Loading...
07-562 Public Works Rate Change CITY OF MERIDIAN RESOLUTION NO. tJ1-562- BY THE CITY COUNCIL: BIRD, BORTON, ROUNTREE, ZAREMBA A RESOLUTION RATIFYING THE CITY COUNCIL'S APPROVAL OF PUBLIC WORKS DEPARTMENT PROPOSED CHANGES TO WATER AND WASTEWATER ASSESSMENT FEES, WATER METERS AND APPURTENANCES FEES, WATER SYSTEM ITEMIZED DAMAGE FEES, AND WATER AND SEWER USER RATES; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on May 15 and 22,2007, the City Council of the City of Meridian, held a hearing on the adoption of the Public Works Department proposed changes to water and wastewater assessment fees, water meters and appurtenances fees, water system itemized damage fees and water and sewer user rates as shown by Attachment "A" and incorporated herein by reference; and WHEREAS, after such hearing, the City Council, by formal motion, did approve said Public Works Department Fee Schedule; and NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF MERIDIAN, IDAHO: Section 1. That the Public Works Department proposed changes to water and wastewater assessment fees, water meters and appurtenances fees, water system itemized damage fees and water and sewer user rates is hereby adopted. A copy of the fee schedule is attached as Exhibit "A". Section 2. That the Director of the Public Works Department is hereby authorized to implement and carry out the collection of said fees. Section 3. That this Resolution shall be in full force and effect on the Idf? dayof tJcfi9~ ,2007. ADOPTED by the City Council of the City of Meridian, Idaho !" e day of J~ ,2007. PUBLIC WORKS DEPARTMENT PROPOSED CHANGES TO WATER AND W ASTEW ATER ASSESSMENT FEES, WATER METERS AND APPURTENANCES FEES, WATER SYSTEM ITEMIZED DAMAGE FEES, AND WATER AND SEWER USER RATES Page 1 of2 APPROVED by the Mayor of the City of Meridian, Idaho, this Itf~day of c1~ ,2007. APPROVED: ATTEST: PUBLIC WORKS DEPARTMENT PROPOSED CHANGES TO WATER AND WASTEWATER ASSESSMENT FEES, WATER METERS AND APPURTENANCES FEES, WATER SYSTEM ITEMIZED DAMAGE FEES, AND WATER AND SEWER USER RATES Page 2 of 2 2007 Public Works Fee Update Proposal ASSESSMENT FEES WASTEWATER Current Assessment Assessment Fee Fee $2,226 $2,749 Last Update April-oe Scheduled Update (Dates listed are ilntici/Jated effective date) June-07 WATER Current Assessment Fee $1 ,463 Proposed Assessment Fee $1,794 April-Oe June-07 Pressurized Irrigation Assessment for Secondary Connection $449 $525 May-oe June-07 WATER & SEWER RATES WATER Base (Administrative) Fee: Use Charge (per 1000 gallons): Current $3.73 $1.05 Proposed $4.04 $1.39 Scheduled Update ( Dates listed are anticipated effective date) June-Oe June-07 June-DB June-07 WASTEWATER Base (Administrative) Fee: Use Charge (per 1000 gallons): Current $4.37 $2.99 Proposed $4.74 $3.04 June-DB June-07 June-De June-07 MISCELLANEOUS WASTEWATER AND WATER CHARGES Scheduled Update ( Dates listed are Wastewater Current Proposed Last Update anticioated effective date) Private Sewer System Review $1,000 no change February-De By individual Private Lift Station O&M agreement no change May-De Septage Dump, per 1000 gallons $48.00 no change May-DB Water Current Proposed Last Update Meter Adapter Kit $80 no change May-De Meter MXU Transmitter $85 no change May-De (1) Meter Adapter Kit $80.00 no change May-oB (2) Meter MXU Transmitter $85.00 no change May-De (3) Meter MXU for 1-in & larger meters $144.00 no change May-DB 3/4 inch meter $146.00 no change May-De 1 inch meter $183.00 no change May-DB 1 1/2 inch meter $399.00 no change May-De 2 inch meter $542.00 no change May-De 3 inch meter $1,058.00 delete May-DB June-07 4 inch turbo meter $2,052.00 no change May-De 4 inch compound $2,884.00 no change May-De (1) Required on some commercial projects when developer's engineer/architect specifies a larger meter selter than the meter that is initially required. For example. a 2-inch selter is specified and a 2-in meter will be used when the project is built-out. However, only a 1 1/2-inch meter is initially needed, requiring the adaptor kit the Water Division presently paYl. for. (2) Recovers cost of radio read transmitter unit on all new meters set. (3) Recovers full cost of a single MXU unit in situations where two meters cannot share a single meter vault. MXU units for most residential serve t\Ml meters serving two houses Scheduled Update ( Dates listed are Water System Repair Fees Current Proposed Last Update anticioated effective date) Private Water System Review $500 no change February-05 5/8 and ~ inch angle valves $15.00 no change May-OS Meter heads $72.00 no change May-OS 5/8 x ~ inch meter $119.00 no change May-Q6 ~ inch meter $146.00 no change May-06 1 inch meter $183.00 no change May-06 1 Yo inch meter $399.00 no change May-OS 2 inch meter $542.00 no change May-OS 3 inch meter $1,058.00 delete May-06 June-07 4 inch turbo meter $2,052_00 no change May-06 4 inch compound $2,884.00 no change May-06 Padlock $4.35 no change May-06 X43 meter lid $93.00 no change May-06 Hydrant Meter $1,049.00 no change May-06 2 Inch Meter valve $79.00 no change May-06 Swivel Adaptor $91.00 no change May-06 1 1/2 to 2 inch adaptor $80.00 no change May-OS 384 Freeze Plates $6.11 no change May-06 Single port MXU $129.00 no change May-OS Dual port MXU $150.00 no change May-06 Touch coupler extension cable $16.00 no change May-OS Truck fee (per trip) $25.00 no change May-06 Equipment (backhoe or dump truck) $25.00 no change May-OS Meter lockout if illegal turn-on $50.00 no change May-06 Hourly charge, service call $35.00 no change May-OS Meter reinstall fee (does not include actual meter) $20.00 no change May-06 Hydrant meter, daily rental $2.50 $5.00 May-OS June-07 Engineering/Development Services QA/QC Plan Review Fee Applies to all subdivision projects and commercial projects with public water or sewer mains. Subdivisions o to 50 building lots: 51 to 100 building lots: More than 100 building lots: Current $100 $175 $250 Proposed Last Update Delete and replace with OLPE Review Fees Commercial $50 per project Qualified Licensed Professional Enaineer (QLPEl Review All subdivision and commercial projects qualified and requested to go through QLPE review process (11 $250 per sheet Proposed (1) Includes only engineering drawing sheets_ Does not include cover sheets, standard detail sheets & standard City notes. Fee includes subsequent reviews of drawings retumed to the City as not meeting the IDEO and/or (2) City requirements_ 2007 Public Works Fee Update Proposal ASSESSMENT FEES WASTEWATER Current Assessment ,Assessment Fee Fee $2,226 $2,749 Last Update April{)6 Scheduled Update (Dates listed are anticioated effective date) June{)7 WATER Current Assessment Fee $1,463 Proposed Assessment Fee $1,794 April-06 June-07 Pressurized Irrigation Assessment for Secondary Connection $449 $525 May{)B JUne-07 WATER & SEWER RATES WATER Base (Administrative) Fee: Use Charge (per 1000 gallons): Current $3.73 $1.05 Proposed $4,04 $1.39 Scheduled Update ( Dates lis/ed are anticioated effective date) June-OB June-07 June-06 June-O? WASTEWATER Base (Administrative) Fee: Use Charge (per 1000 gallons): Current $4.37 $2_99 Proposed $4.74 $3.04 June-OB June-OJ June-OB June-07 MISCELLANEOUS WASTEWATER AND WATER CHARGES Scheduled Update ( Dates listed are Wastewater Current Proposed Last Update anticioated effective date) Private Sewer System Review $1,000 no change FebnJary{)B By individual Private Lift Station O&M agreement no change May-OB Seplage Dump, per 1000 gallons $48.00 no change May-OB Water Current Proposed Last Update Meter Adapter Kit $80 no change May-OB Meter MXU Transmitter $85 no change May-OB (1) Meter Adapter Kit $80.00 no change May-06 (2) Meter MXU Transmitter $85.00 no change May-OB (3) Meter MXU for 1-in & larger meters $144.00 no change May-DB 3/4 inch meter $146.00 no change May-06 1 inch meter $183.00 no change May-DB 1 1/2 inch meter $399.00 no change May-OB 2 inch meter $542.00 no change May-OB 3 inch meter $1,058.00 delete May-OB June-OJ 4 inch turbo meter $2,052.00 no Change May-06 4 inch compound $2,884.00 no change May-OB (1) Required on some commercial projects when developer's engineer/architect specifies a larger meter selter than the meter that is initially required. For example. a 2-lnch setter is specified and a 2-in meter will be used wtlen the project is built-out. However, only a 1 1/2-inch meter is initially needed, requiring the adaptor kit the Water Division presently pays tor. (2) Recovers cost of radio read transmitter unit on all new meters set. (3) Recovers full cost of a liingle MXU unit in situations where two meters cannot share a single meter vault. MXU units for most residential serve two meters serving two houses Scheduled Update ( Dales listed ate Water System Repair Fees Current Proposed Last Update anllclDated effective date) Private Water System Review $500 no change February-05 5/8 and ~ inch angle valves $15.00 no change May-OB Meter heads $72.00 no change May-OB 5/8 x ~ inch meter $119.00 no change May..QB % inch meter $146.00 no change May-OB 1 inch meter $183.00 no change May-OB 1 Y.. inch meter $399.00 no change May-OB 2 inch meter $542.00 no change May-OB 3 inch meter $1,058.00 delete May-OB June-07 4 inch turbo meter $2,052.00 no change May-OB 4 inch compound $2,884.00 no change May-06 Padlock $4.35 no change May-OB X43 meter lid $93.00 no change May-06 Hydrant Meter $1,049.00 no change May-OB 2 Inch Meter valve $79.00 no change May-06 Swivel Adaptor $91.00 no change May-06 1 1/2 to 2 inch adaptor $80.00 no change May-06 384 Freeze Plates $6.11 no change May-06 Single port MXU $129.00 no change May-OB Dual port MXU $150.00 no change May-06 Touch coupler extension cable $16.00 no change May-06 Truck fee (per trip) $25.00 no change May-06 Equipment (backhoe or dump truck) $25.00 no change May-06 Meter lockout if iIIegaltum-on $50.00 no change May-06 Hourly charge, service call $35.00 no change May-OB Meter reinstall fee (does not include actual meter) $20.00 no change May-OB Hydrant meter, daily rental $2.50 $5.00 May-06 June-07 Engineering/Development Services QAlQC Plan Review Fee Applies to all subdivision projects and commercial projects with public wator or sewer mains. Subdivisions o to 50 building lots: 51 to 100 building lots: More than 100 building lots: Current Proposed Last Update $100 $175 $250 Delele and replace with QLPE Review Fees Commercial $50 per project Qualified Licensed Professional Enalneer (QLPE\ Review Proposed All subdivision and commercial projects qualified and requested to go through QLPE review process (1.1 $250 per sheet (1) Includes only engineering drawing sheets. Does not include cover sheets, standard detail sheets & standard City notes. Fee includes subsequent reviews of drawings returned to the City as not meeting the IDEO and/or (2) City requirements.