07-562 Public Works Rate Change
CITY OF MERIDIAN
RESOLUTION NO.
tJ1-562-
BY THE CITY COUNCIL:
BIRD, BORTON, ROUNTREE, ZAREMBA
A RESOLUTION RATIFYING THE CITY COUNCIL'S APPROVAL OF
PUBLIC WORKS DEPARTMENT PROPOSED CHANGES TO WATER AND
WASTEWATER ASSESSMENT FEES, WATER METERS AND
APPURTENANCES FEES, WATER SYSTEM ITEMIZED DAMAGE FEES, AND
WATER AND SEWER USER RATES; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, on May 15 and 22,2007, the City Council of the City of Meridian,
held a hearing on the adoption of the Public Works Department proposed changes to
water and wastewater assessment fees, water meters and appurtenances fees, water
system itemized damage fees and water and sewer user rates as shown by Attachment
"A" and incorporated herein by reference; and
WHEREAS, after such hearing, the City Council, by formal motion, did approve
said Public Works Department Fee Schedule; and
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY
COUNCIL OF THE CITY OF MERIDIAN, IDAHO:
Section 1.
That the Public Works Department proposed changes to water and
wastewater assessment fees, water meters and appurtenances fees, water system itemized
damage fees and water and sewer user rates is hereby adopted. A copy of the fee
schedule is attached as Exhibit "A".
Section 2.
That the Director of the Public Works Department is hereby
authorized to implement and carry out the collection of said fees.
Section 3. That this Resolution shall be in full force and effect on the
Idf? dayof tJcfi9~ ,2007.
ADOPTED by the City Council of the City of Meridian, Idaho !" e day of
J~ ,2007.
PUBLIC WORKS DEPARTMENT PROPOSED CHANGES TO WATER AND W ASTEW ATER
ASSESSMENT FEES, WATER METERS AND APPURTENANCES FEES, WATER SYSTEM
ITEMIZED DAMAGE FEES, AND WATER AND SEWER USER RATES Page 1 of2
APPROVED by the Mayor of the City of Meridian, Idaho, this Itf~day of
c1~ ,2007.
APPROVED:
ATTEST:
PUBLIC WORKS DEPARTMENT PROPOSED CHANGES TO WATER AND WASTEWATER
ASSESSMENT FEES, WATER METERS AND APPURTENANCES FEES, WATER SYSTEM
ITEMIZED DAMAGE FEES, AND WATER AND SEWER USER RATES Page 2 of 2
2007 Public Works Fee Update Proposal
ASSESSMENT FEES
WASTEWATER
Current Assessment Assessment
Fee Fee
$2,226 $2,749
Last Update
April-oe
Scheduled Update
(Dates listed are
ilntici/Jated effective date)
June-07
WATER
Current Assessment
Fee
$1 ,463
Proposed
Assessment
Fee
$1,794
April-Oe
June-07
Pressurized Irrigation Assessment
for Secondary Connection
$449
$525
May-oe
June-07
WATER & SEWER RATES
WATER
Base (Administrative) Fee:
Use Charge (per 1000 gallons):
Current
$3.73
$1.05
Proposed
$4.04
$1.39
Scheduled Update
( Dates listed are
anticipated effective date)
June-Oe June-07
June-DB June-07
WASTEWATER
Base (Administrative) Fee:
Use Charge (per 1000 gallons):
Current
$4.37
$2.99
Proposed
$4.74
$3.04
June-DB June-07
June-De June-07
MISCELLANEOUS WASTEWATER AND WATER CHARGES
Scheduled Update
( Dates listed are
Wastewater Current Proposed Last Update anticioated effective date)
Private Sewer System Review $1,000 no change February-De
By individual
Private Lift Station O&M agreement no change May-De
Septage Dump, per 1000 gallons $48.00 no change May-DB
Water Current Proposed Last Update
Meter Adapter Kit $80 no change May-De
Meter MXU Transmitter $85 no change May-De
(1) Meter Adapter Kit $80.00 no change May-oB
(2) Meter MXU Transmitter $85.00 no change May-De
(3) Meter MXU for 1-in & larger meters $144.00 no change May-DB
3/4 inch meter $146.00 no change May-De
1 inch meter $183.00 no change May-DB
1 1/2 inch meter $399.00 no change May-De
2 inch meter $542.00 no change May-De
3 inch meter $1,058.00 delete May-DB June-07
4 inch turbo meter $2,052.00 no change May-De
4 inch compound $2,884.00 no change May-De
(1) Required on some commercial projects when developer's engineer/architect specifies a larger meter selter than the meter that is initially
required. For example. a 2-inch selter is specified and a 2-in meter will be used when the project is built-out. However, only a 1 1/2-inch
meter is initially needed, requiring the adaptor kit the Water Division presently paYl. for.
(2) Recovers cost of radio read transmitter unit on all new meters set.
(3) Recovers full cost of a single MXU unit in situations where two meters cannot share a single meter vault. MXU units for most residential
serve t\Ml meters serving two houses
Scheduled Update
( Dates listed are
Water System Repair Fees Current Proposed Last Update anticioated effective date)
Private Water System Review $500 no change February-05
5/8 and ~ inch angle valves $15.00 no change May-OS
Meter heads $72.00 no change May-OS
5/8 x ~ inch meter $119.00 no change May-Q6
~ inch meter $146.00 no change May-06
1 inch meter $183.00 no change May-06
1 Yo inch meter $399.00 no change May-OS
2 inch meter $542.00 no change May-OS
3 inch meter $1,058.00 delete May-06 June-07
4 inch turbo meter $2,052_00 no change May-06
4 inch compound $2,884.00 no change May-06
Padlock $4.35 no change May-06
X43 meter lid $93.00 no change May-06
Hydrant Meter $1,049.00 no change May-06
2 Inch Meter valve $79.00 no change May-06
Swivel Adaptor $91.00 no change May-06
1 1/2 to 2 inch adaptor $80.00 no change May-OS
384 Freeze Plates $6.11 no change May-06
Single port MXU $129.00 no change May-OS
Dual port MXU $150.00 no change May-06
Touch coupler extension cable $16.00 no change May-OS
Truck fee (per trip) $25.00 no change May-06
Equipment (backhoe or dump truck) $25.00 no change May-OS
Meter lockout if illegal turn-on $50.00 no change May-06
Hourly charge, service call $35.00 no change May-OS
Meter reinstall fee (does not include actual meter) $20.00 no change May-06
Hydrant meter, daily rental $2.50 $5.00 May-OS June-07
Engineering/Development Services
QA/QC Plan Review Fee
Applies to all subdivision projects and commercial projects with public water or sewer mains.
Subdivisions
o to 50 building lots:
51 to 100 building lots:
More than 100 building lots:
Current
$100
$175
$250
Proposed
Last Update
Delete and replace
with OLPE Review
Fees
Commercial
$50 per project
Qualified Licensed Professional Enaineer (QLPEl Review
All subdivision and commercial projects qualified and requested to go through
QLPE review process (11 $250 per sheet
Proposed
(1) Includes only engineering drawing sheets_ Does not include cover sheets, standard detail sheets &
standard City notes.
Fee includes subsequent reviews of drawings retumed to the City as not meeting the IDEO and/or
(2) City requirements_
2007 Public Works Fee Update Proposal
ASSESSMENT FEES
WASTEWATER
Current Assessment ,Assessment
Fee Fee
$2,226 $2,749
Last Update
April{)6
Scheduled Update
(Dates listed are
anticioated effective date)
June{)7
WATER
Current Assessment
Fee
$1,463
Proposed
Assessment
Fee
$1,794
April-06
June-07
Pressurized Irrigation Assessment
for Secondary Connection
$449
$525
May{)B
JUne-07
WATER & SEWER RATES
WATER
Base (Administrative) Fee:
Use Charge (per 1000 gallons):
Current
$3.73
$1.05
Proposed
$4,04
$1.39
Scheduled Update
( Dates lis/ed are
anticioated effective date)
June-OB June-07
June-06 June-O?
WASTEWATER
Base (Administrative) Fee:
Use Charge (per 1000 gallons):
Current
$4.37
$2_99
Proposed
$4.74
$3.04
June-OB June-OJ
June-OB June-07
MISCELLANEOUS WASTEWATER AND WATER CHARGES
Scheduled Update
( Dates listed are
Wastewater Current Proposed Last Update anticioated effective date)
Private Sewer System Review $1,000 no change FebnJary{)B
By individual
Private Lift Station O&M agreement no change May-OB
Seplage Dump, per 1000 gallons $48.00 no change May-OB
Water Current Proposed Last Update
Meter Adapter Kit $80 no change May-OB
Meter MXU Transmitter $85 no change May-OB
(1) Meter Adapter Kit $80.00 no change May-06
(2) Meter MXU Transmitter $85.00 no change May-OB
(3) Meter MXU for 1-in & larger meters $144.00 no change May-DB
3/4 inch meter $146.00 no change May-06
1 inch meter $183.00 no change May-DB
1 1/2 inch meter $399.00 no change May-OB
2 inch meter $542.00 no change May-OB
3 inch meter $1,058.00 delete May-OB June-OJ
4 inch turbo meter $2,052.00 no Change May-06
4 inch compound $2,884.00 no change May-OB
(1) Required on some commercial projects when developer's engineer/architect specifies a larger meter selter than the meter that is initially
required. For example. a 2-lnch setter is specified and a 2-in meter will be used wtlen the project is built-out. However, only a 1 1/2-inch
meter is initially needed, requiring the adaptor kit the Water Division presently pays tor.
(2) Recovers cost of radio read transmitter unit on all new meters set.
(3) Recovers full cost of a liingle MXU unit in situations where two meters cannot share a single meter vault. MXU units for most residential
serve two meters serving two houses
Scheduled Update
( Dales listed ate
Water System Repair Fees Current Proposed Last Update anllclDated effective date)
Private Water System Review $500 no change February-05
5/8 and ~ inch angle valves $15.00 no change May-OB
Meter heads $72.00 no change May-OB
5/8 x ~ inch meter $119.00 no change May..QB
% inch meter $146.00 no change May-OB
1 inch meter $183.00 no change May-OB
1 Y.. inch meter $399.00 no change May-OB
2 inch meter $542.00 no change May-OB
3 inch meter $1,058.00 delete May-OB June-07
4 inch turbo meter $2,052.00 no change May-OB
4 inch compound $2,884.00 no change May-06
Padlock $4.35 no change May-OB
X43 meter lid $93.00 no change May-06
Hydrant Meter $1,049.00 no change May-OB
2 Inch Meter valve $79.00 no change May-06
Swivel Adaptor $91.00 no change May-06
1 1/2 to 2 inch adaptor $80.00 no change May-06
384 Freeze Plates $6.11 no change May-06
Single port MXU $129.00 no change May-OB
Dual port MXU $150.00 no change May-06
Touch coupler extension cable $16.00 no change May-06
Truck fee (per trip) $25.00 no change May-06
Equipment (backhoe or dump truck) $25.00 no change May-06
Meter lockout if iIIegaltum-on $50.00 no change May-06
Hourly charge, service call $35.00 no change May-OB
Meter reinstall fee (does not include actual meter) $20.00 no change May-OB
Hydrant meter, daily rental $2.50 $5.00 May-06 June-07
Engineering/Development Services
QAlQC Plan Review Fee
Applies to all subdivision projects and commercial projects with public wator or sewer mains.
Subdivisions
o to 50 building lots:
51 to 100 building lots:
More than 100 building lots:
Current
Proposed Last Update
$100
$175
$250
Delele and replace
with QLPE Review
Fees
Commercial
$50 per project
Qualified Licensed Professional Enalneer (QLPE\ Review
Proposed
All subdivision and commercial projects qualified and requested to go through
QLPE review process (1.1 $250 per sheet
(1) Includes only engineering drawing sheets. Does not include cover sheets, standard detail sheets &
standard City notes.
Fee includes subsequent reviews of drawings returned to the City as not meeting the IDEO and/or
(2) City requirements.