Loading...
ACHD Comments McFadden CZCt ~~~~~ ~ CHD ~" e~~~c~~ ~~ May 5, 2008 To: Architectural Productions Ward Schwider 1716 N. 32nd , Boise, ID 83703 Owner: John McCarthy 7204 Brentwood Boise, ID 83709 Subject: MCZC-08-045 132 Broadway Old McFadden Market CC: Carol A. McKee, Pr~ident Sherry R. Huber, lst Vice President Dave Blvens, 2nd ~ce President John S. Franden, Commissioner Rebecca W. Amold, Commissioner ~~~~~ ~ ~~~~ .~UN ~ ~ 200~ C;~~1 Y' ~F fV1~~4~IP~P`,1 ~;I s'~' C'I ~~~ ~!~'=w~:f-= In response to your request for comment, the Ada County Highway District (ACHD) Planning Review staff has reviewed the submitted application and site plan for the item referenced above. It has been determined that there are no site specific requirements for you at this time due to the fact that all street improvements currently exist. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require improvements to the transportation system at that time. Prior to final approval you will need to submit construction plans to the ACHD Development Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. A traffic impact fee will need to be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning ~ Development Services at 387-6170 for information regarding impact fees. Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACHD. If you have any questions, please feel free to contact me at (208) 387-6177. Sincerely, ~/GG~'~d.YXi / Chelsee Kucera Right-of-Way and Development Services Project file, City of Meridian Ada County Highway District • 3775 Adams Street • Garden C'ity, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achd.ada.id.us ~Submit a development application to a City or to the Caunty ~The City or the County will transmit the development application to ACHD ~The ACHD Planning Review Divisfon will receive the development application to review ~The Planning Review Division will do one of the following: ~Send a"No Revlew" letter to the applicant stating that there are no site specific requirements at this time. ^Send a"Comply Wlth" letter to the applicant stating that if the development is within a piatted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ~Write a Commisslon Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ~The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a"No Revlew" or "Comply With" letter. • The applicant shauld submit one set of engineered plans directly to ACHD for review by the Development Revlew Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for AIVY work in the right-of- way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a°Driveway Approach RequesY' form to Ada County Highway District (ACHD) Construction (for approval by Development Seivices & Traffic Services). There is a one week tumaround for this approval. ^ Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a"Temporary Highway Use Permit Application° to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment 8 Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion 8 Sediment Control Narrative 8~ Plat, done by a Certified Plan Designer, must be tumed into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Flnal Approval from Development Services ACHD Construction - Subdivision must have received approval fram Development Services prior to scheduling a Pre- Con. Ada County Highway District • 3775 Adams Street • Garden Gty, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achd.ada.ld.us