Loading...
ACHD Comments~~ ~t. ~~;~ CHD September 23, 2009 To: W.H. Moore Company 1940 S. Bonito Way, Suite 160 Meridian, Idaho 83642 Rep: Cornel Larson (sent via email) Larson Architects 210 Murray Street Boise, Idaho 83714 Subject: MCZC-09-044 Parking lot addition 1937 S. Bonito Way Carol A. McKee, President Sherry R. Huber, 1st Vice President Rebecca W. Arnold, 2nd Vice President John S. Franden, Commissioner Sara M. Baker, Commissioner In response to your request for comment, the Ada County Highway District (ACRD) Planning Review staff has reviewed the submitted application and site plan for the items referenced above. It has been determined that there are no site specific requirements for you at this time due to the fact that all required roadway improvements exist abutting the site. If the site plan or use should change in the future, ACRD Planning Review will review the site plan and may require improvements to the transportation system at that time. Prior to final approval you will need to submit construction plans to the ACRD Development Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. A traffic impact fee may be assessed by ACRD and will be due prior to the issuance of a building permit. Contact ACRD Planning 8~ Development Services at 387-6170 for information regarding impact fees. Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACRD. If you have any questions, please feel free to contact me at (208) 387-6187. Sincerely, ~~~ Matt Edmond Planner III Right-of-Way and Development Services CC: Project file Kristy Vigil, Meridian City Planning Department (sent via email) Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACHD roadway or rig ht-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us II Development Process Checklist II ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACRD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ®Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then architectural plans may be submitted for purposes of impact fee calculation.) The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACRD Right-of-Way Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: Traffic Control Plan An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us