Loading...
Strada Bellissima No 7 CZC 07-263I'll AN,�- �J NOTE: This is not a Building Permit. Prior to any construction, you should contact the Building Department at (208) 887-2211 to verify if any additional permits and/or inspections will be required by the Meridian Building Department. CERTIFICATE OF ZONING COMPLIANCE* Date: December 26, 2007 Project Name/Number: Strada Bellissima No. 7 — CZC-07-263 Owner: Richard Evans Site Address: 3061 S. Meridian Rd. (Strada Bellissima Subdivision, Lot 7, Block 2) Proposed Use: Office Building Shell- Use TBD by Future Owner Zoning: Comments: Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of approval for the Strada Bellissima Development. Issuance of this permit does not release the applicant from any previous requirements of the other permits issued for this site. The issuance of this permit does not release the applicant from any requirements of the approved Annexation and Zoning (AZ -04-028), Conditional Use (CUP -04-047), Preliminary Plat (PP -04-03 8), Final Plat (FP -05-022), as well as any Development Agreements recorded for this site. Because a user for this building is not proposed at this time, the future tenant(s) must obtain tenant improvement sign off from the Planning Department, prior to occupancy. Landscapin&. The Landscape Plan prepared by Pinnacle Engineers, Inc. on May 14, 2004, Sheet Numbers L- 1, is approved (stamped "Approved" on December 26, 2007, by the Meridian Planning Department) with the following changes (see redline changes on plan): 1) UDC 11-3B-5 establishes the minimum plant size standard of for all landscaped areas. Please note that all woody shrubs are required to be of two gallon pot minimum. Other than the aforementioned changes, the approved landscape plan is not to be altered without prior written approval of the Planning Department. No field changes to landscape plan permitted; prior written approval of all material changes is required. Site Plan: The Site Plan prepared by Byron Lee Smith on December 19, 2007, Sheet Number A1.0, is approved (stamped "Approved" on December 26, 2007, by the Meridian Planning Department) with no changes. The approved site plan is not to be altered without prior written approval ofthe Planning Department. Elevations: The Elevations prepared by Byron Lee Smith on December 19, 2007, Sheet Number A4.0, are approved (stamped "Approved" on December 26, 2007, by the Meridian Planning Department) with no changes from the Planning Department. The approved elevation plan is not to be altered without prior written approval of the Planning Department. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved specifications and in accordance with UDC 11-3A-15. Protection of Existing Trees: Any existing trees on site must be protected or mitigated for in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-313-10, coordinate with the Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing trees prior to construction. Any severely damaged tree must be replaced in compliance with UDC 11- 3B -10-C.5. Parking: The proposed parking areas shall be paved and striped in accordance with UDC 11-313. Project engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA and signed appropriately. Curbing: Per UDC 11 -3B -5I, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with UDC 11-3B-11 and UDC 11-3A-18. Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in UDC 11-3A-7. Lighting: Lighting shall not cause glare or impact the traveling public or neighboring development and comply with lighting standards as defined in UDC 11-3A-11. Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in compliance with UDC 11-3 D. Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures must be built in the location and to the size approved by SSC. Handicap -Accessibility: The structure, site improvements and parking areas must be in compliance with all federal handicap -accessibility requirements. ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan stamped "Approved" on December 26, 2007, and Elevations, are not to be altered without prior written approval ofthe Planning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required. Jen Veatch Assistant Planner *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. r cvrvED �. %tF'17GXl�11q 3" Planning Department IDAHO t,1i C 0 at, i' g1p� ADMINISTRATIVE REVIEW CI � ,gti Type of Review Requested (check all that apply) ❑ Accessory Use ❑ Alternative Compliance [certificate of Zoning Compliance ❑ Conditional Use Permit Minor Modification esign Review ❑ Private Street ❑ Property Boundary Adjustment ❑ Short Plat ❑ Temporary Use Certificate of Zoning Compliance ❑ Time Extension (Director) ❑ Vacation ❑ Other Applicant Information APPLICATION Applicant name: e--076*4 GAM T%t Phone: 35g45 -+43.;0 Applicant address: GC -24!!J hl . P�IbGelq , � i 1_0. Zip: &� Applicant's interest in property: ❑ Own ❑ Rent ❑ Optioned U?6ther _d6ftab 2152' Owner name: 0VXct_jQ Phone: eqo Agent name (e.g., architect, engineer, developer, representative): SMI Firm name: LAM 4;nl rev P. [i Phone: 3%45 4e6P Address: 964q !J Mh C egA5 Zip: 92364x2 Primary contact is: ❑ Applicant ❑ Owner [2rAgent ❑ Other Contact name: F?t(Flcp" SM I qt. Phone: _-37s-4550 E-mail: kzye, t'' O Viet Fax: " !!!H:53 Subject Property Information Location/street address: 1504r�pl S. /404 L&T-d ILCJArD Assessor's parcel number(s): Township, range, section: *N I W 024 Current land use: VA%y5V A_,T— 1-yvg&61 nou F! -CINA /�9) Total acreage: 'L9' Current zoning district: 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 1 (Rev. 9/21106) Project Description Project/subdivision name:S[f!t2I, Vj!�JC1J General description of proposed project/request: l._VlW:7 Proposed zoning district(s): _ Acres of each zone proposed: Type of use proposed (check all that apply): ❑ Residential ❑ Commercial 9 Office ❑ Industrial ❑ Other Amenities provided with this development (if applicable): Who will own & maintain the pressurized irrigation system in this development? Qo&Aa6!,, Which irrigation district does this property lie within? .�NlF'XLIQlArJ [K.2Jd5tn0J DtSi Or— Primary irrigation source: /IiLI743i> (uIAAto, D15%Aecondary: Alm( ralPFJ Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): Z Residential Project Summary (if applicable) Number of residential units: Number of common and/or other lots: Number of building lots: Proposed number of dwelling units (for multi -family developments only): 1 Bedroom: Minimum square footage of structure(s) (excl. garage): Minimum property size (s.f): Gross density (DU/acre-total land): Percentage of open space provided: Percentage of useable open space: 2 or more Bedrooms: Proposed building height: _ Average property size (s.f): Net density (DU/acre-excluding roads & alleys): Acreage of open space: (See Chapter 3, Article G, for qualified open space) Type of open space provided in acres (i.e., landscaping, public, common, etc): Type of dwelling(s) proposed: ❑ Single-family ❑ Townhomes ❑ Duplexes ❑ Multi -family Non-residential Project Summary (if applicable) Number of building Other lots: Gross floor area proposed: Existing (if applicable): Hours of operation (days and hours): tU OLCO b0Tbl''M1'> Building height: Percentage of site/project devoted to the following: a Landscaping: ?7�J�fb Building: 1 C®O�O Paving: 51 6 Total number of employees: Number and ages of students/children (if ; Total number of parking spaces provided: Authorization Print applicant name: Applicant signature:. Maximum number of employees at any one time: Seating capacity: Number of compact spaces provided: Date: I'M W 61 V0 E. WatertoW itAane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 84-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 2 byron lee smith architect, p.c. 5649 north big cedar avenue meridian idaho 83642 208 375 4850 fax 208 884 4733 ronegolf@cableone.net 28 November 2007 City of Meridian Planning and Zoning Department 660 East Watertower Suite 202 Meridian, Idaho 83642 Re: Certificate of Zoning Compliance Application Project Narrative project: Strada Bellissima Spec Seven 3061 South Meridian Road Lot 7, Block 2 Strada Bellissima Subdivision Number One Meridian, Idaho 83642 Dear Planning and Zoning Staff, The above referenced application is for the construction of the fourth of a series of professional office buildings. The building department plan review permit process following the approval of this CZC will be for the construction of the shell only for a single story, 3,710 sf (plus 1,479 sf basement) professional office building. Although the tenant has not been determined at this time, it is intended that the use be for one of the 4 uses approved for the City's L -O zoning designation. The building will be constructed using concrete foundations, conventional wood framed walls with pre-engineered wood roof trusses. Exterior finishes will be tile roofs and walls consisting of stone and/ or stucco veneers. The following prior approvals have been granted: 1. Annexation and Rezone AZ -04-028 2. Conditional Use Permit CUP -04-047 3. Preliminary Plat PP -04-038 4. Final Plat FP -05-022 Sincerely, Byron Preside b ron-lee-smith��archit 'd Cc. Y �P 5649 north big cedar avenue meridian idaho 83642 208 375, 4850 fax 208 884 4733 ronegolf@cableone.net 19 December 2007 , City of Meridian _ - �� Plannng and Zoning Department;' - 660'Eirast Watertower - ,Suite 202 Meridian; Idaho 83642, , �> Re: Design Review Applicatiop Project Narrative , � i� project: Strada,Bellissima SpecSeven `3061 South. Meridian Road �- Lot 7, Block 21 - r Strada Bellissima Subdivision Number One _ Meridian, Idaho'$364" Dear Planning and Zoning Staff; � -, The above referencedion is for the construction of the fourth�of a', series of,professional office buildings. The building department plan review permit process,following the approval of-this, Design Review will be for the construction'of the shell only for a single story, 3,710 sf (plus 1,479 sf_�basement) ,professional office`'8u'ildin`g. Although the tenant has not been-determined at'this ' time, it is !intended that the use be for one, of the 4 uses,,approved fol the `City's 'L-O zonings rdesignation.� The building will be constructed using concrete foundations, conventional wood framed walls with pre engineered wood,toof �trusses. Exterior finishes will be the roofs and walls consisting" of'stone 4, and stucco ,veneers.i The ,entry r arcade Will, consist of smooth plaster '�co1'umns; stucco veneer � cent color as noted on the drawl_n Sthe ro0 , nd w o soffit/ fascias to-match the remainder ' (accent \9) f and woo of thev building: The following narrative addresses sues in the Design Review Application, Checklist: �Ir t. Architectural Character � a. Facades: All building facadesincorporatemodulations in the faoade and provide.roof ' line recesses and' projections in quantities far exceeding the 20%o minimum specified by the Clty.' - b,, Primary building entrances are clearly defined through ,the design of the building' Windows and arcades are-provided on all of the four sides;_of the building -,that- exceed the minimum of 30% specified by the C,ity;' c: The roof design incorporates overhanging eaves at all areas, is sloped at 4: 12' and has different roof planes of varying heights. d. Pattern variations are satisfied through the use of both stone and stucco. Stucco shall, be a' minimum of two different colors; a main field color as well as an accent color to be ; used at the entry canopy. 4y AFTER RECORDING MAIL TO: ADA COUNTY RECQRDER I uavtu ru mmu BWE �PM "� III11118f1111�i[I[1[IUlllfflf f1[I RHORDED-REQUEST OF 104155850 First Atmicm Evans Construction Management Company 9560 Pebble Brook Lane Garden City, ID 83714 /%cC s - &S S3 a WARRANTY DEED File No.: 4101-379885 (RPA) Date: November 22, 2004 For Value Received, Cloyd W. Nelson and Bonnie May Nelson, husband and wife, hereinafter referred to as Grantor, does hereby grant, bargain, sell and cony unto BELLISSIMA, LLC'. convey STRADA Brook Lane, Garden 1�' ID er rM ed tone Grantee` o �` wi current address is 9560 Pebble Ada County, Idaho, to wit: City, prises, situated in SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PARTTHEREOF. APN: 51224449555 TO HAVE AND TO HOLD the said premises, with their appurtenances, unto said Grantee, and to the Grantee's heirs and assigns finrever. And the said Grantor does hereby covenant to and with the said Grantee, that the Grantor is the owner in flee sim encumbrances ex t cu PLof said preemises; that said premises .are free from all Cep Rent years taxes, levies, and assessment, and except. U_S. patent reservations, restrictions easements of record and its visible upon the prises, and that Grantor wilt warrant and defend the same from all claims whatsoever. Cloyd W.N on Bonnie May Nelson *AN IDAHO LIMITED LIABILITY COMPANY Page 1 of 2 AMS1224449555 Warranty Deed Fite No.: 4101-379885 (RPA) - continued Date. 11/22/2004 STATE OF Idaho ) ss. COUNTY OF Ada ) On this 23rd day of November, 2004, before me, a Notary Public in and for said State, personally appeared Cloyd W. Nelson and Bonnie May Nelson, [mown or identified to me to be the person(s) whose name(s) is/are subscribed to the within instrument, and acknowledged to me that he/she/they executed the same. In witness whereof, I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written. repo -t s- - s.,�� Notary Public for the State of Idaho . Residing at: Meridian, ID My Commission Expires: 09-26-08 • `. •V V o y • N&t w •�I V Y. •s•ial yo Page 2 of 2 EXHIBIT A LEGAL DESCRIPTION: A tract of land situated in the Southeast Quarter of the Southeast Quarter of Section 21, Township 3 North, Range 1 West, Boise Meridian, Ada County, Idaho, described as follows: Beginning at the Southeast comer of said Section 24, being the REAL POINT OF BEGINNING; thence West along the South line of said Section 24, a distance of 213.77 feet; thence North 70°06' West on the chord of a curve with a radius of 200.00 feet and a central angle of 39048'a distance of 136.15 feet; thence North S0*12' West a distance of 5630 feet; thence North S5'037' East a distance of 92.20 feet; thence North 2729' East a distance of 30.44 few; ii�ence North 5000' East a distance of 56.73 feet; thence South 89031' West a distance of 190.00 feet; thence South a distance of 73.16 feet to tate center of Vit -tory Road; thence North 73"46106- West along the chord of curve with a radius of 350.00 feet and a central angle of 14044'a distance of 88.92 feet; thence North 8104' West a distance of 80.20 feet; thence North 246' East along the center of a concrete ditch a distance of 376:27 feet, thence North 18*36' West along said ditch a distance of 38.74 feet thence North 3215 West along said center of ditch a distance of 33.14 feet; thence North 37030' West along said ditch a distance of 150.18 feet; thence West a dance of 570.50 feet to the West line of the Southeast Quarter of the Southeast Quarter, diene North 0006'20" last along said West line a distance of 588.42 feet to the Northwest comer of said Southeast Quarter of the Southeast Quarter, t umm North 89'55' East along the North line of said Southeast Quarter of the Southeast t umt er a distance of 1317.27 feetto the Nartfieast corner of said Southeast Quarter of the Sorest Qom; thence South along the Fast line of the Southeast Quarter of the Southeast Quarter a dhstance of t33[LW feet to the REAL POINT OF BEGINNING. recordrecorded SepAND tember CEPTING therefrom that property conveyed to STATE OF IDAHO by Warranty Deed Ptember 21, 1987, as Lament No. 8753575, and described as follows: A parcel of land being on the Westerly side of the centerline of State Hr 3782(2) Highway i9�y No. 69, Project No. SR -RS - Transportation asnt, shown on tare Marg thereof now on ihle in the office of the Idaho Southeast Quarter ofn24, M�of iP 3 North, and ftan��i � the Southeast Quarter of the ' 9e a Meridian, described as follows: Beginning at the Southeast corner of Section 24, Township 3 North, Range 1 West, Boise Meridian; thence North 0*38'31" East along the East line of said Section 24 a distance of 1,331.0 feet, more or less, to the Northeast comer of the Southeast Quarter of the Southeast Quarter of said Section 24; thence North 89'26'02" West along the North line of said Southeast Quarter of the Southeast Quarter a distance of 65.0 feet to a point in the line parallel with and 65.0 feet Westerly from the centerline and bears North 89021'29" West from Station 394+31.02 of said State Highway No. 69, Project No. SR-RS-3782(2) Highway Survey; thence South 0"38731" West along said parallel rune 1,265.83 feet to a point opposite Station 381+65.19 of said State Highway Survey; thence South 55044'56" West - 60.96 feet to a point in a line parallel with and 40.0 feet Northerly from the centerline and bears North 0°47'21" East from Station 1+15.10 of the Victory Road Survey as shown on the plans of said State Highway No- 69, Highway Survey; thence North 89'1239" West along said last parallel line 57.14 feet to a point opposite Station 1+72.24 of said Victory Road Survey; thence Northwesterly along a 31831 foot radius curve right having a central angle of 345931" a distance of 194.40 feet to a point in the Northeasterly right of way line of existing Victory Road and opposite Station 3+88.98 of said Victory Road Survey; thence South 89°48'06" West 50.0 feet to a point in the Southwesterly right of way rine of said existing Victory Road; thence. Southeasterly along said existing Southwesterly right of way tine being a 318.31 foot radius curve left having a central angle of 15031'43" a distance of 86-01 feet to a point in the South line of said Section 24 that bears South 253657" West 32.42 fleet from Station 3+10.17 of said Victory Road Survey; thence South 8901239" East along said South fine 320.0 feet, more or less, to the PLACE OF BEGINNING. FURTHER LESS AND EXCEPTING therefrom than property conveyed to STATE OF IDAHO by Corporation Ik Warranty Deed recorded December 6, 1989, as Insbixnent No. 8961310, and described as follows: A parcel of land being a portion of the Southeast Quarter of the Southeast Quarter of Section 24, Township 3 North, Range 1 West, Boise Meridian, Ada County, Idaho, desrnbedas follows: Commencing at the Southeast corner of Section 24, Township 3 North, Range 1 West; Boise Meridian; thence North along the East line of said Section 24 a distance of 35.0 feet; thence West 25.0 feet ft the Westerly tight of way One of existing Slate Highway No. 69 and being the REAL PLACE OF BEGINNING; thence continuing West 10.0 feet; thence South 10.0 feet to the Northerly right of way line of existing Victory Road; thence Fast along said existing idord>erh►of rKJhtyyay line, feet;ii�ence North 10.0 feet to the REAL POINT OF BEGINNING. FURTHER LESS AND EXCEPTING therefrom that property conveyed to INTERMOUIVF,4IN GAS COMPANY by Warranty Deed recorded December 6, 1989, as Irrstry t No. 8961312, described as follows: A parcel of land being on the westerly side of the centefirne of State Highway No 69, Project No. SR-RS- 3782(2)- Highway Survey as shown on the plans thereof now on file in the office of the Idaho Transportation Department;, Division of Highways, and being a portion of the Southeast Quarter of the Southeast Quarter of Section 24, Township 3 North, Range 1 Wes, Base Meridian, descnbed as follows: Commencing at the Southeast comer of Section 24, Township 3 North, Range 1 West; Boise Meridian; thence North 0°38'31" East along the East line of said Section 24 a distance of 85.17 feet to a point coincident with Station 381+85.80 of said State Highway No. 69, Project No. SR -RS -3782(2) Highway Survey; thence North 89021'29" West 65.0 fleet to a point in a line parallel with and 65.0 feet Westerly from the centerline and opposite Station 381+85.80 of said Highway Survey and being the REAL POINT OF BEGINNING; thence continuing North 89*21'29" West 10.0 feet to a point in a line parallel with and 75.0 feet Westerly from the centerline and bears North 89021'29" West from Station 381+85.80 of said Highway Survey; thence South 0038'31" West along said last parallel line 16.97 feet to a point opposite Station 381+68:83 of said Highway Survey; thence North 5544'56' East, 12.19 feet to a point in a line parallel with and 65.0 feet Westerly from the centedine and bears North 89021'29" West from Station 381+75.80 of said Highway Survey; thence North 003831" East alorig said last parallel line 10.0 feet to the REAL POINT OF BEGINNING. N �j .. yNyr- . t TO: ,jiff unary 3'3nitwy $eMMIL enc - 7 W. Fmkiin Meddian, fid $3642 DA i L: ;*2i,2305 : ;.`.-. nMciaw is ra-16 G I LIIcman r' pproSvi" The SUB& 8el11tomt rhow i S am is= of i-b-Ld unim Z0 14 .cow -m—` Bial buildiar, Maw ai;,a ammncrcw iui'hiinp we pa-ppowd m br- S -LL MW 5 at 37 600 s -F in s�d6i�irsr, cls bOildino MiCk haw I,5W s.i. moi. Wo am dw= &urqzan ror ew awmamw ai ire ivwo(L On ow Site plan 'hey are iaacied with rhe 1EMW D. Vft Ockwas am 12'X!2`. Pleuxe mvL-w aw site p%nde me if th.- bu *� tf► desa ,.n.R ,,. i T}t`A - � � .Ki . �i � ir' +�w..� �.�...w.ise•? t�-nam. � .a -y w.n �n�iro !�s ,w.war s pig rim ii you iiii►C S aionw qwsdcw �IIa' S Qii piis)-i'i o. Ji}yC�iClj,. i1 Mepn rxnhwrlan �f Land Use r F=1c 00046LM COMMIR;M i.55 w: ut�;u i sdsi iiFCiir�; ii,� k + tii'Sii�• i��:iiii7 R3llj- f�UBi 141'1-77f.I►- ti�,� (�(n+) :1t+Y-%;�81 ►,LR --------- 4M 2L y .12 S ! 264 9 ?' - '� FINAL PLAT OF TOMHA FOOT 00 .or [lJ} 4NIN 1�4. D! b � o.r•,ar, et III eeaA'IC,DO A �v'1�IDGN I BAppIA PL�� u r uN►uTt1/ 69 &ki & 4e sk. M�oN hNVe . J , •�'� only ons►Pu i ep �t � n ou: E14 I �rlr � 1 y ��ii lil N' w ' [ p Mai 01e I L100' • � ' I I SECTION !INE u n`U' I m A�e►r�r /[ u' a' r� u u li+�li► !1 I eouNdwr LINE ►LR rr 3, y� 4 i LOT LINE ADAP O" IINE (N771D'01'Y/) e) 11■�!� .. - L wir . r -( ..�. '.,i LS' Int �-.w, . ^""'...,► �N ". -' R I '-" ROAD AIONTaOR.WAY J d � 0 � � , I I ®� •� � aN�'NUMENf N�T10111ft14 . you WArLA eAeLUENT qei /iwgga; II I rrr- NOfE (N!1'3!'11'W�(1) f / 1i if•W ' ■ b 1 I R IGj le Cj 1 SE 4 CROPp!"AOC�eiS SND pNtppNO 1 �� ��° �• �14VANN1 AVS y t PAILMENT WNt (ELC N01C 1111 (IS ,IA L) lPSMeNT LINE ►LE. b n ► IA3,11 g `4 I ib MVND ALUMINUM pAp f� I f3 MUND 60' A€9AA AW INO.0111 ryN W GAN MARN€D p9"r RrhL pgA�l LI,La1 Ep, ` I I ■ W/GA�aMMKLbniR4Rlldd4 0 on EEILI ■ it i I# or D r,ea POOIINNTTbor ALOINNINO .- � 111 AIDNT+�IaWWAAY MCNVMENfi Y I �.n.� T?�n 1 , 1 4 4 Guo POINT (NCTNINC Sii) @Q�e4R8"11X�MENr u> o. ids R, 13A11VANt DR nm u wr tneo"euN , ., � ( 3 NDe5011111 It1 r (I) �1 D OAU �1L tNLD. e0 00' LH 1 I GRLE�If eu86MSION NNo, 4 03 Eq(Deub��Le I+ HG." "A ••—•�`WANAb c IL OCA41 MRNn E ND J! Ip ',Jrj"■1y'y `' p „ , - i/] �1 � + eY1e'Se•W le,lo• "'"�'"i�e`ff'^". "�' � r9� 1JS!$P{ I+�, .�' E I la'2 uN►LATIE9 This lot he(e begirt ` -.� ► _ SWTI$1/4 con !ealo'er1 p�C r►. io �f oes ecqulred & will be tired `* + �.e f" k sccTwN !N to extend Late 2 & 9 • �i "� C,7,kF. 901!194 114,40' '� + . _ - .erlororW w.9� erlo'e!•E /— -- — IDkUll F, el+noo ee.9r eeraabe-e uao.iG� — •— �, / AA/Ie o>r OWINo �_. ' 2D so xi�lzieejrs, Inc. Be•wluw u.. -_ . _ . _ _. lot W. F. -t- k. LWd R rNu. IbM 1»u ,Dec. 3. 2007 4:54PM E] (10, �W, IDIAN �*, CoA„o DATE: 12/03/2007 No.3502 P- 2 FORM PW100 The following address has been verified by The City of Meridian Public Works Department as valid for the project listed below. Project Name: STRADA BELLISSIMA SPEC #rt7 (Shell) Address: 3061 S. Meridian Rd. Suite *. Zip Code: 83642 Lot/ Block/ Subdivision: 7/ 2/ Strada Bellissima Sub Notes: Suite numbers will be assigned as tenants apply. EACH SET OF PLANS WILL BE REQUIRED TO CLEARLY REFLECT THE CORRECT ADDRESS AND SUITE NUMBER (IF APPLICABLE). Karie Glenn Department Specialist Public. Works 898-5500 -glennk@meridiancity.org Mayor7ammy de Weerd City Council Members; Keith Bird Joe Gorton Charles Rountree David Zaremba "As cM § § � | � � |& � | |`■ 2 |�� !■■■| ` q /| � / § 2 � � � � � § � � || | �,3� |�■ �|� �/ | Pit r �|� ���`| §�■ k J■ ; 2 i z §�Pz|�| & | #| & |g § L4& A`|| | k | § $� ■ � � � . r■ � -W ft aAxwm s WN _a.r.i IR. W , ,., . 1.14 w s 7 IayR1.•1 ',t i M 1 rt1'w.'Y.a►Il, �.p~II .yyl rryn�.r,Na y1 ••41liRM Im 0 t ..JRafalln�/r .nWNr, 11iA,R9 -/' . u 1 ' M • ti 11,11111 H I+Y Wwl!' Y! J! 1•.1 �I~M� IV" a/A .,�' � '• •.. a r'y �.� .+, � � � 1111 1Y V It 11 til low pu in 1"01'w fv '11cl'�1S i �'"It C a. -10 t ♦ 4 Mr'1r • N 4.•laa WgA,4 r1M114 r — a 11LLy11il■ j N•• ..�tt111�.� A. q It •...J:i�m1 ■ IA• • 1 j P AV M.YI� 1 �•H.w...WiLMI t',►1/Y URN , Iv ����pp��Nryry1���11ggyy.,r,�,It(��jj 1.'al W =1•' .._.._'N 11`: rt� I41Y'�1 1 lV •+1111 i=•t a W ■/N<+IW MJAI.1 "Aft1v111'7.1 "AIM W t r RY YIAYIRI 'ql •1ry KY1 .{di 1'1•� w=vrlA wM, ary�l�y�. Ilh.l'n G• • . W •r .,�My,1y�I wl1 'V,a r iT' ♦A Iri 0lN�lllii y1�WIN IW Rr\ . .« 1 N■YIaWI! 711 w2417MrRy'M ,1.. I.iW41C1'p:p 4� M 1Y Wa,i■Y 1[ahRl 1/♦M ^ /1 .�,,.�.... �..,_,.,. 1 h ,'RSA MNI f ,L1;N� I I. _ r..,..■.�, nyw)�,t ,•� '.FI NM1111tl 0 al ....ZI106■MLy,t�� '1. �,�._11.41��_If . ' "w Iuil«I 71 w M 1•/• 1ry Nq/1 " „n Mi1414«111 `C 1h 1•.1 I+:•ifi l�Jlj A map11i%�4nfr N f" N ---f ITT�J ;T dRS1J�T'tf':UYY 1111111001 lwlr p11i 111 vve;. �111Ny•i;�N0� �? AAMMR11NN w oaM•1Li'WdK1�,4fTiW Ia1'1'1Clip�„ Imo 4•, �,,.J�.� •�i7Ai.} �,�•w. « 140.,4�rl«l4■L.... I91 Y'11+11 {.MI •r�h'1+y y 7«.,, 4•n Uwo►M,1 OI71,1��� IwMRwgot, •.�'••..W....� ,•/'I + 1, W4�iii!1!` i•I+.I t+tC„�.+�' ntuw &"a 3427 •.,.r..� i� • , 11 IL�J�atl 11114 1/IN ill 2, i/1 S J '� 1 a•1•,hu1.1 MI rf ;31IYJ5alCt1 1� 11 1 ,�11{1 „1�lsPI�/Pl'�.i • 1 N t1M'1 n aura I.4TWAR C'F09i flow nMa ll} piT�.1..a11 .1 r«ua■,aiyd'y7Q��� f[I ,,, .pp 1, 1` I.u.r'" ., "'1Hi+'1�1f Ca,.tlrA,uyl•W « +�%' ;: I ° 1•"i�N' A 1��y o.1.1 M*Ky 1 MN p�Y ■�1 • ,HYII. lag n_q&w I«•N.7/•LI1 A'1n IIWN •IM7H'� •p��Q�yp�1{�p,p¢+1177 � .� �'■ it 1� •-+.•-...,.•—,.,..,.....,,,...,I�r"" 77N/ftlW 11N dA1u1V1�hh 1 '011,+'1• a+•1t7�rAII.•ar�11 l�lgii�lf�:t'iiliPd •� �•n•1i5 11 11Y1'1•W 11'� ' �-� C 'flrb'11 ■1 Its" .1"1.1 f:u'h 9 /Row Y P "C' ' oink.,,IIfNfPI�t�1Wll •Lr'',M,� . Mwh• ".•'•,•aN •'j `i1, 1I '•�1`� , •Ii N TV 41 A ', .1..1.... JApr Z.t+•.i, .,1 .�..L f •.1 J NIS,;, f.. �,,�„ �� , .�'. � ,.,�, k I ►,.�, �,, t; Loll •�•1 h ,R?!tl , ,.'..1 f+a► •` .►"'a g4.:,_n • ■r�,y R7'!','R" 1K I • �'"'f1III 11f{!!Q'•luli'lf >�C1/�'•;I � � • 1 it +NWj1 �• 4 is \'i '•j�jAlri� .• ' '1py MA 1' �' ,11; i '� A '! iii : ,•+ .,�' � '• •.. y��' • 1', . � � , r'y �.� .+, � � � 1111 1Y V It 11 til P "C' ' oink.,,IIfNfPI�t�1Wll •Lr'',M,� . Mwh• ".•'•,•aN •'j `i1, 1I '•�1`� , •Ii N TV 41 A ', .1..1.... JApr Z.t+•.i, .,1 .�..L f •.1 J NIS,;, f.. �,,�„ �� , .�'. � ,.,�, k I ►,.�, �,, t; Loll •�•1 h ,R?!tl , ,.'..1 f+a► •` .►"'a g4.:,_n • ■r�,y R7'!','R" 1K I • �'"'f1III 11f{!!Q'•luli'lf >�C1/�'•;I � � • 1 it +NWj1 �• 4 is \'i '•j�jAlri� .• ' '1py c •�C 1� .a �� C .� rr . � . 4 L� 7 � 4 r �. .� f .. Y r r a r V ,� J M 3 3 3 .. 1 AI J Y 4 4, J 7 } 7 a J 7 a -Y-�-�•...-Y.._• -- 0 1/11 CITY OF (�Iwcrldian l` 33 E. Idaho Ave. \\ti Meridian, ID 83642 Date Applicant Address N 01-4/((,� Ql/V' z . 1S/3 &(f(o Phone •DESCRIPTION CASH CHECK # NAME ON CHECK IF DIFFERENT THAN APPLICANT 1029 AMOUNT I CZE < I I I I I I I . I I I I 1 � I I ' I I I I I � I I I I I I PAYMENT DOES NOT INDICATE ACCEPTANCE OF APPLICA ION TAX 12124 Received By TOTAL 1 94352 fAVa Wo6" t ;rftjV ACHD �on,.rwe�'eoC�o >r�iv�ecr. January 10, 2008 TO: Byron Lee Smith Architect 5649 N. Big Cedar Ave. Meridian, ID 83646 OWN: Richard Evans 9560 W. Pebble Brook Way Boise, ID 83703 SUBJECT: MCZC-07-263 Strada Bellissima 7 3061 S. Meridian Rd. Carol A. McKee, President Sherry R. Huber, 1st Vice President Dave Bivens, 2nd Vice President John S. Franden, Commissioner Rebecca W. Arnold, Commissioner .J "t g I, City of Meridian City Clerk Office On November 2, 2004, the Ada County Highway District Planning Review Staff acted on MPP04-038 for Strada Bellissma Subdivision. The conditions and requirements also apply to MCZC-07-263. • Prior to final approval you will need to submit construction plans to the ACHD Development Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. • A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely,- Jt4x Chelsee Kucera Right -of -Way and Development Services CC: Project File City of Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately, supported by the law and evidence presented at the hearing. Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time ®Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ❑Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ❑Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ❑For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit a set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working in the ACHD Right -of -Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic. Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Final Approval from Development Services ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con. Ada County Highway Hi hwa District Right -of -Way & Development Department Planning Review Division This application does not require Commission action and is approved at the staff level as of August 3, 2004. Tech Review for this item was held with the applicant on July 23, 2004. Please refer to the attachment for appeal guidelines. Staff contact. Lori Den Hartog, phone: 387-6174, E-mail. Idenhartog(cD-achd. ada. id. us On October 21, 2004 the Ada County Highway District received the revised preliminary plat for this site that includes the large out -parcel from the previous application. The appropriate changes have been made to the staff report, and the report is re -issued as a staff level approval as of November 2, 2004. File Numbers: Strada Bellissima Subdivision/MPP04-038/MCUP04-047/MAZ04-028 Original: MPP04-022/MCUP04-024/MAZ04-016 Site address: n/w/c of Victory and Meridian Applicant: Pinnacle Engineering, Inc., Dave McKinnon 12552 W. Executive Drive Suite B Boise, Idaho 83713 Owner: Cloyd & Bonnie Nelson and Joan Adkins Application Information: The applicant has submitted the above referenced application to the City of Meridian requesting preliminary plat approval, rezone, annexation, and conditional use permit approval for the development of 90 residential lots, 14 commercial lots, and 12 other lots on 42.46 -acres. The site is located at the northwest corner of the intersection of Victory Road and Meridian Road. Current Zoning: RUT Proposed Zoning: R-4 and L -O Residential lots: 90 Office lots: 14 Common lots: 12 6. Impacted Roadways Roadway Frontage Functional Classification Traffic Count Level of Service* Speed Limit Victory 90' Collector 2,097 west of SH 69 on Better than "C" 50 MPH 5/16/02 Meridian (SH 69) 1,245' Principal 22,266 north of Victory Better than "C" 55 MPH Arterial on 5/15/02 18,196 north of Amity on 4/8/03 *Acceptable level of service for a two lane collector roadway is "D" (9,500 VTD). *Acceptable level of service for a five lane arterial roadway is "D" (33,000 VTD). 7. Roadway Improvements Adjacent To and Near the Site • Victory Road currently has 30 -feet of pavement and no curb, gutter, or sidewalk. • Meridian Road (SH 69) is currently improved with four travel lanes and a center turn lane. There is no curb, gutter, or sidewalk. 8. Existing Right -of -Way • Victory Road currently has 50 -feet of right-of-way. There is approximately 85 -feet of right-of- way for Victory Road at the intersection with Meridian Road. • Meridian Road (SH 69) currently has 125 -feet of existing right-of-way. This roadway is under the jurisdiction of the Idaho Transportation Department (ITD). 9. Existing Access to the Site The site currently has one driveway on Meridian Road located approximately 590 -feet north of Victory Road. The site currently has one driveway on Victory Road located approximately 1,285 feet west of Meridian Road. 10. Site History ACHD has not reviewed this site within the past year. 11. Capital Improvements Plan/Five Year Work Program The intersection of Meridian Road (SH 69) and Victory is scheduled in the District's Five Year Work Program to be signalized in 2009. Victory Road will be widened at the intersection to 4 lanes. B. Findings for Consideration 1. Right -of -Way Internal/Local Streets District policy 7204.4.1 and Figure 72-F1A requires 50 -feet of right-of-way on local streets. This right- of-way allows for the construction of a 2 -lane roadway with curb, gutter and 5 -foot wide concrete sidewalks. Commercial Streets District policy requires 54 -feet of right-of-way on industrial/commercial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 3 -lane roadway with curb, gutter and 5 -foot wide concrete sidewalks. 3 Collector Roadways Victory Road District policy requires 70 -feet of right-of-way on collector roadways (Figure 72-F1 B). This right-of- way width allows for the construction of a 3 -lane roadway with curb, gutter, 5 -foot wide detached sidewalks and bike lanes. The Ridenbaugh Canal is adjacent to Victory Road on the south side. The applicant is proposing to construct a 10 -foot asphalt path abutting the site on Victory Road in lieu of a concrete sidewalk. This pathway would need to be constructed outside of the public right-of-way in an easement. Because the pathway is being constructed outside of the public right-of-way, no additional right-of-way is required to be dedicated with this application. Arterial Roadways Meridian Road (Ski 69) Meridian Road (SH 69 is under the jurisdiction of the Idaho Transportation Department. The application should contact ITD to determine if any improvements and/or additional right-of-way will be required as a part of this application. 2. Street Sections Internal/Local Streets District policy 7204.4.2 states, "developments with any buildable lot that is less that 1 -acre in size will typically provide streets having a minimum pavement width of 32 -feet with curb, gutter and sidewalks. The total street width shall be 36 -feet from back -of -curb to back -of -curb. Variations of this width may be allowed, depending on traffic volumes forecast to be generated by the development. Concrete sidewalks shall be a minimum of 5 -feet in width unless they are separated from the curb 5 -feet or more in which case the sidewalk shall be a minimum of 4 -feet in width. The applicant has proposed to construct the internal local streets as 36 -foot street sections with rolled curb, gutter, and 4 -foot detached concrete sidewalks with 5 -foot planter strips This proposal meets District policy except for the subdivision entrance roads (Alfani Street intersecting Victory Road and Maestra Street intersecting Meridian Road). Commercial Streets District policy 7202.8 and 72-F1 B, requires roadways abutting commercial developments to be constructed as a 40 -foot street section with curb, gutter and 5 -foot concrete sidewalk within 54 -feet of right-of-way. Galvani Street (from Alfani Street to commercial driveway) Galvani Street serves both the residential and commercial portions of this development. Therefore it should be constructed to a commercial street standard (base & pavement depth) with vertical curb, gutter, and 5 -foot concrete sidewalks. The street may be constructed to the width of a residential street (36 -feet back of curb to back of curb). Galvani Street should be signed for "No Parking." Half Streets District policy 7203.4.2 states "if a proposed development abuts an unpaved street or streets the developer shall construct one-half of the full street improvements, including curb, gutter and concrete sidewalk plus additional pavement widening beyond the centerline established for the street to provide a minimum 24 -feet wide paved surface. A 3 -foot wide gravel shoulder and a drainage swale sized to accommodate the roadway storm runoff shall be constructed on the unimproved side. This street section shall be constructed within a minimum 40 -foot right-of-way." 4 Maestra Street (entrance street on SH 69) The applicant has proposed to construct Maestra Street from Meridian Road to Alfani Street as a half - street. The applicant will be required to construct Maestra Street as a commercial street section with vertical curb, gutter, and a 5 -foot concrete sidewalk from Meridian Road to the driveway serving the office lots. Collector Roadways Victory Road District policy 72-F1 B requires collector roadways to be constructed as a 46 -foot street section with vertical curb, gutter and 5 -foot detached (or 7 -foot attached) concrete sidewalk within 70 -feet of right- of-way with parking prohibited on both sides. The applicant will be required to widen the pavement on Victory Road and construct vertical curb and gutter abutting the site along Victory Road. The applicant should coordinate with District Development Review staff on the reconstruction of Victory Road, at the southwest corner of the site, to increase the radius at the reverse curve and to increase the tangent between the curves to meet current standards. If the District can obtain right-of-way from the 0.38 -acre "out -parcel," the District will contribute the funds to construct curb, gutter, and sidewalk abutting that "out -parcel" on Victory Road. This contribution would provide for continuous street improvements along Victory Road. The applicant should enter into a cooperative agreement with District whereby the developer designs and constructs the improvements and receives reimbursement from the District for that design and construction of roadway improvements abutting the frontage of the "0.38 -acre out -parcel." Modification of Policy The applicant is proposing to construct a 10 -foot wide asphalt pathway on the north side of the canal, in lieu of constructing a 5 -foot concrete sidewalk. The applicant is proposing to construct the 10 -foot wide asphalt pathway due to the fact that the pathway can provide multiple functions: a pedestrian path, bicycle path and an irrigation roadway. Staff is supportive the applicant's proposal to construct a 10 -foot wide (minimum) asphalt pathway just north of the canal in lieu of sidewalk. Due to the location of the Ridenbaugh Canal on the south side of Victory Road, the sidewalk that will be required through the development process could be placed on the south side of the canal, as opposed to between Victory Road and the Canal. 3. Stub Streets District policy 7205.5 states that stub streets will be required to provide intra -neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150 -feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". In addition, a stub street must meet the following conditions: 1. A stub street shall be designed to slope towards the street intersection and drain surface water toward that intersection, unless a satisfactory storm drain system is installed. 5 2. The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. The applicant has proposed to extend a stub street (W. Fireweed Drive) into the site from the west property line from Bear Creek Subdivision. This proposal meets District policy and should be approved with this application. The applicant has proposed to construct Garibaldi Street as a stub street to the north property line. The stub street is located approximately 480 -feet east of the westernmost property line (measured property line to centerline). The applicant has proposed that Lot 2, Block 7 will be designated as a temporary turnaround lot until the roadway is extended. The applicant should install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." This proposal meets District policy and should be approved with this application. The applicant has proposed to extend Alfani Street as a stub street to the north property line. The stub street is located approximately 386 -feet west of the east property line (measured property line to centerline). Alfani Street intersects with Maestra Street (proposed half street)at the north property line. If ITD does not approve Maestra Street, the applicant should provide a temporary turnaround at the terminus of Alfani Street. The applicant should install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED /N THE FUTURE." This proposal meets District policy and should be approved with this application. 4. Roadway Offsets District policy 7204.11.6, requires local roadways to align or offset a minimum of 150 -feet from a collector roadway (measured centerline to centerline). The applicant has located the subdivision entrance on Victory Road in accordance with District Traffic Services Staff's recommendations based on sight distance. This location meets District policy and should be approved with this application. District policy 7204.11.6, requires local roadways to align or offset a minimum of 125 -feet from another local roadway (measured centerline to centerline). All of the internal streets exceed District policy offset requirements. These locations should be approved with this application. 5. Islands District policy 7202.7 and 7207.5 requires any proposed landscape islands/medians within the public right-of-way dedicated by this plat should be owned and maintained by a homeowners association. Notes of this should be required on the final plat. The roadway on either side of the traffic island should maintain a minimum of a 21 -foot street section. 6. Turnarounds District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of 45 -feet. The applicant should also be required to provide a minimum of a 29 -foot street section on either side of any proposed center islands within the turnarounds. The medians should be constructed a minimum of 4 -feet wide to total a minimum of a 100 -square foot area. N. Cul-de-sac turnarounds with parking The applicant has proposed two cul-de-sac turnarounds. The turnarounds are proposed to have landscaped islands with parking. The applicant will be required to provide a minimum of a 29 -foot street section on each side of the island to provide for two-way traffic. The applicant should provide the District with letter from the appropriate fire district approving the design of the islands within the turnarounds. Non-standard turnaround The applicant has proposed a non-standard turnaround at the southern terminus of Appia Street. The applicant will be required to either construct a standard cul-de-sac turnaround or a standard knuckle at the terminus of Appia Street. Galvani Street The applicant has proposed to terminate Galvani Street at the driveway for the office lots at the southern end of the site. The applicant will need to provide a turnaround easement over the driveway at the terminus of Galvani Street. The turnaround design/easement should be reviewed and approved by the appropriate Fire District. The applicant should submit a letter to the District from the appropriate Fire District approving the turnaround. 7. Driveways Location District policy F2 -F4 (1) and 72-F4 (2), requires driveways located on local residential roadways to offset a controlled and/or uncontrolled intersection a minimum of 50 -feet (measured near edge to near edge). District policy F2 -F4 (1) and 72-F4 (2), requires driveways located on commercial/industrial roadways to offset a controlled and/or uncontrolled intersection a minimum of 50 -feet (measured near edge to near edge). The proposed driveway for the commercial lots (Lot 2& 3, Block 2) on the south side of Galvani Street does not meet District policy. The driveway shall either align with Alfani Street OR the lots may take access from the internal private driveway that serves the commercial lots. Width District Policy 7207.9.3 restricts residential driveways to a maximum width of 20 -feet. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 36 -feet. Most commercial driveways will be constructed as curb -cut type facilities if located on local streets. Curb return type driveways with 15 -foot radii will be required for driveways accessing collector and arterial roadways. Paving Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, all driveways should be paved at their full width and at least 30 -feet into the site from the edge of pavement. 8. Access to Meridian Road (SH 69) Meridian Road (SH 69) is under the jurisdiction of the Idaho Transportation Department (ITD). The applicant has proposed a public road access (half -street section) at the % mile to serve as an access 7 to this site and the proposed church site adjacent to the north. The applicant shall comply with the requirements of ITD regarding frontage improvements and access to Meridian Road (SH 69). 9. Other Access Victory Road is classified as a collector roadway. Other than the access that is specifically approved with this application, direct lot access will be prohibited and shall be noted on the final plat. C. Site Specific Conditions of Approval 1. Construct all of the internal, local streets (except for Alfani Street, Galvani Street and Maestra Street) as 36 -foot street sections with rolled curb, gutter, and 4 -foot detached concrete sidewalks with 5 -foot planter strips within 50 -feet of right-of-way, as proposed. 2. Construct Alfani Street from the subdivision entrance on Victory Road to Galvani Street (first intersecting street) with vertical curb, gutter, and 5 -foot concrete sidewalks, as proposed. Provide a 21 -foot street section on each side of the proposed landscape island. 3. Construct Galvani Street (from Alfani Street to commercial driveway) to a commercial street standard (base & pavement depth) with vertical curb, gutter, and 5 -foot concrete sidewalks. The street may be constructed to the width of a residential street (36 -feet back of curb to back of curb). Galvani Street shall be signed for "No Parking." 4. If the Idaho Transportation Department approves the location of Maestra Street, construct Maestra Street from Meridian Road to Alfani Street as a commercial half -street with no landscape island at the intersection of Maestra Street and Meridian Road. Maestra Street shall be constructed to commercial street standards (1/2 of a 40 -foot street section with vertical curb, gutter, and 5 -foot sidewalks) from Meridian Road to the driveway serving the office lots. The applicant shall provide a minimum of 24 - feet of pavement for the half street. Maestra Street may taper to a residential street section beyond the driveway serving the office lots, but shall have vertical curb its entire length. 5. Widen the pavement on Victory Road to one-half of a 46 -foot street section and construct vertical curb and gutter abutting the site. Coordinate with District Development Review staff on the reconstruction of Victory Road, at the southwest corner of the site, to increase the radius at the reverse curve and to increase the tangent between the curves to meet current standards. 6. Construct a -10 -foot wide asphalt path along Victory Road abutting the site in lieu of a concrete sidewalk. The path shall not be placed within the public right-of-way, and the applicant shall provide an easement to the District for that path. 7. If the District can obtain right-of-way from the "0.38 -acre out -parcel," the applicant shall enter into a cooperative agreement with District whereby the developer designs and constructs the roadway improvements and receives reimbursement from the District for that design and construction of roadway improvements abutting the frontage of the "0.38 -acre out -parcel." 8. Comply with requirements of ITD for State Highway 69 frontage. Submit to the District a letter from ITD regarding said requirements prior to District approval of the final plat or issuance of a building permit (or other required permits), whichever occurs first. Contact District III Traffic Engineer Dan Coonce at 334-8340. 9. Extend the stub street (W. Fireweed Drive) into the site from the west property line from Bear Creek Subdivision. 10. Construct Garibaldi Street as a stub street to the north property line. The stub street shall be located approximately 480 -feet east of the westernmost property line (measured property line to centerline). Lot 2, Block 7 shall be designated as a temporary turnaround lot until the roadway is extended; a note of this shall be placed on the final plat. The applicant shall install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 11. Construct Alfani Street as a stub street to the north property line. The stub street shall be located approximately 386 -feet west of the east property line (measured property line to centerline). Alfani Street intersects with Maestra Street (proposed half street) at the north property line. If ITD does not approve Maestra Street, the applicant shall provide a temporary turnaround at the terminus of Alfani -Street. The applicant shall install a sign atAhe terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 12. Provide a minimum 29 -foot street section on each side of the landscape islands within the cul-de-sac turnarounds. The applicant shall submit a letter from the appropriate fire district approving the design of the islands within the turnarounds. 13. Construct a standard cul-de-sac turnaround (45 -foot minimum radius) or a standard knuckle at the terminus of Appia Street. 14. Provide a turnaround easement over the office lot driveway at the terminus of Galvani Street (west property line of Lot 6, Block 2). The turnaround design/easement should be reviewed and approved by the appropriate Fire District. The applicant should submit a letter from the appropriate fire district approving the turnaround design. 15. The driveway for the office lots (Lots 2 & 3, Block 2) on the south side of Galvani Street shall align with Alfani Street on the north side OR take access to the internal commercial driveway. 16. Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. - Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all 0 applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #198, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant -at no cost to ACRD shall repair -existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3. Appeal Guidelines 10 Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be -filed within_ten__(1D)_working -days-from-thedate of#he- decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the heaft-Ahe- . Commission-shalLeither affirm or ____ reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 12