Strada Bellissima No 6 CZC 07-099CITY OF 9�
11 IDAHO
'" "c 1 REtiSURE r�"` SINCF
1903
NOTE: This is not a Building
Permit. Prior to any construction,
you should contact the Building
Department at (208) 887-2211 to
verify if any additional permits
and/or inspections will be required
by the Meridian Building
Department.
CERTIFICATE OF ZONING COMPLIANCE*
Date: May 15 2007
Project Name/Number: Strada Bellissima No. 6 — CZC-07-099
Owner: Richard Evans.
Site Address: 3109 S Meridian Rd (Strada Bellissima Subdivision Lot 6 Block 2)
Proposed Use: Office Building Shell- Use TBD by Future Owner
Zoning: L -O
Comments:
Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of
approval for the Strada Bellissima Development. Issuance of this permit does not release the applicant from any
previous requirements of the other permits issued for this site. The issuance of this permit does not release the
applicant from any requirements of the approved Annexation and Zoning (AZ -04-028), Conditional Use (CUP -04-
047), Preliminary Plat (PP -04-038), Final Plat (FP -05-022), as well as any Development Agreements recorded for
this site. Because a user for this building is not proposed at this time, the future tenant(s) must obtain tenant
improvement sign off from the Planning Department, prior to occupancy.
Landscaping: The Landscape Plan prepared by Pinnacle Engineers, Inc. on May 14, 2004, Sheet Numbers L-1, is
approved (stamped "Approved" on May 15, 2007, by the Meridian Planning Department) with the following
changes (see redline changes on plan): 1) UDC 11-3B-5 establishes the minimum plant size standard of for all
landscaped areas Please note that all woody shrubs are required to be of two gallon pot minimum. Other
than the aforementioned changes, the approved landscape plan is not to be altered without prior written approval of
the Planning Department. No field changes to landscape plan permitted; prior written approval of all material
changes is required.
Site Plan: The Site Plan prepared by Byron Lee Smith on April 23, 2007, Sheet Number A0.0, is approved
(stamped "Approved" on May 15, 2007, by the Meridian Planning Department) with the following changes: (see
redline changes on plan): 1) UDC 11 -3A -19C -4a requires a continuous pedestrian walkway that is a minimum
of eight feet (8') in width to be provided from the perimeter sidewalk to the main building entrance. Please
re design to accommodate said walkway which shall parallel the north side of the proposed building. Also
note that the side yard setback for Lot 6, Block 2, Strada Bellissima, was approved at five feet (5'). With the
construction of the proposed 5,103 sq. ft. building, the footprint may not encroach past the required five foot
(51) side yard setback. The approved site plan is not to be altered without prior written approval of the Planning
Department.
Elevations: The Elevations prepared by Byron Lee Smith on April 23, 2007, Sheet Number A4.0, are approved
(stamped "Approved" on May 15, 2007, by the Meridian Planning Department) with no changes from the Planning
Department. The approved elevation plan is not to be altered without prior written approval of the Planning
Department.
Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved
specifications and in accordance with UDC 11-3A-15.
Protection of Existing Trees: Any existing trees on site must be protected or mitigated for in accordance with the
Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the Parks
Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing trees
prior to construction. Any severely damaged tree must be replaced in compliance with UDC 11 -3B -10-C.5.
Parking: The proposed parking areas shall be paved and striped in accordance with UDC 11-313. Project
engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans
with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA and signed
appropriately.
Curbin : Per UDC 11 -3B -5I, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas,
must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for
storm water runoff.
Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior
to occupancy.
Drainaize: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall
be designed in compliance with UDC 11-3B-1 I and UDC 11-3A-18.
Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in UDC I I -
3A-7.
Lim: Lighting shall not cause glare or impact the traveling public or neighboring development and comply
with lighting standards as defined in UDC 11-3A-11.
Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in
compliance with UDC 11-3D.
Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures must be
built in the location and to the size approved by SSC.
Handicap -Accessibility: The structure, site improvements and parking areas must be in compliance with all federal
handicap -accessibility requirements.
ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes
must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the
City of Meridian Planning staff for approval prior to the issuance of a building permit.
Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of
Occupancy. A written certificate of completion shall be prepared by the landscape architect, landscape designer or
qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The
Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler
installation, are in substantial compliance with the approved landscape plan. A Temporary Certificate of
Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount
of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy.
Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan stamped
"Approved" on July 26, 2006, and Elevations, are not to be altered without prior written approval of the Planning
Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all
changes is required.
Jenny Veatch
Assistant Planner
*This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited
to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer,
Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date
of issuance if work has not begun.
}
m410
Type of Review Requested (check all that apply)
❑ Accessory Use
❑ Nternative Compliance
Certificate of Zoning Compliance
❑ Conditional Use Permit Minor Modification
❑ Design Review
❑ Private Street
❑ Property Boundary Adjustment
❑ Short Plat
❑ Temporary Use Certificate of Zoning Compliance
❑ Time Extension (Director)
❑ Vacation
❑ Other
Planning Department
ADMINISTRATIVE REVIEW APPLICATION
Applicant Information
Applicant name: GAI Phone: -.5754-656
Applicant address: 5G� P . FN� C2% -F-- AV0 MOZ40AIJ Zip: &364(__
Applicant's interest in property: ❑ Own ❑ Rent ❑ Optioned 0 Other IW ' I T�G`T'
Owner name: fl IGlt-AP-o (�l�S Phone:
Owner address: �1�r Z1N. PLht' &Qlse Zip: J7
Agent name (e.g., architect, engineer, developer, representative):
Firm name: f . S/�l f 9 Jrl-1S �T��zPhone: 5(S Mzi
Address: 5E6 H=VL Zip:
Primary contact is: Q"A"pplicant ❑ Owner ❑ Agent ❑ Other
• Ph• 'ri 'SI
nnez�affi&CAU&Obe..' J1047 +735
Subject Property Information
Location/streetaddress:iZL7-
Assessor's parcel number(s): S �'Z'% ���' 1 �✓- YS
Township, range, section: 3N Total acreage: t/ +O
Current land use: L_0 I '-" 1 119IJ FJ1W Current zoning district:
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
1 (Rev. 9121/06)
Project Description
Project/subdivision name: `JTI Stec eja kA g tAAA SUPS u tsioQ 6�
General description of proposed project/request: dFF fG6- 27-OM4 1 SC2
Proposed zoning district(s): L d
Acres of each zone proposed:
Type of use proposed (check all that apply):
❑ Residential ❑ Commercial Office ❑ Industrial ❑ Other
Amenities provided with this development (if applicable):
Who will own & maintain the pressurized irrigation system in this development? Q6 F41N1,q(d6A t"Yi11J f (ZF- . t1ST
Which irrigation district does this property lie within? N/10!25c AWf IATJ IP 6?!!5 J i_SjTJ41GT_
NwMPf; —
Primary irrigation source: SLiiL17 Jar—, tw7l e ondary: r 6,r- )UW_Y-l01&FJ
*. blS1' 2 61 �i SF
Square footage of landscaped areas to be irrigated (if pnmary or sec ndary point of connection is City water):
Residential Project Summary (if applicable)
Number of residential units:
Number of common and/or other lots:
Number of building lots:
Proposed number of dwelling units (for multi -family developments only):
1 Bedroom:
Minimum square footage of structure(s) (excl. garage):
Minimum property size (s.f):
Gross density (DU/acre-total land):
Percentage of open space provided:
Percentage of useable open space:
2 or more Bedrooms:
Proposed building height:
Average property size (s.f.):
Net density (DU/acre-excluding roads & alleys):
Acreage of open space:
(See Chapter 3, Article G, for qualified open space)
Type of open space provided in acres (i.e., landscaping, public, common, etc):
Type of dwelling(s) proposed: ❑ Single-family ❑ Townhomes ❑ Duplexes ❑ Multi -family
Non-residential Project Summary (if applicable)
Number of building lots: 1 Other lots:
Gross floor area proposed: Z! 7200 '�W I'* I- R42- Existing (if applicable):
Hours of operation (days Ahours) : 9 -AS 09T65r2m i Nao Building height:
Percentage of site/project devoted to the following:
d 22 fi
Landscaping: U Building: �3 Paving: J 0
Total number of employees: Maximum number of employees at any one time:
Number and ages of students/children (if applicabblle):/' W% Seating capacity:
Total number of parking sp ce provided: �9 Number of compact spaces provided:
Print applicant name: all
Applicant signature: R
E. Watertower Lanelte 202 • Meridian, Idaho 83642
Phone: (208)4-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
2
byron.16e smith -architect, P.Q.
r 5649 north big cedar avenue meridian idaho 83642 208 375 4850 fax 208 8$4'4733 ronegolf@cableone.net
26 'April 2007
M
Cit sof eridian
y�
rJ � _
Plang and Zoning Department Tnin
660 East Watertower_ _
SUiite 2202; -
Meridian Idaho 83642
Re: / Certificate of Zoning CQmplian'6e,'Applioation
Project Nar'ratiye-
(` ` �..
; prefect Strada Be'llissima Spec Six
3169 South Meridian Road -
--Lot
Lot 6, Bloc( 2i�. -'r(�
1 d �'
Stra,�Bel�issfma'Subdiv�sion urnberOnea
Meridian-, Idaho 8�6'
Dear laniin and Zoning'Staff I
The above "referent ' pp { the construction of the third of a/ series of professionay
� �ed�a licatlon is for �
I �
i office, b(aildings The buirdGFlg department�plan revilew permit process following the' approval, of this —_
CZC will' be forTtf e construction of the shell only for a sig,gle story, 3,604 sf (plus 1,499.. s
/_ie
_ -
basement) professibnal office btaildin ! �Ithough the tenant has not been_deterMi,ned=at this time;
r�,_,.r '
it Is in"tended,that the,dsg be forone 6f the 4'.uses approved�for the City's t`` -O zoning designation., ' �' ;
— The�uilding -will be;constr�icted using concrete-fouridations, conventional woodfra�med walls with
r
pre-engineered wood root trusses'_E terior finishes -will be the roofs and walls consisting of s6 e
l
and/ or stucco __eneers{
The following `prior apirovals have, been' granted:
1 Annexation and Rezor�e�Z-04-028
2 Conditional Use Permit�CUP-04-047 "
3. Prelimina`rY Plat PP -04-038'
I /
�
-, 4.y Final Pfat EP -05-022'
iSincerely,
i
r.
Byron Si
President
Lff
5
I
AFTER RECORDING MAIL TO:
ADA COUNTY REDDER J. DAVE NA11WO AMOUNT 15.00 5
BOISE
pE W Nears Hamx-20 PIA 11 llA1111�1111t1111U1�1{18 i I
REWOEO-REQUEST OF [� f 104155850
First America
Evans Construction Management Company
9560 Pebble Brook Lane
Garden City, ID 83714
/VcS - Zg53o
WARRANTY DEED
File No.: 4101-379885 (RPA)
Date: November 22, 2004
For Value Received, Cioyd W. Nelson and Bonnie May Nelson, husband and wife, hereinafter
referred to as Grantor, does hereby grant, bargain, sell and convey unto STRADA
BELLISSIMA, LLC*; hereinafter nefierred to as Grantee, whose current address is 9560 Pebble
Brook Lane, Garden City, ID 83714, the following described premises, situated in
Ada County, Idaho, to wit:
SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART THEREOF.
APN:S1224449555
TO HAVE AND TO HOLD the said premises, with their appurtenances, unto said Grantee, and to the
Grantee's heirs and assigns forever. And the said Grantordoes hereby covenant to and with the said
Grantee, that the Grantor is the owner in fee simple of said premises; that said premises are free from all
encumbrances except current years taxes, levies, and assessments, and except U.S. Patent reservations,
restrictions, easements of record and easements visible upon the premises, and that Grantor will warrant
and defend the same from all claims whatsoever.
Lloyd W. NeTfon
Bonnie May Nelson
*AN IDAHO LIMITED LIABILITY COMPANY
Page 1 of Z
APN: S1224449555 Warranty Deed Fie No.: 4101-379885 (RPA)
- continued Date: 11/22/2004
STATE OF Idaho )
ss.
COUNTY OF Ada )
On this 23rd day of November, 2004, before me, a Notary Public in and for said State,
personally appeared Cloyd W. Nelson and Bonnie May Nelson, known or identified to me to be the
person(s) whose name(s) is/are subsaibed to the within instrument, and acknowledged to me that
he/she/they executed the same.
In witness whereof, I have hereunto set my hand and affixed my official seal the day and year in this
certificate first above written.
Notary Public for the State of Idaho
. �.�€.'s Residing at: Meridian, ID
'Ft NpTa �Z7 My Commission Expires: 04-26-08
v
l C
�e� •;esoie•_
Page 2 of 2
EXHIBIT A
LEGAL DESCRIPTION:
A tract of land situated in the Southeast Quarter of the Southeast Quarter of Section 29, Township 3
North, Range 1 West, Boise Meridian, Ada County, Idaho, described as follows:
Beginning at the Southeast comer of said Section 24, being the REAL POINT OF BEGINNING; thence
West along the South line of said Semon 24, a distance of 213.77 feet; thence North 70006' West on the
chord of a curve with a radius of 200.00 feet and a central angle of 39048' a distance of 136.15 feet;
thence North 50012' West a distance of 56.30 feet; thence North 55037' East a distance of 92.20 feet;
thence North 27029' East a distance of 30.44 feet; thence North 5O' East a distance of 56.73 feet;
thence South 89031' West a distance of 190.00 feet; thence South a distance of 73.16 feet W the center
of Victory Road; thence North 73046'06' West along the chord of a curve with a radius of 350.00 feet and
a central angle of 14044' a distance of 88.92 feet; thence North 8104' West a distance of 80.20 feet;
thence North 2046' East along the center of a concrete ditch a distance of 376.27 feet; thence North
18'036' West along said ditch a distance of 38.74 feet; thence North 3215' West along said center of
ditch a distance of 33.14 feet thence North 37030' West along said ditch a distance of 150.18 feet;
thence West a distance of 570.50 feet to the West line of the Southeast Quarter of the Southeast
Quarter, thence North 00620" East along said West line a d&ance of 588.42 feet to the Northwest
comer of said Southeast Quarter of the Southeast Quarter, thence North 8955' East along the North line
Of said Southeast Quarter of the Southeast Quairber a distance of 1317.27 feet to the Northeast corner of
said Southeast Quarter of the SMOMAQuarter; thence South along the East line of the Southeast
Quarter of the Southeast Quarter a distance of 133057 feet to the REAL POINT OF BEGINNING.
LESS AND EXCEPTING therefrom that property conveyed to STATE OF IDAHO by Warranty Deed
recorded September 21, 1987, as Instrurnent No. 8753575, and described as follows:
A parcel of land being on the Westerly side of the centerline of State Highway No. 69, Project No. SR -RS -
3782(2) Highway Survey as shown on the plans thenW now on file in the office of the Idaho
Transportation Department; Division of Kghways, and being a portion of the Southeast Quarter of the
Southeast Quarter of Section 24, Township 3 Norris, Range 1 West, Boise Meridian, described as follows:
Beginning at the Southeast comer of Section 24, Township 3 North, Range 1 West, Boise Meridian;
thence North 0038'31" East along the East line of said Section 24 a distance of 1,331.0 feet, more or less,
to the Northeast comer of the Southeast Quarter of the Southeast Quarter of said Section 24; thence
North 89026'02" West along the North line of said Southeast Quarter of the Southeast Quarter a distance
of 65.0 feet to a point in the line paralid with and 65.0 feet Westerly from the centerline and bears North
89021'29" West from Station 394+31.02 of said State Highway No. 69, Project No. SR -RS -3782(2)
Highway Survey; thence South 03831' West along said paras time 1,265.83 feet to a point opposite
Station 381+65.19 of said State Highway Survey; thence South 55044'56" West - 60.96 feet to a point in
a line parallel with and 40.0 feet Nortiedy from the centerline and gars North 0°47'21" East from
Station 1+15.10 of the Victory Road Survey, as shown on the plans of said State Highway No. 69,
Highway Survey; thence North 89012'39" West along said last parallel rine 57.14 feet to a point opposite
Station 1+72.24 of said victory Road Survey; thence Nor along a 318.31 foot radius curve right
having a central angle of 3405931" a Mance of 194.40 feet to a point in the Northeasterly right of way
line of existing Victory Road and opposite Station 3+88.98 of said Victory Road Survey; thence South
89°48'06" West 50.0 feet to a point in the Southwesterly right of way Cme of said existing Victory Road;
thence. Southeasterly along said existing Southwesterly right of way line being a 318.31 foot radius curve
left having a central angle of 15031'43" a distance of 86.01 feet to a point in the South line of said
Section 24 that bears South 25036'57" West 32.42 feet from Station 3+10.17 of said Victory Road
Survey; thence South 89012'39" East along said South One 320.0 feet, more or less, to the PLACE OF
BEGINNING.
FURTHER LESS AND EXCEPTING therefrom that property conveyed to STATE OF IDAHO by Corporation
Warranty Deed recorded December 6, 198% as Instrument No. 8961310, and described as follows:
A parcel of land being a portion of the Southeast Quarter of the Southeast Quarter of Section 24,
Township 3 North, Range 1 West, Boise Meridian, Ada County, Idaho, described as follows:
Commencing at the Southeast comer of Section 24, Township 3 North, Range 2 West, Boise Meridian;
thence North along the East One of said Section 24 a distance of 35.0 feet; thence'West 25.0 feet to the
Westerly right of way line of existing State Highway No. 69 and being the REAL PLACE OF BEGINNING;
thence continuing West 10.0 feet; thence South 10.0 fleet to the Northerly right of way line of existing
Victory Road; thence East along said existing NordlerhJr ht way iine,10.0 feet- thence North 10.0
feet to the REAL POINT OF BEGINNING.
FURTHER LESS AND EXCEPTING therefrom that property conveyed to INTERMOUNTAIN GAS COMPANY
by Warranty Deed recorded December 6, 1989, as Instrument No. 8961312, described as follows:
A parcel of land being on the Westerly side of the centerline of State Highway No. 69, Project No. SR -RS -
3782(2) Highway Survey as shown on the plans thereof now on file in the office of the Idaho
Transportation Department, Division of Highways, and being a portion of the Southeast Quarter of the
Southeast Quarter of Section 24, Township 3 North, Range 1 West, Boise Meridian, described as follows:
Commencing at the Southeast comer of Section 24, Township 3 North, Range 1 West; Boise Meridian;
thence North 003831" East along the East One of said Section 24 a distance of 85.17 feet to a point
coincident with Station 381+85.80 of said State Highway No. 69, Project No. SR -RS -3782(2) Highway
Survey; thence North 8902129" West 65.0 feet to a point in a line parallel with and 65.0 feet Westerly
from the centerline and opposite Station 381+85.80 of said Highway Survey and being the REAL POINT
OF BEGINNING; thence continuing North 89021'29" West 10.0 feet to a point in a line parallel with and
75.0 feet Westerly from the centerline and bears North 890212T West from Station 381+85.80 of said
Highway Survey; thence South 0*38'31" West along said last parallel One 16.97 feet to a point opposite
Station 381+68.83 of said Highway Survey; thence North 554456" East, 12.19 feet to a point in a fine
parallel with and 65.0 feet Westerly from the centedine and bears North 89021'29" West from Station
381+75.80 of said Highway Survey; [fierce North 03831" East aOuig said last parallel line 10.0 feet to
the REAL POINT OF BEGINNING.
CITU OF _
ert�lcn :. �j
IDAHO Y
ly
ec
�� ^ � rrzensuHc V>�Y sarc�
i �soa
MAYOR
Tammy de Weerd
CITY COUNCIL MEMBERS
Keith Bird
Charles M. Rountree
Shaun Wardle
Christine Donnell
CITY DEPARTMENTS
Fire
540 E. Franklin Road
888-1234/fax 895-0390
Parks & Recreation
11 W. Bower Street
888-3579/fax 888-6854
Planning
660 E. Watertower Street
-Suite 202
884-5533/fax 888-6854
Police
1401 E. Watertower Street
888-6678 / fax 846-7366
Public Works
660 E. Watertower Street
Suite 200
898-5500/fax 895-9551
- Building
660 E. Watertower Street
Suite 150
887-2211 / fax 887-1297
- Sewer (WWTP)
3401 N. Ten Mile Road
888-2191 / fax 884-0744
- Water
2235 N. W. 8th Street
888-5242/fax 884-1159
FORM PW100
Date: q-30 _ 0
The following address has been verified by City of Meridian Public Works
Department as valid for the project listed below.
Project Name: S-{-r-a(A, ; ; MO—)
Address: 3 )Qg S, Verid I a n .
Suite #:
Zip Code: g
Lot /Block/ Subdivision:
Notes
EACH SET OF PLANS WILL BE REQUIRED TO CLEARLY REFLECT THE
CORRECT ADDRESS AND SUITE NUMBER (IF APPLICABLE).
Tricia Shindle'M`_*
City Of Meridian
Public Works Department
660 E Watertower Street Suite #200
Meridian, ID 83642
PH. 208-898-5500 FX.208-898-9551
shindlet@meridiancity.org
. CITY HALL 33 EAST IDAHO AVENUE MERIDIAN, ID 83642 (208) 888-4433
CITY CLERK — FAX 888- 4218 CITY ATTORNEY/ HR - FAX 884- 8723 FINANCE & UTIIM BILLING — FAX 887- 4813 MAYOR'S OFFICE -- FAX 884-8119
/4C Q4 9119'20'112"t
0
D.&F. 901!194 11""W -
N11►'2'a2'W 911.94'
FINAL PLAT OF
A r i K,
T'971m RN
A i+01t'I'tON CF nie. �� ... �..�.
�I 4IDUN o.P,11�, ®i;uiSd
at I
uNruttt9 LIS MY & 490 1%kA rmgoh h#i1t!
only on* at#dr al iii tip ors
I mum
4t4tR1N WNC
'""'«•-="�wF•• 4OUNOARY UNE
LOt LINE
MAD i?hM LINt
"AD RIONT-OF+WAr
��7 r {N§IRUMENiEMNt 16# 119p14
t� I L:IIK�a����p��up�AttR t:t6tNENT
4 a.. a� ERo59-g1}c��ggb ANd PARxINa
�, � ..� tA6tMENf 11M1t I6tE NOW #14)
EA6GUM LINE
MUNO ALUMINUM OAP
i) ►OUNO 6/8' RUM AN SHOWN
- w eAp aMARkEOR 6ql 11,f66
• WICAd �MARKEbRgpl I,d36
I p.bJ9, ftNtt OP 4COINNINO
Iib A OMt�T-WCAAY MONUNCNT
C CALL POINT (WHINd 6ti)
OCTA
ItE LHLkT �tF
I' p p CqN
fl) @kEk7t §U mMtlIOONAfI0 �t
Zfl1 u E K awil A1A61ON N6:4 R
I Y
I 1b
RA
� IU.NNACIL
jI F: 4149790 �, _^
$5 30 YL' c71X7�511r".�I Xna.
Itb69 9. tY..y9w 9n, all. & ..., IE.h. 93117
. Verr 10r 4 (291) "?.M0
TO.. Bw isr gra
Sanitmy r3cMccs, Tnc-
7 -2 Vvr. siziin
Meri€iiwi� 10 SM42
DA a M ;u, 21, 2005
DOW Mr. GMAM .,
iac SUM6 Sellumma Aiwa i admai,rision conwsm of m6denfi-21 unm =0 14 c^.ta ial
buildinjp& Now if uthe cmwncrciai haWinp ars p.-qximd mise 5.040:LE and 5 € t s600 ai in
addition, them boildinp mig'M%ave I S.Y. ten[. .
Wu am prapurkg tunic aiumpshn 1br the GonuscmW pardon Oi foe WldiviSiom On fm Sim Olan
they me iabiAn.d Wiyh zbe later D. The des am 121X131.
Pleme r4vriew aur SisOLT 3 •_.;;1._ If;�►
=1 - tn--^T1hrm .in tu'e e+Val Ufmo,"e=�-sa.� .:•� vim^. � car. D'L.. th- rwop= �-
P3 c Gurrma I -Em if you no= ad ikwai qwsdow arsaw
U ,.
.land Use Phnncr
ac: File iTt,O46123
1M, SO m [FF wi
AWS $'y ---, Lj_6eE,
tt3i t s - i uNi tt+i7 7764- NA.\ O6d)
SeITO fo LAN
KEYNOTES
i wxw r �wvrtne lexienwe)
GENERAL NOTES
TABULATION
� rwwnM�rse� ro 61' ra ,., ox
= nrmwe�e uexw.s. wmeow.iw �a+e x
` r+obe er e.e ie wc�m xwcee - ^u. x1 �^aieo�.n�io'w
i��pe Locwrev eJeo x e¢r) ) .wo .
or+ wr e, xouc v. sneer %��esn) noo . �
e pT w�e�� wmc�a; rorty. )vwai14vm iw
north
LE6EN0
a a
e
a
F
F£
as a
a
1
I
a a R111111111
O.O
O
•
O
0000
P1
o. a
a
a q a
a
n
s
a g ag a
s
g ag
a
s gga xxa
gsa
g a
a
I
p �o
tp� STRAD4 BELLISSIMA SUBDIVISION NO.1 gy z PINNACLE.
aal
'� LA N O S C A F- E- P LA N 2 y Engineers,. Inc.
N -
EVAN9 OONSTRUCTIOMANAGEMENT Co. §✓E Dsaa�,q�
WO
CITY OF
C 404,
>WCrldiaw
ll 33 E. Idaho Ave.
\\�ti Meridian, ID 83642
Applicant B(�Jkj'X
5d._d-7-
Address . IV' '` ,Q
0 T &O
Phone
CASH I C� QK #_ NAME ON CHECK IF DIFFERENT THAN APPLICANT
DESCRIPTION
1
i
1
i
1
1
1
1
I
1
1
1
1
1
CAVRA=h—
Itllrc�
i nVVCr IHIVIiC Vr
Bviceived
10466
55748
TAX
TOTAL
t
1 r NOTE: This is nota Bui[ding
CITY OF- Permit Prior to any construction,
you should contact the Building
_
YlG�1G .1� 4 Department at (208) 887-2211 to
P/ Yverify if any additional permits
IDAHO a and/or inspections will be required
% by the Meridian Building
`e Department.
CERTIFICATE OF ZONING COMPLIANCE*
MODIFIED
Date: September 21 2007
Project Name/Number: Strada Bellissima No. 6 — CZC-07-099
Owner: Richard Evans
Site Address: 3109 S Meridian Rd (Strada Bellissima Subdivision Lot 6 Block 2)
Proposed Use: Offiee Building She!! Use Tar, by Edge ^ Medical Office/Clinic
Zoning:
Comments:
Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of
approval for the Strada Bellissima Development. Issuance of this permit does not release the applicant from
any previous requirements of the other permits issued for this site. The issuance of this permit does not release
the applicant from any requirements of the approved Annexation and Zoning (AZ -04-028), Conditional Use
(CUP -04-047), Preliminary Plat (PP -04-03 8), Final Plat (FP -05-022), as well as any Development Agreements
recorded for this site. Beeause a user f this building 'ldi r mp oed at this time, the future t nt(s)
must obtain tenant impIrovement sign off f-Fem the Planning Depar-tment, pAor- to oeeupaney-
Landscaping: The Landscape Plan prepared by Pinnacle Engineers, Inc. on May 14, 2004, Sheet Numbers
L-1, L-3 and L-5 are approved (stamped "Approved" on September 21, 2007, by the Meridian Planning
Department) with the following changes (see redline changes on plan): 1) UDC 11-3B-5 establishes the
minimum plant size standard of for all landscaped areas Please note that all woody shrubs are
required to be of two gallon pot minimum. Other than the aforementioned changes, the approved landscape
plan is not to be altered without prior written approval of the Planning Department. No field changes to
landscape plan permitted; prior written approval of all material changes is required.
Site Plan: The Site Plan prepared by Byron Lee Smith on April 23, 2007, Sheet Number A0.0, is approved
(stamped "Approved" on September 21, 2007, by the Meridian Planning Department) with the following
changes: (see redline changes on plan): 1)The side yard setback for Lot 6, Block 2, Strada Bellissima, was
approved at five feet (51) In order to maintain the side setbacks_ the original proposed door on the west
elevation must be built With the construction of the proposed building, the footprint may not encroach
past the required five foot (5') side yard setback. Except for the changes mentioned above, the approved site
plan is not to be altered without prior written approval of the Planning Department.
Elevations: The Elevations prepared by Byron Lee Smith on April 23, 2007, Sheet Number A4.0, are
approved (stamped "Approved" on September 21, 2007, by the Meridian Planning Department) with the
following changes: 1) The side yard setback for Lot 6 Block 2, Strada Bellissima, was approved at five
feet (55 In order to maintain the side setbacks, the original proposed doff—nn the west elevation must
be built• Except for the changes mentioned above, the approved elevation plan is not to be altered without
prior written approval of the Planning Department.
Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the
approved specifications and in accordance with UDC 11-3A-15.
Protection of ExistingTY rees: Any existing trees on site must be protected or mitigated for in accordance with
the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the
Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the
existing trees prior to construction. Any severely damaged tree must be replaced in compliance with UDC 11-
313-10-C.5.
Parking: The proposed parking areas shall be paved and striped in accordance with UDC 11-3B. Project
engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the
Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA
and signed appropriately.
Curbin : Per UDC 11-313-5I, all landscape areas adjacent to driveways, parking lots, or other vehicle use
areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to
allow for storm water runoff.
Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed
prior to occupancy.
Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and
shall be designed in compliance with UDC 11-313-11 and UDC 11-3A-18.
Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in
UDC 11-3A-7.
Li tin : Lighting shall not cause glare or impact the traveling public or neighboring development and comply
with lighting standards as defined in UDC 11-3A-11.
Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in
compliance with UDC 11-3D.
Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures
must be built in the location and to the size approved by SSC.
Handicap -Accessibility: The structure, site improvements and parking areas must be in compliance with all
federal handicap -accessibility requirements.
ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any
changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be
submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit.
Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of
Occupancy. A written certificate of completion shall be prepared by the landscape architect, landscape designer
or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The
Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler
installation, are in substantial compliance with the approved landscape plan. A Temporary Certificate of
Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the
amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary
Occupancy.
Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan stamped
"Approved" on September 21, 2007, and Elevations, are not to be altered without prior written approval of the
Planning Department. No significant field changes to the site or landscape plans are permitted; prior written
approval of all changes is required.
i
Jenny Y�tch
Assistant Planner
*This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited
to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer,
Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date
of issuance if work has not begun.
Type of Review Requested (check all that apply)
❑ Accessory Use
❑ Alternative Compliance
VCertificate of Zoning Compliance MCV IFiW
❑ Conditional Use Permit Minor Modification
❑ Design Review
❑ Private Street
❑ Property Boundary Adjustment
❑ Short Plat
❑ Temporary Use Certificate of Zoning Compliance
❑ Time Extension (Director)
❑ Vacation
❑ Other
Applicant Information
Planning Department
ADMINISTRATIVE REVIEW APPLICATION
5;W 1'1'E'
Phone: '7,7 5-L 4:60
Applicant name:
Zip: 936�
Applicant address: N. pal (!:, 64Z&Ave
—
Applicant's interest in property: ❑ Own ❑ Rent ❑ Optioned
-- //
Dk(Jther Alt4tb MCA—
FCAdMt
Phone: 6 G; 7;, "641
Owner name: J W*V 4S
Owner address: 6151,U W. Omuta Pjk»i:�- LPrt�g
Zip: 3'70 3
Agent name (e.g., architect, engineer, developer, representative):
PAY20W _9A l t'?+-
"} �� l (r- p�
G Phone: 37S�%��
Film name:
zip:�G
Address:
Primary contact is: n -Applicant ❑ Owner ❑ Agent ❑ Other
-ml
Phone: 3
Contact name: @�iiDU S pj::
E-mail:
Subject Property Information
Location/street address: 151 O51 S Nil!fA 0'
Assessor's parcel number(s): S l "4
Township, range, section: 3N l w 2l+
Current land use: L-- o TPA3gSI omi Fkm
A<,&
Total acreage:
Current zoning district:
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
I (Rev. 9121106)
Project Description
Project/subdivision name: 5t]0Jlr1 ISS (M I VLS(alJ
General description of proposed project/request:
Proposed zoning district(s): L "D
Acres of each zone proposed:
Type of use proposed (check all that apply):
❑ Residential -N—W'ommercial 8 Office ❑ Industrial ❑ Other
Amenities provided with this development (if applicable):
Who will own & maintain the pressurized irrigation system in this development? QI "R. S,
Which irrigation district does this property lie within? � AMIp! - MW_4JQ1ArtJ
Primary irrigation source: OmSS yr&I �) Secondary: GQ—f & A6-YZ4 a A_*J
Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): 2 b S
Residential Project Summary (if applicable)
Number of residential units:
Number of building lots:
Number of common and/or other lots:
Proposed number of dwelling units (for multi -family developments only):
1 Bedroom:
Minimum square footage of structure(s) (excl. garage):
Minimum property size (s.f):
Gross density (DU/acre-total land):
Percentage of open space provided:
2 or more Bedrooms:
Proposed building height: _
Average property size (s.f.):
Net density (DU/acre-excluding roads & alleys):
Acreage of open space:
Percentage of useable open space: (See Chapter 3, Article G, for qualified open space)
Type of open space provided in acres (i.e., landscaping, public, common, etc):
Type of dwelling(s) proposed: ❑ Single-family ❑ Townhomes ❑ Duplexes ❑ Multi -family
Non-residential Project Summary (if applicable)
Number of building lots: 1 Other lots:
Gross floor area proposed: Existing (if applicable):
Hours of operation (days and hours): W W19M 1 KA*';) Building height:
Percentage of site/project devoted to the following:
n� 0
Landscaping: �'! TIP Building: 33 D Paving: iU 0 0
Total number of employees: Maximum number of employees at any one time:
Number and ages of students/children (if applicable): Wpr Seating capacity:
Total number of parking spaces provided: Z4*3/ J!J Number of compact spaces provided: —
Authorization
Print applicant name:
Applicant signature: IJ V
Date: IO S0PF O%
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
2
byron lee -smith architect, .cp
5649 north big cedar avenue meridian idaho 83642 208 375 4850 fax 208 884 4733 ronegolf@cableonernet
6 September 2007
City of Meridian
Planning and Zoning Department -
660 East Watertower -
Suite 202
Meridian, Idaho 83642
Re: ° Amended Certificate of Zoning Compliance -Application
Project Narrative
project:StradaBellissima Spec Six
31.09 S�ou'th Meridian Road
Lot 6 Block 2
Strada Bellissima Subdivision Number. One
Meridian, Idaho 83642
-
i
J
i
_Dear Planning an,d!Zoning,Stafif,
The above referenced application is for the construction of;the third of a -series of prpfessional
office,buildings, located in the Strada Bellissima' comme, rcial subdivisiorf. This narrative is a part ,,of
the amended Certificate Of Zoning Compliance required by the City,for achange to the,�buil,ding ��
� -footprint,whichi results in'an,area increase of the building from 3„605 sf to 3,681 trf `an increase of 1
'76 sf. The building departm'en't plan review permit process )hasp been for the construction of ,the s
'shell only fora single storyprofessional office, building: This revision is' 'the result of 'a tenant -
-leasingthe- uildin for use as,a family "'Medical,clinic sone of theusesa-I,roved for�the Cit `s L -O
', b 9 � Y pp� �. , Y i ( ,
' zoning designation': "We will kid submitting
the plans for the tenant improvement to the ,building
Nepartment under separate'cover`-after this modification has been approved"by boththe Planning
and BuildingDepartments.The, building will be constructedusing concrete foundations, conventional woodd-framed walls with
pre-engineered wood roof trusses. Exterior( finishes will be tele roofs" and, walls consisting of stone , i ;
and/,or-stucco veneers. We have not changed wall materials as a,result of this modification.
The following prior approvals have been granted;
- 1. Annexation'and Rezone AZ=04-028
2. Conditional Use Permit CUP -'04-047
P
3. � Preliminary Plat 04 X
PP-04'038
4. Final Plat FP -05-022
5. Certificate of Zoning Compliance CZC-07-099, May 15; 2007
Sincerely,
Byron S- ith
Preside
61/4 con C S09.90'02-[
SECTION 24
C.P,4,F. 9010194 1144.40' _r,
NE9'70'54'W 00.94'
FINAL PLAT OF J A
A ew��nwu -- --. E1ll1 AN N
tf e.P,rr, ®14ri
1�11IDUhf
uNrul;eo L� Bk'� & �6 bks 0+4wyh have
nay -rye Nd�,Ire„ I st �pUon
sum or mmixg \
lu
low
1
LME
fI I °"""�'�'^��•' OQUNONIY LINE
L0T UNE:
NbAb OENTM LINE
�N9tAl`�p t l01114
It
JPto
WAY 4 WNW
• -. _-- .� u AitNENt UN, t5[E PNdiCNA14)
:�,.-. EA6iMtN1 UNE
IY i POUND ALUMINUM CAP
11
/OUNO A/1` NE�E�Agh�p�AW bHOWN
I W/ 1"36- peAL MIA
lowI W%CAV EMAft11tE11pWL 11;116
P•o1!, POINT Or WINNINtl
��--.�. _ I� � 11B AIoMf�ACi=W Y MtlNUMENt
Li WO POINT (NotHIN(I 9tT)
j.... � I Kp 4Et BNN�REN
NEGiAiO bAtq gObpp ap
Ny. 18 U AHO gF�,p
OkEEIt OU bM11dN O. ►
::.;� � I - (!1 CISEEHp®UBGAM610N HO.N�p
t
TI I 133 4{,
IN o p 111 n
Jho " � �j..�
IO.P.#t. i141i01 + , . .. A C .
.�.._ _. is 1x�IrL4slsrls, Ina.
25+90 Ita11 W [Heol. On, twit 6 IHH, Who 1111)
046173_rP sMrrr L nr . (201) 817-71/0
'r
n
p
U
=
II
n
.
h
w.r
Man,
ih
I�
I j
�h
U
>n
N
MM .
Um
l � • Ii T I \ s • A e1 a' e� •ms's s a h / • Y 4 r / l 1 / / f �i • • �/ �y T . _ y a a / I T I J i! l _ • �v n n .. t ti � r !'/ !+
CITY OF
�YlG�IG�"Y�
11 33 E. Idaho Ave.
\\� Meridian, ID 83642 i
0
Date
I _
Applicant L Oy--
Address, !l�
Phone
•
CASH :CHECK # NAME ON CHEC :IF DIFFERENT AN APPLICANT
DESCRIPTION •
I
1
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PAYMENT DOES NOT INDICAT CCEPTANC OP APPLICATION
TAX
I
11412. RReceivedBy .
TOTAL
Z
94352
June 5, 2007
TO:
SUBJECT:
(fOswrivv����0 �r�r.Lric�
Byron Smith Architect
5649 N. Big Cedar Ave
Meridian, Id 83646
MCZC-07-099
Office Bldg.
3109 S. Meridian Rd.
John S. Franden, President
Rebecca W. Arnold, Vice President
Sherry R. Huber, Commissioner
Dave Bivens, Commissioner
Carol A. McKee, Commissioner
RECEIVED
JUN 0 8 2001
City of Meridian
City Clerk Office
On Nov. 2, 2004, the Ada County Highway District Commissioners acted on MPP04-038 for Strada
Bellissima. The conditions and requirements also apply to MCZC-07-099. The required street
improvements have been constructed and access points have been established with the previously
approved subdivision.
• Prior to final approval you will need to submit plans to the ACHD Development Review
Department.
• A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a
building permit. Contact ACHD Planning & Development Services at 387-6170 for
information regarding impact fees.
If you have any questions or concerns please feel free to contact this office at (208) 387-6174.
Sincerely,
Coby Harrod
Planner I
Right -of -Way and Development Services
CC: Project File
City of Meridian
Richard Evans
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
Request for Appeal of Staff Decision
Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the
final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not
properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error
of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or
enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary
of Highway Systems, which must be filed within ten (10) working days from the date of the
decision that is the subject of the appeal. The notice of appeal shall refer to the decision
being appealed, identify the appellant by name, address and telephone number and state
the grounds for the appeal. The grounds shall include a written summary of the provisions
of the policy relevant to the appeal and/or the facts and law relied upon and shall include a
written argument in support of the appeal. The Commission shall not consider a notice of
appeal that does not comply with the provisions of this subsection.
c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of
the filing of the notice of appeal to reply to the notice of the appeal, and may during such
time meet with the appellant to discuss the matter, and may also consider and/or modify
the decision that is being appealed. A copy of the reply and any modifications to the
decision being appealed will be provided to the appellant prior to the Commission hearing
on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the ROWDS Manager's
reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal
and the reply shall be delivered to the Commission at least one (1) week prior to the
hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
Development Process Checklist
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review, Division will do one of the following:
®Send a "No Review" letter to the applicant stating that there are no site specific
requirements at this time.
[]Send a "Comply With" letter to the applicant stating that if the development is within a
platted subdivision or part of a previous development application and that the site specific requirements from the
previous development also apply to this development application.
❑Write a Staff Level report analyzing the impacts of the development on the
transportation system and evaluating the proposal for its conformance to District Policy.
❑Write a Commission Level report analyzing the impacts of the development on the
transportation system and evaluating the proposal for its conformance to District Policy.
❑The Planning Review Division will hold a Technical Review meeting for all Staff and Commission
Level reports.
®For ALL development applications, including those receiving a "No Review" or "Comply With"
letter:
• The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review
Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then
architectural plans may be submitted for purposes of impact fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including,
but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
❑ Working in the ACHD Right -of -Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHD Construction — Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
❑ Sediment & Erosion Submittal
• At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled.
❑ Final Approval from Development Services
• ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con.
Aag
ev'. wv .d to Sri CfP
October 12, 2007
TO: Bryon Smith
5649 N. Big Cedar Ave.
Meridian, ID 83646
OWNER: Richard Evans
9560 W. Pebble Brook Ln.
Boise, ID 83703
SUBJECT: MCZC-07-099
Office Bldg.
3109 S. Meridian Rd.
John S. Franden, President
Rebecca W. Arnold, Vice President
Sherry R. Huber, Commissioner
Dave Bivens, Commissioner
Carol A. McKee, Commissioner
OCT 16 2617
City of Meridian
Pity Clerk Office
On August 3, 2004 the Ada County Highway District Commissioners acted on MPP04-038 for Strada
Bellissima Subdivision. The conditions and requirements also apply to MCZC-07-099.
• Prior to final approval you will need to submit construction plans to the ACHD
Development. Review Department to insure compliance with the conditions identified above
or for traffic impact fee assessment. This is a separate review process that requires direct
plans submittal to the Development Review staff at the Highway District.
A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a
building permit. Contact ACHD Planning & Development Services at 387-6170 for
information regarding impact fees.
If you have any questions or concerns please feel free to contact this office at (208) 387-6177.
Sincerely,
Chelsee Kucera
Right -of -Way and Development Services
CC:
Project File
City of Meridian
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us
Request for Appeal of Staff Decision
Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the
final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not
properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error
of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or
enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary
of Highway Systems, which must be filed within ten (10) working days from the date of the
decision that is the subject of the appeal. The notice of appeal shall refer to the decision
being appealed, identify the appellant by name, address and telephone number and state
the grounds for the appeal. The grounds shall include a written summary of the provisions
of the policy relevant to the appeal and/or the facts and law relied upon and shall include a
written argument in support of the appeal. The Commission shall not consider a notice of
appeal that does not comply with the provisions of this subsection.
c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of
the filing of the notice of appeal to reply to the notice of the appeal, and may during such
time meet with the appellant to discuss the matter, and may also consider and/or modify
the decision that is being appealed. A copy of the reply and any modifications to the
decision being appealed will be provided to the appellant prior to the Commission hearing
on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the ROWDS Manager's
reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal
and the reply shall be delivered to the Commission at least one (1) week prior to the
hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
Development Process Checklist
®Submit a development application to a City or to the County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Division will receive the development application to review
®The Planning Review Division will do one of the following:
❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
®Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of
a previous development application and that the site specific requirements from the previous development also apply to
this development application.
[-]Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the
proposal for its conformance to District Policy.
❑Write a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
❑For ALL development applications, including those receiving a "No Review" or "Comply With" letter:
• The applicant should submit a set of engineered plans directly to ACHD for review by the Development Review
Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,
then architectural plans may be submitted for purposes of impact fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including,
but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
❑ Working in the ACHD Right -of -Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to
ACHD Construction — Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
❑ Sediment & Erosion Submittal
• At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage
Division.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled.
❑ Final Approval from Development Services
ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con.
a
J
r;
�p nt v ;I g
%VlE77Gz�HOMI
iasuo
h
_—
Planning Department
CERTIFICATE OF ZONING COMPLIANCE
Application Checklist
Project name: �liA �.�C.3.ii(9 i,J , �vJ)(, File:
#:
Applicant/agent e�lM QAf'(;- /oq"(r6'--'rt (7,61'
All applications are required to contain one copy of the following unless otherwise noted:
ApplicantStaff
Description
J
Completed & signed Administrative Review Application
Narrative fully describing the proposed use of the property, including the following:
✓
➢ Information on any previous approvals or requirements for the requested use
(i.e.,applicable conditions ofapproval or Development Agreement
Recorded warranty deed for the subject property----^-
t/
Affidavit of Legal Interest signed & notarized by the property owner (if owner is a corporation,
submit a copy of the Articles of Incortoration or oilier evidence to show that the personsigning is an an unized agent.)
✓
Scaled vicinity map showing the location of the subject property
Sanitary Service Company approval for trash enclosure & access drive (stamped site plan)
A photometric test report for any light fixtures) with a maximum output of 1,800 lumens
or more (see UDC 11-3A-11)
Copy of the recorded plat that the property lies within 8 9z" x 11")
✓
Address verification letter from Public Works See Tricia Bieren 898-5500
Site Plan ---A copies (folded to 8'/z" x 11" size)
The following items must be shown on the siteplan:
✓
Date, scale, north arrow, and project name (scale not less than 7"-50')
• Names, addresses, and telephone numbers of the developer and the person and/or
✓
firm Preparing the plan
✓
Parking stalls and drive aisles
cws/t m
Trash enclosure(s) location 0 ex -0
NI�
• Detail of trash enclosure (must be screened on 3 sides)%6
6°
Location and specifications for underground irrigation (pressurized irrigation can only be
waived if you prove no water rights exist to subject Property)
• Sidewalks or pathways (proposed and existing)
• Location of proposed building on lot (include dimensions to property lines)
"--^
• Fencing (proposed and existing)
• Calculations table including the following:
Number of parking stalls required & provided (specify handicap & compact stalls)y✓
,
➢ Building size (sq. 8.) c✓°
➢ Lot size (sq. 2) o�
➢ Setbacks �"`"
➢ Zoning district
• Reduction of the site plan 8 %" x 11"
Landscape plan — 3 copies (folded to 8 '/2" x 11" size)
✓
Platt nutst have a scale no smmller than l " = 50' (1 "= 20' is p-eferred) and be on a standard
drawing sheet, not to exceed 36"x 48" (24"x 36" is preferred). A plan which cannot be drawn m
its entire!), on a single sheet mast be draw with appropriale match lines on Nit) or more sheets.
The following items must be included on the landscape Ian:
✓
• Date, scale, north arrow, and project name
• Names, addresses, and telephone numbers of the developer and the person and/or
firm preparing the plan
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
4
✓
e Existing natural features such as canals, creeks, drains, ponds, wetlands,
flood tains, high groundwater areas, and rock outcroppings,
• Location, size, and species of all existing trees on site with trunks 4 inches or
greater in diameter, measured 6 inches above the ground. Indicate whether the
tree will be retained or removed.
e A statement of how existing healthy trees proposed to be retained will be
protected from damage during construction
• Existing structures, planting areas, light poles, power poles, walls, fences, berms,
parking and loading areas, vehicular drives, trash areas, sidewalks, pathways,
stonnwater detention areas, signs, street furniture and other man-made elements.
Existing and proposed contours for all areas steeper than 20% slope. Berms shall
be shown with one -foot contours.
Sight Triangles as defined in 11-3A-5 of this ordinance.
• Location and labels for all proposed plants, including trees, shrubs, and
groundcovers(trees must not be planted in City water or sewer easements). Scale shown for
plant materials shall reflect approximate mature size
• A plant list that shows the plant symbol, quantity, botanical name, common name,
minimum planting size and container, tree class (I, II, or III), and comments (for
--^
spacing, staking, and installation as appropriate).
Planting and installation details as necessary to ensure conformance with all
required standards.
e Design drawings of all fencing proposed for screening purposes
• Calculations of project components to demonstrate compliance with the
requirements of this ordinance, including:
Y Number of street trees and lineal feet of street frontage
Y Width of street buffers (exclusive of right-of-way)
➢ Width of parking lot perimeter landscape strip
➢ Buffer width between different land uses (if applicable)
➢ Number of parking stalls and percent of parking area with internal landscaping
➢ Total number of trees and tree species mix
➢ Mitigation for removal of existing trees, including number of caliper inches
being removed
Reduction of the landscape plan (8 'h" x 1 P')
Building elevations showing construction materials
If applying for approval of a public school, provide additional information as required by
the Public School Facility supplemental checklist per §67-6519.
>_
Fee (If this project had prior approval on a site plan, reduced fees may apply)
ACHD Acceptance: Applicant shall be responsiblefor meeting the requirements ofACHD as thep pertain to this
application. All intpactfees, ifan y, shall be paid prior to the issuance ofa buildingpernrit. Ifany changes muss be
made to the site plan to accommodate 1heACHD requirements, a new site plan shall be submitted to the Cit), of
Meridian Planning d Zoning Department for approval prior to the issuance ofa building permit.
Pour buildingpersnit will not be issued matil ACHD has approved your plans and all associatedfees have been paid.
THIS APPLICATIONSHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF HAS RECEIVED ALL
REQUIRED INFORMATION
660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
(Rev. 9/1]/0()
rm r
t \�
Planning Department
it IOhilO I
Abol Ftv] CERTIFICATE OF ZONING COMPLIANCE
Application Checklist
Projectname: SrA60A- PjLjA45;sttj""N1/?tL-. R5106tt5' -91Kit46
Applicant/agent: OYP-oma UW ,yvtl v pd f'S!`t�f0�l iwir p. G.
All applications are required to contain one copy of the following unless otherwise noted:
Applicant
Staff
(�
Description
0 11
Completed & signed Administrative Review Application
Narrative fully describing the proposed use of the property, including the following:
➢ Information on any previous approvals or requirements for the requested use
(i.e., applicable conditions ofapproval or Development Agreomcnt)s
^
Recorded warranty deed for the subject property
Affidavit of Legal Interest signed & notarized by the property owner (If owner is a corporation,
.....
submit a copy ofthe Articles offficorlioration or other evidence to show that the poison signing is an authoriudagent.)
✓
Scaled vicinity map showing the location of the subject property
—^
Sanitary Service Company approval for trash enclosure & access drive (stamped site plan)
...
A photometric test report for any light fixture(s) with a maximum output of 1,800 lumens;...
'
or more (see UDC 11-3A-11
✓
Copy of the recorded plat that the property lies within (8 ''W' x 11")
t",
Address verification letter from Public Works (See Tricia Bieren 898-5500
Site Plan ---A copies (folded to 8 Y2" x I l" size)
Tire following items must be shown on the siteplan:
• Date, scale, north arrow, and project name (scale not less than l"=50')
• Names, addresses, and telephone numbers of the developer and the person and/or
firms preparing the plan
• Parking stalls and drive aisles
• Trash enclosure(s)location
• Detail of trash enclosure (,nust be screened on 3 sides)
• Location and specifications for underground irrigation (Pressurized irrigation can only be
waived if on prove no water rights exist to subject property)
• Sidewalks or pathways (proposed and existing)
• Location of proposed building on lot (include dimensions to property lines)
• Fencing (proposed and existing)
• Calculations table including the following:
Number of parking stalls required & provided (specify handicap & compact stalls)
➢ Building size (sq. R)
➢ Lot size (sq. ft.)
➢ Setbacks
➢ Zoning district
• Reduction of the site plan (8 'W' x 11"
Landscape plan —3 copies (folded to 8 Y2" x I I" size)
Plan nmst have a scale no srrmller than I " = 50' (1 " =20' is preferred) and be on a standard
drawing sheet, not to exceed 36".r 48" (24"a 36"is preferred). d plan which cannot be drawn in
its entirely on a single sheet must be drawn with appropriate match lines on two or more sheets.
The following items must be included on the landscapeplan:
• Date, scale, north arrow, and project name
• Names, addresses, and telephone numbers of the developer and the person and/or
firm preparing the plan
660 E. Watenower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
ACHD Acceptance; Applicant stall be responsible fou meeting the requirements ofACHD as theyperlain to this
application. All itnpactfees, ifany, shall be paid prior to the issuance ofa buildingperntit. I/fany changes must be
made to the site plan to acconunodate the ACHD requirements, a nein site plan shall be submitted to the City of
Meuidiata Plmmbtg & Zoning Deparhnent for approval prior to the issuance ofa building peu,init.
Your buildingpernrit will not be issued until ACHD has approved yourplans and all associated fees have been paid.
THIS APPLICA TION SHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF HAS RECEIVED ALL
REQUIRED INFORMATION
660E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
(Rev. 9/21/0()
• Existing natural features such as canals, creeks, drains, ponds, wetlands,
floodplains, high groundwater areas, and rock outcroppings.
• Location, size, and species of all existing trees on site with trunks 4 inches or
greater in diameter, measured 6 inches above the ground. Indicate whether the
tree will be retained or removed.
• A statement of how existing healthy trees proposed to be retained will be
pprotected from damage during construction
• Existing structures, planting areas, light poles, power poles, walls, fences, berms,
parking and loading areas, vehicular drives, trash areas, sidewalks, pathways,
stotriwater detention areas, signs, street furniture, and other man-made elements.
• Existing and proposed contours for all areas steeper than 20% slope. Berms shall
be shown with one -foot contours.
• Sight Triangles as defined in 11-3A-5 of this ordinance.
• Location and labels for all proposed plants, including trees, shrubs, and
groundcovers (trees must not boplanted in City water or sewer casements). Scale shown for
plant materials shall reflect approximate mature size
• A plant list that shows the plant symbol, quantity, botanical name, common name,
minimum planting size and container, tree class (1, 11, or IB), and connnents (for
spacing staking, and installation as appropriate).
• Planting and installation details as necessary to ensure conformance with all
required standards.
• Design drawing(s)) of all fencing proposed for screening purposes
• Calculations of project components to demonstrate compliance with the
requirements of this ordinance, including:
➢ Number of street trees and lineal feet of street frontage
➢ Width of street buffers (exclusive of right-of-way)
➢ Width of parking lot perimeter landscape strip
➢ Buffer width between different land uses (if applicable)
➢ Number of parking stalls and percent of parking area with internal landscaping
➢ Total number of trees and tree species mix
➢ Mitigation for removal of existing trees, including number of caliper inches
being removed
Reduction of the landscape plan (8 ''/�" x 11")
Building elevations showing construction materials
®
If applying for approval of a public school, provide additional information as required by
the Public School Facility supplemental checklist per §67-6519.
Fee If this project had prior approval on a site plan, reduced fees may apply)
ACHD Acceptance; Applicant stall be responsible fou meeting the requirements ofACHD as theyperlain to this
application. All itnpactfees, ifany, shall be paid prior to the issuance ofa buildingperntit. I/fany changes must be
made to the site plan to acconunodate the ACHD requirements, a nein site plan shall be submitted to the City of
Meuidiata Plmmbtg & Zoning Deparhnent for approval prior to the issuance ofa building peu,init.
Your buildingpernrit will not be issued until ACHD has approved yourplans and all associated fees have been paid.
THIS APPLICA TION SHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF HAS RECEIVED ALL
REQUIRED INFORMATION
660E. Watertower Lane, Suite 202 • Meridian, Idaho 83642
Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org
(Rev. 9/21/0()
PLANNING & ZONING DEPARTMENT
INSPECTION CHECKLIST
COMMERCIAL/CZC SITES
This checklist should be attached to the inside cover of the CZC file at ALL times.
Planner/Inspector Name:
Project Name: _ CZC File No.:
Contractor/CompanyName: Phone No.:
First Inspection Date: 4 /�✓ / 1 --
Second Inspection Date:
Third Inspection Date: / l_ (NOTE.- If a third inspection is required, a fee of $ must be
submitted to the P&ZDept. before the inspection is done.)
Landscape Plan Checklist
Site pian Checklist
Z Rev. 5i25,q)5
.: 1p(tiZiBrad=P&-Z.4r?inirPep,arnnettt Pollrie>
X
Post-Inspection Checklist
Item _ Date Complete
A,ncori�plefe? (Follow 5 steps below)
1. Obtain bid for incomplete improvements
— -- —
2. Owner/contractor posts surety (cash, check or Letter of Credit)
3. Clearly print # of days the "Temp CO" is 7Dept.
card - ` •- c
- y
4. Sign "Temporary" column on CO card �rt
S. Submit check or Letter of Credit to Financwith memo
B °Complete?
1. Sign and date "Final" column on CO card S, f
2. Notify Finance Dept. to release surety (if it was a Temporary CO)
2. Complete checklist and close file v' --- —
* The only instance that a CO maybe released prior to 100% completion of improvement is inclement
weather, as determined by the Director. If weather is a factor, follow MCC 12-13-19-2.
- Rei,, 5;25/t)5