Applicant ResponseEngineers-~
Surveyors
June 17, 2010
Bill Parsons
City of Meridian
ision
mworks Subdivision property was annexed into the City of
At that time a Conditional Use Permit was also applied for and
art of the aforementioned approvals a site plan was included
points on Overland and Stoddard Roads. At that time one full
ut access was approved for each of the roads fronting the
movement access on overland road and one emergency
seen constructed.
to request approval for aright-in/right out access to Stoddard
~d type have been approved by the Ada County Highway
cy requirements.
into account the following information during their decision
mile bong through residential neighborhoods that are relatively
that it will carry large quantities of traffic in the future.
the mid-mile, and is in harmony with the City of Meridians
Comprehensive Plan. Uses such as Banks and Convenience
~e of access that we are requesting.
~ht outs would make turning movements across traffic on
cult and dangerous. Utilizing the existing traffic signal on
allow West bound traffic to turn onto Stoddard and then make
will be less disruptive to East bound traffic and will be safer.
n of this item. If you have any questions and/or comments, or
larding this matter, please do not hesitate to call us. We may
5-9600 or contact me by a-mail at Ibailey@lei-eng.com.
• Surveying
• #,and Flaraning
Boise office: 2040 S. EagCe Road • Meridian, ~U $36~t2 c 208.846.9b0~ i G"0~ ti46.96:J:
Cr~rpc~rate 4fVice: 3302 rW'. Main Street • Spanish Fr~rk, UT 84660 c 804.'7~3t~.t}555 i SD 1.7'8.9395
Satf Laka 4ffice_ 44441 Sraulh 9~ west • i3(t~tldalP. UT £44065 L 801 495.2844 ~ 801.495.284