Loading...
New City Hall Update for October 2008IV\\=�mmv�mWAL t 7- t COUNCIL HISTORICAL NIiIAL POINT GN OISOCIETY I, SUITE 100 MAYOR'S OFFICE v 1 :lo (DING DEPARTMENT SUITE 102 MAYOR�'Y Y CLERK'S OFFICE SUITE 104 CITY COUNCIL OI LITY BILLING SUITE 106 COU E 14 LANCE DEPARTMENT SUITE 106 COUNCItMEA )NFERENCE ROOM SUITE 108 COUNCILMEMI )NFERENCE ROOM SUITE 110 COUNCIIMEW ECONOMIC DEVE ERIDIAN IDAHO C�lVfIEN DIAN Meridian City Hall Monthly Report October, 2008 Table of Contents: Section 1 Executive Summary Section 2 Schedule Section 3 LEED Section 4 Financial Section 5 ASI's Section 6 RFI's Section 7 Submittals Section 8 Photos EXECUTIVE SUMMARY SCHEDULE: o Current Estimated Completion: October 15, 2008 o The work on the building interior finishes is substantially complete. The Punch List inspections have been completed and punchlist work is in progress. o The Test and Balance work is substantially complete. Commissioning activities are proceeding with Heery ready to start the functional testing. The air flush for the LEED accreditation will take place in early October. o Work on the Plaza is proceeding, the majority of the site concrete has been poured, the masonry work is complete, pavers and landscape materials are being installed. The Heritage building structure and skin is substantially complete with the finishes in progress. o On the East Parking Lot the contaminated soil found beneath the old gas station has been removed and the mass excavation is proceeding. LEED: ' o Project is scheduled for Silver LEED's accreditation. o Targeted points are 35-36 points out of a range of 33-38 for Silver. FINANCIAL: o The project budget remains unchanged at $20.42 million; this does not include the Phase V East Parking Lot which is currently budgeted at $286 thousand. o Phase II, and III, the building phases, are 99.6% billed to date. o Phase IV, the Plaza, is 85% billed to date. o There were no change orders approved in September. 21 proposed change orders are pending action by the City, 7 by LCA, and 1 by the Contractors. ASI'S & PR'S: o There is a total of 145 ASI's and 2 PR's issued to date. RFI'S: ' o There is a total of 222 RFI's to date; 3 are active and 219 are closed. ' SUMBITTALS: o There are a total of 254 submittals to date; 4 are active and 250 are approved. LL .. .... -.- ...... . — . .. . .... ................................ ........................... .............. ................ .. 0 Z c 0 . Z 0 .............. ........... ...................... . ...... .................. 0 0 — . 0 .......................................................................... ................................................................................................... .................................. . . us ..... 0 0— . .. . ................ ... .... . ... ......................... .................................................................................................................. .................... R cn 0 . ................................................................................................................................................................................................. cnLL CC . ....................................................................................................................................... .............................................................. cc U, W . .................. ............................................................................................................ w ............... U) ....................... ................ ........ ....................... ......... ............................... ............................ D 0 0 ................ r . ........... .............................. M: C" z ME ............................. ........................... ... ..................................................................... ........................ ....... ..... - .................... ........ . z 0 T 0 0 'o a U) 0 ................................................................................................ OR A ................. ............................. ZCO ........... ------ .... ............................................................................................ ........ .. ....... .................. ............................... cr a. 4 O 0 LL L (a w ac a W 0 Ir 4 ...................................................................................... X.0 ...... .... .................................. - ........ LLI Lu W CL U)LU 4 >. w . ........................................................................... . ..... .... ------- cQ~ 0 . .......................... ........ ................... ........ ...... .. ............... ........................ ......... .................... ........................................................ z T 0 ........................... ... ....................... ja ..... ....... :Z) . ......... .......... --------- ui u ............................ Ir ............... ............................................... g g g 2 g g g g g ig a g mc CNC rn aLL 2 cn CO mo U) 3 0 D V m O W M 0 m 0 0 0 w N 0 m w N Z cr UM, z > Iz L.0 z Z L W 0 Lj U) L) Z I C'o z oz zo Lw, La >- LW cc Cc,,)) 0 OZ 0 0 H¢ a x L Q z "n U') W, 0' 0 0 z 0 0 w U) 5 LL u 0 m x x < 0 z L) cr LLI ) 2 0 z § o w d w I Z W � < a= 0 < , 0 (L > W x w 0 3� w w 8 (n x S2 D Z :3 0 z w D w S2 cr I z 0 0 0 0 0 0 W 0 < w < x Lzo > 0 0 X D > > 2 2 , w 0 X < 3. L) LU < a M w Z a 'n LU ir Zi w - w 3: 0 w p - — a: L) > W 0 x >- 0 -j W 0 z O L) cn U) U) z w 0 W X w x X w co w m w x � � w D < x z < < w w a L) Lr 0 x w x 0 w w m U) W w to 0. < 0 I— IN I- I- I- I- I- I- I- 1O 17 1N 1f 1 I -I J.-2 e 11 1�: I�e 1�� N I I& N I N I N I N I N I N I N I m 11;; IN I- Iz; 1- 18 1 --TA 1A I- k IN W CL a 9 N O U W LU 00 O L N N CC) .0 LL j m 0 Li a c co 0 0 m rn j N N Z Q 0 LU 3 z N c7 Z ¢ w rn w LW N w cn Q ¢ a LU Y W Q Lr U>LL W Q a a o a U N CL O w a J a C a r LL W Q N Za Za V N U J Z (7 Lu a W ■ W CL Q U LU W Q F- cn Q 3 0 Q 0 ccto Li fn W Y J Q O J = w Z o UJ O W W U W w W Z H H — in to W Q Z m W Q J J d Q (~j w acn J U C7 W -j ?: V z Q W LU Z a Q a W a d a Q F- Z in Q Z Z H m d U Z J cc o N LU m 1. Q > > _ �- cn a fr O o 0 0 o O O o O O f� L� a0 M N m N m w w � - 7 7 7 - m O m O O LL LL O N 0 7 N 0 0 0 0 o 0 0 0 0 0 OD C V V t[Y 00 N V � N OD OD 00 OD aD r r r N C C C d '- O O O 00 C O O O 7 LL N 7 7 7 F- F- F- aaaaaaaaaa LO -It V 7 V N N Ln 'IT Ln W 0 c7 w z T) ui CE z co w cn w Y O_ F- ~ U > Li ¢cn ¢ W ¢ 0 J ¢ W Q 0-j O W W 0 w ¢ LL LL w d fn w W Q CLW C7 z z ¢ w O ¢ ¢ F z ¢ w ¢ z� z 0 0 0 ¢ -i -i ¢ ¢ M LL LL J LL LL a. J Z J 00 a LL 00 0 00 L F- N ca a N N a U W O O m W 00 O 00 00 a0 00 W OD 00 00 OD a0 O aD O O O O O O O O O O O O O O O Oo7 OD N N I� r C7 L:n N r O r r N N N N r r 7 co - Oo Oo 00 �3 00 W w C a - m O L 7 LL C 7 C '- '- C a O O LL 7 '= r- 0 F 0 LL LL 0 0 LL 00 00 00 00 m 0o 0o m 0 co 00 co 00 0o 00 0 0 o o o 0 0 o o o 0 o o o o a m 1 N� T r � r r r r N N N m m 7 00 .- .- 00 OD 00 m m m 00 N 7 c C L C LLLLN '- N O C N d 7 L ~ m LL a M -0 0 0 N M M a M M m M M M r a r a -O a a a r a a s a a a I;r N co N V' V N LO N N C Ln w L Q . U i W Cr W J cn FW- U W W Q F mCL � O o m-1 w 0 w F- 0 Z LU UJ L j c F- 0 0 Z ¢ J J F- ¢ (n C7 cn co w 0 d W U fL `l U z (n 5 U Z ~ w J ¢ J W Q :rQ d d > Z_ U UJ ¢ W Cr JO d W 0 C LL W� O z c O Q U Fn Q J U j O O LL U w F p a Q a o m a m 5 Z a 0¢ a O Z �a o o��'11>\\\\\\\\>� 0 r N C7 LP O OD O) O r N M V �t2 �12 ��: 0o O' ON r N N N N N N N N N M M a� c � o c m ca m a 7a c c c - a� a) m X SC N W W 0 z co r E E m N � LL Cca B E v a� E o � d d 0 Fi°- cn LL 0 0 Z O OLL W Q OJ O LL 2 Z m wa a O LLI o Q LL ¢ 3 N w o Q r J O 13CW Z � Q U Z J Q Z OU ti w Q _ U a w Q a W w v a EL M V U Z O 0 O 0 ¢ a r r a n 5 0 w O o LL w Z x 0 Z w Q 3 a z Cl) J p x Cl) cc> Q= w > LL E j Y 2 w v ? J Q Z LL W Q LL U Z w Q cn G J p a W v 2 V � U Z a � 3 a 3 m>> wCL— � m r> cn m Z °C m w Z °� LL T 0 Q z o r¢ w O C7 Q Z P a N Q Q x CL x J O- Q o LL 2 a w- J O J Q r W Q LL i Q Q LL (� fQ.. N aC 2 w L¢i O X 0 W O O � N Z_ r Z g N Z W J Q a� LL p W W O > > m U) cn U H cm 3V Q c c - d c X W X W O 0 mm O O w O w O w O w O w O w O w O m w m w w w w m O w O w O w O w O w O w O w O w O w O w O w O O O O O O O O N w "O OD a0 00 00 00 00 00 m W W 3 W M M -O m m C 7 7 N O 3 O N N C N m 'O 7 7 C 'O "O C m '- 7 M) "o L C 7 "C7 N 3 ' U` r 30 ~ LL E r r r r E g r" �- � r ca N w w m m m m w m m m m w m w w m m w m m m w w w m w w w E a' Q O O O o 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 E CO C� s M Ln w N N w N N N �, m U)CL co M ap m m w w T N N N N N N � C22 CQ Cn w C .- .- U "O 3 3 00 OD dD m m 00 00 m � .- r- n � O .- w w w w r0 E U 3 L 3 L LL LL N Q) L r L r N 3 m 3 7 L '- LL 3 L N 3 N 3 C O m 3 '- LL LL 3 L 3 L 3 L 3 �- LL '- LL 7 L .- LL .- LL Cn �_ E a) O r r F- r r r r r g r r r r r U N >. N >.>, N cA N + CA T m N w T C n Tm T T m T ro Cn T cn T (n TTTT N N N En T>.T A N CI. T - C ro m ommmomomro *= 'o -0 -o a -o -o r a -0 -D -o r -o -o a -0 -o a -o v a o 0 m co M I- N 0 M N N O CO LO O It LA M D W W c Ljcn r W =) H Z � O z LWL Q OU w 0 r W ¢ z m y O ¢ Z � J W < y cn 'Q Z CS ¢ Q Z J z Cn J cn ca '- cn O CL W m Z } CO Q LL ? = Z z O z H 2 W J D J 2 (n W U W F- U C¢) Q O 0 a W U W W Z J O D O I- W ~ r z 0 O Y Z z U = O cr LL LL ¢ LL W ¢ Q D Q W= W ¢ U) w j w� Z ca Z= Q Z_ 2 cn W w D LL co a) W cr Q 0ca CL ZLL OQ LL U d Z W Q Q Q Z W O W J O O LL 2 O LL> w a J o ro Q Z F� W LL O Ci W LL m C3 J W Q ¢ F ¢ 0¢ LL Y r 2 J O 1- } � O r r O W F- W Z _ U (n O _ c N Q W Er F- ¢ Z U a W J= U75 r Z Z Z d Q H 2 U w z w cwi) z z a- 2 LLL 0 m U 4 W W U m Q F- m X d - L vm Un 0 N N �o \>\>\>\>i»»\>»� o o »»i » ao U LL R99 LA m r� w 0) O N M Ln w I� m O OF d Ln w n w m O N OM M M M M � � � � � 't It V Ln -[---[-- Ln Ln to Ln lA lA w m w O (b d � (n u 0 a LL 2 § w ) § § § k § & > o® o g o 2 w> z Uj a § § 0 z_0 cra _ " LLI E o � z_ 2 Ch w § I u « o 0 u « § E ° a 2 3 cc A @ k Cl) J § j 7 7 f / \ (D � u0 ID k_ } } \ \ § k § _§ _§ / ) \ / \ 7 ƒ ) D 9 ! ; LL E e e 2 e 4 0 z ± 2 3 3 3 2§ 2 3§ co E m 9 *& a 5§ y\ © 2 CL = 5 Q w % a ° / ca— E 2 m§ 2 2 }\ 2 4 7 a E/ a g 3 = 0 22 » a ^ ^ » c\l c 5 >- z / \ \ g I _ ƒ z Z) / I I CO / ƒ / 2 } / \ \ § 0 w z 0 0 m M w§ j } / \ \ ) /§ \ 0 w } 0 — ©� = 0 0 -j _ -i _ k k § « � l } \ \ u \ \ \ C 2 / ƒ 5 2 ƒ 2 § / m /§ co �. \> \> \> \>ƒ / )\ g $ w 2@ rGww /a =c LEED Update • Point Overview o 36 Points Attempting o 5 Additional Possible Points o 22 Points Unattainable • Energy and Atmosphere — Fundamental Commissioning of the Building Energy Systems, Prerequisite 1 o Heery International, Commissioning Agent for the project is making weekly visits, key to his commissioning report. He notes any discrepancies or concerns for prompt resolution. o HEERY will be on-site for functional performance testing on Oct. 6`h-10�'. O&M's and a training schedule are being compiled for training which will begin for the building staff by the end of the month. • Documentation of LEED EQ Credit 3.1 Indoor Air Quality - Construction o The air flush has commenced on Oct. 2"d. We will be monitoring temperature, humidity and air flow through the building. Proper filtration 1 is in place for this flush. No other work is to be performed in the building during this period. LEED Update 1 of 2 • Material Recycling — Materials and Resource Credit 2.1 & 2.2 o Dumpster Update — List of recycled items to date. Material No. of Approx Yards Approx Yards To Type Capacity tin cubic Yards) Dumps Recycled Landfill General Trash 30 8 240 Sheetrock 30 9 270 Wood 10 37 370 Cardboard 10 21 210 Plastic 10 5 50 Metal 20 10 200 Acc. Tile 10 4 40 Pallets 10 1 53 Totals 1193 240 To Date: 1433 cubic yards sent out, 1193 sent to recycling. Currently 83.3% Diverted from Landfill. LEED Update 2 of 2 LEED for New Construction v2.2 L«o Registered Project Checklist Project Name: Meridian City Hall Revision Date 10-1-2008 Project Address: 33 E. Broadway Vey ? No Fundamental Commissioning of the Building Energy Systems 8 1 5 Sustainable Sites 14 Points Minimum Energy Performance Prereq 1 Construction Activity Pollution Prevention Required Petra Fundamental Refrigerant Management 1 Credit 1 Site Selection 1 Owner/Architect ' 1 Credit 2 Development Density & Community Connectivity 1 Owner/Architect 1 Credit 3 Brownfield Redevelopment 1 Petra/Architect 14% New Buildings or 7% Existing Building Renovations 1 Credit 4.1 Alternative Transportation, Public Transportation Access 1 Architect 3 1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 Architect 1 Credit 4.3 Alternative Transportation, Low -Emitting & Fuel -Efficient Vehicles 1 Architect 28% New Buildings or 21 % Existing Building Renovations 1 Credit 4.4 Alternative Transportation, Parking Capacity 1 Architect 7 1 Credit 5.1 Site Development, Protect or Restore Habitat 1 Civil Engineer 1 Credit 5.2 Site Development, Maximize Open Space 1 Civil Engineer 42% New Buildings or 35% Existing Building Renovations 1 Credit 6.1 Stormwater Design, Quantity Control 1 Civil Engineer 1 to 3 Mechanical Engineer 1 Credit 6.2 Stormwater Design, Quality Control 1 Civil Engineer 1 Credit 7.1 Heat Island Effect, Non -Roof 1 Landscape Architect 12.5% Renewable Energy 1 Credit 7.2 Heat Island Effect, Roof 1 Architect 1 Heery International 1 Credit 8 Light Pollution Reduction 1 Electrical Engineer Yes ? No 1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1 Credit 2 Innovative Wastewater Technologies 1 Credit 3.1 Water Use Reduction, 20% Reduction 1 Credit 3.2 Water Use Reduction, 30% Reduction 1 Landscape Engineer 1 Landscape Engineer 1 Mechanical Engineer 1 Mechanical Engineer 1 Mechanical Engineer Prereq 1 Fundamental Commissioning of the Building Energy Systems Required Heery International ' ® Prereq 2 Minimum Energy Performance Required Electrical Engineer Prereq 3 Fundamental Refrigerant Management Required Mechanical Engineer 'Note for EAc1: All LEED for New Construction projects registered atter June 26", 2007 are required to achieve at least two (2) points under EA01. ®Credit 1 Optimize Energy Performance 1 to 10 Mechanical Engineer 10.5% New Buildings or 3.5% Existing Building Renovations 1 14% New Buildings or 7% Existing Building Renovations 2 17.5% New Buildings or 10.5% Existing Building Renovations 3 4 21% New Buildings or 14% Existing Building Renovations 4 24.5% New Buildings or 17.5% Existing Building Renovations s 28% New Buildings or 21 % Existing Building Renovations 6 31.5% New Buildings or 24.5% Existing Building Renovations 7 35% New Buildings or 28% Existing Building Renovations 8 38.5% New Buildings or 31.5% Existing Building Renovations s 42% New Buildings or 35% Existing Building Renovations 10 ®3 Credit 2 On -Site Renewable Energy 1 to 3 Mechanical Engineer 2.5% Renewable Energy 1 7.5% Renewable Energy 2 12.5% Renewable Energy 3 1 Credit 3 Enhanced Commissioning 1 Heery International 1 Credit 4 Enhanced Refrigerant Management 1 Mechanical Engineer 1 Credit 5 Measurement & Verification 1 Mechanical Engineer 1 Credit 6 Green Power 1 Owner continued... Materials &'F1 13 Points', Prereq 1 Prereq 1 Storage & Collection of Recyclables Required Owner/Arch./Petra Environmental Tobacco Smoke (ETS) Control Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1 Architect/Petra 1 Mechanical Engineer Credit 1.2 Building Reuse, Maintain 95% of Existing Walls, Floors & Roof 1 Architect/Petra Credit 3.1 Credit 1.3 Building Reuse, Maintain 50% of Interior Non -Structural Elements 1 Architect/Petra 1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1 Petra 1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1 Petra 1 Credit 3.1 Materials Reuse, 5% 1 Architect/Petra 1 1 Credit 3.2 Materials Reuse, 10% 1 Architect/Petra 1 Architect Credit 4.1 Recycled Content, 10% (post -consumer + 1/2 pre -consumer) 1 Petra 1 Credit 4.2 Recycled Content, 20% (post -consumer + 1/2 pre -consumer) 1 Petra Thermal Comfort, Design Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regioi 1 Petra 1 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regioi 1 Petra 1 Credit Rapidly Renewable Materials 1 Petra 1 Credit? Certified Wood 1 Petra Yes ? No 11 1 3 Prereq 1 Minimum IAQ Performance Required Mechanical Engineer Prereq 2 Environmental Tobacco Smoke (ETS) Control Required Owner/Petra Credit 1 Outdoor Air Delivery Monitoring 1 Mechanical Engineer Credit Increased Ventilation 1 Mechanical Engineer Credit 3.1 Construction IAQ Management Plan, During Construction 1 Petra Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 Petra Credit 4.1 Low -Emitting Materials, Adhesives & Sealants 1 Petra Credit 4.2 Low -Emitting Materials, Paints & Coatings 1 Petra Credit 4.3 Low -Emitting Materials, Carpet Systems 1 Petra Credit 4.4 Low -Emitting Materials, Composite Wood & Agrifiber Products 1 Petra Credits Indoor Chemical & Pollutant Source Control 1 Architect Credit 6.1 Controllability of Systems, Lighting 1 Electrical Engineer Credit 6.2 Controllability of Systems, Thermal Comfort 1 Mechanical Engineer Credit 7.1 Thermal Comfort, Design 1 Mechanical Engineer Credit 7.2 Thermal Comfort, Verification 1 Mechanical Engineer Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 Architect Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 Architect Yes ? No 5ppsign Process 5 Points 1 Credit 1.1 Innovation in Design: Informational Flyer 1 Owner/Petra 1 Credit 1.2 Innovation in Design: Water Efficency 40 % over Standard 1 Mechanical Engineer 1 Credit 1.3 Innovation in Design: Carpet Materials, 1.25% 1 Petra 1 Credit 1.4 Innovation in Design: Underfloor Plenum System Efficiency 1 Petra 1 Credit 2 LEED® Accredited Professional 1 Architect Yes ? No Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points VOP i TxA Meridian City Hall Meridian, Idaho September 30, 2008 IDIAN�-- IDAFIO INCLUDED IN BUDGETS Current Budget September 30, 2008 1 2 3 Phase I - Buildina Demolition & Abatement 4 Creamery Demolition & Abatement $426,357 5 6 Total Phase I - Building Demolition & Abatement $426,357 7 8 Phase II - Core & Shell 9 Sitework & Utilities Does not incl Cont Soil - see Line 88 $473,527 10 Structural Concrete $885,144 11 Masonry $1,558,726 12 Structural Steel $1,926,485 13 Rough Carpentry $0 14 Insulation & Dampproofing $69,932 15 Rooting & Sheetmetal $182,990 16 Exterior Doors Does not include Ph 4 Doors & Spec $6,923 17 Storefronts & Curtainwall $297,458 18 Shaftwall Framing & Drywall $363,287 19 Elevator $223,700 20 Total Phase II - Core & Shell $5,988,172 21 22 Phase III - TUMEP 23 Architectural Metalworks $93,295 24 Carpentry -Framing, Backing $112,000 25 Cabinetry & Casework $464,062 26 Insulation & Dampproofing Incld in Ph 2 - Sealco $22,388 27 Interior Doors $302,027 28 Interior Storefront $96,749 29 Coiling Overhead Doors/Screens $5,590 30 Interior Gypsum Drywall Systems $1,059,040 31 Ceramic Tile $116,992 32 Resilient Flooring & Carpet $187,951 33 Paint & Wallcoverin s $174,433 34 Specialties $110,365 35 Operable Partitions $20,840 36 Access Flooring $528,800 37 Window Coverings $22,600 38 Fire Suppression Systems $437,433 39 Plumbing $980,670 40 HVAC $2,111,775 41 Electrical $2,828,613 42 Total Phase III - TI/MEP $9,675,623 43 44 FF&E 45 Demountable Walls (Options to $1.163 Million $0 46 Audio Visual Systems $208,907 47 Telecommunication Systems $192,784 48 Security Systems 84,695 49 Phone Service & Equipment Provider By Owner - 50 Interior Sicinaqe Package Allowance 42,954 51 Final Cleaning 40,000 52 Total FF&E $569,340 53 54 Phase IV - Plaza Landscaoino & Site Im rovementa 55 Sitework, Utilities & HMAC Paving $338,000 56 Water Feature $216,775 57 Concrete Unit Pavers $75,462 58 Landscaping $199,679 59 Structural & Concrete Paving Concrete $296,200 60 Masonry $194,585 61 Steel Fabrications $130,450 62 lCarpentry, Bldg Insulation & Drywall $8,400 63 lRoofing & Flashing $10,495 64 1 Doors, Frames & Hardware/ Specialties Incld in Ph 2 - ABS $36,220 H:\Construction\Projects\2006\Tom\Meridian City Hall\Budgets\Budget History & Projections 093008 65 Moisture Protection & Waterproofing $3,028 66 Painting $11,400 67 Mechanical $29,064 68 Electrical $344,090 69 Fence - UPRR $18,934 70 Total Phase IV - Plaza, Landscaping & Site Improvements - Total $1,912,782 71 72 Phase V- East Parking Lot $285,814 73 74 Total Phase V - East Parkin Lot $0 Pending 75 76 General Conditions & Fees 77 Project Reimbursable Cost Allowances $279,812 78 Phase II General Conditions $181,029 79 Phase III General Conditions $181,029 80 Construction Contingency Balance $477,509 81 Winter Conditions Costs Incld in Contingency 82 Estimated LEED Certification Costs for Silver $205,000 83 Estimated Value Engineering Allowance $0 84 Contract CM Fee $574,000 85 CM Fee Pending Change Order Change in Scope & Complexity $376.808 86 Total General Conditions & Fee $2,275,187 87 88 Total Project Direct Costs $20,847,460 89 90 Project Site Costs 91 Contaminated Soils Removal $493,590 92 CM Fee for Contaminated Soils $52,502 93 Unsuitable Soils Removal and Structural Fill for Contm & Unsuit. a2a 526 94 Total Project Site Costs $925,618 95 96 Building Construction Budget w/Site Development Costs $21,773,078 97 Less Creamery Demolition & Abatement $426,357 98 Less Contaminated and Unsuitable Soils Removal $925,618 99 Current Building Construction Budget $20,421,103 1 Phase V- East Parkinq Lot 2 Sitework 127,900 Contaminated Soils Removal 4,337 3 Concrete 28,720 4 Landscapinq 57,317 5 Electrical 67,540 6 7 ITotal Phase V - East Parkin Lot $285,814 H:\Construction\Projects\2006\Tom\Meridian City Hall\Budgets\Budget History & Projections 093008 I MERIDIAN CITY HALL CONTINGENCY ALLOCATION Cost & Project Allocation Summary Contingency Amount Contingency Allocation per 11/13/07 Budget Phase 4 Plaza - Allocation of balance of Plaza budget Current Balance Job Condition / Winter Conditions / Inclement Weather Costs billed to dated thru Sept 08 Billing Contract Budget Allocations Interior Signage Package Overage - Advanced Sign Final Cleaning Budget - ABM Janitorial UPRR Fence - Anvil Fence Approved Change Orders - Phase 2, 3 & 4 thru 09/30/08 Change Orders Approved in Sept 08 - None Phase 2 - Shell CO#01 ABS (07) Ph 2 CO#02 ABS (07) Ph 2 (Ph4 Plaza Drs & Spec) CO#01 Custom Glass (09) Ph 2 CO#01 MJ's Backhoe (03) Ph 2 - Bldg Portion Only CO#02 MJ's Backhoe (03) Ph 2 CO#03 MJ's Backhoe (03) Ph 2 CO#01 Rule Steel (06) Ph 2 - CO#01 Schindler Elevator (11) Ph 2 CO#01 Sealco (12) Ph 2 CO#02 Sealco (12) Ph 2 CO#01 Sidewalks (04) Ph 2 CO#02 Sidewalks (04) Ph 2 CO#03 Sidewalks (04) Ph 2 CO#04 Sidewalks (04) Ph 2 CO#01 TMC (05) Ph 2 CO#02 TMC (05) Ph 2 CO#03 TMC (05) Ph 2 Phase 3 - Tenant Improvements & MEP CO#01 Buss Mech (32) Ph 3 CO#02 Buss Mech (32) Ph 3 CO#03 Buss Mech (32) Ph 3 CO#01 Custom Glass (21) Ph 3 CO#02 Custom Glass (21) Ph 3 CO#01 AWC (24) Ph 3 CO#02 AWC (24) Ph 3 CO#03 AWC (24) Ph 3 Page 1 of 3 09/30/08 Contingency Amount (897.00) 36,220.00 2,137.00 (216,744.20) 44,753.00 35,204.00 35,766.00 1,600.00 22,388.00 2,750.00 137,108.00 4,371.00 23,550.00 64,519.57 (32,348.00) 324.00 5,989.71 $ 166,691.08 $ $ 218,433.00 $ $ 17,954.00 $ $ 13,900.00 8,287.00 $ 18,934.00 $ $ 50,788.00 $ (897.00) 36,220.00 2,137.00 (216,744.20) 44,753.00 35,204.00 35,766.00 1,600.00 22,388.00 2,750.00 137,108.00 4,371.00 23,550.00 64,519.57 (32,348.00) 324.00 5,989.71 $ 166,691.08 $ 4,922.00 $ 12,295.00 $ 10,068.00 $ 19,784.00 $ 8,287.00 $ 7,665.30 $ 1,968.60 $ 10,856.10 700,000.00 342,372.00 1,042,372.00 823,939.00 773,151.00 Pending City Confirm MERIDIAN CITY HALL CONTINGENCY ALLOCATION Cost & Project Allocation Summary CO#01 Designer Flrs (25) Ph 3 CO#01 SBI (27) Ph 3 CO#01 Commercial Paint (28) Ph 3 CO#02 Commercial Paint (28) Ph 3 CO#03 Commercial Paint (28) Ph 3 CO#01 SimplexGrinnell (31) Ph 3 CO#02 SimplexGrinnell (31) Ph 3 CO#03 SimplexGrinnell (31) Ph 3 CO#01 Hobson Fab (33) Ph 3 CO#02 Hobson Fab (33) Ph 3 CO#03 Hobson Fab (33) Ph 3 CO#01 Tri-State Elec(34) Ph 3 CO#02 Tri-State Elec(34) Ph 3 CO#03 Tri-State Elec(34) Ph 3 CO#01 Suncrest/B&B (17) Ph 3 CO#02 Suncrest/B&B (17) Ph 3 CO#03 Suncrest/B&B (17) Ph 3 CO#01 ID Custom Wood (19) Ph 3 CO#02 ID Custom Wood (19) Ph 3 CO#01 Schmacher (26) Ph 3 CO#01 ABS (22) Ph 3 CO#02 ABS (22) Ph 3 CO#03 ABS (22) Ph 3 CO#04 ABS (22) Ph 3 CO#01 Integrated Interiors (35) Ph 3 CO#01 PreCom (36) Ph 3 CO#02 PreCom (36) Ph 3 CO#01 Aatronics (37) Ph 3 Phase 4 - Plaza None to Date Adjustment for SealCo CO#02 - Amt already included as Ph 3 budget TOTAL - Approved Change Orders Change Orders Pending Approval - CO's Pending City Action 20 CO's Pending Contractor Action 2 CO's Pending A/E Approval 7 09/30/08 Contingency Amount 5,597.00 365.00 200.00 22,185.00 773.00 2,917.98 19,499.28 2,136.26 1,335.00 9,941.00 40,499.00 (6,064.75) 12,059.26 72,723.24 267.75 2,677.38 17,085.05 (5,479.66) 5,541.86 6,039.00 7,952.00 5,420.00 6,122.00 5,303.00 10,700.00 (29,687.37) 3,470.96 4,527.86 299,952.10 $ (22,388.00) $ 444,255.18 $ 29 $ 106,951.00 $ 328,895.82 221,944.82 CONTINGENCY AMOUNT - BALANCE REMAINING I $ 221,944.82 I Page 2 of 3 r MERIDIAN CITY HALL ' CONTINGENCY ALLOCATION Cost & Project Allocation Summary 09/30/08 Contingency Amount Projected Future Allocations Winter Conditions/Job Conditions $ 9,000.00 Estimated Amount of Outstanding Pricing Pending CO $ 200,000.00 ' $ 209,000.00 Projected Uncommitted Contingency Amount Is 12,944.82 r Page 3 of 3 Note Pads 323-4500 BOISE, IDAHO RCE -1875 n GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 1 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 01 ASI No. 0001 00001 PRO Furnish all labor, materials and equipment 4/20/2007 necessary to revise details A4 and 65 on sheet S3.1 and A3, 133 and C3 on sheet S7.2 as shown on attached sketches dated march 28,2007. ASI 02 ASI No. 0002 00001 PRO Furnish all labor, material and equipment 6/26/2007 necessary to preform the following work: -Revise the finish floor elevation to 2610.4 -Footings and foundation shall bear on undisturbed native gravel or compacted granular fill per specification section 02300. -Any existing site fill encountered beneath the footings and foundations shall be removed to the undisturbed native sand and gravel. -In areas where removal of contaminated materials has extended below the bottom of footings, the over excavated areas shall be back filled and compacted with granular fill per specification section 02300. -Areas where excavation has occourred to enable the abandonment of water wells shall be backfilled with granular fill per specification section 02300. 00001 PRO Sheet A3.1: D1 -Window Frames Types -revise 6/13/2007 frame type 13 per the enclosed Sketch. Attachments: SK -1 ASI 04, ASI No. <0004 00001 PRO Sheet S5.2: The framing layout for the roof 6/26/2007 joists is specified to be at 5 equal spaces; however the framing plan shows 6 equal spaces. The enclosed sketch SK -1 shows the appropriate number of joists and spaces. Sheet S7.5, Detail E4: Revise the detail callouts for the TS sections to be TS 20x4x5/16 in lieu of the TS 16x4x5/16. See enclosed sketch SK -2. Attachments: SK- 1, SK -2. Expedition® Report RNP 01 Note Pads IL�1 323-4500 BOISE, IDAHO RCE -1875 J. 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 2 of 56 Note Paditem No. Status Required Ball In CourtNotes Otened Closed ASI 05 ASI No. 0005 00001 PRO Sheet 52.11 and S2.12: Refer to the enclosed 6/26/2007 sheets for revisions required for the top of footing elevations based on the revised grading plan. Sheets S5.2: Revised details D2, D5, D6, and E1 to reflect a deeper grade beam at the similar conditions on the north side of the building. Sheet S5.3: Revise details 131, 62, and 63 to reflect the reference to the foundation plan for the T.O.F. elevations. Add the Footing Step Detail D6 to Sheet S5.3. Attachments: Sheets S2.1 and S2.12, Sketches SK -1 thru SK -8. Report R NP_01 Note Pads ONPFTR�VE 323-4500 BOISE, IDAHO I RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 3 of 56 Note PadItem No. Status Required Ball In CourtNotes Otmed Closed ASI 06 ASI No. 0006 ......... __-. ....... ......... .__.. 00001 NEW In response to the ACHD plan review 6/4/2007 comments, the attached civil drawings reflect the following modifications that have occurred to the civil drawings: 1. Sheet C1.0 has been added regarding construction requirements. Sheet C1.1 2. Keynote 14 has been modified to include ACHD truncated dome requirements. 3. Dimensions have been included to R/W line from centerline for both Meridian and Broadway Road. 4. A dimension has been added showing the distance from centerline of railroad tracks to the south property line. 5. Longitudinal and cross slopes have been added. 6. The driveway approach has been modified per ACHD requirements. 7. Detail reference for curb terminus has been added to the plans. See added key note 28. 8. Grade break has been added at the new driveway. 9. Radii at the driveway have added. 10. The radii of the inside curves at the on street parking at on Broadway has been modified to 20' at TBC. 11. The roof drain has been rerouted to the southern seepage bed in the parking lot. The seepage bed size has been changed accordingly. 12. The seepage bed located in Broadway Avenue has been eliminated. All storm water from the Broadway Ave right of way will be routed into existing storm drain lines in Broadway Avenue. 13. The sand and grease trap elevations have been modified. 14. Key Note 27 has been added for pedestrian ramps at driveway. 15. Key Note 29 has been added for new stop sign at driveway. 16. Key Note 30 has been added for new 4" pvc pipe that is used to tie foundation drainage system into new 48 " dia. manhole per added kev note 31. Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 4 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed 17. Key Note 32 has been added for reference to curb taper at curb terminus at Broadway Ave. 18. Key Note 33 has been added for connection of inlet catch basin inlet to existing storm drain manhole at Broadway Ave. Sheet C4.1 has be renumbered to Sheet C3.1 Sheet C3.1 19. Source of groundwater data and design infiltration rate has been added to Sheet C3.1 Sheet C4.2 has been renumbered to Sheet C3.2 Sheet C3.2 20. Note 2 and sub notes 1 through 5 have been added to detail 1 on sheet C3.2 Sheet c4.3 has been renumbered C3.3 Sheet C4.1, C4.2, C4.3, C5.1 and Sheet C5.2 has been added to the set. Expedition® Report RNP 01 Note Pads INCOAkOlA7FD� I 323-4500 BOISE, IDAHO I TM OL3NERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 5 of 56 ■ Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 07 ASI No. 0007 00001 PRO Sheet C1.0: has been added regarding 6/26/2007 construction requirements Sheet C1.1: 2. Keynote 14 has been modified to include ACHD truncated dome requirements. 3. Dimensions have been included to R/W line form centerline for both Meridian and Broadway Rd... 4.A dimension has been added showing distance from centerline of railroad tracks to the south property line. 5. Longitudinal and cross slopes have been added. 6. The driveway approach has been modified per ACHD requirements. 7. Detail reference for curb terminus has been added to the plans. See added key note 28. 8. Grade break has been added at the new driveway. 9. Radii at the driveway have added. 10. The radii of the inside curves at the on street parking at on Broadway has been modified to 20' at TBC. 11. The roof drain has been rerouted to the southern seepage bed in the parking lot. The seepage bed size has been changed accordingly. 12. The seepage bed located in Broadway Avenue has been eliminated. All stormwater form the Broadway Avenue right-of-way will be routed into the existing storm drain lines in Broadway Avenue. 13. The sand and grease trap elevations have been modified. 14. Key Note 27 has been added for pedestrian ramps at driveway. 15. Key Note 29 has been added for new stop sign at driveway. 16. Key Not 30 has been added for new 4" pvc pipe that is used to tie foundation drainage system into new 48" dia. Manhole per added key not 31. 17. Key Note 32 has been added for reference to curb taper at curb terminus at Broadway Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 6 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed Avenue. 18. Key Note 33 has been added for connection of inlet catch basin inlet to existing storm drain manhole at Broadway Ave. Sheet C4.1: Has been renumbered to Sheet C3.1 Sheet C3.1 19: Source of groundwater data and design infiltration rate has been added to sheet C3.1 Sheet C4.2: Has been renumbered to Sheet C3.2 Sheet C3.2: 20. Note 2 and sub notes 1 through 5 have been added to detail 1 on sheet C3.2 Sheet C4.3: has been renumbered to Sheet C3.3 Sheet C4.1, C4.2, C4.3, C5.1 and Sheet C5.2 have been added to the set Attachments: Civil Drawings C1.0, C1.1, C2.1, C3.1, C3.2, C3.3, C4.1, C4.2, C4.3, C5.1 and C5.: ASL 08 ASI No. 0008 00001 PRO Sheet S0.01: Add details C4, C5 and D4 to this 6/26/2007 sheet, per enclosed sketches SK -1, SK -2 and SK -3 Sheet S3.1: Revise details A4 and B5 enclosed sketches SK -4 and SK -5 Sheet S7.2: Revise detail A3 per enclosed sketch SK -4 Attachments: Sketches SK -1 thru SK -6 Expedition® Report R_NP_01 Note Pads Expedition® Report RNP 01 323-4500 BOISE, IDAHO ' RCE_ 1875 rn Roca SOLID GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 7 of 56 rNote PadItem No. Status Required Ball In CourtNotes Opened Closed ASI'09 ; ASI No. 0009' 00001 PRO Elevator Opening Framing: Revise the 6/26/2007 dimensions for the framing locations around the elevators at each level based on the enclosed sketches SK -1 and SK -2. Sheet 57.2: Provide and additional detail C7 showing the increased dimensions between the of slab and the perimeter support framing. See enclosed sketch SK -3. — � -- ASI 10.,,.,,, -.,,ASI No. 0010 —edge r00001 PRO Sheets A4.0, A4.1, A4.2, A4.3: Revise the 6/19/2007 exterior elevations per the enclosed revision sheets: A4.OR, A4.1R, A4.2R, A4.3R. Sheets A5.0, A5.1, 5.2, A5.3: Revise the wall sections per the enclosed revised sheets: AS.OR, ' A5.1R, 5.2, A5.3R. Expedition® Report RNP 01 LT � `Note Pads _ATFD 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 11 of 56 Note PadItem No. Status Required_ Ball In CourtNotes Opened Closed ASI_11 ASI No. 0011 _ ... _.......... _._....... _ ___-- _ _.___ -------- 00001 . _00001 PRO Sheet S2.31: Revise the dimension between 6/19/2007 beams on gridlines 3 and 10 at the roof transition edge to be V-8". This will correspond with the dimension noted in the referenced detail. Sheet S2.31:Provide an additional detail reference E1/S7.6 at the non-bearing edge of the stair vestibule adjacent to gridline F2.5. See enclosed sketch SK -1. Sheet S2.32: Revise the dimension between beams on gridlines 3 and 10 at the roof transition edge to be 1"-8". This will correspond with the dimension noted in the referenced detail dimension between the edge of slab and the perimeter support framing. Sheet S2.32: Provide an additional detail reference El/S7.6 at the non bearing edge of the stair vestibule adjacent to F10.5. See enclosed sketch SK -2. Sheet S2.42: Revise the dimensions for the elevator deck support beams as shown. See enclosed sketch SK -3. Sheet S7.6: Add detail E1 showing the configuration of the slab and wall framing at the stair vestibules of the 4th floor. See enclosed sketch SK -4. Attachements: Sketches SK -1 thru SK -4. Expedition® Report RNP 01 Note Pads rater � \ 323-4500 BOISE, IDAHO ' RCE -1875 TM ROcx SQUID GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 16 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 12 - ASI No,.0012- 00001 PRO Please issue the following clarification to the 6/19/2007 contract documents per attached Stapley Engineering Memorandum dated lune 15, 2007. 00001 PRO 1. Furnish all labor, materials and equipment as 6/26/2007 required to install plastic laminate panels in elevator cars No. 2 and No. 2 as supplied and installed by the elevator manufacturer. Color of panels shall be 7922-07 Brighton Walnut as manufactured by Wilsonart. 2. Furnish all labor material and equipment necessary to install software as required for card reader access system operation of elevator No. 3. 1 1 1 1 1 1 �� Report R NP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 24 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 1.5 _ ASI No. 0015 _........ _... ____.______.—__.___ ._---------- 00001 __ ___ 00001 PRO 1.Furnish all labor, material and equipment as 6/26/2007 required to install drainage fill and filter fabric at foundation drainage system. Drainage fill shall be clean crushed rock containing less then f percent fines passing the No. 200 Sieve. The filter fabric shall be woven or non -woven geotextile filter fabric of PP or polyester fibers, or combination of both. Flow rates range from 110 to 330 gpm per sq. ft. when tested according to ASTM D4491. 2.Install fabric and drainage fill as follows: a.Before installing drainage fill, lay geotextile filter fabric in trench and overlap trench sides. b.Place supporting layer of compacted drainage fill over compacted sub grade to a depth of 4". Install drainage pipe. Add drainage fill such that it is 12" minimum from face of footing and extend over top of footing a minimum of 12". Return drainage fill to face of foundation wall. Place drainage fill layer not exceeding 3 inches in depth. Compact each layer placed. c.After drainage fill has been installed, wrap top of drainage fill with geotextile fabric. Fasten and lap geotextile fabric per manufactures instructions. 3.Foundation drainage system shall run to the 4" pvc pipe connection the foundation drainage system to the 48" diameter manhole as shown on the revised civil drawings. ASI 16 ASI No. 0016 00001 NEW Furnish all labor materials, and equipment 6/26/2007 necessary to install a 48" diameter manhole and 4" pvc pipe for the foundation drainage system per key note 30 and 31 shown on the revised civil drawings. Ecpeditione Report R_NP_01 Note Pads GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 25 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 17 ASI No. 0017 00001 NEW The work shall be carried out in accordance 7/10/2007 with the following supplemental instructions issued in accordance with the contract documents without change in contract sum or contract time. Prior to proceeding in accordance with this instruction, indicate your acceptance of this instruction, for minor change to the work as consistent with the contract documents and return a copy to the architect. Sheet A5.4 Detail A4: Add the following note: Provide 2" I.D. pipe nozzle outlet in bottom of gutter for connection of drain piping by mechanical. ASI 18 ASI No.0018 . 00001 NEW Sheet S2.41: 7/13/2007 1. Connections Grid lines 6 and 7. Remove the moment connection symbol from the V24x55 beams on grids 6 and 7 at the columns on Grid E. Provide a simple gravity connection at these locations. 2. Connectins Grid lines 6 and 7. Provide a moment connection symbol from the W24 x 55 beams on grids 6 and 7 at the columns on Grid G. Provide a rigid frame connection at these locations. 3. W12x16 beams. Provide 1/2" camber at all W12x16 beams with spans greater than 25 feet. Sheet 52.42: 1.Connections Grid line 7. Remove the moment connection symbol from the W24 x 55 beam on grid 7 at the column on Grid E. Provide a simple gravity connection at this location. 2. Connections Grid line 7. Provide a moment connection symbol from the W 24 x 55 beam on grid 7 at the column on Grid G. Provide a rigid frame connection at these locations. 3. W12 x 16 Beams. Provide 1/2" camber at all W12 x 16 beams with spans greater than 25 feet. Expedition® Report R NP_01 1 / ^�� Note Pads Expedition® Report R_NP_01 323-4500 BOISE,IDAHO RCE_ 1875 „e ROCK SOLID GENT- AT. CONTRACTORS ' 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 26 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 19 ASI No 0019» 00001 NEW Sheet S2.41: Show 6 x 6 steel columns in 7/23/2007 canopy area build out at grids 6 and 7. See sketch SK -1. Sheet S2.52: 1. Provide dimensions for the locations of the ' TS sections that span east/west beyond grid A at the west side canopy. These TS members, TS 20x4x5/16 are supported by the bracing located at the column noted in item #1. See sketch SK -2. 2. Delete the TS 20x4x5/16 shown midway between grids 6 and 7 spanning from grid H to ' the TS20x4x5/16 at the entry column line. See sketch SK -2. ' Sheet S7.4 Detail E4: Add TS 6x6.1/4" column and the dimension locating the column. This column was shown in detail e4/57.5 and in the architectural drawings, but was not reflected in the related plan view. See sketch SK -3. - Additional Sketches Enclosed. - Architectural Partial Wall Sections/Elevations: ' These sketches are the architectural elevations showing the configuration of the bracing at the East and West end of the building. Note the configuration of the braces is altered fro what ' appears in the original building elevations and details. See sketches SK -4 and SK -5. -Markups of the Canopy Sections from Steel shop drawings Sheet E -7L: These sketches reflect additional information that was not relayed during the review of the shop drawings. ' This additional information should allow completion of the shop drawings for the entry canopy areas. See sketches SK -6 and SK-7.�_ Expedition® Report R_NP_01 Note Pads ETR INCORKYATFD 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 27 of 56 Note PadItem No. Status Required Ball In CourtNotes opened Closed ASI 20 ASI No. 0020 ___ .._............... 00001 NEW Sheet A2.01T: Per the contractors request the 8/2/2007 wall between Electrical 002 and Mechanical 003 may be left out until the electrical gear is installed and all clearances are verified. This wall may be moved as required into the Mechanical room 003 to accommodate this change. Additionally door 003A may be reositioned within this wall as required. Sheet M0.11: FCU 2 is to be relocated above door 003A as required, maintain all connections and piping as shown. Expedition® Report R—NP01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 n+ POCK 5OL GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 28 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 21 ASI No. 0021 00001 NEW i 1 1 1 1 1 1 1 1 1 1 1 1 PETRA AJ Reference: Full Tenant Improvement with MEP's 9/4/2007 Door Hardware Specification Section 0871013e advised of the following modifications to hardware requirements to the following doors: 1.Add Card Readers to doors 10113, 101C and 101D. These doors shall be secure from the Lobby. 2.Add Card Reader to door 101A. This door shall be secure from Stair 101 3.Add Card Reader to door 104B. This door to be secure from the exterior. 4.Add Card Reader to door 129. This door shall be secure from Receiving 129. 5.Add Card Reader to door 141. This door shall be secure from Corridor 140. 6.Revise door swing at door 152 to swing into Lobby 151. Revise lockset to Storeroom function 7.Delete Card Reader from door 124. 8.Add Card Readers to doors 232A and 238A. These doors shall be secure from Waiting Area 237. 9.Add Card Reader to door 252. This door shall be secure from Corridor 246. 10.Delete Card Reader from door 312. Revise lockset to Storeroom Function. 11.Revise lockset at door 315B to a Storeroom Function. This door shall be secure from Training 315. 12.Add Card Reader to Door 354. Door shall be secure from Lobby 304. 13.Add Card Reader to Door 307A. Door shall be secure from Corridor 305. Report RNP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 29 of 56 Note PadItem No. Status Required Ball In CourtNotes Ooened Closed ASI 22 ASI No. 0022 00001 NEW PETRA AJ Reference: Full Tenant Improvement with MEPs 9/4/2007 Reflected Ceiling Plan Sheets A7.21T and A7.221 Be advised of the following modifications to following ceiling heights: 1. Revise ceiling heights at Corridors 205, 222, 246 and 262 from 10'-0" to 9'-6"and revise soffits from 9'-6" to 9'-5". Note, the 11'-0" high ceiling at these locations shall remain as shown. 2. Revise ceiling height at Plan Vault 210 from 10'-0" to 8'-6". ASI.23 ASLNo 0023 00001 NEW Sheet A3.3 - Detail A5: Provide a 9"x8 1/2"x3/8" 9/4/2007 fabricated angle with epoxy anchors at 24" o.c. for the steel lintel at the stair tower header per RFI #24. Fourth Floor Stair Construction: Provide columns and channels per RFI # 28 for the framing of Stair #4. Sheet S2.11/S2.12: Revise the floor framing to be a W21x44 at the following locations: Gridline 5.5 from D to E and Gridline 7.5 from D to E. ASI 24 ASI No. 0024 ' 00001 NEW i 1 1 Expedition® PETRA AJ Refer to attached civil drawings sheet C2.1. 9/21/2007 Revise location of new water service to connect into existing 10" water service within property line as shown in lieu of connecting into existing 12" waterline located in Meridian Road. Note: Routing of sanitary service shall be located within the building structure per response to RFI No 22 see attached in lieu of location shown on sheet C2.1. Report R_NP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 30 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 25 ASI No. 0025 [1I11011]�►1; tvffj The electrical engineer has been in discussions with the supplier for the electrical bus -duct for the above referenced project. In there discussions, the question was raised whether the specified 208V bus -duct is required to be provided with a 200% neutral bus to match the specified 200% neutral bus for the main switchboard (MSBL). The specification for the bus -duct requires a 100% rated neutral bus. The electrical engineer has recommend that the 208V bus -duct be provided with a 200% rated neutral bus to keep the intent of the design consistent throughout the distribution system, and to minimize the effects of harmonic loads (computers, etc.) that are anticipated to be prevalent on the 208 volt distribution system in the facility. As such the electrical engineer recommends that the contractor provide the following revision in electrical work: Sheet E5.00 1. Bus-ducts'BD-LA' and BD -LB' shall be furnished and installed with 200% rated neutral bussing and the appropriate lugs necessary to accommodate the specified feeders. The electrical engineer has also reviewed the construction requirements for emergency distribution switchboard 'ES63' with the electrical gear supplier, and has found that the contract documents indicate that the feeder for 'ESB3' is sized for 2,280 amps. Per the schedule on the documents,'ESB3' is rated for 400 amps. The electrical engineer dose not believe that the feeder to this switchboard needs to be sized for 2,280 amps. Therefore, in addition to the work recommended above, please direct the contractor to provide the following revisions in electrical work: Sheet E5.00 1. Feeder for'ESB3' (indicated as feeder 'Y on feeder schedule) shall be 4-500 and 1-3(G)-4" in lieu of specified. 9/11/2007 Expedition® Report RNP 01 D�� -\ Note Pads P =TRD 323-4500 BOISE, E IDAHO I TM GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 31 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 26 ASI No. 0026 00001 NEW Reference: Full Tenant Improvment twith MEP's 9/18/2007 Door Hardware Specification Section 08710. Be advised of the following modifications to hardware requirments to the following doors. ASI27 ASI No. 0027 00001 NEW 1. Add Card Readers to doors 102A. This door shall be secure from Stair 104. 2. Add Card Reader to door 110A. This door shall be secure from Stair 110. 3. Add Card Reader to door 124A. This door to be secure from Corridor 113. 4. Add Card Reader to door 102C. This door shall be secure from Stair 104. 5. Delete Card Reader from door 224. 6. Add Card Reader to door 309. This door shall be secure from Corridor 305. 7. Add Card Reader to door 3376. This door shall be secure from Corridor 337. Steve Christiansen, LCA 9/17/2007 Reference: Full Tenant Improvement with MEP's 9/20/2007 Hallow Metal Frames, Doors and Glazing. 1. Refer frame hallow metal frame type 'M'. Revise the two T-9" dimension to read 2'-0". Revise the overall 11'-2" dimension to read 7-8". Glazing in this frame shall be 1/4" wire glass. 2. Glass in frame type 'B' located at door 346B shall be 1/4" clear tempered glass. 3. Glass in frame type 'B' located at doors 135A and 135B shal be type 3 "Fire Lite Plus" 4. Glass in door 133B shall be 1/4 wire glass. 5. Glass in door 135C shall be bype 3 "Fire Lite Plus" 6. Revise frame type for door 144A to read type 'X' in the door and frame schedule. This door and frame shall be glazed with "Fire Lite Plus". 7. Revise frame type for door 124 A to read type 'C' in the door and frame schedule. 8. Revise frame type for door 347 to read type 'N' on the floor plan. Expedition® Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 rr GENFI Ai. CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 32 of 56 Note PadItem No. Status Required Ball In CourtNotes opened Closed ASI 28 ASI No. 0028 00001 NEW Sheet A6.1T. See attached sketches SK -1 and 9/18/2007 SK -2 for additional dimensions of millwork and walls at the City Council Chambers. ASI 28: SK1, SK2. ASI 29 ASI No. 0029 . 00001 NEW Sheet M1.11: Provide (2) smoke dampers at 9/25/2007 9/25/2007 VAV #134 per enclosed RFI #38. Reference RFI #38. ASI 30 ASI. No. 0030 . 00001 NEW Sheet A8. IT: Revise Folding Partition detail D5 9/25/2007 per the enclosed sketch SK -1. Verify all framing requirment with Operable Folding Partition Submittial dated September 7, 2007. ASI 31 ASI No 0031' ...................................... 00001 NEW Full Tenant Improvement with MEPs: 10/1/2007 Dimension Clarification: Revise the following dimensions typical all sheets. Gridline G to H is 27'-8", Gridline H to I is 18'-8". SK -1 ASI 32 ASI No. 0032 00001 NEW PETRA AJ Refer to specification section 09511 Acoustical 10/15/2007 Panel Ceilings item 2.3. -Revise ACP -1 Product to Dune 2712 Tegular Second Look (24x48). -Revise ACP -2 Product to Cortega 2758 Tegular Second Look (24x48). Expedition® Report R_NP_01 Note Pads il1-0P R M d[� 323-4500 BOISE, IDAHO I RCE -1875 ,r GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 33 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 33 ASI No. 0033 - -._ .. _ 00001 NEW PETRA AJ Full Tenant Improvement with MEP's Ceiling 10/15/2007 Revisions Sheet A6.6T: Delete the upper cabinets over the .refrigerator or the copy machine at the following elevations: Al, A2, A4, 131, B5, D1, D2 and E1. Sheet A6.7T: Delete the upper cabinets over the refrigerator or the copy machine at the following elevations: Al, B2, Cl, C4, C5 and D2. Note: At copy machine locations, just the first (2) equal sections of cabinet are to be deleted. ASI 34 ASI No. 0034'' ................ 00001 NEW Sheet AUT: At detail B2, provide a 24" x 24" 10/15/2007 opeing at each wall and trhough the insulation as shown on the enclosed sketch SK -1 to allow a return air path over the folding partition. Attachement: SK -1 ASI 35 ASI No. 0035 00001 NEW t 1 1 Expedition® ALLCON AB(Cold Shell and Core Package 10/29/2007 Screen Wall, Loading Dock and Ramp Area Revisions: Sheets A1.0 and A1.1: Modify the area of the loading dock, trash enclosure, ramp and screen walls Der the enclosed sheets. Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO I RCE -1875 n. r ROCK SOLM I GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 34 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI .36__ _ASI No. 0036 ..... _._.. --- -- _ -.__ _._._ ---..__._�_.._. - 00001 NEW Sheet A2.01TF: 10/17/2007 1. At Elevator Equipment Room #001: Revise the North and West ails to be Wall Type #8A, 2 hour rated walls. 2. At Elevator Equipment Room #001: Provide a wall mounted fire extinguisher (10520) inside the door to this room. Sheet A2.02TF: 1.At Elevator Equipment Room #017: Revise the North, East and West walls to be Wall Type #8A, 2 hour rated walls. 2.At Elevator Equipment Room #017: Provide a wall mounted fire extinguisher (10520) inside the door to this room. Sheet A3.OT: Revise doors 001 and 017 to be provided with a 90 minute rating. Sheet A8.OT: E4- Wall Types, Wall Type #8: Add note as follows: Wall Type 8A is to be a 2 hour rated wall per U.L. U419. Provide (2) layers of 5/8" type X gypsum board each side of wall. This wall is to be constructed at all walls of the elevator equipment rooms, unless already shown to have a 2 hour wall. Sheet A9.OT: 1.Revise Detail 134 - Elevator Wall to be A4. 2.Revise Detail A4 as shown on sketch SK -1. Sheets E2.01L/E2.02L: Light fixture type WF3 in elevator pits shall be revised to Canlet no. 68 -02 -21 -OG -39. Fixture to be NEMA 4 rated vapor proof light fixture, wall mount, with 26W TRT lamp, polycarbonate globe and guard. Sheet E2.01M: 1.Furnish and install dedicated circuit for shunt trip connection to elevator disconnecting means in room 001. Circuit shall be LBA-59, #12's. Connect to shunt -trip device as required. Coordinate connection with elevator equipment supplier. 2.1-ocate elevator disconnecting means in accordance with elevator equipment supplier and the local Authority having jurisdiction. Locations shown on plans are general and are to be coordinated for exact placement. Expedition® Report R_NP_01 Note Pads ETR� 323-4500 BOISE, IDAHO RCE -1875 rye GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 35 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed 3.AII wiring in elevator pit shall conform to requirements of NEMA 4 for wet locations. Sheet E2.02M: 1.Furnish and install dedicated circuit for shunt trip connection to both elevator disconnecting means in room 017. Circuits shall be LBB -27 and LBB -29, #12's. Connect to shunt -trip device as required. Coordinate connection with elevator equipment supplier. 2.1-ocate elevator disconnecting means in accordance with elevator equipment supplier and the local Authority having jurisdiction. Locations shown on plans are general and are to be coordinated for exact placement. 3.Receptacles in elevator pits 1 and 2 are to be GFI type receptacles. 4.AII wiring in elevator pit shall conform to requirements on NEMA 4 for wet locations. ASI37 ASI No. 0037 00001 NEW PETRA A] Full Tenant Improvements with MEP's. 10/17/2007 Based on discussions between Geoff Johnson and Idaho Power Co. regarding the capacity of the pad mounted transformer(s) for doubling the neutral conductor capacity from the main switchboard MSBL to the pad mounted transformer, Idaho Power has indicated that the 200% neutral conductor's requirement shown on the documents can not be met. As such, the following electrical revisions are to be made: Sheet E5.00: Feeder 'P' between main switchboard MSBL and Idaho Power 208V transformer to be revised to be (8) 4" C's each with 4-500 MCM in lieu of indicated. Please provide credit pricing for this revision in work. Because the system neutral is bonded to ground at the main switchboard, we do not believe that this revision will compromise the intent of the design to provide a system to accommodate the heating effects of non-linear electrical loads on the system. Expedition® Report R_NP 01 Note Pads QI9215 P FTR�7-0-111W, � 323-4500 BOISE, IDAHO RCE -1875 r ROCK SOT 7 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 36 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 38 _ ASI No. 0038 00001 NEW Be advised of the following modifications to 10/31/2007 hardware requirements to the following doors. Modify hardware as required for a secure door with access by card reader and or key only. 1.Add Card Reader to door 002 2.Add Card Reader to door 004 (One active leaf of pair of doors to room 004) 3.Add Card Reader to door 005 4.Add Card Reader to door 106 5.Add Card Reader to door 108 6.Add Card Reader to door 200 7.Add Card Reader to door 202 8.Add Card Reader to door 300 9.Add Card Reader to door 302 10.Add Card Reader to door 101E 11.Add Card Reader to door 312 ASI 39 ASI No. 0039 00001 NEW Sheets A2.11T and A2.12T: Relocate WIndow 11/2/2007 Type "Q", typical of (2), at the City Council Chambers per the enclosed sketch SK -1 and SK -2. ASI 40 ASI No 0040 00001 NEW PETRA AJ Sheets A2.11T, A2.12T, A2.21T and A2.22T: 11/8/2007 Relocate the roof and overflow drain piping shown at gridlines 1-F and 12-F per the enclosed Sketches SK -1, SK -2, SK -3, and SK -4. Coordinate relocation with mechanical. Attachments SK -1, SK -2, SK -3, SK -4. Expedition® Report R_NP_01 I�\ Note Pads 323-4500 BOISE, IDAHO RE-1875 i11�/Tr ��\TT GF MRAT_ CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 37 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 41 ASI No. 0041 00001 NEW PETRA AJ Reference. Full Tenant Improvement with MEP's 11/19/2007 1 1 1 1 1 1 1 1 1 1 1_ ExpeditionO Sheets A2.12T and P1.12: Multi Purpose 142 - Delete the sink (P-11) from South section cabinets. Sheet A2.2 IT: 1. Work area 212: Revise per enclosed sketch SK -1. 2. Mens Shower 225 and Womens Shower 226: Delete all plumbing fixtures and revise to be Storage Rooms 225/226 as shown on enclosed sketch DK -1. Coordinate deletion with mechanical. Sheet A7.21T: 1. Work Area 212: Revise per enclosed sketch SK -2. 2. Men's Shower 225 and Women's Shower 226: Delete all plumbing fixtures and revise to be Storage Rooms 225/226 as shown on enclosed sketch SK -2. Provide lay -in acoustical ceiling as shown. SheetP2.11: Mens shower 225 and Womens Shower 226: Delete all plumbing fixtures and associated piping from these rooms. Sheet M2.11: Mens Shower 225 and Womens Shower 226: Delete all exhaust grills and associated duct work from these rooms. Sheet E2.21F: Mens Shower 225 and Womens Shower 226: Delete the Fire Alarm Horns at these two rooms. Sheet E2.21L: Mens Shower 225 and Womens Shower 226: Revise lighting at these two rooms to provide (1) GF2 type fixture at each room with normal switching. Attachements: Sketches SK -1, SK -2. Report RNP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 38 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 42 ASI No. 0042 00001 NEW PETRA A3 Reference: Full Tenant Improvement with MEP's 11/19/2007 Sheets A6.12T: Elevation C5 - Revise the millwork for Reception 354 per the enclosed sketch SK -1. Note the millwork for Reception 321 to remain as per the original drawing. ASI 43 ASI No. 0043'' 00001 NEW PETRA WB Reference: Full Tenant Improvement with MEP's 11/19/2007 Access Flooring System 10270: Color selection for the Static Conductive Plastic Laminate in Rooms 311 and 312 is 'Tate 'Access Floor System Folkstone Graphix. u ASI -'44 ASI No. 0044` 00001 NEW PETRA AJ Reference: Full Tenant Improvement with MEP's 11/19/2007 Sheet A8.3T: Detail E1, revise condoc note 06402110 (Wood veneer over MDF) to be 09260.P (5/8" type 'X' Gypsum Board). ASI 45 ASI No. 0045' _ 00001 NEW PETRA A) Reference: Full Tenant Improvment with MEP's 11/19/2007 Sheet A7.21T and A7.22T: Revise the ceiling height of Unassigned Rooms 211 and 252 to be 9'-4". Revise the soffits of Lobby 111 to 9'-4" above the 2nd floor. ' Sheet M2.11 and M2.12: Revise the duct work at FT -18 and FT -19 per the enclosed sketch SK -12 and SK -13. ASI 46 ASI No. 0046 00001 NEW Reference: Full Tenant Improvement with MEP's 11/19/2007 Sheet A6.6T: Elevation -D1; Revise elevation per enclosed sketch SK -1. Expedition® Report R_NP 01 Note Pads jo'� �� J� 1� --A 323-4500 BOISE, IDAHO ITM 1 RCE -1875 ROCK SOLID GFNMRAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 39 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 47 ASI No. 0047 00001 NEW Reference: Full Tenant Improvement with MEP's 11/20/2007 Sheets M1.01, M1.02, M2.01, M3.01, and M3.02: Revise the locations of the clouded VAV units per the enclosed sketches. AttachementsL SK -9, SK -8, SK -7, SK -5, SK -6 ASI 49 ASI No. 0049 - ....... 00001 NEW Reference: Full Tenant Improvement with MEP's 11/20/2007 Sheets E2.11S, E2.12S, E2.21S, E2.22S, E2.31S and E2.32S: Revise the layout of the cable tray ' at each area per the enclosed drawings. ASI 50 ASI No. 0050 00001 NEW Reference: Full Tenant Improvement with MEP's 11/19/2007 Sheet A2.22T: Provide openings in the gypsum board at the top 12" of the wall along Gridline 9 for a return air path, net open area in wall shall be at least 13.33 sq. ft. See enclosed sketch SK -1. Sheet M2.11 and M2.12: Revise the duct work layout at the clouded areas shown on the enclosed sketch SK -14 and SK -15. Attachements: Sheet SK -1, SK -14 and SK -15. ASI 51 > ASI No. 0051R 00001 NEW Reference: Full Tenant Improvement with MEP's 11/20/2007 Sheet A3.3T: Revise detail D1 per enclosed sketch SK -1. Note this revision only occurs at the head of window type '3' along gridlines 1 and 12, between gridlines F -J. All other locations are to be per the Construction Documents. Expedition® Report RNP 01 DE R\\� Note Pads R�CORP(uATFD 323-4500 BOISE, IDAHO RCE -1875 TM GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 40 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI.52 _ _ASI No. 0052 00001 NEW PETRA AJ Reference: Cold Shell and Core 11/26/2007 Sheet S2.41: Add W8x10 beam at the east end of the elevator penthouse at gridline 3 F. Provide additional detail reference C7/S7.5 for angle deck support between column and stair corner. See attached sketch SK -1. Sheet S2.42L Add W8x10 beams at each end of the elevator at the elevation of the primary roof. Add W8x10 beam to the west elevator shaft also. See attached sketch SK -2. Sheet S2.42: Provide additional detail reference C7/S7.5 for angle deck support between column and stair corner. See attached sketch SK -3. Sheet S7.5: Add detail C5 showing a 4x4x1/4 angle spanning between the column and the masonry wall to provide support for the roof decking. See attached sketch SK -4. Attachements: Sheets SK -1, SK -2, SK -3, SK -4 ASI -53. ASI No. 0053 00001 NEW Reference: Full Tenant Improvement with MEPs 12/2/2007 Sheets M2.01, M2.02, M3.01 and M3.02: Delete all manual dampers shown on the inlets of all under floor VAV boxes. Expedition® Report RNP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 rw i ROCK SOIM I GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 41 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 54 ASI No. 0054 _ 00001 NEW PETRA AJ Reference: Cold Core and Shell Package. 12/3/2007 Sheet 52.41: Adjust the roof elevation at gridline E to be 46-10 1/2". This information was revised in submittals. Provide reference to new detail B5/S/7.6, which shows the proposed method to adjust the top of the masonry wall to the correct elevations. See enclosed sketch SK -1. Sheet S2.42: Adjust the roof elevation at gridline E to be 46-10 1/2". This information was revised in submittals. See enclosed sketch SK -2. Sheet S7.6: Add detail B5 showing a TS12x2x3/16 section cut to match the roof slope for the wall adjacent to gridline 3. See enclosed sketch SK -3. Sheet S 7.6: Revise detail C7 to indicate that the length of the dowels between the masonry wall and the concrete slab on deck will need to vary due to the slope of the roof. See enclosed sketch SK -4. Sheet S7.6: Revise detail C7 to indicate that the length of the dowels between ASI'55 ASI No 0055 00001 NEW Reference: Community Plaza and Site 12/3/2007 Improvements: Sheet L1.70: Terllis Construction Details, See enclosed sketches SK -1, SK -2, SK -3, which clarify the materials and construction of this structure. Expeditione Report RNP 01 1 1 1 1 1 1 Note Pads ETR INCORIO&ATED� 323-4500 BOISE, IDAHO I RCE -1875 ,r GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 42 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 56 ASI No. 0056 - --- _ __-__. 00001 NEW Reference. Full Tenant Improvement with MEP's 12/10/2007 Sheet A2.11TF: Revise wall type at Plan Vault 118 and Storage 126 to wall type 6 as detailed on sheet A8.OT. Sheet A2.21TF: Revise wall type at Plan Vault 210 to wall type 6 as detailed on sheet A8.OT. Sheet A2.22TF: Revise wlal type at Storage 244 to wall type 6 as detailed on sheet A8.OT. Sheet M1.01: Provide (2) additional fire smoke dampers and duct work at Storage Rooms 126 and 134 (leach) per enclosed sketch SK -1. ASI 57 ASI No 0057 00001 NEW Reference: Full Tenant Improvement with MEP's 12/10/2007 Note: This ASI is clarifying the ceiling heights of the 2nd floor Lobby, Waiting and Main Corridors. Previously issued ASI's #22 and #45 had revised some of the ceiling heights in this area, please disregard these and use the information described here. Sheets A7.21T and A7.22T: Revise ceiling heights per enclosed sketches. Sheets A2.21T and A2.22T: At doors #222A and 262 only, revise frame type "Z" to be 9'-4" tall. At door #224 only revise frame type "C" to be 9'-4" tall. Report R NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GSR .L CONTRACTORS 1097 N. ROSARIO STREET - MERIDIAN, ID 83642 - PHONE: (208) 323-4500 - FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 43 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 58 ASI No. 0058 00001 NEW Full Tenant Improvement with MEPs. 1/4/2008 ASI 59 ASI 'No. 0059 ' 00001 NEW ASI 60 ASI No. 0060 Ecpeditione Sheet E2.1113: City Council Conference 133, the power for motorized shades shall be located at the right side of each window opening, when facing the opening from inside the room (Keynote #22). Sheet E2.32P: Mayor's Suite 343 and Executive Conference 346, the power for motorized shades shall be located at the right side of each window opening, when facing the opening from inside the room (Keynote #15). Reference:Full Tenant Improvement with MEP's 1/14/2008 Sheet E2.12S: Revise the cable tray layout per the enclosed sketch SK-E2.21S-1. 00001 NEW Reference:Full Tenant Improvement with MEP's: 1/14/2008 Sheet A2.01T: In Women's and Men's 022 add a door at the void adjacent to the countertop to create a storage closet per enclosed sketch SK -1. Finish interior walls and ceiling of storage closet with painted gypsum board. Ceiling height to be 9'-6". Floor finish to be sealed concrete. Sheet A3.OT: Add doors 019A and 022A to the door schedule per enclosed sketch SK -2. Report R_NP_01 \� Note Pads 323-4500 BOISE, IDAHO I RCE -1875 rw GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 44 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 61 ASI No. 0061 00001 NEW Building Commissioning: Provide all labor, 1/17/2008 materials and equipment as required to assist Heery International, Inc. to complete LEED 2.2 commissioning services, Indoor Air Quality (IAQ) management plan during construction (LEED NC v2.2 IEQ credit 3.1) and Indoor Air Quality (IAQ) management plan pre -occupancy phase (LEED NC v2.2 IEQ credit 3.2) and per attached Commissioning Policies and Procedures Manual dated January 16, 2008. NOTE: THIS IS A NOT COST CHANGE AND IS ISSUED FOR SUPPLEMENTAL INFORMATION ONLY. ASI 62 ASI No. 0062 00001 NEW Sheet A2.11T: Revise the location of the wall 1/17/2008 containing door 124A and reverse frame type C and door 124A per enclosed sketch SK -1. Sheet A2.12T: Revise the location of the wall at frame type L and door 143 per enclosed sketch SK -1. Expedition® Report R_NP_01 Sheet A2.32T: Revise the location of the South wall of Communications Office 351 and reverse frem type E and door 351 per enclosed sketch SK -2. ASI 63 ASI No. 0063 00001 NEW Sheet A9.OT: Enlarged Elevator Plan - B5: 1/22/2008 Revise the 10'-8" dimension to be 10'-2" per enclosed sketch SK -1. ASI 64 ASI No. 0064 00001 NEW Reference. Full Tenant Improvement with MEP'S 1/22/2008 Specification Section 08710: Hardware Schedule: Doors 100A, 100B, 100C and 10OD: Revise the closure to be a surface mounted device in lieu of the floor type specified. rinciiroc to ha Carnant Mnrlel 351 - Expedition® Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 rw GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 45 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 65 ASI No. 0065 00001 NEW Reference: Full tenant Improvements with MEP'5 2/4/2008 ASI 66 ASI No 0066'' 00001 NEW ASI 67 ASI No. 0067 Sheet A2.12TL At office 159: Revise the layout and revise window frame type to be E per enclosed sketch SK -1. At Purchasing Manage Office 160: revise the layout and reverse window frame type F per enclosed sketch SK -1. Reference: Full Tenant Improvement with MEP'S 2/11/2008 Specification Section 15440: Reference Lavatory P-4 Note: Revise sensor operation to be battery operated in lieu of electric transformer operated. 00001 NEW Full Tenant Improvement with MEP's 2/28/2008 Sheet A6.0: Revise the framing dimensions for the showers at Shower 021 and 024 per the enclosed sketch SK -1. ASI 68 ASI No. 0068 00001 NEW Reference: Full Tenant Improvement with MEP's 3/3/2008 Sheet A2.31T: At Server Room 311, add window type BC, per the enclosed sketch SK -1. Sheet A3.1T: Add window type BC, per the enclosed sketch SK -2. Expedition® Report R_NP_01 Sheet A2.12T: Revise the location of Door#143/Frame Type L as shown on the enclosed sketch SK -1. Sheet A7.12T: Revise the ceiling at the area of Door #143/Frame Type L as shown on the enclosed sketch SK -2. Expedition® Report R_NP_01 Note Pads PETR 323-4500 BOISE, IDAHO RCE-1875n ROCK SOLID GENERAL CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 46 of 56 ' Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI> 69 ASI No. 0069 -- - _. ___._ ............. - --- ._... _.-__.........__. -_ ....... 00001 NEW _..— .. -- _ __ .. - - ._.._...... Reference. Full Tenant Improvments with MEP's 3/3/2008 Sheet A2.21T: At Deputy Cheif-Prevention #234 and Recreation Super # 240: Revise door ' frames at both rooms to be type 'G' and swap door frames from one room to the other, per the enclosed sketch SK-1. Note the head of ' frame type V is to be at 8'-10", per detail C6/A3.1T. Sheet A7.2T and A7.22T: At Gridline E, Between gridline 5.5 and 7.7; Frame out around beam per detail A5/A8.IT at Open Office and B4/A8.IT at Offices 234 and 240, per the enclosed sketch SK-2. ASI''70 ASI No 0070 -------------_ __-------____-- _ _-.__-__ ___ _.... ____.___-_ -._ ---- __ 00001 NEW __.._ ___.__. __.--__-_- -- __._ _.._-------_.---_ Reference: Full Tenant Improvment with MEP's 3/11/2008 Sheet A2.11T: The window between Conference 156 and Payroll 161 should be Type 'W", not X. _ ASI 771 ASI No 0071 — 00001 NEW Reference: Full Tenant Improvments with MEP's 3/11/2008 Sheet A2.12T: Revise the location of Door#143/Frame Type L as shown on the enclosed sketch SK -1. Sheet A7.12T: Revise the ceiling at the area of Door #143/Frame Type L as shown on the enclosed sketch SK -2. Expedition® Report R_NP_01 Note Pads 323-4500 T BOISE, IDAHO RCE -1875 ' GRNFJ A -L CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 47 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 72 ASI No. 0072 00001 NEW PETRA A) Reference: Full Tenant Improvments With 3/18/2008 MEP's. ASI 73 ASI No. 0073 1 00001 NEW ASI 74 ASI No. 0074 Expedition® Sheets A 2.12T A2.12TF and A7.12T: Revise the location of the wall between Open Office #309 and Unassigned #314 as shown on the enclosed sketches SK -1 SK -2 and SK -3. Sheets M3.01 and M3.11: Revise the mechanical system at the area Open Office #309 and Unassigned #314 as shown on the enclosed sketches and SK -20 and SK -21. Sheets E2.31F, E2.31L, E2.31M, E2.31P and E3.02: Revise the electrical system at the area Open Office #309 and Unassigned #314 as shown on the enclosed sketches SK-E2.31F-IA, SK-E2.31L-lA, SK-E2.31M-1A, SKE2.31M-1B, SK-E2.31M-1B, SK-E2.31P-1A, SKE2.31P-1B AND SK -E3.02-1. Attachements: SK-E2.31F-1A, SK-E2.31L-IA, SK-E2.31M-1A, SKE2.31M-1B, SK-E2.31M-1B, SK-E2.31P-1A, SKE2.31P-1B AND SK -E3.02-1. Reference: Full Tenant Improvement with MEP'S 3/11/2008 Provide Blackout Shades at the exterior windows of Room 133 City Council Conference; Room 343 Mayor Suite; and Room 346 Executive Conference Room, per enclosed Specification Section 12494. Attachments: Specification Section 12494 00001 NEW Reference: Full Tenant Improvement with MEP'! 3/25/2008 Per RFI #100: Provide grounding of the access floor system as described int he attached RFI. Report R NP_O1 Note Pads ETR INCORPCYAlFD - 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 48 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 7S ASI No. 0075 00001 NEW Reference: Full Tenant Improvement with MEP'! 3/25/2008 ASI 76 ASI No. 0076 00001 NEW Owner Requested Additional Data Drops: Per the City of Meridian's request, provide (40) additional data drops of CAT 5E, non -terminated cable per floor (1st, 2nd and 3rd). See enclosed sheets for location and quantity. - Reference: Full Tenant Improvement with MEP'! 3/25/2008 Sheet A8.1T - Detail 132 - Folding Partition Detail: Provide a C 10 x 20 channel for support of the door track. Spacing of supports is to be per the manufacturers recommendations. Additionally the access flooring at the stack end of the folding partition shall be recessed a minimum of 2" to receive the floor guide track, per sheet 3 of the Modernfold submittal. ASI 77 ASI No. 0077 00001 NEW PETRA AJ Reference: Full Tenant Improvment with MEPs. 3/25/2008 Sheets SK1.01, SE1.04, and SE1.05: Revise the site lighting per the enclosed sketches SE1.01-1, SE1.04-1 and SE1.05-1. ASI'78 ASI No. 0078 00001 NEW Reference: Full Tenant Improvement with MEP's 3/25/2008 Sheet A6.6T - Elevation C1 -Front Counter, Room #238: Revise elevation "C" per the enclosed sketch SK -1. Expedition® Report R—NP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 49 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 79 ASI No. 0079`' 00001 NEW Reference: Full Tenant Improvement with MEP'S 3/31/2008 Specification Section 09310 — Tile: CT3, Color to be 0051 Matte Vanilla. Add the following trim pieces: Bull nose: S4369, 54639, SCR4369 and SCR4639. Note these pieces are to be used at the top tile of the wainscots and outside corners. ASI 80 ASI No. 0080 00001 NEW Reference: Full Tenant Improvment with MEP's 3/31/2008 Sheet2.6T - First Floor Room Finish Schedule: Room #111 - Lobby, revise West wall to be paint color P3, to match other walls. Sheet2.6T - All Room Finish Schedules: At all rooms shown with ACP/GYP under the ceiling finish material column of the schedules, revise the paint color of the gypsum board to match the typical wall color of that room per the schedule (this will be either paint color P1 or P3), except as noted at Lobby 111 and City Council Chambers 135 on the enclosed sketch SK -1. Sheet6.2T - A4 A4 Looby 111 Elevation: Revise the paint scheme per the enclosed sketch SK -2. Sheet A6.3T - CI Corridor 113 and 123 Elevation: Revise the paint color below the chair rail to be P8. t 1 Expedition® Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO I RCE -1875 .n [ ROCK S01M `1 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 50 of 56 Note Padltem No. Status Required Ball In CourtNotes Opened Closed ASI 81 ASI No. 0081 00001 NEW Reference: Full Tenant Improvement with MEP's 4/28/2008 Sheet A2.21T - Second Floor - Area 1 Floor Plans: 1. Per previously issued ASI #41, Showers 225 and 226 were modified to be Storage spaces, per the owners request these rooms will now be Offices, see enclosed sketches SK -1 ans SK -3. 2. Add office 263 adjacent to Office 218 as shown on enclosed sketches SK -1. Hardware for door 263 is to match door 218. 3. Revise Unassigned Space #211 to be Conference Room per enclosed sketch SK -2. Sheet A2.6T-Roof Finish Schedule: 1. Revise the finishes for rooms 211, 225, and 226 per enclosed sketch SK -3. 2. Add room 263 to the schedule per enclosed sketch SK -3. Mechanical: Revise the mechanical work in the above noted spaces per the enclosed sketches. Electrical: Revise the electrical work in the above noted spaces per the enclosed sketches. ASI 82 ASI No. 0082' 1 Expedition® Reference: Full Tenant Improvement with MEP'S4/15/2008 Sheet A2.01T — Basement Floor Plan — Area 1: Due to the electrical gear extending into Mechanical Room 003 make the flowing revisions: At door # 003B, reverse doors and frame in the existing framed opening so that the doors swing out. Revise the hardware for door #003B as follows: Delete the (2) flush bolts, passage set and dust proof strike and add a Sargent vertical rod exit device, model # 8715-LBR-ETL. Repoli RNP 01 Note Pads 323-4500 BOISE, IDAHO I RCE -1875 tx GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 51 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 83 __ ASI No. 0083 _...... 00001 NEW Reference: Cold Shell and Core 4/21/2008 Sunshade Color- Per the City of Meridian's review of the painted sunshade samples, the color is to be #1 left sample which is one shade darker then P-7. Attachments: None ASI 84 ASI No. 0084 00001 NEW Reference: Cold Shell and Core 4/28/2008 Exterior Exposed Metal: All exterior exposed metal between gridlines 6 and 7 at the curved upper roof and front entry canopy is to be painted to match the prefinished metal roofing color (Silver Metallic). _ ASI 85 ASI No. 0085`: 00001 NEW Reference: Full Tenant Improvements with MEP':4/28/2008 Electrical: Per the owners request to provide additional electrical outlets for a Christmas tree in the Lobby and exterior lights and power for a possible future exterior signage or clock, provide the necessary work per the enclosed letter from Eidam and Associateds dated April 22, 2008. Attachements: Sketch Sheets: SK-E2.11P-1, SK -E2.40 -1A, SK -E2.40-16, SK -E2.40 -1C, SK -E2.40-11), SK -E2.40 -1E, SK -E2.40 -1F, SK-E3.01-1,SK-E3.02-3A, SK -E3.02-313, SK -E3.05 -2A, SK -E3.05 -2A, SK -E3.05-213. Expedition® Report R NP -01 Note Pads ETR INGORYC9ATED 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 1012/2008 Project No: 06-0675 Page: 52 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 86 ASINo. 0086 00001 NEW Reference: Full Tenant Improvments with MEP's 5/5/2008 Sheet A6.6T: Elevation E3 -Mail Room #128 & 129, provide (2) tube steel (Painted) braces per enclosed sketch SK -1. Sheet A8.2T: Cabinet Section D5, At Mail Room #128 &129, provide (2) tube steel (painted) braces per enclosed sketch SK -2. Attachements Sketches SK -1 and SK -2 ASI 87 ASI No 0087` 00001 NEW Reference: Full Tenant Improvement with MEPs 4/28/2008 Sheet M1.11 Revise the supply duct work from FT -13 as shown on the enclosed sketch SK -30. Attachments SK -30 1 1 1 1 1 1 ExpeditionO Report RNP 01 Note Pads P �PMRR 06-2-0--`-�' 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 53 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 88 ASI No. 0088'' 00001 NEW Reference: Community Plaza and Site 5/1/2008 Improvements Water Feature: Revise the water features per the enclosed Bulletin #22 from Petra Inc. Dated 4/30/08. The plaza changes to the water feature are as follows: 1) Change to Aquasol System - WTC-L. The system will come as a complete unit. See the attached from Aquasol. 2) Delete the Bromine System. 3) Change to a 36" Baker Hydro HRV, High Rate Permanent Media Filter. 4) Change to a 5.5' tall return tank to acccomodate the over flow line. 5) Add a six inch overflow line from tank to AD -5. 6) Change AD -5 to a precast 24" diameter x 4' tall with grate type to accommodate new overflow from tank. 7) Change pump to turbine type with programmable VFD. VIT-CATM 1 stage 6x11 CLC. 8) Add concrete enclosure on top of tank with grates to cover pump and valves. 9) Use four inch line in and out of filter room at Heritage Building. Filter line to discharge into tank. 10) The return from the canal shall be eight inch. 11) The return from the pool shall be six inch until it connects to the Stream. 12) The return from the Stream shall be eight inch until it connects to the Pool return. 13) Pool and Stream will connect into a ten inch and return to the tank. 14) Delete drain to sanitary sewer. 15) All supply to water features to be six inch. 16) Pool weir to be eight inch in length. 17) There shall be two each of two inch water services to be installed in the mechanical room of the Hertiage Building. One each for the Expedition® Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 54 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed Heritage water service. One each water feature. ASI 89 ASI No. 0089 00001 NEW Reference: Cold Shell and Core Package 5/5/2008 Site: Per the Owners request to maximize the parking count at the South parking lot, revise the layout per the enclosed sheets C1.2AR andC3.1AR. ASI 90 ASI No. 0090 00001 NEW Reference: Full Tenant Improvement with MEP'S 5/5/2008 Finish Legend: See the attached Finish Legend for all interior materials color selections. ASI 91 ASI No. 0091 00001 NEW Reference: Community Plaza and Site 5/7/2008 Improvements Community Plaza and Site Improvements: Per the Owners request to maximize the parking count at the South parking lot, revise the layout per the enclosed sheets L1.40, L1.42 and L1.50. ASI 92 ASI No. 0092 __ ............ _--.__ ------ .__ --------- . _ ..... . . 00001 NEW Reference: Community Plaza and Site 5/12/2008 Improvements Sheets: L1.64, L1.65, L1.68 and L1.69: All brick veneer shown on the Stream water feature and the Canal water feature is to be match brick color #1 from the Main Building Shell and Core Package, Interstate Brick, Color: Canyon Rose, Texture: Matte. Sheets: A2.0, A3.0 and A3.1: All brick veneer use for the Restroom Building is to be per the Community Plaza and Site Improvements specification, Owner furnished brick. Attachments None Acknowledged By: Brent Pitts Contractor Lombard -Conrad Architects, P.A. Expeditione Report R_NF_01 Note Pads PETR 323-4500 ' BOISE, IDAHO RCE -1875 ITU 00001 NEW Expedition® Reference: Full Tenant Improvement with MEP'.- 5/28/2008 Sheet A2.6T - Room Finish Schedule: Revised the flooring from VCT to Carpet Tile at the following rooms: Hall 125, Mail 127, Mail 128, Storage 134, Storage 244, Storage 324, and Storage 335. At Receiving Room 129 provide VCT as called out, except at the area where FB -B is to be relocated , provide Carpet Tile. See mechanical directions below. Sheet M1.01 First Floor HVAC Plan: At Receiving Room 129, relocated FB -B to the Northeast corner of the room. Report RNP 01 GFNFff Ai. CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 55 of 56 1 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 93 ASINo. 0093 00001 NEW _. ------ _ __.. --------- Reference: Full Tenant Improvement with MEP's 5/12/2008 Sheets A2.22T: Per the owners request provide a wall at teh Assistan Planners #257, AS shown on the enclosed sketch SK -i ASI "95 ASI No. 0095. 00001 NEW Reference: Full Tenant Improvement with MEP's 5/21/2008 Specification Section 06200 - Interior Finish Carpentry: The stain color for all interior standing and running trim is to match the stain color for the Interior Wood Doors, approved by this office on 3/27/08 -- ASI 96 ASI No. 0096 -...........- — 00001 NEW Reference: Full tenant Improvement with MEP's 5/21/2008 Sheet a6.6t - Elevation E3 - Mail Room 128 and ' 129: Provide an additional section of opent cabinets as shown on the enclosed sketch SK -1. Area above cabinets to remain open. ASI 97 ASI No. 0097 J 00001 NEW Reference: Cold Shell and Core Package 5/28/2008 Sheet A1.0: D1 - Enlarged Plan: Relocated the gas meter as shown on the enclosed sketch per eq Interuntian Gas Company the request mo � ASI' 98 ASI No. 0098 00001 NEW Expedition® Reference: Full Tenant Improvement with MEP'.- 5/28/2008 Sheet A2.6T - Room Finish Schedule: Revised the flooring from VCT to Carpet Tile at the following rooms: Hall 125, Mail 127, Mail 128, Storage 134, Storage 244, Storage 324, and Storage 335. At Receiving Room 129 provide VCT as called out, except at the area where FB -B is to be relocated , provide Carpet Tile. See mechanical directions below. Sheet M1.01 First Floor HVAC Plan: At Receiving Room 129, relocated FB -B to the Northeast corner of the room. Report RNP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 56 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 99 ASI No. 0099 00001 NEW Reference: Full Tenant Improvement with MEP': 5/29/2008 Sheets E2.40, E3.04: Provide heat tape at the barrel vault roof gutters. See attached sketch sheets SK-E2.40-2KA, SK -E2.40-213, SK -E2.40 -2C and SK -E3.04-2. Expedition® Report R_NP_01 Note Pads ETR U1,00"CYAM. 323-4500 BOISE, IDAHO RCE -1875 TM GENERAL CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 7 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 100 ASI No. 0100 00001 NEW ASI 101 ASI No. 0101 ' 00001 NEW Reference: Full Tenant Improvement with MEP'! 5/29/2008 Sheets A3.OT: Per the Owner's request, revise doors 225 and 226 to by type "C" and revise hardware group to be #25. Reference: Community Plaza and Site 5/27/2008 Improvements Sheets A1.0: Refer to the attached sketch SK -1, Enlarged Plan - E2 for the correct opening layout at the existing smoke stack door. Attachments: Sketch SK -1 Note Pads 323-4500 BOISE, IDAHO I RCE -1875 ru GENERAL CON'TRAC'TORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 8 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 102 ASI No. 0102 00001 NEW Reference: Cold Shell and Core Package 5/27/2008 Sheet A3.3: Add enclosed Sill Detail to sheet A3.3. This sill detail is to be used at doors #307 and 348. Revise the height of window frame type CC, which was added as part of PR #1, to be 8'-8" with the sill of the frame 8" above finish floor. Attachments: Sketch SK -1 ASI 103 ASI No 0103 00001 NEW Reference: Cold Shell and Core Package 6/3/2008 Sheet A2.20: Per the owner's request, provide stone ballast ( 5 lbs/s.f.) at the low roof above the main entry doors. ASI104 ASI No. 0104 . 00001 NEW Reference: Full Tenant Improvement with 6/3/2008 MEP'S: Sheet A6.OT B1 Enlarged Plan Basement: Showers 021 and 024, at each individual shower stall provide an additional shower curtain and rod at teh shower spacem in addition to the current one shown outside the drying area. ASI 105 ASI No. 0105 00001 NEW Reference: Full Tenant Improvement with MEP'S6/3/2008 Sheets SE1.01, SE1.03 and SE1.05: Delete the previously specified 'SL1' luminaries from the project and replace with enclosed product data sheets. Revise the lighting design at the canal water feature per to attached sheets. See the attached sketch sheets showing the revised luminaries schedule, and details for construction. Expedition® Repot R_NP_01 i 1 1 1 1 1 1 1 1 Note Pads ETR INCO1PClA7ZD, 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 9 of 56 00001 NEW Reference: Full Tenant Improvement with MEP's 6/5/2008 Sheet a2.22T: Per the owners request revise the location of the wall between Storage 244 and Conference 245 and add door #243 as shown, per the enclosed sketch SK -1. Door and frame for door #243 is to match door #223, with Hardware Group 21.0 Report R_NF_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GHN IRAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 10 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 108 ASI No. 0108 00001 NEW Reference: Full Tenant Improvement with MEP'S 6/9/2008 ASI -109 ASI No. 0109 00001 NEW TRANSIENT VOLTAGE SURGE SUPPRESSION Furnish and install Transient Voltage Surge Suppression (TVSS) Devices at switchboards MSBH, MSBL, and ESB. TVSS devices shall be in a separate enclosure (not integral to switchboard) and shall be installed as near as possible to the switchboard. TVSS shall have the following specifications: 1. Furnish with disconnecting means for maintenance. Connect to circuit breaker in respective switchboard as required by Code. 2. Surge Current Per Phase: Main Switchboards - 250 KA, Distribution Switchboards: 120 KA. 3. LED Status indicator per phase. 4. Surge counter. 5. Audible indication of failure. 6. Provide normally open/normally closed contacts (5A/125 VAC) for remote monitoring/annunciation. TVSS shall be of the same manufacturer as the respective switchboard. Reference: Full Tenant Improvement with MEP's 6/11/2008 Sheet A6.12T: Elevation E1 -Teller Counter #151: Delete the (2) middle section of the upper counter top dividers as shown on the enclosed sketch SK -1. Expedition® Report R_NP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 12 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ' ASI 110 ASI No. 0110 _. .. ....... __-------_._.._ __ 00001 NEW Reference: Full Tenant Improvement with MEP's 7/14/2008 ASI Ill- ASI No. 0111 _.... 00001 NEW Expedition® Sheet M4.11: Revise the mechanical work as follows: the Exhaust Fan EF -2, 48"x48" louver will be ducted outside on the north wall towards the east parapet. The discharge will terminate 8'-0" from the east parapet. Contractor to provide 30 degree angled discharge with a 1"xl" mesh bird screen. The duct size shall be 48"x16". Connect to 48"x48" louver with the 48"x16" duct. Duct shall be mounted on wall with the narrow side out from the wall. Drop duct down low enough to not be revealed above the parapet. The sewer vent located to the south of the louver shall be connected to and offset to the north wall and routed on the wall below the exhaust duct noted above. The vent shall terminate at the end on the exhaust duct in a vertical position per code. This work shall occure after the penthouse sideing has been installed. Attachments to the siding shall be make weather tight. Reference: Community Plaza and Site Improvements: Sheet L1.20: Add concrete sidewalk and stair at the north stair tower exit door and the fire riser room door as shown on enclosed sketches L1.20 -A and 1-1.20-13. Construct stair and handrail per detail #2 sheet 1-1.62. 6/20/2008 Report R_NP_01 Note Pads PETR� 1 _ 323-4500 ' BOISE, IDAHO RCE -1875 n GLNF- AT. CONTRACTORS ' 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 13 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 112 ASI No. 0112 00001 NEW Reference: Community Plaza and Site 6/16/2008 Improvements: Incorporate the following revisions to the civil drawings. These revisions are in response to ACHD Comments: Sheet C1.1A 1.Tree well at approximately 10+70 on Broadway has been relocated to allow a 10'-0" separation from the 1,500 gallon sand and grease trap. 2.Curb return driveway approach at the Broadway parking area has been revised to be constructed with a curb return driveway with 4 foot valley gutter per SD -708 and SD -807 without deceleration lane). Construct the approach using a minimum 15 -foot curb radius. Construct pedestrian ramps per SD -712C at the curb return approach. Provide matching elevations for the curb return driveway. 3.Parking striping plan along Broadway has been added. 4.Pedestrian ramp at Broadway crossing has been shifted to the west to align with the pedestrian ramp on the north side of Broadway. Sheet C1.2A 1.5.5' dimension between back of curb and paver retainer curb has been added along Meridian Road. 2.Revision to south parking lot has been added per ASI #89. Sheet C1.3A 1.Sheet C1.3A has been added for alley improvements. Sheet C2. 1A 1.Notes have been changed to note that all pit run shall be 6 -inch minus. Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 rr GFNFJ AI. CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 14 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed 2.Note for Type P surface repair has been revised to add reference to ISPWC standard for street repairs per SD -301, SD -303 and SD -806 (minimum cross -slope). Asphalt cut lines shall be a minimum of 2 feet for the pavement match including driveway approaches and utility cut street repairs on Broadway. Sheet C2.2A 1.Add this sheet to the drawing set. ASI 113 ASI No 0113 00001 NEW Reference: Full Tenant Improvement with MEP'S6/18/2008 Sheet A6.7T - Elevation B5 — Casework #346: Per the Owners request revise the base cabinets to provide space for an under counter refrigerator, per the enclosed sketch SK -1. Sheet E2.32P: Executive Conference Room #346: Provide power at the owner requested under counter refrigerator, extend power from the left hand above counter outlet. ASI; 114 ASI No. 0114 00001 NEW Reference: Full Tenant Improvement with MEP'S 6/23/2008 Wireless Internet: Per the Owners request furnish all labor, material and equipment necessary to install CAT 5E cable, terminated at service boxes located above ceiling at location shown on the enclosed sketch SK -1 and connect to patch panel in the nearest Tele/Comm room. ASI 115 ASI No. 0115 00001 NEW Reference: Full Tenant Improvement with MEPs 7/1/2008 Sheet A2.21T: At Unassaigned Space #223, provide all labor, material and equipment necessary to install 7/8" hat channels and 5/8" type gypsum board at the area of exposed CMU wall along Gridline #3. Expeditione Report RNP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 1012/2008 Project No: 06-0675 Page: 15 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 116 _ ASI No. 0116 - — — 00001 NEW Reference: Cold Shell and Core Packeage 7/14/2008 Sheet A1.0: Revise the emergency generator as follows: 1. Use remote fuel tank and reduce capacity. 2. Use remote muffler and pipe exhaust to muffler as required. 3. Saw can and opening in the wall of the generator enclosure and provide a louver in the opening, adjacent to and matching the size of the radiator of the generator. ASI 17 ASI N010117 . 00001 NEW Reference: Full Tenant Improvements with MEP':7/1/2008 Carpet Installation Clarification: CPT1 should be installed in the following Corridors/ Lobbies: 007, 008, 015, 204, 205, 222, 237, 246, 262, 304, 305, 308, 316, 317, &337 as an Ashler pattern with the stripes running perpendicular to the main corridor walls. Please see attached Sketches SK -1. SK -2 and SK -3 for clarification. CPT1: Quarter turn at all other scheduled locations, see Room Finish Schedule A2.6T. CPT2: Quarter turn at all scheduled locations, see Florr Finish Plans, A2.21TF, A2.22TF, & A2.31TF for layout. Expedition® Report R_NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 16 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 1'18I No 0118.:. 00001 NEW Reference: Community Plaza and Site Improvements RE: Sheet SE1.00 Light Fixture P1 Location, C1.1 and C1.2A (ASI 112) Street light fixture type P1 along MEridian Road shall be located in the decorative brick paver strip as sown on sheets C1.1A and C1.2A as part of ASI 112 in lieu of the 5.5 foot landscape strip shown on sheet SE1.00. Aslo note location of southern most P1 light fixture shall also be installed as shown on sheet C1.2A. The face of the concrete foundation for the light fixtures shall be located 24" from the inside edge (edge adjacent to pavers) of the 6" concrete brick paver retainer strip. The face of the concrete foundation for the light fixtures located along Broadway shall be located 24" from the back of the 6 curb in lieu of front face of the curb. Refer to detail 4/SE1.03. ASI 119 ASI No. 0119 00001 NEW 7/8/2008 Reference: Full Tenant Improvements with MEP': 7/16/2008 RE: Building Access System Card Readers Per the City of Meridians request, revise the proximity card readers from teh HID I -class to the XceedID Multi -technology. Revise the smart cards from the HID 2k to the XceedIID 10k. See attached Change Order #1 from Apex dated June 27, 2008. P.- P NP n. Note Pads 323-4500 BOISE, IDAHO RCE -1875 GEN IR AL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 17 of 56 Note Padltem No. Status Required Ball In CourtNotes Opened Closed ASI 120 ASI No 0120 00001 NEW Reference: Full Tenant Improvement with MEP's 7/16/2008 ASI 121 ASI No. 0121 1 1- 1 1 Mechanical HVAC Piping and Control Modifications: It was brought to our attention by the Hydro Therm Boiler Representative that the boilers require a minimum flow rate of approximately 22 GMP per boiler. The current piping installation of the boilers is per the Heating Hydronic Piping Schematic - E-3, Sheet M6.2. The boilers are piped in a parallel configuration. The boiliers as piped will require a total minimum flow rate of 88 GPM. The following system modifications shall be made: Contractor shall provide and install a 3" by-pass between the HS & HR piping as shown on Sketch SK -33, Reference Schematic E-3, Sheet M6.2. Install a 2" Belimo 8252-ARX24-MFT modulation control valve in the new 3" by-pass. Valve provided by Columbia Hydronics. Modify control sequence as follows: The existing system pressure control shall modulate the VFD on loop circulation pumps to a minimum flow of 100 GPM, as system pressure builds on further rise in system pressure and modulate the new by-pass valve open to maintain a minimum flow of 100 GPM to boilers. Attached: Sketch SK -33 Expeditione Seet A2.311TF: Per the City of Meridians request, do not install the millwork in Open Office 309, shown by elevation C5/A6.7T. Contractor is to store this millwork on site for possible future installation, location to be coordinated with owner. 00001 NEW Reference: Fill Tenant Improvement with MEP's 7/24/2008 Report R_NP_01 Note Pads 5IL�P QTR I 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 18 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 122 ASI No. 0122 00001 NEW Reference: Full Tenant Improvement with MEP's 7/23/2008 Sheets SE1.00, E2.22P, E3.01, E3.04, E3.05: Per the City of Meridians request, provide additional site power and outlets in Employee Break #252 per the enclosed sketch sheets: SK-SE1.00-2A, SK-SE1.00-2B, SK-E2.22P-1, SK -E3.01-2, SK -E3.04 -3A, SK -E3.04 -3B, and SK -E3.05-3. 1 ASI 123 ASI No. 0123 00001 NEW Reference: 100% FFE Package 7/29/2008 Sheets A2.10, A2.20 and A2.30: Owner provided furniture layout is to be per enclosed sheets Attachments: Sheets A2.10, A2,20 and A2.30 ASI 124 ASI No. 0124 00001 NEW Reference: Community Plaza and Site 7/29/2008 Improvements Sheet C1.2AR: Per the City of Meridians request, provide all material and labor needed to provide a rolled curb and a 10'x 24'x 4" thick concrete slab on grade for motorcycle parking as shown in the enclosed sketch SK -1. Attachment: Sketch SK -1 1 Expedition® Report R—NP01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GFN$RAi- CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 19 of 56 Note Padltem No. Status Required Ball In CourtNotes Opened Closed ASI 125 ASI No. 0125 00001 NEW Reference: Community Plaza and Site 7/29/2008 Improvements ASI 126 ASI No. 0126 00001 NEW 1 i r i Expedition® Sheet 1-1/30: Per the City of Meridians request, provide all material and labor needed to relocate the City provided clock, extend the conduit and add additional unit pavers as shown on the enclosed sketch SK -1. The area of new unit pavers is to be an extention of the radius currently shown at teh East of the radius sidewalk. Attachments: Sketch SK -1 Reference: Full Tenant Improvement with MEP's 8/5/2008 Sheet A6.7T: Per City of Meridians request, relocate the dishwasher shown at Open Office #145, to Break Room #340. Infill the existing opening at Open Office #145 with a base cabinet to match the adjacent cabinets. Revise the layout of the millwork at Break Room #340 per enclosed sketch SK -1. Note: All millwork that was inteded to be installed in this space is to be reused, with new milwork as needed. Extend plumbing and electrical as needed to the relocated fixtures and appliances. Attachments: Sketch SK -1, SK -2, and SK -3 Report RNP 01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 ,r ONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 20 of 56 Note Paditem No. Status Required Ball In CourtNotes Opened Closed ASI 127 ASI No. 0127" 00001 NEW Reference: Full Tenant Improvements with MEP': 7/30/2008 Sheet E2.40: Per the City of Meridians request, at the following locations, furnish and install (1) 2" EC stubbed through roof into accessible ceitling space below for future wireless equipment. Conduit stub through roof shall be booted and sealed per roofing manufacturer standard details. The locations are as follows: 1. On lower roof at northeast corner, 5' from exterior parapet walls. 2. On lower roof at southeast corner, 5' from exterior parapet walls. 3. On upper roof at the northeast corner, 5' from exterior parapet walls. 4. On upper roof at the southeast corner, 5' from exterior parapet walls. ASI 128 ASI No 0128 00001 NEW Reference: Full Tenant Improvements with MEP'; 7/31/2008 Sheets A6.10T and A6.11T: Revise the interior painting at the following spaces per the enclosed sketches: Mayors Reception 354, Lobby 304 and Gallery 316. 00002 NEW Sheets A6.10T and A6.11T: REvise the interior 8/12/2008 painting aat the following spaces per enclosed sketches: Mayors Reception 354, Lobby 304, and Galley 316. Per conversation with Brent 8-11-08 ASI 129 ASI No. 129 - r Expedition® 00001 NEW Reference: Full Tenant Improvements with MEP'; 8/5/2008 Sheet E2.11L: 1. All luminaries in room 133 shall be raised to 18" below ceiling in lieu of 24" per plans. 2. PF3X at north end of room shall be controlled from a new separate dimmer switch. Install dimmer switch adjacent to dimmer switch for remainder of luminaries on teh east wall. Report R—NP01 323-4500 BOISE, IDAHO RCE -1875 RnCK 4nTT Note Pads GENERAL CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Proiect No: 06-0675 Page: 21 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI' 36, ASY No0130',< 00001 NEW E2/teller counter #151: Per the City of 8/6/2008 Meridian's request provide all laor and materials to raise to center desks 81/2", see enclosed sketch SK -1 _ 00001 NEW Reference: Cold Shell and Core Package 8/14/2008 Sheets A1.0 and A1.1 Provide the following stucco colors at the screen wall/trash enclosure: 1. Beige to match the stone at the top of wall cap 2. Red to match the brick adjacent brick band at the exterior exposed wall 3. Grey to match the exposed foundation at the lower portion of the exposed wall and all of the interior wal surfaces to the bottom of the cap. 00001 NEW Sheet A2.6T: Revise the floor finish at Janitor 8/14/2008 #025, to be painted epoxy with 4" rubber base. t. 1 00001 NEW ASI x134 >ASI' No.134 Expedition® Reference: Community Plaza Site Improvements 8/21/2008 Sheet CLIA: Provide a plate at the sidewalk for the roof drain lines at gridline 6 and 7 per enclosed sketches SK -1 and SK -2 00001 NEW Per the city of Meridian's request, provide all 8/29/2008 material and labor to install card reader and remotely operated buzzer for door #349. Buzzer is to be located in the receptions desk, coordinate location with furniture and owner Report R—NP 01 I'� Note Pads III A������ 323-4500 BOISE, IDAHO RCE -1875 T],--%r.y�r C'nT r GENERAL CONTRACTORS 1097 N ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 22 of 56 Note PadItem No. Status Required Ball In CourtNotes Opened Closed ASI 134 ASI No.134 00002 NEW In addition, per the City of Meridian's request, 9/29/2008 install a 911 call button at the receptionist desk 354. Coordinate location of call button with owner ASI 135 ASI No. 0135 00001 NEW Per the city of Meridian's request, provide all 8/29/2008 materials and loabot to relocate the Sapphire extinguisher tank from the original designed location to the southwest corner of the server room 311, Der attached sketch SK -1 ASI 137 ASI No. 137 00001 NEW Note changes to back of curb elevations at the 9/9/2008 southeast corner of Meridian Road and Broadway as shown on the attached sketch ASI 37-1 dated 9/2/08 ASI 138 ASI No. 138 00001 NEW Note changes to paving pattern on Broadway 9/9/2008 and the deletion of three trees as shown on attached sketch CO 1-1.10 and CO L1.30 dated 9/2/08 ASI '139 ASI N0. 139 r Expedition® New sketch CO1-1.30 transmitted on 9-18-2008 00001 NEW Reference: Interior Sign Package 9/9/2008 Sheet A2 1OT: Relocate the type "D" sign shown in receiving #129, to west wall of the corridor just outside Stair #3. Add three additional type "D" signs at the basement, second, and third floors to the West wall of the Corridor just outside stair 3 Report R NP_01 Note Pads 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Project No: 06-0675 Date: 10/2/2008 Page: 23 of 56 Note PadItem No. Status Required Ball In CourtNotes ASI..141 ._:ASI NO. 141 Opened Closed 00001 NEW REvise the monitor wellhead detail per the encosed sketch SK -1 9/10/2008 .. .. ................................................ 00001 NEW Reference: Community Plaza and Site Improvements Package Sheets SE1.00, SE1.05, SE1.06: Per the City of Meridians request provide all materials and labor to add receptacles for the tree well along Meridian Road as sown on the enclosed sketches. 9/12/2008 ASI1l 3 d'ASI:No 143.:. . 'r 00001 NEW Reference: Shell and Core package 9/12/2008 Refer to Sheet A2.40 Furnish all labor, material and equipmnt necessary to install a 12x24 insulated exterior access panel at the west side of the roof parapet wall located just north of grid line 7 and grid line H. the access panel shall be equal to Larsens Maufacturing Co. L -XT series Insulated Exterior Panel with key operated chrome plated steel handle. See attached cut sheet. Report R_NP_01 Requests for Information Log 323-4500 BOISE, IDAHO RCE -1875 GENERAL CONTRAC'T'ORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 1 of 8 Type To From NumberTitle Status Date Approved Responded Required RFI CITYMER PETRA 00001 CLO 5/14/2007 5/21/2007 5/21/2007 5/21/2007 RFI LOMARC PETRA 00002 Project Director CLO 3/12/2007 3/19/2007 3/19/2007 3/19/2007 RFI LOMARC PETRA 00003 Water / Sewer for Plaza CLO 4/18/2007 4/18/2007 4/18/2007 4/25/2007 RFI LOMARC PETRA 00004 Change Detail C2 - S 5.2 CLO 4/20/2007 5/3/2007 5/3/2007 4/27/2007 RFI LOMARC PETRA 00005 Base Plate Change CLO 4/30/2007 5/3/2007 5/3/2007 5/7/2007 RFI LOMARC PETRA 00006 Embed Plate P-1, P-2 CLO 4/30/2007 5/3/2007 5/3/2007 5/7/2007 RFI LOMARC PETRA 00007 Rule Steel RFI No 2 CLO 5/1/2007 6/13/2007 6/13/2007 5/8/2007 RFI -- ....... LOMARC . _ _ PETRA _._........ .... ... _ 00008 _ _ Rule Steel RFI No 3 ........ - ..........- ....... ---- .............. CLO 5/1/2007 ....... ............................. 5/21/2007 5/21/2007 .. ............. . 5/8/2007 ......... RFI LOMARC PETRA 00009 Wall & Footing height CLO 5/8/2007 6/26/2007 6/26/2007 5/15/2007 RFI LOMARC PETRA 00010 Foundation Drain at Basement CLO 5/16/2007 6/26/2007 6/26/2007 5/23/2007 RFI LOMARC PETRA 00011 ASI Requests -Elevations and Details CLO 5/16/2007 6/26/2007 6/26/2007 5/25/2007 RFI LOMARC PETRA 00012 Rule Steel RFI No. 4 CLO 5/24/2007 6/26/2007 6/26/2007 5/31/2007 RFI LOMARC PETRA 00013 Rule Steel RFI No. 5 CLO 5/30/2007 6/26/2007 6/26/2007 6/6/2007 RFI LOMARC PETRA 00014 Rule Steel RFI No. 6 CLO 5/30/2007 6/5/2007 6/5/2007 6/6/2007 RFI LOMARC PETRA 00015 Top steel elevation@Detail(RS-7) CLO 6/11/2007 6/12/2007 6/12/2007 6/18/2007 RFI LOMARC PETRA 00016 Beam Verification (RS -8) CLO 6/14/2007 6/26/2007 6/26/2007 6/21/2007 RFI _ LOMARC PETRA 00017 Domestic Water Source _ CLO 6/18/2007 6/20/2007 ..-- 6/20/2007 _ _. ............. - 6/20/2007 RFI LOMARC PETRA 00018 Wall Fix at Grid "D" CLO 7/5/2007 7/3/2007 7/3/2007 7/12/2007 RFI LOMARC PETRA 00019 Arched Chord Joist Connection(RS-9) CLO 7/5/2007 7/6/2007 7/6/2007 7/12/2007 RFI LOMARC PETRA 00020 Foundation Drain Colection Manhole CLO 7/11/2007 7/5/2007 7/5/2007 7/18/2007 RFI LOMARC PETRA 00021 Back Filling Basement Walls CLO 7/19/2007 7/19/2007 7/19/2007 7/26/2007 RFI LOMARC PETRA 00022 Sewer Modification Request CLO 7/23/2007 8/1/2007 8/1/2007 7/30/2007 RFI LOMARC PETRA 00023 Masonry Mortar Color Clarification CLO 7/25/2007 7/27/2007 7/27/2007 8/1/2007 RFI LOMARC PETRA 00024 Steel Lintel at Stair Tower Header CLO 7/31/2007 8/2/2007 8/2/2007 8/7/2007 RFI LOMARC PETRA 00025 AC Bolt Correction CLO 7/31/2007 8/2/2007 8/2/2007 8/7/2007 RFI .................. LOMARC ..........__ PETRA .....___....-_...-.... _._..........................--- 00026 Moment Frame Shear Tab Weld CLO 7/31/2007 8/2/2007 8/2/2007 8/7/2007 RFI LOMARC PETRA 00027 Sewage Ejector Tank CLO 8/6/2007 9/3/2007 9/3/2007 8/13/2007 RFI LOMARC PETRA 00028 4th Floor Stair Assembly CLO 8/8/2007 8/14/2007 8/14/2007 8/15/2007 RFI LOMARC PETRA 00029 Wall at Grid H - 4, 9 CLO 8/24/2007 9/18/2007 9/18/2007 8/31/2007 RFI LOMARC PETRA 00030 Water to fixture P-18 CLO 8/29/2007 9/5/2007 9/5/2007 9/5/2007 bpeditiorA Report R_RC_01 RFI Requests for Information Log 323-4500 fl BOISE, IDAHO RCE -1875 x GENERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 e PHONE: (208) 323-4500 • FAX:_(208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 2 of 8 Type To From Number-ritle Status Date Approved Responded Required RFI LOMARC PETRA 00031 Vent for Ejector Pump CLO 8/29/2007 9/6/2007 9/6/2007 9/5/2007 RFI LOMARC PETRA 00032 Basement Toilet Rooms CLO 8/29/2007 9/6/2007 9/6/2007 9/5/2007 RFI LOMARC PETRA 00033 Floor Sink Near Grid 5-F CLO 8/29/2007 9/6/2007 9/6/2007 9/5/2007 RFI LOMARC PETRA 00034 Sink Near Grid 10-E CLO 8/29/2007 9/7/2007 9/7/2007 9/5/2007 RFI LOMARC PETRA 00035 Sink Near Grid 10-B CLO 8/29/2007 9/4/2007 9/4/2007 9/5/2007 RFI LOMARC PETRA 00036 Plumbing Drawing for 4th Floor CLO 8/29/2007 9/7/2007 9/7/2007 9/5/2007 RFI LOMARC PETRA 00037 Switch Board MDS Feeders CLO 9/5/2007 9/10/2007 9/10/2007 9/12/2007 RFI LOMARC PETRA 00038 VAV at Room 134 CLO 9/11/2007 9/14/2007 9/14/2007 9/18/2007 RFI LOMARC PETRA 00039 Interconnection of Fire Stand Pipes CLO 9/11/2007 9/11/2007 9/11/2007 9/18/2007 RFI LOMARC PETRA 00040 RWD 10-D CLO 9/12/2007 9/13/2007 9/13/2007 9/19/2007 RFI LOMARC PETRA 00041 Misc. Plumbing Questions P2.12 CLO 9/12/2007 9/13/2007 9/13/2007 9/19/2007 RFI LOMARC PETRA 00042 Shear Tab Correction CLO 9/18/2007 9/26/2007 9/26/2007 9/25/2007 RFI LOMARC PETRA 00043 Radius SOG at 2ed Floor CLO 9/24/2007 10/9/2007 10/9/2007 10/1/2007 RFI LOMARC PETRA 00044 Smoke Dampers CLO 9/27/2007 9/28/2007 9/28/2007 10/4/2007 RFI LOMARC PETRA 00045 Operable Wall Partition -Submit tial CLO 9/27/2007 11/14/2007 11/14/2007 10/4/2007 RFI LOMARC PETRA 00046 HWS& HWS At Basement CLO 10/2/2007 10/2/2007 10/2/2007 10/9/2007 RFI LOMARC PETRA ................. 00047 W8x10 at North Cold Air Return ......... ... _ ..... CLO 10/2/2007 _ 10/5/2007 10/5/2007 _._..... 10/9/2007 . _ RFI LOMARC PETRA 00048 Clean Agent Releasing Panel CLO 10/3/2007 10/16/2007 10/16/2007 10/10/2007 ......... RFI LOMARC PETRA 00049 Pre -Action Sequence of Operations CLO 10/3/2007 10/16/2007 10/16/2007 10/10/2007 RFI LOMARC PETRA 00050 Elevator Shaft Fire Alarm Question CLO 10/4/2007 10/16/2007 10/16/2007 10/11/2007 RFI LOMARC PETRA 00051 Beam Web to Column Flange Weld CLO 10/4/2007 10/5/2007 10/5/2007 10/11/2007 RFI LOMARC PETRA 00052 Electrcal Drawings TI and Plaza CLO 10/18/2007 , 10/25/2007 10/25/2007 10/25/2007 RFI LOMARC PETRA 00053 Sprinkler Pipe Hangers CLO 10/22/2007 10/29/2007 10/29/2007 10/29/2007 RFI LOMARC PETRA 00054 Fire Suppression Flow Meter CLO 10/22/2007 10/25/2007 10/25/2007 10/29/2007 RFI LOMARC PETRA 00055 RDL & OFL CLO 10/29/2007 11/1/2007 11/1/2007 11/5/2007 RFI LOMARC PETRA 00056 ASI 32 Ceiling Tile Clarification CLO 10/30/2007 10/30/2006 10/30/2006 11/6/2007 RFI LOMARC PETRA 00057 Entry Vestibule Fire Suppression CLO 10/31/2007 11/7/2007 11/7/2007 11/7/2007 RFI LOMARC PETRA 00058 FreRiser Room Issues CLO 10/31/2007 11/6/2007 11/6/2007 11/7/2007 RFI LOMARC PETRA 00059 Supply & Return 1 -Hr Rated Assembly CLO 11/2/2007 11/14/2007 11/14/2007 11/9/2007 RFI LOMARC PETRA 00060 Under Floor Conflicts CLO 11/2/2007 11/19/2007 11/19/2007 11/9/2007 Expeditiong Report R_RC_Ot_RFI Requests for Information Log PETMID � 323-4500 BOISE, IDAHO RCE -1875 TM GENERAL 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 a PHONE: (208) 323-4500 • FAX: (208) 323-4507 ' Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0676 Page: 3 of 8 Type To From NumberTitle Status Date Approved Responded Required RFI LOMARC PETRA 00061 Access to Fire Smoke Dampers CLO 11/2/2007 11/19/2007 11/19/2007 11/9/2007 RFI LOMARC PETRA 00062 Data Drops CLO 11/9/2007 11/20/2007 11/20/2007 11/16/2007 RFI LOMARC PETRA 00063 Electrical through Concrete Wall CLO 11/27/2007 12/3/2007 12/3/2007 12/4/2007 RFI LOMARC PETRA 00064 3ed Floor Sink at Grid 5/E CLO 11/27/2007 11/27/2007 11/27/2007 12/4/2007 RFI LOMARC PETRA 00065 Diminution Verification CLO 11/28/2007 11/29/2007 11/29/2007 12/5/2007 RFI LOMARC PETRA 00066 Fire Aarm Questions lti CLO 12/4/2007 12/14/2007 12/14/2007 12/11/2007 RFI LOMARC PETRA 00067 Security Camera Height CLO 12/12/2007 12/14/2007 12/14/2007 12/19/2007 RFI LOMARC PETRA 00068 Ceiling at Rm 111, 112. CLO 12/12/2007 12/14/2007 12/14/2007 12/19/2007 RFI LOMARC PETRA 00069 2ed Floor Duct Conflicts CLO 12/14/2007 12/14/2007 12/14/2007 12/21/2007 RFI LOMARC PETRA 00070 Return Duct at RM 142 CLO 12/14/2007 12/14/2007 12/14/2007 12/21/2007 RFI LOMARC PETRA 00071 Gas Meter / Condensing Units CLO 12/14/2007 12/17/2007 12/17/2007 12/21/2007 RFI LOMARC PETRA 00072 Lower Entry Canopy Attachment CLO 12/18/2007 12/18/2007 12/18/2007 12/25/2007 RFI LOMARC PETRA 00073 Sun Screen Top Attachment CLO 12/21/2007 1/4/2008 1/4/2008 12/28/2007 RFI LOMARC PETRA 00074 Exterior Wall Types CLO 12/26/2007 1/4/2008 1/4/2008 1/2/2008 RFI LOMARC PETRA 00075 Fire Alarm Questions CLD 1/4/2008 1/15/2008 1/15/2008 1/11/2008 RFI LOMARC PETRA 00076 Brick Type A2 CLO 1/4/2008 1/4/2008 1/4/2008 1/11/2008 RFI LOMARC PETRA _..... ..... ......_...----............ 00077 Test Switches for In -Duct Detectors _ ......... - CLO 1/11/2008 ... _. 1/14/2008 . 1/14/2008 1/18/2008 _.. ... RFI LOMARC PETRA 00078 Building Phone System CLO 1/14/2008 1/14/2008 1/14/2008 1/21/2008 RFI LOMARC PETRA 00079 Under Floor Duct Insulation CLO 1/14/2008 1/15/2008 1/15/2008 1/21/2008 RFI LOMARC PETRA 00080 Filters @ VAV & Fan Coils CLO 1/16/2008 1/22/2008 1/22/2008 1/23/2008 RFI LOMARC PETRA 00081 Column to Moment at Grid 4-E CLO 1/17/2008 1/18/2008 1/18/2008 1/24/2008 RFI LOMARC PETRA 00082 Johnsonite 6" Recess, Color #47 CLO 1/21/2008 1/21/2008 1/21/2008 1/28/2008 RFI LOMARC PETRA 00083 Interface Cable for York System CLO 1/21/2008 1/22/2008 1/22/2008 1/28/2008 RFI LOMARC PETRA 00084 Framing Dimensions on First Floor CLO 1/23/2008 1/24/2008 1/24/2008 1/30/2008 RFI LOMARC PETRA 00085 Exterior Light @ gridiiine J CLO 1/24/2008 1/24/2008 1/24/2008 1/31/2008 RFI LOMARC PETRA 00086 Water Supply to Refrigerators CLO 1/31/2008 2/8/2008 2/8/2008 2/7/2008 RFI LOMARC PETRA 00087 Fan Coil Unit - Verity Model Type CLO 1/31/2008 2/8/2008 2/8/2008 2/7/2008 RFI LOMARC PETRA 00088 Steel Question @ Parapet Wall CLO 1/31/2008 2/8/2008 2/8/2008 2/7/2008 RFI LOMARC PETRA 00089 Beam Pocket @ NW Stair Tower. CLO 2/1/2008 2/4/2008 2/4/2008 2/8/2008 RFI LOMARC PETRA 00090 Power to Clods and Flood Lights CLO 2/5/2008 2/6/2008 2/6/2008 2/12/2008 ExpeditionO Report R_RC_01_RFI Requests for Information Log fop'FEMR -4500 E, IDAHO ' 3234500 75 ROCK SOLID GENERAL CONTRACTORS t 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 4 of 8 Type To From NumberTitle Status Date Approved Responded Required RFI RFI RFI LOMARC ...... _ LOMARC LOMARC PETRA _ . ..................._. PETRA PETRA 00091 _ .... .............. 00092 00093 Power Shut Down at RM 013, 014, 31.r .............. Parking Lot Profile @ Fiber Stair Tower Brick Relief Angle CLO CLO CLO 2/5/2008 2/8/2008 2/12/2008 2/5/2008 2/13/2008 2/13/2008 2/5/2008 2/13/2008 2/13/2008 2/12/2008 2/15/2008 2/19/2008 RFI LOMARC PETRA 00094 Chiller Support Structure CLO 2/13/2008 2/18/2008 2/18/2008 2/20/2008 RFI PETRA PETRA 00095 Data between Sever & RM 303 CLO 2/15/2008 2/18/2008 2/18/2008' 2/22/2008 RFI LOMARC PETRA 00096 Window Head Drip Flashing CLO 2/26/2008 2/26/2008 2/26/2008 3/4/2008 RFI LOMARC PETRA 00097 Time Warmer Entrance CLO 2/26/2008 3/11/2008 3/11/2008 3/4/2008 RFI LOMARC PETRA 00098 Duct Sizes at Basement Toilet Rm. CLO 3/3/2008 3/6/2008 3/6/2008 3/10/2008 RFI RFI LOMARC LOMARC PETRA PETRA 00099 00100 Fre Alarm Quesdions From Simplex Grounding of Access Floor CLO CLO 3/7/2008 3/7/2008 3/11/2008 3/11/2008 3/11/2008 3/11/2008 3/14/2008 3/14/2008 RFI LOMARC PETRA 00101 EF -1 @ Penthouse CLO 3/10/2008 3/11/2008 3/11/2008 3/17/2008 RFI LOMARC PETRA 00102 Tele / Com Riser Driagram CLO 3/13/2008 3/17/2008 3/17/2008 3/20/2008 RFI LOMARC PETRA 00103 Water Feature One Line Diagram CLO 3/13/2008 3/19/2008 3/19/2008 3/20/2008 RFI LOMARC PETRA 00104 Soffit at Entry Lobby. CLO 3/31/2008 4/1/2008 4/1/2008 4/7/2008 RFI RFI LOMARC LOMARC PETRA PETRA 00105 00106 Mail Room Fume Hood Fire Riser Room 130 CLO CLO 4/8/2008 4/8/2008 4/8/2008 4/8/2008 4/8/2008 4/8/2008 4/15/2008 4/15/2008 RFI LOMARC PETRA 00107 Access to FT -9 CLO 4/8/2008 4/15/2008 4/15/2008 4/15/2008 RFI LOMARC PETRA 00108 Screen Wall for AHU's CLO 4/9/2008 4/9/2008 4/9/2008 4/16/2008 RFI RFI LOMARC LOMARC PETRA PETRA 00109 00110 Electrical / Mechanical RM Door Water Feature Questions CLO CLO 4/9/2008 4/11/2008 4/9/2008 4/17/2008 4/9/2008 4/17/2008 4/16/2008 4/18/2008 RFI LOMARC PETRA 00111 Section 13000 Questions CLO 4/28/2008 5/7/2008 5/7/2008 5/5/2008 RFI LOMARC PETRA 00112 Loading dock ramp handrail CLO 4/28/2008 4/28/2008 4/28/2008 5/5/2008 RFI RFI RFI LOMARC LOMARC LOMARC PETRA PETRA PETRA 00113 00114 00115 Boiler Flues Cabinet Keying Schedule Cabinet Keying Schedule #2 CLO CLO CLO 4/29/2008 4/30/2008 5/1/2008 4/29/2008 4/30/2008 5/2/2008 4/29/2008 4/30/2008 5/2/2008 5/6/2008 5/7/2008 5/8/2008 RFI LOMARC PETRA 00116 Owner provided cubicles CLO 5/5/2008 5/12/2008 5/12/2008 5/12/2008 RFI LOMARC PETRA 00117 Cable One Building Entry Conduit CLO 5/5/2008 5/20/2008 5/20/2008 5/12/2008 RFI LOMARC PETRA 00118 Adding wall & door @ room 257 CLO 5/5/2008 5/8/2008 5/8/2008 5/12/2008 RFI LOMARC PETRA 00119 Area Drain 5 Location CLO 5/6/2008 5/8/2008 5/8/2008 5/13/2008 Expeditions Report RRC 01_RFI I Td Til r1�Requests for Information Log �-; �A-\� 323-4500 BOISE, IDAHO '-- — RCE -1875 0KM S0IX ' 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 PHONE: (208) 323-4500 e FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 5 of 8 Type To From NumberTitle Status Date Approved Responded Required RFI LOMARC PETRA 00120 Door Hardware @ Mayor's Area CLO 5/7/2008 5/9/2008 5/9/2008 5/14/2008 RFI LOMARC PETRA 00121 Exterior Reader Board CLO 5/7/2008 5/12/2008 5/12/2008 5/14/2008 RFI LOMARC PETRA 00122 2nd Floor Roof Decks CLO 5/7/2008 5/12/2008 5/12/2008 5/14/2008 RFI LOMARC PETRA 00123 ASI -93 Electrical Requirements CLO 5/7/2008 5/12/2008 5/12/2008 5/14/2008 RFI LOMARC PETRA 00124 Wall Footing @ Transformer CLO 5/8/2008 5/12/2008 5/12/2008 5/15/2008 RFI LOMARC PETRA 00125 Drain Lines CLO 5/8/2008 5/12/2008 5/12/2008 5/15/2008 RFI LOMARC PETRA 00126 Weir Clarificiation Questions CLO 5/13/2008 5/14/2008 5/14/2008 5/20/2008 RFI LOMARC PETRA 00127 Wire Mesh Partitions @ Basement CLO 5/16/2008 5/20/2008 5/20/2008 5/23/2008 RFI LOMARC PETRA 00128 Electrical at Loading Dock CLO 5/20/2008 5/22/2008 5/22/2008 5/27/2008 RFI LOMARC PETRA 00129 PreCom SubmittiaQuestion tion CLO 5/20/2008 6/13/2008 6/13/2008 5/27/2008 RFI LOMARC PETRA 00130 Water Fall Elevation Confirmation CLO 5/20/2008 5/21/2008 5/21/2008 5/27/2008 RFI LOMARC PETRA 00131 Water Feature Clarifications CLO 5/20/2008 5/21/2008 5/21/2008 5/23/2008 RFI LOMARC PETRA 00132 East Ampitheathre Wall Clarfication CLO 5/20/2008 5/21/2008 5/21/2008 5/23/2008 RFI LOMARC PETRA 00133 Door 310 A CLO 5/21/2008 5/22/2008 5/22/2008 5/28/2008 RFI LOMARC PETRA 00134 RFI # 116Revised CLO 5/21/2008 5/22/2008 5/22/2008 5/22/2008 RFI LOMARC PETRA 00135 LEED Air loss testing CLO 5/21/2008 5/29/2008 5/29/2008 5/23/2008 RFI LOMARC PETRA 00136 ASI # 96 Mail Room Cabinets CLO 5/21/2008 6/11/2008 6/11/2008 5/28/2008 RFI LOMARC PETRA 00137 Hollow Metal Frame Construction CLO 5/21/2008 5/22/2008 5/22/2008 5/28/2008 RFI LOMARC PETRA 00138 Women's Room HVAC CLO 5/21/2008 5/23/2008 5/23/2008 5/28/2008 RFI LOMARC PETRA 00139 Sprinkler in Vestibule 100 CLO 5/21/2008 5/22/2008 5/22/2008 5/28/2008 RFI LOMARC PETRA 00140 Accordian door ceiling CLO 5/21/2008 5/22/2008 5/22/2008 5/28/2008 RFI LOMARC PETRA 00141 N & Screens with light eens conflict s CLO 5/21/2008 5/26/2008 5/26/2008 5/28/2008 RFI LOMARC PETRA 00142 Adding soffits for Mechanicals CLO 5/21/2008 5/22/2008 5/22/2008 5/28/2008 RFI LOMARC PETRA 00143 HVAC Basement ElecWcal Room CLO' 5/21/2008 5/22/2008 5/22/2008 5/28/2008 RFI LOMARC PETRA 00144 Building Maintenance Room Heater CLO 5/21/2008 5/23/2008 5/23/2008 5/28/2008 RFI LOMARC PETRA 00145 Room 109 Ceiling HVAC CLO 5/21/2008 5/23/2008 5/23/2008 5/28/2008 RFI LOMARC PETRA 00146 Curtain Wall Head Anchoring CLO 5/22/2008 5/22/2008 5/22/2008 5/29/2008 RFI LOMARC PETRA 00147 Relocate VAV # 215 CLO 5/22/2008 5/23/2008 5/23/2008 5/29/2008 RFI LOMARC PETRA 00148 Columns H-3 & H-10CLO 5/22/2008 5/23/2008 5/23/2008 5/29/2008 RFI LOMARC PETRA 00149 Can Lights in Executive Conference CLO 5/22/2008 5/29/2008 5/29/2008 5/29/2008 Expedition® Report R_RC_Ot_RFI Requests for Information Log 323-4500 BOISE, IDAHO RCE -1875 RFI LOMARC PETRA 00152 Planting Clarification RFI LOMARC PETRA 00153 Floor Box Locations RFI LOMARC PETRA 00154 Elect/Tele/Com room HVAC — - ._----------- — ......... .............. ­ n mad' CLO 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 a PHONE: (208) 323-4500 • FAX: (208) 323-4507 5/30/2008 ...... ................. ................. Project Name: Meridian City Hall 7/14/2008 Date: 10/2/2008 Project No: 06-0676 6/2/2008 Page: 6 of 8 Type To From NumberTitle Status Date Approved Responded Required RFI IOMARC PETRA 00150 Countertop Clarifications CLO 5/22/2008 5/23/2008 5/23/2008 5/29/2008 RFI LOMARC PETRA 00151 Interior Paint Color Clarification CLO 5/22/2008 5/23/2008 5/23/2008 5/29/2008 RFI LOMARC PETRA 00152 Planting Clarification RFI LOMARC PETRA 00153 Floor Box Locations RFI LOMARC PETRA 00154 Elect/Tele/Com room HVAC — - ._----------- — ......... .............. ­ n mad' CLO 5/23/2008 5/29/2008 _......... _._ 5/29/2008 ........ .................__... .......... 5/30/2008 ...... ................. ................. CLO 5/27/2008 7/14/2008 7/14/2008 6/3/2008 CLO 5/30/2008 6/2/2008 6/2/2008 6/6/2008 RFI LOMARC PETRA 00155 Mayors Office Return Air Plenum CLO 5/30/2008 6/2/2008 6/2/2008 6/6/2008 RFI LOMARC PETRA 00156 Council Chamber Return Air CLO 5/30/2008 6/2/2008 6/2/2008 6/6/2008 RFI LOMARC PETRA 00157 Site Drainage System CLO 6/3/2008 6/4/2008 6/4/2008 6/4/2008 RFI LOMARC PETRA 00157R Site Drainage System CLO 6/4/2008 6/5/2008 6/5/2008 6/11/2008 RFI LOMARC PETRA 00158 Fume Hood Submittal / Installation CLO 6/4/2008 7/14/2008 7/14/2008 6/11/2008 RFI LOMARC PETRA 00159 Signage Wall Footing CLO 6/11/2008 6/17/2008 6/17/2008 6/18/2008 RFI LOMARC PETRA 00160 Utility Penetrations CLO 6/18/2008 6/20/2008 6/20/2008 6/25/2008 RFI LOMARC PETRA 00161 Bleed Sensors CLO 6/20/2008 6/26/2008 6/26/2008 6/27/2008 RFI LOMARC PETRA 00162 Thermostat locations CLO 6/20/2008 6/24/2008 6/24/2008 6/27/2008 RFI LOMARC PETRA 00163 Re -Ask RFI 111-A/V Rack location CLO 6/25/2008 7/14/2008 7/14/2008 7/2/2008 RFI LOMARC PETRA 00164 Generator Size/ Screen wall CLO 6/25/2008 6/30/2008 6/30/2008 7/2/2008 RFI LOMARC PETRA 00165 Break Room Cabinetry CLO 6/25/2008 6/26/2008 6/26/2008 7/2/2008 RFI LOMARC PETRA 00166 Ceiling in Bike Storage 009 CLO 6/25/2008 6/26/2008 6/26/2008 7/2/2008 RFI LOMARC PETRA 00167 Elevator Center lights @ Directory CLO 6/25/2008 6/26/2008 6/26/2008 7/2/2008 RFI LOMARC PETRA 00168 Gallery wall lights @ soffits CLO 6/25/2008 6/27/2008 6/27/2008 7/2/2008 RFI LOMARC PETRA 00169 Mono Coating sealing at fire damper CLO 6/25/2008 6/26/2008 6/26/2008 7/2/2008 RFI LOMARC PETRA 00170 Amphitheater Footings CLO 6/27/2008 6/27/2008 6/27/2008 7/4/2008 RFI RFI LOMARC LOMARC PETRA PETRA 00171 00172 Site Electrical Clarifications Stream Grade Clarifications CLO CLO 6/27/2008 6/27/2008 6/27/2008 6/27/2008 6/27/2008 6/27/2008 7/4/2008 7/4/2008 RFI LOMARC PETRA 00173 Piping at Heritage Building CLO 7/1/2008 7/2/2008 7/2/2008 7/8/2008 RFI LOMARC PETRA 00174 Pool Elevation Clarification CLO 7/1/2008 7/1/2008 7/1/2008 7/8/2008 RFI LOMARC PETRA 00175 Window Sill/Apron CLO 7/2/2008 7/2/2008 7/2/2008 7/9/2008 RFI RFI LOMARC LOMARC PETRA PETRA 00176 00177 Heritage Building Color Selections Drainage at East Property Line CLO CLO 7/7/2008 7/16/2008 7/8/2008 7/8/2008 7/14/2008 7/23/2008 Expeditior(!D Report R_RC_01_RFI Requests for Information Log 1 9 323-4500 BOISE, IDAHO RCE -1875 GF -NERAL CONTRACTORS 1097 N. ROSARIO STREET • MERIDIAN, ID 83642 • PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 7 of 8 Type To From NumberTitle Status Date Approved Responded Required RFI LOMARC PETRA 00178 P-2 Ligjt Pole Bases at Plaza CLO 7/16/2008 7/16/2008 7/16/2008 7/23/2008 RFI LOMARC PETRA 00179 Mortar color at Heritage building CLO 7/17/2008 7/18/2008 7/18/2008 7/24/2008 RFI LOMARC PETRA 00180 Canal Water Feature Brick Veneer OLD 7/21/2008 7/29/2008 7/29/2008 7/28/2008 RFI LOMARC PETRA 00181 Streamside Water Feature CLO 7/21/2008 7/22/2008 7/22/2008 7/28/2008 RFI LOMARC PETRA 00182 Fire Riser Room Door Steps/Wall CLO 7/21/2008 7/29/2008 7/29/2008 7/28/2008 RFI LOMARC PETRA 00183 Waterfall feature CLO 7/22/2008 7/29/2008 7/29/2008 7/29/2008 RFI LOMARC . PETRA 00184 Egress Lighting at Heritage Bldg CLO 7/23/2008 7/24/2008 7/24/2008 7/30/2008 RFI LOMARC PETRA 00185 Exposed Ceiling Colors CLO 7/29/2008 7/29/2008 7/29/2008 8/5/2008 RFI LOMARC PETRA 00186 Deletion of pre -cast panels CLO 7/29/2008 7/29/2008 7/29/2008 8/5/2008 RFI LOMARC PETRA 00187 Lanscape Irrigation Boxes CLO 7/29/2008 7/30/2008 7/30/2008 8/5/2008 RFI LOMARC PETRA 00188 Finish Grade of entry features CLO 7/29/2008 7/30/2008 7/30/2008 8/5/2008 RFI LOMARC PETRA 00189 Door Glass Size CLO 7/30/2008 7/31/2008 7/31/2008 8/6/2008 RFI LOMARC PETRA 00190 ASI 107 Lighting CLO 8/1/2008 8/8/2008 RFI LOMARC PETRA 00191 Dumpster Door RevisionCLO 8/4/2008 8/5/2008 8/5/2008 8/11/2008 RFI LOMARC PETRA 00192 Plaza Tower Cavity CLO 8/5/2008 8/5/2008 8/5/2008 8/12/2008 RFI LOMARC PETRA 00193 Plaza Tower Opening CLO 8/5/2008 8/5/2008 8/5/2008 8/12/2008 RFI LOMARC PETRA 00194 Cashier* 153 CLO 8/6/2008 8/7/2008 8/7/2008 8/13/2008 RFI LOMARC PETRA 00195 Retaining Wall for Canal Feature CLO 8/6/2008 8/13/2008 RFI LOMARC PETRA 00196 Bollard Circuli y CLO 8/6/2008 8/13/2008 RFI LOMARC PETRA 00198 Entry Pool Penetrations CLO 8/6/2008 8/13/2008 RFI LOMARC PETRA 00199 Door 337 B card reader CLO 8/7/2008 8/14/2008 RFI LOMARC PETRA 00200 Restroom building roof drains CLO 8/8/2008 8/15/2008 RFI LOMARC PETRA 00201 Sprinkler Control Box CLO 8/12/2008 8/19/2008 RFI LOMARC PETRA 00202 FM -200 fire suppression requirement CLO 8/12/2008 8/15/2008 8/15/2008 8/19/2008 RFI LOMARC PETRA 00203 P5 water pump timer CLO 8/12/2008 8/19/2008 RFI LOMARC PETRA 00204 HVAC in rooms 332, 335 CLO 8/13/2008 8/20/2008 RFI LOMARC PETRA 00205 Lobby 111 return air grill CLO 8/14/2008 8/21/2008 RFI LOMARC PETRA 00206 Stairwell gate hinges CLO 8/14/2008 9/17/2008 9/17/2008 8/21/2008 RFI LOMARC PETRA 00207 Copper sheeting in water feature CLO 8/14/2008 8/21/2008 RFI LOMARC PETRA 00208 unused NEW 8/14/2008 8/21/2008 ExpeditiorPD Report R_RC_01_RFI rRequests for Information Log 323-4500 BOISE, IDAHO RCE -1875 ROCK SOI. ' 1097 N ROSARIO STREET • MERIDIAN, ID 83642 a PHONE: (208) 323-4500 • FAX: (208) 323-4507 Project Name: Meridian City Hall Date: 10/2/2008 Project No: 06-0675 Page: 8 of 8 ' Type To 1 1 1 1 1 1 From NumberTitle Status Date Approved Responded Required RFI LOMARC PETRA 00209 Plaza bathroom light/HVAC conflict CLO 8/18/2008 8/25/2008 RFI LOMARC PETRA 00210 Door #349 Buzzer to reception desk CLO 8/18/2008 8/25/2008 RFI LOMARC PETRA 00211 Timing of planting of annual plants CLO 8/20/2008 8/27/2008 RFI _ _ _ LOMARC ._....... _................. _ . PETRA 00212 _ _ ......_ ...------ Drainage area -----...._........__._._.... ........... _...... .................... _... _.._._._..... __.. _..............._....._ CLO _ ............._.... 8/20/2008 _ --- 8/27/2008 ._....... - ..__.. _—_._.__...._......... .... --- .......................... .. RFI LOMARC PETRA 00213 Moving Sapphire tank in IT CLO 8/22/2008 8/29/2008 RFI LOMARC PURA 00214 More fire extinguishers needed — _ --- --- — CLO ...._.._� 8/26/2008 9/2/2008 RFI LOMARC PETRA 00215 Directive for tree well receptacles _ CLO 8/29/2008 9/5/2008 RFI LOMARC PETRA 00216 _............ _..__...— Monitor wellhead revisions. ...._.._..—------- CLO 9/3/2008 _ .. 9/10/2008 -— .... .... -- ' RFI LOMARC PETRA 00217 Tree well circuits CLO 9/9/2008 9/15/2008 9/15/2008 9/16/2008 RFI LOMARC PETRA ---. 00218 _ ..._..---. Onsite submittal approvals ....- — -- CLO 9/9/2008 9/10/2008 9/10/2008 9/16/2008 ' RFI LOMARC PETRA 00219 Lobby 111 Art Work Support NEW 9/22/2008 9/29/2008 RFI LOMARC PETRA 00220 Domestic Hot Water Heater Exhaust NEW 9/30/2008 10/7/2008 Report R_RC_01_RFI .r., s moin 2�W W AF or 0 0 � �- a �.- ��,� l b n � tu: � w` �:,: .�' �• r �� lk i i% 1 .1 A F 1:1:1, I-ONWOMMIL I M ; 4 r� Pum