ACHD Comments~
.,~`~~ ~~~~,.
Carol A. McKee, President
Sherry R. Huber, Vice President
Dave Bivens, 2n0 Vice President
G'om~wv7~'"ed~'o ~.t.v~+:co
May 20, 2008
To: Tami Shoemaker
51 E. Cariton Ave.
Meridian, Idaho 83642
Subject: MCZC-08-049
Building expansion (Miss Tami's
1031 N. Main Street
John S. Franden, Commissioner
~~~Rebecca W. Arnold, Commissioner
~,l '~
~~~ -
` , ~e~; --~ ~ ~ ~
~ --~ ~.~
~~~ ~ ~eA
Q~~ ,JUI~ 0 ~ 20Q$
Tea Room)
f_;ity O~'1V~~ric~ian
~ity Clerk Of~icE~
In response to your request for comment, the Ada County Highway District (ACHD) Planning
Review staff has reviewed the submitted application and site plan for the item referenced above. It
has been determined that there are no site specific requirements for you at this time due to the
fact that:
All required improvements exist abutting the site.
If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require improvements to the transportation system at that time.
Prior to final approval you will need to submit construction plans to the
ACHD Development Review Department to insure compliance with the conditions identi~ed
above or for traffic impact fee assessment. This is a separate review process that requires
direct plans submittal to the Development Review staff at the Highway District.
A traffic impact fee will need to be assessed by ACHD and will be due prior to the issuance
of a building permit. Contact ACHD Planning & Development Services at 387-6170 for
information regarding impact fees.
Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk,
pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained
from ACHD.
If you have any questions, please feel free to contact me at (208) 387-6171.
Sincerely,
~~ 0' 7Zt..~~3rvc-e~
Kristy Scovill
Planner I
Right-of-Way and Development Services
CC: Project file
City of Meridian
Ada Counry Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achd.ada.id.us
Development Process Checklist
~Submit a development application to a City or to the County
~The City or the County will transmit the development application to ACHD
~The ACHD Planning Review Division will receive the development application to review
~The Planning Review Division will do ne of the following:
~Send a"No Review" letter to the applicant stating that there are no site specific requirements at this time.
^Send a"Comply With" letter to the appticant stating that if the development is within a platted subdivision
or part of a previous deve{opment application and that the site specific requirements from the previous
development also apply to this development application.
^Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
^Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
~The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
^For ALL development applications, including those receiving a"No Review" or "Comply With" letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.)
• The applicant is required to get a permit from Construction Services (ACHD) for AIVY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
^ Driveway or Property Approach(s)
• Submit a"Driveway Approach Request° form to Ada County Highway District (ACHD) Construction (for
approval by Development Services & Traffic Services). There is a one week turnaround for this approval.
^ Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a"Temporary Highway Use Permit
Application" to ACHD Construction - Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50'
or you are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
^ Sediment 8 Erosion Submittaf
• At least one week prior to setting up a Pre-Con an Erosion & Sediment Controt Narrative & Plat, done by a
Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved
by the ACHD Drainage Division.
^ fdaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con
being scheduled.
^ Final Approval from Development Services
ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-
Con.
Ada County Highway District • 3775 Adams Street • Garden Ciry, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • vwvw.achd.ada.id.