Loading...
Strada Bellissima No 6 CZC 07-099CITY OF 9� 11 IDAHO '" "c 1 REtiSURE r�"` SINCF 1903 NOTE: This is not a Building Permit. Prior to any construction, you should contact the Building Department at (208) 887-2211 to verify if any additional permits and/or inspections will be required by the Meridian Building Department. CERTIFICATE OF ZONING COMPLIANCE* Date: May 15 2007 Project Name/Number: Strada Bellissima No. 6 — CZC-07-099 Owner: Richard Evans. Site Address: 3109 S Meridian Rd (Strada Bellissima Subdivision Lot 6 Block 2) Proposed Use: Office Building Shell- Use TBD by Future Owner Zoning: L -O Comments: Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of approval for the Strada Bellissima Development. Issuance of this permit does not release the applicant from any previous requirements of the other permits issued for this site. The issuance of this permit does not release the applicant from any requirements of the approved Annexation and Zoning (AZ -04-028), Conditional Use (CUP -04- 047), Preliminary Plat (PP -04-038), Final Plat (FP -05-022), as well as any Development Agreements recorded for this site. Because a user for this building is not proposed at this time, the future tenant(s) must obtain tenant improvement sign off from the Planning Department, prior to occupancy. Landscaping: The Landscape Plan prepared by Pinnacle Engineers, Inc. on May 14, 2004, Sheet Numbers L-1, is approved (stamped "Approved" on May 15, 2007, by the Meridian Planning Department) with the following changes (see redline changes on plan): 1) UDC 11-3B-5 establishes the minimum plant size standard of for all landscaped areas Please note that all woody shrubs are required to be of two gallon pot minimum. Other than the aforementioned changes, the approved landscape plan is not to be altered without prior written approval of the Planning Department. No field changes to landscape plan permitted; prior written approval of all material changes is required. Site Plan: The Site Plan prepared by Byron Lee Smith on April 23, 2007, Sheet Number A0.0, is approved (stamped "Approved" on May 15, 2007, by the Meridian Planning Department) with the following changes: (see redline changes on plan): 1) UDC 11 -3A -19C -4a requires a continuous pedestrian walkway that is a minimum of eight feet (8') in width to be provided from the perimeter sidewalk to the main building entrance. Please re design to accommodate said walkway which shall parallel the north side of the proposed building. Also note that the side yard setback for Lot 6, Block 2, Strada Bellissima, was approved at five feet (5'). With the construction of the proposed 5,103 sq. ft. building, the footprint may not encroach past the required five foot (51) side yard setback. The approved site plan is not to be altered without prior written approval of the Planning Department. Elevations: The Elevations prepared by Byron Lee Smith on April 23, 2007, Sheet Number A4.0, are approved (stamped "Approved" on May 15, 2007, by the Meridian Planning Department) with no changes from the Planning Department. The approved elevation plan is not to be altered without prior written approval of the Planning Department. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved specifications and in accordance with UDC 11-3A-15. Protection of Existing Trees: Any existing trees on site must be protected or mitigated for in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing trees prior to construction. Any severely damaged tree must be replaced in compliance with UDC 11 -3B -10-C.5. Parking: The proposed parking areas shall be paved and striped in accordance with UDC 11-313. Project engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA and signed appropriately. Curbin : Per UDC 11 -3B -5I, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior to occupancy. Drainaize: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with UDC 11-3B-1 I and UDC 11-3A-18. Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in UDC I I - 3A-7. Lim: Lighting shall not cause glare or impact the traveling public or neighboring development and comply with lighting standards as defined in UDC 11-3A-11. Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in compliance with UDC 11-3D. Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures must be built in the location and to the size approved by SSC. Handicap -Accessibility: The structure, site improvements and parking areas must be in compliance with all federal handicap -accessibility requirements. ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan stamped "Approved" on July 26, 2006, and Elevations, are not to be altered without prior written approval of the Planning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required. Jenny Veatch Assistant Planner *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. } m410 Type of Review Requested (check all that apply) ❑ Accessory Use ❑ Nternative Compliance Certificate of Zoning Compliance ❑ Conditional Use Permit Minor Modification ❑ Design Review ❑ Private Street ❑ Property Boundary Adjustment ❑ Short Plat ❑ Temporary Use Certificate of Zoning Compliance ❑ Time Extension (Director) ❑ Vacation ❑ Other Planning Department ADMINISTRATIVE REVIEW APPLICATION Applicant Information Applicant name: GAI Phone: -.5754-656 Applicant address: 5G� P . FN� C2% -F-- AV0 MOZ40AIJ Zip: &364(__ Applicant's interest in property: ❑ Own ❑ Rent ❑ Optioned 0 Other IW ' I T�G`T' Owner name: fl IGlt-AP-o (�l�S Phone: Owner address: �1�r Z1N. PLht' &Qlse Zip: J7 Agent name (e.g., architect, engineer, developer, representative): Firm name: f . S/�l f 9 Jrl-1S �T��zPhone: 5(S Mzi Address: 5E6 H=VL Zip: Primary contact is: Q"A"pplicant ❑ Owner ❑ Agent ❑ Other • Ph• 'ri 'SI nnez�affi&CAU&Obe..' J1047 +735 Subject Property Information Location/streetaddress:iZL7- Assessor's parcel number(s): S �'Z'% ���' 1 �✓- YS Township, range, section: 3N Total acreage: t/ +O Current land use: L_0 I '-" 1 119IJ FJ1W Current zoning district: 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 1 (Rev. 9121/06) Project Description Project/subdivision name: `JTI Stec eja kA g tAAA SUPS u tsioQ 6� General description of proposed project/request: dFF fG6- 27-OM4 1 SC2 Proposed zoning district(s): L d Acres of each zone proposed: Type of use proposed (check all that apply): ❑ Residential ❑ Commercial Office ❑ Industrial ❑ Other Amenities provided with this development (if applicable): Who will own & maintain the pressurized irrigation system in this development? Q6 F41N1,q(d6A t"Yi11J f (ZF- . t1ST Which irrigation district does this property lie within? N/10!25c AWf IATJ IP 6?!!5 J i_SjTJ41GT_ NwMPf; — Primary irrigation source: SLiiL17 Jar—, tw7l e ondary: r 6,r- )UW_Y-l01&FJ *. blS1' 2 61 �i SF Square footage of landscaped areas to be irrigated (if pnmary or sec ndary point of connection is City water): Residential Project Summary (if applicable) Number of residential units: Number of common and/or other lots: Number of building lots: Proposed number of dwelling units (for multi -family developments only): 1 Bedroom: Minimum square footage of structure(s) (excl. garage): Minimum property size (s.f): Gross density (DU/acre-total land): Percentage of open space provided: Percentage of useable open space: 2 or more Bedrooms: Proposed building height: Average property size (s.f.): Net density (DU/acre-excluding roads & alleys): Acreage of open space: (See Chapter 3, Article G, for qualified open space) Type of open space provided in acres (i.e., landscaping, public, common, etc): Type of dwelling(s) proposed: ❑ Single-family ❑ Townhomes ❑ Duplexes ❑ Multi -family Non-residential Project Summary (if applicable) Number of building lots: 1 Other lots: Gross floor area proposed: Z! 7200 '�W I'* I- R42- Existing (if applicable): Hours of operation (days Ahours) : 9 -AS 09T65r2m i Nao Building height: Percentage of site/project devoted to the following: d 22 fi Landscaping: U Building: �3 Paving: J 0 Total number of employees: Maximum number of employees at any one time: Number and ages of students/children (if applicabblle):/' W% Seating capacity: Total number of parking sp ce provided: �9 Number of compact spaces provided: Print applicant name: all Applicant signature: R E. Watertower Lanelte 202 • Meridian, Idaho 83642 Phone: (208)4-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 2 byron.16e smith -architect, P.Q. r 5649 north big cedar avenue meridian idaho 83642 208 375 4850 fax 208 8$4'4733 ronegolf@cableone.net 26 'April 2007 M Cit sof eridian y� rJ � _ Plang and Zoning Department Tnin 660 East Watertower_ _ SUiite 2202; - Meridian Idaho 83642 Re: / Certificate of Zoning CQmplian'6e,'Applioation Project Nar'ratiye- (` ` �.. ; prefect Strada Be'llissima Spec Six 3169 South Meridian Road - --Lot Lot 6, Bloc( 2i�. -'r(� 1 d �' Stra,�Bel�issfma'Subdiv�sion urnberOnea Meridian-, Idaho 8�6' Dear laniin and Zoning'Staff I The above "referent ' pp { the construction of the third of a/ series of professionay � �ed�a licatlon is for � I � i office, b(aildings The buirdGFlg department�plan revilew permit process following the' approval, of this —_ CZC will' be forTtf e construction of the shell only for a sig,gle story, 3,604 sf (plus 1,499.. s /_ie _ - basement) professibnal office btaildin ! �Ithough the tenant has not been_deterMi,ned=at this time; r�,_,.r ' it Is in"tended,that the,dsg be forone 6f the 4'.uses approved�for the City's t`` -O zoning designation., ' �' ; — The�uilding -will be;constr�icted using concrete-fouridations, conventional woodfra�med walls with r pre-engineered wood root trusses'_E terior finishes -will be the roofs and walls consisting of s6 e l and/ or stucco __eneers{ The following `prior apirovals have, been' granted: 1 Annexation and Rezor�e�Z-04-028 2 Conditional Use Permit�CUP-04-047 " 3. Prelimina`rY Plat PP -04-038' I / � -, 4.y Final Pfat EP -05-022' iSincerely, i r. Byron Si President Lff 5 I AFTER RECORDING MAIL TO: ADA COUNTY REDDER J. DAVE NA11WO AMOUNT 15.00 5 BOISE pE W Nears Hamx-20 PIA 11 llA1111�1111t1111U1�1{18 i I REWOEO-REQUEST OF [� f 104155850 First America Evans Construction Management Company 9560 Pebble Brook Lane Garden City, ID 83714 /VcS - Zg53o WARRANTY DEED File No.: 4101-379885 (RPA) Date: November 22, 2004 For Value Received, Cioyd W. Nelson and Bonnie May Nelson, husband and wife, hereinafter referred to as Grantor, does hereby grant, bargain, sell and convey unto STRADA BELLISSIMA, LLC*; hereinafter nefierred to as Grantee, whose current address is 9560 Pebble Brook Lane, Garden City, ID 83714, the following described premises, situated in Ada County, Idaho, to wit: SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART THEREOF. APN:S1224449555 TO HAVE AND TO HOLD the said premises, with their appurtenances, unto said Grantee, and to the Grantee's heirs and assigns forever. And the said Grantordoes hereby covenant to and with the said Grantee, that the Grantor is the owner in fee simple of said premises; that said premises are free from all encumbrances except current years taxes, levies, and assessments, and except U.S. Patent reservations, restrictions, easements of record and easements visible upon the premises, and that Grantor will warrant and defend the same from all claims whatsoever. Lloyd W. NeTfon Bonnie May Nelson *AN IDAHO LIMITED LIABILITY COMPANY Page 1 of Z APN: S1224449555 Warranty Deed Fie No.: 4101-379885 (RPA) - continued Date: 11/22/2004 STATE OF Idaho ) ss. COUNTY OF Ada ) On this 23rd day of November, 2004, before me, a Notary Public in and for said State, personally appeared Cloyd W. Nelson and Bonnie May Nelson, known or identified to me to be the person(s) whose name(s) is/are subsaibed to the within instrument, and acknowledged to me that he/she/they executed the same. In witness whereof, I have hereunto set my hand and affixed my official seal the day and year in this certificate first above written. Notary Public for the State of Idaho . �.�€.'s Residing at: Meridian, ID 'Ft NpTa �Z7 My Commission Expires: 04-26-08 v l C �e� •;esoie•_ Page 2 of 2 EXHIBIT A LEGAL DESCRIPTION: A tract of land situated in the Southeast Quarter of the Southeast Quarter of Section 29, Township 3 North, Range 1 West, Boise Meridian, Ada County, Idaho, described as follows: Beginning at the Southeast comer of said Section 24, being the REAL POINT OF BEGINNING; thence West along the South line of said Semon 24, a distance of 213.77 feet; thence North 70006' West on the chord of a curve with a radius of 200.00 feet and a central angle of 39048' a distance of 136.15 feet; thence North 50012' West a distance of 56.30 feet; thence North 55037' East a distance of 92.20 feet; thence North 27029' East a distance of 30.44 feet; thence North 5O' East a distance of 56.73 feet; thence South 89031' West a distance of 190.00 feet; thence South a distance of 73.16 feet W the center of Victory Road; thence North 73046'06' West along the chord of a curve with a radius of 350.00 feet and a central angle of 14044' a distance of 88.92 feet; thence North 8104' West a distance of 80.20 feet; thence North 2046' East along the center of a concrete ditch a distance of 376.27 feet; thence North 18'036' West along said ditch a distance of 38.74 feet; thence North 3215' West along said center of ditch a distance of 33.14 feet thence North 37030' West along said ditch a distance of 150.18 feet; thence West a distance of 570.50 feet to the West line of the Southeast Quarter of the Southeast Quarter, thence North 00620" East along said West line a d&ance of 588.42 feet to the Northwest comer of said Southeast Quarter of the Southeast Quarter, thence North 8955' East along the North line Of said Southeast Quarter of the Southeast Quairber a distance of 1317.27 feet to the Northeast corner of said Southeast Quarter of the SMOMAQuarter; thence South along the East line of the Southeast Quarter of the Southeast Quarter a distance of 133057 feet to the REAL POINT OF BEGINNING. LESS AND EXCEPTING therefrom that property conveyed to STATE OF IDAHO by Warranty Deed recorded September 21, 1987, as Instrurnent No. 8753575, and described as follows: A parcel of land being on the Westerly side of the centerline of State Highway No. 69, Project No. SR -RS - 3782(2) Highway Survey as shown on the plans thenW now on file in the office of the Idaho Transportation Department; Division of Kghways, and being a portion of the Southeast Quarter of the Southeast Quarter of Section 24, Township 3 Norris, Range 1 West, Boise Meridian, described as follows: Beginning at the Southeast comer of Section 24, Township 3 North, Range 1 West, Boise Meridian; thence North 0038'31" East along the East line of said Section 24 a distance of 1,331.0 feet, more or less, to the Northeast comer of the Southeast Quarter of the Southeast Quarter of said Section 24; thence North 89026'02" West along the North line of said Southeast Quarter of the Southeast Quarter a distance of 65.0 feet to a point in the line paralid with and 65.0 feet Westerly from the centerline and bears North 89021'29" West from Station 394+31.02 of said State Highway No. 69, Project No. SR -RS -3782(2) Highway Survey; thence South 03831' West along said paras time 1,265.83 feet to a point opposite Station 381+65.19 of said State Highway Survey; thence South 55044'56" West - 60.96 feet to a point in a line parallel with and 40.0 feet Nortiedy from the centerline and gars North 0°47'21" East from Station 1+15.10 of the Victory Road Survey, as shown on the plans of said State Highway No. 69, Highway Survey; thence North 89012'39" West along said last parallel rine 57.14 feet to a point opposite Station 1+72.24 of said victory Road Survey; thence Nor along a 318.31 foot radius curve right having a central angle of 3405931" a Mance of 194.40 feet to a point in the Northeasterly right of way line of existing Victory Road and opposite Station 3+88.98 of said Victory Road Survey; thence South 89°48'06" West 50.0 feet to a point in the Southwesterly right of way Cme of said existing Victory Road; thence. Southeasterly along said existing Southwesterly right of way line being a 318.31 foot radius curve left having a central angle of 15031'43" a distance of 86.01 feet to a point in the South line of said Section 24 that bears South 25036'57" West 32.42 feet from Station 3+10.17 of said Victory Road Survey; thence South 89012'39" East along said South One 320.0 feet, more or less, to the PLACE OF BEGINNING. FURTHER LESS AND EXCEPTING therefrom that property conveyed to STATE OF IDAHO by Corporation Warranty Deed recorded December 6, 198% as Instrument No. 8961310, and described as follows: A parcel of land being a portion of the Southeast Quarter of the Southeast Quarter of Section 24, Township 3 North, Range 1 West, Boise Meridian, Ada County, Idaho, described as follows: Commencing at the Southeast comer of Section 24, Township 3 North, Range 2 West, Boise Meridian; thence North along the East One of said Section 24 a distance of 35.0 feet; thence'West 25.0 feet to the Westerly right of way line of existing State Highway No. 69 and being the REAL PLACE OF BEGINNING; thence continuing West 10.0 feet; thence South 10.0 fleet to the Northerly right of way line of existing Victory Road; thence East along said existing NordlerhJr ht way iine,10.0 feet- thence North 10.0 feet to the REAL POINT OF BEGINNING. FURTHER LESS AND EXCEPTING therefrom that property conveyed to INTERMOUNTAIN GAS COMPANY by Warranty Deed recorded December 6, 1989, as Instrument No. 8961312, described as follows: A parcel of land being on the Westerly side of the centerline of State Highway No. 69, Project No. SR -RS - 3782(2) Highway Survey as shown on the plans thereof now on file in the office of the Idaho Transportation Department, Division of Highways, and being a portion of the Southeast Quarter of the Southeast Quarter of Section 24, Township 3 North, Range 1 West, Boise Meridian, described as follows: Commencing at the Southeast comer of Section 24, Township 3 North, Range 1 West; Boise Meridian; thence North 003831" East along the East One of said Section 24 a distance of 85.17 feet to a point coincident with Station 381+85.80 of said State Highway No. 69, Project No. SR -RS -3782(2) Highway Survey; thence North 8902129" West 65.0 feet to a point in a line parallel with and 65.0 feet Westerly from the centerline and opposite Station 381+85.80 of said Highway Survey and being the REAL POINT OF BEGINNING; thence continuing North 89021'29" West 10.0 feet to a point in a line parallel with and 75.0 feet Westerly from the centerline and bears North 890212T West from Station 381+85.80 of said Highway Survey; thence South 0*38'31" West along said last parallel One 16.97 feet to a point opposite Station 381+68.83 of said Highway Survey; thence North 554456" East, 12.19 feet to a point in a fine parallel with and 65.0 feet Westerly from the centedine and bears North 89021'29" West from Station 381+75.80 of said Highway Survey; [fierce North 03831" East aOuig said last parallel line 10.0 feet to the REAL POINT OF BEGINNING. CITU OF _ ert�lcn :. �j IDAHO Y ly ec �� ^ � rrzensuHc V>�Y sarc� i �soa MAYOR Tammy de Weerd CITY COUNCIL MEMBERS Keith Bird Charles M. Rountree Shaun Wardle Christine Donnell CITY DEPARTMENTS Fire 540 E. Franklin Road 888-1234/fax 895-0390 Parks & Recreation 11 W. Bower Street 888-3579/fax 888-6854 Planning 660 E. Watertower Street -Suite 202 884-5533/fax 888-6854 Police 1401 E. Watertower Street 888-6678 / fax 846-7366 Public Works 660 E. Watertower Street Suite 200 898-5500/fax 895-9551 - Building 660 E. Watertower Street Suite 150 887-2211 / fax 887-1297 - Sewer (WWTP) 3401 N. Ten Mile Road 888-2191 / fax 884-0744 - Water 2235 N. W. 8th Street 888-5242/fax 884-1159 FORM PW100 Date: q-30 _ 0 The following address has been verified by City of Meridian Public Works Department as valid for the project listed below. Project Name: S-{-r-a(A, ; ; MO—) Address: 3 )Qg S, Verid I a n . Suite #: Zip Code: g Lot /Block/ Subdivision: Notes EACH SET OF PLANS WILL BE REQUIRED TO CLEARLY REFLECT THE CORRECT ADDRESS AND SUITE NUMBER (IF APPLICABLE). Tricia Shindle'M`_* City Of Meridian Public Works Department 660 E Watertower Street Suite #200 Meridian, ID 83642 PH. 208-898-5500 FX.208-898-9551 shindlet@meridiancity.org . CITY HALL 33 EAST IDAHO AVENUE MERIDIAN, ID 83642 (208) 888-4433 CITY CLERK — FAX 888- 4218 CITY ATTORNEY/ HR - FAX 884- 8723 FINANCE & UTIIM BILLING — FAX 887- 4813 MAYOR'S OFFICE -- FAX 884-8119 /4C Q4 9119'20'112"t 0 D.&F. 901!194 11""W - N11►'2'a2'W 911.94' FINAL PLAT OF A r i K, T'971m RN A i+01t'I'tON CF nie. �� ... �..�. �I 4IDUN o.P,11�, ®i;uiSd at I uNruttt9 LIS MY & 490 1%kA rmgoh h#i1t! only on* at#dr al iii tip ors I mum 4t4tR1N WNC '""'«•-="�wF•• 4OUNOARY UNE LOt LINE MAD i?hM LINt "AD RIONT-OF+WAr ��7 r {N§IRUMENiEMNt 16# 119p14 t� I L:IIK�a����p��up�AttR t:t6tNENT 4 a.. a� ERo59-g1}c��ggb ANd PARxINa �, � ..� tA6tMENf 11M1t I6tE NOW #14) EA6GUM LINE MUNO ALUMINUM OAP i) ►OUNO 6/8' RUM AN SHOWN - w eAp aMARkEOR 6ql 11,f66 • WICAd �MARKEbRgpl I,d36 I p.bJ9, ftNtt OP 4COINNINO Iib A OMt�T-WCAAY MONUNCNT C CALL POINT (WHINd 6ti) OCTA ItE LHLkT �tF I' p p CqN fl) @kEk7t §U mMtlIOONAfI0 �t Zfl1 u E K awil A1A61ON N6:4 R I Y I 1b RA � IU.NNACIL jI F: 4149790 �, _^ $5 30 YL' c71X7�511r".�I Xna. Itb69 9. tY..y9w 9n, all. & ..., IE.h. 93117 . Verr 10r 4 (291) "?.M0 TO.. Bw isr gra Sanitmy r3cMccs, Tnc- 7 -2 Vvr. siziin Meri€iiwi� 10 SM42 DA a M ;u, 21, 2005 DOW Mr. GMAM ., iac SUM6 Sellumma Aiwa i admai,rision conwsm of m6denfi-21 unm =0 14 c^.ta ial buildinjp& Now if uthe cmwncrciai haWinp ars p.-qximd mise 5.040:LE and 5 € t s600 ai in addition, them boildinp mig'M%ave I S.Y. ten[. . Wu am prapurkg tunic aiumpshn 1br the GonuscmW pardon Oi foe WldiviSiom On fm Sim Olan they me iabiAn.d Wiyh zbe later D. The des am 121X131. Pleme r4vriew aur SisOLT 3 •_.;;1._ If;�► =1 - tn--^T1hrm .in tu'e e+Val Ufmo,"e=�-sa.� .:•� vim^. � car. D'L.. th- rwop= �- P3 c Gurrma I -Em if you no= ad ikwai qwsdow arsaw U ,. .land Use Phnncr ac: File iTt,O46123 1M, SO m [FF wi AWS $'y ---, Lj_6eE, tt3i t s - i uNi tt+i7 7764- NA.\ O6d) SeITO fo LAN KEYNOTES i wxw r �wvrtne lexienwe) GENERAL NOTES TABULATION � rwwnM�rse� ro 61' ra ,., ox = nrmwe�e uexw.s. wmeow.iw �a+e x ` r+obe er e.e ie wc�m xwcee - ^u. x1 �^aieo�.n�io'w i��pe Locwrev eJeo x e¢r) ) .wo . or+ wr e, xouc v. sneer %��esn) noo . � e pT w�e�� wmc�a; rorty. )vwai14vm iw north LE6EN0 a a e a F F£ as a a 1 I a a R111111111 O.O O • O 0000 P1 o. a a a q a a n s a g ag a s g ag a s gga xxa gsa g a a I p �o tp� STRAD4 BELLISSIMA SUBDIVISION NO.1 gy z PINNACLE. aal '� LA N O S C A F- E- P LA N 2 y Engineers,. Inc. N - EVAN9 OONSTRUCTIOMANAGEMENT Co. §✓E Dsaa�,q� WO CITY OF C 404, >WCrldiaw ll 33 E. Idaho Ave. \\�ti Meridian, ID 83642 Applicant B(�Jkj'X 5d._d-7- Address . IV' '` ,Q 0 T &O Phone CASH I C� QK #_ NAME ON CHECK IF DIFFERENT THAN APPLICANT DESCRIPTION 1 i 1 i 1 1 1 1 I 1 1 1 1 1 CAVRA=h— Itllrc� i nVVCr IHIVIiC Vr Bviceived 10466 55748 TAX TOTAL t 1 r NOTE: This is nota Bui[ding CITY OF- Permit Prior to any construction, you should contact the Building _ YlG�1G .1� 4 Department at (208) 887-2211 to P/ Yverify if any additional permits IDAHO a and/or inspections will be required % by the Meridian Building `e Department. CERTIFICATE OF ZONING COMPLIANCE* MODIFIED Date: September 21 2007 Project Name/Number: Strada Bellissima No. 6 — CZC-07-099 Owner: Richard Evans Site Address: 3109 S Meridian Rd (Strada Bellissima Subdivision Lot 6 Block 2) Proposed Use: Offiee Building She!! Use Tar, by Edge ^ Medical Office/Clinic Zoning: Comments: Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of approval for the Strada Bellissima Development. Issuance of this permit does not release the applicant from any previous requirements of the other permits issued for this site. The issuance of this permit does not release the applicant from any requirements of the approved Annexation and Zoning (AZ -04-028), Conditional Use (CUP -04-047), Preliminary Plat (PP -04-03 8), Final Plat (FP -05-022), as well as any Development Agreements recorded for this site. Beeause a user f this building 'ldi r mp oed at this time, the future t nt(s) must obtain tenant impIrovement sign off f-Fem the Planning Depar-tment, pAor- to oeeupaney- Landscaping: The Landscape Plan prepared by Pinnacle Engineers, Inc. on May 14, 2004, Sheet Numbers L-1, L-3 and L-5 are approved (stamped "Approved" on September 21, 2007, by the Meridian Planning Department) with the following changes (see redline changes on plan): 1) UDC 11-3B-5 establishes the minimum plant size standard of for all landscaped areas Please note that all woody shrubs are required to be of two gallon pot minimum. Other than the aforementioned changes, the approved landscape plan is not to be altered without prior written approval of the Planning Department. No field changes to landscape plan permitted; prior written approval of all material changes is required. Site Plan: The Site Plan prepared by Byron Lee Smith on April 23, 2007, Sheet Number A0.0, is approved (stamped "Approved" on September 21, 2007, by the Meridian Planning Department) with the following changes: (see redline changes on plan): 1)The side yard setback for Lot 6, Block 2, Strada Bellissima, was approved at five feet (51) In order to maintain the side setbacks_ the original proposed door on the west elevation must be built With the construction of the proposed building, the footprint may not encroach past the required five foot (5') side yard setback. Except for the changes mentioned above, the approved site plan is not to be altered without prior written approval of the Planning Department. Elevations: The Elevations prepared by Byron Lee Smith on April 23, 2007, Sheet Number A4.0, are approved (stamped "Approved" on September 21, 2007, by the Meridian Planning Department) with the following changes: 1) The side yard setback for Lot 6 Block 2, Strada Bellissima, was approved at five feet (55 In order to maintain the side setbacks, the original proposed doff—nn the west elevation must be built• Except for the changes mentioned above, the approved elevation plan is not to be altered without prior written approval of the Planning Department. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved specifications and in accordance with UDC 11-3A-15. Protection of ExistingTY rees: Any existing trees on site must be protected or mitigated for in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing trees prior to construction. Any severely damaged tree must be replaced in compliance with UDC 11- 313-10-C.5. Parking: The proposed parking areas shall be paved and striped in accordance with UDC 11-3B. Project engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA and signed appropriately. Curbin : Per UDC 11-313-5I, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with UDC 11-313-11 and UDC 11-3A-18. Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in UDC 11-3A-7. Li tin : Lighting shall not cause glare or impact the traveling public or neighboring development and comply with lighting standards as defined in UDC 11-3A-11. Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in compliance with UDC 11-3D. Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures must be built in the location and to the size approved by SSC. Handicap -Accessibility: The structure, site improvements and parking areas must be in compliance with all federal handicap -accessibility requirements. ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. Plan Modifications: Except for the changes mentioned above, the approved Site Plan, Landscape Plan stamped "Approved" on September 21, 2007, and Elevations, are not to be altered without prior written approval of the Planning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required. i Jenny Y�tch Assistant Planner *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. Type of Review Requested (check all that apply) ❑ Accessory Use ❑ Alternative Compliance VCertificate of Zoning Compliance MCV IFiW ❑ Conditional Use Permit Minor Modification ❑ Design Review ❑ Private Street ❑ Property Boundary Adjustment ❑ Short Plat ❑ Temporary Use Certificate of Zoning Compliance ❑ Time Extension (Director) ❑ Vacation ❑ Other Applicant Information Planning Department ADMINISTRATIVE REVIEW APPLICATION 5;W 1'1'E' Phone: '7,7 5-L 4:60 Applicant name: Zip: 936� Applicant address: N. pal (!:, 64Z&Ave — Applicant's interest in property: ❑ Own ❑ Rent ❑ Optioned -- // Dk(Jther Alt4tb MCA— FCAdMt Phone: 6 G; 7;, "641 Owner name: J W*V 4S Owner address: 6151,U W. Omuta Pjk»i:�- LPrt�g Zip: 3'70 3 Agent name (e.g., architect, engineer, developer, representative): PAY20W _9A l t'?+- "} �� l (r- p� G Phone: 37S�%�� Film name: zip:�G Address: Primary contact is: n -Applicant ❑ Owner ❑ Agent ❑ Other -ml Phone: 3 Contact name: @�iiDU S pj:: E-mail: Subject Property Information Location/street address: 151 O51 S Nil!fA 0' Assessor's parcel number(s): S l "4 Township, range, section: 3N l w 2l+ Current land use: L-- o TPA3gSI omi Fkm A<,& Total acreage: Current zoning district: 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org I (Rev. 9121106) Project Description Project/subdivision name: 5t]0Jlr1 ISS (M I VLS(alJ General description of proposed project/request: Proposed zoning district(s): L "D Acres of each zone proposed: Type of use proposed (check all that apply): ❑ Residential -N—W'ommercial 8 Office ❑ Industrial ❑ Other Amenities provided with this development (if applicable): Who will own & maintain the pressurized irrigation system in this development? QI "R. S, Which irrigation district does this property lie within? � AMIp! - MW_4JQ1ArtJ Primary irrigation source: OmSS yr&I �) Secondary: GQ—f & A6-YZ4 a A_*J Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): 2 b S Residential Project Summary (if applicable) Number of residential units: Number of building lots: Number of common and/or other lots: Proposed number of dwelling units (for multi -family developments only): 1 Bedroom: Minimum square footage of structure(s) (excl. garage): Minimum property size (s.f): Gross density (DU/acre-total land): Percentage of open space provided: 2 or more Bedrooms: Proposed building height: _ Average property size (s.f.): Net density (DU/acre-excluding roads & alleys): Acreage of open space: Percentage of useable open space: (See Chapter 3, Article G, for qualified open space) Type of open space provided in acres (i.e., landscaping, public, common, etc): Type of dwelling(s) proposed: ❑ Single-family ❑ Townhomes ❑ Duplexes ❑ Multi -family Non-residential Project Summary (if applicable) Number of building lots: 1 Other lots: Gross floor area proposed: Existing (if applicable): Hours of operation (days and hours): W W19M 1 KA*';) Building height: Percentage of site/project devoted to the following: n� 0 Landscaping: �'! TIP Building: 33 D Paving: iU 0 0 Total number of employees: Maximum number of employees at any one time: Number and ages of students/children (if applicable): Wpr Seating capacity: Total number of parking spaces provided: Z4*3/ J!J Number of compact spaces provided: — Authorization Print applicant name: Applicant signature: IJ V Date: IO S0PF O% 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 2 byron lee -smith architect, .cp 5649 north big cedar avenue meridian idaho 83642 208 375 4850 fax 208 884 4733 ronegolf@cableonernet 6 September 2007 City of Meridian Planning and Zoning Department - 660 East Watertower - Suite 202 Meridian, Idaho 83642 Re: ° Amended Certificate of Zoning Compliance -Application Project Narrative project:StradaBellissima Spec Six 31.09 S�ou'th Meridian Road Lot 6 Block 2 Strada Bellissima Subdivision Number. One Meridian, Idaho 83642 - i J i _Dear Planning an,d!Zoning,Stafif, The above referenced application is for the construction of;the third of a -series of prpfessional office,buildings, located in the Strada Bellissima' comme, rcial subdivisiorf. This narrative is a part ,,of the amended Certificate Of Zoning Compliance required by the City,for achange to the,�buil,ding �� � -footprint,whichi results in'an,area increase of the building from 3„605 sf to 3,681 trf `an increase of 1 '76 sf. The building departm'en't plan review permit process )hasp been for the construction of ,the s 'shell only fora single storyprofessional office, building: This revision is' 'the result of 'a tenant - -leasingthe- uildin for use as,a family "'Medical,clinic sone of theusesa-I,roved for�the Cit `s L -O ', b 9 � Y pp� �. , Y i ( , ' zoning designation': "We will kid submitting the plans for the tenant improvement to the ,building Nepartment under separate'cover`-after this modification has been approved"by boththe Planning and BuildingDepartments.The, building will be constructedusing concrete foundations, conventional woodd-framed walls with pre-engineered wood roof trusses. Exterior( finishes will be tele roofs" and, walls consisting of stone , i ; and/,or-stucco veneers. We have not changed wall materials as a,result of this modification. The following prior approvals have been granted; - 1. Annexation'and Rezone AZ=04-028 2. Conditional Use Permit CUP -'04-047 P 3. � Preliminary Plat 04 X PP-04'038 4. Final Plat FP -05-022 5. Certificate of Zoning Compliance CZC-07-099, May 15; 2007 Sincerely, Byron S- ith Preside 61/4 con C S09.90'02-[ SECTION 24 C.P,4,F. 9010194 1144.40' _r, NE9'70'54'W 00.94' FINAL PLAT OF J A A ew��nwu -- --. E1ll1 AN N tf e.P,rr, ®14ri 1�11IDUhf uNrul;eo L� Bk'� & �6 bks 0+4wyh have nay -rye Nd�,Ire„ I st �pUon sum or mmixg \ lu low 1 LME fI I °"""�'�'^��•' OQUNONIY LINE L0T UNE: NbAb OENTM LINE �N9tAl`�p t l01114 It JPto WAY 4 WNW • -. _-- .� u AitNENt UN, t5[E PNdiCNA14) :�,.-. EA6iMtN1 UNE IY i POUND ALUMINUM CAP 11 /OUNO A/1` NE�E�Agh�p�AW bHOWN I W/ 1"36- peAL MIA lowI W%CAV EMAft11tE11pWL 11;116 P•o1!, POINT Or WINNINtl ��--.�. _ I� � 11B AIoMf�ACi=W Y MtlNUMENt Li WO POINT (NotHIN(I 9tT) j.... � I Kp 4Et BNN�REN NEGiAiO bAtq gObpp ap Ny. 18 U AHO gF�,p OkEEIt OU bM11dN O. ► ::.;� � I - (!1 CISEEHp®UBGAM610N HO.N�p t TI I 133 4{, IN o p 111 n Jho " � �j..� IO.P.#t. i141i01 + , . .. A C . .�.._ _. is 1x�IrL4slsrls, Ina. 25+90 Ita11 W [Heol. On, twit 6 IHH, Who 1111) 046173_rP sMrrr L nr . (201) 817-71/0 'r n p U = II n . h w.r Man, ih I� I j �h U >n N MM . Um l � • Ii T I \ s • A e1 a' e� •ms's s a h / • Y 4 r / l 1 / / f �i • • �/ �y T . _ y a a / I T I J i! l _ • �v n n .. t ti � r !'/ !+ CITY OF �YlG�IG�"Y� 11 33 E. Idaho Ave. \\� Meridian, ID 83642 i 0 Date I _ Applicant L Oy-- Address, !l� Phone • CASH :CHECK # NAME ON CHEC :IF DIFFERENT AN APPLICANT DESCRIPTION • I 1 I I I I I I I I I I 1 I I I I I I I I I I I I I I I I PAYMENT DOES NOT INDICAT CCEPTANC OP APPLICATION TAX I 11412. RReceivedBy . TOTAL Z 94352 June 5, 2007 TO: SUBJECT: (fOswrivv����0 �r�r.Lric� Byron Smith Architect 5649 N. Big Cedar Ave Meridian, Id 83646 MCZC-07-099 Office Bldg. 3109 S. Meridian Rd. John S. Franden, President Rebecca W. Arnold, Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner Carol A. McKee, Commissioner RECEIVED JUN 0 8 2001 City of Meridian City Clerk Office On Nov. 2, 2004, the Ada County Highway District Commissioners acted on MPP04-038 for Strada Bellissima. The conditions and requirements also apply to MCZC-07-099. The required street improvements have been constructed and access points have been established with the previously approved subdivision. • Prior to final approval you will need to submit plans to the ACHD Development Review Department. • A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6174. Sincerely, Coby Harrod Planner I Right -of -Way and Development Services CC: Project File City of Meridian Richard Evans Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review, Division will do one of the following: ®Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. []Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ❑Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ❑Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ❑The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ®For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working in the ACHD Right -of -Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Final Approval from Development Services • ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con. Aag ev'. wv .d to Sri CfP October 12, 2007 TO: Bryon Smith 5649 N. Big Cedar Ave. Meridian, ID 83646 OWNER: Richard Evans 9560 W. Pebble Brook Ln. Boise, ID 83703 SUBJECT: MCZC-07-099 Office Bldg. 3109 S. Meridian Rd. John S. Franden, President Rebecca W. Arnold, Vice President Sherry R. Huber, Commissioner Dave Bivens, Commissioner Carol A. McKee, Commissioner OCT 16 2617 City of Meridian Pity Clerk Office On August 3, 2004 the Ada County Highway District Commissioners acted on MPP04-038 for Strada Bellissima Subdivision. The conditions and requirements also apply to MCZC-07-099. • Prior to final approval you will need to submit construction plans to the ACHD Development. Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, Chelsee Kucera Right -of -Way and Development Services CC: Project File City of Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ®Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. [-]Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ❑Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ❑For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit a set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working in the ACHD Right -of -Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Final Approval from Development Services ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con. a J r; �p nt v ;I g %VlE77Gz�HOMI iasuo h _— Planning Department CERTIFICATE OF ZONING COMPLIANCE Application Checklist Project name: �liA �.�C.3.ii(9 i,J , �vJ)(, File: #: Applicant/agent e�lM QAf'(;- /oq"(r6'--'rt (7,61' All applications are required to contain one copy of the following unless otherwise noted: ApplicantStaff Description J Completed & signed Administrative Review Application Narrative fully describing the proposed use of the property, including the following: ✓ ➢ Information on any previous approvals or requirements for the requested use (i.e.,applicable conditions ofapproval or Development Agreement Recorded warranty deed for the subject property----^- t/ Affidavit of Legal Interest signed & notarized by the property owner (if owner is a corporation, submit a copy of the Articles of Incortoration or oilier evidence to show that the personsigning is an an unized agent.) ✓ Scaled vicinity map showing the location of the subject property Sanitary Service Company approval for trash enclosure & access drive (stamped site plan) A photometric test report for any light fixtures) with a maximum output of 1,800 lumens or more (see UDC 11-3A-11) Copy of the recorded plat that the property lies within 8 9z" x 11") ✓ Address verification letter from Public Works See Tricia Bieren 898-5500 Site Plan ---A copies (folded to 8'/z" x 11" size) The following items must be shown on the siteplan: ✓ Date, scale, north arrow, and project name (scale not less than 7"-50') • Names, addresses, and telephone numbers of the developer and the person and/or ✓ firm Preparing the plan ✓ Parking stalls and drive aisles cws/t m Trash enclosure(s) location 0 ex -0 NI� • Detail of trash enclosure (must be screened on 3 sides)%6 6° Location and specifications for underground irrigation (pressurized irrigation can only be waived if you prove no water rights exist to subject Property) • Sidewalks or pathways (proposed and existing) • Location of proposed building on lot (include dimensions to property lines) "--^ • Fencing (proposed and existing) • Calculations table including the following: Number of parking stalls required & provided (specify handicap & compact stalls)y✓ , ➢ Building size (sq. 8.) c✓° ➢ Lot size (sq. 2) o� ➢ Setbacks �"`" ➢ Zoning district • Reduction of the site plan 8 %" x 11" Landscape plan — 3 copies (folded to 8 '/2" x 11" size) ✓ Platt nutst have a scale no smmller than l " = 50' (1 "= 20' is p-eferred) and be on a standard drawing sheet, not to exceed 36"x 48" (24"x 36" is preferred). A plan which cannot be drawn m its entire!), on a single sheet mast be draw with appropriale match lines on Nit) or more sheets. The following items must be included on the landscape Ian: ✓ • Date, scale, north arrow, and project name • Names, addresses, and telephone numbers of the developer and the person and/or firm preparing the plan 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org 4 ✓ e Existing natural features such as canals, creeks, drains, ponds, wetlands, flood tains, high groundwater areas, and rock outcroppings, • Location, size, and species of all existing trees on site with trunks 4 inches or greater in diameter, measured 6 inches above the ground. Indicate whether the tree will be retained or removed. e A statement of how existing healthy trees proposed to be retained will be protected from damage during construction • Existing structures, planting areas, light poles, power poles, walls, fences, berms, parking and loading areas, vehicular drives, trash areas, sidewalks, pathways, stonnwater detention areas, signs, street furniture and other man-made elements. Existing and proposed contours for all areas steeper than 20% slope. Berms shall be shown with one -foot contours. Sight Triangles as defined in 11-3A-5 of this ordinance. • Location and labels for all proposed plants, including trees, shrubs, and groundcovers(trees must not be planted in City water or sewer easements). Scale shown for plant materials shall reflect approximate mature size • A plant list that shows the plant symbol, quantity, botanical name, common name, minimum planting size and container, tree class (I, II, or III), and comments (for --^ spacing, staking, and installation as appropriate). Planting and installation details as necessary to ensure conformance with all required standards. e Design drawings of all fencing proposed for screening purposes • Calculations of project components to demonstrate compliance with the requirements of this ordinance, including: Y Number of street trees and lineal feet of street frontage Y Width of street buffers (exclusive of right-of-way) ➢ Width of parking lot perimeter landscape strip ➢ Buffer width between different land uses (if applicable) ➢ Number of parking stalls and percent of parking area with internal landscaping ➢ Total number of trees and tree species mix ➢ Mitigation for removal of existing trees, including number of caliper inches being removed Reduction of the landscape plan (8 'h" x 1 P') Building elevations showing construction materials If applying for approval of a public school, provide additional information as required by the Public School Facility supplemental checklist per §67-6519. >_ Fee (If this project had prior approval on a site plan, reduced fees may apply) ACHD Acceptance: Applicant shall be responsiblefor meeting the requirements ofACHD as thep pertain to this application. All intpactfees, ifan y, shall be paid prior to the issuance ofa buildingpernrit. Ifany changes muss be made to the site plan to accommodate 1heACHD requirements, a new site plan shall be submitted to the Cit), of Meridian Planning d Zoning Department for approval prior to the issuance ofa building permit. Pour buildingpersnit will not be issued matil ACHD has approved your plans and all associatedfees have been paid. THIS APPLICATIONSHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF HAS RECEIVED ALL REQUIRED INFORMATION 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org (Rev. 9/1]/0() rm r t \� Planning Department it IOhilO I Abol Ftv] CERTIFICATE OF ZONING COMPLIANCE Application Checklist Projectname: SrA60A- PjLjA45;sttj""N1/?tL-. R5106tt5' -91Kit46 Applicant/agent: OYP-oma UW ,yvtl v pd f'S!`t�f0�l iwir p. G. All applications are required to contain one copy of the following unless otherwise noted: Applicant Staff (� Description 0 11 Completed & signed Administrative Review Application Narrative fully describing the proposed use of the property, including the following: ➢ Information on any previous approvals or requirements for the requested use (i.e., applicable conditions ofapproval or Development Agreomcnt)s ^ Recorded warranty deed for the subject property Affidavit of Legal Interest signed & notarized by the property owner (If owner is a corporation, ..... submit a copy ofthe Articles offficorlioration or other evidence to show that the poison signing is an authoriudagent.) ✓ Scaled vicinity map showing the location of the subject property —^ Sanitary Service Company approval for trash enclosure & access drive (stamped site plan) ... A photometric test report for any light fixture(s) with a maximum output of 1,800 lumens;... ' or more (see UDC 11-3A-11 ✓ Copy of the recorded plat that the property lies within (8 ''W' x 11") t", Address verification letter from Public Works (See Tricia Bieren 898-5500 Site Plan ---A copies (folded to 8 Y2" x I l" size) Tire following items must be shown on the siteplan: • Date, scale, north arrow, and project name (scale not less than l"=50') • Names, addresses, and telephone numbers of the developer and the person and/or firms preparing the plan • Parking stalls and drive aisles • Trash enclosure(s)location • Detail of trash enclosure (,nust be screened on 3 sides) • Location and specifications for underground irrigation (Pressurized irrigation can only be waived if on prove no water rights exist to subject property) • Sidewalks or pathways (proposed and existing) • Location of proposed building on lot (include dimensions to property lines) • Fencing (proposed and existing) • Calculations table including the following: Number of parking stalls required & provided (specify handicap & compact stalls) ➢ Building size (sq. R) ➢ Lot size (sq. ft.) ➢ Setbacks ➢ Zoning district • Reduction of the site plan (8 'W' x 11" Landscape plan —3 copies (folded to 8 Y2" x I I" size) Plan nmst have a scale no srrmller than I " = 50' (1 " =20' is preferred) and be on a standard drawing sheet, not to exceed 36".r 48" (24"a 36"is preferred). d plan which cannot be drawn in its entirely on a single sheet must be drawn with appropriate match lines on two or more sheets. The following items must be included on the landscapeplan: • Date, scale, north arrow, and project name • Names, addresses, and telephone numbers of the developer and the person and/or firm preparing the plan 660 E. Watenower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org ACHD Acceptance; Applicant stall be responsible fou meeting the requirements ofACHD as theyperlain to this application. All itnpactfees, ifany, shall be paid prior to the issuance ofa buildingperntit. I/fany changes must be made to the site plan to acconunodate the ACHD requirements, a nein site plan shall be submitted to the City of Meuidiata Plmmbtg & Zoning Deparhnent for approval prior to the issuance ofa building peu,init. Your buildingpernrit will not be issued until ACHD has approved yourplans and all associated fees have been paid. THIS APPLICA TION SHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF HAS RECEIVED ALL REQUIRED INFORMATION 660E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org (Rev. 9/21/0() • Existing natural features such as canals, creeks, drains, ponds, wetlands, floodplains, high groundwater areas, and rock outcroppings. • Location, size, and species of all existing trees on site with trunks 4 inches or greater in diameter, measured 6 inches above the ground. Indicate whether the tree will be retained or removed. • A statement of how existing healthy trees proposed to be retained will be pprotected from damage during construction • Existing structures, planting areas, light poles, power poles, walls, fences, berms, parking and loading areas, vehicular drives, trash areas, sidewalks, pathways, stotriwater detention areas, signs, street furniture, and other man-made elements. • Existing and proposed contours for all areas steeper than 20% slope. Berms shall be shown with one -foot contours. • Sight Triangles as defined in 11-3A-5 of this ordinance. • Location and labels for all proposed plants, including trees, shrubs, and groundcovers (trees must not boplanted in City water or sewer casements). Scale shown for plant materials shall reflect approximate mature size • A plant list that shows the plant symbol, quantity, botanical name, common name, minimum planting size and container, tree class (1, 11, or IB), and connnents (for spacing staking, and installation as appropriate). • Planting and installation details as necessary to ensure conformance with all required standards. • Design drawing(s)) of all fencing proposed for screening purposes • Calculations of project components to demonstrate compliance with the requirements of this ordinance, including: ➢ Number of street trees and lineal feet of street frontage ➢ Width of street buffers (exclusive of right-of-way) ➢ Width of parking lot perimeter landscape strip ➢ Buffer width between different land uses (if applicable) ➢ Number of parking stalls and percent of parking area with internal landscaping ➢ Total number of trees and tree species mix ➢ Mitigation for removal of existing trees, including number of caliper inches being removed Reduction of the landscape plan (8 ''/�" x 11") Building elevations showing construction materials ® If applying for approval of a public school, provide additional information as required by the Public School Facility supplemental checklist per §67-6519. Fee If this project had prior approval on a site plan, reduced fees may apply) ACHD Acceptance; Applicant stall be responsible fou meeting the requirements ofACHD as theyperlain to this application. All itnpactfees, ifany, shall be paid prior to the issuance ofa buildingperntit. I/fany changes must be made to the site plan to acconunodate the ACHD requirements, a nein site plan shall be submitted to the City of Meuidiata Plmmbtg & Zoning Deparhnent for approval prior to the issuance ofa building peu,init. Your buildingpernrit will not be issued until ACHD has approved yourplans and all associated fees have been paid. THIS APPLICA TION SHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF HAS RECEIVED ALL REQUIRED INFORMATION 660E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org (Rev. 9/21/0() PLANNING & ZONING DEPARTMENT INSPECTION CHECKLIST COMMERCIAL/CZC SITES This checklist should be attached to the inside cover of the CZC file at ALL times. Planner/Inspector Name: Project Name: _ CZC File No.: Contractor/CompanyName: Phone No.: First Inspection Date: 4 /�✓ / 1 -- Second Inspection Date: Third Inspection Date: / l_ (NOTE.- If a third inspection is required, a fee of $ must be submitted to the P&ZDept. before the inspection is done.) Landscape Plan Checklist Site pian Checklist Z Rev. 5i25,q)5 .: 1p(tiZiBrad=P&-Z.4r?inirPep,arnnettt Pollrie> X Post-Inspection Checklist Item _ Date Complete A,ncori�plefe? (Follow 5 steps below) 1. Obtain bid for incomplete improvements — -- — 2. Owner/contractor posts surety (cash, check or Letter of Credit) 3. Clearly print # of days the "Temp CO" is 7Dept. card - ` •- c - y 4. Sign "Temporary" column on CO card �rt S. Submit check or Letter of Credit to Financwith memo B °Complete? 1. Sign and date "Final" column on CO card S, f 2. Notify Finance Dept. to release surety (if it was a Temporary CO) 2. Complete checklist and close file v' --- — * The only instance that a CO maybe released prior to 100% completion of improvement is inclement weather, as determined by the Director. If weather is a factor, follow MCC 12-13-19-2. - Rei,, 5;25/t)5 _.:�P&-Z.3;;rtr''IP&7.4rf,;;ir:'.UBjPat