June 26, 2008
To: Jennifer Hernandez
211 N. Record St, Ste. 222
Dallas, TX 75202
Rep: Wal-mart Real Estate Business Trust
~oz s.w. s~" st.
Bentonville, AR 72716
Subject: MCZC-08-053
4051 E. Fairview
Wal-Mart Remodel
Carol A. McKee, Pre.sident
Sherry R. Huber, lst vice President
Dave Bivens, 2nd vice P~ident
]ohn S. Franden, Commissioner
Rebecca W. Amold, Commissloner
~ ~ ~~~~.~~~
~~
~~L 0 1 200~
~I~~~' ~F iVIE~I~IAI~
~ ~I~~'~ ~CI. ~~~ ~~~~~`I~
In response to your request for comment, the Ada County Highway District (ACHD)
Planning Review staff has reviewed the submitted application and site plan for the item
referenced above. This site was previously reviewed under MSPR-08-177 for a tenant
improvement on March 11, 2008. The applicant was required by ACHD Development
Review Staff to update curb ramps at the sidewalk to meet current ADA codes. The same
conditions and requirements apply to MCZC-08-053. There are no additional requirements
at this time due to the fact that the proposed development will not impact the roadways.
If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require improvements to the transportation system at that time.
Prior to final approval you will need to submit construction plans to the ACHD
Development Review Department to insure compliance with the conditions identified
above or for traffic impact fee assessment. This is a separate review process that requires
direct plans submittal to the Development Review staff at the Highway Districk
A traific impact fee will need to be assessed by ACHD and will be due prior to the
issuance of a building permit. Contact ACHD Planning ~ Development Serv~ces at
387-6170 for information regarding impact fees.
Prior to the construction or installation of any roadway improvements (curb, gutter,
sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement
must be obtained from ACHD.
If you have any questions, please feel free to contact me at (208) 387-6177.
Sincerely,
~/~~~
Chelsee Kucera
Right-of-Way and Development Services
CC: Project file, City of Boise
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achd.ada.id.us
~Submit a development application to a Citv or to the Countv
~The City or the County will transmit the development application to ACHD
~The ACHD Planning Review Dlvision will receive the development application to review
~The Planning Review Divislon will do one of the following:
~Send a"No RevPew" letter to the applicant stating that there are no site specific requirements at this
time.
^Send a"Comply With" letter to the applicant stating that if the development is within a platted
subdivision or part of a previous development application and that the site specfic requirements from the
previous development also apply to this development application.
OWrite a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
^Write a Commission Level report analyzing the impacts of the development on the transportation
system and
evaluating the proposal for its conformance to District Policy.
~The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
^For ALL development applications, including those receiving a"No Revlew" or "Comply With" letter.
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Division for plan review and assessment of impact fees. (Note: if there are no site
improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee
calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-
way, including, but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impa~t fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Constniction (Zone)
^ Driveway or Property Approach(s)
• Submit a"Driveway Approach Request° form to Ada County Highway District (ACHD) Construction (for
approval by Development Services 8~ Traffic Services). There is a one week tumaround for this approval.
^ Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a°Temporary Highway Use Permit
Application" to ACHD Construction - Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50'
or you are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
^ Sediment & Erosion Submittal
• At least one week prior to setting up a Pre-Con an Erosion 8~ Sediment Control Narrative & Plat, done by a
Certified Plan Designer, must be tumed into ACHD Construction - Subdivision to be reviewed and approved by
the ACHD Drainage Division.
^ Idaho Power Company
• ~c Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con
being scheduled.
^ Final Approval from Development Services
ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-
Con.