One Subidivision #2 FP'~.. • . 9213`
J. DAVID pdAVARR0
RECORDER BY
~~
SUPPLEMENTAL DECLARATION 'g2(flfl8 5 P(~ 4 21
OF
COVENANTS, CONDITIONS AND RESTRICTIONS FOR
ONE SUBDIVISION _ PHASE 1
(Annexation of One Subdivision #2)
This Supplement 1 Declaration ("Supplement") is made
effective as of the 5~ day of YY1a.C1-G~{ 1992,
by MAX A. BOESIGER, INC., an Idaho corporation, or
"Declarant," and shall be incorporated into and supplement
that certain Declaration of Covenants, Conditions and
Restrictions for One Subdivision -Phase 1, recorded as
Instrument No. 9152521, records of Ada County, as to the
Phase 2 Property hereby covered as described below.
ARTICLE I.
GENERAL
1.1 Property Covered. Grantor/Declarant is the Owner for
the real property in the County of Ada, State of Idaho,
describe as:
One Subdivision #2, a portion of the S.W. 1/4 of
the S.E. 1/4, Sec. 2, T.3 N., R.1 W. B.M.,
Meridian, Ada County, Idaho, according to the
official plat [hereof recorded as Instrument No.
9152520, records of Ada County, Idaho. ("Phase 2
Property" and "Phase 2 Lots" as to the lots
therein).
1.2 Purpose. The purpose of this Supplemental Declaration
is to annex the Phase 2 Property to the Property covered by
the Declaration, and to include the Owners of Phase 2 Lots in
the Association.
1.3 Annexation. Grantor, pursuant to the provisions of
Article VIII of the Declaration, does hereby annex the Phase
2 Property to the Property covered by the Declaration and
said Phase 2 Property hereby becomes subject to the
Declaration and encompassed within the general plans and
scheme of covenants, conditions, restrictions, and
reservations of easements and equitable servitudes and other
terms and conditions therein, except as otherwise specified
herein. Unless otherwise provided, all defined terms as
contained in the Declaration shall have the same meaning in
this Supplement as are applicable to the Declaration.
1.5 Association Membership. Article IV general and Section
4.2 specifically, is hereby supplemented to provide that each
Owner of a Phase 2 Lot shall be a member of the CRYSTAL
SPRINGS HOMEOWNERS ASSOCIATION.
ARTICLE II
DECLARATION
Grantor hereby declares that the Phase 2 property,
and each Lot, parcel, or portion hereof, is and shall be
held, sold, conveyed, encumbered, hypothecated, leased, used,
occupied and improved subiect to the Declaration, as
supplemented hereunder, and the restrictions, covenants,
limitations, conditions ad equitable servitudes contained
therein, all of which are declared and agreed to be in
furtherance of a general plan for the protection,
maintenance, subdivision, improvement and sale of the Phase 2
property, or any lot, parcel or portion thereof, and to
enhance the value, desirability and attractiveness of the
Property. The covenants, conditions and restrictions set
forth in the Declaration, as supplemented hereunder, shall
run with the land (described as [he Property including the
Phase 2 Property), and each estate therein and shall be
binding upon all persons having or acquiring any right, title
or interest in the property, including the Phase 2 Property,
or any Lot, parcel or portion hereof shall inure to the
benefit of and be binding upon Grantor, its successors in
interest and each Grantee and his respective successors in
interest, and may be enforced by Grantor, by any Grantee or
Owner or his successors in interest, or by the Association as
described in the Declaration.
ARTICLE III
SUPPLEMENTS AND MODIFICATIONS
3.1 Plat Conditions. Article 1, Section 1.19 is hereby
supplemented to provide that "Plat" as the Phase 2 property
shall refer to the recorded plat of One Subdivision No. 2.
All conditions of the Plat are hereby incorporated herein by
reference and notice is hereby given of the same.
IN WITNESS WHEREOF, the Gran[or has executed and
acknowledged this Supplemental Declaration effective as of
the day and year first written above.
MAX A,,,,BOESIGER, INS., an IQaho Corporation
B y / "`~ i
Max A. Boesiger Jr., Presi nt
STATE OF IDAHO )
ss.
County of Ada )
On this ~~ day of ~A~~~- 199y,
before me the undersigned, a Notary Public in and for said
State, personally appeared MAX A. BOESIGER JR., known or
identified to me to be the President of Max A. Boesiger
Inc., the corporation that executed the instrument or the
person who executed the instrument on behalf of said
corporation, and acknowledged to me that such corporation
executed the same.
IN WITNESS WHEREOF, I have hereunto set my hand and
affixed my official seal, the d and year in his
certificate first above written 1 I
Notary Public fbr ~daho
Residing at Boi e, Idaho ~~
My Commission Expires: 11
~~p4 AIpY
~ ~AV i~ S1G -
0
SUBDIVISION EVALUATION SHEET
Date
Proposed Development Name ONE SUB NO. 2 City MERIDIAN
formerly CRYSTAL SPRINGS
Date Reviewed ..2/20/92 Preliminary Stage Final XXXXXXX
Engineer/Developer H~IBBLE ENGR./MAX BOESIGER INC. Date Sent
The following SUBDIVISION NAME is approved by the Ada County Engineer or hts
designee per the requirements of the IDAHO ST~Ey/C~ODE1
ONE SUBDIVI~ON. NO. 2 X. V" (_ ///' Date L/ f0/yes
The Street name comments listed below are made by the members of the ~4DA COUNTY
STREET NAME COMMITTEE (under direction of th~Ada County Engineer) regarding this
development in accordance with the Boise City Street Name Ordinance.
Tie followinY existinY street names shall appear on the olat as•
"W. CHERRY LANE
"N WATERFALL AVENUE"
The following, new street name is approved and shall aooear on the Diet as•
"W. RAINWATER STREET"
The following new street name is approved and shall appear on the oIat as
"N. COOL CREEK AVENUE"
The above street name comments have been read and approved by the following
agency representatives of the ADA COUNTY STREET NAME COMMITTEE. ALL of the
signatures must be secured by the representative or his designee in order for the
street names to be offtcially approved.
ADA COUNTY STREET NAHE COHNITTE
Ada County Engineer John Priester
Ada Planning Assoc. Terri Raynor
Meridian Fire Dept. Representative
E, AG NCY PRESE ATIVES OR DESIGNEES
- .L~ p
. U`7~Lk i^- Date ~ ! Z
t
ate ~-O /
NOTE: A copy of this evaluation sheet moat be presented to the Ada County
Engineer at the time of signing the "final plat ", otherwise the plat will not be
signed l111 Sub Index Strec~ Index Map
NUMBERING OF LOTS AND BLOCKS
CENTRAL
•• DISTRICT
~1THEALTH
DEPARTMENT MAIN OFFICE • 1455 N. Orchard • Boise, Idaho 83706 • (208) 375-5211
92-84
SeMng
Ada Boise.
Elmore, and Valley
Coumies 1992
February 5,
Boise C W my Office
1455 N.Omhard
Boise, ID 03]CB
Nuesing: 3755211
EnNronmantal
Health:37S5230 DAVID NRVARRO
ADR COUNTY RECORDER
650 MAIN STREET
Elmore Counry Offce
szo=_.emstreelN. BOISE ID 83702
Mountain Homy
ID 03047
~"40'
RE: ONE SUBDIVISION NO. 2
Dear Mr. Navarro:
Elrtare Counry Ollke
of Emironmenial Health
190 s.4tn s0eel E'
Central District Health Department,
Environmental Heal
Moun+aln Home.
io6364]
Division has reviewed and can approve
the final plat an thas
sw-ezzs
subdivision for central water and central sewer facilitaes.
Final approval was given on February 4, 1992.
Vatley Counry Office
r.o.gex+mfi
No lot size may be reduced without
prior approval of t e
McCall, ID 03630
63a-],s4
health authority.
If you have any questions please call.
Sincerely,
~i~/ J~ Z - ~~
~.
Thomas E. Schmalz, E.H.S.
Sr. Environmental Health Specialist
cc: Tom Turco, Director
Meridian City Public Works
Meridian City Building Dept.
HUD
Max A. Baesiger, Inc.
Hubble Engineering
TS:bls
~tt~ Of CredZt West One Bank, Idaho, N. A.
International Banking Department ~ ~~
101 5. Capital BIM., Boise, Idaho
Post Office Box 8247, Boise, Idaho 88733
Telephone: 20&3837800 Fax: 20338&7563 ~K -
Telex: 262542 Answerback: WEST ONE BA IDA
3
City of Meridian
33 East Idaho Avenue
Meridian, Idaho 83642
Irrevocable Standby
Letter of Credit No.: 6328S
Dated: February 3,.1992
Expiration Date: July 1, 1992
At Our Counters
z
e
0
c
3
:~
a
`s
E
9
W
E
.~
9p
M
e
5
9
'a^
.B
3
0
9
9
5
0
A
S
Y
yV
W
Dear Sirs:
We hereby authorize you to draw on WEST ONE BANK, IDAHO, N.A., BOISE, IDAHO 83733
For account of Max A. Boesiger, Inc., 6479 Glenwood, Boise, Idaho 83703
Up to the aggregate amount of******THREE THOUSAND AND NO/100 U.S. DOLLARS*****
available by your draft(s) at eight accompanied by the following documents:
--Original of this letter of credit for endorsement.
--A statement purportedly signed by an authorized official of the City of
Meridian as follows: "Max A. Boesiger has failed'to perform or is-in default
for the installation of street lights to One Subdivision Phase No. 2 and.
area(s) of non-performance have been communicated directly to Max A.
Boesiger by the City of Meridian."
Partial drawings are permitted.
All drafts drawn must be marked: DRAWN UNDER WEST ONE BANK, IDAHO, N.A. LETTER
OF CREDIT N0. 63285
We hereby agree with drawers of drafts drawn under and in compliance with the
terms of this credit that the same shall be duly honored on due presentation to
the drawee.
CR00513 (8-89)
~]
MERIDIAN CITY COUNCIL
JRNURRY 21, 1992
PAGE 3
Post•ItTM brand fax transmittal memo 7671 # of pages ~
o. ~
~
d
,
, Mr~~
.o~,
Dept. Phone
33
Fex # _ O i Fax # 6
Eng. Smith: I sent the minutes out to the committee members and
I'm waiting far a response from them to make sure everything is
the way it was discussed. I had previously contacted the Highway
District requesting studies on Locust Grove with emphasis on
signalization at Locust Grove and Fairview. I specifically
requested a counter be placed on Locust Grove north of Fairview
and also one north of Chateau so we can see what kind of traffic
there is being generated on there right now.
The Motion was made by Tolsma and seconded by Giesler to approve
the preliminary plat on Kearny Subdivision.
Motion Carried: All Yea:
ITEM,~#~?.:F~IIt?~1ffE'"R+LRT ON ONE;.~l813IVit3If)N ~~:
Corrie: On itam'+K"f' vt7'"~Tie EdM'lxils~=ll` "~~'iey going to put that
turn around over there for the fire department?
Max Boesiger: We do 3a} ~ r:xRat in. What we will do is
~x .. ~'.:'.:.
put in a t~s'FYOy+ir~q '`turn around just beyond the end of this
platted subdivision for service vehicles and so forth to turn
around in.
Tolsma: You dadn't~•,ti~ any `other problems with any of the other
comments? '
Boesiger: I don't believe so.
Tolsma: Did you ,4+qe>-. tHta''School District' s comments about the
buses?
Boesiger: Yes. No problems.
T
0
~Eorrie #6f;t~Rpt~'ove
Giesler: Have they received a copy of the City Engineer's
comments?
Roy Johnson: Yes. We have no problems with them.
ITEM #5: FINAL PLAT ON SUNBURST SUBDIVISION tit:
~~t ~oF
s~
Qo~...~~:~ ..
~ ~ United States Department of the Interior
~; _ A;.
,.~ BUREAU OF RECLAMATION
~ , CENTRAL SNAKE PROJECTS OFFICE
°R ~.3..'!~'°` 214 BROADWAY AVENUE
BOISE, IDAHO 83702-7298
a er r~.r
RF.k ER TU.
320 January 21, 1992
Meridian Planning
& Zoning Commission
City of Meridian
33 East Idaho Avenue
Meridian ID 83642
r~ ~~
a~
Subject: Amended Review of One Subdivision #2 Final Plat (Zoning Review)
Dear Meridian Planning & Zoning:
Please disregard our letter of December 27 regarding platting of this
subdivision. Upon review of our records we determined that the proponent has
obtained a permit to discharge storm waters from One Subdivision #2 to the Nine
Mile Drain.
We recommend approval of this plat.
Please contact John Caywood of my staff (ph. 334-1463) if we can be of any
assistance.
Sincerely,
Je~D
99
Project Superintendent
cc: Nampa Meridian Irrigation District
ENGI/y •
U ` e~9N
NUBBLE ENGINEERING, INC.
9 ~y 7025 Emerald Suite 200 • Boise, Idaho 83704
mG sunvE°Oe
TRANSMITTAL LETTER
C,~~. GGEti/~
Attn:
(208) 322-8882 • Fax (208) 378-0329
Job No.:
Project:
ONE Sit:rBO. nJd . Z
WE ARE SENDING YOU:
^ As Requested
~ttached
^
Under Separate Cover, Via
FOR YOUfl:
^ Use
^ Information
^ R~~cord
Review and Comment
^
^
Bidding ^ Cost Estimating
THE FOLLOWING:
B~Prints
^ Specifications
^ Plans
^ Shop Drawings
^
^
Samples ^ Copy of Letter
Copies Date Sheet No. Description
~~ 3av
REMARKS:
Copy To: ^ With Encl.
^ With Encl.
^ With Encl.
By:
Signed:
ti ,
~9~ ~
~ ice, ",~
~ N ~
W a ~'
~~
~~~
r ¢
~ ~ o N " r-~
i
NO _ N W ? CT ONE V 1
~ Q __
.IRN 2t '92 12:06 FROM NUBBLE ENGINEERING PAGE.002
O1i21/8P 1P:41 1?• ~]9 9715 B9R CSPO • 1~99Y
1
~-• United States Department of the I~nt~rior
;_
rt_.. ~ wriw Fehr nc ?.t'~`S s~"!T':^??
F r'R~ sr_ yua._~s D~.w:~,.."~So.PZ'Ti'F'..:c _~ ~
P1s BROADWAY AYF1iRiE _
eQtSE, il?AISO i379tt T~96 .
u frxr
Itllift'Kx
32O January 21. 1992
Martdian Planning
& Zoning Co®rtission
City of Meridian
33 East Idaho AvBpue
Meridian iD 83642
Subject: AmBnded Revier of One SBbdivision t2 Final Plat {Zoning Review)
Dear Meridian Planning d ZoMng:
Please disregard our Iettcr of December 27 regarding plattinc} of this
_ ~~< .~_~ _ ,._ <~,.. ~ ,-;- ;,,L.orda Ma datQrvained that the proponent has
~. _.~ __=
'%u*Sined d ~e",'Alt rH discharaa s#~nr.~, mater i`ir_.~ ^S ^L•~c~aEs..,; .~~ -,~ r.s~ RR.,
Mole Drain_ ~..-'-.
xe re~msnd approval of this plat.
Please contact John CayKOad of pU~ staff {ph. 334-1463) if we tan ~ of a:
assistance.
Sincerely.
Rro~e<t rini:Bndent
cc: mae~pa Meridian Irrigation District
** TOTRL PRGE.002 **
FINAL PLAT
ONE SUBDIVISION # 2
COMMENT S
1: ADA COUNTY HIGHWAY DIST: NOTHING RECEIVID:
2: CENTRAL DISTRICT HEALTH: CAN APPROVE WITH CENTRAL WATER & SEWER:
3: BUREAU OF RECLAMATION: SEE ATTACf~D iFrrrFR;
4: MERIDIAN SCHOOL DIATRICT: SEE ATTACf~ LETTER:
5: CITY ENGINEER: SEE ATTACHID CONII~[VTS:
6: POLICE DEPT: NO OBJECTIONS:
7: FIRE DEPT: FIRE DEPAF~II~TP WILL NEID A TURNAROUND AT THE END OF BLK # 4 IJJT #13
& BLK# 3 LO'P # 27:
8: SEWER DEPT: NO COMMENT AT THIS TIME:
9: BLDG. DEPT: PLAT NEEDS TT SHOW STREET' NAME OF THE NORTH-SOU'PH STREEP OFF OF
WEST RAINFALL STREET.
N
o-,_,
"m~
/~ .
A
J
IN REPLY
REFER TO:
320
January 9, 1992
Meridian Planning & Zoning Commission
City of Meridian
'ss cast iaano Hvenue
Meridian ID 83642
Subject: Review of One Subdivision #2 Final Plat (Zoning Review)
Dear Meridian Planning & Zoning:
~_
n~
This subdivision's storm water will run off into Reclamation's Nine Mile Drain,
operated and maintained under contract by the Nampa Meridian Irrigation District.
All storm water discharge to this drain requires a permit from Reclamation.
The proponent has not obtained a permit to discharge storm waters from One
Subdivision #2 to the Nine Mile Drain. While the proponent-.has a permit to
discharge storm water from the earlier "One Subdivision #1", that permit does not
allow runoff from adjacent areas or later developments.
We recommend that approval of this plat be withheld until the proponent has
either secured a discharge permit from Reclamation or developed other means of
storm water disposal.
Please contact John Caywood of my staff (ph. 334-1463) if we can be of any
assistance.
Sincerer
Q ~
errold D. G
Project Sup rintendent
cc: Nampa Meridian Irrigation District
United States Department of the Interior
BUREAU OF RECLAMATION
CENTRAL SNAKE PROJECTS OFFICE
214 BROADWAY AVENUE
BOISE, IDAHO 83702-7298
• • SUPERINTENDENT OF SCHOOLS
Dr. Nick Hallett
OR EXCEL DEP Dan Mabe RF nance & Administration
`~Z ASSISTANT SUPERINTENDENT
,~~~ n Bob Haley. Instruction 8 Personnel
m DIRECTORS
Jim Carberry, Secondary
Darlene Fulwood, Elementary
JOINT SCHOOL DISTRICT N0.2
911 MERI DIAN STREET • MERI DIAN,IDAH083642 PHONE(208)888-6701
January 10, 1992
Meridian City Council
33 East Idaho
Meridian, Idaho 83642
Dear Members:
i have reviewed the preliminary plans for One Subdivision #2 and
have concerns about approving such a subdivision with no
provisions being made to house additional students in our
schools. The addition of Pioneer Elementary will provide some
relief at the elementary level, but our secondary schools
continue to become more over-crowded. We need help and support
to provide adequate classroom space.
I have two additional comments that may be on interest to you.
The first is that busses may not enter the subdivision until our
transportation director has inspected the turns for radius. The
second is that these children may not attend the most local
schools currently serving the area. It may be necessary to
transport them to any school in our district with available space.
Sincerely,
Dan Mabe
Deputy Superintendent
DM:gr
~~~~ _s
~< a~~
° ~ m
~ ali
~ ~~
~~y
\Vq~H:.3..~a9e
iA' REPLY
REf P.R 10~.
320
January 9, 1992
Meridian Planning & Zoning Commission
City of Meridian
#-~as~-ia~4ra-i~v~n-a~----- - .. _ _ .__ _ .
Meridian ID 83642
Subject: Review of One Subdivision #2 Final Plat (Zoning Review)
Dear Meridian Planning & Zoning:
TAIL ~~
~~
~ ^
This subdivision's storm water will run off into Reclamation's Nine Mile Drain,
operated and maintained under contract by the Nampa Meridian Irrigation District.
All storm water discharge to this drain requires a permit from Reclamation.
The proponent has not obtained a permit to discharge storm waters from One
Subdivision #2 to the Nine Mile Drain. While the proponent has a permit to
discharge storm water from the earlier "One Subdivision #1", that permit does not
allow runoff from adjacent areas or later developments.
We recommend that approval of this plat be withheld until the proponent has
either secured a discharge permit from Reclamation or developed other means of
storm water disposal.
Please contact John Caywood of my staff (ph. 334-1463) if we can be of any
assistance.
Sincerer
Q
errold D. G
Project Sup rintendent
United States Department of the Interior
BUREAU OF RECLAMATION
CENTRAL SNAKE PROJECTS OFFICE
214 BROADWAY AVENUE
BOISE, IDAH083702-7298
cc: Nampa Meridian Irrigation District
DATE: JANUARY 15, 1992
T0: MAYOR & CITY COUNCIL
RE: ONE SUSDIVISIDN NO. 2
FINRL PLAT
FROM: GARY SMITH, PE /~ "_~"V
~~
I have reviewed the final plat in accordance with City Ordinances
and policies and I have the following comments:
1.
2
3
4.
This final plat generally conforms to the lot and street lay
out as approved in the preliminary plat submittal. R11 lot
sizes meet or exceed 8,000 sq. feet in size.
R street name is required for the north-south street
connecting to W. Rainfall St.
The 3rd line from the bottom of the legal description on the
plat back should show a distance of 491.43 feet, not 891.43
feet.
The subdivision improvement plans are being reviewed at this
time and will be sent to the developers engineer under
separate cover.
1
S~IVISION EVALUATION SET
Proposed Development Name ONE SUB NO. 2 City MERIDIAN
formerly CRYSTAL SPRINGS
Date Reviewed 1/02/92 Preliminary Stage Final _XXXXXXX
Engineer/Developer NUBBLE ENGR /MAX BOESIGER INC Dete Sent
The following SUBDIVISION NAME is approved 6y the A~County Enginner or his
designee per the requirements of the IDAHO STATk,' Cz0 /
ONE SUBDIVISION N0. 2 X ~,~~~ Date ~'Z' JZ
The Street name comments listed below are made by the members of the ADA COUNTY
STREET NAME COMMITTEE (under direction of the Ada County Engineer) regarding this
development in accordance with the Boise City Street Name Ordinance.
The following existing street names shall appear on the plat as•
"W. CHERRY LANE
"N. WATERFALL AVENUE"
The followinY new street name is approved and shall appear on the plat as•
"W. RAINWATER STREET"
Choose a street name for the new North/South street and have it approved by the
street name committee.
above street name comments have been read and approved by the following agency
representatives of the ADA COUNTY STREET NAME COMMITTEE. ALL of the signatures
must be secured by the representative or his designee in order for the street
names to be officially approved.
ADA COUNTY STREET NAME COHHITTEE
Ada County Engineer John Priester
Ada Planning Assoc. Terri Raynor
Meridian Fire Dept. Representative
OR DESIGNEES
Date ~ Z ~ Z
Date. ~~
Date
NOTE: A copy of this evaluation sheet must be presented to the Ada County
Engineer at the time of signing the "final plat", othezwise the plat will not 6e
signed 1!!1 Sub Index ~ A Street Index Map
NUMBERING OF LOTS AND BLOCKS OK C~ ~~ I, i - 2 -
E •
>+
~~ ~ I ~ Cua ~U
UCa H W O ~ w
6 G ~ ~~.7 O Cal W x O F
W 4N Z 3U EF
~ ~ ° z o~ ~ m (o7 0 ~ r~ o
N E H UU] M E x ~~ 6
~ w ~ ~a a ~ z ~ a
z w ao H off o o a M
H o ~E ~ a~ a ~ y
ZU ~ x ~a ww za x ~s '~ r 1
H ~ ~ ~ ~ ~ Aa W vE~ N ~r
W yV L
a H2 W Hw 2 ~D E
£ ~ ~ ~w o ~ a ~~~ o
r, ~
01 ~r] N
M G1 H ~ ~ ~
CCF~JJ U O~
..7 N r-I
N H V] 41 ~
x 3 ~~
m w N
C] U~pQm~>+ ~ ~
H Llw Z 0,y a h O
F ~ ~ F
~ Nwv`"i~ ~ 0 a
pp p Q w
FwCi~4'm RC ~
z H
w N a ~'
~ 0 w ~ w
,~ 3 a E
H
a iwi a o a
~ a~ o z a a
m ¢ ° a
E ~ a W H
S$+
H ~ W ~ 4 ~ U
U 7..
a ¢ ° w w ~ ~
Wtc~ z E o
U W E O ~ ~ vi £ ~ a ~
~ w o¢ a~ o `' H~ o
a w a" s~ o a a~
H
H a
a r~ ~~ 2 Ea w °4 W 8U E' ~ H H H Pi a H v
O a W ~ Q D -~ ~ v1 W ~Zi rcAi o M ~w ~¢ a
a x ~ i ~ H ~ ~ ~ s. H ~ zd ~'a ~ v ~ a~ H o
a~~ s "~ o a ~~ a H H i a~ o
h~h~H~a~~~~~~~ ~~~~~~~~~Q~
w
H
x
~
~
T
I ~ ~~
iao
Ca w w
O >+ W
n W p
E
c a0 ~ W
a~q
W QN Z 3U pp
FF
M~ O U q~ u~i W pp
2G] O
H p p
H
H H V [~ n'~ x ~ k7
~ r.C 4 E v1
>+ z w a o H o~ o o m w
° ~ H a~
v w m ~
wa
A o
~~ x ~ H w
s
~ ~
a ~ s
o w
H ^
£
a
~
Ua
cn a
q W
a ca ~~ z
e °~ ~H
~
s
w o ~ a a ~ ~ o
H
0
EQ
H
7.
H
h
~~
rn ~.
~ (i~
` CO H
4' N
M ~`„~ ~ 01
a~3 ~~
~oOF `n
W 6 E N~ H
W E Q 6I W a
Q ~ ~ FC
W~ a
~ 3 h
~iw~i~m
N
.-I
N
a
D
h
R:
O
w
ca
2
W
a
H
V
0
U
~+
H
H
U
w
N ~ ~ ~-~
`~
a
pQ m
fn r~
.]
~ a
°'
S ~ QQ
.]
E
~
Coo~7
rX~
£
I h
I
I F
I
I ~
I
i W
i £
i
°d
U
aEa
~4
o ~{a
~'t of W
1
E
H
a
i
r
~y
v
flJ
~1'
J
~~
~ 0
M
~. ~:\
~1 ~J ~
~'~, ~ ~ M
~~ ~
~~~ ~
~
/~y
^~
~
'~ _
_ ~
N ~
.~ .7
z a
o
Q H
a r~
~a m
Z D
H p1
E
wj a
U a H
U] V ~
o w Q
a O
8 ~ ~
~a~ QQ7 pQ
E £ Q
III
a
U
O
E
4
H
Z
H
a
H
H
0
O
H
Q
C7
H
E
QJ
G]
x
U
a
F
A
H
U
t/~
II
`y
~~
1 ~-
N
Z ~ O
o ~ ~
a o aw
.] E
a RC a
~ a z
z a w
H
Cs i W
~a w
E w iii
f!1 E ~.]
O .~W7 H a
Z a v ~-
o w
~ a ~
a z
H ~ Q
Z
f/7~ H
[LI Q
o
IIII
O
6
a
w
a
z
H
w
~L
E
H
a
Q
V
z
m
O
h
O
H
a
a
i
' i
H i i i i
n
~ ii
33
~ i
33
~ z
Z o m
~ 7
b L [
+7
7
a H ~ y T~ T' ~
[n H
Ta b o r b ro o 0
~
7 ~ ~ ~
o z Q ~ ~ Z Z
F
. o
W [j] H M H H y UJ
,T7 , Q
O L7 Z H L1 V
x~ _ H y O r
3 ro H ~ '
'7
~ _ d
H ~ '
cf O ~ 5 K H
_ r ,~
7 Z m
m n
O
Z ro
~ -I
~
3 [~]
H
O G1
H q b
H d L
TJ ~
H ~ r, H
4 H m 3 H O C Z H ~ y
~ 3 Z
~ a+ r
Z ~
R+ Z 's] H 3
om H
5 H t
" ~ H Z
~
z
ro
r i»
jj
jj{ r H r
d
^
ro
r
o
v
y C Z
m y
r
ro a
H
Z z
r
~
O
~ ro
H
3 K
--- [
+] H
E
~ O
m ... r r
n7 H vG
H (n
q
r
ro
b
H
~
m
O
Z f
m
H
FC
O
(0
c+
Z
O
n
O
m
~+
~b N
o ~
o
H ~
~
y r.
~'
o
Z H
9
r r.
m
~
!~ -~
T
y I Iy I
~ O ~ Ip7 I~7
O
H C LD y Z 3 ~ 3 [~9 3
T~ p) [A+7 O ° m H ~
+
Y [rrJ T r
~* 4
~
~ O L
J
U7 H
~ ~ ~ z ~ ~' o ~
~ ~
~ z
`~ ' y ~ ~b ~ ~
~ ~
N ~
i ~
n
H
H
k
l]
O
z
H
r
z
nn yy
K ~
~ O
~ Z
Z
xJ ~ ~ d C
J~
~ m
~ ~ y
og
d
l7 H r
,~'U' ~O~HH~ b
rC
U1 ~ '~ Z K ~ fi
y]
Cr!
N y (m] ~ ~ $c1
Z
H
~ l0 ~/1 O
N
10 ~~rr, W
H N ~
`
~
l0 CH" [~+~ H
N Z ~
H ~
~H
y ~ p ~ H
z roc
mH °z
~ H ~
z H ~ ~, ~
r~ c
n
o
r
yn ~ ~
H
H p
H
H ~ ti ~ ~ (n O
d
~ t
-+
3y xl p
' C ~ '
y y
~jj
H OZ
~'o ttl
d ro H
r~ ~C Z
~,
o~
r !n o
~ y~7
t~C~ H
H ~
H ro w ro
~ H n
y
H ~
~ ~ 7.
~ ~
~ [
+J V7(A H O H t
~
N
~o z
y •.
~ o
z <
~~ c~
~ ~ ~
~
~
H Z 3 x ys W ~
~ H r
z o ~d ~ [
J
~ n
i
m 1
i d H
~ o ~i w
yy
O N x [~J L'1 r
N b7 p
H 2
~ ;tl H tr+7 ~
+
~o C? H
~ ~ ~ ~ O
[y[p
H ~C O
~ 'T1
~ H
~ '
~ b~
C
~ ~ I y
i ~
y ~ k N °
5
H
rn
~NTRAL DISTRICT HEALTH DEPARTME~
ENVIRONMENTAL HEALTH DIVISION
1455 North Orchard
Boise, Idaho 83706
REVIEW SHEET
Return to:
Boise
_ Rezone # _ Eagle
_ Conditional U # d Meridian
Preliminary /Short Plat _ Kung
~/ nN~ Subcr~Lisr~.J 4k Z M~ ~~9.,5/GEfe _ AC7
1. _ We have no objections to this proposal.
2. We recommend denial of this proposal.
3. _ Specific knowledge as to the exact type of use mist be provided before we can cament on
this proposal. -
4. _ We will require more data concerning soil conditions on this proposal before rm can cormient.
5. _ We will require more data concerning the depth of (high s~sonal ground water)(solid lava)
fran original grade before we can torment concerning individual sewage disposal.
6. _ We can approve this proposal for individual sewage disposal to be located (2,4) feet above
solid lava layers.
7. y We~ c//an approve this proposal for:
'Central sewage Interim sewage Individual sewage _ Cannurity sewage system
and ~entral water Individual water _ Camunity rater cell.
8. !~ Plans for _~.entral sewage Corrmuuty sewage system Sewage dry lines, and
/ Central water Ctmnurity water must be suhrdtted to and approved by the Regional
Health and Welfare Environmental Services Field Office.
9. '~ Street runoff is not to create a nnsquito breeding problem.
10. _ 'Ibis departnent would recrnnend deferral until high s~sonal ground water can be detexmi.ned
if other considerations indicate approval.
11. _ If restroan facilities are to be installed then a sewage systan MUST be installed to meet
Idaho State Sewage Regulations.
12. _ We will require plans be submitted fora plan review for any (food establishment)(beverage
establistment)(swimning pools or spas)(grocery store).
13.
/~' ef~~ /a/.~ o/pr
Reviewed by Date
iii33iiii iiiiiiii iiiiiiii3i
H O v m m~ ~b H O H :~ ~ ~ O M n H O H
~ ~ ~ ~ ~ v r ~ ~ ~ ~ ~ N ~i ~ m ~ ~ ~ 3 ~ a m a
O r Y~ ro v v n m G7 ~ ~ [r~ ~~ O
C H I r H H ~ '$ 3 m v 'y H x ro
Cs] H
o z ~ ~ ~ ~ ~ ~ ~ ~ y ~ ~ ~ fA F] ~ ~ o ~7
~~J W ~H7 H ~H M y ~ 'S' ~~H'' r O 'A ~I
RJ b m cx~7 y~y H LZ] 5 [~/~ ~ m y y ~ 3 ~ ~ ~ Z
(r Z r ~ ~ Z- n ~ O 8 K ~ .,.. Z 9~
m
~ ~ ~ m
H ~ ro z~ m H k n n
o ro H~ c~ ~~ o m
Z ~ 3 H ~ H H H Vi ;p^ H
O 3 ~ 3 H Z ~ Z y t9 y
m ro m r ~
t7 ~ q H m ~ 3
ES'~ H
C r H ro C z n
' r O H ~ r ~
O K Z ~ ~ (z]
3 r ~ ~ H ti
4 ~ ~ Z ~
N y K m
~ z
~ K~8~'~
~ UI H
4 Q ~i~~im y
z %U ~v~ym tom"
k b7~Sn
FC
~ KKMym v
~ ~ ~ ~ ~ K ~
N ''yy 'Jy
H ~ ~ (7 H ~ W
ZcQ^ r
r N nr
~o r m H
N Z l0
yz~ y~ r.~ ~ iD
v a ~ ~ ~ H ~ tC H 'TC Z t~+ ~ O ~ H m
G ~ ~ m ~m d ror m ~~ ~ c H
v. `h ~ H cn m ~d m r . ~ ~, d
~ ~ Q ~ .~ r y x roz ~ ro H ~ x y ~Z
~ ~ ~ ~ v~, ~ a ~~ o ~~ ~ ~ H
r ?' ~r'' C H ,o O H y
~' U~ ~p ~ ba O ~ HH CH11 O ~ Vl ~ ~
~, ~ y, ~ J N m z v~cn H~ o H r
H ~ n ~ ~ ~ ~' z~ z x~ z r
~ / ~ H H 2 x m N ~ R H H tH^
~ q ~ ('l; O y ~7 m x o C1 O~ w
m ~ ~ z ~N ~E z Ny ~ H m
o (D o ~y zy ~ °~ c ~~
~ ~ ~ ko ~ w
~H r ~ ~ ~° o
K' ~ ~ I N O
'S
H
rn
January 2, 1992
MAYOR
COUNCIL MEMBERS
ATTORNEY
ENGINEER
ATTACHED IS REVISED FINAL PLAT ON ONE SUBDIVISION # 2 FOR
YOUR REVIEW: THEY HAVE REVISED LOTS # 13 through #17 SO NO
SPECIAL SETBACK LINES ARE REQUIRED:
JACK NIEMANN
CITY CLERK
,`y ENGiNFF
`~9N RUBBLE ENGINEERING, INC.
y 7025 Emerald • Suite 200 • Boise, Idaho 83704
~~ SURVE~GP
TRANSMITTAL LETTER
To: G 1 ~ m ~ Mr fL t ~ l R'nJ
Attn:
nwrr
(208) 322-8992 • Fax (208) 378-0329
Job No.:
Project:
QnJc S(,1JBp , r..A. y
~owr-IF.rcl,~ ~+~~~s ~L S~/d~~
WE ARE SENDING YOU:
^ As Requested t"J Attached
^
Under Separate Cover, Via
FOR YOUR:
^ Use ^ Rgcord
^ Information Review and Comment
^
^
Bidding ^ Cost Estimating
THE FOLLOWING:
^ Prints ^ Plans
^ Specifications ^ Shop Drawings
^
^
Samples ^ Copy of Letter
Copies Date Sheet No. Description
f'~ ( c~
REMARKS:
~-1--~~~~ ~LS
Copy To: ^ With Encl.
^ With Encl.
^ With Encl.
Signed:
iiii
Q1 H HG
C S O
~ z
m
~ [*1
r z r ~
~ ~ b
Z ~ 3
4 H R~ 3
~ 3 ~ ~
Z H
V M r
ro r
° ro H ~
r O H
H k Z
H "~L' v K
3 r ~-
K
a+ v
"q
H
r
H
i
[>7
H
°z
d
H
H
A
b ~ro
r
0
HV H
H
~Z ~
H
H
L1 TTT~~~
H ~
°z
d
H
H
i~~~ i i
b ~
H H
ro o N
~ m ~ ~
~ H
Sn ~ r
t~'~j ~ FRJ-i HG
H O
z° y ~ y
r
y 3
".~. 4
c ,Hz~
b7 r
C+] H
Z zO
r Z
H ~
(H
H I I
~ ~ I~
H (H
~ I~
H I~
~ ~
~ ~
W I~s~7 I~
y I IH I
~ 3 A
~ IH I~
3 [j] IH
3
~ C
+ m l O ~
T~ (p t i tJ
W H t
J r
i 3 [~a7
R L ]
f
n ~ t~-~ O
•
O ~ 7 i ~
H o
~ ~ L
~ ~ ~ ~
~ y
`~ '
O
~ H O 7 ~
~ H Z
~ z ~
-
[9
n
H
H
~e
n
0
C
z
H
r
G]
tl]
z
d
4
z
c
r~C
N
F-~
H
N
b
R'~
sl
O
Z
~G ?~ Oa+H
~ fZA H
z~v ~
~~'m~~~
KKHbLTJ
~ O Z~ H ~
n ~ ~ Z 0 ~
N ~ ~ r ~ W
rH-mH
~~
~ ~
H
3
H
v
~
~ z ~ O
z -"" L Z ~
H
[
xJ
r-i [/~ C J ICJ fn y
t-~ .~ ::
.~S ~ O
r ~ x y ~
E x
roc~i d r~
r fA y
~ 1CO H H ro O
~ H y
z
i
~ ro
~ tG
C
s] '
A V1ff) H O H r (]
ro ~ ~ z x ~ ~ ~
~ f-]
.~7
~ x ~
N
W
Lz]
~ ~ `
H H tH"
y
(~7
~ ~ .. U1 CC::
~t O n O ~ W
O
F] y,
QH
"C
f H
~
Nr z H
~ ~
H°z .
i
e~m
~ H
r
b]
o
hi~ H f/1
~ ~H
C
~ (n
~ H
~
d
y.
N i-C O
rro '~J
~ H
~ °
o
y
F ~
F'C F-J Z ~ N O
L
=7
H
i
FINAL
REQUEST FUR SUBDIVISION APPROVAL
PkELIMINARY PLAT AND/OR FINAL PLAT
PLANNING AND ZONING COMMISSION
TIME TABLE FOR SUBMISSION:
A request for preliminary plat approval must be in the City
Clerks possession no later than three days following the
regular meeting of the Planning and Zoning Commission.
The Planning and Zoning Commission rill hear the request at
the monthly meeting following the month the request vas
made.
After a proposal enters the process it may be acted upon at
subsequent monthly meetings provided the necessary
procedures and documentation are received before 5:00 P. M.,
Thursday following the Planning and Zoning Commission
action.
GENERAL INFORMATION
1. Name of Annexation and Subdivision, One Subdivision No. 2
2. General Location. SE 1/4 Section 2, T.3N., R.1W., B.M.,
3. Orners of record, Max A. Boesiaer, Inc.
Address, 6479 Glennwood .Zip83703Telephone(208)853-2001
4. Applicant, Max A. Boesiaer, IncAddress, 6479 Glennwood
5. Engineer, E. Don Hubble Firm Hubble Enaineerina, Inc.
Address 7025 Emerald, Ste 200.Zip83704 Telephone_(208)322-8992
6. Name and address to receive City billings: Name Same as owner
Address Telephone
FINAL- PLAT CHECKLIST: Subdivision Features
1. Acres 8.09
2. Number of lots 32
3. Lots per acre 3.96
4. Density per acre 3.96
5. Zoning Classification(s) R-8
6.
7.
&.
9.
10.
11.
12.
13.
19.
15.
i •
If the proposed subdivision is outside the Meridian City
Limits but rithin the urisdictional mile, chat is the
existing zoning classification N/A
Does the plat border a potential green belt NO
Have recreational easements been provided for NO
Are there proposed recreational amenities to the City NO
Explain
Are there proposed dedications of common areas? NO
Explain
For future parks? Explain
What school(s) service the area Meridian do you
propose any agreements for future school sites NO
Ex
Other proposed amenities to the City
Water Supply
Fire Department Sewer Other _
. Explain
Type of Building (Residential, Commercial, Industrial or
combination) Residential
Type of Drelling(s) Single Family, Duplexes, Multiplexes,
other Single Family
Proposed Development features:
a. Minimum square footage of lots>, B,000 Sq. Ft.
b. T)inimum square footage of structure(s)_11300 Sa. Ft.
c. Are garages provides for. X square footage 450
d. Are other coverings provided for NO
e. Landscaping has been provided for YES, Describe
See covenants
(2)
f.
9•
h.
i.
3-
Treea rill be provided for YES Trees rill be
maintained YES
Sprinkler systems ere provided for YES
Are there multiple units YES Type
rema
Are there special set back requirements NO
Has off street parking been provided for NO ,Explain
k. Value range of property $80,000 to $100,000
1. Type of financing for development Standard
m. Protective covenants were submitted .Date
16. Does the proposal land lock other property NO
Does it create Enclaves NO
STATEMENTS OF COMPLIANCE:
1. Streets. curbs. gutters and sidewalks are to be constructed
to standards as required by Ada County Highway District and
Meridian Ordinance. Dimensions rill be determined by the
City Engineer. All sidewalks rill be five <5) feet in
width.
2. Proposed use is in conformance with the City of Meridian
Comprehensive Plan.
:i. Development rill connect to City services.
4. Development rill comply with City Ordinances.
5. Preliminary Plet rill include all appropriate easements.
6. Street names must not conflict with City grid system.
<3)
/ ll .1 x 1 I
~ Va, i
t= / . I
z -
~~ ~ `~ ;
~ SJ ' ~
x e ei
2 ~ .. 3 ~
AV ~ t ~
• Q
~ xn ~ zx, 2
(i 10 ~ ~ (11
' a 2" ^~ 1 1 -O it
x' ~ IeJ 11
04`pQ` A :. r
<( 2! 1, ~ It K ~ ~~ 1
~~ n ~~ ~~ Z 11 1.
ze Is ~
s ~'.. .z ; , 14 3Q to
.: C' z,
y u 3~ is 4 t Is u
la r • n n
~a ~ w is # s e ~ ,i y 1.
a • to vP It e 7 tt 'jL~ H
i N
r ~q~S~, r i s e e e • ~ ~ ><
{tY CT. ~ 9
10 \
2e 29 tl 1
22 i 11 I I
), 27 !S 21 2 I
0 2. 12 1 .11 0~~ ~Ubt7IJtStn
Il OO :e ~ zo o ~
1 t4 Q
?2 19 I I
. /6 '
10 Ix P\
Pp b la N
a Is /y` it III
Is a ' Is IiI
s la
r i le 11 1 1'I
! Ir to ~f ~ 17
MISTY . li o ! • ~ ' 14 1
le Is ! 1 0o r I 113 16 16 . 2
// 3
. ' ~ ----r--• 4
1O '~ ~. ~~ ~: ~ 1 i 11 10 9 ~ 27 0 11
C ly ~ z 1 12 13
• + I I 6 7 8 i 28 2g 30 1,
z ~ I • ! . ~ E ! ~ i 5 314
•
~--`---
-_ wr 2 ~ I 4 32~~
~ 'a _
.~ • s T i s x 1 l I 1 ~ j 3 2 1 I J5 34 33 ~1~ _.
I J 1
-- ---- •--. i-
I ~ 1
--~ T
!
,,
.- . 3" 1.
~! ,
1 ` ~
2 2 !o
O r! 1
~ ? sr u ~
1 QQ rANA CT
! u
10 !y
C i _ Iz 1~ 1•
N ~`4 0 to ~ r KINGS{ypp /
D~
s
11 ~ !~
12 ~ •O
10 ' !2 t9
!3
!.
n u
K
n Sq N~q`W
LASHER CT 2 11 1
20
2! 2t 21 ! Q 21 10 !
1 ; i3 11 ~:
! O NENDRICKS
V
i Q
Z 21 z]
r f
IJ r~o. Z °
zs; zz
•
13 1 27
v.12 I 26
11 i 25
10 i 24
9 23
8 1 22
i 21
6 7 ~ 20
R~l~• 18
18 17 X18
-_...... r. _ _L