Loading...
Creative Homes by Design CZC 06-208CITY OF IDAHO SINCE 1903 RECEIVED DEC 19 2006 City Of Meridian ("ity clerk Office CERTIFICATE OF ZONING COMPLIANCE* Date: December 18,2006 Project Name/Number: Creative Homes by Design – CZC-06-208 Owner:— Dave Evans Construction Site Address: 2963 E. Copper Point Drive Proposed Use: 4,292 square -foot office building Zoning: Q -Q Comments: Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of approval for Bonito Subdivision No. 3. The issuance of this permit does not release the applicant from any requirements of the approved Annexation and Zoning (AZ -01-018), Conditional Use (CUP -01-037), Preliminary Plat (PP -01-020 andPP-05-010), Final Plat (FP -05-038), as well as any Development Agreements recorded for this site. NOTE: This is not a Building Permit. Prior to any construction, you should contact the Building Department at (208) 887-2211 to verify if any additional permits and/or inspections will be required by the Meridian Building Department. Landscgping: The Landscape Plan prepared by Toothman-Orton Engineering Company, and dated November 2006, labeled Sheet I of 1, is approved (stamped "Approved" on December 18, 2006 by the Meridian Planning Department) with the following changes: Show the existing landscaping in the interior parking lot planter on the north side of the building, adjacent to the trash enclosure, and adjacent to the compact parking (see redlines) and submit a revised copy to the Planning Department. The approved landscape plan is not to be altered without prior written approval of the Planning Department. No field changes to landscape plan permitted; prior written approval of all material changes is required. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The certificate of completion shall verify that all landscape improvements, including plant materials and sprinkler systems, are in substantial compliance with the approved landscape plan. Site Plan: The Site Plan prepared by Dave Evans Construction, on October 27, 2006, labeled Page 1, is approved (stamped "Approved" on December 18, 2006 by the Meridian Planning Department) with the following changes: 1.) Per UDC 11 -3C -6G, one (1) bicycle parking space shall be provided for every twenty-five (25) vehicle parking spaces. Install a one (1) park bike rack as close as possible to the building entrance (see redlines). The approved site plan is not to be altered without prior written approval of the Planning Department. Elevations: The Elevations prepared by Dave Evans Construction, labeled page 5 -6, dated October 27, 2006 are approved with no changes from the Planning Department. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the - approved specifications and in accordance with UDC 11-3A-15. Protection of Existin Trees: Any existing trees on site must be protected or mitigated for in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11 -3 13- 10, coordinate with the Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing trees prior to construction. Any severely damaged tree must be replaced in compliance with UDC I I - 313-10-C.5. Parking: The proposed parking areas shall be paved and striped in accordance with UDC 11-313. Project engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls must have signage in accordance per ADA and signed accessible. See redline parking changes/notes on the site plan. Curbin : Per UDC I 1 -313-51, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3: 1, shall be fully vegetated, and shall be designed in compliance with UDC 11-313-11 and UDC 11-3A-18. Lighting: Lighting shall not cause glare or impact the traveling public or neighboring development and comply with lighting standards as defined in UDC 11-3A-11. Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in compliance with UDC 11-3D. Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -1 1-3A-12. Trash enclosures must be built in the location and to the size approved by SSC. Handicgp-Accessibili : The structure, site improvements and parking areas must be in compliance with all federal handicap -accessibility requirements. ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACHD requirements, a new site plan shall be submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. All changes in occupancy need to comply with the requirements of the Building Department. It is unlawful to use or occupy any building or structure until the Building Official has issued a certificate of occupancy. A certificate of occupancy or temporary certificate of occupancy is obtained from the Building Department (208) 887-2211 after inspections are complete and the field inspection record is returned to the building department. Plan Modifications: Except for the items mentioned above, the approved Site Plan, Landscape Plan and Elevations stamped "Approved" on December 18, 2006, are not to be altered without prior written approval of the Planning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required. Kri4 Vigil Assistant City Planner *This letter does not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. lk U 1D. -J C) Type of Review Requested (check all that apply) 0 Accessory use 0 Alternative Compliance ;KCertificate of Zoning Compliance 0 Conditional Use Permit Minor Modification 0 Design Review 0 Private Street 0 Property Boundary Adjustment 0 Short Plat 0 Temporary Use Certificate of Zoning Compliance 0 Time Extension (Director) 0 Vacation 0 Other Applicant Information Planning Department ADMINISTRATIVE REVIEW APPLICATION `*NOL L/ f Applicant name: - 60-t-, 54ru e- �1'trn Phone: 1653-(7,0-1 Applicant address: 7 -7 (o ( EJ - F4 ve�-s,-Jo 'br . S�t. 10-0 Zip: I Lf Applicant's interest in property: '� Own 0 Rent 0 Optioned 0 Other Owner name: Phone: Owner address: Zip: Agent name (e.g., architect, engineer, developer, representative): Firm name: Phone: Address: Primary contact is: XApplicant 11 Owner El Agent 0 Other Contact name: rath_-'� Z>&4fJ_QW-1 E-mail: 1—rav;566 Subject Property Information Zip: Phone: 657-41&1-7 Fax: 6 153 -1 Z 7� C) Location/street address: Assessor's parcel number(s): 10 712 7 56 0 Q 9 0 Township, range, section: E ., 2- Q Total acreage: 0. 2� -7 1 Current land use: �O-F Current zoning district: L- 6-7 660 E. Watertower Lane, Suite 202 * Meridian, Idaho 83642 Phone: (208) 884-5533 e Facsimile: (208) 888-6854 * Website: www.meridiancity.org I (Rev. 9121106) Project Description Project/subdivision name: (_,reAk- t�,,L Vfomes. )oX bes.,-4,ti L I General description of proposed project/request: Ca-% S ± vk ge+ v\l_ L-) LI, f.1 Z 5-F cAIe b44 ik�l ,132 5-F �4&c- f&,r ss sr- LcAse- SP&c-e- Proposed zoning district(s): L__ Acres of each zone proposed: Z-7( Type of use proposed (check all that apply): 0 Residential Commercial 0 Office 0 Industrial 0 Other Amenities provided with this development (if applicable): Wk Who will own & maintain the pressurized irrigation system in this development? Which irrigation district does this property lie within? Primary irrigation source: J_'( jj�_bvx Secondary: Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): Residential Project Summary (if applicable) I I / A� Number of residential units: ( Number of building lots: Number of common and/or other lots: Proposed number of dwelling units (for multi -family developments only): 1 Bedroom: Minimum square footage of structure(s) (excl. garage): Minimum property size (s.f): Gross density (DU/acre-total land): _ Percentage of open space provided: Percentage of useable open space: 2 or more Bedrooms: Proposed building height: - Average property size (s.f.): Net density (Macre-excluding roads & alleys): Acreage of open space: (See Chapter 3, Article G, for qualified open space) ..- Type of open space provided in acres (i.e., landscaping, public, common, etc): Type of dwelling(s) proposed: 0 Single-family 0 Townhomes 13 Duplexes 0 Multi -family Non-residential Pro Number of building lots:. Other lots: Gross floor area proposed: LI, -Z-q 7- 5-F Existing (if applicable): Hours of operation (days and hours): &,m - 6wm M - F Building height: Percentage of site/project devoted to the following: ­_ 2- Z, 1 Landscaping: -S -7 ��o Building: "' 5 (F - � �/cl Paving: Total number of employees: Z- 0 - Maximum number of employees at any one time: Number and ages of students/children (if applicable): Seating capacity: Total number of parking spaces provided: Number of compact spaces provided: Authorization Print applicant name: Applicant signature: Date: V 660 E. Watertower Lane, Suite 202 * Meridian,Idaho 83642 Phone: (208)884-5533 a Facsimile: (208)888-6854 * Website:www.meridiancity.org 2 December 5, 2006 To: City of Meridian Planning & Zoning Dept. RE: CZC — Office Creative Homes by Design at El Dorado Business Park Statement of Proposed Use of Property This project is on Lot 20, Block 1 of Bonito Subdivision #3 and will be used for a 4,292 square foot, single story office building with Creative Homes using 3,137 square feet and the remaining 1,155 square feet will be available for lease. The lot is bordered by a vacant lot on the west with existing parking/drive aisle to the north & east and the Ridenbaugh Canal to the south. Please see site plan for any additional information, or contact me at 853-1203. Travis Burrows Dave Evans Construction ADA COUNTY RECORDER J. iL. . 10 NAVARRO AMOUNT 6.00 BOISE IDAHO 02104/05 05:00 PM DEPUTY Patti Thompson RECORDED -REQUEST OF 105014514 Title One WARRANTYDEED For value received, Kimball Properties Limited Partnership, the grantor, does hereby grant, bargain, sell and convey unto William David Evans and Caroline F. Evans, husband and wife, the grantee, whose current address is 5561 N Glenwood St, Boise ID 83714, the following real property located in Ada County, Idaho: See Exhibit A, attached; To have and to hold said premises, with their appurtenances, unto the grantee, its heirs and assigns forever. And the grantor does hereby covenant to and with the grantee that it is the owner in fee simple of said premises, that they are free from all claims except taxes and assessments; recorded easements, rights-of-way, and restrictions; and other mafters apparent or of record, and that it will warrant and defend the same from all other lawful claims whatsoever. Dated: I -f— � V-cx c3 (9 5— Kimball Properties 9mited Partnership By V'�4' Winston H. Moore By Jeff WAaoore, his aftorney-in-fact State of Idaho ) )ss. County of Ada ) On this 4th day of February, 2005, before me, the undersigned, a Notary Public in and for said State, personally appeared Jeff W. Moore, known or identified to me to be the same person whose name is subscribed to the within instrument as the attorney in fact of Winston H. Moore, and he duly acknowledged to me that he executed the name H. Moore as principal on behalf of Kimball Properties Limited Partnership, a partnership in w I is a partner, and his own name as attorney in fact, and that said partnership executeif Notary Public f Id h S_ % PLTBLIC 0: -Z Residing at pls& % 0..., e - Comm Expires '?_� Z_ (0— CD ef Property Description Dave Evans Construction at El Dorado January 27, 2005 A parcel of land being part of Lots 2 and 6, and all of Lots 4 and 5, in Block 1 of Bonito Subdivision, according to the official plat thereof as filed in the records of Ada County, Idaho, which parcel is also Parcels C, D and E of Record of Survey #6671 recorded in Ada County as Instrument No. 104134825, and Parcel F of Record of Survey #6786 recorded in Ada County as Instrument No. 105012677, and which parcel in the aggregate is more particularly described as follows: Commencing at the Southeast corner of Lot 5 in said Block 1; thence North 85* 55'46" West 206.07 feet to a point; thence North 000 00' 00" East 405.12 feet to a point of curve; thence .,along a curve to the left, said curve having a central angle of 45* 49'59", a radius of 237.00 feet, and a long chord bearing South 840 18'03" East 184.57 feet to a point; thence North 72' 46'57" East 43.23 feet to a point of curve; thence along a curve to the right, saidburve having a central angle of 460 48' 12", a radius of 463.00 feet, and a long chord bearing South 830 48' 57" East 367.78 feet to a point; thence South 00* 00' 00" East 158.70 feet to a point; thence South 900 00'00" West 18.09 feet to a point; thence South 00* 00'00" East 101.29 feet to a point of curve; thence along a curve to the left, said curve having a central angle of 290 25'05", a radius of 250.00 feet, and a long chord bearing South 750 25' 10" West 126.95 feet to a point; thence South 600 42' 38" West 121.50 feet to a point of curve; thence along a curve to the right, said curve having a central angle of 330 21'35", a radius of 200.00 feet, and a long chord bearing South 770 23'26" West 114.81 feet to a point; thence North 85* 55'46" West 26.15 feet to the point of beginning; EXCEPTING THEREFROM all of Lot 3 in said Block 1. Exhibit A STATE OF IDAHO COUNTY OF ADA AFFIDAVIT OF LEGAL INTEREST -7 (.0 J�i vu--Rk bi - SL. 107) (name) (address) (city) being first duly sworn upon, oath, depose and say: (state) 1. That I am the record owner of the property described on the attached, and I grant my permission to: -7 -7 6o ( LJ_ 12t w_ -s,4 SA,. 19D (name) (address) to submit the accompanying application(s) pertaining to that property. 2. 1 agree to indemnify, defend and hold the City of Meridian and its employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property which is the subject of the application. 3. 1 hereby grant permission to City of Meridian staff to enter the subject property for the purpose of site inspections related to processing said application(s). Dated this S4'�' —day of 't) e- cQvi 6ee- 20 0 A., (Signature) SUBSCRIBED AND SWORN to before me the day and year first above written. 0 A B 4 (Notary Public for Idaho) 0. C Residing at: L 1 41 My Commission Expires: OF I; 660 E. Watertower Lane, Suite 202 e Meridian, Idaho 83642 Phone: (208) 884-5533 a Facsimile: (208) 888-6854 * Website: www.meridiancity.org (Rev. 9121106) Creative Homes by Design Vicinity Map This map is a user generated static output from an Internet mapping site and is for general Notes: Lot 20, Block 1, Bonito Sub. #3 reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION. I Legend Major Streets ,W MINOR ARTERIAL Ae MAJOR COLLECTOR ,W SECTION df PRINCIPAL ARTERIAL INTERSTATE Other Minor Streets LOCAL PARKS pd PRIVATE ,V RESIDENTIAL Other Street Names (minor) Addresses C3 Parcels Ada -002003 r--1 Schools r-1 Parks City Limits C3 Kuna 13801se C3 Garden City C3 Eagle C3 Star 0 Meridian IN Other N A� Scale: 1:1,500 —W . . 1 -'05 14:09 FROM -SSC -015 -063 .1 149 2088885052 T P001/003 F udgm r -worsts %_U11Vt1UU%1P Lroyra evallw 41MITIMUCtlan U'e: 40: aw P. M. I I -U1J'zVUzk nDAVE EVANS CONSTRUCTION 5561 N. Glenwood ST - Boise, ID 83714 Office 853-1203 Fax 853-1220 devansconstruction.com . . . . . . . . . . I . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . Tr*ansmiftal Date: November 8, 2005 ................................................. From: Travis Burrows ............ ....................................... TO: Bill ............. * ............. Company:- :.ssc ............ .............. Via Fax#: Via0ther. 88'8-5052 ....................... $ ................... Subject' El Dorado Business Park .................................................... Affached: 2 Pages +Cover ........................ v ................. Bill We are about to stake the parking lot & curbs & want to make. sure we -have:,enough trash- enclosures- and all'in the right locations for your trucks to work with. Let me know if we need to make any adjustments. Travis SANITARY SERVICE COMPANY Appro .......... ...................... C0MMFNTS.-e_---T4AaK* copy: 1 11-09—'05 14:09 FROM—SSC 2088885052 T-015 P002/003 F-063 "0 600 1 zzv uvvs r_vwlir- IIAUIIWLIUUUU kl;llllsuwtluli Vg;AOP:4Q F,111. F I -vG-zv4j;) Ld I . I . 11-09—'05 14: 09 FROM—SSC .L',m 000 l."w I�Mvw r-vasflt; %,UFl]$tFvt;%ltj 2088885052 T-015 P003/003 F-063 VRIVCS CV29flb; �—MlWtIVULIUlt P. rn. I I -VO-dtvua 0 ia i 35 0 32 m VUbWAu'an 93MA IMMI*WIOLIW NM 9MM IndWIJIM INMUN MU ADWWXM N " VW400LW 7M *4mm X1 I UNNIVOWL Winum MM 34YO 900 r i 35 0 32 m VUbWAu'an 93MA IMMI*WIOLIW NM 9MM IndWIJIM INMUN MU ADWWXM N " VW400LW 7M *4mm X1 I UNNIVOWL Winum MM 34YO 900 December 5, 2006 To: City of Meridian Planning & Zoning Dept. RE: Lighting Statement This project is on Lot 20, Block 1 of Bonito Subdivision #3 and will not have any lighting with a maximum output of 1,800 lumens or more. We use a 65w incandescent bulb in a recessed can light fixture in the soffit of the buildings. If you have any questions, please contact me at 853-1203. Travis Burrows Dave Evans Construction UNIE TAR -E LTNE— _��GTH BEARING Ll 43-23 N774639 -E L2 8.09 N90,00,00,w Ly- __22.59 MM 3-917 -M5'35-E 51.78 L7 __N605 LB —m SOW53*37W M8-21 w -E) Q W-51 IM B ONITO S UEDI VISION NO. 3 - A PAR09L OF LAND 11,16"ING A PORTION OF LOTS R AND 6, AND ALL - OF LOTS 4 AND 5, BLOCK I OF BONITO SUBDIVISION, LOOATED IN THE EAST IIR OF SECTION 20, TO#WSHIP 3 NORTH, R4NGE I EAST, BOISE MERIDIAN, CIYY OF JVERIDL4N, ADA COUNY7, IDAHO 2006 coppop E RRIVE ID I� ps-'l,-nft .57v) ------------------ -------- ------------- ---- volt" -w _C2 CIS i, b 5' IRRIWION 1-- FASEMFNT 1 ,4 P711 THOUSAND SPRINGS SUBDIVISION NO.2 SEE NOTE 11 c; L SSA�19'35W Aw BLOCK 1 [a] m 26OZO—Or EXISTING 35' DRAINAGE EASEMENT FD 1/2- f�EE!ArR 30' P`DESm— PIS 7876 IIENT PARCEL D E F P PARI R _j t 66 ------- R, NO_ 'G.� R.O.S. NO 193 b---------- - ---- FD. 1/2' REBAR a P.LS 876 &W.C. T 4�IS.%C- NOT W C. ENT 50' EXISTING CANAI EASEMENT -�l 2.27' CA RMVMWH CAMAIL 57.94 NOT LOT LINE A 'ART SECYIONAL LINE --------- EASEMENT LINE SURVEY THE LINE — — — — — — — — — — — — R/W OR PROPERTY UNE 7. PARCEL 'B' NO. 3 OWNER'S ASSOCKTION SHAU- B RESPONSIBLE E R.O.S. No. 6671 al ASSUMED BY AN IRR(GATION/DRAINAGE DISTRICT. LAP TIOH, 01 C, gll.L. bN FOUND 1/2- REBAR -PLS 797$-. REPLACED RiOUN2 E. ITS OF THT CONDITIONAL USE PERMIT CUP -01-037. DATED APRIL Z 2002, THE P MINARY PLAT PP-01-020DATED Zi E.S. BUFFER EASEMENT AREA ALONG E. COPPER POINT DROVE SHALL BE MAINTAINED BY THE EL DORADO OWNER'S ASSOCIATION FOR INS PLAT, DIRECT ACC TO E. COPPER POINT DRONE 6 PROHIBITED - LOTS 13-21. BLOCK I AND THE P UEVC C 1614 Secti= 20 FO ss CAP PRECLUDED FROM CONSTRUCTION WITHIN THIS PERMIT. CP&FN INSTRUMENT NO. 95018676 REGULATION TIME OF UTILITY PROVIDERS. NAMFA-MERtDIAN RRIGATION DISTRICT. EASEMENT. (2M) 32J-2288 RIESUBOMSION. FD. PLS B"S OF BEARMS LBoolNITo/llUbC--plw THE BASIS CPS M� 'Ho �_"` I qAwr,.r;vt7 i nx,q D- IN. FR. TF-D THE NOR _8172_ THOUSAND SPRINGS SUBDIVISION NO.2 SEE NOTE 11 c; L SSA�19'35W Aw BLOCK 1 [a] m 26OZO—Or EXISTING 35' DRAINAGE EASEMENT FD 1/2- f�EE!ArR 30' P`DESm— PIS 7876 IIENT PARCEL D E F P PARI R _j t 66 ------- R, NO_ 'G.� R.O.S. NO 193 b---------- - ---- FD. 1/2' REBAR a P.LS 876 &W.C. T 4�IS.%C- NOT W C. ENT 50' EXISTING CANAI EASEMENT -�l 2.27' CA RMVMWH CAMAIL — WATERUNE EASEMENT INST. NO. 105049332 7- i -Tr L Mo SUBDIASION BOUNDARY NOT LOT LINE A 'ART SECYIONAL LINE --------- EASEMENT LINE SURVEY THE LINE — — — — — — — — — — — — R/W OR PROPERTY UNE 7. CENTERUNE NO. 3 OWNER'S ASSOCKTION SHAU- B RESPONSIBLE WATER —ENT .— NO. 1051-51. o FOUND 5/8' ReBAR -PLS 787r ASSUMED BY AN IRR(GATION/DRAINAGE DISTRICT. SET 5/9' REM W/PLASTIC CAP -PLS 0961 - I FOUND 1/2- REBAR -PLS 797$-. REPLACED — WATERUNE EASEMENT INST. NO. 105049332 7- i -Tr EX — 20 tSTP"EDGES E - f'-T '113' NOT 'No. ll INRIGATK). A 'ART WEMENT f_ 7 UTJ,?, HEIGHT OF 35 -FEET, MEASURED FROM THE 21.21 7. THEREOF. UNLESS SUCH RESPONSIBIUFY IS NO. 3 OWNER'S ASSOCKTION SHAU- B RESPONSIBLE Top OF THE RDGF. I'S i PARCEL 'G' R.O.S. NO. 6786 ASSUMED BY AN IRR(GATION/DRAINAGE DISTRICT. A PO TION OF I LOT 2. BLOCK I ...IT. "DIVISION RiOUN2 E. ITS OF THT CONDITIONAL USE PERMIT CUP -01-037. DATED APRIL Z 2002, THE P MINARY PLAT PP-01-020DATED ]L.T 3. LJ( I -t BONITO SUB. E.S. — WATERUNE EASEMENT INST. NO. 105049332 7- i -Tr EX — 20 tSTP"EDGES E - f'-T '113' NOT 'No. ll INRIGATK). A 'ART WEMENT f_ PASS NAGE DITCH PIPE.ESMRES NVM/F`o`R" OR THE MAINTENANCE EASEMEW AS SHOWN WITHIN IhWRUMENT NO. 106022612. THE BONITO SUBDIVISION HEIGHT OF 35 -FEET, MEASURED FROM THE W.C. C!.4� THOUSAND SPRINGS SUBDIVISION NO -1 1 - THIS LAT ECT TO COMPLIANCE .A� �r NO UUY WITH '1-3805, CON ERNING IRRIGATION WATER. 4. THE OWNER OF EACH Lar, ACRqSS WHICH '6. LOT 12. BLOCK 1 IS E?=MBERED By AN EXISTING BLAMET PERMANENT PEDESTRIAN & ALL STRUCTURES ON LOTS 13-21, BLOCK 1, SHALL BE RESTRICTED TO A "IMUM 11. THE BOTTOM ELEVAT1 N OF STRUCTUPAL F007INGS SHALL BE SET A kMMUM OF LOT OWNERS ARE SUBJECT TO AN ASSESSMENT. SEE NOTE PASS NAGE DITCH PIPE.ESMRES NVM/F`o`R" OR THE MAINTENANCE EASEMEW AS SHOWN WITHIN IhWRUMENT NO. 106022612. THE BONITO SUBDIVISION HEIGHT OF 35 -FEET, MEASURED FROM THE 12 -INCHES ABO?VE THE HIGHEST ESTABLISHED 7. THEREOF. UNLESS SUCH RESPONSIBIUFY IS NO. 3 OWNER'S ASSOCKTION SHAU- B RESPONSIBLE Top OF THE RDGF. NORMAL GROUND WATER ELEVATION. TH ' S&"VN - ON SUBJECT TO ALL ASSUMED BY AN IRR(GATION/DRAINAGE DISTRICT. FOR THE MAINTENANCE OF THEE SO EWALKS. 9. THE DGSDNO 20 FEET WIDE LAMDsr-NpE 12. OTHER THAN ACCESS POINTS APPROVED RiOUN2 E. ITS OF THT CONDITIONAL USE PERMIT CUP -01-037. DATED APRIL Z 2002, THE P MINARY PLAT PP-01-020DATED 5. LOT 12, BLOCK I SHALL BE OWNED AND B LONGS ARE PRECLUDED FROMD CU ONSTRUCTION WITHIN THIS EASEMENT BUFFER EASEMENT AREA ALONG E. COPPER POINT DROVE SHALL BE MAINTAINED BY THE EL DORADO OWNER'S ASSOCIATION FOR INS PLAT, DIRECT ACC TO E. COPPER POINT DRONE 6 PROHIBITED - WITH 5/8- REBAR W/PLAsnc CAP -PLE; agei- FOUND 1/2- RESAR -PLS 7876 - SET 1/2- REM W/PLAS= CAP -PLS 8961- 0 WITNESS CORNER W.C. SET 1/27 REBAR W/KAsnc CAP -PLs sqw- a WITNESS CORNER W -C- SET 5/8' REM W/PLASTIC CAP 'PLS 0861" . CALCULATED POINT (NOTHING SET) + FOUND BRASS CAP P.O.B. POINT OF BEONNING CP&FR INSTRUMENT NO. 103135428 (26&F..9.9 RECORD DATA 17 16 20 + 21 LA 61 .p b bl.� OF 0 0 � n Z,z 20 FO. 5/8' R ' '171 C R N5�. Pa'F NO. 103204073 1/4 CORNER 0 25 so 100 150 MAY 10. 2005, THE RECORDED DEVELOPMENT MAINTM ED BY THE BONITO SUBDIVISION =ER'S 7. IRRIGATION OF THE SUBDIVISION COMMON 13. BUILDING SETBACKS AND WMENSIONAL ACREEME NT (INSTRUMENT NO' 10302W2 )' No. 3 ASSOCIATION. AS A COMMON LOT WITH AREA, PERIMETER, LANDSCAPE ISLANDS IN THE PARKING LOTS 10. LOTS 12, 17, 19. 20 AND 21. BLOCK 1 STANDARD JN THIS SUBDIASION SHALL BE IN T MGBffMVG.Q0J&"Y AN D THE APPROVED ANNEXATION AZ -01-90111. A BLANKET INGRESS/ SHARED PAR KING. STORMWATER IRRIGATION AND BUILDING FOUNDATION PLANTING- 94ALL BE WITH WATER FROM THE SHALL BE SUBJECT TO THE EXISTING 30 -FEET WIDE P EDESTRIAN EASEMENT COMPUANCE WITH ALL APPLICABLE ZONING -2��-QRTON REGULATIONS OF THE CITY OF MERIDIAN AT 'Y"ESU SHAU BUG 6:j�EGRESS' AND PLO UTILITIES FAVOR OF IN OVERALL BONITO SUBDIASION PRESSURIZED INSTRUMENT No 103193110. BL"LDINGS ARE THE TIME OF ISSUANCE OF THE SUil-DINIG 9777 CHRMEN bWiEVARD ZONING LOTS 13-21. BLOCK I AND THE P UEVC IRRIGATION SYSTEM OWNED BY THE PRECLUDED FROM CONSTRUCTION WITHIN THIS PERMIT. BOIS& 10,WO 8-T7f4 REGULATION TIME OF UTILITY PROVIDERS. NAMFA-MERtDIAN RRIGATION DISTRICT. EASEMENT. (2M) 32J-2288 RIESUBOMSION. qAwr,.r;vt7 i nx,q 2 E ONITO S UE D -I VISION NO - 3 MMCATE OF OMWM?s KNOW ALL MEN BY THE&PRESENTS. THAT THE UNDERSIGNED ARE THE OWNERS OF THE PROPERTY HEREINA R DESCRIBED AND IT IS THEIR INTENTION To INCLUDE SAID PROPERTY IN THIS PLAT. A PARCEL OF LAND BEING PART OF LOTS 2 AND 6, AND ALL OF LOTS 4 AND 5, IN BLOCK I OF BONITO SUBDIVISION, ACCORDING TO THE OFFICIAL PLAT THEREOF AS FILED IN BOOK 86 OF PLATS AT PAGES 9703-9788. RECORDS OF ADA COUNTY. IDAHO. AND PARCELS C. D AND E OF RECORD OF SURVEY NO. 6671. RECORDED AS INSTRUMENT NO. 104134825. RECORDS OF ADA COUNTI(� IDAHO. AND PARCEL F OF RECORD OF SURVEY NO. 6786. RECORDS OF ADA COUNTY, IDAHO, LOCATED IN THE EAST 1/2 OF SECTION 20, TOWNSHIP 3 NORTH. RANCE 1 EAST. BOISE MERIDIAN. CITY OF MERIDIAN. ADA COUNTY, IDAHO, DESCRIBED AS FOLLOWS! COMMENCING AT THE t/ .+. CORNER COMMON TO SECTIONS 20 & 21. TOWNSHIP 3 NORTH, RANGE I EAST BOISE MERIDIAN; THENCE. ALONG THE LATITUDINAL CENTERLINE OF SAID SECTION 2D. - A) S -89-54'36-W.. 2664.08 FEET TO A POINT MARKING THE CENTER OF SECTION 20; THENCE. LEAVING SAID CENTERUNE. B) N.80`53'43"E., 1680.52 FEET TO THE NORTHWESTERLY CORNER OF SAID PARCEL C OF RECORD OF SURVEY NO. 6671. ON A CURVE ON THE SOUTHERLY RIGHT-OF-WAY LINE OF EAST 0006 -ER POINT DRIVE, MARKING THE POINT OF BEGINNING; THENCE ALONG SAID RIGHT-OF-WAY LINE. 1) SOUTHEASTERLY ALONG SAID CURVE TO THE LEFT. HAIANG A RADIUS OF 237.00 FEET. AN ARC LENGTH OF 189.60 FEET, THROUGH A CENTRAL ANGLE OF 45-50-14- AND A CHORD REARING AND DISTANCE OF S.8'Vl8'14-E_. 184.59 FEET TO A POINT OF TANGENCY. THENCE. CONTINUING ALONG SAID RIGHT-OF-WAY LINE. 2) N.7T46'39"E.. 43.23 FEET TO A POINT OF CURVATURE; THENCE. CONTINUING ALONG SAID RIGHT-OF-WAY LINE. 3) SOUTHEASTERLY ALONG SAID CURVE TO THE RIGHT, HAVING A RADIUS OF 463.00 FEET, AN ARC LENGTH OF 378.21 FEET, THROUGH A CENTRAL ANGLE OF 46-48-12- AND A CHORD BEARING AND DISTANCE OF S.83 -49-15-E.. 367.78 FEET TO A POINT MARKING THE NORIHEASTERLY CORNER OF SAID PAkCEL F OF RECORD SURVEY NO. 6786; THENCE, ALONG THE EASTERLY LINE OF SAID PARCEL F. THE FOLLOWING COURSES: 4) S.O(YOO'OO"W., 158.70 FEET; 5) N.90*00'00'W.. 18.og FEET; 6) S.00'00'()O-W.. 101 29 FEET TO A POINT ON A CURVE ON THE CENTERUNE OF THE RIDENBAUCH CANALz 'iAENCE. ALONG SAID CENTERLINE THE FOLLOWING COURSES: 7) SOUTHWESTERLY ALONG SAID CURVE TO THE LEFT. HAVING A RADIUS OF 250.00 FEET, AN ARC LENGTH OF 128.34 FEET, THROUGH A CENTRAL ANGLE OF 2!r24'51- AND A CHORD BEARING AND DISTANCE OF S75 -24'44-W., 126.94 FEET TO A POINT OF TANGENCY. 8) S.60*42'18"W.. 121.50 FEET TO A POINT OF CURVATURE; 9) SOUTHWESTERLY ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 200.00 FEET, C TANGENCY; '23-05W.. 114.81 FEET TO A POINT OF HORD BEARING AND DISTANCE OF S.77 '21'35- AND A AN ARC LENGTH OF 116.45 FEET, THROUGH A CENTRAL ANGLE OF 33 10) N.85*56'07N., 232.27 FEET TO THE SOUTHWESTERLY CORNER OF SAID PARCEL C OF RECORD OF SURVEY NO. 6671; THENCE ON A NON -TANGENT LINE ALONG THE WESTERLY LINE OF SAID PARCEL C. 11) NOOICO'03"E.. 405.13 FEET TO THE POINT OF BEGINNING. EXCEPTING THEREFROM: LOT 3 BLOCK 1 OF SAID BONITO SUBDIVISION, 13EING MORE PARTICULARLY DESCRIBED AS �OLLOWS: BEGINNING AT A POINT MARKING THE NORTHWESTERLY CORNER OF SAID LOT 3. THENCE, 1) S.88'15'35"E., 39.97 FEET; THENCE, 2) S.00 -07-14-W., 51-78 FEET TO A POINT ON A CURVE. THENCE NON -TANGENT 3) SOUTHWESTERLY ALONG SAID CURVE TO THE LEFT. HAVING A RADIUS OF 300.00 FEET. AN ARC LENGTH OF 4b.19 FEET, THROUGH A CENTRAL ANGLE OF Or4O'35" AND A CHORD BEARING AND DISTANCE OF S -52-46-22W.. 40.16 FEET; THENCE ON A NON -TANGENT LINE, 4) N.00'00'00"E.. 58.05 FEET TO THE POINT OF BEGINNING. SUBDI'VISION CONTAINS 4.98 ACRES, MORE OR LESS. SUBJECT TO ALL COVENANTS. RIGHTS. RIGHTS-OF-WAY. EASEMENTS OF RECORD. AND ALL ENCUMBRANCES. MMMATE OF OWAWRS COATMUED IT IS THE INTENTION OF THE UNDERSIGNED TO AND THEY DO HEREBY INCLUDE SAID LAND IN THIS PLAT: THE EASEMENTS INDICATED ON SAID PLAT ARE NOT DEDICATED TO THE PUBLIC, BUT THE RIGHT' TO USE SAID EASEMENTS IS HEREBY PERPETUALLY RESERVED FOR PUBLIC UTILITIES AND FOR SUCH OTHER USES AS DESIGNATED HEREON. ALL OF THE LOTS IN THE PLAT WILL BE ELIGIBLE TO RECEIVE DOMESTIC WATER SERVICE FROM MERIDIAN WATER DEPARTMENT, A PUBLIC UTILITY SUBJECT TO THE REGULATIONS OF THE IDAHO PUBLIC UTILITIES COMMISSION, AND MERIDIAN WATER DEPARTMENT HAS AGREED IN WRITING TO SERVE ALL LOTS IN THIS SUBDIVISION. /IlV w7NESS WE HAVE HEREWTO SET OUR HAND THIS DAY 0,11,�'A .7005 WUJAA4r DAWD EVAMS 0 WNER HOOF7' ��f6# dp' 00WER L41HO&14 H00fT AQ OWATR c Z70- !�!n 041E E. BEAqLEY U -BER BEA17ZEY 1MTS7)VE?V?S, LLC f AC"OWLEDGAWNT 5TAW OF 'W"O/ ss CDOW OF Aa4 p - sd Ai9rARY La A,, OEFDW AAF IW MV& -R MWO A EWWS �W AND #ZIZ lavOW OR VD Y AFPC4RED MULAM OA W E~ AW C4R"C F WYZED rO AC tO BE 7W PA5RSVAOS �"nF AIWES ARE SM� 70 7�C FORE"W l)FR2y7r47F Or O*NERS'"D ACAWKEDGED ro Air THEY CATCUrED Thr S46C. 4V HYMEW NFEREOF - / 94W SET MY ~ AND SE& 7HE D14Y AAO YFAR RRST A60W wRn7Z7V *&NSA or I'D Aff COAAWAS59M Etpo%"S oig. 2 - , /I Ili ACANOWLWOMY7v SrArE , 0'"o/ ss. COWffY OF Am ��mr .2005. 8& -CRE AOF Zr FOR 7Z PfR5aWIUrAWLV?EV �1� 'VorARr LAW�W RO&T Hf,�54HD AAV )Wg; KM7#W OR AXWWXD 7V ME TO BE rHE PERS� WiO,­ N44� Aw SURORAMED M IW FORFCawc 'CCRlzF7rA7F a, OWAERS' AND ACKAOM-10GED 70 Ml IWY DrEcura) 7w S�. ,�OTAt)p b W Wn&-,S OftWOF I MWSZ7 MY SEAL 7W �r AAV KFAR �r A60W �rrm - . OF vo MY COAMOSWON Evvks 01_AAL� AC"0#_Z&QG"NT SZAI� a- 04W camry or ss LA ON mnAl_a4 &TWE W ?W W&W%WO, A NOrARY r -P&wm aur F aDaux A A A-whwat 0, WE 1,W)w bouri, r&4r DWC&rfp 7W Wr'V WS7RMUM7 IV '�F PERSON -M LIATCV7W A -.s=7 a4w" cempmrAvp A~MAS TO AIE ?x4r MEW tw avmlr OF sev"MITP imaep lAguffIe FATaffE-p THf. svw. IN WnWTS WHOtEOF. HAW HMEWTO 5E7 kY AWO AND AFFWFDLAFY OFY'V14L SZAl 7HE OF MY CMAIMI&V DONRE� ON_j E ONITO S URDI VISION . NO. 3 A DA � UNTY A LOR�TA Y. AQCM0rANrr FuRsconc Pur WAS ACCEPW AAV AppRoWD gr ME BL14RO OF Aa4 COUNTY HIGhWY olsn?lcr comussovERS ON THE_= LA y OF_j9fT_"ffF__.2005 P, 00(j, 0 �IM COUNTY NlaYIJA Y DSrRICT yot dtf.WOVAL OF 27m arry ENGBUTR 1, 771E' UA49EAWGwD Cy7y EWWER IN AAV FOR 7W CITY OF MERIONN, AOA COUNTY ILKHO, HERE&Y AARROW THIS PLAT OF "BON11D SUBaWSM AOO, 37 ,olviaL.0 CITY E�Mttfe - MERIDAM-1046O AaP�ROFAL OF 27M ciTy-couNCZ 4 rhE UNDERSnVED CITY CaL IN AAV FOR THE CYTY OF MER=N, ADA COUNTY /04HO, H�7Q�'_cj.RnFy 77mr AT A REGULAR MEE7MAG OF ME Cffy COUWIL HELD ON TW_L%,a4y F_4.aL�_ - 2005, rHIS Pt4r OF 'BOlVIrO SUODMSM Ivo J' WAS DISr AWE AMD 'PrED of C17Y CL0?X - 00W D4HO cmm "CAM OF mwvErOR I. STEVEN J. FRGBIE� DO HEREBY CERTIFY THAT I AM A REGISTERED PROFESSIONAL LAND SURVEYOR IN THE STATE OF IDAHO. AND THAT THIS MAP REPRESENTS AN ACTUAL SURVEY MADE ON THE GROUND UNDER MY DIRECT SUPERIVISION AND COMPLIES WITH ACCEPTED STANDARDS OF SURVEYING. I FURTHER CERTIFY THAT I HAVE COMPLIED WITH TITLE 55, CHAPTER 16, IDAHO CODE. SrEVEIV J FRISME P.L.S. IL1010 No. 8967 2? or It JWAL22V 6MUWCA22r SWIlARY REMWTAWS AS REOUIRED SY AUW CODE MZE 50. CHAP7rR IJ H4VF BEEN S4fl5f)M 64SED ON A REVIEW SY A OUM&IIED L100.15ED PROFESS"ML ENGNE&R (OLPE) REPRESEWMG JrhE C17Y OF MEAMW rW MPE APAWVAL OF Af DESIGN PLANS AND SPE0F)rA7XW AAV PC CONDMONS A0POSED ON THE DEVELOPER FOR CON7NUED SAnSFAcnw a� PC S4AUARY RfSlWrA2U &yYFR IS r,4MK)ATD TWAT A r Thr 77mE OF mig APPROV41, NO ~1W WA SrTEAGOWS OR SEWR iXMNS"S NOW CONS7RUCMD &IWNG COA57RW77ON OW HE AtLOWD WW AfARoPRwTr maAw PEWrS h' DR#~ WATER &VfENM0NS OR Sf� 4X7EAf&OVS IAVF SWE BUN CON57AW7EV OR IF' AhE VEMOPIER IS 54MIArAAEVUSLY COAG7RUMNG nfOSE FACkJ77FS IF 7W DEVELOPER FA'ff.S ro CQAWRUCr FACXMES THEN T`46 &W/rARY RESMYCnONS AMY BE REMPa-WV, IN ACCORD4010VE *7H SEC770W 50- IJ26, 04HO COM 8Y VE 45540AAX OF A CER7*7CA 7E OF DIWPROVAL, AND AID COAlST?lICn0N a- ANY BUXANC OR -'*(EZ IM RSOUIRING DRNKMOU WA 7ER OR SSWRISEP77C FACILITY _W4LL BE ALLOWED. AUJA Ds7RIcr HE&TH ornCER .:�l.COIUNTY:,>f' CM?MCATE OF TAW COUNTY IRVASURER 4 rHE UAQER5XWCo, CCuNrr TREASuRER IN Aw FoR rw couw OF Aat STA7E OF- /Aojo, PfR ME REOUREmmrs Or z c w- 008, DO HD?EBY cERImY 7H4 r ANY AND ALL CURREWT AND OR DWAVUENr COtWY PROPERTY )AXES FOR 7NE' PROPERTY MACLUDED IN THIS SUBOMSUN H4W BEEN PAID IN fULL 7HIS CER77F)CA710N IS VALID FOR rHE NDrT 7MRry po) a4ys OwLy a47F ;7REASURV? ==CATE OF COMY 9K�OR � I THE UAVIERSXMD A REGSIMED PROFESS"W IAAto SURWYOR FOR Aa4 COLINry ,04HO, DO HLER&YY CER77FY rmr I HAVE CHECKD THIS pLAT AND TAAr IT COMPLIES WITH rHE STATE OF 04HO CODE RELAANG TO PL47S AND SURVEYS Ul-qFl--O- L SURVEYOR CERMCATE OF COUNTY RECORDER S?A7E OF Aa4HO COUNTY OF ADA I HD?E&y CER77FY tH4r 77#S INSWUMENT JIAS nt.-D FOR RECaffiO AT PIC REOUEST OF wat, ft 41 MINUTES PASr_aO`GtOCK P M. ON THts _2A_ DAY oF IA67RLMENT NO. — '. 800/1- RA PAGES N\4vh. kkszz - %MM& I 'T, Na& %=t\ DEPUTY �W- EX OFFIVIO RECORDER ev"n."OT, ArIn 0 rl � MAYOR Tammy de Weerd CITY COUNCIL MEMBERS Keith Bird Charles M. Rountree Shaun Wardle Christine Donnell CITY DEPARTMENTS Fire 540 E. Franklin Road 888-1234 / fax 895-0390 Parks & Recreation 11 W. Bower Street 888-3579 / fax 888-6854 Planning 660 E. Watertower Street Suite 202 884-5533 / fax 888-6854 Police 1401 E. Watertower Street 888-6678 / fax 846-7366 Public Works 660 E. Watertower Street Suite 200 898-5500 / fax 895-9551 - Building 660 E. Watertower Street Suite 150 887-2211 / fax 887-1297 - Sewer (WWTP) 3401 N. Ten Mile Road 888-2191 / fax 884-0744 - Water 2235 N. W. 8th Street 888-5242 / fax 884-1159 Date: 12/5/2006 FORM PW100 The following address has been verified by City of Meridian Public Works Department as valid for the project listed below. Project Name: CREATIVE HOMES BY DESIGN SHELL & T.I. Address: 2963 E. COPPER POINT DRIVE (shell address) Suite #: 150 (Creative Homes By Design T.I) Zip Code: 83642 Lot /Block/ Subdivision: Lot 20 Block I Bonito Sub #3 Notes: Lease space to be assigned space # 100. Form PW100 will be required for that TI prior to submittal. EACH SET OF PLANS WILL BE REQUIRED TO CLEARLY REFLECT THE CORRECT ADDRESS AND SUITE NUMBER (IF APPLICABLE). Tricia Shindle MINI MIMIC City Of Meridian Public Works Department 660 E Watertower Street Suite #200 Meridian, ID 83642 PH. 208-898-5500 FX 208-898-9551 bierent@meridiancity.org CITY HALL 33 EAST IDAHO AVENUE MERIDIAN, ID 83642 (208) 888-4433 CITY CLERK - FAX 888- 4218 CITY ATTORNEY/ HR - FAX 884- 8723 FINANCE & UTILITY BILLING - FAX 887- 4813 MAYOR'S OFFICE -- FAX 884-8119 MODS S.F. Land 0-otSize) Basic Wind Speed go MPH 4,292 S.F. DoWng � I I pWWng spaces M C(d 1.0 Building Category 400 S.F. Wind Exposure B ADA spaces - 1 Parking spaces shoon component & Claddlng ""!Z - 36A% BWM[n. coverage wall 15 .8 PSF ,,%F; .F. 28.2 PSF R-1 overhang 8.000 S.F. Landscape 57.6% Landscaping coverage Seismic Use G..p 113.SPSF 11,805 S.F. On L(Apprax 6% Pegbian Path) % 0.17 171 LANDSCAPING Basic Seismic Force Resisting System Wood Frame Design Sees She. ro Analysis procedure mump.--w . Unffmm (psf) concentrated (1b.) Roof Snm Load 25 PSF SP— 7ac 6 5- _3611F*.- Roof Dead Load 25 PSF per HVAC plan Ar + 20DO lb. + C C C C + IN Corridors above flmt4loor 80 PSF 20DO be 1.0% P 6 1 .0 Code Analysis Q(P)- .184 CFS 12' INV. IN- 2658.08 W Section Requited provided Buildl.g Codes ....... la 12" INV. OUTcz 2r,57.98 Building Haight U1.51' INSTALL PEDESTRIAN 1.0% RAMP TYPE 'Cl' ..ad. 1 _Z PER ISPWC SD -712 7VC Landscapinq. 62.03 + Exiling Wift 00, B LD G. 'H' FFE 2663.60 5 CN 0) L j 4� 4_j �z_ A DRAINAGE AND C� IRRIG. EASEMENT (D CO 0 2 BENCHMARK #2 Pedestrian Path `NA_V­DT__98ff__DMUW—� ELV: 2664.19 N 698998.5,5 6' Tube steel Pent, 50' RIDENBAUGH CANA EMENT Structural Design Crited Basic Wind Speed go MPH Importance Factor 1.0 Building Category 11 Wind Exposure B Internal Coeffi component & Claddlng wall 15 .8 PSF Roof Overhang 28.2 PSF R-1 overhang Seismic Use G..p 113.SPSF Spectral Response Coefil ends On 0M % 0.17 171 LANDSCAPING Basic Seismic Force Resisting System Wood Frame Design Sees She. ro Analysis procedure mump.--w . Unffmm (psf) concentrated (1b.) Roof Snm Load 25 PSF SP— 7ac 6 5- _3611F*.- Roof Dead Load 25 PSF per HVAC plan Ar + 20DO lb. + C C C C + IN Corridors above flmt4loor 80 PSF 20DO be partition load 0 Ll� PFSSFF P 6 1 .0 Code Analysis Q(P)- .184 CFS 12' INV. IN- 2658.08 W Section Requited provided Buildl.g Codes ....... la 12" INV. OUTcz 2r,57.98 Building Haight Building ConalL Type Fire Suppression 1.0% ..ad. 1 _Z -7 7VC Landscapinq. 62.03 + Exiling Wift 00, INLET CATCH BASIN #9 PER ISPWC SD -601 .498 CIFS 12' 2659.03 FFE 663.80 A 1:1 n 9 T9 5 CN 0) L j 4� 4_j �z_ A DRAINAGE AND C� IRRIG. EASEMENT (D CO 0 2 BENCHMARK #2 Pedestrian Path `NA_V­DT__98ff__DMUW—� ELV: 2664.19 N 698998.5,5 6' Tube steel Pent, 50' RIDENBAUGH CANA EMENT Structural Design Crited Basic Wind Speed go MPH Importance Factor 1.0 Building Category 11 Wind Exposure B Internal Coeffi component & Claddlng wall 15 .8 PSF Roof Overhang 28.2 PSF R-1 overhang Seismic Use G..p 113.SPSF Spectral Response Coefil ends ce 0M % 0.17 SR. class D Basic Seismic Force Resisting System Wood Frame Design Sees She. 0.041W Analysis procedure mump.--w . Unffmm (psf) concentrated (1b.) Roof Snm Load 25 PSF par JUC 16Da Roof Dead Load 25 PSF per HVAC plan Floor U. Load' 08c 1607): Lobbies & first -floor cmrldms 100 PSF 20DO lb. Onto. 60 PSF 2D56 —F. Corridors above flmt4loor 80 PSF 20DO be partition load 0 Ll� PFSSFF Floor dead load Code Analysis W Section Requited provided Buildl.g Codes ....... se- EluildlngFlomAma Building Haight Building ConalL Type Fire Suppression ..ad. UtIng Occ. Load .—I—T— I Exiling Wift or t 0 ;I =r Creative Homes 2963 E. Copper Point Dr., Meridian, ID 83642 Legal Desctiption: Lot: 20, Block: 1 Business Park: El Dorado Business Park Meridian, Ada County, Idaho See civil engineering drawings by Toothman-Orton for complete site development inforniation. Site Ran - 0' 5' 10' 20' 30' 1 DATE'. Oct. 27, 2006 STATUS: jj Design: while Pricing: yallm El construction: gmen Revision: blue UCDM ARONTECT' M_1 — ium_ E U) z W z 0 32 > 21-22 E Cl F Z W) M0 41 100 Cn a) E _Ile 0 3: 11(a ty) 0 > ca a) 10 E 0 = 5 % N 41) , R q , T > `0 . M 0. . W Drawl 9 Index I Site Plan and Specs 2 Foundation Plan 3 Floor Plan 4 Roof Framing 181-1— S... 7 Sections Dews HVAC & Electrical EN -1 En.W cal. IL1 . I DRA�N,,(SE AND RRIG 50' l,-'6EtJF3AUCH CA I NA - L . c c c C c c LANDSCAPE SUBMITTAL REQUIVEIVIENTS: CITY OF MERIDIAN ZONING COMPLIANCE StJBWrrAL IFtFlGAMN PERPOWMANICE PMMERIDIANCIWOODES-1-28 =CC= LANDSCAPE NOTES MRIGATION NOTES T?_�kW_ W 'TREE PLANTING* DETAIL 'TREE PLANTING' DETAIL T4 .... . .. .. ,LNT '5HRUB PLANTING" DETAL 'S41OVEL PLANTER EDGE' DETAIL M a MH co) C) 03 SHEff I OF I i C, > 0 0,00 IL 42 'NJ IZZ,-t' Rr "N" H, NMI R c -4A Nql IN M�Eldah 'fv r eridiian,,JD:8�642. io MEMO 77 CL CL < z z a ) LU cc OR C 0 LU LL CL LL a LL z 0 LU z a. L 0 (L < w z LL w OP z (L LLJ LU LU Cc -SP co X (n C/) w 0 cu z 0-) w < < Rr "N" H, NMI R c -4A Nql IN M�Eldah 'fv r eridiian,,JD:8�642. io MEMO 77 1*49 *HD January 10, 2007 TO: Dave Evans Construction 7761 W Riverside Dr, Ste 100 Boise, ID 83714 SUBJECT: MCZC-06-208 Creative Homes Office 2963 E Copper Point Dr Meridian, ID 83642 John S. Franden, President Rebecca W. Arnold, 1st Vice President Sherry R. Huber, 2nd Vice President Dave Bivens, Commissioner Carol A. McKee, Commissioner RECEIVED JAN 19 2007 City of Meridian ck*ClerkOffice In February 2001, the Ada County Highway District Commissioners acted on MCUP-01-037/MPP-01- 020/MPP-05-010 for El Dorado Business Campus. The conditions and requirements also apply to MCZC-06-208. Prior to final approval you will need to submit plans to the ACHD Development Review Department. A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, Chelsee Kucera Planner I Right -of -Way and Development Services CC: Project File City of Meridian Ada County Highway District a J11/7S Adams Street 9 Garden City, ID * 83714 9 PH 208-387-6100 * FX 345-7650 * www.achd.ada.id.us ADA COUNTY HIGHWAY DISTRICT Planning and Development Division Development Application Report Preliminary Plat — Eldorado Business Campus s/w/c Overland Road/Eagle Road 15 -lots MCUPOI-037/MAZOI-018 The application has been referred to ACHD by the City of Meridian for review and comment. The Eldorado Business Campus is a 32 -lot office/commercial subdivision on 85.36 -acres. The applicant is requesting rezone approval from R -I to C-C/C-G, annexation approval, as well as preliminary plat approval for the 85.36 acre subdivision. The site is located at the southwest comer of Overland Road and Eagle Road. This development is estimated to generate 8,262 additional vehicle trips per day based on the submitted traffic impact study. Roads impacted by this development: Overland Road Eagle Road Interstate 84 Facts and Findings: A I ACHD Commission Date — January 16, 2002 — 12:00 noon. General Information - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -- - - -- -- - - - - - - - Owner — Winston Moore Applicant — W.H. Moore Company R- I -Existing zoning (low-density residential) C -CIC -G — Proposed zoning (general commercial) 85.36 - Acres 32 - Proposed building lots 17 -Proposed common lots 4,950 - Total lineal feet of proposed public streets 285 - Traffic Analysis Zone (TAZ) West Ada - Impact Fee Service Area Meridian - Impact Fee Assessment District Eldoradoxmm Page I Overland Road Minor arterial with bike lane designation Traffic count of 13,551 on 11-30-99 (e/o Eagle Road) Traffic count of 11,422 on 11-30-99 (w/o Eagle Road) D -Existing Level of Service Greater than E - Existing plus project build -out Level of Service 1,300 -feet of frontage 50 -feet existing right-of-way (25 -feet from centerline) 54 to 48 -feet required right-of-way from centerline Overland Road is improved with 2 -lanes with no curb, gutter or sidewalk abutting the site. There is a southbound turn lane on Overland Road at the Eagle Road intersection. The Overland/Eagle Road intersection currently operates at a level of service F. Eagle Road Minor arterial with bike lane designation Traffic count of 19,790 on 11-30-99 (n/o Overland Road) Traffic count of 7,498 on 2-2-00 (s/o Overland Road) Traffic count of 44,397 on 10-19-99 (n/o 1-84) C - Existing Level of Service D - Existing plus project build -out Level of Service 2,700 -feet of frontage 50 -feet existing right-of-way (25 -feet from centerline) 52 to 48 -feet required right-of-way from centerline Abutting the site Eagle Road is improved with two travel lanes with no curb, gutter or sidewalk. North of Overland Road Eagle Road widens to 5 -lanes. North of 1-84 Eagle Road is under the jurisdiction of ITD. Interstate 84 Traffic count on 1-84 was not available 0 -feet of frontage Interstate 84 is three lanes eastbound and three lanes westbound. There is an "ON" and "OFF" ramp at Eagle Road. B. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. Eldoradoxnun Page 3 C. The Overland Road / Eagle Road intersection is in the Five Year Work program. With the reconstruction of this intersection, the level of service for Eagle Road, Overland Road and the intersection are anticipated to improve. D. On March 14, 2001, the Commission approved the original Silverstone Corporate Center located directly across from the proposed Eldorado Business Campus. The Silverstone Corporate Center was estimated to generate approximately 9,629 vehicle trips per day. The Eldorado Business Campus is estimated to generate approximately 8,262 vehicle trips per day. On November 7, 200 1, the Commission considered and allowed the Silverstone Corporate Center to have a fourth access point on Eagle Road due to the fact that the Silverstone Corporate Center had an extraordinary circumstance before them. Staff supported a fourth access on Eagle Road because of three key major components: I . The Silverstone Corporate Center did not anticipate ownership of the newly acquired parcel, 2. They placed the access point (a public street) in a safer location than if they had not been approved with this request and 3. The applicant did not request direct access to Eagle Road when a formal application was filed for the newly acquired parcel (Silverstone 11) with the City of Meridian or the District. On January 9, 2002, the Commission formally acted on Silverstone 11, the newly acquired parcel. Silverstone 11 did not request a new access point to Eagle Road. Rather, they subdivided the 7.83 acre site into 3 1 -lot commercial subdivision and took access from the fourth access point that was approved on November 7, 2001. E. The formal application that was submitted to the City of Meridian and the District showed three access points on Eagle Road. Since the District received the formal submittal, the applicant has requested a fourth access point located on Eagle Road approximately 1,150 -feet south of Overland Road. On January 16, 2002, the Commission formally acted on the Eldorado Business Campus and granted the fourth access point to Eagle Road. This access point was proposed to be a driveway located on Eagle Road approximately 1,150 -feet south of Overland Road. The following report reflects the Commissions formal action. F. The applicant hired Earth Tech Traffic Engineering to perform a traffic analysis of this site. The analysis has identified the following conclusions, and this information has been verified by District staff: • The proposed development is projected to generate an average daily traffic (ADT) of 8262 vehicles per day (vpd), of which the PM peak hour traffic (PHT) is 1085 vehicles per hour (vph). • At build -out, the project will add 5,420 vehicles per day to Eagle Road north of the site, of these trips 727 will take the westbound 1-84 ramp, 2,148 will travel eastbound on 1-84, and the remaining 2,545 will continue to the north. An additional 942 vehicles per day will travel south of the site on Eagle Road. The project will also add 1, 182 vehicles per day to Overland Road east ofthe site and 727 vehicles per day on Overland Road west of the site. Eldoradoxnun Page 4 • The intersection of Eagle Road and Overland Road is currently operating at Level Of Service (LOS) F. It will operate at a LOS F under background conditions with or without the site traffic. This Development should be required to participate in improvements to this intersection to bring it up to an acceptable level of service. • The intersection of Eagle Road and the Eastbound and Westbound off ramps of 1-84 will function at an acceptable LOS with the addition of the site traffic. This assumes that the proposed signal in the Eastbound off -ramp is constructed by ITD. • The intersection of Eagle Road and Franklin Road will operate at LOS F with or without the project. Improvements to this intersection will require additional right-of-way and coordination with the other projects. Since the majority of the traffic will be coming from other growth in the area, widening of this intersection should be considered by ACHD and ITD. • The intersection of Overland Road and Meridian Road will operate at LOS F with or without the project. Additional lanes are required to make this intersection operate at an acceptable LOS D. This intersection is within the limits of a proposed project by ACHD. The site traffic should be included in the planning of the ACHD improvement project. • The intersection of Overland Road and Cloverdale Road will operate at LOS E under background traffic. This site traffic will reduce the operation to LOS F. Additional lanes are required to make this intersection operate at an acceptable LOS E. This area will probably see development in the coming years. • The intersection of Eagle Road and Victory Road will operate at LOS D under background traffic. The intersection operation will reduce to LOS F with the addition of site traffic. Adding a southbound left turn lane to this intersection would increase the operation to an acceptable LOS C. • Eagle Road south of the project will operate at an acceptable level of service after build out of the project. The site should contribute right -or -way for future roadway expansion. Since Eagle Road is on a section line, it is assumed that the future roadway will be a five -lane road. • Eagle Road north of the site will operate at an acceptable level of service after build out of the project. • Overland Road west of Eagle Road will operate at an acceptable level of service for a three -lane road. A three -lane road is proposed to be built by ACHD on this section of roadway. • Overland Road east of Eagle Road will operate at a poor level of service after build out of the project. The Silverstone Corporate Center Traffic Impact Study suggests that right-of-way should be dedicated for a five -lane future roadway. • The project should be required to construct a signal at the south main entrance to the site on Eagle Road. • The on-site roadways will operate above LOS C. • The signalized entrance to El Dorado, along Eagle Road, will operate at a LOS C. • The north unsignalized entrance, along Eagle Road, will operate at a LOS E. • The south-unsignalized entrance, along Eagle Road, will operate at a LOS C. • The west unsignalized entrance along Overland Road will operate at a LOS C. • The middle unsignalized entrance, along Overland Road, will operate at a LOS C. • The east unsignalized entrance, along Overland Road, will operate at a LOS B. • The signalized entrance to El Dorado along Eagle Road will operate at a LOS C. Eldoradoxnini Page 5 Pending projects assumed to be built by build -out and included in the analysis. Locust Grove Overpass, and associated projects (RD157, RD157B, F201-01, F201 -01B). These projects are all either unfunded or pending and are not scheduled to begin acquiring R/W until at least 2004 for the overpass. Overland Rd, Eagle Rd/Cloverdale Rd (RD072) — Reconstruct and widen to 5 -lane urban section. (unfunded) Overland Rd, Locust Grove Rd/Eagle Rd (RD266) — 4/5 -lane rural section. (2005) Project not included in the traffic analysis that will affect the impact area. Project RD201-02, on Cloverdale Road between Overland Road and the 1-84 overpass. This project includes widening the overpass to three lanes and will also include intersection work at Cloverdale and Overland that will widen all four approaches to a 5 -lane rural section. This intersection. This project is scheduled to begin in Oct. 2002 and be completed by Summer 2003. G. The applicant should be required to construct a 5 -foot wide detached concrete sidewalk on Eagle Road located 2 -feet within the new right-of-way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of-way, provide an easement for the sidewalk H. The applicant should be required to construct a 5 -foot wide detached concrete sidewalk on Overland Road located 2 -feet within the new right-of-way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of-way, provide an easement for the sidewalk District policy 7204.7.3 states that access points on arterials are based on the following: 4- One access point for less than 150 -feet of frontage Two access points for 150 -600 -feet of frontage Three access points for greater than 600 -feet of frontage. Access points are considered to be both public streets and driveways. Due to the fact that this parcel has approximately 1,300 feet of frontage, they are allowed a maximum of three access points to Overland Road. The applicant is proposing three access points on Overland Road. The access points are proposed to be located in the following locations: The applicant is proposing to construct a drivew on Overland Road approximately 240 -feet west of Eagle Road The applicant is proposing to construct a drive�Kay on Overland Road approximately 550 -feet west of Eagle Road The applicant is proposing to construct a public road on Overland Road approximately 950 -feet west of Eagle Road Eldoradoxmm Page 6 District policy requires driveways on arterial roadways to align or offset a 150 -feet from any existing or proposed street. These Spacing requirements are illustrated in Figure 72-F5. If the driveway is proposed to be located at or near a signalized intersection, the driveway should align or offset a minimum of 440 -feet for a full access driveway or 220 -feet for a right- in/right-out driveway. These spacing requirements are illustrated in Figure 7243. The drivewly that is proposed to be located on Overland Road approximately 240 -feet west of Eagle Road meets District policy as a right-in/right-out driveway only. Because it meets District policy, it should be approved with this application. The drivewgy that is proposed to be located on Overland Road approximately 550 -feet west of Eagle Road meets District policy as a full -access driveway. Because it meets District policy, it should be approved with this application. District policy 7204.11.6 restricts access to collector and arterial roadways. Due to the fact that access is restricted on collector and arterial roadways the applicant should construct the new public streets entering onto the arterial public roadway system to align or offset a minimum number of feet from any existing or proposed street. These spacing requirements are listed on in policy number 7204.11.6 and states, "the optimum spacing for collector intersections along arterials is 1,700 -feet to allow adequate signal spacing. The minimum spacing for collector intersections along arterials is 1,300 -feet." The public roadway access point that is proposed to be located on Overland Road approximately 950 -feet west of Eagle Road is a collector roadway. This specific location does not meet District policy. Earth Tech, the applicants Traffic Engineer, states, and "the internal roadways will adequately handle projected traffic volumes at a LOS C or greater according to the Ada County Roadway Capacity Guidelines. These roads should be constructed to an ACHD standard for a collector road in a business district." Due to the fact that the District approved a similar design on the east side of Eagle Road and the applicants Traffic Engineer feels that a collector roadway is warranted with this development, District staff believes that a modification of policy 7204.11.6 is, both, warranted and justifiable. District policy 7204.7.3 states that access points on arterials are based on the following: -.*- One access point for less than 150 -feet of frontage 4- Two access points for 150 -600 -feet of frontage 4- Three access points for greater than 600 -feet of frontage. Access points are considered to be both public streets and driveways. Due to the fact that this parcel has approximately 1,300 feet of frontage, they are allowed a maximum of three access points to Overland Road. The applicant is proposing four access points on Eagle Road. The access points are proposed to be located in the following locations: Eldoradoxmm Page 7 * The applicant is proposing to construct a public roadwgy on Eagle Road approximately 700 -feet south of Overland Road 4 The applicant is proposing to construct a drivew4y located on Eagle Road approximately 1,150 -feet south of Overland Road. 4 The applicant is proposing to construct a public roadwgy on Eagle Road approximately 1,700 -feet south of Overland Road * The applicant is proposing to construct a public roadwgy on Eagle Road approximately 2,400 -feet south of Overland Road District policy 7204.11.6 restricts access to collector and arterial roadways. Due to the fact that access is restricted on collector and arterial roadways the applicant should construct the new public streets entering onto the arterial public roadway system to align or offset a minimum number of feet from any existing or proposed street. These spacing requirements are listed on in policy number 7204.11.6. The public roadw access point that is proposed to be located on Eagle Road approximately 700 -feet south of Overland Road is a collector roadway. This specific location does not meet District policy. Earth Tech, the applicants Traffic Engineer, states, "the internal roadways will adequately handle projected traffic volumes at a LOS C or greater according to the Ada County Roadway Capacity Guidelines. These roads should be constructed to an ACHD standard for a collector road in a business district." Due to the fact that the District approved a similar design on the east side of Eagle Road and the applicants Traffic Engineer feels that a collector roadway is warranted with this development, District staff believes that a modification of policy 7204.11.6 is, both, warranted andjustiflable. The driveway that is proposed to be located on Eagle Road approximately 1, 1 50 -feet south of Overland Road was approved as a modification of policy by the District Commission on January 16, 2002. The public roadway hat is proposed to be located on Eagle Road approximately 1,700 -feet south of Overland Road meets District policy. Because it meets District policy, it should be approved with this application. The public roadw access point that is proposed to be located on Eagle Road approximately 2,400 -feet south of Overland Road is a collector roadway. This specific location meets District policy and should be approved with this application. K. The applicant is proposing to construct a spine road through the site with connections at Overland Road and Eagle Road. This roadway (Copper Point Way) is proposed to align with the roadway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicant's proposed site plan, the applicant should construct this roadway as a 46 -foot street section with curbs, gutters and sidewalks. The street should be constructed within 70 -feet Eldoradoxnun Page 8 of right-of-way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. The proposed roadway on Eagle Road located approximately 1,700 -feet south of Overland Road is proposed to align with the roadway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicants proposed site plan, the applicant should construct this roadway as a 46 -foot street section with curbs, gutters and sidewalks. The street should be constructed within 70 -feet of right-of-way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. M. The proposed roadway on Eagle Road located approximately 700 -feet south of Overland Road is proposed to offset a driveway that was approved with the Silverstone Corporate Center. Due to the volumes of traffic this development is expected to generate, the recommendation of the applicants Traffic Engineer, and the applicants proposed site plan, the applicant should construct this roadway as a 46 -foot street section with curbs, gutters and sidewalks. The street should be constructed within 70 -feet of right-of-way. Parking should be restricted on the proposed street, and the applicant should submit a signage plan prior to final plat approval. N. The Silverstone Corporate Center has a comparable impact on the public roadway system. The Silverstone Corporate Center was required to construct center turn lanes on Eagle Road and Overland Road. To promote consistency and mitigate traffic in the area, the applicant should be required to construct center turn lanes on Overland Road and Eagle Road for the proposed public street intersections and for full access driveways. 0. The applicant's site plan indicates a traffic signal on Eagle Road located approximately 1/3 -mile south of Overland Road. According to the submitted traffic study that was submitted by the Eldorado Business Campus' and the Silverstone Corporate Center's traffic impact studies, at full build -out, the projects should be required to construct the signal, and the necessary site improvements associated with the signal. The Eldorado Business Campus' traffic impact study specifically addresses the proposed signalized intersection and states that the Eldorado Business Campus should construct a left turn bay at the main entrance on Eagle Road. Based on ACHD Commission action, traffic signals cannot be installed at these intersections until there is a warrant. The applicant's traffic engineer should work with ACHD Traffic Services staff to determine when the warrant is met, or is close to being met. The developer should be financially responsible for the cost of one-half of the signal due to the fact that the Silverstone Corporate Center was required to contribute the half of the signal. This applicant should enter into a three way written agreement with the District for the cost and specific location of the traffic signal. The applicant is proposing to construct several landscape islands throughout the site. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat should Eldoradoxnirn Page 9 be owned and maintained by a homeowners association. Notes of this should be required on the final plat. Q. The applicant is proposing to construct a stub street to the west property line. District staff recommends that a stub street be constructed to the west property line to provide connectivity throughout the area. District policy requires temporary turnarounds at the end of stub streets that serve more than one lot, or are greater than 150 -feet in length. The applicant should be required to provide a paved temporary turnaround at the west end of the stub street with a temporary easement provided to the District. The applicant should be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround (if necessary) with District staff. R. The turnarounds should be constructed to provide a minimum turning radius of 55 -feet. S. Any existing irrigation facilities should be relocated outside of the right-of-way. T. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. U. If utility relocation is necessary to construct improvements required with this development, then all utility relocation costs associated with improving street frontages abutting the site should be borne by the developer. V. ACHD's Park & Ride Division Staff have indicated the need for a park and ride location at the applicant's site. The District requests that applicant grant the District an easement for a 10 to 12 - space Park & Ride area at this site. Commuteride staff will contact the applicant to coordinate the location of the Park & Ride area. W. In order to reduce trips to and from this development it is recommended that Tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Pat Nelson at 387-6160. X. In order to reduce trips to and from this development, it is recommended that the tenants occupying the proposed building(s) be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. A Transportation Management Association (TMA) or Transportation Management Organization (TMO) is formed with a coordinator that works as a liaison between businesses and private and public transportation providers to increase the use of alternative transportation and other trip reduction measures (shuttle buses, bus pass programs, vanpools, carpools, bicycle and walking Eldoradoxnun Page 10 enhancements). An annual survey will be required of the TMA/TMO to monitor participation in alternative transportation programs and forwarded to the ACHD Commuteride Office. Y. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will not be adequate to accommodate additional traffic generated by this proposed development at accepted levels of service without modificationsto Eagle Road and Overland Road, and the intersection. Special Recommendation to City of Meridian: I In order to reduce trips to and from this development it is recommended that tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Ms. Pat Nelson at 387-6160. 2. In order to reduce trips to and from this development, the tenants occupying the proposed building(s) should be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. 3. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. 4. Based on development patterns in this area and the resulting traffic generation, staff anticipates that the transportation system will not be adequate to accommodate additional traffic generated by this proposed development at accepted levels of service without modifications to Eagle Road and Overland Road, and the intersection. The following Site Specific Requirements and Standard Requirements must be met or provided for prior to ACHD approval of the final plat: Site Specific Requirements: Dedicate 54 to 48 -feet of right-of-way from the centerline of Overland Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way. The applicant shall coordinate the dedication of right-of-way on Overland Road with District staff. Eldoradoxtnrn Page I I 2. Dedicate 52 to 48 -feet of right-of-way from the centerline of Eagle Road abutting the parcel by means of recordation of a final subdivision plat or execution of a warranty deed prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way. The applicant shall coordinate the dedication of right-of-way on Eagle Road with District staff. 3. Construct a 5 -foot wide detached concrete sidewalk on Eagle Road located 2 -feet within the new right-of-way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of-way, provide an easement for the sidewalk 4. Construct a 5 -foot wide detached concrete sidewalk on Overland Road located 2 -feet within the new right-of-way. Coordinate the location and elevation of the sidewalk with District staff. If the sidewalk meanders outside of the right-of-way, provide an easement for the sidewalk 5. Construct the proposed drivewgy on Overland Road approximately 240 -feet west of Eagle Road. This driveway meets District policy as a right-in/right-out driveway only and is approved with this application. The applicant shall coordinate with the Districts Traffic Services Division to determine a mean to restrict this driveway to a right-in/right-out driveway only (ie raised median, internal island, etc.). 6. Construct the proposed driveway on Overland Road approximately 550 -feet west of Eagle Road as a full -access driveway. This driveway meets District policy and is approved with this application. 7. Construct the proposed public roadwgy access point located on Overland Road approximately 950 -feet west of Eagle Road is a collector roadway. This location is granted a modification of policy and is approved with this application. 8. Construct the proposed public roadw4y on Eagle Road approximately 700 -feet south of Overland Road as a full -access roadway. This roadway meets District policy and is approved with this application. 9. Construct the proposed driveway on Eagle Road located approximately 1, 150 -feet south of Overland Road. This driveway was granted as a modification of policy by the District's Commission on January 16, 2002. 10. Construct the proposed public roadway on Eagle Road approximately 1,700 -feet south of Overland Road. This roadway meets District policy and is approved with this application. 11. Construct the proposed public roadway on Eagle Road approximately 2,400 -feet south of Overland Road as a full access roadway. This roadway meets District policy and is approved with this application. Eldoradoxmm Page 12 12. Construct the proposed spine road with connections at Overland Road and Eagle Road, as proposed. This roadway shall be constructed as a 46 -foot street section with curbs, gutters and sidewalks within 70 -feet of right-of-way, as proposed. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 13. Construct the proposed roadway on Eagle Road located approximately 1,700 -feet south of Overland Road to align with the roadway that was approved with the Silverstone Corporate Center. This roadway shall be constructed as a 46 -foot street section with curbs, gutters and sidewalks within 70 -feet of right-of-way. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 14. Construct the proposed roadway on Eagle Road located approximately 700 -feet south of Overland Road is proposed to offset a driveway that was approved with the Silverstone Corporate Center. This roadway shall be constructed as a 46 -foot street section with curbs, gutters and sidewalks within 70 -feet of right-of-way. Parking shall be restricted on the proposed street, and the applicant shall submit a signage plan prior to final plat approval. 15. Construct center turn lanes on Overland Road and Eagle Road for the proposed public street intersections and for all of the full access driveways. 16. Construct a left turn bay at the main entrance on Eagle Road. 17. Enter into a three way written agreement with the District for the cost and specific location of the traffic signal on Eagle Road. 18. Any proposed landscape islands/medians within the public right-of-way dedicated by this plat shall be owned and maintained by a homeowners association. Notes of this shall be required on the final plat. 19. Construct a stub street to the west property line. The applicant has proposed that the stub street be located approximately 450 feet north of the south property line. Staff is supportive of this location or any location that is located south of the proposed Lot 11. The applicant shall construct the stub street and provide a paved temporary turnaround at the west end of the stub street with a temporary easement provided to the District. The applicant shall be required to install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". Coordinate the sign plan for the stub street, and the design of the turnaround (if necessary) with District staff. 20. The turnarounds shall be constructed to provide a minimum turning radius of 55 -feet. 21. Any existing iff igation facilities shall be relocated outside of the right-of-way. Eldoradoxffun Page 13 22. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 23. If utility relocation is necessary to construct improvements required with this development, then all utility relocation costs associated with improving street frontages abutting the site shall be bome by the developer 24. Other than the access points specifically approved with this application, direct lot or parcel access to Eagle Road and Overland Road is prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. Standard Requirements: A request for modification, variance or waiver of any requirement or policy outlined herein shall be made in writing to the ACHD Planning and Development Supervisor. The request shall specifically identif y each reguirement to be reconsidered and include a written explanation of Ahy such a Leguirement would result in a substantial hardship or inegui1y. The written request shall be submitted to the District no later than 9:00 a.m. on the dgy scheduled for ACHD Commission action. Those items shall be rescheduled for discussion with the Commission on the next available meeting agenda. Requests submitted to the District after 9:00 a.m. on the day scheduled for Commission action do not provide sufficient time for District staff to remove the item from the consent agenda and report to the Commission regarding the requested modification, variance or waiver. Those items will be acted on by the Commission unless removed from the agenda by the Commission. After ACHD Commission action, any request for reconsideration of the Commission's action shall be made in writing to the Planning and Development Supervisor within six days of the action and shall include a minimum fee of $110.00. The request for reconsideration shall specifically identify each requirement to be reconsidered and include written documentation of data that was not available to the Commission at the time of its original decision. The request for reconsideration will be heard by the District Commission at the next regular meeting of the Commission. If the Commission agrees to reconsider the action, the applicant will be notified of the date and time of the Commission meeting at which the reconsideration will be heard. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance # 193, also known as Ada County Highway District Road Impact Fee Ordinance. 4. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. Eldoradoxmni Page 14 5. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 6. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 9. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. Conclusion of Law: ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Should you have any questions or comments, please contact the Planning and Development Division at 387-6170. Submitted by: Commission Action: Planning and Development Staff Eldoradoxmm Page 15 CERTIFICATE OF ZONING COMPLIANCE* Date: December 18,2006 Project Naine/Number: Creative Homes by Design — CZC-06-208 Owner: Dave Evans Construction Site Address: 2963 E. Copper Point Drive Proposed Use: 4,292 square -foot office building Comments: Conditions of Approval7 Project is subject to all current City of Meridian ordinances and the conditions of approval for Bonito Subdivision No. 3. The issuance of this permit does not release the applicant from any requirements of the approved Annexation and Zoning (AZ -01-018), Conditional Use (CUP -01-037), Preliminary Plat (PP -0 1 -020 and PP -05-01 0), Final Plat (FP -05-03 8), as well as any Development Agreements recorded for this site. NOTE: Thiv & not a. Ruildina Pprm;y LandscWing: The Landscape Plan prepared by Toothman-Orton Engineering Company, and dated November 2006, labeled Sheet I of 1, is approved (stamped "Approved" on December 18,2006 by the Meridian Planning Department) with the following changes: Show the existing landscaping in the interior parking lot planter on the north side of the building, adjacent to the trash enclosure, and adjacent to the compact parking (see redlines) and submit a revised copy to the Planning Department. The approved landscape plan is not to be altered without prior written approval of the Planning Department. No field changes to landscape plan permitted; prior written approval of all material changes is required. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The certificate of completion shall verify that all landscape improvements, including plant materials and sprinkler systems, are in substantial compliance with the approved landscape plan. Site Plan: The Site Plan prepared by Dave Evans Construction, on October 27, 2006, labeled Page 1, is approved (stamped "Approved" on December 18, 2006 by the Meridian Planning Department) with the following changes: 1.) Per UDC 11 -3C -6G, one (1) bicycle parking space shall be provided for every twenty -rive (25) vehicle parking spaces. Install a one (1) park bike rack as close as possible to the building entrance (see redlines). The approved site plan is not to be altered without prior written approval of the Planning Department. Elevations: The Elevations prepared by Dave Evans Construction, labeled page 5 -6, dated October 27, 2006 are approved with no changes from the Planning Department. Irrigatio : An underground, pressurized irrigation system must be installed to all landscape areas per the Qn 6 6-5: I ." )K - 'I vv L2 I 99Z 31�� s zo w q IN Yjp L 91 fU 6-5: I ." )K - 'I vv 0 (5 —o HE 8 R R z !:p -&�' AR9 -E'W AMY 9p -- e I a, Re q Mit. 01 A MR1 NIM1,11 11 t 1 9 F i I i "Rol, .4, 9 n Rig IWO 194,p-. 9 w pi 9�� a�AW Mg No 512, On gz d- N,31H Mil A Yi w q IN L 91 fU 2. 0 (5 —o HE 8 R R z !:p -&�' AR9 -E'W AMY 9p -- e I a, Re q Mit. 01 A MR1 NIM1,11 11 t 1 9 F i I i "Rol, .4, 9 n Rig IWO 194,p-. 9 w pi 9�� a�AW Mg No 512, On gz d- N,31H Mil A Yi tho Aliaumpuour�m :aj!sqaAX - t989-888 (80Z) :oPulls"A - CM -M (ROZ) :OuOqd uga oqvpl U'31pljaw 0 ZOZ oPnS 13UH-1 lomovolum a 099 :PaIOU asimjoLpo ssolun Suimolloj oqljo Sdoo mo- uiLluoz) ol pojinbw an suolipagddu [IV mid ay upe ai ujjg WAIqq jo/puu uosiad otp PUB jodojQAQP 3qjj0 sj;)qmnu auoqdojoj ptue'sossoippu IsmieN e 777777���� auivu joaloid puu 'Atom 1piou 'Djuas IQ)vCj a muld adu3spuul aqj uo papnjaui aq )snm stua�jau.imojjcj aqjL N)adqs djow do OAV uo Eaull qojnw ainydoiddv y1m umodp aq 1911W IdoqS al2u!s v uo d)ajtlua gli ui umnip aq joitum qo!qm upId V (poddafaid si , 9E x, p,7),,Rpx,,qfpoao,,o ou q. )/ '100 vffinmvp pjvpuv)yPuoaqpuv (padjqfajdn,0,, =,,[),O�, =,,[ ijvqjjo11vwSoudIvjNv9AvqINIIw UDId x,,z/, 8 01 poploj) s3idoo E —uvjdgdLospuv-j 8) uvjdoj!9 aqIjo uoijonpmd JOIJISI Uluoz P s3louqi3s (u bs) oz[s jo-I (,U bs),jz[S ftppg (silvisjoudmoDW deoipuuqAj!o3ds) PQP!Aoid W paiinboi 9[[t:ls �iupjjndjo loquinm :2uTmoj[cj aqj 2tuploui algi suoiMnoleD pug posodoi ('supsm d)TuToUaj k iol uo OuT -1 pl!nq poiuduiuju U01jujo (2u!jS!xo pus 0,-,) 1 mq)t �10 llilvm� P�S�L @pis (Aliodoid loofqn-- -- S 01 ISIND S)qFIJ 10)RM OU AO�T�. JI �PoATM oq,�Iuo uma uoilegui.1 PDZTjnss�d) uo[ vfj[ i puncuiliopun joj suoi nagpods uoi -I PUB (sop's f uopauowosoqjsnw) oinsopua, qsLjnjo pla uoilrool (spinsoloua qsujj, gal !V QAIlP PUB S11131S U11jej UPI Oqj Ulm aj aug Jo/PUL UoSjQd aqj PUB jodoJOA3P oqljo sjoqtunu ouoqdajOj put, 'SOSSQJPPL 'SOIULN 0 —(,og-.,f uRqj SS31 IOU oluos) alum 10310id PUB moln t[jJoU,QjrOS ajua a uld ails a u i uo umoqs aq isntuux s uimolloj aqjL (azis ,f I x ,Z/, 8 01 POP10i) Soidoo t--unld @ITS 0099-868 UQJQIE[ R13!lL o3s) sjjoM oilqnd uioij ioliol uoi .1BOUTJOA SS (,IIx,,t/i8)tqqITAkso!j)Wodoj oqjjvqjjejcIpapjooajoqjj TO 6— (I I -Vc-j I o(in oasTojm a jo Sumint OOS'l jo Indino tunmixetu v qj!m (s)ojn)xg jqf!l fun Jcj liodal Isal oulaulojoi d w (URId 011S p3dWuls) jP OAT SsOjou W ginsolow qseil loj P?Aojddr AUPCItUoD 3O­TAI-0S—X—Mj—IU13S —,A qns gip jo uoi L3oj oqj Aj!UIOIA P31LO 'S (juaRu PM!1041nu m s! 2u JO S013113V 01PJ0 Aa03 v iiwqiis f 4 uoymodio3 uST JQU�O JI) JQUMOApodoid oql Xq Pawl jou W pau2t S 193104[q IL23'j JO I!AePIJJV O'd luemuvw�Ou ju is�uuHjo suo!j!puoa o1quw1dan - 3 T) Agid/ut 3sn palsanboi oqj joj sluotucuinbai jo SIBAcuddu snol uc, uoijLuuojul Buipnioui 'Xiiadoid :2u[[Aolloj 3qj ailljo 3sn posodoid oql gui 11JLfq qposap Xjjnj DAITt opt D u o!lddV MOIAO-j 3AUUljSIU­TUlPV—p-3U­ffjS W �Pojaj uj�o —�A di 17 -dd jM!I - w :PaIOU asimjoLpo ssolun Suimolloj oqljo Sdoo mo- uiLluoz) ol pojinbw an suolipagddu [IV jsij3jooqD uoiII3oijddV HDNVI'IJWOD DNIMOZ A0 3IVDjAjjW9D juatupuda(I Numunij 01 v I �W-A,3 WAIqq :)UO B/JUPOT V 777777���� :niuru joa old jsij3jooqD uoiII3oijddV HDNVI'IJWOD DNIMOZ A0 3IVDjAjjW9D juatupuda(I Numunij 01 v I r,Amo�kal (9011,16 199) SJO-AIPURIPpaw-Av" :a4pqaM . P989-888 (80z) :011MISORA . ff5g-V88 (80z) :Ouoqd DIM OqBPI 'uR,P!JOW - zoz aj!nS lauel jamolialuM -a 099 VOILvnyogjvl allyifl&vu T7v(lJAl_9DyysvHJ'9VLs7llmll 91,77MOD (mmisjvm aglOAT 77VHSVOlLVJI7ddVElHL Pinduadq dADY EdOOOM1009-mlinpun suDjddnodpa(iojddv svq alDVIgunpallss' aq loull!m l!lujad2Wpl!nq dnOA puidad2utplpiq Pfo aounng! aqj ol daidd IL'"ddd" do fodnD aqi oipauyaqns aq llvqy uvldal!smdu D -fl"aUydPd"(T -7uluOZ T 2u'uuvld uPJPd9H 'slualuadInhad alljV aq) a;vpotmwojov ol unlda;!s aqj ol apvla aq gnta sq��uvqa fuvfj 'puuad2Ripj!nq nfo aoumsq aqj o)df�iddp!vdaq llnqs 'dunf! 'Y9dfjjvdwz 11V 'uOymyIddr s�lyloiRividad,faqisvaHoVfog)uaivai.iiihadoq)2kl)aatu.iofalq!suodso.ioqllvqsluDdilddV: 90"Vid'aaaVaHiv 0 Idau �_IOTJPL kAlUUU ARM S9DJ PQOIIPDJ'LMICI OITS It UO ILA 111 Po �Ojs" J� 0 159-M JOU TSl[j33q3 121110111JIUCHIS Aj!If3Ld looqoS ot Xq pajunboi se tum Iqnd 3ql .)13UUOJUI 113UOIIIPPL '0p!AoUl'Iooqos oilqnd ujo ILIAOJddl3 JOj 2fUj,(IddpjI -77 T�i SIR[ JawluuoionqSUO3 UlMOqSSUO1jUA_lIoButpj!nq [TOFLOSPUPI ggi jo Uolimpax p3AOU131 Z[uT.aq soqoui jodilL P n jo nquinu Out njout ls3ail gul s[ xTut s3joods ooil put, so3li jo jaqwnu ptiol Rlu 2uiduospuullLLualu[LP!AktlojLOui djoluoojodpursile)sSupfiLdjoiaqLunm (a[quoilddej!) 93sn PULI luc)jojj!p wamloq top!m jajjng duls oft ospuul lalauniod jol &iWedjo qlp!M t X iA-jo-jq2!jjo OATSnioxo) sjojjiiq po.qsjo qlp!M 02"1"04 1001)SJO 103J IROull Pup s331) imisjo joquinN lulpt-ijour 'ODU13ul 0 ST jo SJUOLUOlutbai P .111 oql tp!m a3upildwoo 0113jisuourap ol quouodutoo joafouljo suctilulnoleD sasodi��u�uluoojosiojp3soaojctzulouojl[13JO(S)2u.mlpU I Q(I 'spippums pwinboj 1113 ql!AA gourmoittoo oinsua ol Ansswau se sI!qQp UOT Ilulsu[ pup 2jul' Puld -(3jLUaojc1desl3Uo!jvJIqSUf PUB' tu is' U131? s 10j) SjugunuoO PUS '(III Jo 11 '1) ssulo Oall 'JaUlLIU03 Pug QzTs i?uilau[d tunuamall . 3WLuuoultuoo'3LUEuleoiutlloq',�l!luianb'[oqujXslueldoqjsmoqs . 1131P 1911 juit[d V ons ainpun 3ptutaxoitift loOL40i [Igqs SILI DIEW ]URI 10JUMOtISOILOS M� SJOA00PUnOJ2 pop csqnrqs 'sz)Ojl 2u,pniom'smid p3sodoid I[v joj sloqu[ pup uoilLool plu SIT JO 5 3011THE U! p -sanoluoa looj-ouo qjjm umoqs c)q lluqs snuoEl odols %OZ myndools sulau lip jqj sxno)uoo p3sodoid put Suqsixg -Sup)wQI3 OpuUT-UHM J3qjO Put, 31111�wllj joails -Suals -sean U01luolap IOIRMUUOJS . 'sAvAkqjLd ls)HLm3p!s,sLaju qsLjl 'S@Alip julnol A 'SUOIL Sol Vol pUL ZUI .110 p Pliud stunq'somaj IsIlLm 's3lodiamod's3lod I 'Sem 2ulluL q2hl ld 'sainjonils Rut sag uu!ljlljlsuoo aminp, mump luoij P01331 oq 1[!m pouploi oq ol pasodoid sawl Xyleaq 2upsm moqjo luotuolL, PoAuwoj -to pouilli3i aq Ipm ow) 3111 10WOk Owaipul punojil aql OAoqL soilow 9 poinsLaut liolownip ul jalLolo . . 10 saqoui I, s3junjj ql!m o)!s uo, soo�n ft S[ a I[BJ0 smads putt'oz [s,u oi 000-I .1 X .1 muiddonino laol PUL 'SL31P Jolumputton qZlq'sUiujdpooIj ISPULIJOM SpUod,SUlbxp slam SptURO se qons saMroj Iv'jMuu'2?ui slxg