Loading...
Les Schwab Tire CenterRECEIVED N 0 V - 4 1994 ,, . ~ ~ . GiTY OF MEkiL~~AN GLENN J. RHODES, President SHERRY R. HUBER, Vice President JAMES E. BRUCE, Secretary November 2, 1994 TO: LES SCHWAB TIRE CENTERS OF OREGON INC. P.O. BOX 667 PRI~dE~JILLE OP. 97754 FROM: Karen Gall r, or Developm e s SUBJECT: LES SCHWAB TIRE CENTER E. 1ST & GEM STREET Your application for the above referenced project was acted on by the Commissioners of the Ada County Highway District on November 2, 1994. The attached staff report lists the conditions of approval and street improvements which are required. If you have any questions, please feel free to call me at 345-7680. LS CC: Development Services Chron MERIDIAN CITY HALL ada county highway district 318 East 37th • Boise, Idaho 83714 • Phone (208) 345-7680 cc~rc GLENN J. RHODES, President SHERRY R. HUBER, Vice President JAMES E. BRUCE, Secretary TO: ACRD Commission INTER-DEPARTMENT CORRESPONDENCE LESCHWAB/DSTECH 11-2-94 DATE: October 31, 1994 FROM: Development Services SUBJECT: Les Schwab Tire Center E lst and Gem Street Meridian Site Plan Review (Applicant - Les Schwab Tire Centers of Oregon, Inc., P.O. Box 667, Prineville OR 97754) (Representative - Russ Parker) FACTS & FINDINGS: 1. The applicant is requesting site plan approval for a tire service center located on the west side of East 1st Street in Meridian, north of Gem Street. 2. GENERAL INFORMATION: ACRES - 1.89 SQUARE FEET OF PROJECTED BUILDING - 15,200 ZONING - Commercial - C-G ESTIMATED VEHICLE TRIPS PER DAY - 580 TRAFFIC ANALYSIS ZONE - 280 L.F. OF FRONTAGE ON E First Street - 530 MOST RECENT TRAFFIC COUNTS - Date 1994, 15,870 n/o Central Dr FUNCTIONAL CLASSIFICATION MAP DESIGNATION - Minor Arterial ADA COUNTY RIDGE-TO-RIVERS PATHWAY PLAN - Route EXISTING RIGHT-OF-WAY - 80-feet REQUIRED RIGHT-OF-WAY - No additional required E First Street is improved with two 26-foot street sections separated by a landscaped island. There is no sidewalk on the west side of E First Street. L.F. OF FRONTAGE ON Gem Street - 155 MOST RECENT TRAFFIC COUNTS - None available FUNCTIONAL CLASSIFICATION MAP DESIGNATION - Local ADA COUNTY RIDGE-TO-RIVERS PATHWAY PLAN - No pathway shown EXISTING RIGHT-OF-WAY - 95-feet ada county highway district 318 East 37th • Boise, Idaho 83714 • Phone (208) 345-7680 Les Schwab Tire October 31, 1994 Page 2 Meridian - E 1st and Gem REQUIRED RIGHT-OF-WAY - 60-feet north of canal Gem Street is improved with 24-feet of pavement. Gem Street has 95-feet of right-of-way. Located within the right-of-way is a canal. Sixty-feet of right-of-way is required north of the canal. IMPACT FEE BENEFIT ZONE - West Ada IMPACT FEE ASSESSMENT DISTRICT - Western Cities 3. There are two existing 46-foot wide curb cuts on E First Street. The applicant is proposing to decrease. the width of the northern of the two existing curb cuts. Staff recommends a minimum width of 30-feet. 4. Staff recommends that sidewalk be required on E First Street and Gem Street. 5. Staff recommends that Gem Street be required to be constructed to half of a 41-foot street section with curb, gutter, and sidewalk. 6. Staff recommends that the access point on Gem Street be a minimum of 30-feet wide and located no closer than 50-feet from E First Street. 7. This application is scheduled to be reviewed administratively by the City of Meridian. The following requirements are provided to Meridian as conditions for approval. SITE SPECIFIC REQUIREMENTS: 1. Construct curb, gutter, 4-foot sidewalk and match paving on Gem Street abutting parcel. Improvements shall be constructed to a 41-foot back-to-back street section. 2. Construct 5-foot wide concrete sidewalk on E First Street abutting parcel. 3. Construct access points a minimum of 30-feet in wide, located as proposed in the submitted site plan. STANDARD REQUIREMENTS: 4. Street and drainage improvements required in the public right- of-way shall be designed and constructed in conformance with District standards and policies. Les Schwab Tire Meridian - E lst and Gem .- - October 31, 1994 Page 3 5. Specifications, land surveys, reports, plats, drawings, plans, design information and calculations presented to ACRD shall be sealed, signed and dated by a Registered Professional Engineer or Professional Land Surveyor, in compliance with Idaho Code, Section 54-1215. 6. Provide written approval from the appropriate irriga- tion/drainage district authorizing storm runoff into their system. 7. Locate obstructions (utility facilities, irrigation and drain- age appurtenances, etc.) outside of the proposed street im- provements. Authorization for relocations shall be obtained from the appropriate entity. 8. Continue existing irrigation and drainage systems across par- cel. 9. Submit three sets of street construction plans to the District for review and appropriate action. 10. Submit site drainage plans and calculations for review and appropriate action by ACRD. The proposed drainage system shall conform to the requirements of Meridian City and shall retain all storm water on-site. Public street drainage facilities shall be located in the public right-of-way. 11. Provide design data for proposed access to public streets for review and appropriate action by ACRD. 12. Locate driveway curb cuts a minimum of 5-feet from the side lot property lines when the driveways are not being shared with the adjacent property. 13. A right-of-way permit must be obtained from ACRD for all street and utility construction within the public right-of- way. Contact Construction Services at 345-7667 (with zoning file number) for details. Les Schwab Tire October 31, 1994 Page 4 Meridian - E 1st and Gem 14. A request for modification, variance or waiver of any require- ment or policy outlined herein shall be made, in writing, to the Manager of Engineering Services within 15 calendar days of the original Commission action. The request shall include a statement explaining why such a requirement would result in substantial hardship or inequity. Should you have any questions or comments, please contact the Development Services Division at 345-7662. STAFF SUBMITTING• Karen Gallagher DATE OF COMMISSION APPROVAL: Nnv g 21994 ~~ ~ _ r._ , ~~ ~\ ~1 I 1~ V/ y',~'--~ LANE W W z Q fi111fSN// i I I ~ \ \ I ~' ii !h ~~ i~ i H sltll!l,IL H C•- I y Q W 51~-rE i , I snnsf:ro ~ I ~~ I slnuulee I ~ anu,s,w nml»/a I i I III li!• annulw I N I - n . /~ ~ s ~ ~7 S ~--~ £qsT i`I CSN7.. s,ln,ua/ _ ~ / ~ ~._ _.-- f r y tv M,grroen y-. _ CORPORATE _ .. I ~ ~ i li / 1 nxalNa ~ n,nmlr y / CBNTRAL / VALLEY ~ ~,, ;I J ~--1r-~---~- ' ~ • ~ ~ i, ~~' CORPORATE ~ "'"61M" ~~ i ~ ;~~ % ,~~ ~ h,,,r i `. ~~ u7, ~~ l ~. I.I __ _~ a ns ry ! ~\ ~__ *'„mat<.dABt~a'f;.7'4[~.'Je~!4i;wt r~~. f. ;~:::~.._lrr.~t':.^ ~--4i.» - +~:~a~r;>tia _ -:<~.;. r.< GEM AVENUE ~1 - '• 1 O N.'T. S, C3EAA STREET I n uws W I - -_M. ~~~"`.- `~~#aceli~'c.'s,W+sFa'~e~C'£.: !~t.7,>!F."~ w+". ce+ea:•-ef....?;~s.z. .. ,:•.e,.H.. ,-x t~.-,., ~ «..e~..w:i.;i - ...-_vw: -~ .>