Loading...
Hightower Bldg No. 3 CZC ACHD Comments~~~~~ C H D Carol A. McKee, President Sherry R. Huber, 1st Vice President Dave Bivens, 2nd Vice President ~ioaw,wv'~`ecl~o Sr2v~oc~ John S. Franden, Commissioner Rebecca W. Arnold, Commissioner February 8, 2008 F~~ ~ ~ Z~O~ City of Meridian TO: R.S. Hosac Inc. City Clerk Office 10221 W. Emerald, Ste. 100 Boise, ID 83704 REP: Tomlinson Designs -Jason Tomlinson 335 W. State St, Ste. C Eagle, ID 83616 SUBJECT: MCZC-07-148 Hightower Bldg. #3 1050 E. Everest St. On March 30, 2006, the Ada County Highway District Commissioners acted on MPP-06-003 for Hightower Subdivision. The conditions and requirements also apply to MCZC-07-148. • Prior to final approval you will need to submit construction plans to the ACRD Development Review Department to insure compliance with the conditions identified above or for traffic impact fee assessment. This is a separate review process that requires direct plans submittal to the Development Review staff at the Highway District. A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACRD Planning & Development Services at 387-6170 for information regarding impact.fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, ~~G~~l,~'~'' Chelsee Kucera Right-of-Way and Development Services CC Project File City of Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101..6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACRD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed,. as such action is adequately supported by the law and evidence presented at the hearing. Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review The Planning Review Division will do one of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ^Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit a set of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACRD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACRD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction -Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. Tech Review Date / February 17, 2006 Staff Level Approval / March 7, 2006 Revised / March 30, 2006 %~ ~~~~ CHD ~ Right-of-Way & Deve/opmenf Services Planning Review Division 26 ca~~xo :~ File Reference Numbers: Hightower Preliminary Plat AZ-06-003, PP-06-003, CUP-06-004, VAR-06-004 Site address: SW corner of State Highway 20/26 and Jericho Road. Applicant: Hightower, LLC. 8312 North Northview. Suite 120 Boise, ID 83704 Owner: Louise E. White 6201 North Jericho Road Meridian, ID 83642 Representative: The Land Group, Inc. 462 East Shore Drive Eagle, ID 83616 ACRD Staff Contact: Ryan McDaniel (208)387-6174 rmcdanielCa~achd.ada.id.us Project Abstract: The applicant proposes to develop the 22.95-acre subdivision. Annexation and Zoning of 12.31 acres RUT to R-8, 6.95-acres RUT to R-15 and 3.68-acres RUT to C-C: 106 Residential lots, 4 Commercial lots. ~ Hightower Subdivision Revisions: The District received revised plans on March 10, 2006. The index of changes include the elimination of a northern stub street, elimination of two internal streets, alignment of a commercial service drive and the adjustment of private street location. The revisions to the staff report are approved at the staff level and are noted in blue type. The changes were made on March 30, 2006. A. Development Impact and Findings-of-Fact 1. Site Information: - The site is located at the southwest corner of State Highway 20/26 and Jericho Road. Site: Acreage: Current Zoning: Proposed Zoning: Current Lots: Total Lot Commercial Lot Residential lot Common Lots: 22.95 RUT R-8, R-15, and C-C 1 110 4 106 0 2. Description of Adjacent Land Uses: a. North: Castlebury #1, zoned R-1. b. South: Saguaro Canyon #3, zoned R-4. c. East: Blythe Estates, zoned RUT. d. West: West Borough, zoned RUT. 3. Site History: - This site has not previously been reviewed for development. 4. Roadway Improvements Adjacent To and Near the Site: - State Highway 20/26 is under the jurisdiction of Idaho Transportation Department and has three lanes, 56-feet of pavement with no curb, gutter or sidewalk. - Jericho Road is an improved 33-foot wide 2 lane paved local roadway that is improved with vertical curb, gutter a.nd sidewalk on the opposite side from the site and abuts the site. 5. Existing Right-of-Way: - State Highway 20/26 has approximately 81 feet of right-of-way (40 feet from centerline). - Jericho Road has approximately 50 feet of right-of-way (25 feet from centerline). 6. Traffic Impact Study: - A traffic impact study was not required with this application.. The applicant did complete a traffic impact study; its results were taken under advisement, but did not affect the original findings. 2 Hightower Subdivision 7. Impacted Roadways: Roadway Frontage Functional Traffic Count Level of Speed (Approx.) Class Service Limit State Highway 760' Principal 23,967 on 6/8/05 LOS ~F' 55 MPH 20/26 Arterial Jericho Road 600' Local 1,136 on 12/2/03 * 25 MPH Residential *Acceptable planning thresholds for existing local resioentiai rvaaways are u~ w 2000 ADT. *Acceptable Levels of Service for Principal Arterials with three lanes and no parking is LOS D at 17,000 ADT. 8. Existing Access to the Site: - One unimproved access from Jericho Road provides access to the site. 9. Trip Generation: / 600s.f. Coffee shop: 496 per 1000s.f. generates 298 / 5,9OOs.f. Drive-thru: 496 per 1000s.f. generates 2927 / 7,800s.f. Shopping Center: 42 per 1000s.f. generates 335 / 5,000s.f. Medical Office: 36 per 1,000s.f. generates 181 / 106 single family dwellings: 10 per one-each generates _1060 The revised site plan showed the elimination of one commercial buildings: / 5,000 s.f. Drive-thru: 496 per 1,000 s.f. generates 2480 / 5,000 s.f. Medica Office: 36 per 1,000 s.f. generates .181 / 3,750 s.f. Shopping center: 42 per 1,000 s.f. generates .158 / 106 single family dwellings: 10 per one-each generates lObO - This development is estimated to generate 4801 additional vehicle trips per day (0 existing) based on the Institute of Transportation Engineers Trip Generation at the land use designations listed above. The revised site plan is estimated to generate 3879 additional vehicle trips per day (0 existing) based on the Institute of Transportation Engineers Trip Generation at the land use designations Listed above. 10. Lmpact Fees: - There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time.. il. Capital Improvements Plan/Five Year Work Program: - No roadways abutting the property are currently in the Capital Improvements Plan or within the Five Year Work Program at the present time.. 3 Hightower Subdivision B. Findings for Consideration 1. West. Hi4htower Drive District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from another local roadway (measured centerline to centerline). District policy 7202.8 and 72-F1A, requires roadways abutting commercial developments to be constructed as a 40-foot street section with curb, gutter and 5- foot concrete sidewalk within 54-feet of right-of-way. Offsets: - West Hightower Drive aligns with Newberry Street, serving the properties abutting the eastern side of Jericho. Location: - West Hightower .Drive is located approximately 280-feet north of the southeast property Line (back of curb to property line) and proceeds west where it intersects North Saguaro Hills and stubs on the west property line approximately 110-feet north of the southwest property line (property line to back of curb). Commercial driveway accessing West Hightower Drive: - The applicant is proposing northern access from West Hightower Drive to the commercial development approximately 230-feet east of North Saguaro Hills Way (centerline to back of curb). - This location meets district policy and is approved as proposed. - The revised site plan shows that commercial drive aligns with North Menara Avenue. North Menara Avenue has moved ten feet east to facilitate the alignment. Street Section: - The applicant has proposed this roadway to be constructed as a Local residential street section. The roadway abuts a commercial development and staff will require that West Hightower Drive be constructed as a 40-foot street section within 54-feet of right-of-way; complete with vertical curb, gutter and sidewalk. - The revised site plan shows West Hightower Drive as a 37-foot street section within 54-feet of right-of-way. The applicant is required to construct West Hightower Drive as a 40-foot street section within 54-feet of right-of-way. 2. North Saguaro Hills Wav District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from another local roadway (measured centerline to centerline). District policy 72D2.8 and 72-F1A, requires roadways abutting commercial developments to be constructed as a 40-foot street section with curb, gutter and 5- foot concrete sidewalk within 54-feet of right-of-way. District policy 72-F1A, 7202.3.2 and 7202.3.5, requires that residential collectors be constructed as 36-foot street sections with curb, gutter and 5-foot wide concrete sidewalks with no front-on housing. The access restrictions for these street 4 Hightower Subdivision segments should be stated on the final plat. Unless otherwise noted, parking should be prohibited on these street segments. Coordinate the signage Program with District staff. Offsets: - North Saguaro Hills Way intersects State Highway 20/26 and aligns with Castlebury Avenue which serves the properties abutting the northern side of State Highway 20/26. Location: - North Saguaro Hills Way is located approximately 80-feet east of the northeast corner of the property fine (property line to back of curb) and proceeds south where it intersects West Hightower Drive, West Macau Street and West Tallinn where it terminates 111-feet west of the southeast property .line (property line to back of curb). All of these offsets meet district policy and should be approved as proposed. - The revised site plan shows that North Saguaro Hills Way is Located approximately 77-feet east of the northeast corner of the property line (property Line to back of curb) and proceeds south where it intersects West Hightower Drive, West Macau Street and West Tali-inn where it terminates 111-feet west of the southeast property line (property Fine to back of curb). Staff requires that North Saguaro Hills Way align with Castlebury Avenue to the north of State Highway 20/26. Commercial driveway Location. on North Saguaro Hills Way: - The applicant is proposing western access from North Saguaro Hills Way to the commercial development approximately 170-feet south of State Highway 20/26. This location meets district policy and is approved as proposed. North Saguaro Hills Way as a 40-foot Street Section.: - The applicant has proposed this roadway to be constructed as a 33-foot Local residential street section from State Highway 20/26, approximately 310-feet south of the north property line, to West Hightower Drive. Staff will. require that North Saguaro Hills Way, from West Hightower Drive north approximately 310-feet to the north property line, be constructed as a 40-foot street section within 54-feet of right-of-way; complete with vertical curb, gutter, 5-attached or 7-foot detached sidewalk. - The revised site plan shows North Saguaro Hills Way as a 33-foot street section within 54-feet of right-of-way. The applicant is required to construct North Saguaro Hills Way as a 40-foot street section within 54-feet of right-of-way. North Saguaro Hills Constructed as a 36-foot Street Section.: - The applicant has proposed this roadway to be constructed as a 33-foot Local residential street section. The roadway abuts a residential development and staff anticipates that traffic volumes will exceed 1000 ADT; therefore, staff requires that North Saguaro Hills Way be constructed as a 36-foot street section from its intersection with West Hightower Drive south, approximately 310-feet south of the north property line to stub at the south property line located approximately 115- 5 Hightower Subdivision feet west of the southeastern property line. A 36-foot street section is constructed within 50-feet of right-of-way; complete with curb, gutter and sidewalk. 3. 7ericho Road as ~/z of a 40-foot Street Section District Policy 72-F1A, 7202.8 states that, "The applicant shall construct 1/2 of a 40-foot street section with vertical curb, gutter and 5-foot wide concrete sidewalk within 54-feet of right-of-way (27-feet from centerline)." Street Section - The applicant should construct Jericho Road as one half of a 40-foot street section with vertical curb, gutter and 5-foot concrete sidewalk. Right-of-Way abutting the site along 7ericho Road: - Jericho Road has 50-feet of right-of-way. The applicant will be required to dedicate a total of 27-feet of right-of-way from centerline, an additional 2-feet, in order to construct the roadway. Access to Jericho Road - The applicant is proposing to construct a 30-foot wide curb return type access that intersects Jericho Road approximately 285-feet south of the north property fine, This driveway width and location meets District policy and should be approved with this application. 4. Roadway offsets District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from another local roadway (measured centerline to centerline). Local Streets -Internal Roadways 1. West Hightower Drive 2. North Menara Avenue 3. West Macau Street 4, North Saguaro Hills Way 5. North Tashkent Avenue 6. Tallinn Street 7. North Torre Place 8. North Praha Way -Eliminated 9. West Rail to Street -Eliminated The applicant proposes 9 public internal. roadways. No proposed roadway location offsets closer than 125-feet from another roadway, unless it aligns with another roadway. The internal roadway offsets meet district policy and their locations are approved as proposed. Local Commercial - )ericho District policy 72D4.11.6, requires local roadways to align or offset a minimum of 150-feet from a residential collector roadway (measured centerline to centerline). 6 Hightower Subdivision - The applicant proposes to construct West Hightower Drive aligning with Newberry Street, there is no other roadway within 150-feet of West Hightower Drive, and as such, the location meets district policy and should be approved as proposed. 5. 29-foot Street Sections District policy 7240.4.3 allows a developer to construct a local urban residential street with a reduced width of 29-feet from back-of-curb to back-of-curb with curb, gutter and sidewalk. Policy restrictsparkina on reduced street sections. - The applicant is proposing three streets constructed as 29-foot street sections within 42-foot right-of-way. All the following meet district and ACRD approves of the locations, pending the receipt of written approval from the Fire Department. - The applicant is proposing to construct Praia Way, located 280-feet west of the east property Line, as a 29-foot street section - Eliminated - The applicant is proposing to construct Rail To Street, located 280-feet to 170- feet west of the east property line, as a 29-foot street section. - EI'iminated - The applicant is proposing to construct Torre Way, located 140-feet west of the east property Fine and running north, as a 29-foot street section terminating with a turnaround. Torre Way is now located 150-feet west of the east property line (measured centerline to property line). 6. Seven Stub Streets District pol-icy 7203..5.1 states that the street design in a proposed development shall cause no undue hardship to adjoining property. An adequate and convenient access to adjoining property for use in future development may be required. If a street ends at the development boundary, it shall meet the requirements of sub section 7205, "non-continuous streets." District policy 7205.5 states that stub streets will be required to provide intra- neighborhood circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A. A sign shal'I be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". B. A stub street shall be designed to slope towards the street intersection and drain surface water toward that intersection.. C. The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. 7 Hightower Preliminary Plat The location of West Hightower Drive The applicant is ,proposing to construct a stub street to the west property line located approximately 330-feet south of the north property line. This .stub street is anticipated to serve the 5-acre parcel located directly to the west. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant wi11 not be required to construct a temporary turnaround at the terminus of the roadway. The Location of North Menara Avenue The applicant is proposing to construct a stub street to the south property line located approximately 120-feet east of the west property line. The location has shifted east 10-feet. The new location is 130-feet east of the west property line (measured centerline to property line). This stub street is anticipated to serve the 5-acre parcel located directly to the south. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will,be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. The Location of West Macau Street The applicant is proposing to construct a stub street to the west property line located approximately 110-feet south of the north property line. The location has shifted south 10-feet. The new location is 120-feet east of the west property line (measured centerline to property line). This stub street is anticipated to serve the 9.5-acre parcel located directly to the west, Blythe Estates 1993. District staff is supportive of the applicant's proposal.. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. The location of North Saguaro Hiils Way The applicant is proposing to construct a stub street to the south property line located approximately 110-feet west of the east property line. This stub street is anticipated to serve the 55-acre parcel located directly to the south, Saguaro Canyon Subdivision #3 2005. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. 1. The location of North Tashkent Avenue -Eliminated The applicant is proposing to construct a stub street to the north property line located approximately 110-feet east of the west property line. This stub street is anticipated to serve the 5-acre parcel located directly to the north. District staff is supportive of the applicant's proposal. Due to the 8 Hightower Preliminary Plat fact that the proposed stub street will be Less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. The location of Tallinn Street The applicant is proposing to construct a stub street to the west property Fine located approximately 11.5-feet north of the southwest property line.. The location has shifted .north 10-feet. The new location is 125-feet east of the west property line (measured. centerline to property line). This stub street is anticipated to serve the parcel located directly to the west, Blythe Estates 1993. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. 7. Comply with ITD for State Highway 20/26 - The site has approximately 760-feet of frontage on State Highway 20/26 and the applicant will comply with the Idaho Transportation Department at this location. ACHD will requ-ire a letter from ITD outlining their requirements and ACRD will require the appiicant to satisfy those requirements. 8. Private Alleys There are two .private alleys that connect, at both ends, to public roadways. The first is 115-feet south of West Macau Street (now located 125-feet south of West Macau Street) and traverses east and west along block 11. The second is approximately 115-feet north of West Tallinn Street (now located 125-feet north of West Tallin Street) and also traverses east and west along block 11. - Both locations and offsets meet district policy and are approved 9. Turnarounds for North Torre Place District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius. of 45-feet. The applicant should also be required to provide a minimum of a 29-foot street section on either side of any proposed center islands within the turnarounds. The medians should be constructed a minimum of 4-feet wide to total a minimum of a 100-square foot area. - The applicant is proposing to construct (two) a cul-de-sac turnaround with island at the terminus of North Torre Place, approximately 115-feet north of West Hightower Drive and 90-feet south of West Hightower Drive (measured centerline to back of curb of the island). The minimum design standards require that 21-feet of pavement surround. the .island and the turnaround has a minimum 45-foot turn radius. Block 4, lot 1 is designated a common lot for the island and indicates that the lot is the property of the Homeowners Association. 10. Island at North. Saguaro Hills Wax 9 Hightower Preliminary Plat District policy 7202.7 and 7207.5 require islands to be constructed a minimum of 4- feet wide with a minimum area of 100-square feet and designed to safely channel traffic. The roadway on either side of the traffic island should maintain a minimum of a 21-foot street section. District policy also requires any proposed landscape islands/medians within the public right-of-way dedicated by this plat should be owned and maintained by a homeowners association. Notes of this should be required on the final plat. The design should be reviewed and approved by ACHD's Development staff. - Block 2, lot 1 is proposed as a common lot. The Highway District requests that the applicant dedicates Block 2, lot 1 to ACH'D to preserve the Right-of-Way instead of privatizing the island. This can be accomplished by entering into a License agreement with ACHD to provide access to the Homeowners association for landscaping in the public Right-of-Way. Also, the applicant will be required to shift the island to the east so as to align with Castlebury Avenue to the north of State Highway 20/26. 11. Driveways Graveled driveways abutting public streets create maintenance problems due to gravel being tracked. onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. District Policy 7207.9.3 restricts residential driveways to a maximum width of 20- feet. - Locai Residential driveways are to be constructed not more than 20 feet wide, paving them the entire width and no less than 30-feet into the site. - ACHD understands direct lot access for certain lots in block 5, 6, 7, and 8 may not be able to meet district offset policy anal are approved as proposed. C. Site Specific Conditions of Approval, 1. Construct West Hightower Drive in alignment with Newberry Street approximately 265-feet south of State Highway 20/2b (measured centerline to property line). 2. Locate West Hightower Drive approximately 265-feet north of the southeast property line (property line to centerline) to approximately 110-feet north of the southwest property Line (property tine to centerline) as it traverses the site east to west. 3. Construct West Hightower Drive as a 40-foot street section within 54-feet of right- of-way; complete with vertical curb, gutter, 5-foot attached or 7-foot detached sidewalk. Any additional direct lot access to West Hightower Drive other than 10 Hightower Preliminary Plat specific approvals in this application are prohibited and will be required to be noted on the final plat. 4. Locate. a northern access from West Hightower Drive to the commercial development approximately 230-feet east of North Saguaro Hills Way (centerline to back of curb). Locate the access to the commercial drive in alignment with North Menara Avenue. 5. Locate North Saguaro Hills Way in alignment with Castlebury Avenue, approximately 78 or 80-feet east of the northwest property Fine, the location must align with Castlebury Avenue, transitioning south, past the intersection with West Hightower Drive, to where it stubs 120-feet west of the southeast property Line (property Line to centerline). 6. Locate the western access from North Saguaro Hills Way to the commercial development on the east side of the road approximately 170-feet south of State Highway 20/26 (centerline to centerline). 7. Construct North Saguaro Hills Way, from the north property line south to West Hightower Drive, as a 40-foot street section within 54-feet of right-of-way; complete. with vertical curb, gutter and sidewalk. 8. Construct North Saguaro Hills Way, from approximately 310-feet south of the north property line, where it intersects West Hightower Drive., south to stub at the south property Line (located approximately 115-feet west of the southeastern property fine) as a 36-foot street section within 50-feet of right-of-way; complete with rolled curb, gutter and sidewalk. 9. Construct Jericho Road as one half of a 40-foot street section with vertical curb, gutter and 5-foot concrete sidewalk; additional direct .lot access in this area, other than the specific approvals in this application, are prohibited and will be required to be noted on the final plat. 10. Dedicate a total of 27-feet of Right-of-Way from the centerline of Jericho Road to the new property line. 11. Locate West Hightower Drive intersecting Jericho Road approximately 285-feet south of the north property Fine (property line to centerline) aligning with Newberry Street adjacent to the site. 12. Locate (one) three 29-foot street sections within 42-feet of Right-of-Way as proposed a. Praia Way, located 280-feet west of the east property line (property line to centerline), as a 29-foot street section within 42-feet of Right-of- Way. -Eliminated 11 Hightower Preliminary Plat b. Rail To Street, located 280-feet to 170-feet west of the east property line (property line to centerline), as a 29-foot street section within 42-feet of Right-of-Way. -Eliminated c. Torre Way, located 150-feet west of the east property line (property line to centerline) and running north and south across West Hightower Drive, as a 29-foot street section terminating with two island turnarounds 13, Locate the seven stub streets in alignment with other existing streets in the adjacent subdivisions are attached to this report. ACHD's approval is contingent on actual alignments. A stub street shall be designed to slope towards the street intersection and drain surface water toward that intersection and have a sign stating, "This street will be extended in the future." Locate the internal local roadways with stubs as proposed. The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. a. The location of West Hightower Drive The applicant is proposing to construct a stub street to the west property line located approximately 330-feet south of the north property line. This stub street is anticipated to serve the 5-acre parcel located directly to the west. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. b. The location of North Menara Avenue The applicant is proposing to construct a stub street to the south property line located approximately 1.20-feet east of the west property line. The location has shifted east 10-feet. The new location is 130-feet east~of the west property Line (measured centerline to property Line). This stub street is anticipated to serve the 5-acre parcel located directly to the south.. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. c. The Location of West Macau Street The applicant is proposing to construct a stub street to the west property Fine located approximately 110-feet south of the north property line. The location has shifted south 10-feet. The new location is 120-feet east of the west property line (measured centerline to property line). This stub street is anticipated to serve the 9.5-acre parcel located directly to the west, Blythe Estates 1993. District staff is supportive of the applicant's 12 Hightower Preliminary Plat proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. d. The location of North Saguaro Hills Way The applicant is proposing to construct a stub street to the south property Fine located approximately 110-feet west of the east property line. This stub street is anticipated to serve the 55-acre parcel located directly to the south, Saguaro Canyon Subdivision #3 2005. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. e. The Location of North Tashkent Avenue -Eliminated The applicant is proposing to construct a stub street to the north property Line located approximately 110-feet east of the west property line. This stub street is anticipated to serve the 5-acre parcel located directly to the north. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. f. The location of Tallinn Street The applicant is proposing to construct a stub street to the west property Line located approximately 115-feet north of the southwest property line. The Location has shifted north 10-feet. The new location is 125-feet east of the west property line (measured centerline to property fine). This stub street is anticipated to serve the parcel located directly to the west, Blythe Estates 1993. District staff is supportive of the applicant's proposal. Due to the fact that the proposed stub street will be less than 150-feet in depth, the applicant will not be required to construct a temporary turnaround at the terminus of the roadway. 7. Locate two private alleys 115-feet south of West Macau Street now 125-feet (centerline to property line) and 115-feet north of West Tallinn Street now 125-feet (centerline to property Fine). 8. Construct a cul-de-sac turnaround with island at the terminus of North Torre Place, approximately 115-feet north of West Hightower Drive and 90-feet south of west Hightower Drive (near edge to centerline) with a minimum 21-foot pavement surface surrounding the island and a minimum 45-foot turning radius around the island. 9. The location of the island. located at the intersection of Worth Saguaro Hills Way and State Highway 20/26, located in block 2 lot 1, is approved as proposed. 13 Hightower Preliminary Plat The highway district requests the dedication of Block 2, lot 1 to preserve the Right- of-Way for this particular island. 10. Construct Local all Residential driveways not more than 20 feet wide, paving them the entire width and no less than 30-feet into the site.. 11. Direct lot access for certain lots in block 5, 6, 7, and 8 may not be able to meet district offset policy and are approved as proposed. 12. Provide a letter from ITD outlining their requirements; ACRD will require the applicant to satisfy those requirements as well. 13. Comply with Section D, Standard Conditions of Approval. 14 Hightower Preliminary Plat D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. Private sewer or water systems are prohibited from being located within any ACRD roadway or right-of-way. 3. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. Comply with the District's Tree Planter Width Interim Policy. 6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 7. All design and construction shall be in accordance with the Ada County Highway District Policy .Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 9. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 10. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #200, also known as Ada County Highway District Impact Fee Ordinance. 11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACRD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACRD conduits (spare or filled) are compromised during any phase of construction. 12. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The. burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 13. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless awaiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 15 Hightower Preliminary Plat E. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. F. Attachments 1. 2. 3. 4. 5. 6. Vicinity Map Site Plan adjacent subs Development Process checklist .Process flowchart A~~eal Guidelines Q 3 W Y N ~ Q L F p 7 a ST m ST w ~ W g T VY 0 N SITE T w N N R ~ cno T w q 2 0 26 ~ m H P L_L _. LJ - LJ C N LV !: :::::::::: ..:::::::::::: T .... .... .... ... .................. ........ ................................. ................................. ............................. E yy eQ ~ N S g o C< { w ~ a ~ w ~P = Z w t a ~ a s y I yG o~o P~~ A THE BDR 0 N Z P~ T 16 Hightower Preliminary Plat ~a~~~i;~~~~;~~~gt~n p p 3 ~ f ~ 8 ~ ggg j 7 6 F 5~~ 6 F~ s F ~ ~ ~ S d ~ V ~ 'e 6 ~ ~ . a rr~ ~ ; 6 a F F o~~~ v F¢ t~ :C F F t y t n = 5 F ; ' ~ ~ ~ > x n a -,~,_ ~ _ ty i ~ ~ 6 y ~~8 ~cca r-~>> ~~ ~~s r~N ~~ O 0 z N a;r ~ I~ N ~~p~~~~ °PoF d £x }n 6~eQQ,~~ $~ s ~ ~ i~ eg o A FR ~ ~~~~ ~ ~ ~~-. ~A a~e~~~. 1$~~~ a N Q 'L 'c~r~ b g~~o E'n ~~E~ ~~~~s~ ~m$d -e y7a r o~oo y z m ~_ pi 17 s n 7 p ~~ ~ H~i 9~~ ~~ YY iIN qq~S ~qg( ~~ i y~9~99"a ~~1 ~l 1 q d~ b {~ s~ AY a III ap~~~~~~~~; .~.g.~{i A5 p III o ~5~~~ d" ~a$~ ~~ ~ xA-$~ll ~~ z~ ~ ,g ~~~~~~~1 ~ ~ 4 ~ fi ~~ o~ ~ ~ ~ aa;~ ~li~ R ~ ~ vg vA ~ ~ 9 a ' g ~ i$~y~ ~pj~g ~ L y ~A 9A ~a o ~ ~b~~~z~ ~ Y a~ a~ ~ ~ f ) .>I ~ d~ i efi aR ~ e I' j I-lq ` I {,t~t~ ° ~Pa'+16 HIGHTOWER SUBDIVISION rl{ °~ e ~ : , ~ ~~001 ~ jlj~ ~~~ 'M Preliminary Plat ~4 ~I~~ , ~ ~,• / I ~ 1 ~ ~ ~ Meridian, Idaho i ~ ~ c• Hightower Preliminary Plat ~, oyep~ ~uelP~aW 2 ~ N ~j~~ E leld tieuiwga~d ~~~ ((~j! I !°1~ ~ a ;; ej{ NOISIA1a8f1S213MOlHJIH f.55-~~~I f~•,•! I o~~~e~ ),,~' ~~' ~ ~ Ye Ye d e grr~~g~~E 6F b~ ~~so~e~° e e e c~ ~' h~ ~.....:.c,T D Y~ Y~ ~ j6 Y„~e ~e t~~~a o .`~ ~ H~ ~ S ~ e~ @~ ~ d~ q 2~ ~ ` m III ~ .. ~ ~ o n ~ ~ ~ ryes... RM~; ~v, ~a.~ ,,. ~ ~ ~~ ~ ~~ ~ ~ ~ ~ III " .! s. , 6 6 p ~c 'p2 ._~~ B r i ~+ ~ ~b ~~ ~~~ ~ sE IFfi, $aY~~+74~~ ~_. 7 _Q W OumO O a 5o~e .. F-.. ~ Agoa ~~~z~~ a ~ 3'z ~ ~~O ~a 0 z 0 E 8 Ya•~o d9=+ k ~~~~~~ o ya £ U e 8 A 55z a x 8'~E s a Y~ ~@~siA ~u pp ~3 o ;€k'o 6~a8~6 X `~ (p Q e o c d C t C C C 4 ~ q t a r~ 9 S Sal n p y ~ ~ ! ~ G o ° ~ 8 " ~ ~ ~ C?' Y g o 9 9 c J 9~ @@k 9 i ~ g tl $ r ~ o F ~ ~ ~ Q ~ ~ N o ~ c0 c a 6g y ~ ~ 9 ~ Y ~ ~ 9 ~ ~ Y L ~ y • Y 7 ~ ~~E Y ~ ~ ~ E r s i ~ $gg k § Q fl p ilil €~~~ 8~ e~ C~ 9 S 4~ 333 p J F 18 Hightower Preliminary Plat i ~ ~ ~ „fI 03llYtd VR ~ s~' O3L'V'Id Nrl u ~ ~ pSIS9~i ?E-'; Ca _ z~~ .LO'6Zfl M.SZ.Zi.~_ .,-- -.;.~^. __-' ,..'•?~ -?~c ---- A~: ~ ~_-i~ jf~Y'4 t~ _ __ ..+ '" a T.i' x.T' - ~. .:a I-q:oU ` T :+ft. ?~~ . mu: _ __.a __ _____.._ __ a ~_._..~ _ 3 _ _ ~____^_. ~- ~ -_ ` ' -- v~- '3 'nr- I __ _crr ___ vu- is ~ sy \~ 2"ym r 1 - c a e ~ £_ aY x~ aY -~ is ~~ a\ ~ ~_~ ~ .,~~~ - ~ \n tl- \p \~ ~^\~ \ r ~~ - I ~' ',n •a:w+~•.va. .n • ~nT .. ~:n ,., ;~ r. `:~:' ~ . xm 1N Silul OWgrs 'x moi v ` I is m>t ann7r, n ,_,_` ,,.;t., `-- I ~~. I..°\ AC 'r3 ~° a3^ 9'°Z~ 3 r 'i' ~ rI^ ( ~ ~\ \m k I tl °~0 ^\xr`nl ~ W _ ~ _ I 9Y3 \~- ~a- \L- \.- ~~3-_. e~ - y' Lr, ~• q - r .61LO, .. rm, x I z \ ~ ~ num • ~~ i.._.<. ,.err ...,. >, » ` ,a+. r x r Flk °.\ ~.. 8 ( a' °\ a'm`\nlE I ^a ~ ai .,~ ~~ R<,.~. V.uny9 }.. c~ A ~ se \.~. ~ \ z ~Iz + ,. nos. a I ~ : ,.. ~ s ~X5 c F99S 1 . c a 1 H ~! a ~'iz Ig I m'•~a JI~. .,.em 3^ •., ~•,r. »n e~ ,>:, • .NY~S9n~71di KQVrn_1 I~ iiu:x. ~ 1gaC a , m\pa + n >~ ~- (r. uw. :!W _w. `~• ~ .~.:: \ ~ mu :\ i @i I m~~ ~1 8 W i -1\ca \'¢ I :. a Y ~x I x\l Iry~ s '. ....~^ r,r.v,. 1 r\ 5. m e., m ~._ _ v ~_~-_ ! a rnsam. I ..',~ ,.r .n• g L - nG+, 'q ` ~^~- - ~f:~\' jv.a - ~w n. o _ +•y ~ ? 3, d ~~ \e.' p g • tf11\g .`Ix 4 ! i \ ` y •.xv+• . ~ .. vo .r«. i.nu -_IS ' c I a. eo. b! L; `~ ?'1 I i I Si ~ S., \ I~ L----l n. - ~ .»unor H .,rv i & ,y~ W ~ ' r ~~_ _ ~~' -LVOn- _ _-i1a, - I _;t I ~ _ " 3^ I, e q ^a 6 .~ ~~ / ~ ..~W _ 1 r ~ I n - 'r"• Y - ~39 son, hh 1~3 .I 1. 5 ~ ~a -=¢ ~ =s~:_~ a , ~ § ;~ m ~~ ' I ~ -- IE ~~ Q~ ~,t i. l - I a` i c ,s,u.. xrsislalaiar'~nT----I N = I I.. o' `~ j d .. i~\x .l "` - I n' u'\fiv w.\Se, n a3 « ~i s _ s E ,.r xis. ( ...rsocoo ,• vo, li ~.. p _ ~. n ~• ~ .. 7 Ir e j v e Q$~ P I r5-_3 1-_-..:5_ r-_~-`y_n , a~ ,. :, .-; .m~\^. ,. . me mw,\p .,- m$$ ~- ~- 3/Y 511N. Ylpgs .N„ ,~':4 -~"-_-'-_- a~.r^ ~.,°\_ - 8• - 40~b~ to s 1\.. \ \ \-. ``' \ \ u - a- ~'<7~'~'' I .. xl k..r m~ - s>'r"~`°, (!~ R~$ O $zr R 1 e - g ' ;{ 9'~gt B u" 7S o G as X 5' R fi ~. 8 I .. '~ ~ Ln m~ J ~ ~ NGB,. I ' if 7008` S" ~~ ^ [ - ~ '~ ~ ~~6 ap~>n a~~ I .,ra, ~n, r.r.x.,,. 1,_~,§ - A`° w., ^~ NI ,n~~ ~+~' .Ro .-~~3) ~S ~~ s a .p m :~z ^ ~g_ I:_ ~ i ~ 'G. _ " _ '.® _ = x - a_- ~:'aL:_ uo^,. ~I'' .cu.,. ', IG °~. a`v uI 9 a ~ -F+n'-+r,,,~vb_'1d SRH ULIM-N .i 'u.~r ~ e + B .. p •' v~ti- 1 ', ~SMI Oltl 'N n1tl I ..e m . u d o o W , n ~.. » ., ,.,. _,:~~4r. ~ Ye. ' s I - _:,\ _\* I ~ ..arm ~ ,r~~ .' a" N a I ~ - \°a '~ nY. ! F-'~~as 5c ,'• _ \ r 37\p .~- ~ ~ I . x . , . ny. ~ ' ' _ ._,r, n • a ,ror • , ~•=~:, R•, u„• ~ 3r S~ _ -~ .Kma r - n r ~ + 6 :m ° Qpl M 8 . ~ d - Jg I V1 \p I p - ~ sG~% e •a ~;- .,-. ~ ~' ~. tea. ~I .~~.,, I a\ea.._~-~~ ~~ I ~, -~~ ~. % 5 I I I% Y rs 1 p_ r r m r I .\ C '^ - a L g '~ [~?- a .sI `.. H$'I~I;N; N~ d p C- =- Y .r `"~ Z ~r a ao. '.wr. arr+~ aN ,,,r,. kl° ~ ~ ~ - .va r 9 mx ~•, Y.Y NQNYJ lL3NN 'N ' -!rw a)"..xm - ~~711Y NN.R17 /lDM17E N R~irn'~~~ ~ IR S r ~ mn ro, mn ,wn m b I * ~ ; ~ b.e ! I~ \, ' \ 1 . '-~ . ' ~ , ~. . S m E Bbl ~~'ao a `5p +_ s ~cn ag^ c°'+ u~- I'a~-o;Si~$~ R ..;I~ (/~ W I I .~ bt urns.. '~ ~ 9 .+.s c a ~ ~ d I `•' ° ~ + • 4 '~ ~ I •.K o r 1. $~ ~ 8 ° x »s: GI 4 g I• - ~~ a ~ »ns. , ~ _ '" ,°r ~'a $`C. cSB'ZBL 3.,ri I Nrl ~ r 091 i ! 5- WI _ \§'i' a'~ ,`moo `'3.1f;L0: IA = v,.\ ~ 0 . som \.p s 2 pS A i ? « n a ~~4 'p a ~I- i2. ;p$bo~,o W Ei 31Y aro l3NrD t+ ..rte. - i.------ - -- ~S° +x3` c= t= ny. +_ _ + ~~S aa4 i~ j R ~ IL$ ~+ mn ~ ~ xa _• mn ~ __C'L_ r .ro+- r-I nr. m_~ rn $ G -- ~~ 3` -`~- - - ,Lf'0683 ,ri,sz.oo'N f ~g ~ Is ~ if ~I _..$bS si ~~Q A "~ ~~ - - - _ - - - - - - - - ~tl07jI NVIORI3W 'N 'e!v@L ~ ° I n 2 19 Hightower Preliminary Plat C 2 9 S ~ I B63.O rL ~ ~ ,~ i, m.n 5? ~ g ~ c u i >° A R 20 O 0 m D A O 'N OOTN'02' E 88{.85' o ew.n• ~ / / / / /' / / e o /~~// o ` N / ~ µ // a~ ,/ ~ ~ / / ~/ // / / / _ _ _ _ / / / w avlt'/f' • JtTAB~ /~~• ~~ 5 00'0{'37• W 881.89' _1 I ~ m I, I ~ I~ I I i 14I I = ~ ~ ~ I h m l m ~ ' ~ I ~ I I ~I o s. IC i.I I~ I I I I I II c I i~ r'~~ I )I I td} J$ I I 5 Doo{'ze' w 92{.as' ~I ~ u o ~ i~ ~- N. BLYTHE SPIRIT LANE --------- ~ r7s.oo ~> ~~ ~ I >n ~ ~~ 1 0 I ~ 0 Z 0 'c' ~~ • s x= ~ J ~ Z ~ -~ 0 ~ y 4 I ~ ~ O ~~ m ~ I ~' 0 , ~ Z 1 ygF $ / Q A ~ J 621.89' 5 OOW'37' W BBI.BB' ^' ``yes 81A E > aiyn '1 ~~~ O Y Z >: ~ m m :~ c v i I~ ` N w' ~ 0 2 m 1~ + t~ ~ w m IZ F'~D ~2 o <m , m '~ OZ o~ (D m= °< ~~~i Zm° ~ o ~ I • a p a 0 ~~=ref ~ n ~'g:l~ o4 ~ U N V L ~ T T E D o ~~~ m ego s~~ a m ±~ m ~ c ,~ ~ L c 0 0 ~' . o N~~~ 10~c° wL~ ~~2 m $ $4Y '(I > m c~ 4 ~ Q' 3 0 ~ ~ ~a~ 0 ~ ~ ~ ~~~ 0 ' ~~~~< ~ W ~ ~ ~ ~y o ~g m p;A v ' ~ ~ > q ~ Z ~ ~ ~ r ~ '~ ~ x m ~g ~ ~ ~a ~s~ ~ ~ ~ e Aga I£ ~ ~~ "~ > g ~ V~~~ G aF ~ I : 4~C ~~ :~ ~~ ~R~¢~ ~~5~ a ~ ~ Z a I N • • o B r~ ~~ = ~ a~ ~a~g~ ~~ ~° ~ o ~ : 4 ~ ~ o e a~ ~ ~ ~ ~ ~ ~ ~~ ~ ~ ~¢ s a ,~ ~ ~ s ~ ~ • ~ g ~ e ~~ F ~' b ~ , 8 s 7' ~ P Hightower Preliminary Plat 'r i --- ..- • . .. ~....~..... .. r ~. 4 -. .__ ___. __ ____. I \ ~ a ~-~~~_-if-- r ~-~. +• o o f ~1 ~ j -.Q~T ,~ '; -- _ .,. /yen I ~ f~-- ' ~1 ~i aj ~o __. ~'~~~_ ,..ti I~ °~ !; ~ j I... ~ i ~` jI II }} a ~ ~ _, ~ 1 I _ - ii o ~ ~_'~" -- ~ ;~~ %i °~ d~[~ ~ ~ggf ~y!p a~B ~Y6dvE ~V ~S ~3kY ~4 ~ C~ Cp ~C; Y ~ ~ N ~ ~~~~ [F~e ~ ~E :~ ~~~ ~Z$ ~~ R ~~ ~ §a E~~~~ ~YI~ ~ ~ II ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ O e 4 / m . i i pz~~ '~ li 4 tEf;7 ~6 gad ~ g v~ a~ ~~ A ~~ ~R3Ej9R$~ E°tl [ywq ~ gq§ ~ ~ ~ ~ ' ~~l9 ~sa ~~~~~d!g ~~ d~!~aap~ 91B Rpx 9 E[&0 trl 7§ ~aa Fp ~~gg~¢~`~.On § # R~ Q8 ~Ra ~~Y :~ ~~ E~~ i~ ~g;~~a® e a ~ ~ ~ ~ ~r ~ - d6 p R ~yrQC~~~ f~~ ~ ~ ~_ ~yiGG+ ~y®~ E~E lR 7 ~"!6p° ~~ ~,~C, ~C~ ~ to ° S s 6 § § ~ R a~ ~ ~ ~ a ~ ~ ~ ~ ~ g~ 8s Aa ~ ~ ~ ~~ tl ~9A R~~ ~~ ~ ~~~ ~~ ~ ~a~~~ p ~ a ~ ~ ~ ~ e~ ~ ~ ~ ~ I ~ C ~~tt~~ ° ~ ~~ ~a ~~~ ~~a p~G R ~E~ ~~ ~~ ~~55~ ~E g ~ ~ ~ ~ ( b 8444 ~~ ~ ~ ~q~ ~~ ~~ ~ ~ ~cpgp~ b~ ~ ~~~~ II e ~ A , vR v B ~9 6R ~ ~ ~ ~ 3 i P a e ~ ~ : ~ y -~ „~ wan cuour nac ~ a jgj+ "-~ O Gd y ~~ b Nz0 [fe ~ fn ~•COa~x ~mo a y .Q o~~°z~ ~'~r~ ~o~ 0 w 0 " (q% %~ WESTBOROUGH r ~~~ ?_: ~ ~ ~ ~ ~ ~~~-- ~;~µ~,,, SUBDIVISION g~ l~~ is ~"~= ~' ~ Meridian, Idaho 0 ll:f i y -- t~' ' - - - -- - - - 21 Hightower Preliminary Plat 22 Hightower Preliminary Plat Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal.. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal., and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held. within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 23 Hightower Preliminary Plat Submit a development application to a City or to the County The City or the County will transmit the development application to ACRD The ACRD Planning Review Division. will receive the development application to review The Planning Review Division will do one of the following: ^Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ^Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ^Write a Commission Level report analyzing the impacts of the development on the transportation system and. evaluating the proposal for its conformance to District Policy. The Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ^For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. ^Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) ^ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ^ Working in the ACRD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction -Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ^ Sediment & Erosion Submittal • At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACRD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. ^ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ^ Final Approval from Development Services ACHD Construction -Subdivision must have received approval from Development Services prior to scheduling aPre-Con. 24 Hightower Preliminary Plat