Sherwin Williams Annex CZC 07-152NOTE: This is not a Building Permit
Prior to anv construction, You should
contact the Building Department at
(208) 887-2211 to verify if any additional
permits and/or inspections will be
required by the Meridian Building
Department.
CERTIFICATE OF ZONING COMPLIANCE*
Date: July 26 2007
Project Name/Number: Sherwin Williams Annex — CZC-07-152
Owner: Jackson's Food Stores Inc.
Site Address: 3500 Commercial Court
Proposed Use: Leased Space Within Existing Capitol Distributing Buildinir (10,000 sq. ft.)
Zoning: I L Lilllt Industrial)
Comments: _.
Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of approval for the
Commerce Park Subdivision. Issuance of this permit does not release the Applicant from any previous requirements of other
permits issued for this site.
Site / Landscape Plan: The Site Plan prepared by Dale Binning on July 12, 2007, labeled S -lb, is approved (stamped
"Approved" on July 20, 2007, by the Meridian Planning Department) with no changes. The approved site / landscape plan is
not to be altered without prior written approval of the Planning Department. No field changes to the plan are permitted; prior
written approval of all material changes is required.
Parking: All parking areas shall be paved and striped in accordance with UDC 11-3B. Project engineer/architect shall certify
that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap
accessible stalls must have signage in accordance per ADA and signed accessible.
Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior to
occupancy.
curbing: Per UDC 11 -3C -5B, all landscape areas and sidewalks adjacent to driveways, parking lots, or other vehicle use
areas, must be protected by curbing, and wheel stops or other approved protective devices. Overhang is allowed and wheel
stops / protective devices not required when two feet (2') is added to the width of the adjacent sidewalk or landscaped area.
Curbing may be cut to allow for storm water runoff.
Protection of ExistingTrees: rees: Any existing trees on site must be protected or mitigated for in accordance with the Tree
Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the Parks Department Arborist
(Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing.trees prior to construction. Any
severely damaged tree must be replaced in compliance with UDC 11 -3B -10-C.5.
Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved
specifications and in accordance with UDC 11-3A-15.
Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be
designed in compliance with UDC 11-313-11 and UDC 11-3A-18.
Lighting: Lighting shall not cause glare or impact the traveling public or neighboring development and comply with
lighting standards as defined in UDC 11-3A-11.
Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in compliance with
UDC 11-3D.
Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures must be built in
the location and to the size approved by SSC.
Handicap -Accessibility: The structure, site improvements, and parking areas must be in compliance with all federal
handicap -accessibility requirements.
ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes
must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City
of Meridian Planning Staff for approval prior to the issuance of a building permit.
Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A
Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or
cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary
Occupancy.
Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan, and Elevations,
stamped "Approved on July 20, 2007, are not to be altered without prior written approval of the Planning Department. No
significant field changes to the landscape/site plan are permitted; prior written approval of all changes is required.
Amanda Hess, Associate City Planner
*This letter does not indicate compliance with requirements of other departments/agencies; including, but not limited to, Ada County Highway
District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary
Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun.
x
� x
f
C ridicn
Type of Review Requested (check all that apply)
❑ Accessory Use
❑ Alternative Compliance
X Certificate of Zoning Compliance
❑ Conditional Use Permit Minor Modification
❑ Design Review
❑ Property Boundary Adjustment
❑ Short Plat
❑ Temporary Use Certificate of Zoning Compliance
❑ Time Extension (Director)
❑ Vacation
❑ Other
Planning Department
ADMINISTRATIVE REVIEW APPLICATION
Applicant Information
Applicant name: Sherwin-Williams Annex / Capitol Distributing Phone: 888-6061
Applicant address: 3500 Commercial Court Zip: 83642
Applicant's interest in property: ❑ Own N Rent ❑ Optioned ❑ Other
Owner name: Jacksons Food Stores, Inc (a Nevada Corporation) phone:
Owner address
3500 Commercial Court
Agent name (e.g., architect, engineer, developer, representative): Dale Binning
Firm name: Dale Binning, Architect
Address: P.O. Box 686, Boise, Idaho
Primary contact is: ❑Applicant ❑Owner 09 Agent ❑Other
Dale Binning
Contact name: Dale Binning, Architect
E-mail: P.O. Box 686, Boise, Idaho
Subject Property Information
Location/street address: 3500 Commercial Court
Assessor's parcel number(s):
Township, range, section: _
Zip: _
Phone:
Zip: _
Phone;
888-6061
83642
383-0209
83701
383-0209
Fax: 83701
R1527260160 Lot 4, Block 2, Commerce Park Subdivision
Total acreage: 2.81 (122,530 SF)
P
Current land use:
Capitol Distributing, Inc Current zoning district: I -L
660 E. NVatertmNer Lane. Suite 203 • Meridian. Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: NvNNw.meridiancitv.orz
1
Project Description
Project/subdivision name: Sherwin-Williams Annex
General description of proposed project/request: 10,000 sf leased space located inside the existing
Capitol Distributing Building
Proposed zoning district(s):
Acres of each zone proposed
I -L
2.81
Type of use proposed (check all that apply):
❑ Residential X Commercial ❑ Office ❑ Industrial ❑ Other
Amenities provided with this development (if applicable):
Who will own & maintain the pressurized irrigation system in this development?
Which irrigation district does this property lie within?
Primary irrigation source:
existing well Secondary:
Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): existing - no change
Residential Project Summary (if applicable)
Number of residential units:
Number of common and/or other lots:
Number of building lots:
Proposed number of dwelling units (for multi -family developments only):
1 Bedroom:
Minimum square footage of structure(s) (excl. garage):
Minimum property size (s.f):
Gross density (DU/acre-total land):
2 or more Bedrooms:
Proposed building height:
Average property size (s.f.):
Net density (DU/acre-excluding roads & alleys):
Percentage of open space provided: Acreage of open space:
Percentage of useable open space:
(See Chapter 3, Article G, for qualified open space)
Type of open space provided in acres (i.e., landscaping, public, common, etc):
Type of dwelling(s) proposed: ❑ Single-family ❑ Townhomes ❑ Duplexes ❑ Mitlti-family
Non-residential Project Summary (if applicable)
Number of building lots: (1) Other lots:
Gross floor area proposed: 10,000 sf leased spaceExisting (if applicable): within Capitol Distributing Bldg
Hours of operation (days and hours): M -F 8:00 - 5:00 Building height: 26'
Percentage of site/project devoted to the following:
Landsca in-: 5.4% Building:
20.5%
Paving:
74.1%
P
Total number of employees: (6) Maximum number of employees at any one time: (6)
Number and ages of students/children (if applicable): Seating capacity:
Total number of parking spaces provided: (12) Number of compact spaces provided: (0)
(12) for Sherwin-Williams / 10 for Capitol Distributing
Authorization
I Irale Binni rchitect for Capitol Distributing
Prim app can name,. /
Applicant signature: Date: f1 u'1 5 - 07
60 E. W to ger Lane. Suite 202 • . Meridian. Idaho 830,42
Phone: (208) 884-553-3 • Facsimile: (208) 88 - 4 • Website: Nnww.meridiancih•.or<_=
2
Certificate of Zoning Compliance
City of Meridian
Planning & Zoning
Sherwin-Williams Annex / Capitol Distributing Building
3500 Commercial Court, Meridian Idaho 83642
NARRATIVE:
This CZC Application is for approval of a 10,000 sf leased space to be located inside the existing
Capitol Distributing Building.
This leased space will be occupied by Sherwin-Williams Paints. The existing Sherwin-Williams retail
store and warehouse is located in the building next to this leased space.
Site Character:
There are no proposed changes to the existing Capitol Distributing site. The paving, parking,
landscaping will not be changed. The proposed Sherwin-Williams Annex will be located inside the
existing building.
There is no change in use. The leased space will continue as a warehouse with non-combustible paints
stored on pallet racks.
Sherwin-Williams is proposing a wall mounted sign above their entrance. This would require a separate
sign permit.
Trash Enclosure:
A trash enclosure is not required. The warehouse recycles all containers and stores them indoors for
pick-up. All other trash will be placed in the existing trash enclosure at the Sherwin-Williams building
next door.
S/ 9
a
V
COMMERCE PARK SUBDIVISION
SW 1/4 Sectl'on 9, T. M., RAE., B.M., Ada County, Ida,
o
5w4 1". 100'
DETAIL"A"
� [nglnaar �
LEGEND
Section Corner
0-4 1/4 Corner
B Stage Cay
0 Found lite Rebar
a S% b2" a 24" Rebar
Station Line
1/4 Station Lint
NOTES
I. (11111ty and aaineat tatemmte to be Id inside
Lot Llan, along Roode, Subditiaae Boundary wA
Commai Am% and d Centered an all Interior Lot
Llw unless dlrerWiss %been,
2. Might Anew Is Lot I in Black I and Lot I In
Bless 2 Is rsstrkM te Commorelel Orin.
S. Sulldinit Selbocgs In this SabdMaon shall be In
eampllana With the gypllabte taahp Meuwtess
4. tach Lot Ower shall, prim Is Coenlfuaaon,
Submit a trellle and dgnlepneeM plan to IM
Ada Cama Send of Caamlsslow for goo - 1.
Each Loi caw "I N responsible IN
Ifalsi that and msisiowea of Landscaping an
grit Loh
OME6T 1 (W 2
C14RONIC a ASSOCIATES
Conwltlnq Enplmere
ata, uth.
�[Nro.Mrl w�Mu�
ps
i
- - B7CISvkiG `
CAPITOL DISTRIBUTING
5 wARBaousai��
SITS PLAN I" = 201
Certificate of Zoning
Compliance Application
aua .lc+' mann
EcnK ancon l�A' erasff
Ka-ufe..au.rcn.+u awv
.e.. e.vrt uosulo.+e.- om v
1��v:Le�nm"towere ooceve
aQ "
wne
� e
1vcE..molv"�E.�aoweov�s .ro
DRAWING LIST
..c(n B1fi.WIKiEICE +E.' i,L+lff
�-
MQ
! L..lF/b0 Y . O lWue+Ee SM¢t ��aleALtff
� � _
<
'
Y4 L[i[ R.w / lwOSLIPE R/l
z w p
�
a o
.� .
nfa.�
.MM lAf
� !'=
r
I
�OlaR�0104lwlltlK
w_
zo�
�O
I
.rte elle.fflEW.FL /elOQffrtpl[t
z V
.-0.. oaw u�Esaes/eon maoe.[S
H BWA �
iomT—
'
-wb igrol fOEOtti / e0E! iGEOLFS
+�V =
VICINITY YAP
'
u r.. OJYOK IDlfOti / N �Ia000 LttfN
.'M trtMMlr4fwf V[[BCnlmtt -
w
§pp{ �
�
YRfeY. t RLLK RNl
�
if
-L .Mel Ree! Po S[ t Wsu�[MOM
Flt l nCpr O1S OMLK!
O
A
r
1
1
K u
SETS INPORMATIN
S
aua .lc+' mann
EcnK ancon l�A' erasff
Ka-ufe..au.rcn.+u awv
.e.. e.vrt uosulo.+e.- om v
1��v:Le�nm"towere ooceve
aQ "
wne
� e
1vcE..molv"�E.�aoweov�s .ro
..y m
..c(n B1fi.WIKiEICE +E.' i,L+lff
"gyp
! L..lF/b0 Y . O lWue+Ee SM¢t ��aleALtff
� � _
<
Dunn onm®nKlaowff w,E.t'
151.lRAaeff X11 "Y16EV iMEEt 1mMife: ll @.EEt
� Q
I.eea.cerino .cesoul.a
�
a o
.� .
nfa.�
v�vlix uqc� [�aytL ppfEi
yaEfX
wl10
r �
r
EOt1NIUE
E[..IO.YlON
A
6:.rEY
iomT—
�y r
0 I.iLy
VICINITY YAP
V "
,!lenL "`0.71., lom
o.m
>tAr q. ]007
zoNlNa el.A.urlc.rwN
"gyp
ZON[nG tLASS[F[CAl[�!L'[-L
c_�I�
G'osw�wr�`ad�o 5'r.Lrrur.
August 7, 2007
To: Sherwin- Williams Annex
3500 Commercial Court
Merdian, ID 83642
Subject: MCZC-07-152
Sherwin-Williams
3500 Commercial Court
John S. Franden, President
Rebecca W. Arnold, Vice President
Sherry R. Huber, Commissioner
Dave Bivens, Commissioner
Carol A. McKee, Commissioner
CEWED
AUG 09 M7
City of Meridian
City Clerk Office
In response to your request for comment, the Ada County Highway District (ACHD)
Planning Review staff has reviewed the submitted application and site plan for the item
referenced above. It has been determined that there are no site specific requirements for
you at this time due to the fact that the proposed development has no impact to the
roadway.
If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require improvements to the transportation system at that time.
A traffic impact fee will not need to be assessed by ACHD.
Prior to the construction or installation of any roadway improvements (curb, gutter,
sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement
must be obtained from ACHD.
If you have any questions, please feel free to contact me at (208) 387-6177.
Sincerely,
A6"a��
Chelsee Kucera
Right -of -Way and Development Services
CC: Project file
City of Meridian
Dale Binning, Architect
P.O. Box 686
Boise, ID 83701
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do one of the following:
®Send a "No Review" letter to the applicant stating that there are no site specific requirements at this
time.
[]Send a "Comply With" letter to the applicant stating that if the development is within a platted
subdivision or part of a previous development application and that the site specific requirements from the
previous development also apply to this development application.
❑Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
❑Write a Commission Level report analyzing the impacts of the development on the transportation
system and
evaluating the proposal for its conformance to District Policy.
®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
❑For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the
Development Review Division for plan review and assessment of impact fees. (Note: if there are no
site improvements required by ACHD, then architectural plans may be submitted for purposes of impact
fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for
approval by Development Services & Traffic Services). There is a one week turnaround for this approval.
❑ Working in the ACHD Right -of -Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit
Application" to ACHD Construction — Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50'
or you are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
❑ Sediment & Erosion Submittal
• At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a
Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by
the ACHD Drainage Division.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con
being scheduled.
❑ Final Approval from Development Services
ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -
Con
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
ofS :�J.
€-Al " A his!
zDO
w 7
a - s
�I+1 •' ' � � ���3 66 y� �as�s
J r e ..a Fa 9: 9F�!
.f------------- v --
�
` by
oust?osx
iW �.U0,00.Oo5 ,16698
OS'f9f ,S6'9SY
30000 AOS
/ r3. [2'611
f
,S2 M ji
ci
T_
_ I p I a oB ao.ao s
� O 96159
� I
ae I I
Qw
3 UO,OO .00S b $
Y_ i I m m 5212. � o
W2 m Y iatl
3
LL ~o N ~
Ol, I L 3„oa ,ao Aos l a
v I--------.6.�: --T--
W
N .19 -2t.9 -2t. `
3 O 9"fU I I U
U
- I
W
100 I
' m I I p000i
L yl Y 3 GO,OO AOS I
J
3 oo po Aos
J 9c's9
� I
eS I o
m I u I
s6'Sz9 J11
nl
I Q
I's
0
_ y^
➢'009 ,L6"Y2Y
m FS'F6
36/,%Z./ON OC,ON .91'd863�.%6,
mom__—_—_._—.—
' r
l.'a_: V R=:eC
ril o e$ a i
a LA}g4g,
SR�g'.R
'Jim IS
i:: A
9 Srroa
eyyA.pA.
�SY43"
OOCO tiFlyYOyCirvs�� yy�� gg''yY[CyA�Y++w��ay��y ) q iYryV(t+O((oy�O}`NryVU(I�'yNgVgI�OyI�Y'yigt�Y�a '1g1y(1(Oy.'�1 „4gVyPJ$lyiryW,WyVW��OyO➢'s
wEUO•i'e{3a.&uAV KA V 038' fn4CJiiV43i11! Cs16iW l'FU S! dF1LiTl^'ihA1i3V1fVJYp^1Z^J
'JI�III�It�IIH $ IVQ Su[p�[ng 8ai3ngjjj9iQ fio3idvD
�xelej e�� �� « ���� 9� � •EI ��I 3 �I 93 4 ! a1g f _� A §$��
R 333fi33f3 3 ?± d
ME
e
Approved By
----------
WWI
EXISTING CAPITOL DISTRIBUTING BUILDING
MR FLOOR LEASU SPACE - 25.05 IT UNCWDIS SNFRWTA W IMS E GPITOL OISTR191NING)
TWE OF CONSTRNCTURU V -B
FIRE ALARN SYbEN, SPOKE CONTROL SYSTEN, INSPIRED,
ANNMTIC FRE SPRINNLEIC SYSTEM REDDISH.
19X¢0 ONWANLY{
OWUPANCY MASffiIGIIWO ORIVR M - MEMANTIIE
OSEIWAREY 0 SIFIGT16E 6R[W S -P - L➢N MAX- STORPLE (MAFSCItl1ETIRLE)
INS
UPANCY Ni SEPARATWN REWIND RETWETN M AND S-2.
_9
WNXLE FIND AREAUR FOR MIXED USE EXCUPARCY1
GARW M - REASNRO.E (SALES AREAX %. OF ALLOWABLE AREA GCTUAL - I.SRO OF
CREW S-2 - LPN MIND SIDMOE (ROX{4Y0USTIRLE} 13,900 IF ALLOWREE AREA (ACTUAL = WAI05 OF
AREA E
GRtl@ M - RERCANTO.E (ME$ AREAR 9,000 OF S SWY = 27.000 OF (ACONL = 4,4W Si)
GROG' S -E - LOW MANN STORAGE (NNI-CONBYSf1BLE.Y IS.= IF X 3005 - 40,500 S2 WTWL - ADDS S2)
.5 DO Gd W'E 123.61'...
ACIY6L BUILDING WITiMT1 S➢YAE STORY WAREMOSE
ALLNWn. a.. REINA 7.0 ETIRY W (IABLE E031
EXIT. OCCUPANCY LG�O FACTOR F011 PRMCNSTILE = EW
/.ARO SP/250 =1R PSRSMS
CORE EXIT RESE EO. ISABLE 1003¢8.2)
EXTON OCCUPANCY LOAD FACTOR FOR WARFNWSE/STOAMi - SW
7,00 SF/b0=�2�SONO TWO TROTS DENNIS, (TAOLC 10032..0
REWI2O Puff RESISTANCE EMTEPotlI WM = WNE
GREATER THAN W' DO LESS IRAN 3W IEWIREE (0) HOUR R6T.
PER (TABLE BW
GREATER TRAN W - ITAII.. WIONS. PEPMETIEO (TABLE 1015)
S