Three Corners AZ PP Applicationn
MAYOR
Tammy de Weerd
CITY COUNCIL MEMBERS
v�Keith Bird
Joseph W. Borten
Chanes M. Rountree
Daum Zaremba
CITY DEPARTMENTS
City Attorney/HR
703 Main Street
898-15506 (City attorney)
898-5503
Fax 884-8723
Fire
540 E. Franklin Road
888-1234 fax 895-0390
Police
1401 E. Watertower Lane
888-6678 fax 846-7366
Public k (I
660 E. Watertower Lane
Suite 200
898-5500 fax 898-9551
Building
660 E. Watertower Line
Seita 1.50
887-221 fax 887-1297
Wastewater
3401 N. Ten Mile Road.
888-2191 fax 0744
Water
2235 N.W. 8th Street
888-5242 fax 884-1159
TRANSMITTALS TO AGENCIES FOR COMMENTS ON
EVELOPMENT PROJECTS WITH THE CITY OF'MERIDIAN
o insure that your comments and recommendations will be considered by
the Meridian Planning and Zoning Commission please submit your
comments and recommendations to Meridian City Hall
Attn: Will Berg, City Clerk, by: November 8, 2007
Transmittal Date: October 16, 2007 File No.: AZ 07,017 & PP 07,021
Hearing Date: November 15, 2007
Request: Public Hearin - Annexation and Zonin of 40.4 acres from RUT to C -C zone
` (21.3 acres), R-8 zone (8.27 acres) and R-2 zone (12.87 acres) and Preliminary Plat
approval of 54 lots including:. 33 residential lots, 11 commercial. lots and 10 common lots
on 40.4 acres in the proposed C -C, R-8 and R-2 zoning districts for Three Corners
By: David Dean ..°
Location of Property or Project: 6380 N. Locust Grove Road
Steve Siddoway (no FP)
David Moe (no FP)
Wendy Newton-Huckabay (No FP)
Michael Rohm (No FP)
Tom O'Brien (No FP)
Tammy de Weerd, Mayor
Charlie Rountree, CIC
Joe Borton, CIC
Keith Bird, CIC
David Zaremba CIC
Water Department
Sewer Department
Sanitary Servlces(No VAR, VAC, FP)
Building Department 1 Rich Greene
Fire Department
Police Department
City Attorney
City Engineer
City Planner
Parks Department
Economic Dev. (CUP only)
Your Concise Remarks:
Meridian School District (No FP)
Meridian Post Office(FP/PP only)
Ada County Highway District
Ada County Development Services
Central District Health
Nampa Meridian Irrig. District
Settlers Irrig. District
Idaho Power Co. (FP,PP,CUP)
Qwest (FP/PP only)
Intermountain Gas (FP/PP only)
Bureau of Reclamation (FP/PP only)
Idaho Transportation Dept. (No FP)
Ada County Ass. Land Records
Downtown Projects:
Meridian Development Corp.
Historical Preservation Comm.
South of RR 1 SW Meridian:
NW Pipeline
New York Irrigation District
' Boise -Kung Irrigation District
CITY HALL 33 T IDAHN AVEhiUE MERIDIAN,, IDAHo 83642 (208) 888-4433
I La ,,�, 1 FINANCE& UTILITY IL LIN FAX 887-4813 MAYOR'S OFFICI FA. 119
,moi
Printed on recycled paper
Hearing Date: 11/15/2007
Project Name: Three Corners
File No.: AZ -07-017
Request: Annexation and Zoning of 40.4 acres from Ada County RUT to
C -C (Community Business District) (21.3 acres), R-8 (Medium Density
Residential) (6.27 acres) and R-2 (Low density Residential) (12.87 acres) by
David Dean
File No.: PP -07-021
Request: Preliminary Plat approval of 54 Lots including: 33 residential lots, 11 commercial
lots and 10 Common Lots on 40.4 acres in the proposed C -C, R-8 and R-2 zoning
districts by David Dean
■ iR h
File No: ALT -07-015 `'
.w a
Request: Alternative Compliance forlthe 10 foot landscape buffer adjacent to local streets
by David Dean.
Location: 6380 N. Locust Grove Road, Section 29, Township 4 North, Range 1 East, B.M.
I
,
el CITY CW �
r 54
IDAM0 1�
may:
' fM�
L+J
Planning Department
COMIvMISSION & COUNCIL REVIEW APPLICATION
c�iu►-�s
Applicant Information
Applicant nazne: A V i jA 4 • Ok phos; -13-1 0. 1 �3
Applicant address: 1!1 !4(e F=e 14" WaDEMcto Zip: 06 10 tf 4 20,
Applicant's interest mi prop. : gOwn ❑ Rent ❑ Optioned ❑ Other
Owner nan'fc: 1 Phonz:
Owner address:
Zip:
Agdat name (fig., arghithct, tnginft, dtvdlopir, rtPib§ft&tativbb): A Idl1 KWA.
Finn n-VOG'iv" f-%evk&A1_ to - Phone: 3 L3
Address: x1'11 � d'1/l1 o#2 4N �zip: �-
5100000
Primary contact is: ❑ Applicant ❑ Owner IYApnt ❑ Other
Contact name: TAj*A MOKW^4..
E-mail: "F w� o�yLA Cd_ e 1n a r c_ n.
Phony: 3 2A
Fax: b Z3 !L31
Sub wt Property Information veel 4 1 1W
Location/stL VOA address ■
As scar's pardel num s]: 5 015 2,J 2-7 21 t'
�C. 7-1 Total acres ae.•Township, range, section.• -
Ciurent land use: rl C untnt zoning district: CO or
600 E. Wate tower Lane, Suib%2& ■ Meridian, Idaho 83642
Phone: (208) 884-5533 ■ Facsimile: (208) 888-6854 ■ V*bsitu www��� tyT�
1
gip;
Project Description
Pro'ectlsubdivision name: llkree. Z6�
Citneral description of ropospmfect/r - uvst: f 1•
Ce
Proposed zon-m*g district(s): Cv!
Acre of each zone proposed: G �_
r
HOLM
L$ndr Awn I On I Le W) AA !Cif - . i t
St
goo tO
FL-�b � V •Z'[ ac• �.-2 = to .3H
TyrW of usb propo, d (check -all that apply):
Iff/ Residentialommarctal C+�Dffica ❑ Industnal VOdw
Amenities mvidcd with this dove/ meat if a licabl - 1 • •
P oP � PP ). �
Who will own dt m aintain ffe prtssudzbd irrigation systEm in this div loP rent? - d. s,44(
Which inigatiop district docs this property lie within? 1,4,
Primary trop source. 1 - �'WAkAoleo
so vcvndary: +�`'L
Squa faatag,8 of laadscap6d arias to b` (if P=Kyamcondwy point of cou ction irCity wahm dK
Rebidential Project Summery cif appReable
An
Number of *sid'�tia1 omits: � � - &S " um - ' of ' ding lots: � �- Use
4,41st-6 � •
Number of common and/or other lots:
Propood number of dw0ifi,g units (for multi -family &mfi pments only):
1 BUroom: 141tt 2 or morn: Bldrooms: A
Nfinimurn square footap of structure(s)() (mcl. 000 Proposed buildins he' t: S -�
AA0
MiniMinimuln px- rty si& (s.f): Av"t propdrty size (s.f.): 7= VIP
Gross density (DU4=-til lid): ���U v`&'/'tY (Di]mcre-excluding mdx& ai1ey:):
Ai e.. 0
Parcen m of en ace rovidad. _ ` Acts of o ac+a: ' •
� open sP P P� sP
Pbrcen a of me -able: o2ft space: Chapter 3 Articlb G for 'fred op en space)
Type of op& space providbd in acrks (i.e., landscaping, public, common, etc):1"cksa%Pc/%fhwj%,W,
Typo of d lling(s) praFoeed: NrSi4v-family ❑ Townhomes ❑ Duplex= ❑ Multi -family r
Non -re dentisd Project 5umn ry IF applicable)
Number of building.lois: + Other lots:
Gross floor area med: q01 MOM wa spFxi if a licablt :
T( )
Hours of op6 ration (days and hours). 4 ding. Might:
PercentagAf aita/project devoted to the following:
LandscaP. IV Building; 0 Paving: •
Total numl*r of employ s:• ��� Maximum number of amploy�ee�s at any on* tima:
Numlor and ages of students/children if a licab� :.� � 0a � � Z 4L Seatin c &U "go � �
� ( PP ) _ � �
� Number of tomPacts actprovided:TAU numbbr of parking g sP` ages mvid*d: l Z697 4 Wk 0 t �
Authorization
Print applicant name: v► d 04 - d . tUe ," - d*
Applicant tutt:u r / I W:
PP si �
/660rlftower Lane, Suite 202 • 'than, daho 83642
Phone: (208) 854-553+ Fadliniild: (208) 888-6854 • W6blfite: www.meridiancity.org
2
9777 CHINDEN
BOULEVARD
BOIDAHO 83714-2i
88o FAX i r.
boise@toeniirco.com
City of Meridian
City Planning Department
660 E. Watertower, Suite 202
Meridian, Idaho 83 642
RE: Revised Narrative for Three Corners Subdivision— Annexation/ Rezone,
Alternative Compliance, and Preliminary Plat Application Package
To: The City of Meridian Planning Department
Attached are the revised applications for an Annexation/Rezone, Alternative Compliance and
Preliminary Plat for the property located at the Southeast corner of Locust Grove and Chinden.
Also included are the relevant checklists with the supplemental information required within the
checklists for the three applications. This proposed subdivision contains approximately 39 -
acres. These applications are submitted, and intended to be processed concurrently with, the
previously submitted Comprehensive Plan Amendment, submitted to the City on June 15,
2007. The submittal has been revised to remove the property in Lot 16 of the Dunwoody
Subdivision. Previously, that area had been proposed to contain additional estate lots, however
the owner has elected to remove the property from the project rather then develop with the stub
street conditions being proposed by the City and ACHD staffs. It is our opinion that
connection to the stub streets as directed by the City and ACHD staffs would not provide the
type of rural, estate neighborhood envisioned for the R-2 lot area and, further, would greatly
diminish the "rural feel" of the existing Dunwoody Subdivision to the West.
The site is bordered on the North by Chinden Boulevard (U.S. HWY 20/26), and on the west
by N. Locust Grove Road, which will provide vehicular access to the proposed subdivision.
The site is currently zoned RUT (Rural Urban Transition Zone). Our application requests a
rezone of the property with three different Zoning designations:
• We request a rezone of approximately 21.3 -acres, near the northwest corner of the
property, to the C -C Zone to allow for the construction of the proposed Foundations
Academy private school. The C -C Zone is also intended to contain approximately (10)
office buildings and/or limited retail, as permitted within the City Code in the C -C
Zone. A common area lot is intended to contain a blanket easement with cross -access,
i
City ri i
Revised Three Comers SubdivisionApplication ativ
October , 2007
Page 2o
ingress -egress and shared parking in favor of the office/limited retail buildings. The
proposed zone is conducive to the proposed Comprehensive Plan Designation of
"Mixed Use — Community". The purpose of the CC zone request is to allow the office,
school and some limited retail with the flexibility of a future drive-thru. The CC zone
also has a "0 -Setback" from the proposed Three Corners Trail, which is conducive to
the concept for the CC area in that the buildings would be located close to the back of
the sidewalk and the landscaping would be located in the center medians of Three
Corners Trail. We are also proposing a band of common area on the south side of
Three Corners Trail to provide additional landscape buffering for the R-8 lots south of
the proposed roadway. With our application we are submitting for an "Alternative
Compliance" for the required landscape buffer along the road, since the buffer
landscaping is incorporated into the median and the common area south of the road. We
don't anticipate any uses which would approach the maximum building size of 60,000
SF allowed in the CC Zone, and as such, would accept a restriction to a lesser
maximum square footage, in the Development Agreement that will be required for this
proj ect.
• This application requests a rezone to R-8 for the area south of the office portion and
east of the proposed school site. This area will contain a loop street, which will provide
access to the proposed detached patio home community. The area is proposed to be
pedestrian oriented with all of the homes oriented towards a center common area with
pathways and other amenities such as gazebos, tot -lots and picnic shelters. The area
proposed for rezone to R-8 consists of approximately 6.27 -acres. The R-8 Zone request
is for a portion of the property requested for a Comprehensive Plan Designation of
"Mixed Use -Community"
■ Lastly, we are requesting rezone of approximately 11.4 -acres South of the R-8 area to
R-2. This area is proposed to contain lower density estate lots averaging approximately
3/4 -acres in size, which will be compatible with the current Comprehensive Plan
designation of "Low Density". The subdivision as proposed, would contain (13) of
these "estate" type lots with extensive pathways and a pond, which will serve a dual
function of aesthetics and irrigation storage. An existing barn is intended to remain on
Lot 17, Block 1.
No variances to the City's Uniform Development Code standards are proposed with this
application.
l -
.
1 0*13'f I I I VICM � 1 �
City of Meridian
Revised Three Comers Subdivision ApplicationNarrative
October 5, 2007
Page 3 of 4
We are identifying "specific use easements" for all common side lot lines for the lots in the R-
8 area. The purpose of this is to allow homes to stagger the difference between the adjacent
home, in which on one lot a home could be on the property line while the adjacent home is
setback, with a patio, 1 0 -feet from the property line. This would allow for the 1 0 -foot
separation as currently required in the R -S zone, but again, this would be staggered to allow for
more landscaping on every other lot. So the landscaping adjacent to the patio areas would be
private and would be the maintenance responsibility of the adjacent lot owner. The home set
on the property line would not have openings and would be made of a one --hour fire rated wall
construction. Additionally, the plat will indicate the proposed utility easement locatiops so that
the 5 -foot utility easements, typically required along lot lines, will be accommodated.
As mentioned earlier, this application also include an "Alternative Compliance" request to
permit the C -C zoned portion fronting on the proposed East Three Corners Trail to have a zero
street landscape buffer (from the proposed East Three Corners Trail). The design intent here is
to have the landscaping (street trees) within the center medians and the office fronts up close to
the street for an urban feel in this section of the community. By having the buildings more
dense in this area, it will enhance the mixed-use features of this subdivision. The concept is to
create an urban neighborhood edge ,with contrasting adjacent open green spaces such as the
landscape buffered walking path. Having the buildings close to the pedestrian edge of the city
sidewalks allows the parking to be located behind the buildings further screening the parking
from the proposed R-8 residential area. The landscape buffer reduction requested on the
interior areas of the property will have no negative effect on existing surrounding properties.
We are not proposing a reduction in the required landscape buffer along Chinden or Locust
Grove.
We have also met and communicated with the Meridian Public works Department on sewer
and water service to serve the development. while the adjacent sewer and water facilities
contain the capacity required to serve this subdivision the depth of the adjacent sewer in Locust
Grove is such that limiting sewer in the roadways would not provide the required depth needed
to serve the entire site by gravity sewer, without extensive fill in the northwest corner of the
property. As such, we are proposing sewer along the eastern property line and southern
property line of the school site to allow the connection to the Locust Grove sewer further
south, where we can gain two -additional feet of sewer depth. This also allows for the potential
of approximately (11) of the existing lots in the Dunwoody Subdivision access to City Sewer.
For the domestic water and fire protection water for the subdivision we are proposing an 8 -inch
main along the proposed Three Corners Trail and stubbing to the south boundary for future
extension through Lot 16 of the Dunwoody Subdivision, once/if that property is developed. If
the Lot 16 portion is developed, the water main would complete a large loop with the existing
water main stubbed to the property at the north end of the existing Dvorak Ave.
C: Documents and SettingslLPerkinslLocal Settings I Temporary Internet Files IOLK5C107121-annexation-rezoneletter-
amended October 07.doc
File: 07121-20-110
(fril I 116P 147) P4 (1);1i i k,194 10 D1 i''1111 I I , ;
A- L N -: -4 OZ11,111 ip
City f Meridian
Revised Three Comers Subdivision Application Narrative
October 5, 2007
Page 4 of 4
We have made every effort to address all the requirements of the City of Meridian Subdivision
Ordinance for the design of this development and the content of the application. We thank you
in advance for your consideration of and the timely processing of the attached applications.
9=
Tim Mokwa I
F'ro ect Managet
j
Mr. And Mrs. Dave Dean
Brian Hauff
Pat Dobie
C - 0ocuments and Settings �LI`erkins ILocal Settingsl Temporary Internet Files IOLK500 7121 -annexation-rezoneletter-
amended October 07.doc
File - 0 7121-20-110
i*
• -
�+ ADA CDUHTPA'
CCR�FR
J. AYi RR4
old I l0 FEr---%q4DEPUT
1999 Sp 1kX D 99091922
DEED
For VOua Recce
B:uWw=-Smith LLP, as Idaho limited H*Mty pmtu=hip
riikff rafarred to (3*ntoirj domh=W b io, aLaw aoovey tso
s
D*Ad J. DedWd Yai,� l��n, hgbod d wife
harola r reformd to esuGvantea, eweatarddrert Ig r rj VG 6. 00 *Od41 • `' [�� ��
db fiAy t rad p-manft to -W.
y
Lot 16 in Block 1 of DUN*MY SUBDIVISIM; xccord:Lng to they Official Plea
thereof, h1ed in 'soak 56 of Plattit< at Page 54M and 54830 Official Records of
Aft County. I fth. o .
,A 1 _ IIl�#h int t in Lot 29, M.oc]� 1 A
To HAVE -AND TO HOLT] t�w- id pr=d9cs, Wkh their Sto the d � � hdtu
7d d �f rt var. A 4 �P � c� to sd vrith t1w add a4 that Orantm in
} this corm is fisc dM* of MW p rCming that mrd era fm trona 98 an • exempt corm
ft
�0° + U.S. �- �W4 qg r�'a, ind r; to=, I Lkg% *d
vide up= the prcm3 wd ttr Grantor vM owtvA sad defend this wms tram Wl cis;
DMed: Saptemtrr ID, 1999.
rclgkson- th LLP
•
OR
Wd
Hiro R. nrMazoon, Pj , n4kx
St th r Pa rtn+er.
STATE OF IDALHO
1AL
COUNTY OF AJDA
On I%$ VU of Sa anbar in this `
t3�r pt iteear 1999, be�tare me, r IliatarY Public m �d far rwid 5�c,
� Y PP d Ha
rd. d R. B� ran It 9tcit'aa C. Smith, iat t]r ati�d to me to , qp of tura
rt is the p B LLF,, d tb�e r w ora of the put m who
.� !_ ■ _ ` 1p n=a to rLB d to Ift s io
irF
,F
Nahk Fnlft cffl-12L-
RaziftaA
=o�=
First American 27tle Company of Idaho
O
7H&. =" FLIMdkED CoURTMY OF -1 r�
ESCROW CANCE
. &
14
61,
9 N R
NAM 1000E THS LHR no V=077" DATA
327torder No.: 27069656 NO
W DEED
FOR VALUE RECEIVED SEE EXHIBIT " a " ATTACHED HE0 AND MADE A PART
HEREOF
GRANTOR(S), ado) hemby GRANT, BARGAIN, SELL and CONVEY unto DAVID J DEAN
AND LUANZ I DEAN* HUSBAND AND WIFE
G S), whom cut jma$q.add A is:
the following descried real property in ADA. County, State of Idaho, more particularly
dawibied at follows, to wit:
`i`" " BY REFERENCE MADE
SEE E�HI B IT A ATTAHCED HERETO AND EF
A PART HEREOF
TO HANE AM TO HOLD thit said prerniges, with their appurftnarcW unto tha said Grant*, ate
Granted(s) heirs end assigns forever. AM the aWd r(3) doft(do) hefty covenant to anrd with tieitaid
Gmntee(b), that Grantor(s) is/are the o (s) in f WrAp* of :&Wd prftias; that said premlAn are free from
all emumbrames, EXCEPT thane to wb ich this convoy' ispexpress ly made subject and these made, suffered
or dona by ft, Grantee(s); and subject to reswvafiogp,, restricQpns, dad ions, - rnonts, rights of way and
agreements, (if any) of record, and gemral taxes and asse its, (including ireigation and utility assenments,
if any) for the current year, which are not yet due and payable, sW that Grantors) gill warrrant and defend
the. sane from all lawful claim 1 whatwever.
Dated: September 11, 1997
�a
STATE OF
COUNTY OF IDAHO �
A
:2f.9
A
.X{
9.
1 29
1,12
%
`07/17/,2007 1; 2083758580
0pjDER No. 970696563
WESTEFIN RECYCLING
s
8XITIB IT
■
� PGE 0
rtear of the Northwest Quart*r of section
29, Tho Ko � these � t qua
To*nghip 4 North, Range I East, Boise Me it f d i an , Ada:-
County, x daho .
EXCEPT
to the State of Idaho by Right of WILY
That portion conveyed
Deed recorded SWtember 291 19 3 9. in Fobk 238 of heads of
Page 171 ;�Lnd scribed as follows
strIV of land 40 feet wide, b8img 40 feet on the
f cs of the following lowing described venter line of
Southerly � - n the �f�'i�iarl of
Plat
said Highway as surveyed and *hot o --
F. ,A� . S e 161-D jj) Highway Survey on f i l e in
the Fr�lr�l in Road
the office of the Department of Public Wort m of the State
�' daho and lying over and acroiRv the Northwegt Quarter
o � Y
tiorth�et Quarter ofd Section 29, ToUnShig 4 forth Range I
East r Boing Narid�an
S = TIN t Station 770+74.7 of the said Highway Survey,
k hick stat ton in an angle point of 00 dog r # 2 5 V. Right
roxirnet� coincident with the Northwest co=er of
SPP y
Section 29, Township 4 North, g R e l East, Boise Meridian;
th%nce ruri ning+43 . o of
South 89 degrees 5 6' East 10328,3 f e9t to Stat ior� # 7 8
said Surv*y, wh1ch staiti.on is a point on tangent
approximately l., 328.3 ftet East Irom the Northwoot
corner of Stction 29, Township 4 North, Range 1 Ea9t ,
Poise M6ridian e
t
+� L
R
. 07/17 2007 21: 48 2083758588 WESTERN RECYCLING PAGE 0
■ 97069656 " • ':
OR-HIBI
NAR
■ A
e
They Northw99t Quarter of the Northwreet rter of Section
Townahip 4 North, Range 1 East, Boj" Meiridian, Ala
County, Idaho .
EXCEPT $
Thatp ortioz conveyecl to the State of Idaho by Right of Way
Deed re cord � Sept einbe r 29, 19 3 9 in Book 238 of Deeds of
Page 171 and daWcribadl as
AA strip of land 40 feat xid%, being 40 feet on the
Southdrly aide of the following described center line of:
said Highway an surveyed anRl shorn on then Df filial Plat of
the Frankl i n Road F. A. S. 161- D ( l) H i ghway S u rv&y on file in
the office of the De rtz-ant of Public Works o:jV tht State
of id�►ho, and lying_ over and acros■ the Northw t Quarter
Northwest Quarter of Section 39, Township 4 North, RKnge I
East, noise Meridian
HHGINNING at Station 770+74.7 of the said Highs y Survey,
which station is an Angles point of 00 degrees 25' Right .
approximately coincident with the Northwest corner of
Section 29, .Townshilo 4 North, Range 1 Bast, noise Meridian;
thence rur ing ..•.:
South 89 de9reee 561 East 1,328.3 feet to Station 784+03.0 of
said Survey, *hich atAtion is a point on tangent
approxi.ma t e ly 1, 3 2 8.3 'feet East from the No rthwe s t
corner of Section �9, Township 4 North, Range 1 East ,
Bois* Meridian.
,A
A
W"
;r;
t
t
CA
07V,; , 07 21:48 2083758588 WESTERIN RECYCLING PAS 04
ORDLPR K0.r *97069656 "-w)
.,
EXHIBIT
w
The Wortlrhwebt Quarter of the Northwegt Quarter of Stiction
29, 'i'owniship 4 North, RangW 1 Ea et , Boise Heridign, Ada
Counter, zdaho . ,r•
ERCXPT
That portion conveyed to the State of Idaho by Right of W!y
B
Deed recarc�� S ept6mve-r 29, l939. in oak 238 of Deeds of
Page 171 and deAcribed is follows;
A strip of lAnd 40 reet wide, being 40 fgqt on the
Southerly sift of the following dagcribed center line of
said HighwAy U surveyed and shown an the Official PlAt of
the Franklin Road F.A.S. 161-- D (1) Highway Survey on fit ■ in
the Office of the Dep tmen�t of Public Works of the State
of Idaho, and lying over and across the Northwest Quarter
Northwest Quarter of section 29, Towashil; 4 North, Range I
East, Bois& 9dridion
BANNING at. Station 770+74.7 of the said Highway Survey,
which Atktion is in angle point of 00 degrees 25' , Riht
approximately coincident with the Northwq@t corner. a
Section 29, Town"i.p 4 North, Range: l Eaat, Boise Meridian;
thence rumoring
South 89 degrolm 56' East 10328,3 Beet to Station ,�,784+❑3.0 of
said Survey, which gtat ion is a point on tangent
approxin#tely 1, 3 2 8.3 feet t from the Northwest
corner of Section 29, Township 4 North,. Range: 1 East,
Boise Meridian. , ..
y
■
F
M
y
x -x
tY'
Y
��I
�C
ire
0 I 3W. -A. V 7 2 1■ 4 El 208375858B
ASTERN ACLi PAG
E 05
rr
ORDER NO* 97069656 -)/PD
rti
EXHIBIT "B r
CLAUDE W BARRI CK AND M ELAINE BWXCK, HUSBAND AND WIFE AND JAS J
COUGHLI H AND MARTHA H COUGHLIN , HUSBAND AND WIFE, AND C CLIFFORD
JOHNSON (WHO ACQUIRED TITLE AS CLIFFORD C JOHNSON)AND RUTH D JOHMON s
HUS BAKD AKD WIFE, AND JAMES H HAWLEY AND MARCR LLA R HAWL EY , HUSBAND
AND WIFE, AND GLENN A COUGHLAN AND AURRE L L CGUG HL14N , HUSBAND AND
W Z FE , AM I.UCY C DSII N NS , AS TRUSTRE OF THE DAI N E S TRUST
ti
L U t W BA K .
L F K .'
C C-LIFFORD -
i � ■
00V
OU Iff a HM
Y
L 4ll-'*SIE a s ru sTO c-
e
of the Baines Trust
;rr �
ti�
f4i
.;
'0 1:48 2083758588 WESTERN RECYCLI43 PAGE 05
STATE OF AHO County dt ADA las
On thi* 11th day of 5 e t e m b e r in the year of 19 9 7'
ap
— -
lief ori me a un �r igned e a Notary Public in ind for d id
State, personally appeared * the undersigned .
thq pennon (s) vrhosa name(M) i are bubmo 140 o the within
ins t rument F and aoknowljdg!qd that Yee / phel t executed
the same
S igen&tura
Ndme; PAM -LA IR" ER
(Type or Print)
Relyiding At: Boise Idaho
My Comrnistion expires; RUL2D03
P'.1
Barrick and M. Elaine Barrick and James J Coughl ' n
Claude W� Ba
and Martha H Coughlin and C Clifford Johnson and Ruth p Johnson
an
da�imes K Hawley and Marcella E Hawley and Glenn h Coughlan
and Aurr+el L Coughlan and Lucy C Dai nes , as Trustee of the Daps nes
Trust
r
%
■ ■
dim
�, ` jp16 tj D 1,a
■
�®
Zook
�F;�S
k
'tea;
z
■
�w
'tea;
z
■
Xl
AFFIDAVIT OF LEGAL INTEREST
STATE OF IDAHO }
}
COUNTY OF ADA }
13 bav 'I e am -yElf
VJ Ovo
(name) (address)
W
-- - - - �-
'OEM (city) i (state)
being first duly sworn upon, oath, depose and say:
1. That I am the record owner of the property described on the attached, and I grant my
permission to:
40
T name (address)
to submit the accompanying application(s) pertaining to that property.
I agree to indemnify, defend and hold the City of Meridian and its employees harmless
from any claim or liability resulting from any dispute as to the statements contained
herein or as to the ownership of the property which is the subject of the application.
I hereby grant permission to City of Meridian staff to enter the subject property for the
purpose of site inspections related to processing said application(s).
1 1,1
Dated this l2 day of
SUBSCRIBED AND SWORN to re me the day and year f
My Commission Expires-
AFFIDAVIT OF LEGAL INTEREST
STATE OF IDAHO }
}
COUNTY OF ADA }
r, L ut :rw ci:
(name) (address
r
` (city) - - - - — — - (state) '
being first duty sworn upon, oath, depose and say:
1. That I am the record owner of the property described on the attached, and I grant my
permission to:
Too to" Z6% - 2w" ill co 91.
I t AA Ao(4wo.., aill � A06., ?;LVD.
JHM61 � � A (address) ._
to submit the accompanying application(s) pertaining to that property.
I agree to indemnify, defend and hold the City of Meridian and its employees harmless
from any claim or liability resulting from any dispute as to the statements contained
herein or as to the ownership of the property which is the subject of the application.
I hereby grant permission to City of Meridian staff to enter the subject property for the
purpose of site inspections related to processing said application(s).
Dated this � 2 day o _ _ _ — _ 20
� T
.ti
-`��.
�Y • i � ■
SUBSCRIBED AND SWORN to before me the day and year first above written.
x..
x
x
�x
■■ ``
x _ ■ i 1 Idaho)
Residing
x
CHAW.-My Commission Expires:
x::xx
x:: I
x. x
"
to
mom
mom
............ .......
ON
SIN
WL M
. ... .........
fl rbv�
OIL
�:��1111111//wr)Y�J
Mf
IN
iab.: �11�
W-
A
I
TOOTHMAN-ORTON ENGINEERING COMPANY
CONSUILUNCY ENGMERS, SURVEYORS AND PLANNERS
9777 CHINDEN BOULEVARD
BOISE, IDAHO 83714-2008
208-323-2288 * FAX 208-323-2399
boise@toqrlgrco.com
Project: 07121
LF.'ate: September 7, 2007=
[-!evised: October 4 2007
F"'age: 1 of 1
r
E B I T " B
Land Descliption of Property for Annexation
To the City of Meridian�,, Idaho
A parcel of land located in the North Half of the Nortftwest 1/4 of Section 29,
Township 4 North, Range 1 East, Boise Meridian, Ada County, Idaho, being more
ry-,articularly described as follows:
BEGINNING at the comer common to Sections 197 207 29 and 30; thence, along the
northerly boundary of said Section 29,
1) S.89026"4197ions
E, •1326.49 feet to W 1/16 comer common to Sect
3p 20 and 29;
thence5
2) S.0003155919W'i� 1324.64 feet to the east -west centerline of the NW1/4 of said
Section 291; thence, along said centerIffie,
3) N,89036`20"'W.� 1328.58 feet to theN 1/16 comer common to Sections 29 and
30,; thence,, along the westerly boundary of said Section 297
4)
. .2 994.36 feet; thencel N00037')245)E
a
I
SUBJECT TO all Covenants, Rights, Rights -of -Way, Easements of Record, and any
Encumbrances.
EXHIBIT "C" attached and by this reference, made a part hereof
A LAND
REA 42 V
T map D F
MERIDIM14 PUBLIC
WORKS BERT.
(This description is based on record survey data and is for Annexation purposes only. A
field survey was not conducteq.
H:\07121\WPfiIes\Survey\ExhB-NW Parcel-Annex.doc
BOISE * COEUR d'ALENE a CALDWELL
1
R
5�
W
I -
MMMIT IV"
ANNM2YON MAP
FOR PROPERTY LOCATED IN THE
NW1/4 OF SECTION 29. TOWNSHIP f NORTH, RANGE 1 EAST B.M.. ADA
COUNTY. IDAHO
"on a"
1
■
I�EGE11iD
ANNEXATION BOUNDARY '
— — -- RIGHT--OF---WAY LINE
SECTION LINE
PROPERTY BOUNDARY
r
.B." POINT OF BEGINNING
■
N
h
M
I
W � I
f
5 W3@"W E 132M — — c - M
I
I
gk
_ I
I
30 c 1/4
WTR
1/4 �IVy
MXlMMA rbc MMMMW AIM; 41YJNWA TO;7]
MS 'I=W v__
b
r
■ r
.■ I
I
0 200 400 800 1201
TOOTHMAN---ORTON ENGINEERING CO.
ENGINEERS SURVEYORS PLANNERS
3777 CHINDEN BOULEVARD • BOISE, IDAHO 83714--2008
PHONE: 208-323-2288 • FAX: 208--323-2399
E-Fg: EXHO-AUX UPS9 WE: 10-4-01 0:07121
TOOTHMAN-ORTON ENGINEERING COMPANY
. ' CONSUIMNG ENGINEERS, SURVEYORS AND PLANNERS
F 9777 CHIN DEN BOULEVARD
BOISE, IDAHO 8371 4-2QQ8
jU8-323-2288 0 FAX 208-323-2399
k.{ boiseotoengrco.com
,�l
Project: 07121 Z'
Date: September 7, 2007
Revised: October 4, 2007
Page: 1 of 1 C
EXHIBIT "A"
Three Corners Subdivision
Preliminary Plat Description
A parcel of land located in the North Half of the Northwest 114 of Section 29,
Township 4 North, Range 1 East,.Boise Mefidian, Ada County, Idaho, being more
particularly described as follows: ,i
Ai 2.
BEGINNING at the cornier common to Sections 19, 20, 29 and 30; thence, along the
northerly boundary of said Section 29,
1 V�
1) S.89°26'41 "E., 1326.49 feet to W 1115 cdffier common to Sections 20 and..29;
thence,
2) S.00°31'59"W., 1324.64 feet to the east -west centerline of the NW114 of said
Section 29; thence, along said centerline,
kv
3) N.89036'205)W., 132$.5$' feet to the N 1116 corner common to Sections 29 and
30; thence, along the westerly boundary of said Section 29,
4) N.00037'24"E., 994.36 feet; thence,
F<
5) N.00137'24"E., 334.00 feet to the POINT OF BEG G.
CONTAINING: 40.4 acre., more or less.
SUBJECT TO all Covenants, Rights, Rights -of -Way, Easements of Record, and any
r
Encumbrances.
#e
eE
LANG
C
120 )71;
10 Vt%
of
s•
(This description is based on record survey data and is for
Preliminary Plat purposes only. A field survey was not conducted)
H:\07121\WPfi1es\Survey\ExhA-3 Corners Sub Pre Plat.doc
BOISE • COEUR d'ALENE • CALDWELL
�Ij
K
1}
COMPANY
N T , ENG , . S Yo PLANNERS
' rrl r 9 T
R.- 9777 CHINDEN BOULEVARD
TOISE, IDA 083714-2 8
8-3202288 • FAX 208`123-2399
C boil ' toe rco.com
Proj ect: 0.'67121
Date: September 7,2007
Revised: October 4. 2007 �. *
Page: 1 of 2
}�
EXHIBIT.I.In"
Land Description of?rop.erty ofezone to C -C Lone
A
# #t
; A parcel of land located in the.N4�alfiof the 4orthwest 114 of Section 29,
Township 4 North, Range 1 East, Boise- Meridiani, Ada County, Idaho, being more
particularly described as follows:
BES G at the corner common to Sections 19, 20, 29 and 3 0; thence, along the
iz,northerly boundary of said Section 29 V, ..
1 S.89°26'41 "E., 1'326.49et to W 1116 corner common to Sections 20 and 29•
thence,
2} S.0003 1'59"W., 342-50 feet; thence,'
3)" S.58°11' 08_'W ., 240.00 feet; thence,,
4) N.24°02' 5 8"W., 39.52 feet; thence, R.FJ
Fy
5 Northwesterlyaloe a curve to the left having a radius of 3 0@.00 feet an ar
g g � c
length of 342.45 feet, through a central angle of&65 024'11 ", and a chord
.K
bearing and distance of MW 45' 03 "W., 324.16 feet; the;ince,
.4I
6) N.89027'0953W.5 187.49 feet; thence,
tiK
7) Southwesterly along a curve to the left having wradius of 300.00 feet, an arc #
length of 269.24 feet, -through a central angle of 51025'19", and a chord
bearing and distance of S.64°50' 11" W., 260.30 feet; thence,
8) S.39007'3251W., 15.56 febt; thence, y
xy
9) S.44026'45"E., 183.17 fe'et; thenw,
10) Southwesterly along a cuwe toxtl-lb left having a radius of 12 1. 00 feet, an arc
length of 70.79 feet, through ,4 central an.gle'of 3 39 1'09", and a chord bearing
and distance of S .17 ° 18' 49"W., .V . M feet; thence,
11) S.00°33' 15"W., 14.83 feet; thence;
12) S.99059' 56"W., 3.09 feet; thence,
ti
13) S.00 37 20 W., 730.62 feet to the east -west centerline of the NW114 of said
Section 29; thence, along skid east --west centerline, ;
H:\07121\WPfi1es\Survey\ExhD-NWParcel-Rezone C-N.doc L
BOISE • COEUR. d' ENE • CALDWELL
■
r �
TOO N-4RTON ENGINEERING COA PANY
r�
■
1
Project: 07121 L�ti
Date: September 7, 2007 '
Revised: October 4, 2007
Page: 2 of 2
1;
.L
l
ti
14} N.$91136'20"W.3 51 (T.'90 feet t ; e N 1116 corner common to Sections 29 and
3 0; thence, along the,;Westerly boundary, of saidoection 29,
� 1328.3 feetto 1S N.00�37'2�, ,t
he OINT OF B GI G .Fil1 1 2
V.
;
+ r. • ■
CONTAINING: 21.3 acres, mord or less.
SUBJECT TO all Covenants, Rights, Rights -of -:Way, Easements of Record, and any
Oncumbrances.
'M
EXHIBIT "G" attached, and by this reference, made a part hereof.
�
Xd
:-
(This description is based on record survey data and is for rezoning purposes only. 14
W
field survey was not conducted.) ,.
1
AL
E ■
T
H:\07121\WPfflC-.-o\Survey\ExhD-NW Pard! -Ruane C N.dvc
I I
TOOTHMAN-ORTON ENGINEERING COMPANY
CONSULTING ENGINEERS, SLJRVEYORS AND PLANNERS
9777 CHINDEN BOULEVARD
BOISE, IDAHO 83714-2008
208-323-2288 e FAX 208-323-2399
boise4ptoengrco.com
Project: 07121
Date: September 7, 2007
Revised: October 4,, 2007
Page: 1 of 2
EXHIBIT "E99
Land Description of Property for Rezone to R-2 Zone
A parcel of larid located in the North Half A the Northwest 1/4 of Section 29,
Township 4 North, Range 1 East, Boise Meridian, Ada County, Idaho. beiniz more
particularly described as follows:
COMMEENCING at the comer common to Sections 19, 20, 29 and 30; thence, along
the northerly boundary of said Section 29, Ic
A) S.89026'41"E,50 1326-49 feet to the W 1/16 comer common to Sections 20 and 29;
thence,
B) S.0003 1'591W'.1 342.50 feet to the POINT OF BEGENNI[NG; thence,
1) S.00031`59'11W.,982.14 feet to the east -west centerline of the NW1/4 of said
Section 29; thence, along said east -west centerline,
2) N-89036'20 $18.58 feet; thence, leaving said east -west centerline,
,Fall
3) N.0003712015E., 730.62 feet; thence,
614 R ) N -89059556)5E.5 3.09 feet�,thence,
5) S.00033'151)5w.3 24.55 feet; thence,
6� Southeasterly along a curve to the left having a radius of 221.61 feet, an qrc
9
length of 663.27 feet, through a central angle of 171 '29'0 1 ", and a chord
bearing and distance of-v-S.89026"45"E., 442.00 feet; thence,
7) N.00033' 15"., 39.38 feet; thence,
8) Northwesterly along a curve to the left having a radius of 121.00 feet., an arc
length of 18.48 feet, through a cetral angle of 08'45'07", and a chord bearing
and distance of N.03'49'1 9'.'W.3 18.46 feet; thence,
2
9) S.87026930'39E,,5 169.18 feet; thence,
10) Northeasterly along a curve to the left having a radius of 125.00 feet, an arc
length of 19.47 feet, through a ceptral angle of 08055'31", and a chord bearing
F,i and distance of N -02009'59"E., 19.45 Feet; thence, 9 r.
H:\07121\WPfi1es\Survey\ExhE-NW Parcel-RezoneM-2.doc
BOISE * COEUR d'ALENE * CALDWELL �fk<
L
1
Cy
TUD N-ORTON ENGIN&RING COMPANY
� y
i/
Project: 07121
Date: September 7, 2007
F "
Revised: October 4, 2007
Page: 2 of 2
a
14) Northwesterly along a curve to the left having a radius of 29.50 feet, an arc
length of 14.48 feet through a central angle of 28007'02", and a chord bearing
` and distance of NJ 6°21' 18"W.�a14.33 feet;.thence,
12} N.30°24'49"W. 36._25 feet; thea ce,
4 ti =_
13} N.24°02' 5 8"5W., 15.69 feet; thence, '
F< 14 N.58°1'08"E. 276.33 feet t the
� o��POINT OF BEGENNING
16
w _S 1
Ell
CONT G: 12.87 acres.1, nore or less.
SUBJECT■TO all covenants, Rights, Rights -of --Way, Vasements of Record, and any
Encumbrances.
EXHIBIT "G" attached, and by this reference, made a part hereof. ■
U
(This description is based on record survey data bndlsfor Rezoning purposes only. A
s,
field survey w.9s not conducted) Ll
i ■
1
Ll%
d F
a +
,w
r■ +
i
ir
a. -dm ID
i
rw r
WORKS DEPT. Rof Ohl
■
■
fk
adz
V.
1
M
H A07121 \WPfilftIsurvey\ExhE-NW Parcel -Rezone R 2. doc
��Ir - I
Z.
&W!
rin-dr%Jv%
11�1-HMAN-ORTON ENGINEERING COMPANY
COMUILTING EMUNMERS, SURVEYORS AND PLANNERS
9777 CHINDEN BOULEVARD
BOISE, IDAHO 83714-2008
.208-323-2288 * FAX 208-323-2399
bolsel@toengrco.com
Project: 07121
Date: September 7, 2007
Revised: October 4,, 2007
Page: I of 2
EXMBIT "F"
r Land Description of Property for Rezone to R-8 Zone
A parcel of lalYd located in the North Half of the Northwest 1/4 of Section 29,
Township 4 North, Range PEast, Boise Meridian, Ada County, Idaho, being more
particularly described as follows:
COMMIENCING at the comer common to Sections 19, 20, 29 and 30; thence,
along the northerly boundary of said Section 29,
!M 6
A) S.89°26'41 "E., 1326.49 f8'et to the W 1/16 comer common to Sections 20 and 29;
thence, iltill
B) S.00031'599V'!) 342.50 feet; thence,
C) S.58011"0851w,!) 240.00 feet to the POINT OF BEGINNING; t4enci!,
1) S.58° 11'08"W., 36.33 feet; thence,
2) S.24002`58')'E,, 15.69 feet; thence,
drd
3) S -30024'49')'E., 36.25 feet; thence,
4) Southeasterly along a curve to the right having a radius of 29.50&feet, an arc
29.50`
feet,
of 14.48 feet, through a central angle of 28'07'02", and a chord bearing
and distance of S.16°21' 1 8`5W. 14.33 feet; thence,
P
5) Southwesterly along a curve'to to the right having a radius of 125.00 feet, an arc
length of 19.47 feet, through a central angle of 08"55'33", and a chord bearing
and distance of S.02'09'59"W.,, 19.45 feet; thence,
6) N -87026'305W., 169.18 feet; tbencq,
"0
7) Southeasterly along q curve to the right having a radius of 121.00 feet, an arc
length of 18.48 feet, through a central angle of 08045'07", and a chord bearing
and distance of S -03049'19"E., 18.46 feet; thence,
8) S.00°33' 15"W., 39.38 feet; thence,
9) Northwesterly along a curve to the right having a radius of 221.61 feet,, an arc
length of 663.27 feet, throughma central angle of 171029'01", and a chord
bearing and distance of N.89126'45"W., 442.00 feet; thence,
H:\07121\WPfi1es\Survey\ExhF-NW Parcel -Rezone R-8.doc
BOISE * COEUR d)ALENE # CAT -DWELL
A
SE
TOO -ORTON ENGINEERING COMPANY 1 ;#
Project: 07121 }
D ate : September 7, 2007
Revised: October 4, 2007 ?
Page: 2 of 2
10) N.00°33' 15"E., 39.38 feet; thence,
Ri
11) Northwesterly along a curve to the right having a radius of 121.00 feet, an arc ,
length of 70.79 feet, through a central angle of 3303 F0tW, and a chord bearing
and distance of N.17° 18'49"E., 69.78 feet; thence,` ,
12) N.44°26'45"w., 183.17 feet; thence,
.7i
13) N.39°07'32"E., 15.56 feet; thence, -
ti
14) Northeasterly along a curve to the right having a radius of 3 00.00 feet, an arc
length of 259.24 feet, through a central angle of 51'25'19". and a chord'
bearing and distance 8f N-64050'1 1 "E., 250.30 feel; thence,"
LJ
i
15) S.89027309"E., 187.49 feet; thence,
16) Southeasterly along a curve to the right having a radius of 300.00 feet, an arc
length of 342.45 feet, through a central angle of 65024'11", and a chord
bearing and distance of S.56041'03"E., 324.15 feet; thence,
W) S . 24 ° 02' 5 8 "E,, 3 9.5 .feet to the POINT OYBEGINNING.
Z pt
less.CONTAINING: 6.27 acres, more or
SUBJECT TO all Covenants, ,
.
a
Encumbrances. Rights -of -Way,, Easements of Record, and any
ti�
V2
a AR
EXIEUBIT
LL y attached., and by +
rY
C J'
bmfield survey was not conducted.)
1
(This ilescription is based on record survey data and isfor Rezoning purposes only. A
r[
REIM
l
Fy L
L± Fy
rn '
;, :� 1
t_.
F
1202
&bow -7
MERIDIAN It 0. i a
�#ORKSIW5*
M.�
■ .l
H407121\WPfi1esxSurvey\ExhF-NWa cI- o •
m
-AMM- IT *G $#I
REZOAW MAP
FOR PROPERTY LOCATED IN THE
NW1/4 OF SECTION 29, TOWNSHIP 4 NORTH, RANGE 1 EAST, B.M., ADA
COUNTY IDAHO
L3 S30'24'49"E 36.25
L4
N87'26'30"W
169.18
L5
S00'33' 15"W
39.38
L6
N00'33' 15"E
39.38
L7
N39'07'32"E
15.56
L8
S24`02'58'
39.52
CURVE LENGTH
Cl 14.48
C2
19.47
C3
18.48
C4
663.27
C5
70.79
C6
269.24
C7
342.45
C~' 20
3.6." L�E'GEND
6E r
REZONE BOUNDARY r
r
�+► - - --- RIGHT---OF-WAY LINE
-- - SECTION LINE
rail
- - PROPERTY BOUNDARY
"P.O.B," POINT OF BEGINNING r
r
N
w
b Ny
r
N
sW31WE 13^ - - C -M. /*
DUMW W SUWISAoM k
s' a 14s•3a- E
1$4.33•
M +3•2roa- E LOT 16 BLOCK 1, DUNWOODY SUBDIVISION
11%r w 45.3fl" w �.
2a7.�s '*
S 43*2row w I
� gg
� 1
CURVE TABLE
RADIUS DELTA TANGENT CHORD BEARING I
29.50 2807'02" 7.39 14.33 S 16'21'1 8"E
125.00 08'55'33" 9.76 19.45 S02'09'59"W f�
a
121.00 08.45'07" 9.26 18.46 S03'49"19 "'E x
221.61 171'29'01 " 2976.36 442.00 N89'26'45"W I
k
121.00 33.31'09" 36.44 69.78 N 17' 18'49"E I
300.00 51'25' 19" 144.45 260.30 N64'50' 1 1 "E
300.00 65"24"l 1 " 192.61 324.16 S56'45'03"E
M ii45'32- w a0t.4T
VIMMA robes SUA rlll MN A
0 200 400 800 1200
TOOTHMAN-ORTGN ENGINEERING CO.
ENGINEERS 0 SURVEYORS PLANNERS
9777 CHINDEN BOULEVARD • BOISE, IDAHO 83714---2008
PHONE: 208-323-2288 • FAX: 208-323-2399
EAE: EXW- -REZONE iMP.dwg DATE: 10/d/07 M 07121
PRE PLAT CLOSURE.txt
Parcel name: PRE PLAT CLOSURE (EXHIBIT "A")
North: 723395.2167
Line course: S 00-31-59 w
North: 723052.7315
Line course: S 00--31-59 0
North: 722070.6341
Line course: N 89-36-20 w
North: 722076.2694
Line course: N 89-36-20 w
North: 722079.7804
Line Course: N 00-37-24 E
North: 723074.0816
Line course: N 00-37--24 E
North: 723408.0618
Line course: S 89-26-41 E
North: 723395.2064
East 2462574.9564
Length: 342.50
East : 2462571.7700
Length: 982.14
East : 2462562.6327
Length: 818.58
East : 2461744.0721
Length: 510.00
East : 2461234.0842
Length: 994.36
East : 2461244.9019
Length: 334.00
East : 2461248.5354
Length: 1326.49
East : 2462574.9631
Perimeter: 5308.07 Area: 1,760,969 sq. ft. 40.43 acres
Mapcheck closure -- (uses listed courses, radii, and deltas)
Error closure: 0.0123 course: S 33--0328 E
Error North: -0,01032 East 0.00671
Precision 1: 431,550.41
Page 1
�y
ANNEX CLOSURE.txt
Parc
na
N
NNEX BOUNDARY
CLOSUEXHIBIT
"B"]
North:
723
167
Eas
2462574.9564
Line
Course:
s-31-59 w
Len :
342.56
North:
2.7315
East :
2462571.7700
Line
Course:
S 0 -59 w
Le h:
982.14
North:
7220 41
East :
2462562.6327
Line
Course:
N 89-36 w
Le the
815.58
North:
722076.
East :
2461744.0721
Line
Course:
N 89-36-2
ngth:
510.00
North:
722079.78
East :
2461234.0842
Line
Course:
N 00--37-24 E
ngth:
994.36
North:
723074.0816
East :
2461244.9019
Line
course:
N 00-37-24 E
h:
334.00
North:
723408.0615
East :
2461248.5354
Line
Course:
5 89-26-41 E
Len '�
1326.49
North:
723395.2064
-
East :
2462574.9631
Perimeter: 5308.07
Mapcheck closure -- (uses
Error Closure: 0.0123 1
Error North: -0.010321
Precision 1: 431,550.41
r
9 --
Ba: 1, 760,. sq . ft. 40.43 acres
fisted cours radii, and deltas)
Co : S 33-03--28 E
Ea : 0.00671 W
2y
b.
Page 1
11
3�p
E�3
2y
b.
Page 1
11
3�p
REZONE CLOSURES.txt
PROJECT: THREE CORNERS SUBDIVISION
DATE: SEPTEMBER 7, 2007
RE: CLOSURE SHEET FOR REZONE BOUNDARIES
TOOTHiMAN-ORTON ENGINEERING COMPANY
Parcel name: REZONE C -C (EXHIBIT D)
North: 717340.0130
Line Course: S 00-31-59 w
North: 716997.5278
Line course: S 58-11--08 w
North: 716871.0070
Line course: N 24-02-58 w
North: 716907.0964
Curve Len the 342.45
De ta: 65-24-11
Chord. 324.16
Course In: S 65-57-02 w
RP North: 716784.8390
End North: 717084.8253
Line course: N 89-27-09 w
North: 717086.6168
Curve Len the 269.24
De ta: 51-25-19
Chord: 260.30
Course In: S 00--32-51 w
RP North: 716786.6305
End North: 716975.9371
Line course: S 39-07-32 lei
North: 716963.8662
Line Course: S 44-26-45 E
North: 716833.0988
Curve Length: 70.79
Delta: 33-31-09
chord: 69.78
Course In: S 55-55--36 E
RP North: 716765.3081
End North: 716766.4784
Line Course: S 00-33-15 %
North: 716751.6491
Line Course: S 89-59-56 w
North: 716751.6490
Line Course: S 00-37-20 w
North: 716021.0721
Line Course: N 89--36--20 w
North: 716024.5831
Line course: N 00-37-24 E
North: 717018.8843
Line Course: N 00-37-24 E
North: 717352.8645
Line Course: S 89-26-41 E
North: 717340.0091
Line course: S 83-42-34 w
*. North: 717340.0091
East 2465162.2094
Length: 342.50
East : 2465159.0229
Length: 240.00
East : 2464955.0806
Length: 39.52
East : 2464938.9752
Radius: 300.00
Tangent: 192.61
Course: N 56-45-03 w
Course out: N 00-32-51 E
East : 2464665.0170
'%I East : 2464667.8836
Length: 187.49
East : 2464480.4022
Radius: 300.00
Tangent: 144.45
Course: S 64-50-11 w
Course Out: N 50-52-28 w
East : 2464477.5355
East : 2464244.8060
Length::115.56
East : 2464234.9873
Length: 183.17
East : 2464363.2493
Radius: 121.00
Tangent: 36.44
Course: S 17-18-49 w
Course out: N 89-26-45 w
East : 2464463.4762
East : 2464342.4818
Length: 14.83
East : 2464342.3384
Length: 3.09
East : 2464339.2484
Length: 730.62
East : 2464331.3141
Length: 510.00
East : 2463821.3262
Length: 994.36
East : 2463832.1439
Length: 334.00
East : 2463835.7775
Length: 1326.49
East : 2465162.2052
Length: 0.00
East : 2465162.2052
Perimeter: 5604.12 Area: 926,885 sq. ft. 21.28 acres
■
lMapcheck Closure - (uses listed courses, radii, and deltas)
Error Closure: 0.0057 Course: S 47-35-43 w
Errol North : --0.00384 East : -0.00421
Page 1
N
a_
11i -"
F,
REZONE CLOSURES.txt
�Iprecision 1: 983,177.19
Parcel name: REZONE R-2 (EXHIBIT E)
North: 727872.9040
Line Course: s 00-31-59 w
North: 726890.8065
Line Course: N 89-36-20
North: 726896.4418
Line Course: N 00-37-20 E
North: 727627.0187
Line course: N 89-59-56 E
North: 727627.0188
Line Course: 5 00-33-15 w
North: 727602.4699
curve Len the 663.27
De to: 171-29-01
Chord: 442.00
Course In: N 86-17--45 E
RP North: 727616.7870
End North: 727598.1961
Line Course: N 00-33-15 E
North: 727637.5742
curve Length: 18.48
Delta: 8-45-07
Chord: 18.46
course In: N 89-26-45 w
RP North: 727638.7445
End North: 727655.9380
Line Course: 5 87-26-30 E
North: 727648.4464
Curve Length: 19.47
Delta: 8-55-33
Chord: 19.45
course In: N 83-22-14 w
RP North: 727662.8773
End North: 727667.8859
Curve Len the 14.48
De ta: 28-07-02
Chord: 14.33
course In: s 87-42-13 w
RP North: 727666.7039
End North: 727681.6379
Line Course: N 30-24-49 w
North: 727712.8997
Line Course: N 24--02--58 w
North: 727727.2277
Line Course: N 58-11-08 E
North: 727746.3798
Line course: N 58--11-08 E
North: 727872.9006
East : 2461098.6007
Length: 982.14
East : 2461089.4635
Length: 818.58
East : 2460270.9029
Length: 730.62
East : 2460278.8371
Length: 3.09
East : 2460281.9271
Length: 24.55
East : 2460281.6897
Radius: 221.61
Tangent: 2976.36
Course: s 89-26-45 E
Course out: s 85-11--16 E
East : 2460502.8367
East : 2460723.6655
Length: 39.38
East : 2460724.0464
Radius: 121.00
Tangent: 9.26
course: N 03-49-19 w
Course Out: N 81-48-08 E
East : 2460603.0521
East : 2460722.8157
Length: 169.18
East : 2460891.8270
Radius: 125.00
Tangent: 9.76
Course: N 02-09-59 E
Course out: N 87-42-13 E
East : 2460767.6628
East : 2460892.5625
Radius: 29.50
Tangent: 7.39
Course: N 16-21-18 V#
course out: N 59-35-11 E
East : 2460863.0861
East 2460888.5267
Length: 36.25
East : 2460870.1756
Length: 15.69
East : 2460863.7815
Length: 36.33
East : 2460894.6533
Length: 240.00
East : 2461098.5957
Perimeter: 3811.51 Area: 560,819 sq. ft. 12.87 acres
Mapcheck closure - (uses listed courses , radii, and deltas)
Error Closure: 0.0061 Course: 5 56-40-24 W
Error North: -0.00334 East -0.00508
Precision 1: 624,837.70
Page 2
9
y y
I
REZONE CLOSURES.tXt
---------------------------------------------------------------------------
Parcel name: REZONE R-8 (EXHIBIT F)
North: 727746.3852
Line Course: S 58-11-08 w
North: 727727.2332
Line course: S 24-02-58 E
North: 727712.9051
Line Course: S 30-24-49 E
North: 727681.6434
Curve Len the 14.48
De ta: 28-07-02
Chord: 14.33
Course In: S 59-35-11 w
RP North: 727666.7093
End North: 727667.8914
Curve Len the 19.47
De ta: 8-55-33
Chord: 19.45
course In: S 87-42-13 W
RP North: 727662.8828
End North: 727648.4518
Line Course: N 87--26-30 w
North: 727656.0034
Curve Length: 18.48
De ita: 8-45-07
Chord: 18.46
Course In: S 81-48-08 w
RP North: 727638.7500
End North: 727637.5797
Line Course: S 00-33-15 W
North: 727598.2015
curve Len the 663.27
De ta: 171--29--01
Chord: 442.00
Course In: N 85-11-16 w
RP North: 727616.7925
End North: 727602.4754
Line Course: N 00-33-15 E
North: 727627.0242
Line Course: N 00-33-15 E
North: 727641.8535
Curve Len the 70.79
De ta: 33-31-09
Chord: 69.78
course In: S 89--26-45 E
RP North: 727640.6832
End North: 727708.4739
Line course: N 44-26--45 W
North: 727839.2413
Line Course: N 39-07-32 E
North: 727851.3122
Curve Len the 269.24
De ta: 51--25--19
Chord: 260.30
Course In: S 50-52-28 E
RP North: 727662.0056
End North: 727961.9919
Line course: S 89-27-09 E
North: 727960.2004
Curve Len the 342.45
De ta: 65-24--11
East : 2460894.6622
Length: 36.33
East : 2460863.7905
Length: 15.69
East : 2460870.1845
Length: 36.25
East : 2460888.5357
Radius: 29.50
Tangent: 7.39
Course: S 16--21--18 E
Course out: N 87-42-13 E
East : 2460863.0951
East : 2460892.5714
Radius: 125.00
Tangent: 9.76
course: 5 02-09-59 w
Course out: S 83-22-14 E
East : 2460767.6718
East : 2460891.8360
Length: 169.18
East : 2460722.8246
Radius: 121.00
Tangent: 9.26
Course: S 03-49-19 E
Course out: S 89-26-45 E
East : 2460603.0610
East : 2460724.0553
Length: 39.38
East : 2460723.6745
Radius: 221.61
Tangent: 2976.36
Course: N 89-26-45 w
Course out: 5 86r-17-45 w
East 2460502.8456
East 2460281.6986
Length: 24.55
East 2460281.9360
Length: 14.83
East 2460282.0795
Radius: 121.00
Tangent: 36.44
Course: N 17-18-49 E
Course" out: N 55-55--36 w
East : 2460403.0738
East : 2460302.8470
Length: 183.17
East : 2460174.5850
Length: 15.56
East : 2460184.4037
Radius: 300.00
Tangent: 144.45
Course: N 64-50-11 E
course out: N 00-32-51 E
East : 2460417.1332
East : 2460419.9998
Length: 187.49
East : 2460607.4813
Radius: 300.00
Tangent: 192.61
Page 3
Ocl<
Chord: 324.16
course In: S 00-32-51 w
RP North: 727660.2141
End North: 727782.4715
Line Course: S 24-02-58 E
North: 727746.3821
REZONE CLOSURES.txt
Course: S 56-45-03 E
Course out: N 65-57-02 E
East : 2460604.6146
East : 2460878.5729
Length: 39.52
East : 2460894.6782
Perimeter: 2160.14 Area: 273,265 sq. ft. 6.27 acres
Mapcheck closure - (Uses listed courses, radii, and deltas)
Error closure: 0.0163 course: S 78-54--14 E
Error North: -0.00314 East 0.01600
Precision 1: 132,523.31
--------------------- -r�------.-------------------------------------- - - - - - -
Page 4
Q
City ofMericiian lire -application Meeting Notes Date:
ProfecVs�x iv mon Name: Dean Prover
,,4.pplicant/Contact: M r
-
ity Staff ift, Sca- 4 -
-SE4,11
Lc atian: 2e LyC
k, n (4z. 0
E�sting caning: Ur �-�� � �
CoAOI
ntiguous and Within [A only):
Proposed Tania:
Nu of U
nits and/or Lots:
Propey Sipe:Aac,,�es
Dwe - Type if residential):
Sunrou4ding Uses: -6.CaLn
•
Comp 've Plan Designation(s): �e � ,.- -d-PvS_+V-
YAPS 1 '] a l x
Street Buffers and/or laud Use Buffers: -3s `
-
a,}�, �,i ��� � .Y 0' . y low
Open � aCein
Qp /A eniti-
p es/Pathways:
- - -
Street S Stub S Access=
Sewer ani Water Sm -vice:
T0P09aphY/VYd ology/Floodp .Ism=:
.
CartLaivDltches/fn`igatign =&or TT§47..q : N
'
msory:
. Additional Meeting Dotes:
a Ye � ,,5;
Chfndala
. gx4e
i
Other Agencie ents to Contact (drele):
Hi way Distri Nampa and Merida ri Irriga`lion Parks Department
ment
o T r ortation ep t Settlers %Ti,gatron Public Works Department
dP amtary Services Corpora�.on Fire Department Building Deparbment
Central District with Police PMattmqwAt .er:
C
Ap Ycbt ions Required (circle ail that apply):
Accessory Use ' - Design Review Short Plat A
Aft 've Compliance. Fin aI PlatMo didcation Time Extension
xten�an.
e sti - Nfsc. (DA Modification) UDC Text Amendment
Certificate o Toning Compliance Pied Unit Development Vacation.
T�om__tp Pan m en eat 7)26r tPe PIZ Variance
Co Plan Text endbment T� Private
� �� z S
Conditional Use P 05 g2��Ne
5�
Additional Pre --.Application Co a circle one):
Cth -
RequftigQ F! a6#- Not Required
q
Anticipated Submission Date: ' I s - 01 a�- - Anticipated e .
p aarmg Date. _ t per. ! S�-
NOI ESS. ppli■ants are required to hold a n0ghborhood meeting, in accordance with UDC I1--5A-5C, prior to
submittal of an application requiring a public hearbig. 2) Except for UDC Text Amendments, Comprehensive Plant
Text Am6ndments and Vacation `applications, an other application& requiring a public hearing shall be posted in
accordance with UDC 11-5A-5 A 3) Tire Wfoarmietxan provided during th meeting is based on current CIWCode and
Comprehensive Mal Any subsequent changes to City Gide audlor tIn Comprehensive pian may affect your
subnaftai and/or application. This pre -application meeting shaD be valid for 6 months.
W&
Neighborhood Meeting Sign -fn Sheet
For Wednesday, July 18th, 2007, 7: 00 PM
Meeting to Discuss the Proposed Dean Property Subdivision
ram mil
Neighborhood Meeting Sign -In Sheet
For Wednesday, July 18th, 2007, 7:00 PM
Meeting to Discuss the Proposed Dean Property Subdivision
ii
m Implill!1111
COMMITMENT OF PROPERTY POSTING
Per Unified Development Code (UDC) 11 -5A -5D, the applicant for all applications requiring a
public hearing (except for a UDC text amendment, a Comprehensive Plan text amendment
and/or vacations) shall post the subject property not less than ten (10) days prior to the hearing.
The applicant shall post a copy of the public hearing notice of the application(s) on the property
under consideration.
The applicant shall submit proof of property posting in the form of a notarized statement and a
photograph of the posting to the City no later than seven (7) days prior to the public hearing
attesting to where and when the sign(s) were posted. Unless such Certificate is received by the
required date, the hearing will be continued.
The sign(s) shall be removed no later than three (3) days after the end of the public hearing for
which the sign(s) had been posted.
I am aware of the above requirements and will comply with the posting requirements as stated in
UDC 11-5A-5.
Appl n ent signature -� Date �
Page 1 of 2
Mokwa, Tim
From: Jerry Hastings __ -
Sent: Friday, August 31, !0.
Davejdean@aol.com
Subject: ! •
August 31, 2007
Dave Dean
RE: Subdivision Name Reservation: "Three Corners Subdivision"
Dear Dave,
At your request, I will reserve the name "Three Corners Subdivision" for your project. I can honor this
reservation only as long as your project is in the approval process. Final approval can only take place when the
final plat is recorded.
�k
Sincerely,
Jerry Hastings, P. L.S.
Acting County Surveyor
Ada County, Idaho
287-79'12
From: Davejdean@aol.com [mailto:Davejdean@aol.com]
Sent: Friday, August 17, 2007 2:13 PM
To: Jerry Hastings
Subject: subdivision name
Jerry,
We are in the process of obtaining entitlements on approximately 70 acres. Approximately forty (40)acres
are at the southeast corner of Chinden and Locust Grove Road and the other 30 acres are contiguous
to the southeast bordered to the east by Bristol Heights, to the south by Vienna Woods, to the west by
Dunwoody Subdivision and to the north by Fuller Estates. The remainder of the surveying will be done by
Tooth man -Orton engineering. I
The name of the subdivision we are considering for your approval is ( 3 Corners } Please let me know
if you need any additional information or if changes are nscessary. My cell number is 871-2190 and e-mail
is davaidean ol.com
Thanks,
9-5-2007
7 T
r,n
Or
rn
rn
A
oil
Is m MAkY OF %OW-097ft MGQMNC CO. 9&Y &PW=M. ig(M OR WWOrM OF iM WMWW OR fM 0;" IQW SKM OAM pommo Of TOM&" -OWN MMWC Co is AV
d
THREE CORNERS SUBDMSION TOOTFOI.W-ORTON ENGINMING CO*FeO
LORMIMp IMHO. ADAF COUNTY CGFOMW EMIMAM, WMOO MD PLAAWM
m Exac
PRELHAINARY MATCOEUR 4'zm� Wo
Ai
m
m
C) tv
>
0
tz
N c',
AD
c�
-3
tz
0
*--4
:RRM> . 4M-m-mm"Ru,
+, _ �� �},.•.��_ } ti�Cr� fin
��•�a �iJ� ^ -: v�-riles. r, _ _ rvw ��n-ati���{�-�^ f�,',1 k _ �a' •:�- • +G � z•�,�L�C-'�•_i�K �� ! -- ._._...
l.'n� x •I �T~ r "'�
} }�t},1 i •+�r 'rtit• �_`�•�7 '�+:'= �•/�J�.`!J',. 5� _- - -
y •.r5 �. 'f', }I•�f -�• :y y ,ire.
l it � - - �r Nfp'�� �'' �• � � + y� y r � {'
16.
+I
•t' I
'+5+ �4 �1 F •�Y S•Iv rJe� .L �� I M.� �•� _ F�
Al
I � � � � 'may c•' +� f
! - } ' 'SFJr �� IR � i• �r �1'
•',1� �'Tyr�,a+��" _�rl:t}��+ _•..,�y�+P���S,�y 7'�•�; y.U�iL ��
JL �
. 1 y I •15
y
u_3S.bq Ty r•�stitir' Nvi�:lY _.�vtci'v,�•iL�G:iIC'�= rte`:=.r ter= •- _-'._,' y . _.. - •,$�. S},I•'
' _ _ _ .. iiiCCC y
` M1 rM1 4�, {�.
- '
�• 1
-W ,a �I, i
F r
4
} �L�
qL
I
WSMkW IS THE PKPERW OF TWMA-ORTON EMG*Ehk 00, MY wpbWUm, Ca oR wRoWm oF Tm *wWw oR fis cAft ww spianc %M KmJhm or MPwx-oP1w m*mw co. s
A
19
I
gm
9
1A
fill R
q Ilk q1 114 2�% Aw
RV P.
Us$
�8 pq A
1
moil
a
4
THRM CORNIORS SUBDMSION TOOTHMAN—ORTON INGIbigWING CGOMY
A d 4
AERIDW, EDAHO. %DA COUNTY coma"Mm E�4& -h�
SE
GM
PRELIKINARY ENGD&ERING I ONS 1 83714 2TX ISM
2 -2
3�2 - 2p cow I
NOTES & ROAD FAX-!6fV3M
cry
Fln
41
19
I
gm
9
1A
fill R
q Ilk q1 114 2�% Aw
RV P.
Us$
�8 pq A
1
moil
a
4
THRM CORNIORS SUBDMSION TOOTHMAN—ORTON INGIbigWING CGOMY
A d 4
AERIDW, EDAHO. %DA COUNTY coma"Mm E�4& -h�
SE
GM
PRELIKINARY ENGD&ERING I ONS 1 83714 2TX ISM
2 -2
3�2 - 2p cow I
NOTES & ROAD FAX-!6fV3M
M TOOTMM-am Awftw mNm MR&O is x
AWOUIMMTib, )ff Ce 4S CM vown
®r
. . ........................................
.............
. ...........................
... ... ..
...........
TOOTHW—ORTON *GDTWRING COIPANY
CQWATft iWWdW AA9 ftAM?IM
orna
Ll -
cm
FAX ip
3
...................... ... .....
t;
ENREENC CO. M SWTLY PWJYkD
AM
T
Awl
Took.
%d
3MIL37
iia
7
AW64
4
®r
. . ........................................
.............
. ...........................
... ... ..
...........
TOOTHW—ORTON *GDTWRING COIPANY
CQWATft iWWdW AA9 ftAM?IM
orna
Ll -
cm
FAX ip
3
...................... ... .....
t;
ENREENC CO. M SWTLY PWJYkD
AM
T
SUMP 259tsl
r 7.i9
L
eta
-;M,73 PPE
SVKP 72
I
I
THREE CORNERS SUBDMSION
MEREDLM, IDAH0. -AD& COUNTY
PRIMLIrXNY ENGDMERING
MW
MWER PROFIIIPB
M& M MOF41M X 7M WMtWff ORM MffM *Off SWCW VMM PMW OF MIX -MM MAMW
0
+
POO 26"As
W 4W.22 POK
IN &W,22 W
7M4.12 ME
2
—44
12
p
lit; on M#413 PM
Z
041 fAL-
A-
-::T-,I
30
PIPE
+
IN
I" PWE
Now
IA P,),03
1w. Im '03 At
--+iwmo;gw amp A
Pott
PM
NP7�M
.303
lip2 00
IN 76%'%K
R7 v PPE
09MV14, own
23.77
7M5,04 FVE
PPE
X*O WE
J . . . . . . . . . .
% w49ff 04 W740 W
- Neff OUT 3W40 Pft
0 7.
3
TOOTHM-4ii-ORTON fNGMI&ING C0IjP.,kNY
COM*M& EAEWft. OMM APA-5LMAD'M
323-22M CMRCjWF- noo
FAs:52,3-W
wow 4*11 pft
10
ex
84 IN 7,11 PM
OW 7.03 PK
PW 25*7.03
'44
IN 6% pre
pi .81 WE
*?AI PIK
2w4AO
wis MT;4974, POE
W 2507.VT
WW,W PPE
lot
ej �w
P, IWPWT
-49-M
Mficko=
w WA-
ALM"71 P(m
wm" OUT 0 WE
Ew
V, 21 PW
m
I
Kil
WWA
I
0
Ic
WOOD
ONE
THMI CORNMV SUBDIVISION
MMMIAN, IDAHO. ��ADW COUNTY
PRE PIAT
LANDSCAPE PIAN
rr
T00TEl*AN-dR--T0N %NGWORING CQ*PANY
I- -
c000mma F, 1I I parmycift AM KAWM&
m CAM 0:
No4-2W CdW3j:AL
'I CMA
(2 2 WM& K"
FAX: (W*) 323-2,XW
V�
L
Li
T00TEl*AN-dR--T0N %NGWORING CQ*PANY
I- -
c000mma F, 1I I parmycift AM KAWM&
m CAM 0:
No4-2W CdW3j:AL
'I CMA
(2 2 WM& K"
FAX: (W*) 323-2,XW
V�
L
Of TOMM-OM EXIMONG CO. AWMMWM
o'40� Or '6191-t >:w- z otnon
it
h2t
Flo raw
ItII
SL d 0 x
a o gL
Fe: olw�t
ILI 172,
-a
Z_
So a a
>
Z
X
tp
to
z
ij.
THREE CORNERS SUBDIVISION
MWIDUN, IDAHO. M& COUNTY
Idl
PRAU)"ARY PL9T
IANDSChPE RUN
m
cl)
km oR mmmum oF m ANJUiT M rm awmMjgw sKcm Wm@N P@mAm oF mon*m-Am mscmc Go, is
89"22'36" E 35.0
p:�OCUST4-R
I I Z5
TOOTBMW—ORTON WGRUMING COMPANY w," Now 10-11
M?A)V" m"m
as
W
CIS" ENVp*j^ q%VEYM ANk
777
ZA-21 4
am=
4
F i KAHO
3
�12r ' 3327 COE �64nl. QA#40
f 8
X: -246
AX. ) 1,23
7+ T ; � co Is
....;.�
! F I#
III m
z
I j C:Co
a
36
- - - - — - --
'-
'' 'l Y F •�` 1 -
i y
LW
9-v m M 57 0 pp- - —
X DO
r
v
RV�jp jv
-
! r, 1
L I a u
a• '
I ISI Ijai 0rt =.�`.twu
00 CN
II Irn
I ::
k _Ln >
I_ M
R
�� 3 mR•
.......: 3
— '' w - - ti • y Ial
r
L
A
6 a '
q F
IF
f
Fi
s+� � a.� +� 1 ' ■■���j 1 � SRS•
3.
— — ,.-..—
a
f
"no
ILIE I
I,
plid .
c w m
t
CD m v L
der
# j
itLn
rl
,rt
i
Y'
Y
M
` •--,
z74
—
� S �f• Ftl �
4.
!
97
•
- rF
amp
THREE CORNERS SUBDMSION TOOTIW-it
9 §A 9 I
COUNTY
R .
r10"'CS CAW
y
IANDSCRPE PLAN
MEAN f
¢e
F' ;
. j• aQ}aurroaaa-•• •.� S
LL�� -� J�'Y`,Ky x
�[[ i7k�Ji'vriC�.c 1. y
r+ -
4
• � 1 � . iii' .Y�y •�
�1i r F ,
jl
• aai _ � • 1 �i ij
J31 '0
r =
••{ r
x' •L y:.
LM1f �� { r
19
1 }
Le• +���1 gyp_ -; ,
� F ; I _ t
• C• • %amu.. a_;}'.? �{ ::'�.•'-� _
�nM
� I tri .,� +yak 7. i� �-.�• 1{• ar,�M1� '' h..,
{ ?f fir_
R : isl..+-,.1.: LX: i:,- ' S-_ 1' r•L + _
• S f� ..fir Y r 'M1 1' r M1
� � 1
Yy4} v i Ij__ _�L�I} � I• a F
.+
A{f
�J'.��
F ry o � �y r•'•� ' •� -
•- 1cti�_ryu__..
rrl.rcc-
.r'- o- J+
k .I a; %S:sa
+++!!� iiiiiiktik-r •.. L• L}y�,y,
}+SYS.. L"i{•�L'SL F 1.4 V. •�r• af• ���1
�� Y � an R'�{• Y .}i 2 . r� rr �
L L
S ��F � ' �• r
yy y 1
•1i•IJ '1� 5 �I � '1 ��' f�ZA � T
� 1 { 54"F.�& g[ L •�J•
�� y .1 � yam_-. �` } '�, rrn� `I}• i
M �y rF . {. r'. ` •��: Yr... _�� � ' '_� � � Ski ;
+� � slf3� • :r ^4'� � iL. Kai
�1
tm
LL
{ ; ���,::, a�.sr F Ly}J�R` ryft!•.i�i�Yr li,'r �
'�.• � �LL51 ����r'
h
r�IF 0
r; ,l ,fir
- -
y �—'N� -fit= �! {•
yAr YL71.7�Y ��GP�C Y r
r# J -� HfEQt t
y7 trt-.• Lam• •� r, — —
N
rW s•+�, 151 r•''F ti,f1 f ',
'r LW rl;e Cr C. L} it ' r. bi r, Ck
y,�.: rt.
Ir • ■�►wi���r' LS
it UdomwaM�a'r #
■ �11L�w, pl
v { ■
_J M I
=�avO
M
F
0 Vr
aX
Z=CZ7
;u0
-C:
mrnm�
00�-IC
0
D
�rr
Z
m rr
W
rn
C7 X
a
X
v
J� 4
lk
-a
t k 1L
1
5 .f
.. "' L y L
'r,
`r
r
} 5•
v •-' •OM1 ;
- { „
• •.r ''C �'r�l r7 '�'f ' '; 1
'� � t'• �1 �r -
� I
1}i
1'5 L .Ir4 t rL
rJr.
r
Vii; ,�~i- , ��I��•_, �• .;,•• _- �
%
f� 11 ��r.•',i S ��
at��--o-�fV „�,'r�, 'yam`•
t' L
1 t'
� r
p5
C• e ' " r -';i5 JL
wg ' • ' �y 'F , l * •• j, 'I hal 3.
1 �i •y� Wit, .
41
•2 + J 1 . _ � �4y� 7rJpq�j�1 _ _
e.4�:�: lL:3. .{ ${•' • � •'r, r . tit'• K 1y� k
Ilk! r 'r 5M1
•t •• � rr_l r t �•
i
r . •r F 1 }:r i
.. 1} �• r tiM1 �_.
vr
tly •rr
F%:�7k
1-n 7
yfk-;f�
� LS'aCr v rr,�-rrL¢• .. S
c -mrn Y.4I r
•J L �.4 r} ±kms SIC }•; �i r' 'R;L
y} -d{
�I I
y !
{{LII II
r3 0 � �
6/ �
10 —4 ,c
P. p r
I
lm Z •
=r
V.
V.
90 CA
C)
CO 0
cn
cn 00
0
0 "*4
cr)
0)
cn j�
/
►■ l�rj��iii��ii�i�i�i��� �� t
4h,
4s
F
IP
.2170 1 :c�
14
m3l. cc:
0 bmcD>
If >0m
za
cp�z
59i5*00 ip-
co 0 ilu
co 0
0 Tozz
0 CD
o
A
n
Date
ON 0
AA
D3 Applicant
"—L.—
Ln
0
Address
7zi/
hone
C4 Mi.
Er3-%
NAME OWCHM DIFFERENT THAN 13APPLICANT 3
ru OUAN. DESCRIPTiON Alk"OUNT
or
rLj
t
z
c
m
0
z
46
cyl
Mail
1p
pdl
E:
7
P'.d
al
■
■
sf
■
QA7 /)VIZ
.......... rw ..........................
PAYMENT DOES NOT INDICATE ACCEPTANCE OF APPLICATION
TAX
ff m
.A% — — --------- ...................
'r Recei /To
4 5 N TOTAL
By _ Vvi
W52
z •d 9r
P'.d
P'.d
116�
0
Or
b; Z■:
GEOTECHWICAL ENGINEERING & mATERIALSTESTING
August 31, 2007
File: DEADAV B07178A
Dave and Luane Dean
1746 E. Dunwoody Court
Meridian, ID 83646
RE: DRAFT REPORT
Geotechnical Engineering Evaluation
Dean 70 -Acre Development
Locust Grove and Chinden Boulevard
"Meridian,- Idaho
Dear W. and Mrs. Dean:
STRATA, Inc. is pleased to provide this draft geotechnical engineering evaluation
to assist with civil engineering infrastructure design and planning for the proposed 70 -
acre development to be located southeast of the intersection of Locust Grove and
Chinden Boulevard in Meridian, Idaho. our services were performed referencing our
proposal dated July 26, 2007.
The accompanying report summarizes the results of our field evaluation,
laboratory testing, and presents our geotechnical engineering opinions and
recommendations. Based on our findings, our opinion is the site is suitable from a
geotechnical standpoint for the proposed development, provided the recommendations
in this report are accomplished. We recommend STRATA be retained to review the
plans and specifications for the project as well as provide construction consultation,
observation, and material testing services to verify the recommendations contained in
this report are accomplished. If we do not perform the above -recommended services,
we cannot be responsible for design and construction -related errors or omissions.
The project site encompasses soil conditions including uncontrolled fill near canal
ditches and, su rficial lean clay. In general, after uncontrolled fill remediation near
canals and ditches the site soil conditions are generally good. STRATA did not identify
1i
soil conditions that would require remediation prior to constructing infrastructure or
structures. We did not encounter groundwater during exploration, and we do not
anticipate groundwater will be encountered within the upper 16 feet of the soil profile.
Infiltration rates measured below cemented soil are relatively high which may help
reduce the size of stormwater infiltration facilities.
As we discussed in our proposal dated July 26, 2007, this geotechnical
engineering evaluation is of a preliminary nature and will be likely used to assist the
design team in preliminary planning and design. Once the final building configurations
are known, we have been authorized to provide a final geotechnical engineering
evaluation that will include additional exploration and one exploratory boring. We
MONTANAIDAHO EVADA OREGON UTAH WASHINGTONY
www.stratagootach.com 8653 W. 1*ckimoak Dr. Bo*49,, Idaho 83709 P. 208.37%.8200 F.208.376.8201
Dean 70 -Acre Development
File: DEADAV B07187A
Page 2
strongly recommend STRATA be retained to provide geotechnical continuity from
design to construction. In addition, the preliminary geotechnical recommendations for
foundations provided herein are based on an assumption of potential structural loads
and foundation configurations for the proposed residential or commercial structures.
STRATA must be retained to review our geotechnical recommendations relative to site-
specific residential or commercial structure design and provide final geotechnical
recommendations to assist structural design. Providing geotechnical continuity through
construction provides the design and ownership team with verification that geotechnical -
related project plans and specifications are followed, which helps protect the
development team's investment.
We appreciate the opportunity to assist you on this project. Please contact us if
you have any questions or concerns.
Sincerely,
Y
Br , is E. LT
jest Engineer
i
Chris M. Comstock, P.E., P.G.
Project Manager
BN/nm
Cc: Mr. Tim Mokwa, P.E., Toothman-Orton Engineering
IBJ
IDAHO A A NEVADA OREGON UTAH WASHINGTON WYOMING
TABLE OF CONTENTS
IDAHO A A NEVADA OREGONUTAH WASHINGTONWYOMING
�,
PAGE
INTRODUCTION.................................................................................................................
2
PROJECT UNDERSTANDING AND SITE DESCRIPTION ..................................................
2
FIELD EVALUATION...........................................................................................................
4
FieldExploration..............................................................................................................
4
Subsurface Conditions.....................................................................................................
4
LaboratoryTesting...........................................................................................................
5
GEOTECHNICAL OPINIONS AND RECOMMENDATIONS................................................
5
Earthwork........................................................................................................................
6
Wet Weather/Wet Soil Conditions....................................................................................
7
Foundation and Slab Design Criteria................................................................................8
Pavement Areas ........... ........................................................
9
StormwaterDisposal......................................................................................................12
Pond Excavations ................................................. ......13
ADDITIONAL RECOMMENDED SERVICES.....................................................................13
Plans and Specifications Review...................................................................................13
Construction Observation and Testing...........................................................................14
EVALUATION LIMITATIONS.............................................................................................14
IDAHO A A NEVADA OREGONUTAH WASHINGTONWYOMING
�,
REPORT
Geotechnical Engineering Evaluation
Proposed Dean 70 -Acre Development
ro Locust Grove and Chinden Boulevard
Meridian, Idaho
INTRODUCTION
STRATA, Inc. has accomplished the geotechnical engineering evaluation for the
proposed Dean 70 -Acre Development to be located southeast of the intersection of Locust
Grove and Chinden Boulevard in Meridian, Idaho. This geotechnical engineering evaluation
constitutes Phase 1 of our proposed scope of services described in our proposal dated July 26,
2007. The purpose of this initial evaluation was to obtain site soil and groundwater information
and to provide geotechnical recommendations for earthwork, stormwater disposal, preliminary
pavement design, and preliminary foundation and slab design criteria. Specifically, we provided
geotechnical recommendations for:
■ Earthwork
• Reusability of on-site soil
• Site preparation
■ Structural fill and compaction criteria
• Preliminary foundation design criteria
• Preliminary concrete slab -on -grade design criteria
• Allowable stormwater infiltration rates
■ Recommended seasonal high groundwater levels
• Preliminary flexible pavement design
• Additional recommended services
The following sections present the site description, our project understanding, field
exploration, subsurface conditions, laboratory testing, engineering opinions and
recommendations, evaluation limitations, and additional recommended services.
PROJECT UNDERSTANDING AND SITE DESCRIPTION
The project is located southeast of the intersection of Locust Grove and Chinden
Boulevard in Meridian, Idaho. The site is located in a relatively flat area adjacent to several
large residential developments. Based on our discussions with you, we understand the project
will consist of approximately 70 acres of mixed residential and commercial development with
asphalt paved parking, individual retail and office pads, and 2 to 3 large ponds for stormwater
detention and water features. Specifically we understand approximately up to 36 residential
single --family lots, 19 town homes/patio homes, 9 office buildings and one commercial/retail lot
may be planned for this development. The main project access will extend from Locust Grove
Proposed Dean 70 -Acre Developr'ient
File: DEADAV B07178A
Page No. 3
to the commercial and multi -family portion of the project, and then extend south toward the
single-family residential lots. We understand the nortt prn portion of the site may be elevated
with on-site structural fill on the order of 1 to 3 feet.
Based on discussions with you and Nk. Mokwa, we feel that it is difficult to provide
specific geotechnical recommendations for foundations and slabs without reviewing actual
foundation details or structural loads. Accordingly, we discussed that STRATA would provide
preliminary recommendations for foundation and slab construction herein, with the
recommendation that STRATA review individual office, commercial or multi -family lot plans and
specifications and provide final geotechnical recommendations specific to each parcel. We do
not propose to provide preliminary recommendations for the single-family residences located on
the south portion of the project. As indicated by your authorization for our services, we
understand you agree with this approach.
We understand preliminary planning for the roadways allows for local residential roads
and a designated commercial section of road. We preliminarily assume the designated traffic
loading will be equal to a traffic index (TI) of 6.0 for local roads and a TI of 8.0 for commercial
roads.
Based on our experience with residential developments of this nature and discussions
with you, we anticipate the retail structure will be single -story with wood -frame or concrete
masonry unit (CMU) construction. The office buildings will likely wood -frame construction with
relatively light structural loads. While the multi -family structures are anticipated to be one to two
stories, the structures are anticipated to have conventional foundations with light structural
loads.
Stormwater will likely be disposed via subsurface seepage beds, swales, or ponds
adjacent to East chinden Boulevard. The proposed ponds will likely be lined; however, the
project team has not established whether synthetic liner or a clay liner will be used. Soil
excavated from the ponds will likely be used to generate structural fill to elevate the site,
specifically to the north along East chinden Boulevard. We understand a school site may be
planned along North Locust Grove; however, you specifically requested we exclude this portion
of the project from our evaluation.
IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOMING
FIELD EVALUATION
Field Exploration
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 4
On August 1, 2007, STRATA observed the excavation of 8 test pits at the project site.
We coordinated the test pit locations with you and with Mr. Weiser, who is currently farming
portions of the project. We attempted to locate test pits outside active farming areas. A
standpipe piezometer was installed two of the test pits to help verify the absence of groundwater
at the site. Approximate test pit locations are provided on Plate 1, Test Pit Location Plan. The
subsurface conditions encountered were described and classified referencing ASTM D 2487
W.
FF
and ASTM D 2488, Unified Soil Classification System (USCS). A brief explanation of the USCS
is presented in Appendix A and should be used to interpret the terms used on the exploratory
logs, which are also provided in Appendix A. Select soils were retained for laboratory testing.
At the conclusion of our subsurface evaluation, test pits were loosely backfilled level with
the existing ground surface. Test pits were staked prior to their advancement and were later
surveyed by Toothman-Orton Engineering. The survey information provided by Toothman-
Orton is presented below in Table 1. Test pit locations are identified in the field with labeled
stakes or standpipe piezometers. We recommend loose test pit backfill be completely removed
to undisturbed native soil and backfilled with structural fill according to the structural fill
requirements presented herein.
Table 1. Test Pit Survey Data
Subsurface Conditions
The soil encountered in the test pits generally consisted of lean clay overlying silty sand
underlain by poorly graded gravel with depth. At the locations of TP -4, and TP -5 we
encountered silt with sand underlying the clay to a depth of 4 to 4.5 feet below existing grade.
Uncontrolled fill was encountered at the ground surface to a depth of 2 feet below existing grade
in TP -5, which is likely associated with construction of the adjacent ditch. Specific subsurface
conditions, soil descriptions, and sample locations can be referenced on the exploratory logs
provided in Appendix A.
IDAHO 119ONTANA NEVADA OREGON UTAH WASHINGTON WYOMING
www.strgthg%otech.com
Proposed Dean 74 -Acre Development
File: DEADAV B07178A
Page No. 5
Groundwater was not encountered within the depths of exploration at the time of
excavation. Based on our knowledge of the area and review of well logs, groundwater is
anticipated to remain at depths of greater than 15 feet below existing ground surface throughout
the year. STRATA is available to monitor groundwater levels throughout irrigation season to
verify the absence of groundwater as requested by you or Toothman-Orton Engineering.
Laboratory Testing
We performed laboratory testing on select soil samples obtained from our field
exploration. Laboratory testing was accomplished referencing ASTM procedures, and included
grain -size distributions, moisture content, R -value, and Atterberg limits determinations.
Laboratory index test results are provided on the individual test pit logs. R -value test results are
provided in Appendix B.
GEOTECHNICAL OPINIONS AND RECOMMENDATIONS
Our opinion is the site is suitable from a geotechnical standpoint for the proposed project,
provided the recommendations in this report are accomplished. Our geotechnical
recommendations are generally limited to infrastructure improvements with respect to
pavement, stormwater, and earthwork considerations for the proposed development. We are
also providing preliminary foundation and slab recommendations to provide preliminary design
criteria to assist individual pad development. However, STRATA is not providing final
geotechnical recommendations for individual commercial or multi -family development. STRATA
can review the plans and specifications for individual structures to verify the preliminary design
criteria provided herein is suitable for the proposed building construction. We recommend
individual commercial developers be informed of our recommendations to accomplish individual
geotechnical evaluation of each structure. However, if STRATA is retained to provide
geotechnical continuity via earthwork testing, additional exploration may not be required to allow
us to review individual project plans and provide geotechnical recommendations. Accordingly, if
the commercial or multi -family developer does not retain STRATA or a licensed geotechnical
engineer to provide final geotechnical recommendations for strucutres, STRATA is not
responsible for foundation -related construction errors or omissions that have the potential to
negatively impact each structure.
The subsurface conditions may vary at the project site and the variation may not be
known until construction. Variations in soil and groundwater conditions may impact construction
C4 -
IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOMING
www.stratagiioteLch.com
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 5
plans and/or costs. Given the above understanding, the following paragraphs provide our
geotechnical opinions and recommendations.
Earthwork
We recommend test pit backfill located beneath future structures or pavement, sidewalk,
or proposed structural fill areas be completely re -excavated to undisturbed native soil and
backfilled with structural fill placed and compacted in accordance with this report. Toothman-
Grton surveyed test pit locations following their excavation and their coordinates are provided in
Table 1, which will allow the test pits to be accurately relocated prior to mass grading or after
site stripping.
We recommend the upper soil with vegetation and organics (topsoil) be stripped to a
minimum depth of 4 inches beneath all planned pavement, sidewalk, and structural fill areas.
Isolated thicker areas of topsoil may be encountered. In addition, any uncontrolled fill should be
completely removed to undisturbed native soil. Uncontrolled fill was encountered in TP -5 to a
depth of about 2 feet. We anticipate several irrigation laterals in the southeast and northwest
portions of the project site may be re-routed or piped. We anticipate these laterals may contain soft
or loose soil or uncontrolled fill in and adjacent to the channels. If the ditches will be re-routed,
piped, or if structural fill will be placed over the ditches, we recommend the base of any ditch be
overexcavated to firm or medium dense native soil and structural fill be placed in the
overexcavation in accordance with this report. The base of this overexcavation may incorporate
extremely wet and soft soil conditions. STRATA should be consulted if these difficult excavation
and fill placement conditions are encountered during construction.
Following removal of uncontrolled fill and topsoil, the stripped subgrade in structural fill
areas should be proofrolled with a minimum of 5 passes of a vibratory roller having a drum
weight greater than 10 tons or other equivalent heavy construction equipment as approved
during or prior to construction by the geotechnical engineer's representative. Prior to structural
fill placement, if any weaving or pumping is observed during compaction, those areas should be
removed to firm or medium dense native soil and replaced with structural fill or, alternatively,
recompacted in place to structural fill requirements. After the above soil stripping, fill removal,
and proofrolling operations have been observed by the geotechnical engineer's representative,
structural fill placement may commence to site grades. In roadway subgrade areas, the
subgrade must be compacted to a minimum of 95 percent of the maximum dry density of the
soil as determined by ASTM D 598 (Standard Proctor) as required by the most current edition of
IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOMING
www.st rite g ootach.CO m
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 7
the Idaho Standards for Public Works Construction (ISF9"NC).
All fill placed to support structures should consist of structural fill. Structural fill should be
free from vegetation or organics and be moisture conditioned sufficiently to achieve compaction
requirements. All structural fill should be classified as silt, sand, or gravel (SP, SW, SM, GP,
GW, GM or ML) in accordance with the USCS. Structural fill should not contain particles greater
than 6 inches in diameter. The on-site silty sand, sandy silt, and poorly -graded gravel soils may
be used for structural fill. However, soil containing more than about 10 percent silt may be
moisture sensitive and may experience difficulty when moisture conditioning the soil. During
periods of extended wet or cold weather, silty soils may be difficult to utilize as structural fill. We
do not recommend the on-site clay be reused as structural fill. The native clay can remain on
the site in its current undisturbed conditions and does not require overexcavation, but will be
extremely difficult to reuse as structural fill. If it is excavated as part of site development, clay
soil can be used as landscape fill away from settlement -sensitive structures or be removed from
the project site if it is excavated as part of site development.
Structural fill should be placed to the subgrade elevation in uniform, maximum 12 -inch -
thick, loose lifts, and compacted to a minimum of 95 percent of the maximum dry density of the
soil, as determined by ASTM D 598 (Standard Proctor). This assumes heavy compaction
equipment, such as rollers, with a minimum drum weight of 5 tons is used. The maximum loose lift
thickness should be reduced where smaller and/or lighter compaction equipment is used. We
recommend STRATA be retained to perform field density testing of structural fill to verify contractor
compliance with the above minimum compaction criteria.
Wet Weather/Wet Soil Conditions
We recommend site construction be undertaken during dry weather conditions. If site
construction, particularly grading, is undertaken during wet periods of the year, the on-site soil may
be susceptible to pumping or rutting when subjected to heavy loads from rubber -tired equipment or
vehicles, which exert a point load. Wet weather earthwork should be performed by low pressure,
track -mounted equipment that spread and reduce the vehicle load. Earthwork should not be
performed immediately after rainfall or until soil has dried sufficiently to allow construction traffic.
All loose or disturbed areas should be excavated to undisturbed soil or recompacted in-place to
structural fill requirements. Compaction should be sufficient to preclude pumping of the underlying
IDAHO N A NEVADA OREGON UTAH WASHINGTON WYOMING
L,
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 8
soil. In summary, careful construction procedures are paramount to the successful grading
operation if the on-site soil is wet.
Additional precautions should be taken if subgrade soils are to be exposed to freezing
temperatures. STRATA should be contacted to provide recommendations prior to initiating or
delaying construction during wet or cold weather to improve earthwork efficiency, achieve a stable
subgrade and to help mitigate frost conditions.
Preliminary Foundation and Slab Design Criteria
The following preliminary recommendations should be accomplished for all foundations
for the office, retail, commercial, or multi -family structures.
1. Footings should hear only on the following:
• Undisturbed silty sand
• Undisturbed silt with sand
• Undisturbed lean clay
• Native soil recompacted in-place to structural fill criteria
• Approval structural fill placed over the above soils
In no case should foundations bear on lean clay or silt with sand that has a pocket
penetrometer reading of less than 2 tons per square foot (tsf) at the time of concrete
placement. If soil with a pocket penetrometer reading with less than 2 tsf is
encountered at the foundation subgrade, the foundation subgrade must be
excavated to undisturbed native soil with a packet penetrometer reading of greater
than 2 tsf.
2. Exterior footings should be located at least 24 inches below final, exterior grade to
reduce frost effects.
3. Minimum strip footing widths should be consistent with the International Building
Code (IBC). An IBC Soil Site Class D can be preliminarily used for structural
design.
4. All loose soil, frozen soil or standing water at foundation and slab subgrades should
be removed. Following removal, the footing bearing surface should be prepared as
described above.
5. Structural fill placed beneath structures should extend a minimum of 1 foot
horizontally for each 2 feet of thickness placed beneath the structure. The
horizontal dimension is measured from the edge of the structure.
5. If STRATA is not retained to verify foundations are constructed according to the
following recommendations, we cannot be responsible for foundation
performance.
IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOWING
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 9
If the above recommendations are accomplished, an allowable bearing pressure range of
2,000 to 2,500 pounds per square foot (psf) could be preliminarily used for foundation design
depending on the type of structure, structural loading, final bearing elevation, and our assessment
of subsurface conditions at the pertinent structure. Based on the above bearing pressure range,
we preliminarily estimate total and differential settlement will be less than 1 -inch and 112 -inch,
respectively.
We recommend concrete slabs -on -grade bear directly on an appropriately designed
aggregate layer placed over soil prepared as described in Items 1 through 6 above. The architect
and/or structural engineer should evaluate the need for moisture protection beneath slabs.
Moisture protection could include several moisture reducing systems such as puncture resistant
vapor barriers, clean sand blotter layers, or other methods to reduce moisture below slabs. The
owner should carefully evaluate the type of structure and susceptibility of equipment or assets
placed within the interior buildings that may be susceptible to moisture damage. Floor coverings
should be carefully selected.
Pavement Areas
Recommendations outlined in the Earthwork section of this report should be accomplished
in all pavement areas. As we previously indicated, 15PWC standards require pavement subgrades
be compacted to the structural fill criteria provided in the Earthwork section. The pavement
subgrade& anticipated to be at a depth of approximately 16 to 30 inches below planned grades
depending upon the final grading plan and bearing soil. Accordingly, it appears the majority of the
pavement subgrade will exist in silty sand. However, in some portions of the project, lean clay with
sand may be encountered at the subgrade. Furthermore, based on conversations with Mr. Tim
Mokwa, we understand on-site sand and gravel derived from pond excavations may be used as
structural fill to elevate the north portion of the site. Given the above assumptions, it appears the
majority of pavement subgrade will consist of silty sand and portions of the subgrade will consist of
native lean clay or structural fill. Because site grades and the traffic loading conditions are not
completely developed at this time, we preliminarily recommend the civil designer assume the
subgrade will be comprised of silty sand.
The following sections provide pavement section alternatives for varying subgrades and
road designations. If roads are designed assuming a silty sand subgrade, pavement section is
anticipated to be placed at approximately 20 to 28 inches below -grade for the local and commercial
roadways, respectively (assuming a 3 to 4 -inch topsoil stripping depth). Based on our current test
IDAHO44
AA NEVADA OREGON UTAH WASHINGTON WYWING
www.striitagootech.com
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 10
pit explorations, it is possible a thin layer of lean clay may exist at the subgrade directly overlying
silty sand. Instead of redesigning the pavement section thickness during construction to account
for the clay, it appears reasonable to require the contractor to remove the clay at the subgrade to
the underlying silty sand. In addition, the roadway excavated at the north portion of the project may
identify structural fill sand and gravel at the pavement subgrade. Structural fill sand and gravel will
likely realize an R -value of greater than 60, which will reduce the required subbase section
assuming silty sand subgrades. At that time, STRATA can accomplish R -value testing of the
structural fill and submit a revised pavement section to the civil engineer of record for submittal to
the Ada County Highway District (ACHID). If ACHD approves the change, the pavement subgrade
can be elevated slightly using on-site sand and gravel as structural fill to reduce the required
amount of imported subbase.
We conducted R -value testing on the silty sand and lean clay with sand. Laboratory test
results are provided in Appendix B. Vire used a "design" R -value of 36 for a silty sand subgrade, a
design R -value of 5 for pavement design with a lean clay subgrade, and a design R -value of 60
(assumed) for granular structural fill derived from the on-site ponds. We provide the following three
pavement sections for either a silty sand, granular structural fill, or lean clay subgrade for
residential and commercial roads.
Local Residential Roadways
Clay Subgrade (assumed R -value = 5�
Local Roadways - Flexible Pavement (TI=6.0)
2.5% class III asphalt concrete top course
5.0% 3/ -inch -minus, crushed sand and gravel base course
12.0% Pit -run sand and gravel subbase course
Silty Sand Sub -grade (assumed R -value = 30)
Local Roadways - Flexible Pavement (TI=6.0)
2.5"- class III asphalt concrete top course
4.0" -3A -inch -minus, crushed sand and gravel base course
9.0"- Pit -run sand and gravel subbase course*
Granular Structural Fill Subggrade (assumed R -value = 60}
Local Roadways - Flexible Pavement (TI=6.0)
2.5% class III asphalt concrete top course
4.0% %-inch-minus, crushed sand and gravel base course
9.0% Pit -run sand and gravel subbase course*
IDAHO MONTANA NEVADA OREGON UTAH WASHINGTONI
www.strht6geotqch.com
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 11
*Note: Nine inches of subbase assumes a 6 -inch maximum aggregate size for subbase. ACHD requires a
mir*num subbase thickness of 1.5 times maximum subbase particle size.
Commercial Roadways
Clay Subgrade assumed R -value = 51
Commercial Roadways - Flexible Pavement (TI=8.0)
3 -EP- Class III asphalt concrete top course
5.0"- 3/ -inch -minus, crushed sand and gravel base course
15.0% Pit -run sand and gravel subbase course
Silty Sand or Sandy, Silt Subarade assumed R -value = 30}
Commercial Roadways - Flexible Pavement (TI=8.0)
2.5"- Class III asphalt concrete top course
5.0"- 3/ -inch -minus, crushed sand and gravel base course
12.0% Pit -run sand and gravel subbase course
Granular Structural Fill Subgrade !assumed R -value = 60)
Commercial Roadways - Flexible Pavement (TI=8.0)
2.5"- Class III asphalt concrete top course
4.0"- 3/ -inch -minus, crushed sand and gravel base course
9.0% Pit -run sand and gravel subbase course*
*Note: Nine inches of subbase assumes a 6 -inch maximum aggregate size for subbase. ACHD requires a
minipum subbase thickness of 1.5 tines maximum subbase particle size.
Vire recommend STRATA traverse and observe the final road alignment subgrade after
excavation. As we previously discussed, because the northern portion of the site must be
elevated, and onsite granular structural fill from the pond excavations is anticipated to be used
as fill, we assumed an R -value of 50 for preliminary design. The actual R -value of the material
excavated during pond excavation will be tested by STRATA to verify this assumption or provide
alternative pavement sections. The granular structural fill placement must be accomplished in a
manner that allows the roadway pavement subgrade to consist of granular structural fill, as
opposed to other soil fill that may be derived on the project. Vire recommend you consult
STRATA during structural fill placement to allow such project economies to become realized.
The above -recommended flexible pavement sections are based on a maximum 20 -year
design life and a TI of 6.0 for "local residential" roadways and a TI of 8.0 for "commercial"
roadways. The subbase should consist of 6--inch-minus, well -graded sand and gravel consistent
with ISPWC Section 801 and with less than 10 percent passing the No. 200 sieve. The base
6
IDAHO MONTANA NEVADA OREGONUTAH WASHINGTON WYOMING
www.stratageotech.com
Proposed Dean 70 -Acre DeveVopment
File: DEADAV B07178A
Page No. 12
course should consist of 314 -inch -minus, well -graded, crushed sand and gravel with less than 9
percent passing the No. 200 sieve and consistent with ISPWC Section 802. The subbase and
base course should be compacted in accordance with the Earthwork section of this report.
The asphalt concrete for the flexible pavement area should have material properties as
specified in ASTM D 3515 and have a mix design with a maximum aggregate size between 314
and 318 inch. The asphalt concrete should consist of Class III asphalt concrete top course and
should be compacted as required by ISPWC Sections 809 and 810.
We recommend crack maintenance or surface soils be accomplished in all pavement
areas as needed and at least every three to five years to reduce the potential for surface water
infiltration into the pavement section and underlying subgrade.
Stormwater Disposal
We understand on-site stormwater may be retained using retention ponds, swales, or
subsurface seepage beds. We performed infiltration tests within native gravel encountered at
depth across the site. Infiltration rates were observed to be greater than 40 inches per hour.
The on-site lean clay is not suitable to accept subsurface stormwater. The on-site silty sand
contained weak to moderate cementation from approximately 2 feet to as deep as 8 feet below
the existing ground surface. We do not recommend stormwater be disposed of in or above any
cemented layer. Accordingly, we recommend infiltration facilities extend below cemented soil.
We recommend all infiltration facilities be extended a minimum of 1 foot into native poorly
graded gravel or sand with less than 20 percent fines. Excavation depths of up to
approximately 8 feet should be anticipated to expose native poorly -graded sand or gravel soils,
depending on location. We recommend an allowable infiltration rate of 8 inches per hour be
used for stormwater facilities constructed as discussed above.
We suspect the project may incorporate shallow stormwater swales excavated 2 to 3
feet below -grade. The base of these swales may consist of weakly cemented silty sand, silt, or
structural fill, depending upon location. We recommend STRATA assist stormwater design by
excavating additional test pits in exact pond or swale locations as part of our Phase 2, Final
Geotechnical Evaluation. Depending upon the degree of cementation, infiltration rates between
1 and 2 inches per hour could be preliminarily assumed for sandy silt or weakly cemented silty
sand. Stormwater swales can designed for an allowable infiltration rate of 8 inches per hour if
the swale will be overexcavated to the underlying poorly -graded gravel as discussed above.
IDAHO XONTANA NEVADA OREGON UTAH WASHINGTON WYOMING
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 13
As discussed in the Subsurface Conditions section, groundwater was not encountered at
the time of excavation on August 1, 2007. Groundwater is anticipated below 15 feet. STRATA
verified the absence of groundwater in TP -2 and TP -6 prior to publication of this report. We
recommend the civil designer assume a seasonal high groundwater depth of 15 feet for
stormwater design. We remain available to verify the absence groundwater as requested by
you or Toothman-Orton Engineering.
Pond Excavations
We understand up to three small ponds may be excavated to generate structural
fill for the site as well as for water features and stormwater purposes. Depending upon
groundwater depths and pond configurations, the base of the ponds may exist below the
groundwater table. Based on the test pit excavations, we estimate the sidewalls of the ponds
will consist of medium dense to dense, native, poorly -graded gravel. The upper 4 to 8 feet of
the ponds may consist of lean clay, sandy silt, or silty sand. We recommend the pond slopes
constructed in these soil types be excavated at 2H:1 V (horizontal to vertical) assuming the
ponds will be lined. In general, medium dense to dense, poorly -graded gravel with sand in the
Boise area can be excavated below the groundwater table at 2H:1 V (horizontal to vertical) side
slopes for long-term pond slope design. This assumes the pond liner will not leak. While 2H:1 V
side slopes are predicted to be stable, the civil designer and owner should recognize that
isolated sloughing and spalling of the soil can occur prior to liner placement.
If a synthetic liner will be used to line the ponds, it is feasible that the ponds could be
excavated steeper than 2H:1 V. However, at this time, STRATA was not retained to accomplish
a geotechnical boring or slope stability analyses for pond configurations. As part of our Phase 2
services, STRATA can utilize our boring data and accomplish geotechnical analyses to evaluate
steeper pond side slopes.
ADDITIONAL RECOMiI'ENDED SERVICES
Plan and Specification Review
We recommend STRATA be retained to review earthwork, pavement, and stormwater
portions of the plans and specifications prior to bidding. Having us review the construction
documents reduces the potential for geotechnical -related construction errors and omissions. In
addition, as discussed in our July 26, 2007, proposal and throughout this report, it will be
IDAHO MONTANAEVA OREGON UTAH WASHINGTONWYOMING
www. st rata otec h.co m
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 14
important for STRATA to maintain geotechnical continuity through foundation design for each
individual commercial or multi -family structure. We strongly recommend STRATA review plans
and specifications for individual structures and provide specific geotechnical recommendations
as necessary. If we are not retained to review plans and specifications for proposed structures
relative to geotechnical aspects, we cannot be responsible for the performance of any
foundation or slab structure at the site. We recommend STRATA contract directly with
individual lot developers to provide final geotechnical recommendations specific to the proposed
development. If STRATA is not retained to review plans and specifications and provide specific
geotechnical recommendations, at a minimum, we recommend the lot developers retain a
licensed qualified geotechnical engineer to assist planning, design, and construction.
Construction observation and Testing
We recommend STRATA be retained to observe mass grading, earthwork, stormwater
facility construction, and pavement section construction to verify our geotechnical
recommendations presented throughout this report are followed. Providing geotechnical
continuity throughout construction provides the owner with verification that earthwork and
geotechnical aspects have been constructed as designed and recommended. STRATA can
also provide construction materials testing and special inspection of concrete, reinforcement,
steel, masonry, and asphalt. If we are not retained to perform the recommended services, we
cannot be responsible for geotechnical related construction errors or omissions.
EVALUATION LIMITATIONS
This report has been prepared to provide a geotechnical engineering evaluation primarily
to assist earthwork, pavement, and stormwater aspects of the proposed 70 -Acre Development
to be located southeast of the intersection of Locust Grove and chinden Boulevard in Mbridian,
Idaho. In addition, we are providing preliminary geotechnical recommendations to assist
preliminary design for individual structures. STRATA is not providing final geotechnical
recommendations which can be relied upon for final design criteria. Our opinions and
recommendations are based on our preliminary understanding of the project development. The
above recommendations assume an adequate program of tests, observations, and geotechnical
consultation during construction is accomplished by STRATA. construction observation is an
important part of the geotechnical design process.
ib
IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOMING
www.stratageot�th.com
Proposed Dean 70 -Acre Development
File: DEADAV B07178A
Page No. 15
Our services consist of professional opinions and recommendations made in accordance
with generally accepted geotechnical engineering principles and practices as they exist in
southwest Idaho at the time of the report. This acknowledgement is in lieu of all express or
implied warranties. The opinions and recommendations contained herein are based on the
findings and observations made at the time of our exploration. If, at a later time, conditions are
exposed which appear to be different from those encountered during our field exploration,
STRATA should be notified to consider the need for modifications to the geotechnical
recommendations presented herein. This report has been prepared exclusively for the use of
Dave and Luane Dean and Toothman-Orton Engineering as described for this specific project.
The following plates accompany and complete this report:
Plate 1: Test Pit Location Plan
Appendix A: Exploratory Logs and USDS Explanation
Appendix B: R -Value Test Results
IDAHO MONTANA NEVADA OREGONUTAH OASHINGTON
a a 4 !] 0
r -*
F,111
J
2;,
REMARKS
■ ■
USDS Description � LE
W
U U) m
J
Q.
�'
in N >
�tr7
> _
N
^
C w
o a
0? o
"
Note: BGS = Below Ground
H
CL O
E
Surface
Lean CLAY Native — brown,
CL
+4.5
Moderate vegetation and
hard, moist.
organics observed to
BG
86
9.4
3 inches BGS.
1
Atterberg limits: '
+4.5
Test Performed at
0.5-1 feet BGS
BK
'
(LL=32 VV 1 19)
Moderate cementation
TiIty SA — tan, medium
SM
dense, moist.
BK
obsary d from 2 to
3 feet BGS.
3
Weak cementation
observed from 3 to
4 feet BGS.
4
Moderate cementation
obsarved f rom 4 to
6 f eet BGS.
5
■ ■
Cobbles observed up
2qArlyra ed GRAVE niith _
_ ,a�
and■ and obbles mkan,
■
to six inches in
__
dense, moist.
s s s
diameter.
■ 07
■
*. :;m
11 ■ ■ �11111 ■
8
■ am a
9
"
@ a
■
ea
10
a:a
■
w ■jg
Test pit terminated at 10.5
feet BGS due to caving 11
conditions.
12
13
1*
15
1 1
Client: DEADAV Test Pit Number: TP -1
EXPLORATORY
I
TEST PIT LOG
V" , �� TEAS T 04
r _% r �� �� v Sheet's of 6
Project: B07178A Date Excavated: 8/01/07
Backhoe: CASE 550 Bucket Width: 2'
Depth to Groundwater: N.E. Lagged By: BN
F,111
P ME
Description
USCSU
W
J
M
Wo�
C1 (n N 7
��,
�-'
�-•
o a o
f
REMARKS
Note: BGS = Below Ground
S u rf a c e
eon CLAY-Vertivel brown,
CL
2.5
Moderate vegetation and
stiff to har, , moish.
organics observed to
3 inches BGS.
1
+4.5
i
2+4.5
Atterberg limits:
BG
9.9
Test Performed at
—
2--2.5 feet BGS
iI - — an, medium
Sal ■ ■ ,
_
(LL=32, P1=19)
dense, moist.'
-3
■ , •
•
■ r i
rL r / ■
weak cementation
t
r r
observed f rom 4 to
■
_
r ■
0
6 feet BGS.
■
r
i r
•
t
/ r ■
■
r r
I
•
• ■
r
• r
i
ti
Poorly—Graded UNAVLL'w�
GP—GM
Silt and Sand — brown,
.
dense, moist.
GP
Sand and Cobbles — tan,
dense, moist. I
;
Percolation test performed a
8.5 feet BGS.
Infiltration rate = X40
■ A �
�' °�a.
in/hr measured.
m a
10
Cobbles observed up
�� , ■ ■'F■ �■
to six inches in
■ �,�
"77
I
diameter.
T
11
Test pit terminate at 12
Standpipe piezometer
feet BGS due to caving
installed to 12 feet
conditions.
BGS.
13
14
15
Client: DEADAV
Test
Pit Number: TP -2
r:__
EXPLORATORY
Project: B07178A
Date Excavated: 8/01/07
TEST PIT LOG
Backhoe: CASE 550
Bucket Width: 2'
15 Ir FR &Ir
GEOTECHNICAL ENOINEMI%4 # MATEnw.S:EST"G
Depth to Groundwater: N.E.
Logged By: BN
r* -hs rzfx frog, �.� r�rcc4Kd up Sheet 2 of 6
USCS Description
W
Uj
V) Ln
C.)
C>
M
a- CL
ai C)�
C4
CiN
V 2
o a. oa
CL n_ E
REMARKS
Note: BGS = Below Ground
Surface
Lmn - C'LAY WIthSo a rrM7I
CL
3.0Moderate
vege a ion an
brown, very stiff, moist.
organics observed to
2 inches BGS.
+4.5
2
SM
dense, it.
4
Moderate cementation
observed f rom 4 to
5 feet BGS.
5
0 0
■
oory—Graded GRAVLL with
GP—GM,y
Silt and Sand — brown,
Weak cementation
dense, moist.
observed f rom 6 to
7.5 feet BGS.
GP
Sand and Cobbles tan,
dense, moist.
Cobbles observed up
to six inches in
diameter.
10
'Test Sp -Pt terming .5F
feet BGS due to caving
11
conditions.
12
13
■
14
15
Client: DEADAV
Test Pit Number:
TP -3
EXPLORATORY
Project: B07178A
Date Excavated:
8/01/07
TEST PIT LOG
Backhoe: CASE 550
Bucket Width: 2'
T F air
CN0JN1!M1W4 A 14ATCRIA4r. T"T*4G
Depth to Groundwater: N. E.
Logged By:
BN
gram 4� �rcwtd
Up Sheet 3 of 6
h
REMARKS
W
USCS Description L:&
V) L10 V)
U
0 _j
M C1. 0.
o
4-j = W
E2 w
3.De L_
n Ground
Note: BGS = Below Ground
ld',,
Vol
Surface
e a n T 3 k r --Ma `iv 'e7 P�___ brown
C L
3.0
to tan, stiff tohard, moist.
organics observed to
3 inches BGS.
+4.5
2.0
ML
2.0
SILT WILIP Sand -'—brown, very;
stiff, moist. 3
BG
25
4.0
4
Silty SAND — tan, medium
SM
0 0
dense, moist. 5
Poorly—Graded GRAVEL with
GP—GM
Silt and Sand brown, 6
dense, moist.
Cobbles observed up
Sand and Cobbles tan, 7
to six inches in
densa4 moist. C
L
diameter.
I
a:• .
9
10
Ld W
Z*C-r.�Jjm. WPI111111UNCIA UM a
feet BGS due to caving
conditions.
12
13
14
15,
Client: DEADAV Test Pit Number: TP -4
EXPLORATORY
TEST PIT LOG
S T FT
GF.07rCHNICAL ENMNEEMUG A MATERALS TFST"G
Trt4-&�r,F4/.4'1-o*q 4-lLe �remptd Or Sheet 4 of 6
Project: B07178A Date Excavated: 8/01/07
Backhoe: CASE 550 Bucket Width: 2'
Depth to Groundwater: N.E. Logged By: BN
USES Description
=r- L2
M CL
IMP
C CD
.55 C�
C;
-0-0 C
'S2
0 (J
32
0 a) 4)
8- (D
c- E
REMARKS
Note: BGS = Below Ground
Surface
CL
Trac-"67egetati7n and
brown to ton, very stiff,
organics observed to
most.
4 inches BGS.
4.0
,..)ILI *M*M S)c3nd ativ
Z
ML
brown, stiff moist.
2.0
2.0
BG
Dory— Graded GRAVEL w7h
_T GP -GM
Silt and Sand - brown,
dense, moist.
Sand and Cobbles ton,
dense, moist.
6•
ercolation test performed a
6 feet BGS.
•
Infiltration rate = 740
in/hr measured.
Cobbles observed up
to six inches in
8
diameter.
9 t
C>
ti
p7i termin—dt-6T dt-
-
,Nest
feet BGS due to caving
conditions.
12
13
14
15
Client: DEADAV
Test
Pit Number: TP -5
EXPLORATORY
Project: B07178A
Date
Excavated: 8/01/07
TEST PIT LOG
Backhoe: CASE 550
Bucket Width: 2'
s T air
GF! 0 1 IMHN ICAL ENOW'st M. NG & MATC MAk'S TEST NG
Depth to Groundwater: N.E.
Logged By: BN
J1111111111111 I
;zr
j-.#0Wqr14y rP-Om 414�- e7FCL4Kd Up Sheet 5 of 6
->N
USDS Description
p
L
o
� �'
_
�
J W
m �-
��
Co
N �
o •ai
Vol z
�
-� _
.o +,CL
o
U
� _ I ^
to
°'
o Q- E
REMARKS
Note: BGS = Below Ground
Surface
rown,
CL
-
, +4.b
Trace vegetation and
very hard,moist. I
organics observed to
4 inches BGS.
SM �
Moderate cementation
dense, moist. '
s
�
observed from 2 to
2
+
2.5 f eet BGS.
Moderate cementation
s
observed from 2.5 to '
3
r
'
3.5 feet BGS.
BG
28
3.5
*
ARMs
Sand and Cobbles — tan,
dense, moist.
4
• '
Percolation test performed at
• . ' -
4 feet BGS.
- • '
Infiltration rate
'
-
40 in/hr measured.
5
• - '
Cobbles observed up
'
to six inches in
•
diameter.
8
g
RR-
IL
pest11
I
Standpipe piezometer
feet BGS due to caving
'
' I
I I
installed to 10 feet
conditions.
BGS.
11
F
12
13
' II
14
15
Client: DEADAV
Test
Pit Number: TP-6
-
EXPLORATORY
Project: B07178A
Date Excavated: 8/01/07
TEST PIT LOG
Backhoe: CASE 550
Bucket Width: 2'
Ir air
�eov cHH:c u ENOINEERNG A MA,'MFtvtia'TFST"G
Depth to Groundwater: N.E.
Logged By: BN
4`�C`7rcuKdUp Sheet 6 of 6
UNIFIED SOIL CLA_76-SSIFICATION SYSTEM
I'll
MAJOR DIVISIONS
GRAPH
SYMBOL
LETTER
SYMBOL
TYPICAL NAMES
j
: " ". .�•
GW
Well --Graded Gravel,
CLEAN
. ..
. •
Reading
Gravel—Sand Mixtures.
GRAVELS
"�-.
GP
Poorly—Graded Gravel,
GRAVELS
.. .. " :
Shelby Tube 3—Inch OD
Gravel --Sand Mixtures.
GM
Silty Gravel, Gravel ---
GRAVELS
Sand—Silt Mixtures.
WITH
FINES
GC
Clayey Gravel, Gravel—
-
Sand—Clay Mixtures.
GRAINED
GRAINED
SOILS
o 0 o a o v
0 0 0°° 0
SW
Well ---Graded Sand,
l CLEAN
o 4 C o 0 o
Graven Sand.
y
* *
Poorly—Graded Sand,
SANDS#
■ s ■ s ■ ■
SID
Gravelly Sand.
SANDS
■■■■■
■
0
■
SM
Sand—Silt Mixtures.
SANDS
WITH,
I FINES
. ■ i ■
.
SC
Cla a Sand
y y '
.*,�
•
an
Sd-Clay Mixtures.
Inorganic Silt, Sandy
ML
or Clayey Silt.
SILTS AND CLAYS
Inorganic Clay of Low
LIQUID LIMIT
�
CL
to Medium Plasticity,
LESS THAN 50%
Sandy or Silty Clay.
I
I
1
Organic Silt and Clay
I
I
I
I
I
OL
of Low Plasticity. '
FINE _
k GRAINED
Inorganic Silt Mica—
SOILS
Sol LS l
MH
ceous Silt, Plastic
I
Silt.
SILTS AND CLAYS
Enorganic Clay of High
l
CH
Plasticity, Fat Clay.
LIQUID LOMIT �
l GREATER THAN 50%
` �
OH
Organic Clay of Medium
g y
to High Plasticity.
'
PT
Peat, Muck and Other
—
Highly Organic Soils.
BORING LOG SYMBOLS GROUNDWATER SYMBOLS TEST PIT LOG SYMBOLS
I Standard 2—Inch OD
Split—Spoon Sample
- Groundwater
B� Baggie Sample
- After 24 Hours10
California Modified 3—Inch
OD Split—Spoon Sample
(7_3-07) Indicates Date of
Bulk Sample
S
Reading
IIRock Core
Q Groundwater
RG Ring Sample
at Time of Drilling
Shelby Tube 3—Inch OD
Undisturbed Sample
Shorthand Notation:
BGS = Below Existing Ground Surface
N.E. = None Encountered
FAi I a w
IL a a Oli!l DIICAL I 1�
M0
TMA R1. J
Project: Dave Dean 70 -Acre Property
C.,lient: Mr. Dave Dean
Sample ID: Subgrade Soil
Location: TP -1 @ 2.0'- 2.5'
Soil Description: Silty Sand
R VALUE DATA
Percolation: None
Point I
Point 2
Point 3
Exudation, PSI
179
213
328
Dry Density, PCF
102.0
104.4
104.6
Moisture Content, %
20.1
19.5
18.5
Exp. Pressure, PSI
0.55
1 0.68
0.83
—0
W k-1
9
5
I
Lab Number: B7L2239F
File Name: DEADAV B07178A
Date Sampled:8/18/07
Sampled by: BN/Strata
Date Received: 8/18/07
Tested by: CAK/Strata
[40]] W -K. 01*1
R VALUE:
IrCREN AS RECEIVED AS TESTED
SIZE %PASS11C
*PASSING
F4'
4
311
P. 211
3 If
/4
1/2
No. 4
No. 8
No. 16
No. 30
NID. 60
No. I CQkO
No. 200
Ili
All
................
6
0 0 0 0 CD 0 0 0
Co r*- CO U) 1W 0 C%4
R v4pe
Note: This report covers only material as represinfbd by this sample and does not necessarily cover 0
soil from this layer or source.
Reviewed by: -4joetu _lot,
IrFR&lr
(IMOTECHWAL EMNAFRAIG WTEMALS IMTEG
'rP%4v!'q rl4-X 4 -AA *vou sd IVF
Project: Dave Dean 70 -Acre Property
Client: Mr. Dave Dean
Sample ID: Subgrade Soil
Location: TP -3 @ 2.01. 2.51
Soil Descron: Lean Clay with San,,-&
R VALUE DATA
Percolation: None
Point 1
Point 2
Point 3
Exudation, PSI
149
257
421
Dry Density, PCF
105.2
105.4
107.5
Moisture Content, %
19.3
18.1
16.9
Exp. Pressure, PSI
0.25
1 0.74
1017
9
5
0
cqi
MIN W610,
W�
I
A
5
I
Lab Number: B7L2239G
File Name: DEADAV B07178A
Date Sampled: 8/18/07
Sampled by: BN/Strata
Date Received: 8/18/07
Tested by: CAK/Strata
R VALUE: 12
I
SCREEN S CEIVED AS TESTFEDfi—�-.
L SZE SSING
JPI
310
211
3/400
3/811
No. 4
No. 8 A
M. 16
No. 30
No. 50
NID. 100
ti
200
0 0 0 C) 0 0 0 0 0 Ir -
CO r- CO to IV 0 N IT-
R v466
Note: This report cover's only material as rapiosifnted by this sampli and does not rawessarily cover ah
soil from this layer or source.
Reviewed
mir R amir
CROTEC4WAL IMWJME�ff & 16bKEKALS TESTOG
-fK4i�r9r14-y om 4-A%e 4:*rrou#Ld
Or
t
4
.09—C. 0-1
r
T+iREE CORNMS SUBDIVISIOR.
M
i
T
I
AfflQ STUDY I
r
i
L �
r
I
i
i
f
r
i
VIC
1�
tol
t• � �
-`
ht
t} i
SEPTEMBER 13, 2007
SUBMITTED
i ; II
i
CITY OF
�I
F
MERIDIANI
33
r
E.
IDAHO AVE.
7 i
MERIDIAN,
ID 83642IDAHO TRANSPORTATION DEPARTMENT
P.O.
BOX 8028i
BOISE,
ADA COUNTY HIGHWAY DISTRICT
3775 N. ADA64S ST.
ry BOISE, ID 83713
Y
1
I
•— � SIE ENGINEERING, INC.. BOISE, ID 83702 (208),345-3290
L OWNS
�. •;
i _ __reW6--
?F.
o
SUMMARY OFPNI)INGS-
RECOMmENDA110N$
THREE CORNERS SUBDIVISION
TRAFFIC IMPACT STUDY
BRIEF PROJECT DESCRIPTION
The proposed Three Corners Subdivision is a 70 -acre mixed-use development
and school site located at the southeast corner of the Chinden Boulevard/Locust Grove
Road intersection in Meridian, Idaho.
SUMMARY OF FINDINGS
1. At full buildout the site development will produce a total drivewff6W. volume of 2,610
vehicles per day with a PM peak hour loading of 230 vehicles per
2. The proposed site access plan includes 2all-movement accesses to Locust Grove
Road. No direct access to Chinden (US 20/26) is proposed.
3. The US 20126 intersection with Locust Grove Road now operates with moderate traffic
congestion and ADT volumes are approaching the highway capacity of US 20126,
4. The proposed site access will conform to acceptable traffic capacity standards. The
average queue for vehicles exiting the site will be less than 1 vehicle and theq ueue
back-up extending south from the Chinden signal will not block either of the site accesses.
5. The site access will not generate sufficient turning traffic to warrant a right -turn
deceleration lane on Locust Grove Road. The left -turn lane warrants are met for the
business park and the school site.
6. The Chinden/Locust Grove intersection will exceed the capacity of the existing lane
geometry by 2016, and through lane improvements will be needed to accommodate
regional traffic growth as identified in the COA4PASS Long Range Transportation Plan.
RECOMMENDATIONS ;
1. A two-way left -turn lane will be needed on Locust Grove Road at the main subdivision
entrance (East Three Corners Trail) and at the school site to accommodate projected
traffic. The existing northbound LT lane should be extended as a TWLTL to south of the
school entrance.
1�;Oxl
Study prepvred by. Dobie Eng ee jn9, bac. 777 H*wth&tcwe Or. Bo�;, !D 83702 208--345-3290 Ph. 208-388*0309 Fox dobie_de*rgLn.corn
Three comers Subdivision Traffic Impact Stud
PROPOSED DEVELOPMENT
Study objectives
This study was prepared to assess the traffic impacts and access management
g meat
issues resulting at buildout of the Three Corners Subdivision and to evaluate the capacity
of the road system to accommodate the site -generated traffic. Dobie Engineering, g ung, Inc.
DEI} was retained by the site developer to perform this traffic stud in
y accordance with
ACHD, ITD and City of Meridian policy for transportation impact studies.
On -Site Development
The proposed development plan for the Three Corners Subdivision Includes 42
single family residential lots, 20 townhome units and a professional business park
complex on a 70 -acre tract. Also included is a private K-12 school (Foundations
Academy) on an 8 -acre parcel on Locust Grove Road. The site is located at the
southeast corner of the intersection of Locust Grove Road and Chinden Boulevard (SH
20/26.) Access to the site will be from Locust Grove Road. No direct access to Chinden
Boulevard is proposed. This project is expected to be fully p Y developed b 2015.
roads.
Illustrated in Figure 1 is a site map showing the development Ian and the
p p adjacent
:2
,:e:
Prepared by Dobie Engineering, Inc.
Page 1
0738
Pell
■
I N FIGURE 1
THREE CORNERS SUBDIV9S1UN
PTE DEVELOPMENT PLAN
JLCHINDEN BOULEVARD (US 20-26)
a
CA_
H,
h'�
Troffic Study Prepared By.
T::Dx
I El
DOME ENGINEERING, INC.
777 How
jisiVe or. MM, M W702 34, -i, -3X4
i
C
Three Corners Subdivision Traffic Impact Study
PROJECTED TRAFFIC
Existing Traffic and Circulation
Chinden Boulevard (SH 20/26) is a standard principal arterial under the jurisdiction
of the Idaho Transportation Department (ITD). Currently it is improved with a 3 -lane rural
road section and 4 -ft. paved shoulders. The posted speed limit is 55 mph adjacent to the
site.
y�
Locust Grove Road is`"an ADHD minor arterial with a 2 -lane rural section and a
50mph posted speed limit.
The Chinden Bou levard/Locust Grove Road intersection has atraffic-actuated
signal with left -turn lanes on all approaches. The Chinden approaches have protected
phasing and the Locust Grove approaches have protected/permitted phasing.
Average daily traffic counts were made by ACHD during June 2005. Recent peak
hour turning movements and ADT counts were measured by DEI in September 2007.
Figure 2 presents summaries of those turning movement counts for the PM peak period.
Shown in Table 1 are the daily traffic counts on the arterial streets.
;QO:,
-p_ -. by DobieEngineering,
Page 2
t
THREE CORNERS SUBDIVISION FIGURE 2
LOCATION: LOCUST GROVE ROAD AND CHINDEN BOULEVARD
CONDITION: EXISTING CONDITIONS
DATE: SEPTEMBER 2007
1
r
d
127`
74
53 I
a
r
1
r
�• ti
1
F
y
i {
To'D
1167
r
W
1947
789
1
1
M
R
Table I
Existing Traffic Volumes
Location:
Vehicles Der Da)L
Date of Count
Chinden Blvd. East of Locust Grove Road
24,556
6/05
Chinden Blvd. East of Locust Grove Road
24,317
9/07
Locust Grove Road North of Chinden Blvd.
5,820
6/05
Locust Grove Road South of Chinden Blvd.
5,951
9/07
An assessment was made of the current capacity at the adjacent arterial
intersection. The results are summarized in Table 2 below, and details of the calculations
are located in Appendix A for review.
Table 2
Existim Intersection Car)acit
Approach
LOS
Northbound
E
Southbound
E
Eastbound
C
Westbound
D
Intersection
D
Prepared by Dobie Engineering, Inc.
Page 3
0738
Three Corners Subdivision Traffic Impact Study
On average the existing signalized intersection has adequate capacity to
accommodate additional traffic as indicated by the current service levels. The 3 -lane
highway section on Chinden Boulevard east of Locust Grove Road already exceeds the
COMPASS capacity guidelines for a typical 3 -lane arterial section.
The Destination 2030 Long Range Transportation Plan includes the reconstruction
of SH 20/26 to a 5 -lane section between Locust Grove Road and Canyon County. Project
construction is not scheduled at this time. However, it was assumed in this traffic study
that Chinden would be reconstructed by year 2015 due to the current capacity
constraints.
No improvements to Locust Grove Road south of Chinden areproposed at this
time in the ACRD Capital Improvements Plan (ORD #202).
61
U
�9
Prepared by Dobie Engineering, Inc.
Sk Page 4
IN 0738
Baseline conditions
The capacities of the arteria •
p l roadways were calculated for the year �0� 5 prior to
p
inclusion of the site -generated traffic from the proposed develb ment. These calculations
alculations
were made to establish baseline conditions from which to atsess site traffic impacts.
Appendix B contains a copy of the current COMPASS model projections for year
2015
traffic. Since existing traffic now exceeds model projections, baseline Volumes were
estimated using a 3% annual growth rate.
The projected baseline capacities of the adjacent arterials are shown in Table
3.
Table
Location:
Chinden Blvd. East of Locust Grove Road
ADT Volume
No. Lanes
Vol./Cap.
LOS
30,300
5
0.78
C
71400
2
0.45
A
Assumed in this analysis is a raid -range Los "D" capacity of 1 4 000 v d on
p Y a p a
2-1ane arterial and 33,000 vpd on a 5 -lane highway. (Source: COMPASS RTP Speed
Capacity Matrix.)
9X
Prepared by Dobie Engineering, Inc.
Page
K 0738
V -
Three Corners Subdivision
Traffic lmvact Study
The baseline capacity of the project intersection is summarized in Table 4. Service
levels were calculated for both the existing lane configuration and an improved
intersection with 2 through lanes on the east and west approaches. These findings
indicate that existing lane capacity is not adequate to accommodate projected tragic.
Intersection improvements will be required to accommodate projected traffic growth. (Ref.
Appendix B.)
Table 4
Baseline Intersection Cavacitv
Chinden Boulevard/Locust-Grove Road
Approach
3 -Lane
5 -Lane
Northbound
F ■
D
Southbound
F
D
Eastbound
D
D
Westbound
F
D
Intersection
F
D
I
A
6i. Prepared by Dobie Engineering, Inc.
Page 6
0738
Z!P.
00 on .1 fl -I ray, M I O!T 1 rp
Trip Generation
The following trip rates are recommended in the latest edition of the ITE Trip
Generation Manual (Seventh Edition) for a Business Park (#770) land use and Single
V.
Family Residential (#210) and Private School (K-12) (#536).
A floor area ratio of 0.18 was assumed for the building area of the Business Park.
It was estimated that the 7.8 -acre commercial tract could support 60,000 square feet of
gross building area.
:6
K2
W
Pre parectby Dobie Engineering, inc.
Page 7
0738
Table 5
Trip
Generation Rates
Trip Occurrence
Business Park
Residential
School
(Per KSF)
(Per Lot)
(Per Student)
Weekday End Trips
12.76
9.57
2.48
Peak AM Hour
1.43
0.75
0.79
Enter
(84%)
(25%)
(61%)
Exit
(16%)
(75%)
(39%)
Peak PM Hour
1.29
1.01
0.17
Enter
(23%)
(64%)
(43%)
Exit
(77%)
(36%)
(57%)
A floor area ratio of 0.18 was assumed for the building area of the Business Park.
It was estimated that the 7.8 -acre commercial tract could support 60,000 square feet of
gross building area.
:6
K2
W
Pre parectby Dobie Engineering, inc.
Page 7
0738
i
Three Corners Subdivision Traffic Impact Stud
Future site -generated traffic at full buildout of the residential lots and the Three
ree
Corners Business Park is shown in Table 6.
Table 6
Site -Generated Traffic
(Rounded)
Land Use
No. Units
Total ADT
AM Tris
PM. Trips
Business Park
60 KSF
755
85
80
Residential
63 Lots
505
45
65
School
500 Students
1240
395
85
Total Traffic
2610
525
230
At full buildout the site will produce a total driveway volume of 2610 vehicles per
day with a PATI peak hour loading of 230 vehicles per hour. Since the system y roadway
traffic reaches its peak during the PM hour, the AMeak was evaluated separately parately only at
the school entrance.
LE'
;V
Prepared by Dobie Engineering, Inc.
Page 8
, 0738
K.
W
Site Access
The proposed access plan for the Three Corners Subdivision includes one
ali-movement median -divided approach to Locust Grove Roadlus i •
p interconnections with
two residential streets east of the site. The new approach is located
Pp approximately 500
feet south of the curb line of Chinden Boulevard.
Access to the school site for student pick- uIdro -off needs will p p [l be from the Three
Corners Subdivision main access street.
The school parking entrance will directly access
Locust Grove Road. A copy of the schoolIan is attached in A e '
P pp nd[x A.
Future trips full buildout of the e Three Corners Subdivision development and
school site were estimated and assigned to the proposed project entrance (Figure 3).
3e
Figure 4 illustrates the turning movements at the site intersections for the PISA peak hour
period in the year 2015. Included in this traffic forecast are baseline traffic volumes plus
the new site -generated traffic.
Prepared by Dobie Enginellring, Inc.
Page 9
0738
W;
0,
�• _•._}. •. �y•.�Y x- w•.w -r' yl�� --- - _ ,y - - - - ��o--.,,�.kL�.,+�. aver }�,LC
.vc .f;__S .{� r• � - • F'•. . �' •_ ' � ' 'n , • `'��ii •:•,r ^'. •- _� _• 1 � _�, ... kms.•.•
}.• ,�.v ;':4y •. -'r. .r-:: �' 1 +r- • , t t:. s+;'4.,,, •_ '•J}i` �'x�r
•�'v'r kLT ryt . Y. r' Hyl ;x�r: , ••r • ':X- '• f .. J'f+(c .•` 4.
r'• _}' .J t.' _x• �r '•. •,�L ' :J• _ ,. '!•,• r %r` .•{}': _4 k. ••{+ +•. •:
F �', }3+ •M1.- t< .. 2
- �' _t• •" }� .� I�M1 i 'r.•J �, _� •',�' ;.f l•J •L � •r.. r.L, �', ,y� �;`4 ,r •�.C�'�_} �{};1. _:.' spy
..L •'Y-•• ••OM1`+ .'• - A'{s Y�i I.•'• L�' •}' F,L' S• '_} $ ���S��fes• '�Lr•�vf
•'.ti7S%.y _J:v,••' •L.r- °. •, f.v•_ t,.' s'• ! k••:�i'+":.-yM1x• ._L..� ,
r J rG}• "J{ r.. .l 1. •�. •., }}.I{]-..• 'M1"�• :. '='• s.i+:.�lr t i-r.:�•�'�.+_+,'J:�.=r<'..• ' '' f'=
• •' Y4. '�'� � T�rr� � rc-�`•, ��� :r.�l 4}�1,'Y�fl �� �••l L: K. Lli.
� 1 r �y r }� r `� , J , } Ak• AC r�
•'k• 1. 'L.• aye'}: �h'..: L,�
z}' �'. t.., - ". v�_.^ �Ly •- _ -.� �k •k n''� a_ L r. -'. }_'rx •,r +.+�+���h�%r
L. kL k�r��=' r.K.'•.-n' {��'_ �. , ti ��' •ti_v,L � = i � I i +J f,��.� +�� Li
i t'.r:_.'r4•�;y M1�_ti }', yM1 ��I � If�� ...-4Yir4}•-. 1.�.�
_ ^ �• r.M1. .';�•. •• 1� r r • �a�a.�. , 1,
,v ti•+ .+^_-�1 �,�k L•'_ '�rlr '�_ `i•�,M1'••}•. •,t. .J •' { •14 L"r�l *7'�`t�
} ' ?•� �'t � xL - �',� 5' w, ikr •�, �;}`;` � •Ly }�•A .�'I'.M{
}i4 x •J - � � Iy, '^� � i •� �nNl i ��e 4-: 'r L�•\J'JI�� 1M1 •+�•x F 5•� �}'-�}�?_
/I t
_�J, _ � �• } -1 � i� � � x_�- ay,. •••X- • _ _ .. _ter: x� �T.a inti • ' ° �r
V his '�{ a k - r l `L .+t ryy..l,.�� : }• }.r 7'�: :`• rY: J }�•"�
�C'-' }j: •i H{f•'J'�f�l•} rM1M1 ^'y�{:. t• ...{• [I'..,Y'•. •• ,L:}y - •Ff
.. r�� a.y �' • � � • •'~rte ,¢e aa, i�'ya {{ •' 1 �_ +�
�•j. M1 t' 'yrt7 L�"jSw,;�_� • •{ :=:n•Yrna.• • •li':aN, r }_��':::,_-'a-a • 'r k�� f� _{•]F-
}��y�' v
}•M1 '"•IM1 x �a '• M1. s k3+_�i=�'a+'a Xis :; __._t•- ;� r•f�yl.. f
�.K,
•.J .. { -tri. '. r`' a} Y ��• � 4 '�' +,�.
I •{ .. ti .. _iii � .� � r Ir
.a L I + k � �. L ••.,{•,,� :n f. 5 i+.ir-[�•1 7'
n �' }• �' -'+'- }"'ll`AFf
•,r - r. ti. °"i•': h.�' t �i 'ti �y� '� �}_ Jy I �� t•i: i,- .�� ;:��i. ;'.t' `• i '_�'�� r'ti-.� ��.} �:_ fr.� � •._� •�.
}L� �%ia - t r •£v rti}. ,-�ftw f,r _,L '.._ •.4 •,'�•. -•'.� ft n�� •�
r LGYL .. � •L� ''` I .r }{..: /+ f:a. t,i _ '-J L.1I�� ,���. M1/J.i �.•r � 1
I � 3 - '�.�.�.rl.f •_, L'_}r_ �' �`}-��: dkJtJ`:,;��5'� f rrv.3h•t-'i 2-.,�{.:J�+.k -'1- k"`nM1 1' -:c ?4Y�,s f a��
�. f�r; ;{-•�,�°:M1 .�s'�r ,i' •t_• y�•y,i'••L: �M1w �-���.•Y.,. x•rJ��.� �����M..v.. �Jr_rr�}"'�
t' •. - { '}_+2y ` •> '• rw :i'••'}+air'• �-: •:_--bk•y21L�r -..r ,le to -'•t': �= r'I r . �{ 5 -
� ':- - � �� - 'L .��[, :..: �.f •A•v. � Y .•'�`hl,' ���'.'�"• L �'vj �it�+!{J2 t: � . r•,..1� _r i1� �vr M1L
n � , � L � ^'}� ..,., J py ''Y. r'•' L�•+'~•r•+- 'L•r tip.. F'
�, 1 L'_. } _ � ,fig �, rM1 �•a.t. �,�� M1Y���.�x,.,r: � 7/ �•�• �; v '-kh
•}. � L L 1 a t „'y{,_y}� f rr f �: 1-_. � J�.2' • . .f{:: . Y l'
7-3
�g {J,� .'� r �•,3 f, ki y.5sj,�+��'11 r i� S+ •c,• yc.,, JJ�i} �1'-k,+ � r 'y,•�; ' `a AJrY •. r ti:
. S �4 • } i f'h'• F i7^�yG'' }�'�o-i1 •• ikrL*T fyky: i iJJ.}.s}4'°};rA } r�
rrT",- '1- r VF `+ � }, N�.k� f,"-•��•a}' L rirs���`7Jy.}u,i• •. -ti's{' f�
'i ,�� � � �':• � - '� � 14 � 11; • _. '�'{ �,� •niM1r'� �_�•��3' }� a,,' yv,�, }, �' L•ysv5,��:� N .yi. �� }a
�.Fl ira '• k�. 4 ""J_}+a'.�:r i''iJ"• y�;S }:cyb�: M1 17f Lr 1}-
• k. �: t,}• � � rF r � L_ �d �_�-}•'L ,3 t�:•{�hG� • •.r r.�.
./.rr�.�{ � � �'f' ��'':.��'r`, �s;��t• r�� - }y]}S� �.'}.yL � �. �
• .%Q �C14� r .Lr t,r �'j"i���'' � S. r} ; J��]~D+I fti,,�. y{Yv M1.. _.
', -Jj { lti }fir �i11_{� f�[�r![J�°ilf`,-}1''�� •� J +'\•-' *T��+S�•�. �L�j �Y•
j"�rry-¢'$,.-J°`a, {�L1�'� Y•y��l 11 .: i.rs 'IMJI-'ct,� '•.
r:ti S�._ .�,eM1• 'Fr }.- tiTr� .��+i �_. �YrY���;G�3: ����=•i�•_� � T�'� ,r•'•
r,$�.. r}.•,'. F' �•M1: L{.i� -•'•4''71 •�T M1Y ; ,:.�
M1jY•;{Iy_�y.L_;•: X •7"
si}�lx 14{•..'1�j}1{',,��iFY�y r{;F +. ;. }•J
-
'%
rM1i: ` 'I•+rt
; �F3 •' � { 5 • R Lf} ` �f}} L; ¢,t yy }�• J-
,..• • ' 3 y''��' I�:�'a �sSc?_Jrx7t:Fr 4 _k .t�,2ti7L�+ lir +'�I }} }•J �•s'}} t
h��Ly M1.• .?■+..�Fr v L ii x•',_Ja , ,.r..: �S_'}'•Sr._:,fl"_.
P. +fig'• 1' F �. �'[F,. LAS" fir[ Y}� � ,-�...f r� �r �y
' L Eiji {L 7� �f ��,•, i-. L.•�}tr��+a'T�•_�tLl`� t {iL }}{�{TT
}ry}'s{; } '•� - ,X1 rL; r�r�+3, '�'3�'%�`•`r',LI'' f��'•,-�•�•,r•- 7
f•."'t••-i ry�G 1.'* .�.. r a.J: r.�'��''Sf_ f}.C; ;I �Jc}C'li _
,ice!%"
5 14�ySy�'11:.=rt „•a �1:t+'�Ii._' :r:..=,
1 �" `� 1 ��.F •} r °�L-;}J'°�'£'L +'r-��+'+}' ■ Ky �. Iti Lk a+ rM1�
�'amu - I ImoWL.'',, ry�,•yry'�•,-.}L��:":rte{=�"••`�,r
'yi"y°�; a�I l• ' { ��' `rSr_���3' • ' '_ •�1'fM17�
W' I,�• •�,,� 1,J 4{t yM1-i�� Jrl �'; LL �•�fi•�n {firi'f•.v.vi�•- JLC-
:�_ '' "ter 'rL}ti�� %r �},_ �• •fY'[•F _ti}y'�y1 rrrtw• :J`w•$}}
•� �i>�.atiJ•{•:ax�Xa�'r 1 JL' �r��iW,A�::•�:.il•ry�XL�
y Ji '.Y"L -'yy ��Ft�a+S ' L•f � -Y }.. ... LZ.,,.� • �}��x i{1 L
5i •;rf�� . � �','crt •. f 1•` `J YyOs 1�'�'''.'+J ^ • `t', �rt'ti lr`i ��'�'r�•,•-; .� • y.., �[•-3
_ rr'•f�.. 'R'Y 4• F,.�•�Wi+y,kl{i 1L-�-k� �5,,�� �-��1,Ct'`. �',-i ,'f •} 2,.-1.
+Y'+�:• I {a •5 ��11•_la/_`.:_ � �1 � r4_;•YF_1, {I� �.._ ty_ri'vx F,�'
f f� +. f l,•, F' Ify ��J sr� ;�ii'i
M1��A•l}o-_.i _•: fp;-�=
•'1 %- 's. r;." I r•" lY vr�. rJ r+y.+ •• ;t.�C ..-• . • rl 1. •�
r L i. v r I *. + J Vii' k 4 �, ., iy . r {'•' C.
.L �. ••T' .� _ � ���� � K ZLi ��t�k{ �r.:y ��,7r�r1 r JL}i•�`" {
�' .{° -Lt°+T t I.' I_i1'-� ; ';•}••£}ti' L L�.S.,rLN.f}•'+ �
>� 4J �. rM1{•• J, f3 �� � F -,!'.i f,.:. ice'' ,};� �r�•! •rAF,�•`.-{-� ��£�.� L �}��,
°�i�'LM1 x r , t � • •� .,�' .3'. �,r '�' �°I• �•7 �r 1 iN-�rX�y+r���`{•� �` Y •I�,�G,� "5�'S7G w�-•�tl,r }v •�L;��.. #� ��Y .
- . Flpd'7' `-`Y fJ'7'f �i� •° rye. {_ {C
J ' ' �/ r•1 �!-•.•�}�ja'L�,i,. r-�L�' ti yy.L x'.' 7�. j•,'
r��}y+. _'�•y::: '+ � 1}'- a a� i�l•'L�•.��.: -r `� �
{.•��},ii• - _ ,:{+,�yy�-i� L..:: f�IC r ,}}'W SL,�,, .•yr`•�.`'� '�4!'at��+-y��}#,-'. `�'L�o-�-:�,ri. �;�i.
}• * .=�_ � •L + r�,�4'+J- L} ' L:~ N�i��{p n -J�F`{1y �I:�L�+A :�T•a � a� tiv •r� A� {'�+•
} �l�'F• 1 _ � L M1 • ..�� rj��• ��.; � �r,'��r=s rd o-�= ,�� y{�^�'• *' •: 'r�ao�' i`•'�_'`''' -t �. ` Y ,' • �'=:`.y;^.
,2_i �•I. `i ,,}�fJ ti• .f ,• rt*;'��•- =Yk_ f}f �:'• -' r,a�S�['2`=-rf'n�1�7 •, fi j.••• j •¢k•
-� . "' •, v< : w L . -M1 a•' ,� L,.A.1 _-: 'v J• L•,c •' �° 4 `''���*'' 77FF::- •r��'��••: .t i�l���' � {� 'r � .�.. +D
�±.. •,x �•-� �. } is M1 5.. ��'• �I_ti�0• .v°}M1 iT-•;^'r I}}-\..►�����' fit, rM1 �� Xi' •fry}OF•�-��F°•_a .'Tt,a �.,,
. ti t F L-� t .� t .tiF • -v r.tiyy•• .,�L:� Y' it. i.l�•� •',1 f..=� J�' t•' +TL
' �J` _: {,' ]� ,, ^ �'�� i i }�' ._? .J+'+. ''Aar 'fM1:Y�� •_ I ,-.F5'�4+. r' `� �• I'� • Y� {� Y T
'• .-p•;f-'_^; = • fx� f -.. ti v�4��yy'LT�:..:y�!'- t ";'_L• %�;, r �•,, "� •5 �C 77 -UL
r. 1
!b,-
01
M1..,�,'_aL r yy ��''•.'rl• 1 � sr' ��" .fes '} _ t_r.• •••,1}n-•_.;�_���..
P"A-.2�,L �,'f• 1 a �1+M1.�-i L},l-.'r� r_•S �r� ',yL,.. = aY.r� �L in•. _ _Y- �. I
V� ���• moi}:'.-" r.i �. �v; �5 Slr•-}-- t.- 3f4 L; •r- . ` . yrs r Rr 5`
L r j{ yy'• h �_ k•
�$ 4 v 'L • - �fr{'a rr7�''�y�' / Y QACf 1 L'~.�• .1}.Y
1 4 •-IA' �•{ �• +},•' •,¢�n}Lr��y, ti r_ I. J ,I,` -f''y }. x.. nrl
�® y�yr �y-•'�± •' �lyi f'-0'' _3y Ti 1};ySf1 •`~F 1
rya• � 1T '•� _*" '.��5_ r ''t+ ��i L" `��'�-�� L _ •'.•f`y - ���' �' }f •: L
_'ry �1�%/�^ � fJ'�7y. +ti... •' _ 1 {r- � � • r. } z 1 �+. L ���{• ��_�s��_Yi �+'�'_' �i 'i�"�{ vr.:. �r
3 •�:a� = �•� e' j � � �� - .a'•' � tiR'y.`,� M1n.��"'i F M1�r?� �� �; F,.f,�f+yr`pL -�� ry � --. , �-}.y'�n{}p�•
rs �' �k db�� .. I +'�R��?=�.:,t�j'_ - �{'� {I � •��L iy� r' <' T '' Q h: � �: �L�Li ''�.:: Y
�#L. l' �1�P � '��+�_��,� F° ''�1�j •�• �' �•+1 y�{'r•a�i• Y� I' �.Y ,� �� ' `�1���' '}v� � �?f viM1Y'- :moi{ �
1-•�-.avgT.i� t_Y� 1rl++:vti '}ji. Tyr= 1•ifA •5Y�-F 1. -TLS£, 3:}L•,��y 'z ~?t }y L+� as 1A '4• Yr,F i 1
M1 aw .'•t4a - a 7 - x ': ' 7�y . ''3 '� s t`^'- • ' t{ r • r
�.L- yr; � '�"' v, "- l ,•+�• ���;J 1.}YK�' wr i3� 'y7'.��. I:ti �.=�1. £5i:+��,�kl'., 'f.
•J •: •� `Ir ♦.' {y�-';'•Ir Jvt' _ r•.��..__a.::v •,r�.r - k.�•.... ti. �,.,�.• r1.
'_ t•. �_y'f�r i�}..�••i`Vr�:�'].•..r M1n�-• _ ry- h++ti •1 •, •� - L:: � 4 Y-
S.F _`v F{ n �i - r �" � . l' +3�•� .�4• : � �'[••�-,Y 1i, YrL'•• : ' `' J•��s + •r' •k •.., -. J.
r: „°y Y+: t% �,t.+-,r rr � • L Jrri �`' �• ,t�'�•,. �''•'J :'•..• t
F J�, �'"• `?'M'X• } �.\.Li _i}i}J- �1� +i Yf� i -•, 1 YaRL li•K'h X•k t :'�y,b _
?•'�L. k' 7 • Y � i� Ya_ ryIrY�L_
Y+4 k-:��f,R ii A �Y-, ��•'�'�J<•Ly�'} F��,� }K� x �i.Ji °�i�•.� u.L•�{• -_��1••
{5
i{I•.ti }: r.•'.r �1+_ .+ } `�JY,a'L .iC `l'v•+, yO=tYM'�'YF+_t{_�=_1 {: 'J• '� 'L•
�yy•r'rrr��i r$ $'+''f�f _ r: °'C '�S••. i.' .._J Y.... �, i �+•W_"r V' { yi _ r• L .{ Rr,'•
•1 L. i°.i+ ..• •�K;. i}.'•r• Y. ,.i'_ f$ s^�•�+Y-.s: .' �• � �•• 4'r•.
• }•, �. !:'_ "� �7rYr..t� . f '�ti.' • u'' •" rL 1. �1P- M1 IM1 _. ~, y,. ' •4rJ-� - � , } �, - -
.Yi-7� :L•+L ••?�3 :+ '.•.,._ �••"i •F:• :'==r�� �F� h?C`:-L'•+� y. :r Y
rr: _ r. •i: 'r!' $..Y"
.„ is _ _Yi •'•`-?°`�:.. ��-I�ti:._ti.° 70 � � r � r _ t..�
_ � _,'fid Iy � .`e I� w !. �'_ •T ;�vi-�,P,,'-i�'J'• }.• �{�••_ ti _ •'Mr y. i_ �. _ J (... �_} J i�
• •t :m�l�f� x. :l�fl�:ir.'A{ •• �� . *7 rr:.r .'J• _'�� : R ••• y, •' f' _•.• ? 'r �� ; r%�� � "y' � �.
�7� ~�� �wC: i y+;;.„Y ,}..•: ,•r • � •i'�'.i ._ .y..�rY � ?�• : 'i:�Y •� •• , � cin
r S'{� •[ ='°rte' '� � `CJrr _ ;, }' �.- •,�•• � .,1- r� f� .
I •�J. �(t•_ •®F r"+ •� { - s°t.•4�i.•i.L:="`• •.3.�+.• ?.J:� i �.• 1�.�'. 'L'1-�. y},��.ti4 _ N. ic:d. o,t
t" A
�} �3�'�T" �.a �yy��-''.1_.' _ ,�•�Y : _ - - .r.J:.:?!�; M15_= -ter_, - ,s ;,'.• '. y
Z� _ i,�lf®'^+,. tti�}J.� .'.,w ,v17+•' f} '.4 •' r y i. Llyv. ••; .���yti- •YY �•+yy•_cr �rft r.`__ �'a, lry"`i'}:t K'"_L'r'�ti•: .2
Z.��7�<� + l �e$ yr �Y �' ' { �•:J,+LF_ tUr {_..,i•.�. :.� �+ y,_}M1:• L,�
-a.jC. '��� w IL I o ®yR���. �M1.� _°f.�� , _ � �:' _'• •r -•�}.' y rr;. k'.,_ •�� •' -J'x•.i�� - � �
1 K• of .f`' l Y'•'�•• !'7't�';Y_,{ �' k - �• = °F• r' •••
{: �.•YrM1 r�`�'�• �{_{•=_.e;rj .�•yS'-.:�+X, }_'4''•� 't J 3-�• 7,"�'��:• •. �,�T.=• ti.._ i •�ti w{. M1• _� +4
gat; }'L`r q I +/ •}., t, s. -i�jJ 'Tw7 ytp �� .� �.•• °��`srt ,
�. 'f'� M1tr�'_..y •f, L.r:, _- l�
aV r f •'-•`n•r•y• t: I,o=2 _-
' � t p'��� r` �� 5 •;L��.��ir/.: 1 Ski y T`�'�.'J.�I�•Y • .. �. � J �},,+� t }�� �.sa'k•�'l: �� �'x•�.xr+hl�i �i}� •L,� f .`•�:1,{,{'_�-• Y. ''f�L. •_�jc r''• !•" � i
• �Tr '•�_ X fid' lMs
�Fi .4~�1P' �_ "+' -- •.r J• k t a ° 1 ^^` 7°I v. ,��;}� l yA,� }•!.wl ' •�tj'_.tk••
iy+r.:�••._.� �. ` o-�� � Ip�;v�,;._.;M1��L':..1 r•��p f � � •�'.. ` l��Y F '7�+' Y �a , � - 1 y '•-.:: •' � •+f
7'JY��r* x •�J r*�, '�c 4 ��'zg �_•7 7i 1� �!! .L, i a. ' �: r•Y Lit;�
�A�
®
'-' . 1., . E ' a� 5�.'-rte•. •L� r- 3 ,�..: iY �q oc .� • ,! ;r•1r x '.�y • r : ' i n,
I �at_`� }•w a 17� 1' �, r 5 w ::.� Y-• � '. �• • 5'_ �� *�. � �f }Y �3r�•.7 .x, / iF� � .':' '.�M1�1( I,,I�
i,,,'fYJ 1' J J � Pie r�, °r' L'+ � � •:k� 5� ��•'• •�i ��_ ��� `A .+ ���
� ,M1J i• �,� �.IC C-4� °T r•• R`=7 '¢' r�:. °-_°}���° °� h=�y1 �v .� �• •�' ypy � �}�4.1 a3 J ���7.�'Jt,`i7*� µ°.
yt P4.� ���1 _ �L+: r¢'�YL } "�'�'r. Y'i ��'' i� a Y � �\,ljL`•�+��"��t _ter �y,A,, �..,.�rL �aJ�
9
rr.
X'vl
T�
P,
FL�
zq�
I
neral Information
nalyst
agency or Co.
ate Performed
Mme Perio&
Volume and Tim!n
P. DOB1E
DEf •
9/11/2007
PA411
nit))
SHORT REPORT
1ite Information
ntersection
LOCUST GROVE I
0 0
CHINDEN
krea"Type
All other areas
lurisdietion
lTD 1A CHD
knalysis Year _
_ _ _ 2007
EB WB NB SB
LT TH RT LT TH
RT LT TH RT LT TH RT
um. of Lanes
1
0 0
0
1
1
0
1
1
D
1
1
0
ane group
L
TR
- - 08
L
TR
10.0 G=- G- 10.0
L
TR
1174
L
TR
Y= Y+ 4
alums v h
16
585
69
155
995
17
103
29
ane Group Ca acs
21
35
18
% /o H ea veh
0
3
0
0
3
0
0
2
0
0
2
9
HF
0.90
9.90
0.90
0.90
0.99
0.90
0.90
0.900.
90
0.90
0.90
D. 90
ctuated PIA
A
A
A
A
A
A
A
58.5 29.1 61.1
A
A
A
elay factor k
tartu lost time
2.9
2.0
0.11
2.0
2.0
0.3 3.1
2.0
2.0
0.4
2.0
2.0
1. we 1.000
eff. 2reen
2.0
2.0
1.000
2.
2.0
61.8 53.5 70 5
2.0
2.0
55.3
2.0
20
E �R D E
rrival type
3
3
pprch. delay
3
3
74.1
3
3
pproach LOS
3
3
E
i� nit Extension
3 0
3.0
- 4
3.0
3.0
3.0
3.0
3.0
3.0
edlBike/RTOR Volume
70
10
30
10
14
15
10
10
30
10
10
75
. ane Width
12.0
12.0
12.0
1Z 0
12.0
12.0
T2.0
12.0
arkinglGradelParking
N
0
N
N
0
N
N
0
N
N
D
111
arkinglhr
us stopOr
0 0
0 0
0 0
0
nit Extension
3.0 3.0
3.0 3.0 3.0 3.4
3.0
3.0
Khasi n7TGCl.Left
ru
n l 04 Excl. Left
N S Perm
ru & RT
- - 08
Emin 14.0-=
9
770 G�
FG
10.0 G=- G- 10.0
G- 5D
= 180
kY=
G=
4
_ 4 Y�
Y= Y+ 4
Y -
4
Y=
uration of Analysis hrs
= 0.25 �;
_
cle Length
C = 150.0
ane Group Ca acs
,Contro1 Delay,and
LOS Determination
-
EB
ws
NB
SB
d . flow rate
18 593
172 1108 114182
123
42
ane group cap.
168 938
289 1779 171
234
171
289
Ic ratio
0.11 0.74
0 60 4.99 0 67
0.78
0.13
015
ree n ratio
0.09 0.51
0.16 0.61 0.13
0.15
0.13
0.15
nif. delay dl
62.3 28.6
58.5 29.1 61.1
61.0
58.4
55.0
elay factor k
0.11 0.30
0.18 0.49 0.24
0 33
0.11
0.11
ncre m. delay d2
0.3 3.1
3.3 ' 24.4 9.5
15.3
0.4
0 2
F factor
1. we 1.000
1.000 1.400 1.009
1.0w
1.0 ,00
1.000
ontrol delay
62.6 31.7
61.8 53.5 70 5
76.3
. 5S 4
55.3
ane group LOS
"` E C
E �R D E
E
E
E
pprch. delay
32.5
54.6
74.1
56.4
pproach LOS
C
D
E
E
to rsec. delay
- 4
Intersection LOS
D
CS20WTU
Copyright 0 2000 University of Flriridd, All R�Shts Reserved
Version 4.
file://C:1Documents%2Oand%2OSetti��gs1DOBIE\Localo/o2OSettings\Templs2kI
3.t n
p
9111I��4
y
d..
�j
APPENDIX B
.51
PA
R
4
OOLZ
5 OOLZ _ ___
!r
Wk Ct I F- Zo?
hum,
CD CD
CD
,AU
Locust Grove Rd.
2600
2500
0
MaM
Iry
Zr
fi
CD
C>
CO
Locust Grove Rd.
00 2600
�
I -
- - - ; [I
* i Jj I
006Z 2900
ti
CD� CD
C) CD
CN
CD
m
V6,.
pl,
I(XI z z
SUM
P8 al6e3
�V.
4800
GDOP .000
�fl
------
iY3-
"4a
CIVs
53K)
atgv 4500 OOCO
d) C��
CV3 Cn P8 &]!V4 BAI
40
0
4300
V)
r
cc
rw
i Oo
CZ -
4000
1000 009
C)
w
LO
9500 0109(3
0061
00i0i
wl-Ammm#ftmwm�- �q -
0
cc
PM eJBPJ8AOjO
009 1- 77-T
CUt
it C)
Ln
QD
C'4 0
CN:
04
0006 L
COS)C,
09 9 1 23700
009 �z
0099 L 22200 CIMIZ
10
8
C%4
PH 816eg
tn
Cj
101%
Co
Locust Grove Rd.
cc
o clq
5 C, 0 C. 6 7
009Z goo
4600 ON z
PH aAOJE) Isnoo- w
z
Ui
0
z
:D
0
6
CY)
rZ
00C 1,
5 2 010'
UD�9 57W
21
IOL9
OOE I
0OZ9
Lj%jevq
'pa UelpmaiN
009S
PH WINVen
CO
CN
m S
0
C-$
(0
■
6100 0099
008,9 6200 OM
CN
CN
ev C\I
04
pt
CIQ
C14
006L ar� V 0
L i
'
p�j e� Me 3
CN
%J
■
CL
0
(n Locust Grove Rd.
CD 40,00
U
00gz x 1,. 10 0
0
U 46
�m P�
E
E
0
9r
0
C\j
)9 Met
Nrl,
11
wgcj
INNS 0061?
,P8 uelp!jqkvq
0
hL
C%j C4,4
w
CC C --
c-
0
CD
0OZ9
.0 C,?.
ACK
(3
0 0 .
:.I r °WO."K
L)
CN
le
64
*t
C�
C)
C�
C)
0000 L
C�
Cloverdele Rd.
CV)
MA
0
C)
CN
65 -OV
001L
C)
C\j 0-01ri
ispul-1 Linder Rd
%00
WOOL
006V
I
OOC9
OOC9
P-8 U
&CWO
OWH
CD
Cloverdale Rd
0
CY)
loverdele Rd.
cc:>
w
(n
CO
C)
64 -
CO
M
V
Cf
C�
C>
P?3.japull
006L
0-8QG 7300
■
CQ 9
0-00, . 7000 7 500
a ~�.
Pb Japut-i
'R n 9,
R.
CD
.2
Ln
PH a
U
'n
'19.800 0096 r
N-602
0017 -L
00r
V'
i9700 0()z6;r
C -060Z
PIJ albe3
11
wgcj
INNS 0061?
,P8 uelp!jqkvq
i
oil
0
0
C% -j
CD
0OZ9
.0 C,?.
ACK
(3
0 0 .
:.I r °WO."K
L)
CN
P8 8AOJE) Isnoo-1
C�
C)
C�
C)
0 C\j
m
00
CV)
MA
0
C)
CN
65 -OV
C)
C\j 0-01ri
ispul-1 Linder Rd
i
oil
D
0099
0OZ9
.0 C,?.
ACK
0 0 .
:.I r °WO."K
is
i
P8 8AOJE) Isnoo-1
C�
C�
LLJ
z
CV)
P8 UBIPPqN
C)
CN
A S
C)
C\j 0-01ri
006V
LIJ
P-8 U
z
00
CD
0
CY)
cc:>
w
(n
CO
64 -
CO
V
Cf
C�
C>
P?3.japull
006L
0-8QG 7300
CQ 9
0-00, . 7000 7 500
a ~�.
Pb Japut-i
'R n 9,
0 A
0:
I
.A.PMfK-ow .8
THREE COAt"S SUBDIVI$lON
PW BASE414 A
I C CONDi Tj oN$
%ArAR IA-
-0
2
Traffic Study Prrpor*d By.
DOME ENGINEERING, INC.
777 Nponhatont Dr 0 �P702 345-320
J.�
ti
4�
Traffic Study Prrpor*d By.
DOME ENGINEERING, INC.
777 Nponhatont Dr 0 �P702 345-320
J.�
Volume and Timing input
- -
EB
SB
Vve
TH
RT
SHORT REPORT
TH
RT
un*ral lnformatlon
❑
[to Information
WB
0
1
nalyst
P. DOB1E
rsection
LOCUST GRCVEI
RT
40ency or Co.
DE1
RT
Cf�11N3EN
Perfom-ed
9/112007
ar Type
All offer areas
,)ate
rime Period
2
sd$ction
1TD/ACRD
ane group
_l
sis Year
2015 BASELINE
Volume and Timing input
- -
EB
SB
Vve
TH
RT
LT
TH
RT
EB
❑
144
WB
0
1
TR
1457
LT
TH
RT
LT
TH
RT
LT
urn. of Lanes
1
2
❑
1
2
0.90
1
ane group
L
TR
A
L
TR
A
L
olume v h
�
20
734
85
195
1245
20
130
o
/fl Heavy veh
0
3
0
0
3
❑
0
m HF
0.90
0.90
0.90
0.90
0.90
0.90
0.90
uated PIA
A
A
A
A
A
A
A
to rtu lost fi me
rbd. eff. green
2.0
2.0
2.0
2.0
D
2.0
2.6"'
2. ❑
2.4
34.5
2.0
2.0
N rival a*!
3
3
pproach LOS
3
3
3
nit Extension
3.0
3.0
30
3.0
IntersecWn LDS
3.0
ed/BiRWRTOR Volume
TO
14
60
10
10
20
10
ane VWth
12.0
12.0
12.0
12.4
12.0
ri . arking/Grade/Parking
N
0
N
111
0
N
N
arkin9 !hr
us stopsth r ❑ 0 0
■ nit Extension 3.0 13.0 13.0 3. ❑
hasing Excl. Left Thru & RT Only04 Excl. Left
G 14.0 G= 63.0 G= 10.0 G= G= 10.0
Timing Y= 4 Y= 4 Y= -
Y- Y= 4
uration of Analvsis Mrs) = 0.25
ne Group Capacinf, Control Delay,and LOS Determination
MB
- -
EB
SB
Vve
TH
RT
LT
TH
RT
l
❑
144
0
1
TR
1457
L
TR
294
25
215
25
45
25
2
0
0
2
0
0.90
0.90
0.90
0.90
0" 90
A
A
A
A
A
2.0
48.7
2.0
2.0
0.17
2. 4
0.32
2.0
2.0
' ncrem. delay d2
3
0.5
3
3
1.3
30
F fa _or
3.0
3.0
1.000
10
60
10
10
25
12.0
70.8
12.0
12. ❑
49.9
0
N
N
0
N
0 0 0 0
3.0-- 3.0 w 3.0 3.0
Ns Perm ru ' T - 0
- 19.0fYK=.
1&0 G_
Y = 4 Y=
cle Length C =150.0
ffie:llC:\f)ncuments°/o2Oand%2OSettings\DOBIE\Local°/v2OSettigs\Temp\s2k 15.tmp
SB
28 50
191 460
0.15 0.11
❑.22 0.25
47.0 43.7
0.11 0.11
0.4 0.1
1.00❑ 1.0w
47.4 43.8
D D
45.1
D
D
Vion 4.
X 9113/200
EB
Vve
NB
dj. flow rate
22
839
217
1383
144
200
Lane group cap.
158
1457
289
1803
294
391
Ic ratio
.0.13
0.57
0.75
0.77
0.49
0.51
reen ratio
0.00
0.42
0.16
0.51
4.22
0` 25
nif. delay dl
62.4
33.2
60.1
29.3
54.8
48.7
lay factor k
011
0.17
0.31
0.32
011
012
' ncrem. delay d2
0.4
0.5
10.5
2.1
1.3
1.1
F fa _or
1.004
1.000
1.000
1.000
1.400
1.000
ontrol delay
62.8
33.7
70.8
31.4
51.9
49.9
ane group LOS
E
C
E
C
D
D
pprch. delay
34.5
36-7
now
50.7
pproach LOS
C
D
D
ntersec. delay
37.9
IntersecWn LDS
WS2VOTM
copyright 2OW
Univw*y of Florida, All Riffs Rmrved
ffie:llC:\f)ncuments°/o2Oand%2OSettings\DOBIE\Local°/v2OSettigs\Temp\s2k 15.tmp
SB
28 50
191 460
0.15 0.11
❑.22 0.25
47.0 43.7
0.11 0.11
0.4 0.1
1.00❑ 1.0w
47.4 43.8
D D
45.1
D
D
Vion 4.
X 9113/200
Volume and Timing input
um. of Lanes
ane group
plume (vph)
o/o Heavy veh
HF
ctuated PIA
tartup lost time
7d. eft`. green
rrival type
nit Extension
ed/Bike/RTOR Volume
ane Width
Parking/G rad e1Pa rki ng
TH
RT
00�
1
0
SHORT REPORT
TR
General Information
195
lte information
27
Analyst
P. DOBIE
tersection
LOCUST GROVE I
'agency or Co.
DBI
9, DOM
CHINDEN
Date Perrorrrsed
9/112007
ea Type
All other areas
Time Period
Ptd
urisdiction
ITD /ACHD
L h
3
0.09
alysis Year
2015 BASELINE"
Volume and Timing input
um. of Lanes
ane group
plume (vph)
o/o Heavy veh
HF
ctuated PIA
tartup lost time
7d. eft`. green
rrival type
nit Extension
ed/Bike/RTOR Volume
ane Width
Parking/G rad e1Pa rki ng
LT
TH
RT
00�
1
0
vv�
TR
Ohasin Excl. LefttGG
195
12#5
27
a
3
0
vvo
Y= 4-
0.90
9, DOM
A
A
vvo
2.0
093
2.0
2.0
0.84
3
3
0.09
vv�
3.0
0.61
10
10
15
12.0
112.0
60.1
N
I0
N
aso
4.11
F
0.45
LT
TH
RT
1
1
0
L
TR
Ohasin Excl. LefttGG
195
12#5
27
a
3
0
4.900.90
Y= 4-
0.90
A
A
A
2.0
2.0
093
2.0
2.0
0.84
3
3
0.09
3.
3.0
0.61
10
10
15
12.0
112.0
60.1
N
I0
N
SB
0 0
00�
nit Extension
3.0 3.0 _
00�
3.0
Ohasin Excl. LefttGG
dvo
Perm
Excl. Lett9Y.
Tbru & RT
IG = 14.0
iming
= 77.0 G= 10.0
ly=
OEM
=G= 100 5.0
vvo
Y= 4-
4
Y= 4
171
234
voo
0.13
093
0.75
1.24
0.84
1.00
v�
0.09
vv�
0.16
0.61
0.13
8.15
Unif. delay dl
Room=
34.0
60.1
00m
63.0
63.5
aso
4.11
F
0.45
SB
�r ti i l sis h rs = 0.25
bane Group Ca aci Control Delay,and LOS Determination
�tcle Length C_=, 1W.0_
0 0
00�
nit Extension
3.0 3.0 _
3.0 _3.0 __ �3. 3.0
3.0
Ohasin Excl. LefttGG
dvo
Perm
Excl. Lett9Y.
Tbru & RT
IG = 14.0
iming
= 77.0 G= 10.0
ly=
OEM
=G= 100 5.0
G- 180
iy=7'
Y= 4-
4
Y= 4
171
234
Ic ratio
0.13
093
0.75
1.24
0.84
1.00
v�
0.09
0.51
0.16
0.61
0.13
8.15
Unif. delay dl
Room=
34.0
60.1
00m
63.0
63.5
�r ti i l sis h rs = 0.25
bane Group Ca aci Control Delay,and LOS Determination
�tcle Length C_=, 1W.0_
0 0
0
nit Extension
3.0 3.0 _
3.0 _3.0 __ �3. 3.0
3.0
Ohasin Excl. LefttGG
hru & RT Only__0!mw�:::IY=
Perm
Excl. Lett9Y.
Tbru & RT
IG = 14.0
iming
= 77.0 G= 10.0
ly=
OEM
=G= 100 5.0
G- 180
iy=7'
Y= 4-
4
Y= 4
171
�r ti i l sis h rs = 0.25
bane Group Ca aci Control Delay,and LOS Determination
�tcle Length C_=, 1W.0_
R.
file :1/C:\Documents/a20and°/o2OSettings\DOBIE\Local%2OSettings\Temp\s2k13 .ttnp
T�
0
:73:.0
88
Y=
SB
28 61
177 275
0.16 0.22
0.13 0.15
58.2 55.7
0.77 0.91
0.5 0.4
1.000 9.00b
58.6 56g�4
E E
56.9
r
F
Verb* 4.
9/11/200
EB
VkAB
NB
d. flow rate
22
872
217
1389
144
234
ane group cap.
168
936
289
1118
171
234
Ic ratio
0.13
093
0.75
1.24
0.84
1.00
reen ratio
0.09
0.51
0.16
0.61
0.13
8.15
Unif. delay dl
62.4
34.0
60.1
29.5
63.0
63.5
elay factor k
4.11
F
0.45
0.31
0.50
0.38
0.50
ncrem. delay d2
0.4
15.5
10.5
116.8
29.8
;8'.8
F factor
1.000
1.000
1.040
1.000
1.000
1.000
ontrol delay
62.8
49.6
70.6
146.3
92.8
122.3
arse group LOS
B
D
E
F
F
F
perch. delay
49.9
136.1
111.1
pproach LOS
D
F
F
ntersec. delay
104.6
Intersection LOS
ICS200dm
CopyriWASD 2*
Univenity of Florida, All Ri* Reserved
R.
file :1/C:\Documents/a20and°/o2OSettings\DOBIE\Local%2OSettings\Temp\s2k13 .ttnp
T�
0
:73:.0
88
Y=
SB
28 61
177 275
0.16 0.22
0.13 0.15
58.2 55.7
0.77 0.91
0.5 0.4
1.000 9.00b
58.6 56g�4
E E
56.9
r
F
Verb* 4.
9/11/200
APPENDIX C
3eneral Information
Analyst
P. DOBIE
kgency or Co.
DEI
Date Performed
9/11007 r
time Period
PU
Volume and Timing Input
SHORT REPORT
Information
ntersection
rea Type
urisdiction
na lysis Year
LOCUST GROVE I
CHINDEN
All other areas
I TD / ACHD
2915 BASE +SITE
'arkinglhr
Sus stops/hr 0 0 0 0
)nit Extension 3.0 3.0 3. a 3.0
�hasin Excl. Left PG:
u & RT Only 04 - c . e
O= 14.0 53.0 O= 10.0 O- G= 100
iming Y= 4 4 Y= Y-
Y- 4
uration of Anal sisMsi= 0.25
-P"MROW -..
ane Group ca act control Delay,, and LOS Determination
0 0
0
EB
3. d 3.0
3.0
W13
rserm
Th ru & RT
NB
O= 19.4
G= 180
iY=
SB
Fy-
4
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
um. of Lanes
1
2
0
1
2
0
1
1
4
1
1 1
0.37
ane group
L
TR
ncrem. delay d2
L
TR
17.7
L
TR
27
L
TR
1.6w
Olume_(vphl
20
734
145
215
1245
20
155
35
240
25
ONE 55
25
/o Heayyveh
0
3
0
0
3
4
0
2
0
0
2
H F
-
0.90
0.90
9.99
0.99
0.90
090
0.99
0.90
9.90
9.90
0 90
woft0 ON
9.90
ctuated T UA
A
A
A
A
A
A
A
A
A
A
A
A
ta rtu lost time
2.0
2.0
2.4
2.0
2.0
2.0
2.0
2.0
pct. eff. ree n
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
arrival tyE
3
3
3
3
3
3
3
3
anit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
'ed/BikeIRTOR Volume
10
10
60
10
10
20
10
10
60
10
14
25
.an e VWlth
12.0
12.0
12.0
12. D
12.0
112.0
12.0
12.4
'arkinglradelParking
IV
0
1U
N
0
N
N
0
N `'
N1
0
N
'arkinglhr
Sus stops/hr 0 0 0 0
)nit Extension 3.0 3.0 3. a 3.0
�hasin Excl. Left PG:
u & RT Only 04 - c . e
O= 14.0 53.0 O= 10.0 O- G= 100
iming Y= 4 4 Y= Y-
Y- 4
uration of Anal sisMsi= 0.25
-P"MROW -..
ane Group ca act control Delay,, and LOS Determination
0 0
0
0
3. d 3.0
3.0
3.0
rserm
Th ru & RT
08
O= 19.4
G= 180
iY=
G=
Fy-
4
Y=
cle Len
th C = 150. _
0.83
w � i
d# . flow rate
22
881
239
1383
1172
239
■ ane group cap.
188
1461
289
1803
293
393
Ic ratio
4.13
0.59
0.83
0 77
0.59
0.61
ree n rano
0.09
0.42
4.15
0.51
0.22
0.25
n if. delay d1
82.4
33.5
81.0
29.3
52.5
501
elay factor k
411
0.18
0.37
0.32
018
4.19
ncrem. delay d2
0.4
0.6
17.7
2.1
3.1
27
F factor
1.000
1.6w
1.040
1.000
1.000
1.000
vntrol delay
82.8
34.2
78.7
31.4
155.6
52.8
ane group LOS
E
C
E
D
E
D
ppreh. delay
34.9
38.3
54.0
pproach LOS
C
D
D
ntersec. delay
39.7
Intersection LOS
ICS2MOTM
Ccffright O 2000
University of F#■rida, All Rights Reid
file:IIC:\Documents%2Oand°lo2OSettings\DOBIE\Local0lo2OSettings\Templs2k9.tmp
SB
28 81
171 460
0~ 16 0.13
0.22 0.25
47.4 44.4
0.11 0.11
4.5 10.1
1.004 1.000
47.8 44.7
D D
45.3
D
D
Version 4.
9/13/200
s�
file:IIC:\I)oc ments%2OandOlo2OSettilgs\DOBIE\Local%2OSettulgs\Templs2kB.tmp 9113/200
i
BACK-OF-QUEUE WORKSHEET
eneral Information
Iroject Description THREE CORNERS SUBDIVISION
OWN
1 -- - -
-
EB
IVB
NB
LT TH RT
LT
TH
RT LT
TH
RT LT
TH _
Lane group
L TR
L
TR
L
TR
L
TR
nit. queueAane
0.0 0.0
0.0
0.0
0.0
0.0
0.0
0.0
low rate/lane
22 861
239
1383
172
239-
28
--
61
atflow per lane
1805 1827
1605
1844
1332
1594
777
1863
w apacityllane
168 1461
289
1803
293
393
171
480
low ratio
0.01 0.25
0.13
0.39
0.1.3
0.15
0.04
'
0.03
Ic ratio
0.13 0.59
0.83
0.77
0.59
0.61
016
0.13
# factor
1
1.000 1.000
1.000
1.000
1.000
1.000
1.000
1.000
rriva l type
3 3
3
3
3
3
3
3 -�
Platoon ratio
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00 -
PF factor
1.00 1.00
1.00
1.00
1.00
1.00
1.00
1.00
f
0.8 14.5
9.6
24.3
5.8
8.8
0.9
2.0
1. 0.3 0.8
0.4
0.9
0.4
0.5
0.3
0.6
0.0 1.1
1.7
2.7
0.6
0.8
0.1
0.1
avg.
0.9 15.6
11.3
27.0
6.4
9.6
1.0
2.1
centile Ba kof
ue:(95th percentile)
r _
2.1 1.8
1.8
1.6
1.9
1.9
117.8
21
2.0BOQ_
_ Q%
1.8 27.4
20.8
44.1
12.3
Z 0
- V
14.2
eWs _ Stara
_
1 spacing
25.0 25.0
25.0
25.0
25.0
25.0
25.0
25.0
storage
0 0
0
0
0
0
0
0
vg. Q
50 RQ%
JVC.,3 MOTM
Tt
Copyright 0 2040 University of Floris, F11 Ridp Reamed
�
Version 4.
s�
file:IIC:\I)oc ments%2OandOlo2OSettilgs\DOBIE\Local%2OSettulgs\Templs2kB.tmp 9113/200
TWO-WAY STOP CONTROL SU 1�i�ARY
. eneral. Information
nt . matron
lyst
VencylCo.
_
DE1
��'�
_ w. -
n ersect�On
LOCUST G -
risdttion
A CHD
e Performed
911412007
lysis Year
2015 BASELINE + SITE
a is Time PedelfW,
EastWest Street: SCHOOL
ACCESSU41Q-
i
- -
ntersection Orientation: North-South
- -
w
--- _
s'tMents
_
a or Street
Northbound
oun
ovement
1
2
3 4
--
L
T
R L
i
T ---
dlurne
D
405
l5 15
370
Peak -Hour Factor, PHF
0.95
0i 95
0.95 0.95
y
0.95
Hou rl Flow Rate, H FR
0
425
15 15
4
389
11 ercent Heavy Vehicles
2
2
a Median Type
- -
- -1J//+ --
-- - _
RT Channelized
p
fi
- -
D
1
figuration
TR L T
-
U stream Signal
p
1
inor Street
Westbound
--1 -
-
ovement
7
g
g D
1 _ � - �•
1RG
ti
L
T
R L
- _ Y•
T R
olurne
15
0
15 0
0 -
ea - our Factor
0.95
0.95
0.95 a95
_
0.95
_ e, H
15
0
15 D
,
p -
ercent Heavy Vehicles
2
2
2 2
2 y
ercent Grade
❑
0-3 - - --
Flared Approach
N
-
- N - - —
torage
❑
0
RT Channelized
❑
0
Lanes
0
p
0 0
0
onfiguration
LR
-_
ueue �and1e'vil'ofudivice-
-
pproach
NB
SB
Westbound
_
- Eastbound - r
Movement
1
4
7 8 9
Flo 11 12
ane Configuration
LT
LR
(vph)
15
30
(m) (Vph)
1100
412
_
Vc
0.01
0.07
. 5% queue length
0.04
0.23
-
ontrol Delay
8.3
14.4
LDS
A
B
_
- -
pproach Delay
--
14.4
pproach LOS
--
$
- r
- v A
Zights Reserved
- - -
HCS208OTM
CoWriSk 0 2003 Univaro ty
of Fid,Ada, All Rigs Remved
VwWrn 4.
VeRMnn 4. 1 d
file:/1C:\Documents%2Oand°/o2OSettin s\DOBIE\L �
� oea� ��2DSettlngslTemp\u2k
.
l f ,imp
9/13/200
k
L' 7r
TWO-WAY STOP CONTROL SURY
kna
nerar�formaton
its Information
lyst P. DOBIE ntersection LOCUST GROVE/SCH050
agency/Co. DE1 urisdiction ACRD
ate Performed 8/14/2007 nal sis Year 2015 $
y BASELINE + SITE
nal sis Time Period A '�.
ro-ect Descri tion THREE CORNERS/FOUNDATIONS ACADEMY
LR
astMest Street: MC�HOOL ACCESS
lSouth Street.
LOCUST GROVE
tersection Orientation: ftrth-South
Westbound
BtuPeriod hrs :
0.25
7 y 8 9 10
ehMs Volumes and Adjustments
LT
LR
(Vph)
68
a or Street
Northbound
1156
437
Southbound
ovement "i
2
3
4
7.31
L
T
R
L
T
olume 0
300
65
65
300
eak-Hour Factor, PH F 0- 95
0.9455
0.95
0.95
0.95
ourly Flow Rate, HFR 0
31 5
fib
3? 5
ercent Heavy Vehicles 2
--
--
2
than TZpe
Undivided
T Channelized
❑
ones 0
1
0
0
1
onf uration
TR
LT
��} str am
0
7
Inor street
Westbound
Eastbound
vement 7
8
9
10
11
L
T
R
L
T
olume 55
0
55
0
0
eak Hour Factor, PHF 0.95
0.95
0.95 0.95
4.95
Hourl Flow Rate, HFR 58
0
68
0
0
ercent Heavy Vehicles 2
2
2
2
2
ercent Grade (%)
p
0
fared Approach
N
N
torage
0
❑
T Channelized
❑
ones 0
0
0
0
❑
on uration
LR
elay, Queue Length, and Level of Service
-J
pproxh NB
SB
Westbound
vement 1
4
7 y 8 9 10
ane Configuration
LT
LR
(Vph)
68
736
(m) (vph)
1156
437
/c
0.06
0.31
queue length
0.79
7.31
ontrol Delay
8.3
76.9
OS
A
C
RproqpkDelay
pproach LOS
Rights Reserved
HCS20MTM" Copyrj&j) 2063i
3 Univem of Floridm� All Rights Red
Vd�i�lh V d
fele://C:\Documents%2Oand�/o2OSettins\DOB\Local°/v2OSettin s\Tem \u2kl C.t n
8
R
0
0.95
0
0
0
12
R
0
0.95
0
2
Eastbound
11
12
Ry
V*sion 4.
9/13/200
-
-r
"
TWOMAY STOP CONTROL SUMMARY
enerai Information
---_
. --
- -
Malyst
P. DDBIE
S C
_
,
Ngency/Co.
DEI
risdiction
A CHID
e Perfomued
3114/2007
i
lys s Year
ja
2015 BASELINE + SITE
a is Time Period
L - 0
asVWest Street: SITE ACCESS
Jetrsection
out
_
r
orientation:
North-South
Y ry
-
Ma or street
Northbound
ovement
2
3
4
= -
L
T
R
L
T
plume
0
385
35
35
340
_ -
eak-Hour Factor, PHF
0.95
0.95
0.95
0.95
J
0.95
-
Hourly Flow Rate, HFR
0
405
36
36
357
.0
_
Percent Heavy Vehicles
2
--
--
2
Median Types
.re' Y ti
.
n ' a
RT Channelized
0
Lanes
0
1
0
0
onfiguration
TR
LT
-7-
-7stream
stream-Signal
0
Mor Street
Westbound
-.M�s=� -: -
as aun- -
ovement
7
8
9
10
_
L
T
R
L
T
_ -
pmom
lume
45
0
45
0
0
-...-
•
-O-
a h= our a or
0.95
4.95
0.95
0.95
0.95 -
_
1=347
0
47
0
0
Percent Heavy Vehicles
2
2
2
2
2
- -
ercent Grade t°/off
0
Flared Approach
N
N
-
torage
0
0
-
RT Channelized
0
- -
Lanes
4
0
4
0
0
- --
onfi uration
i
LR
-
-
- - t
IN
i► o • enr1ce-
-- -
-
Pproach
NB
SB
Westhound
9- astboun
_
-
ovement
4
7 8
9
10 1 1
.-
ane Configuration
LT
LR
-
(vph)
38
94
-
(m) (vph)
1100
409
-
lc
0.03
0.23
5% queue length
0-10
0.88
-
ontrol Delay
8.4
16.4
t -
. LOS
A
C
proach Delay
--
--
16.4
-
pp roach LOS
--
-
C
-
lights Reserved-
HCS208
Corfr*�& 2003 Univm ty
of F1wi(* All Rights Remved
i*rf.on 4.
Ve*.dh 4-1d
R`
file 0-1//Co-\I)ocuments%20and%2OSettis\DO$IE\LotalO/o2OSetfings\Temp%2kI f .tmp
9/13/200
- + APPENDIX D
rti
li.
)9