Loading...
Iceberg CZC 07-205 ACHD CommentsN ~~~ ~~~ C i i ~ Carol A. McKee, President 1st Vice President f1, ~ ~ e nd Vice President ~io~wnrv~'eal~o ~~..~;~ ~ .. John nden, Commissioner FEB 2 1RZ~1~~ w. Arnold, Commissioner February 13, 2008 To: CSHQA ~~ QF MERIDIAfv 25o s. 5'h st. Cll'Y CLERK OFFfCE Boise, ID 83702 Owner: Rimrock Development 11635 S. 700 E. #200 Draper, UT 84020 Subject: MCZC-07-205MOD Increasing square footage 3450 N. Eagle Rd. In response to your request for comment, the Ada County Highway District (ACRD) Planning Review staff has reviewed the submitted application and site plan for the item referenced above. It has been determined that there are no site specific requirements for you at this time due to the fact that all street improvements exist. This file was previously acted on under the original MCZC-07-205 and impact fees were assessed and paid. However due to the increase in building size the applicant will be required to re-submit plans to ACHD Development Review Department for impact fee assessment. This must be completed and impact fees must be paid in order to issue a building permit from the city. Prior to final approval you will need to submit construction plans to the ACRD Development Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. Contact ACHD Planning 8 Development Services at 387-6170 for information regarding impact fees. Prior to the construction or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc), a permit or license agreement must be obtained from ACRD. If you have any questions, please feel free to contact me at (208) 387-6177 Sincerely, C ~~~'G Q~ y~~~c'~~` Chelsee Kucera Right-of-Way and Development Services CC: Project file, City of Meridian Ada County Highway District • 3775 Adams Street • Garden Ci ID • 83714 • tY, PH 208-387-6100 • FX 345-7650 • wawv.achd.ada.id.us Development Process Checklist Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ®Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of- way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DlD YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approaches) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. Working in the ACRD Right-of-Way Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment 8~ Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre- Con. Ada County Highway District • 3775 Adams Street • Garden. City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us