. 12434-001-o1 Prepared for: April 27, 2007 RiveRidge Engineering Company 405 West Myrtle Street Bola*, Idaho 83702 Attention: Barry Semple, PE Prepared by., GeoEngineers, Inc. 802 West Bannock Street. Suite 700 Project Engineer •� i Steven B. Richey, PE Principal DPZ:SBRJSH:mih Boise:\12\124340011011Finals11243400101koT.doe Disclaimer: •Any e1e0onic form, facsimile or hard copy of the original document (etnail, text, table, and/or figare), if provided, and any Atachmerds are only a copy of Ow original document The original document is stored by GeoEngincets, Inc, and will serve as the atkial g document of record CopysightO 2007 by GeoEoginew, Inc. All rights reserved. Fik No.12434-001-01 TABLE OF CONTENTS Pace No. INTRODUCTION.................................................................. SCOPE OF SERVICES ................................ 1 TASK 1— GROUNDWATER MONITORING SERVICES ..................................................... 1 TASK 2 — GEOTECHNICAL INVESTIGATION SERVICES ....................... . SITE CONDITIONS_... ............................................ SURFACE CONDITIONS .................... ................ ..........................2 ................................................... SUBSURFACE CONDITIONS......................................................... .....2 ............. ..................... CONCLUSIONS AND RECOMMENDATIONS ........................ „3 517EERAL PREPARATION..........................................................................................................................3 .....................................................................................................3 STRUCTURAL FILL .................... General............................................................................................................................4 Suitability of On -Site Soil...........................................................................................................5 Imported Soil..................................................................... ..................5 EXCAVATABILITY............................................................................................... PERMANENT SLOPES ....................................................................................................................6 INFILTRATION CONSIDERATIONS ............................• g Depth toGroundwater.............................................................................................. Infiltration Rate...............................................................................�....................................... 6 PAVEMENT RECOMMENDATIONS................................................................................................8 LIMITATIONS .......................... List of Tables Table 1. Allowable Infiltration Rates ........................... Table 2. Recommended Pavement Sections...............................................................................................6 Llst of Figures Figure 1. Vicinity Map Figure 2. Site Plan APPENDICES APPENDIX A — FIELD EXPORATION AND LABORATORY TESTING ..................... Appendix A Figures Figure A-1 - Key to Exploration Logs Figures A -2—A-12. Logs of Test Pits Figure A-13. Grain Size Analysis Figure A-14. Atterberg Limits Test Results Figure A-15. R -value Test Results APPENDIX B — REPORT LIMITATIONS AND GUIDELINES FOR USE ..................... ...............B -1...B-3 FikNo. 12454-001-01 Page p GEoEaeiaEEn� Apr[! 27, 2007 • 0 REPORT GEOTECHNICAL ENGINEERING SERVICES JAYKER SUBDIVISION MERIDIAN, IDAHO FOR RIVERIDGE ENGINEERING COMPANY INTRODUCTION This report presents the results of our geotechnical engineering evaluation for Phases I and 11 of the Jayker Subdivision located between Chinden Boulevard and the Phyllis Canal, west of Ten Mile Road in Meridian, Idaho as shown in the Vicinity Map, Figure 1. We understand that Phases I and R of the subdivision will consist of approximately 290 lots containing single-family patio homes and single-family homes, including a garden retail center, and a community center. Cuts will be on the order of 2 to 4 feet in the northeast portion of the site and fills will be on the order of 6 feet or less throughout the center of the site. Stormwater will be disposed of by means of infiltration galleries. Water supply and wastewater collection and treatment will be serviced by public agencies and companies. SCOPE OF SERVICES Our services have been completed in general accordance with our proposal dated February 9, 2007. Our study was authorized by RiveRidge Engineering Company on February 21, 2007. The purpose of our evaluation was to provide geotechnical information for use in design of infiltration basins, suitability of on-site soils for use as structural fill, and pavement design, and to monitor groundwater elevations is the piezometers installed for the Preliminary Geotechnical Investigation dated November 1, 2005. Specifically, we completed the following scope of services: TASK 1-- GROUNDWATER MONITORING SERVICES 1. Monitored groundwater conditions in piezometers we installed for the preliminary investigation, a total of two times over a 2 -month period. 2. Provided a brief addendum letter dated October 12, 2006 to our preliminary report addressing the estimated seasonal high groundwater levels for the site. TASK 2 — GEOTECHNICAL INVESTIGATION SERVICES 1. Contacted Idaho State "Dial -Before -You Dig" contractor number to notify them of our intent to excavate test pits at this site. 2. Explored the subsurface conditions by excavating 11 test pits to depths ranging from S%2 to 12 feet below the existing ground surface with a backhoe subcontracted to GeoEngineers. 3. Evaluated the engineering properties of the soils by completing a series of laboratory tests. 4. Provided conclusions and recommendations regarding site development with respect to the soil and groundwater conditions at the site. Provided earthwork recommendations including erosion protection during construction, compaction requirements, structural fill criteria, wet weather construction considerations, and the suitability of on-site materials for use as structural fill. Fife No. 12434-001-01 Page 1 GEoENGutEERs� April 2Z 2007 S. Provided recommendations for design infiltration rates for stormwater disposal based on the classification of the soils encountered. b. Provided recommended pavement sections for the on -situ roadways based upon the results of an R value test. Pavement sections for residential and residential collector streets were provided according to Ada County Highway District requirements. SITE CONDITIONS SURFACE CONDITIONS The site is bounded on the south by Chinden Boulevard, on the east by a sod farm, a private driveway '/4 -mile east of Black Cat Road on the west bour)darN and on the north by the Phyllis Canal. The site is currently used for Jayker's Wholesale Nursery, Inc, and is currently planted with various types of trees. We observed multiple access roads throughout the site. Multiple irrigation ditches, both lined and un -lined, cross the site to supply water to the nursery's trees. Jaykees offices and equipment storage shops border Chinden Boulevard on the southem end of the site. A few houses aro prose tt north of the property. West Wing Estates are located southeast of the subject site, north of Chinden Boulevard. Tho site is relatively flat, and slopes gradually to the north and west. SUBSURFACE CONDITIONS Soil and groundwater conditions at the site were explored to depths of approximately 5'/s to 12"feet below existing ground by excavating II test pits ('ITP -1 through TP -11) on April 5, 2007 with a backhoe subcontracted to GeoEngineers. The test pits were excavated at the approximate locations shown on the Site Plan, Figure 2. A variety of soil conditions were revealed at the locations of our test pits. Topsoil and an associated root zone were encountered at each test pit. We also encountered fine and coarse-grained soil deposits in all of our test pits except test pit TP -1, which was terminated due to refusal on hardpan. Generally, fine-grained soils were encountered near the ground surface and were separated from the deeper coarse-grained deposits by a cemented hardpan or caliche layer. The character of the soil deposits varied as generally described in the following paragraphs. Detailed logs of conditions encountered at the location of each test pit are shown on the test pit logs in Appendix A, along with laboratory test results. The fine-grained soil deposits consisted of clay, silt and sandy silt. In general, these deposits were soft to hard in place, and characterized by low to moderate strength, low to moderate compressibility, and low permeability. We also encountered very dense hardpan consisting of silt and silty fine to coarse sand. The hardpan was 3 inches to more than 1 foot thick. The fine-grained hardpan possessed low compressibility and moderate, to high strength. The coarse-grained hardpan also possesses low compressibility and high strength in place. The coarse-grained soil deposits included fine to coarse sand, and fine to coarse gravel with variable silt and cobble content. In general, the sand and gravel deposits were medium dense to dense in place and characterized by moderate to high strength, low compressibility and low to high permeability. We did not encounter groundwater in our test pits at the time of our exploration. We had periodically monitored the piezometers installed during our preliminary geotechnical investigation for groundwater File No. 12434-001-01 Page 2 GEOENGINEERS� ApK127, 2007 elevation. The results of that monitoring were presented in a letter dated October 12, 2006. Groundwater levels should be expected to fluctuate as a function of season, precipitation, irrigation and other factors. CONCLUSIONS AND RECOMMENDATIONS GENERAL A summary of the design and construction considerations for the proposed project is provided below. The summary is presented for introductory purposes only and should be used in conjunctibn with the complete discussion in the appropriate sections of this report. • The site soils are moisture -sensitive because of the fines (silty and clay -sized soil particles passing the U.S. No. 200 sieve) content and the plasticity of some of these tines. It will be difficult to properly compact these soils if the moisture content is significantly above or below optimum. Trafficability at the site under wet conditions might be difficult for rubber -tired equipment and could result in considerable surface soil disturbance. • We encountered layers of lightly to strongly cemented soils and hardpan or caliche layers in our test pits. Excavation for site grading and trenching through these layers will likely require the use of heavy-duty equipment. • Earthwork for the project should be completed during dry weather. Nconstruction must continne during periods of wet weather, disturbance of the native soil will occur, requiring overexcavation and replacement with imported material. Overexcavation will increase grading costs. • Infiltration rates are relatively low in the upper soils and relatively high in the sand and gravel soils (below 3 to 8 feet in depth) that we encountered at the site. A table of infiltration rates and depths is provided in the `°Stormwater Infiltration Considerations" section of this report. • We encountered low to moderately plastic clays in a few of our test pits near the ground surface. Recommendations for the use of these soils as fill are provided below. - SITE PREPARATION The area to be developed should be stripped of all topsoil, sod, vegetation, and otherwise unsuitable material. Stripping depths are expected to range from about 3 to 9 inches across the site. The stripped material should be wasted off-site or stockpiled and used for landscaping purposes, if determined suitable by the Owner. For the purposes of this report, we generally define topsoil as a fine-grained soil with an appreciable amount of organic matter based on visual examination. It is unsuitable for direct support of the proposed improvements. However, the organic content, and other mineralogical and gradational characteristics used to evaluate the suitability of soil for use in landscaping and for agricultural purposes was not evaluated, nor considered in our analyses. Therefore, the information and recommendations in this report,, and our logs and descriptions should not be used as a basis for concluding that topsoil from the subject site is suitable for use in landscaping or for agricultural purposes, nor for estimating the volume of topsoil that could be available for such purposes. After stripping, roots larger than about'/: inch in diameter should be grubbed out. The site then should be proofrolled with a loaded dump truck or other heavy vehicle to identify soft, wet, unstable or other area of unsuitable soil. Any soft, loose or otherwise unsuitable areas identified during proofrolling should be recompacted if practical or removed to a depth of about 2 feet or firm bearing, whichever is less, and File No. 12434-001-01 Page 3 CiEOENGiNEER� April27, 2007 replaced with structural fill. We recommend the proofroliing of the subgrade be observed by a representative of our firm to assess the adequacy of the subgrade conditions and to identify areas needing remedial work. We further recommend that this procedure not be performed during wet weather. If construction needs to continue during wet weather, it may be necessary to overexcavate disturbed material and place a layer of sand and gravel with less than 5 percent fines to provide a working surface over moisture -sensitive soils. Areas of deeper, soft, wet, unstable subgrade that are encountered or created, may require the Contractor to overexcavate and stabilize the subgrade by placing an Engineer -approved woven geotextile and clean compacted granular fill to create a working platform. Relatively light, non -vibratory compaction equipment should be used during this operation to rttinimize further softening and pumping ofthe exposed subgrade. The prevailing sur6cial soils on the site will be moisture -sensitive, difficult to operate on, and very difficult to compact during wet weather. RubberAi rd vehicles will disturb this type of soil when it is above the optimum moisture content. It readily absorbs moisture and is diTkult to dry out. It has a moderate erosion potential in-place and is easily transported by running water when disturbed. Therefore, silt fences and other Best Management practices (BWs) may be necessary to control erosion and sediment transport during construction. The vegetation and topsoil act as protective layers to the surficial soil. Therefore, they should be removed only where and when necessary. All areas to be filled first should be scarified to a minimum depth of 8 inches, moisture conditioned to within 2 percent of the optimum moisture content, and then compacted to a minimum relative compaction of 90 percent of the maximum dry density (MDD), based -on the American Society for Testing and, Materials (ASTM) D1557 laboratory test procedure. STRUCTURAL FILL General All new structural fill and backfill placed under building pads and parking lot areas should be placed and compacted as structural fill subsequent to site preparation work as described above. The fill should be placed in horizontal lifts not exceeding 8 inches in loose thickness, or less if necessary to obtain adequate compaction. Each lift must be thoroughly and uniformly moisture conditioned and compacted. Fine- grained clay soils should be moisture conditioned to optimum moisture content to two percent above. Optimum moisture content. Moisture conditioning of all other soils should be to within two percent above or below optimum moisture content. We recommend that all structural fill placed beneath the building pads and within 2 feet of pavement elevation be compacted to at least 95 percent of tate maximum dry density (MDD) as determined by the ASTM D 1557 test procedure. Below this depth in roadway areas, we recommend that structural fill be compacted to at least 90 percent of the MDD. All structural fill material should be free of organics, debris and other deleterious material, with no individual particles larger than 4 inches in diameter or one-half the lift thickness, whichever is smaller. As the amount of fines increases, the soil becomes increasingly sensitive to small changes in moisture content and adequate compaction becomes more difficult to achieve, particularly during wet weather. Generally, soils containing more than about 5 percent fines by weight cannot be properly compacted when the moisture content is more than a few percent from optimum moisture content. Full -tune earthwork monitoring and a sufficient number of in-place density tests should be performed by GeoEugineers to evaluate fill placement and compaction operations and to confirm that the required compaction is being achieved. File No. 12434-001-01 Page 4 GEOENGINEElt April 2 7. 200 7 5-0 • Suitability of On -Site Soil The soils encountered in all the test pits consisted of fine-grained soils (clay, silt, sandy silt) and granular soils (silty sand, sand, and gravel) throughout the site. The on-site soils are suitable for use as fila, provided they are properly moisture conditioned and compacted as recommended above. The fine-grained clay soils near the surface of our test pits oxhibited low to moderate plasticity and have a small potential of volume change upon wetting (expansion). This. potential expansion/swell can be minimized by proper moisture conditioning as discussed in the General subsection above. The on-site soils contain a significant amount of foes, are moisture sensitive and wiU be difficult to compact if the moisture content is more than a few percent either wet or dry of optimum moisture content. Moisture conditioning will be required to facilitate compaction. Additionally, it may be necessary to stop placing the fine-grained soils as structural fill during rains. For these reasons, we recommend that a contingency be included in the construction budget for importing select, free -draining sand or sand and gravel mixtures. The hardpan encountered at the site is generally not suitable for reuse as structural fill. It is difficult to adequately pulverize and uniformly moisture condition and compact the material. Variable moisture conditioning results in variable compaction of the hardpan material. The hardpan may be used in conjunction with other soil for use as structural fill ~fader the following conditions: 1) the hardpan pieces are less than 4 inches in greatest dimension and are thoroughly mixed with sufficient soil such that the interstitial spaces are filled with soil; 2) the hardpan pieces are not allowed to "nest," creating voids; and 3) the soil mixture is thoroughly moisture conditioned and compacted in lifts using .large vibratory equipment. We recommenA hardpan material not be placed within 2 feet of the bottom of the asphalt pavement in roadway areas or finish subgrade of building pads. Other structural fill should be used in this zone. The fine-grained soils we encountered in our test pits are suitable for use as sutural fill, but should be considered for deeper fills. The granular soils are more suitable for structural fill use. Imported Soil On-site and imported soil, if used as structural fill, should conform to the recommendations provided in the "General" section above. On-site and import soils used as structural fill shall be non -expansive, reasonably well -graded, and be free of organics, other perishable material and construction debris. In addition, they shall meet the following criteria. Sieve Size 4" #4 No. 200 Percent Passing No, 200 Sieve Percent Passing (by dry weight) 100 70-100 0-35 Max. Max. LL PI 0-20 40 15 21-35 35 10 Liquid Limit (LL); Plasticity Index (Pl) Min. R value = 40 (pavement areas only) File No 11434-001-01 Page 5 S� April 27, 2007 GEOENGINEER w ExCA mswy We encountered dense to very dense hardpan in most of our test pits at this site. The rubber -tired backhoe that we used to excavate our test pits had difficulty penetrating some of the harder layers. Large track-mountedexcavators and dozers will typically be more efficient than a rubber -tired backhoe for excavations through the hardpan. PERMANENT SLOPES We recommend a maximum permanent slope inclination of 2H: IV (Horizontal:Vertical) in the native soil or in structural fill placed in accordance with our recommendations. Fill should be carefully compacted on the slope face, or the fill embankment can be overbuilt and cut back to a 2HAV configuration. Permanent slopes must be hydroseeded or otherwise protected from erosion. Temporary erosion control measures may be necessary until permanent vegetation is established. INFILTRATION CONSIDERATIONS Depth to Groundwater We installed four piezometers at the site to measure the depth to groundwater during our preliminary geotechnical investigation. We returned to the site approximately eleven months later to measure groundwater levels. These results have previcuply been reported to you but ranged from 7% feet or more below existing ground. We did not install additional piezometers during our current investigation, not did we encounter groundwater. We anticipate that groundwater levels will fluctuate between 7 feet below the ground surface to greater than 15 feet. We anticipate that the seasonal high groundwater level will occur in the We summer as a result of recharge from irrigation. Groundwater levels should be expected to fluctuate as a function of season, precipitation, irrigation, and other factors. lnf Waffon Rate Table 1, below, describes the soil conditions encountered at the locations of our I test pits, the recommended allowable infiltration rate for each layer, and our stormwater disposal recommendations. Table 1. Allowable Infiltration Rates Test Pit De thSoil a Allowable Inftitratlon Rate TP -1 r4 to 554+ {aet Silt and silt hardpan s Not suitable for intilbatlen swwnsnscr�uurwr�. "Wv wge warer to sulrabie sol! oe(Ow 3%,feet. Test Pit Depth Soil Type Allowable Inttltration Rate TP -2 'r4 to 3 feet Silt Not suitable for infiltration 3 to 4 feet Sft sand hardpan Not suitable for inflttraiion Sand with silt 4 to 4% feet hardpan Not suitable for infiltration. 4% to 10 feet Sand with silt 2 inches per hour 10 to 11 feet Sand hardpan Not suitable for InfiKralon 11 to 11% feet 8aad with gravel and 4 inches per hour cobbles Recommendation: Discharge water to the sand with gravel below II feet at 4 inches per hour.y EM Rh No. 12434-001-01 Page 6 GiEoENGiNEER4� dpH127,2007 • 0 Depth Soil Type Allowable: Infiltration Rate to 61A feet Silt Not suitable for InMratlon 5% to 6 Si sand hardpan Not suitable for Infiltration > to 8 feet Sand with silt 2 Inches per hour to 10% feet I Sitty gravel 4 inches per hour Recommendation: Discharge water to the silty gravel below 8 feet at 4 inches per how. Test Pit gu Agawabts k0butlon Rate TP -4 % to 4% feet Set Not suitable for Witration 4% to 8 feet Sand with sa 2 inches pE hour 8 to 10 feet Sand with gravel 4 inches per hour Recommendation: Discharge water to the sand with silt below 43Sfeet at 2 inches per hots or to the sand with gravel below 8 feet at 4 inches per how: Test Pit Depth GW Aillowable Infiltration Rate TP -5 34 to 3 feet SIR with sand Not suitable for infiltration 3 to 8% feet Silty sand 1 kncln pff hour 8% to 12 feet Fine sand 1 Inch per hot r Recommendation: Discharge water to thefine sand below 8Y feet at I inch per hour. Ll 1, Test Pit Depth Soil Type Allowabia InMbadw Rats TP -8 %to 4 feet Silt with sand Not suitapia for Infiltration 4 to 8% feet Silty sand 1 Inch pff hour 8% to 10 feet Sand with gravel 4 inches per how Recommendation: Discharge water to the sand with gravel below 8 feet at 4 incises per how. Test Pit De Soil Type Mk viable IrdilbvMon Rahe TP -7 %to 3 feet sit Not suitable for InflUalioil 3 to 4 feet Sand with silt Not suitable for inlillration ha an A to 6% feet Sand with silt 1 inch per hour 6% to 7 feet Cemented sand with Not suitable for Infiltration Silt 7 to 9% feet Silty sand with 2 inches per hour vel Recommendation: Discharge water to the sand with gravel below 7 feet at 2 inches per hour. NOW Fik Na 12434.001-01 Page 7 QoErlanu:I:ess i� Apri127, 2007 Test Pit De th Soil T Allowable Infi'. TP -8 % to 1'% feet Silt Not suitable fi 2 inches per hour I% to 2% feet Send with sift hard an Not suitable A 2% to 6 1 Cemented silty sand Not suitable f 6 to 9% feel I Gravel with sand 4 inches Recommendation: Discharge water to the gravel with sand below 6feet at 4 inches per hour. Test Pit F±pth Soil Type Allowable inflitration Rabe TP -9 %10 1% feet Silt Not suitable for tnlbtratim 2 inches per hour 1% to 3 feet Sandy silt % inch per hour 3 to 4 fast Sand war grevel Not suitable for isliiltratton haftloart 4 to 7% feet Saw with silt and 2 Inches per hour gravel Re commendation: Dischow water to the sand with gravel below 4 feet at 2 inches per Imus Test Pit Soil Allowable InlilM*n Rata TP -10 i4 to 5% feet Silt and hardpan Not suitable for infiltration 534 to 8% feat Silty sarxl with I 2 inches per hour Recommendation: Discharge water to the silty sand with gravel below S'YS feet at 2 inches per hour: Test Pit Depth Soli Type Allowable Infiltration Rate TP -11 34 to 5 feet Clay and sOt with sand Not suitable for Miliration 5 to 9 feet Sand with gravel 4 inches per hour Recommendation: Discharge water to the sand with gravel below S feet at 4 inches per hour: The infiltration rates above are based on the soil types encountered. They also are based on the assumption that the infiltration system will be designed and constructed in general accordance with Ada County Highway District Development Policy Manual recommendations. If another methodology will be used, please consult with us to be sure that the infiltration rates above are applicable. PAVEMENT RECOMMENDATIONS We recommend that the subgrade be prepared in accordance with the recommendations in the "Site Preparation" section above. The pavement sections presented below are recommended for residential streets and residential collector streets. We do not have traffic loading data to complete a formal pavement design; however, the following pavement sections have generally proven to be adequate under typical traffic loads in this vicinity with a stiff silt subgrade. Fite No. 12434-01-01 Page 8 CiEoI:NGINlt R5� April 27, 2007 We performed a resistance value (R -value) test on a soil sample from test pit TP -7. The R value for the silt was 46. This soil was chosen for testing because it was representative of the surficial silt encountered across the site, and would likely be used as fill in the central portion of the site. The recommended pavement sections, based on a minimum R value of 40, are provided in Table 4. Table 2. Recommended Pavement Sections sat Su rade Residential Stsets Collector Streeb Material Thiduiess inches Thickness riches Plantmix Class 11 Z,g 3 3WInch, clashed gate base 4 4 3 -inch minus qmnular subbase a 10 The thicknesses above are minimum thicknesses for each layer. The materials should meet the requirements specified below. We recommend that the roadway construction be completed in accordance with the current edition of the Idaho Standards for Public Works Construction (ISPWC). The base course should conform to all of the specifications for "3/4 -inch (Type I) crushed aggregate for basil' as described in Section 802 of the ISPWC. The plantmix pavement should conform to all of the specifications for Class II mix as described in Section 810 of the ISPWC. The crushed aggregate base should be compacted to a minimum of 95 percent of NIDD per ASTM D1557.. LIMITATIONS We have prepared this report for use by RiveRidge Engineering Company, and the rest of the design team for design of the Jayker Subdivision located between Chinden Boulevard and the Phyllis Canal, west of Ten Mile Road in Meridian, Idaho, as shown in the Vicinity Map, Figure 1. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of geotechnical engineering in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood. Any electronic form or hard copy of this document (email, text, table, and/or figure), if provided, and any attachments are only a copy of a master document. The master hard copy is stored by GeoEngineers, Inc. and will serve as the official document of record. Please refer to Appendix B titled "Report Limitations and Guidelines for Use" for additional information pertaining to use of this report. We appreciate the opportunity to work with you on this project. If you have any questions regarding this report, or ifyou need additional information, please call. Rk No. 12434-001-01 Page 9 GEOENGfAEE95� Aprd 27, 2007 0 • 0 GEOENGINEERS. • APPENDIX A FIELD EXPLORATION AND LABORATORY TES77NG • 0 APPENDIX A FIELD EXPLORATION AND LABORATORY TESTING EXPLORATION PROGRAM Soil and groundwater conditions at the site were explored using a backhoe subcontracted to Goangineers on April 5, 2007. A total of 11 test pits were completed at the site to depths ranging from 5% to 12 feet deep below the existing ground surface. The approximate locations of the test pits are shown in Figure 2. The test pits were located in the field by pacing and/or measuring from survey stakes and based on the site plan provided by RiveRidge Engineering Company. The test pit locations should be considered approximate. A soils scientist from our office observed the test pits on a full-time basis, maintained detailed logs, and obtained representative samples of the soils encountezed for further examination in our laboratory. The soils encountered were classified visually in accordance with the classification system shown in Figure A- L The logs of the test pits are shown in Figures A-2 through A-12. Each of the soil samples was evaluated in our laboratory to confirm the soil classifications and soil properties described in the logs. LABORATORY TESTING Groin Size Ana4 ads A grain size analysis (ASTM D421) indicates the range in diameter of soil particles included in a particular sample. Grain size analyses were performed on three representative samples obtained from the site. The results of the grain size determinations for the samples are presented in Figure A-13. Atterberg lim/ts Atterbag limits (ASTM D4318-98) were established on three selected samples. •Atterrberg limits are used primarily for classification and indexing of cohesive fine-grained soils. The liquid and plastic limits are defined as the moisture content of a cohesive soil at arbitrarily established limits for liquid and plastic behavior, respectively. The results of the Atterberg limits are presented on Figure A-14. Resistance Value A resistance value (Idaho Method T-8) was completed on one selected sample from test pit TP -7. Resistance value data is used primarily for estimating bearing strength of soil from a vertically applied load. The result of the resistance value test is presented on Figure A-15. File Na 12434.001-01 pageA-1 GtoEHramtf. S Apri! 27, 2007-061 • SOIL CLASSIFICATION CHART MAJOR DINISIONa SYMABOLS TYPICAL GRAPH rL—Er—M-1 simrtderd Powilivillon Test (WT) DESCRIPTIONS sh ft tube ® Puton iz Dkestf4wh ®Bu ft or grab VEL CLEAN GRAVELS oo"jj ° GW Pp 8A IGUNED AM GRAVELLY 900.4;o ow"C"Womm °°°° o GPCOARSE 000.iYarAwoouvns aU1Y<-aAND MOt[URfi DRAMSYNftt o GIN OLTP*aNWL-6 e . SCILS mm%Twwaw W RVANW ONNo, eeavi FWM UNNYOFAVl1,. oM1vi -AM- curaernwue &AND ANO SANUV wuSANDS MEAN SANDS NrnaeRMorrq .SW a AvmeN awa�uaNO Sip pOafty-A "MND , MIW�LYiIWo FlNeswYirtr eAw-f4T YM[TW W aro�. FFc*ARll I PACTM e 4AriT.»a..eae•C,AY ML a1011aalloaCT�.AOCKPIOOR aw�aY.a»vwMauan nASTwn GRAINlD 91USA" CLAYa ""W CL O tlle'aOr LOwaD 40a =0=2". YmOY /Uqa 0 °wq ". 1mm%"ftsLTYCW% OLmcminummm ,LhCAYa�p uMl„a,Y 90115 aouaas o 6rToa�oran OLTPNOR AND sauWJ10L wsa CLAYS I' I CH MoaswouAYaormw RANTE OH M&AMOM»AND SM Oi aR1WW To Moa FL48 IY neGNLYORGANIC60118 Y. �� VON - --- ---- T - -• -'--- -- �� .� ...•+..o. w..wn... w aw.r aq1 RWif�lOallpla Sampler Symbol Desedg2ra —• ■ 2A41tah LD. split beirsl Ms simrtderd Powilivillon Test (WT) ❑ sh ft tube ® Puton iz Dkestf4wh ®Bu ft or grab Slowcount b nreordmd for driven samplm as the nurnber of blows required to advance ssnpler 12 mites (or distance not@4 See expiomtion fog for hamnierwelght and drop. A "P" indicia sampler pushed using the weight of the drlu dg. • ADDITIONAL MATERIAL SYMBOLS OhMalltRhig Chet MOW contact betwee-so strata or eeok►pil:•urdb / r bewm a soft atrala or @pproxbraft"'-w often haw WMM a geologic am pert %F exPlorado", Welk or F, TYPICAL.ETTER DE8CRIyms OwwWwWoWw"d atom of Ms list ce P 0118 waftrobservadmitilmot eqgwdlon Cc Cement Concrete iz AC Asphalt Concrete a� Makki o ooden t and dry dwm ft CR Crushed Roar/QuarrySpallsT ceadvctl W >b vih► Pp 8A 8iew walysls T�� OW uc unoomkled ownprasslan Fared DuWaod OhMalltRhig Chet MOW contact betwee-so strata or eeok►pil:•urdb / r bewm a soft atrala or @pproxbraft"'-w often haw WMM a geologic am pert %F exPlorado", Welk or F, AL CA OwwWwWoWw"d atom of Ms list ce P 0118 waftrobservadmitilmot eqgwdlon DS pi rise prodYet In wreg or , OhMalltRhig Chet MOW contact betwee-so strata or eeok►pil:•urdb / r bewm a soft atrala or @pproxbraft"'-w often haw WMM a geologic am pert %F Labomtm I Fiero Tests Pero"Aft s AL CA CIlirllb Ms list ce nsoldWon DS DDkedshm HA me Mfolehns MD a� Makki o ooden t and dry dwm ft OC Organk eot►tont ceadvctl W >b vih► Pp 8A 8iew walysls TX Tiim" cornpnesion uc unoomkled ownprasslan vs Vans, ohm Sheen CiagaNWANen He 888 8hwnN*VkftSMsn Ms Modasie sheen ms Hmyshm NT Nesiod NOTE: The reader must refer to the diseussion h the mPOd text and the logs of expbrallons for a proper underslandhg of submtses cgWitlons. I _2esatptions onto bps appy onry aid* specise expbmWn bcoMms and at the tbsa ft muCIAD tins were made; they ars nal rnsrarysd icbe prsaentaUvs of subasfam cartditbns at cVw bastions at tingles. KEY TO EXPLORATION LOOS GffoENGINEER � FIGURE A-1 0 • 0 Date Excavated: 04/05/07 Logged by'. BWi Equipment: Case 580 Suver L Backhoe Surface Elevation (it) NA 0--, * "' --"-o 0 • Date Excavated: 04/05/07 Logged by: 3WH Equipment:Case 580 Suver L Backhoe Surface Elevation (ft)' NA Grain Size Analysis Figure A-13 0 50 CH or OH 40 so MH or OH 20 CL or OL o io ° _----CL-NAL � ML or I L 0' - 1R v LU 40 so so i00 Uquid Umn Jab Number. 124334-001-01, Exploration Sample Misture Liquid Plasticity Sol(*) Chart No. Depth Content Limit Index Description bol TP -4 0.5-1.0 19% 32 12 CL o TP -11 031.0 23% 39 19 CL • *Soil descriptions based on percent passing size No. 40 sieve. •i• a c 4 0 4 GEoE NGINEERS Atterberg Limits Test Results Figure A-14 ■ I 1 Rn-YAC,tJE mAHO Hi=s Project Treehaven SubdWlon 012434 I.01 lob Number. 137LO543 Client Goo Engineers Fite Name: GEOEOi BM071$7 Sample ID: Subgrade Sol Date Sampled: NIA Location: TP -7 @ 1-3' Sampled by: Client Sol Description: Red -Brown Sill w/ sand Date RewN e& 4/1 OW Tested by: BHFX*ta R WAN pig TH one P01011 wnta hie2 mon+ Pet 168 204 .390, tfi► Dateity. #SCF 96.9 96.3 100.4 L"5bzEeconb K %21.6 21.0 X4 Exp. Pressure, P81 O.0$ 0 39 0.37411 IC J� A K d 9 R x 4 R 8 s 9 R a o a- Nob Thts witramlAip� "I""" t; by V* swo ed d $ na nsosuy com all, R VALUE: 46 GPAMMMA11a1t10Td1 TH P N #= sewirn r V aw Ur or ft 4 too too otn s N0. is ►eLao "a so Na too i"b.300 r ..oae..roaewr►.iou.s.wwa R -value Test Results Jayker Subdivision Meridian, Idaho Reference: Labotatory Testing Services provided by G W E N G I N E E RS Figure A-15 STRATA • GEOENGINEERS APPENDIX B REPORT L/MITAnoNS AND GUIDELINES FOR USE • APPENDIX B • REPORT LIMITATIONS AND GUIDELINES FOR USE' This appendix provides information to help you manage your risks with respect to the use of this report, GEOTECHNICAL, SERVICES ARE PERFORMED FOR SPECIFIC PURPOSES, PERSONS AND PROJECTS This report is for the use by RiveRidge Engineering Company and the rest of the design team for design of the Jayker Subdivision located between Chinden Boulevard and the Phyllis Canal, west of Ten Mile Road in Meridian, Idaho, as shown in the Vicinity Map, Figure 1. Tbis report is not intended for use by others, and the information contained herein•is not applicable to other sites. GeoEngineers structures our services to meet the specific needs of our clients. For example, a geotechnical or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction contractor or even another civil engineer or architect that are involved in the same project, Because each geotechnical or ge010910 study is unique, each geotechnical engineering or geologic report is unique, prepared solely for the specific client and project site. No one except RiveNdge Engineering Company should rely on this report without first conferring with GeoEngineers. This report should not be applied for any purpose or project except the one originally contemplated. A GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT 15 BASED ON A UNIQUE SET OF PROJECT -SPECIFIC FACTORS This report has been prepared for RiveRidge Engineering Company and the rest of the design team for design of the Jayker Subdivision. GeoEugincers considered a number of unique, project -specific factors when establishing the scope of services for this project and report. Unless OwEngineers specifically indicates otherwise, do not rely on this report if it was; • not prepared for you, • not prepared for your project, • not prepared for the specific site explored, or • completed before important project changes were made. For example, changes that can affect the applicability of this report include those that affect: • the function of the proposed structure; • elevation, configuration, location, orientation or weight of the proposed structure; • composition of the design team; or • project ownership. If important changes are made after the date of this report, GeoEngineers should be given the opportunity to review our interpretations and recommendations and provide written modifications or confirmation, as appropriate. r Developed based on material provided by AVE, Professional Firms Practicing in the Gooseieaces;www.asfe.org . File No.12434-001-01 Page B-1 April 27, 2007 GEoENGmEERs SUBSURFACE CONDITIONS CAN CHANGE This geotechnical or geologic report is based on conditions that existed at the time the study was performed. The findings and conclusions of this report may be affected by the passage of time, by manmade events such as construction on or adjacent to the site, or by natural events such as floods, earthquakes, slope instability or groundwater fluctuations. Always contact GeoEngineers before applying a report to determine if it remains applicable. MOST GEOTECHNICAL AND GEOLOGIC FINDINGS ARE PROFESSIONAL OPINIONS Our interpretations of subsurface conditions are based on field observations from widely spaced sampling locations at the site. Site exploration identifies subsurface conditions only atthose points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory data and then applied our professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ, sometimes significantly, front those indicated in this report. Our report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions. GEOTECHNICAL ENGINEERING REPORT RECOMMENDATIONS ARE NOT FINAL Do not over -rely on the preliminary construction recommendations included in this report. These reeomm"dations are not final, because they were developed principally from GooEngineers, professional judgment and opinion. GeoEngineers, recommendations can be finalized only by observing actual subsurface conditions revealed during construction. OwEngineers cannot assume responsibility or liability for this report's recommendations if we do not perform construction observation. Sufficient monitoring, testing and consultation by GeoEngineers should be provided during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork activities are completed in accordance with our recommendations. Retaining GeoEngmeers for construction observation for this project isthe most effective method of managing the risks associated with unanticipated conditions. A GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT COULD BE SUBJECT TO MISINTERPRETATION Misinterpretation of this report by other design team members can result in costly problems. You could lower that risk by having GeoEngineers confer with appropriate members of the design team after submitting the report. Also retain GecEngineers to review pertinent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering or geologic report. Reduce that risk by having GeoEngineers participate in pre-bid and preconstruction conferences, and by providing construction observation. DO NOT REDRAW THE EXPLORATION LOGS Geotechnical engineers and geologists prepare fmal boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering or geologic report should never be redrawn for inclusion in architectural dr other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk. Fire N6.12434401-01 Page B-2 APM 2% 2007 GEoEriramats GIVE CONTRACTORS A COMPLETE REPORT AND GUIDANCE Some owners and design professionals believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give contractors the complete geotechnical engineering or geologic report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for p of bid development and that the report's accuracy is limited; urposeencourage them to confer with GeoEagineers and/or to conduct additional study to obtain the specific types of information they need or prefer. A pre- bid conference can also be valuable. Be sure contractors have sufficient time to perform additional study. Only then might an owner be in a position to give contractors the best information available, while requiring them to at least share the financial responsibilities stemming Som unanticipated conditions. Further, a contingency for unanticipated conditions should be included in your project budget and schedule, CONTRACTORS ARE RESPONSIBLE FOR SITE SAFETY ON THEIR OWN CONSTRUCTION PROJECTS Our geotechnical recommendations ase not intended to direct the contractor's procedures, methods, schedule or management of the work site, The contractor is solely responsible for job site safety and for managing constriction operations to minimize risks to on-site personnel and to adjacent properties. READ THESE PROVISIONS CLOSELY Some clients, design professionals and contractors may not recognize that the gooscience practices (geotechnical engineering or geology) ate far less exact than other engineering and natural science disciplines. This lack of understanding can create unrealistic expectations that could lead to disappointments, claims and disputes. GeoEngineers includes these explanatory "limitations" provisions in our reports to help reduce such risks. Please confer with GeoEngineers if you are unclear how these "Report Limitations and Guidelines for Use" apply to your project or site. GEOTECHNICAL, GEOLOGIC AND ENVIRONMENTAL REPORTS SHOULD NOT BE INTERCHMew The equipment, techniques and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical or geologic study and vice versa. For that reason, a geotechnical engineering or geologic report does not usually relate any environmental findings, conclusions or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Similarly, environmental reports are not used to address geotechnical or geologic concerns regarding a specific project. File No. 12434-001.0! Page B-3 April 27, 2007 GEoENGINEERS