Loading...
Parks & Rec Commission RecommendationsCITY OF MERIDIAN BY THE CITY COUNCIL: RESOLUTION NO. BIRD, HOAGLUN, ROUNTREE, ZAREMBA A RESOLUTION OF THE MAYOR AND THE CITY COUNCIL OF THE CITY OF MERIDIAN, AMENDING THE PATHWAYS MASTER PLAN; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Meridian City Code section 2-2-3(A)(11) charges the Meridian Parks and Recreation Commission with reviewing and commenting on the City's comprehensive plan as it relates to parks and recreation, and the Meridian comprehensive plan includes, by reference, the Pathways Master Plan; WHEREAS, City staff from both the Planning Department and the Parks and Recreation Department reviewed and analyzed the Pathways Master Plan, compazed the information contained therein to on-the-ground conditions, determined that the Pathways Master Plan contains some outdated and/or inaccurate information, and proposed amendments to the Pathways Master Plan; WHEREAS, on January 13, 2010, by resolution, the Pazks and Recreation Commission directed the Parks and Recreation Director to request that the City of Meridian City Council implement the amendments to the Pathways Master Plan as set forth in the staff report, attached to the Commission's resolution as Attachment 1 thereto; and WHEREAS, the Mayor and City Council find that it is in the best interest of the health, safety, and welfare of the people of Meridian to implement such amendments to the Pathways Master Plan; NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF MERIDIAN CITY, IDAHO: Section 1. That the amendments to the Pathways Master Plan as set forth in Attachment 1 to the Commission's January 13, 2010 resolution, attached hereto as Exhibit A, aze hereby accepted and adopted by the Mayor and City Council of the City of Meridian. Section 2. That this Resolution shall be in full force and effect immediately upon its adoption and approval. ADOPTED by the City Council of the City of Meridian, Idaho, this day of 2010. Mayor Tammy de Weerd ATTEST: sy: APPROVED by the Mayor of the City of Meridian, Idaho, this day of 2010. APPROVED: Jaycee Holman, City Clerk RESOLUTION ADOPTING PATHWAYS MASTER PLAN AMENDMENTS Page 1 of 1 EXHIBIT A MPR Commission Resolution - .Ianua~y 13, 2010 E IDIAN~--- ®, PARKS AND RECREATION COMMISSION A RESOLUTION OF THE PARKS AND RECREATION COMMISSION OF THE CITY OF MERIDIAN, IDAHO, RECOMMENDING THAT THE PATHWAYS MASTER PLAN BE AMENDED. WHEREAS, Meridian City Code section 2-2-3(A)(11) charges the Commission with reviewing and commenting on the city's comprehensive plan as it relates to parks and recreation, and the Meridian comprehensive plan includes, by reference, the Pathways Master Plan; and WHEREAS, the Parks and Recreation Department and Commission have reviewed and analyzed the Pathways Master Plan, comparing the information contained therein to on-the- ground conditions, and determined that the revisions incorporated herein as Attachment 1 are necessary to improve the Pathways Master Plan and future network; and WHEREAS, the Commission finds that providing opportunities for safe, fun, interconnected, and convenient foot and bicycle travel is in the best interest of the health, safety, and welfare of the people of Meridian. NOW, THEREFORE, BE IT RESOLVED BY THE PARKS AND RECREATION COMMISSION OF THE CITY OF MERIDIAN, IDAHO, AS FOLLOWS: Section 1. That the Parks and Recreation Director shall request that the City of Meridian City Council adopt the amendments to the Pathways Master Plan as set forth in the update incorporated herein as Attachment 1. Section 2. That this Resolution shall be in full force and effect immediately upon its adoption and approval. ADOPTED by the Parks and Recreation Commission of the City of Meridian, Idaho, this ~~ day of .jc~K ~ , 2010. APPROVED: c _... Creg Steele, President Parks aa'id Recreation Commission RESOLUTION OF PARKS & REC. COMMISSION -AMEND PATHWAYS MASTER PLAN PAGE 1 OF 7 Attachment 1 UPDATE Proposed Pathways Master Plan Amendments December 9, 2009 The Parks & Recreation Commission recommends the following changes to the Meridian Pathways Master Plan for consideration by the Mayor and City Council: A. CINDER ROAD/EAGLE ISLAND Revise the narrative description for the Linder Road/Eagle Island Connector Pathway, Section A, as follows: Providing a connection to Eagle Island and the Greenbelt is vitally important for bicyclists of all skill levels. The recommended connection is a combination on- street facility and separated pathway along Linder from south of I-84 to the Eagle Island entrance off Linder. The pathway will begin on the west side of Linder south of I-84, continue with a physically separated connection over the interstate and proceed north to Franklin. From Franklin, +~ r a striped, on-street bike lane will extend north to Chateau on both sides of the roadway. *~-~~•° ° °~*~°~ ~~-'° °~T ~~a°~ D~°a North of Chateau to Eagle Island ~e a se arp ated pathway will proceed along the east side of the roadway. Pending roadway design, the bike lane will likely continue in addition to the separated pathway north of Chateau. Revise the maps on page 4-3 ("Pathway Network Map") and 4-22 ("Linder Road/Eagle Island Pathway") as shown in Exhibit 1. B. LOCHSA FALLSBEROES PARK Revise the maps on page 4-3 ("Pathway Network Map") and 4-24 ("Meridian Loop Pathway") as shown in Exhibit 2. The narrative description of the Meridian Loop Pathway, Section C (Meridian -Linder), states the following: "This pathway segment is completed. There is a short on-street segment connecting from Lochsa Falls to Heroes Park." A revision to the narrative is therefore not necessary. C. FULLER PARK TO TEN MILE Revise the map on page 4-3 ("Pathway Network Map") as shown in Exhibit 3. D. DOWNTOWN/E. 3RD STREET Revise the map on page 4-3 ("Pathway Network Map") as shown in Exhibit 4. E. RIVER PLANNING AREA Revise the map on page 4-2 ("Pathway Network Map") as shown in Exhibit S. RESOLUTION OF PARKS 8i REC. COMMISSION -AMEND PATH WAYS MASTER PLAN PAGE 2 OF 7 CHINDEN i I I ' ~ 1 CM LAN ~ I ~ /, r J ~ ( ` t ~ 1 W ~ 1 I O ~ i ~ Z I - ~ w - U W ~ _ ~ ~ O ~ ~ ` U ICK ~~ ~ I USTICK USTICK D 1 ~ I J ~ 1 - • 1 : - ~ ri' I ` -_ ~` - - - ~ r ` dHER - ~ E - ~ `- V Z ~ _ _ I I Q .. V I I ~ Y V p J __ Z l T Q I T ^ ~ W Z FRANKLIN i ~ Q w J_ Z __ j ~ I INTER ATE 84 INTERSTATE 8 0 2,00o a,o~ a,ooo Feet Change proposed 10' pathway to on-street bike lane from Cayuse Creek south to Franklin. ~ ~ ~ ~ ~ Proposed Change Exhibit 1 A RESOLUTION OF PARKS 8L REC. COMMISSION -AMEND PATHWAYS MASTER PLAN PAGE 3 OF 7 z~~ ~ ~oQ~ N~o< ~o am v pp v O ~~n~ 3Com co r~~~ o a~ o ~~~ ~~~o °O-aD ~7 ~ v ~ ~ o a ~ m O ~ ~ p 7 O C~ ~ N O ~ ~ n ~ lD lD x X N I ( I I ~ ~ ~ ~ ~ ~ $ ~ o ~ o n ~ _~ ° a ~ ~ ~ ~ o ~ ~ c_ ~ ~ rn `~ m ~ ~, ~ TEN MIL ~ ~ ~ ~ __1 ~ t _. I O m-~ _ ~~ I V CE i 1 i ;~ I i i _ ~ ~\ I i i -~ - ~a I , ~ +. ra~ ~ • C ~ ;~ ~1-~1 (~ ~-~ ^ ,I~ ^ ~ /C' - ~ i`---- ~ \ - ~-~~ ~ ~ ~ ~~ ~~~ 1 , i ~ ~ -- ~~ ~~ ~ ~~. ~- ,~~ ~ ,,,\ j P EEk¢ ~ \/ ~~ • ~\ ~ ~~ % ~ 1 ~~• ~ ~ ~ i I I ~ ~ --~ ta, /~ . ~ ---- ---_ ~ ~~ C ~ ~-~ ' ~` % ~, ~,- - i .. 1 ~~~ ~' ~ ~\ ~~ i ~- ~ LL ~- '--~-~_ ~ 1, I RESOLUTION OF PARKS & REC. COMMISSION - AMEND PATEIWAYS MASTER PLAN PAGE 4 OF 7 v ~ o o v ~ m ~ ~ ~ ~ ~ ~ cn N. n ? ~ m ~~ c~ ~ _ ~ ~~ ~ ~ j Ivy ~~ ~~ -~ ~ o ~ c v 3 ~ ~~~o c~ ~ ~v m C7~~ ~~ ~ ~n~ o ?~ ~ ~ -~ o,~~-a ~o v~~~v~.o cn~ u mX ~ N ~ ~ ~ ~ v o rn ~ ~ ~ '-~ ~ o ~ ~~ ~ ~w~v~.~ Q ~ ~ ~ r--F N ~ ~ 0 ~ V 1 t ~ - ~ ~ `~ocD~~ (N/1 ~~-- ~ ~ 0 N ~ _, ~ ~ CD ~ (D O ,~-r ~ ~ rn-r ~o~°c°nrn Q ~ ~' x < rn o ~ c~ ~ cn ~ ~ a ~ c~ a`~.v ~ ~ sv rn ~ ~ ~~cn rn x W ~~~~= v O ~ x o ~° ~ o ~. o o ~ ~ ~ v ~ a m _ a .-. ~ ~ ~ v n v o s ~ ~ ~ f ~ ~ ~ ~ ~ m .~' ,~ "~ .~~ ~_~_~.~. ~:~ h T.~.-,r ., ~~ r~ , v RESOLUTION OF PARKS & REC. COMMISSION -AMEND PATH WAYS MASTER PLAN PAGE 5 OF 7 Z a 0 w CHERRY ~ FAIRVIEW ^ ^ ^ - ^ ^ • _ ^ ^ ^ ^ • ^ ^ ~ ~ • ~ • r • ^ • ` • • ~ ^ ~ ^ ^ ~ ~ _. • • • ~ • • • - _ ~ • - 2 ^ ~ a Z _ o a ^ ~ ~ ^ w ~ PINE ^ .~, Z • '- • _ _. ~ °~ '5n ~ 500 ?50 1,000 ~~ Feet Extend E. 3rd St. On Street Route north to Fairveiw along proposed roadway extension alignment. Add on street connections on Fairview from Main St. to Lakes Ave. crossing, and on Washington from E. 3rd to Cathy and north to tie in with Five Mile Creek Pathway Segment H.1 at Badly. Exhibit 4 ^ ^ ^ ^ Proposed Change Existing Pathway - - Long-Term Route Micro Path On Street Route Proposed Pathway RESOLUTION OF PARKS & REC. COMMISSION -AMEND PATH WAYS MASTER PLAN PAGE 6 OF 7 o a ^ a' n ^ ~ ~ _ ~ S ~ ~ O ~ ~ 0 O N O N do ~ Q lJ ~ ~' ~ ~ ~ ~ ~ ~ m m .~ ~ ~' a~ = o ~~ a~ ~ °c O~ =~ 0 m x f~' V, ~~+ C r.: 7 ~-' _ Fad ~~ ~' S. d ~ r ~ ' f z: ,1 m EMMETT LACK CAT m $ - - - ~ • ~ ,` ~ ^ ~ ~ • -- • 1 -- ~ _ P MER `. _ . ~ . N n ^ m ~~ ~--- ~ ~ __ ~ m c; ~ _ - o 3. m ~ B; m a r ~; s ~ ~ - r r L • ~ Z • O f ~ m .~~ Z CINDER ~; m ~~ o to C' L' ~a a~Q~ i. ~. F /` ~ yn / J .y RESOLUTION OF PARKS 8c REC. COMMISSION -AMEND PATH WAYS MASTER PLAN PAGE 7 OF 7