Loading...
Sakana Sushi Restaurant CZC 06-154CITY on -r'ia��I'k' �` IDAHO F , City of Meridian City Clerk Office $DICE 1913 CERTIFICATE OF ZONING COMPLIANCE* Date: Se tember i 2006 Project Name/Number: Sakana Sushi Restaurant— CZC-06-149 Owner:___.. TMI Group, Inc. Site Address: Lots 8 9 & 10 Block 3 Destination Place Subdivision Proposed Use: Restaurant Zoning: C -G Comments: Conditions of Approval: Project is subject to all current City of Meridian ordinances and the conditions of approval for the Silverstone and Silverstone No. 3 Subdivisions. Issuance of this permit does not release the applicant from any previous requirements of other permits issued for this site. The issuance of this permit does not release the applicant from any requirements of the approved Annexation & Zoning (AZ -01-001), Conditional Use (CUP -01-002), Preliminary Plat (PP -01-001, PP -02-017), Final Plat (FP -01-019, FP -03-002), as well as any Development Agreements recorded for this site. Landscaping; The Landscape Plan prepared by The Land Group on August 8, 2006, Sheet Numbers L1.0 and LL 1, is approved (stamped "Approved" on September 1, 2006, by the Meridian Planning Department) with the following changes (see redline changes on plan): 1) Per UDC 11 -3B -8C -2a, alla� rking lot landscape buffers and Planters shall not be less than five feet S' in any dimension measured inside curbs. The Landscape Plan reflects some four -foot 4' wide planters. Please .correct this and install shrubbe lawn or other a ro nate vegetation to account for the increased planter width. 2) Per UDC 11 -3B -7C -3b and 11 -3B -SC -2d landsca a buffers ad'acent to streets and parking lots shall be planted with one 1 tree per thirty -rive 35lineal feet. Provide 1 more tree in the east parkine lot landscape buffer. Additional!y,provide 3 more trees in the landscape buffer abutting the private road, as depicted on„the landscape plan. The approved landscape plan is not to be altered without prior written approval of the Planning Department. No field changes to landscape plan permitted; prior written approval of all material changes is required. Site Plan: The Site flan prepared by Larson Architects on August 17, 2006, Sheet Number SP -1, is approved (stamped "Approved” on September 1, 2006, by the Meridian Planning Department) with the following changes (see redline changes on plan): 1) Per UDC 11 -3B -8C -2a alI parking lot landscape buffers and Planters shall not be less than five . feet 5' in any dimension measured inside curbs. Please account for this requirement at the time of construction. 2) Per UDC 11-3A-19C=4a a pedestrian walkway that is a minimum of eight feet S' in width shall be provided from the perimeter sidewalk to the main building entrance. The walkway as drawn by staff on the site plan is to serve as an example only. However, a walkway must be installed which meets the intent of this regulation. The walkway must be distinguishable from the vehicular driving surface through the use of pavers, colored or scored concrete bricks etc. The approved site plan is not to be altered without prior written approval of the Planning Department. Elevations: The Elevations prepared Larson Architects on May 15, 2006, Sheet Number A-1, is approved (stamped "Approved" on September 1, 2006, by the Meridian Pla ming Department) with no changes from the Planning Department. The approved elevation plan is not to be altered without prior written approval of the Planning Department. Excepting the aforementioned. change, the approved elevation plan is not to be altered without prior written approval of the Planning Department. Irrigation: An underground, pressurized irrigation system must be installed to all landscape areas per the approved specifications and in accordance with UDC 11-3A-15. Protection of Existing Trees: Any existing trees on site must be protected or mitigated for in accordance with the Tree Preservation section of the City's Landscape Ordinance. Per UDC 11-3B-10, coordinate with the Parks Department Arborist (Elroy Huff, 888-3579) for approval of protection/relocation measures for the existing trees prior to constriction. Any severely damaged tree must be replaced in compliance with UDC I I- 313 -10-C.5. Parking: The proposed parking areas 'shall be paved and striped in accordance with UDC 11-3B. Project engineer/architect shall certify that the number and size of handicap -accessible spaces conforms to the Americans with Disabilities Act (ADA). Handicap accessible stalls musthave signage in accordance perADA and signed appropriately. Curbing: Per UDC 11-3B-51, all landscape areas adjacent to driveways, parking lots, or other vehicle use areas, must be protected by curbing, wheel stops, or other approved protective devices. Curbing may be cut to allow for storm water runoff. Sidewalks: All sidewalks shall be constructed in accordance with 11-3A-17. Sidewalks shall be constructed prior to occupancy. Drainage: Storm water drainage swales shall not have a slope steeper than 3:1, shall be fully vegetated, and shall be designed in compliance with UDC 11 -3B -1I and UDC 11-3A-18. Fencing: Any required or proposed fencing shall be installed with current fencing standards as defined in UDC 11-3A-7. Li tin : Lighting shall not cause glare or impact the traveling public or neighboring development. Comply with all lighting standards as defined in UDC 11.-3A-11. Signage: No signs are approved with this CZC. All business signs will require a separate sign permit in compliance with UDC 11-3D. Trash Enclosure: All dumpster(s) must be screened in accordance with UDC -11-3A-12. Trash enclosures must be built in the location and to the size approved by SSC. Handicap -Accessibility: The structure, site improvements and parking areas must be in compliance with all federal handicap -accessibility requirements. ACHD Acceptance: All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must be made to the site plan to accommodate the ACED requirements, a new site plan shall be submitted to the City of Meridian Planning staff for approval prior to the issuance of a building permit. Certificate of Occupancy: All required improvements must be complete prior to obtaining a Certificate of Occupancy. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion ofthe landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. A Temporary Certificate of Occupancy may be obtained by providing surety to the City in the form of a Letter of Credit or cash in the amount of 110% of the cost of the remaining improvements. A bid must accompany any request for Temporary Occupancy. Plan Modifications: Except for the changes. mentioned above, the approved Site flan and Landscape Plan stamped "Approved" on September 1, 2006, are not to be altered without prior written approval of the Planning Department. No significant field changes to the site or landscape plans are permitted; prior written approval of all changes is required. Amanda Hess Associate Planner *This letter sloes not indicate compliance with requirements of other departments/agencies, including, but not limited to, Ada County Highway District, Central District Health Department, affected irrigation district(s), Meridian Sewer, Water, Building or Fire Departments, Sanitary Services Co., etc. This letter shall expire one (1) year from the date of issuance if work has not begun. erldig7n IDAHO 5 of Review all that ❑ Accessory Use ❑ Alternative Compliance X Certificate of Zoning Compliance ❑ Conditional Use Permit Minor Modification X Design Review ❑ Property Boundary Adjustment ❑ Short Plat ❑ Temporary Use Certificate of Zoning Compliance ❑ Time Extension (Director) ❑ Vacation ❑ Other Planning Department ADMINISTRATIVE REVIEW APPLICATION STAFF USE ONLY: FileNumber(s): ('Tr; .-0�- 15q Project name: 50.61 A U S� ► �� u� �� Date filed:R —la aDate complete: Assigned Planer: wTr.LS� Concurrent files: Previous files: Applicant Information Applicant name: Sundance Limited Partnership,LLC Phone: 322-7300 Applicant address:9056 West Blackeagle Drive, Boise, Idaho Zip: 83709 Applicant's interest in property: X Own ❑ Rent ❑ Optioned ❑ Other Owner name: Same as above Phone: Owner address: Zip: Agent name (e.g., archi.tect, engineer, developer, representative): Cornel Larson Firm name: Larson Architects P.A. Address: 2:1.0 MurrayStreet, Boise Zip: 83714 Primary contact is: ❑ Applicant ❑ Owner X Agent ❑ Other Contact name: CorneI Larson Phone: 376-7502 E-mail:.Cornel-Larsonarc@cabelone.net _. Fax: 658-0224 Subject Property Information Location/street address: Silverstone„Corporate Center Subdivision —SE Corner of Overland and Eagle Roads. Assessor's parcel number(s): Parcel `I' — ROS 6550 Township, range, section: 3N IE 21 Total acreage: 0.75 Current land use: Vacant Current zoning district: CG 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone. (208) 884-5533 + Facsimile: (208) 888-6678 • Website: �s,�k,%v.meridiancitv.orc I Project Description Projectlsubdivision name: Silverstone Corporate Center Subdivision General description of proposed project/request: Proposed 4,000 s . Restaurant building. Proposed zoning district(s): Same CG Acres of each zone proposed: 0.75 Type of use proposed (check all that apply): ❑ Residential X Commercial ❑ Office ❑ Industrial ❑ Other Amenities provided with this development (if applicable): None Who will own & maintain the pressuriz.Fd Irrigation system in this development? Subdivision Well Which Irrigation district does this property lie within? Nampa -Meridian Irrigation Primary Irrigation Source: Irrigation Secondary: City Water Square footage of landscape areas to be irrigated (if primary or secondary point of connection is City water): 44 $34 s_f. Residential Project Summary (if applicable) Number of residential units: Number of building lots: Number of common and/or other lots: Proposed number of dwelling units (for muiti-family developments only): I Bedroom: 2 or more Bedrooms: Minimum square footage ofstructure(s) (excl. garage): Proposed building height: Minimum property size (s.i): Average property size (s.f.): - Gross density (DU/acre-total laud): Net density (DUlacre-excluding roads & alleys): Percentage of open space provided: Acreage of open space: Percentage of useable open space: (See Chapter 3, Article G, for qualified open space) Type of open space provided in acres (i.e., landscaping, public, common, etc): Type of dwelling(s) proposed: ❑ Single-family ❑ Townbomes ❑ Duplexes ❑ Multi -family Non-residential Project Summary (if applicable) Number of building lots: One Other lots: Gross floor area proposed: 4,000s.f. Existing (if applicable): N/A Hours of operation (days and hours): Building height: 24'-0" Max. Percentage of site/proj ect devoted to the following: Landscaping: 14.68% Building: 12.141/a Paving: 65.71% Total number of employees: Maximum number of employees at any one time: Number and ages of studentsichildren (if applicable): Total number of parking spaces provided: 45 Authorization Print applicant name: 17 -COW-Me ( Applicant signature: - Seating capacity: Number of compact spaces provided: 0 Date: i./S. 06 660 E. Watertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6678 • Website: Nvww.meridiancitv.org 2 Larson architects, P.A. 210 Murray Street • Boise, Idaho 83714 (208) 376-7502 • Fax (208) 658-0224 August 17, 2006 MERIDIAN CITY PLANNING & ZONING DEPARTMENT 660 E. Watertower Ln., Suite 202 Meridian, Idaho 83642 RE: Design Review (DR) Application for Sakana Sushi Restaurant @ Silverstone Corporate Center To Whom It May Concern: Attached, please find a Design Review application for the Sakana Sushi Restaurant Building @ Silverstone Corporate Center Subdivision, located on the southeast corner of Eagle and Overland Roads. The building facades have multiple modulations and relief in the roof lines meeting the 20% of the length requirements. The Primary entry is easily identified with storefront doors and entry element in this area. The building will be a stone and two tone beige colored stucco, to be compatible with the theme of the balance of the subdivision. The Mechanical units are roof mounted and screened by the building parapets. The patron parking is located to the east, west and south of the building; the west parking is screened from Eagle Road by the required 35 foot landscape bufferlberin. An 8'-0" wide Pedestrian walkway has been added to the west entry of the building and extending north to connect this building to the required sidewalk out to Eagle Road.. Per the provided checklist for Design Review requirements, the proposed building meets or exceeds all requirements and we hope the Design Review Committee and City Staff will approve this project, please feel free to call with any questions. Sincerely, Larson Architects Dawna Jenkins Larson .Architects, PA. 210 Murray Street • Boise, Idaho 83714 (208) 376-7502 • Fax (208) 658-0224 August 17, 2006 MERIDIAN CITY PLANNING & ZONING DEPARTMENT 660 E. Watertower Ln., Suite 202 Meridian, Idaho 83642 RE: Certificate of Zoning Compliance (CZC) Application for Sakana Sushi Restaurant Building @ Silverstone Corporate Center To Whom it May Concern: Attached, please find a Certificate o1:'Zoning Compliance application for a 4,000 s.f. Sakana Sushi Restaurant Building located in the Silverstone Corporate Center Subdivision, located on the Southeast corner of Eagle and Overland Roads. The project consists of a 4,000 s.f. Sushi Restaurant. It will be a single story, stone and Stucco facade, with stucco cornice and accents with a low slope single -ply membrane roofing behind parapets. The HVAC units will be roof mounted and screened by the parapets. We hope the Certificate of Zoning Committee and City Staff will approve this project, please feel free to call with any questions. Sincerely, Larson Architects Dawna Jenkins ZOSL-967 (BOZ) ),/ZEEogzpl •aexag O CM 'NVi01Fi3U'i e�qa -'j, w d r •:rwr UgLN30 3.LVklOcrdOO 3N S S ! a7 yd `SlaaMO-iii UOSL•n7 iHsns vN"vs lan[eNr. ma ro xottsrnard xrtmu ret racxrrr ar5osr mtay.cnr saxurrc imoe FU>+t�rr xoyyrr rita�nxirw t t ' e 8 , n q3 Ila : „ k ba avotl 3MV3 'S - - 11111 lMy s� Qu tee.. s if6i� O4epi `ueipuayV q} ! r as o [ a 3 22 9 t3 44 ll� ,s Lid 11 a�3lta Q 1.1psm, g if6i� tJ as [ a 3 22 9 t3 44 ll� ,s Lid 11 a�3lta Q � E w ) p 8 m i � co UZ $Yx:7?:i F54xia 1.1psm, �wl Ma a� i3 gee g if6i� [ a 3 1 WA ll� ,s Lid Q �wl Ma a� i3 gee y [ a WA `1it5111 iil�e�BuIpHy Y 11 r� f r �9 91!11[4111 �`pop l l j i� E it m b p Y r� �9 IL IP 3 1 2 A. z 0 LU w F- CC 0 z� z 0 Q w w ws 08-17-'06 12:26 FROM -SSG ----..---- -A 1V U1 cr) l 2088885052 T--504 P002/002 F-352 YvbdBv I SANITARY SERVICE COMPANY BY COMM7ffSo /"'f- u� S s s - September 27, 2006 TO: Sundance Limited Partnership 9056 W. Blackeagle Dr. Boise, ID 83709 SUBJECT: M CZC-06-154 Restaurant S. Eagle Road @ Overland John S. Franden, President Sherry R. Huber, 1st Vice President David Bivens, 2nd Vice President Carol A. McKee, Commissioner Rebecca W. Arnold, Commissioner On 8-26-2002, the Ada County Highway District Commissioners acted on MPP02-017 for Silverstone Subdivision No. 3. The conditions and requirements also apply to MCZC-06-154. • Prior to final approval you will need to submit plans to the ACHD Development Review Department. • A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, C��C�2ee Chelsee Kucera Right -of -Way and Development Services CC: Project File Lead Agency: Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us f 100 N� ACHD �iontirwe�`eai�o �iwicr. September 27, 2006 TO: Larson Arch. 210 Murray Boise, ID 83714 SUBJECT: MCZC-06-154 Restaurant S. Eagle Road @ Overland John S. Franden, President Sherry R. Huber, 1st Vice President David Bivens, 2nd Vice President Carol A. McKee, Commissioner Rebecca W. Arnold, Commissioner On 8-26-2002, the Ada County Highway District Commissioners acted on MPP02-017 for Silverstone Subdivision No. 3. The conditions and requirements also apply to MCZC-06-154. • Prior to final approval you will need to submit plans to the ACHD Development Review Department. • A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, G&4'eL Chelsee Kucera Right -of -Way and Development Services CC: Project File Lead Agency: Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • F)(345-7650 • www.achd.ada.id.us �° Ada County Highway District Might -of -way (k Leve[opment Deparnnem Planning Review Division This application does not require Commission action and is approved at the staff level as of August 26, 2002. Tech Review for this item was held with the applicant on August 23, 2002. Please refer to Attachment 3 for appeal guidelines. Staff contact: Craig Hood, 387-6174, chood@achd.ada.id.us File Number: Silverstone Subdivision # 3, MPP02-017 Site address: Southeast corner of Overland Road and Eagle Road Owner: Sundance Investments, L.P. 9100 W. Blackeagle Drive Boise, ID 83709 Applicant: Sundance Company C/O Ryan Anderson 9100 W. Blackeagle Drive Boise, ID 83709 Representative: Patrick Tealey C/O Tealey's Land Survey 2501 Bogus Basin Road Boise, ID 83702 Application Information The applicant is requesting preliminary plat approval from the City of Meridian to subdivide 13.77 -acres of C- C zoned property into 6 buildable lots. The site is located on the east side of Eagle Road, approximately 200 - feet south of Overland Road. Acreage: 13.77 -acres Current Zoning: C -C Proposed buildable lots: 6 Proposed common lots: 0 Vicinity Map A. Findings of Fact 1. Trip Generation: This development is estimated to generate 1,370 additional vehicle trips per day (0 existing) based on the Institute of Transportation Engineers Trip Generation Manual. 2. Impact Fees: The impact fee rate from the fee tables for this use is $2,182 per thousand square feet of gross building area, based on the impact fee ordinance in effect at this time. 3. Traffic Impact Study: A traffic impact study was not required with this application. 4. Site Information: This site is currently vacant. 5. Description of Adjacent Surrounding Area: a. North: Commercially zoned lots b. South: Silverstone Corporate Center c. East: Large undeveloped parcels d. West: Vacant (approved EI Dorado Commercial Subdivision) 6. Impacted Roadways: Eagle Road: Frontage: Functional Street Classification Traffic count: Level of Service: Speed limit: Nearest intersection: Overland Road: Frontage: Functional Street Classification Traffic count: Level of Service: Speed limit: Nearest intersection: Silverstone Way: Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: Nearest intersection: 730 -feet Minor Arterial 10,232 south of Overland Road on 2-27-02 LOS C or better 35 MPH Overland Road a signalized intersection None Minor Arterial 13,341 east of Eagle Road on 2-27-02 LOS D 35 MPH Eagle Road a signalized intersection 700 -feet Collector No current count available unavailable 25 MPH Eagle Road a stop -controlled intersection 7. Roadway Improvements Adjacent To and Near the Site Eagle Road abutting the site is currently improved with two travel lanes, a 5 -foot wide meandering sidewalk with no curb or gutter. Silverstone Way is currently improved with two travel lanes curb, gutter and 5 -foot wide sidewalk on both sides of the street. 2 8. Existing Right -of -Way There is currently 73 -feet of right-of-way (48 -feet from centerline) for Eagle Road abutting this property. There is currently 80 -feet of right-of-way (40 -feet from centerline) for Silverstone Way. 9. Existing Access to the Site There are two existing curb return driveways on Silverstone Way and two on Eagle Road into this site. The first driveway on Silverstone Way is located at the north property line and is shared with the property to the north. The second driveway on Silverstone Way is located approximately 200 -feet south of the first driveway. There is a shared driveway which functions as an access road to a few lots within the original Silverstone Subdivision #1 from Eagle Road, located at the north property line. The other driveway into the site is a shared driveway with Lot 5, Block 1, Silverstone Subdivision #1, located at the south property line on Eagle Road. 10. Site History The applicant is proposing to re -subdivide Lots 2, 3, 6, 7 and portions of Lots 8, 10 and 11, of Silverstone Subdivision #1 (MPP-01-001/MCUP-01-002/MAZ-01-001), which the Commission approved on March 14, 2001. All of the required street improvements have been completed and driveway locations approved, with the original plat of Silverstone #1. It does not appear that the applicant is proposing any new access points to Silverstone Way or Eagle Road that would contradict what was approved previously for MPP -01 -001 /MCUP01 -002/MAZ-01 -001. 11. Five Year Work Program Overalnd Road, from Linder to Five Mile, is in the Five Year Work Program for roadway and intersection improvements within the next five years. More specifically, Overland Road, from Meridian Road to Eagle Road, is scheduled for improvements in the year 2003 and Overland Road from Eagle Road to Cloverdale Road is scheduled for improvements in 2006. Eagle Road, from Victory Road to Overland Road, is in preliminary development for roadway and intersection improvements. 12. Other Development in Area The Commission recently approved EI Dorado Subdivision (MCUP01-037/MAZ01-018) on January 16, 2002. The driveway locations and roadway improvements for this development will not effect those approved locations or improvements. B. Findings for Consideration Right -of -Way District policy requires 70 -feet of right-of-way on collector roadways (Figure 72-F1 B). This right-of- way width allows for the construction of a 3 -lane roadway with curb, gutter, 5 -foot wide detached sidewalks and bike lanes. There is sufficient right-of-way for Silverstone Way abutting this property. The applicant should not be required to dedicate any additional right-of-way for Silverstone Way with this application. District policy requires 96 -feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5 -lane roadway with curb, gutter, 5 -foot concrete detached sidewalks and bike lanes. There is currently 48 -feet of right-of-way from the centerline of Eagle Road abutting this property. The applicant should not be required to dedicate any additional right-of-way for Eagle Road abutting this property. 3 2. Sidewalk District policy requires 5 -foot wide (minimum) concrete sidewalk on all collector and arterial streets (7204.6.5). There are currently sidewalks on both sides of Silverstone Way and on the east side of Eagle Road. The applicant should not be required to construct any additional improvements to Silverstone Way or Eagle Road. 3. Access Points District policy (Figure 72-F5), requires driveways located on collector or arterial roadways with a speed limit of 30 MPH to align or offset a minimum of 125 -feet from any existing or proposed driveway and to align or offset a minimum of 440 -feet from a signalized intersection. In addition, District policy 7207.8 states that direct access to arterials and collectors is normally restricted and the developer shall try to use combined access points. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35 -feet. Curb return type driveways with 15 -foot radii will be required for driveways accessing collector and arterial roadways. Access points into this site were previously approved with Silverstone Subdivision #1. Site Specific Condition #9 of Silverstone Subdivision #1 restricts driveway locations on Silverstone Way to be a minimum of 175 -feet from Eagle Road and Overland Road, and to align or offset a minimum of 125 - feet from any proposed driveways. All proposed driveways into this development from Silverstone Way should be a minimum of 175 -feet from Overland Road and offset a minimum of 125 -feet from any proposed or existing driveway on the same side or across the roadway. On March 14, 2001, the Ada County Highway District Commission approved two access points on Eagle Road for this site. The approved accesses are located 400 -feet south of Overland Road and 690 -feet south of the northern driveway. The applicant should be required to utilize these existing driveways and not construct any additional access points to Eagle Road. Other than the access points specifically approved with this application, direct lot or parcel access to Eagle Road and Silverstone Way should be prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35 -feet. Most commercial driveways will be constructed as curb -cut type facilities if located on local streets. Curb return type driveways with 15 -foot radii will be required for driveways accessing collector and arterial roadways. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave all driveways their full width and at least 30 -feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15 -foot radii abutting the existing roadway edge. C. Special Recommendation to the City of Meridian 1. In order to reduce trips to and from this development it is recommended that tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Ms. Catherine Sanchez at 387-6160. 4 2. In order to reduce trips to and from this development, the tenants occupying the proposed building(s) should be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. 3. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. D. Site Specific Conditions of Approval 1. Driveways on Silverstone Way shall be located a minimum distance of 175 -feet from Eagle Road, and shall align or offset a minimum of 125 -feet from any existing or proposed driveways. Pave all driveways to a maximum width of 35 -feet and at least 30 -feet into the site beyond the edge of pavement of Silverstone Way and install pavement tapers with 15 -foot curb radii abutting the existing roadway edge. 2. The following access points on Eagle Road are approved with this application: ♦ A driveway located on Eagle Road approximately 440 -feet south of Overland Road is approved with this application. ♦ A driveway located on Eagle Road approximately 1,150 -feet south of Overland Road (approximately 690 -feet south of the northern driveway) is approved with this application. Both driveways shall be paved a maximum width of 35 -feet and at least 30 -feet into the site beyond the edge of pavement of Eagle Road and install pavement tapers with 15 -foot radii abutting the existing roadway edge. 3. Other than the access points specifically approved with this application, direct lot or parcel access to Eagle Road and Silverstone Way is prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. 4. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact. Construction Services at 387-6280 (with file numbers) for details. 5 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACRD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. F. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Preliminary Plat 3. Appeal Guidelines N. Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Appeal Guidelines 7 Development Process Checklist ®Submit a development application to a City or to the County One City or the County will transmit the development application to ACHD One ACHD Planning Review Division will receive the development application to review One Planning Review Division will do one of the following: ❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ®Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. ❑Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. QWrite a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. OThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ®For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. []Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOUREM�bfBER: Construction (Zone) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working In the ACRD Rlgbt-ofWay • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Final Approval from Development Services • ACHD Construction —Subdivision must have received approval from Development Services prior to scheduling a Pre -Con. September 27, 2006 >F`��i � ACHDIs � 1/Omrw���0 }vivwcG TO: Sundance Limited Partnership 9056 W. Blackeagle Dr. Boise, I D 83709 SUBJECT: MCZC-06-154 Restaurant S. Eagle Road @ Overland John S. Franden, President Sherry R. Huber, 1st Vice President David Bivens, 2nd Vice President Carol A. McKee, Commissioner Rebecca W. Arnold, Commissioner SES City of Meridian City Clerk Office On 8-26-2002, the Ada County Highway District Commissioners acted on MPP02-017 for Silverstone Subdivision No. 3. The conditions and requirements also apply to MCZC-06-154. • Prior to final approval you will need to submit plans to the ACHD Development Review Department. • A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, CGiC�.e Chelsee Kucera Right -of -Way and Development Services CC: Project File Lead Agency: Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us September 27, 2006 TO: Larson Arch. 210 Murray Boise, ID 83714 SUBJECT: MCZC-06-154 Restaurant S. Eagle Road @ Overland John S. Franden, President Sherry R. Huber, 1st Vice President David Bivens, 2nd Vice President Carol A. McKee, Commissioner Rebecca W. Arnold, Commissioner On 8-26-2002, the Ada County Highway District Commissioners acted on MPP02-017 for Silverstone Subdivision No. 3. The conditions and requirements also apply to MCZC-06-154. • Prior to final approval you will need to submit plans to the ACHD Development Review Department. • A traffic impact fee will be assessed by ACHD and will be due prior to the issuance of a building permit. Contact ACHD Planning & Development Services at 387-6170 for information regarding impact fees. If you have any questions or concerns please feel free to contact this office at (208) 387-6177. Sincerely, Chelsee Kucera Right -of -Way and Development Services CC: Project File Lead Agency: Meridian Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achd.ada.id.us ACHD Ada County Highway District Right -of -Way & Development Department Planning Review Division This application does not require Commission action and is approved at the staff level as of August 26, 2002. Tech Review for this item was held with the applicant on August 23, 2002. Please refer to Attachment 3 for appeal guidelines. Staff contact: Craig Hood, 387-6174, chood@achd.ada.id.us File Number: Silverstone Subdivision # 3, MPP02-017 Site address: Southeast corner of Overland Road and Eagle Road Owner: Sundance Investments, L.P. 9100 W. Blackeagle Drive Boise, ID 83709 Applicant: Sundance Company C/O Ryan Anderson 9100 W. Blackeagle Drive Boise, ID 83709 Representative: Patrick Tealey C/O Tealey's Land Survey 2501 Bogus Basin Road Boise, ID 83702 Application Information The applicant is requesting preliminary plat approval from the City of Meridian to subdivide 13.77 -acres of C- C zoned property into 6 buildable lots. The site is located on the east side of Eagle Road, approximately 200 - feet south of Overland Road. Vicinity Acreage: 13.77 -acres Current Zoning: C -C Proposed buildable lots: 6 Proposed common lots: 0 A. Findings of Fact Trip Generation: This development is estimated to generate 1,370 additional vehicle trips per day (0 existing) based on the Institute of Transportation Engineers Trip Generation Manual. 2. Impact Fees: The impact fee rate from the fee tables for this use is $2,182 per thousand square feet of gross building area, based on the impact fee ordinance in effect at this time. 3. Traffic Impact Study: A traffic impact study was not required with this application. 4. Site Information: This site is currently vacant. 5. Description of Adjacent Surrounding Area: a. North: Commercially zoned lots b. South: Silverstone Corporate Center c. East: Large undeveloped parcels d. West: Vacant (approved EI Dorado Commercial Subdivision) 6. Impacted Roadways: Eagle Road: Frontage: Functional Street Classification Traffic count: Level of Service: Speed limit: Nearest intersection: Overland Road: Frontage: Functional Street Classification Traffic count: Level of Service: Speed limit: Nearest intersection: Silverstone Way: Frontage: Functional Street Classification Traffic count: Level of Service: Speed limit: Nearest intersection: 730 -feet Minor Arterial 10,232 south of Overland Road on 2-27-02 LOS C or better 35 MPH Overland Road a signalized intersection None Minor Arterial 13,341 east of Eagle Road on 2-27-02 LOS D 35 MPH Eagle Road a signalized intersection 700 -feet Collector No current count available unavailable 25 MPH Eagle Road a stop -controlled intersection 7. Roadway Improvements Adjacent To and Near the Site Eagle Road abutting the site is currently improved with two travel lanes, a 5 -foot wide meandering sidewalk with no curb or gutter. Silverstone Way is currently improved with two travel lanes curb, gutter and 5 -foot wide sidewalk on both sides of the street. 2 8. Existing Right -of -Way There is currently 73 -feet of right-of-way (48 -feet from centerline) for Eagle Road abutting this property. There is currently 80 -feet of right-of-way (40 -feet from centerline) for Silverstone Way. 9. Existing Access to the Site There are two existing curb return driveways on Silverstone Way and two on Eagle Road into this site. The first driveway on Silverstone Way is located at the north property line and is shared with the property to the north. The second driveway on Silverstone Way is located approximately 200 -feet south of the first driveway. There is a shared driveway which functions as an access road to a few lots within the original Silverstone Subdivision #1 from Eagle Road, located at the north property line. The other driveway into the site is a shared driveway with Lot 5, Block 1, Silverstone Subdivision #1, located at the south property line on Eagle Road. 10. Site History The applicant is proposing to re -subdivide Lots 2, 3, 6, 7 and portions of Lots 8, 10 and 11, of Silverstone Subdivision #1 (MPP-01-001/MCUP-01-002/MAZ-01-001), which the Commission approved on March 14, 2001. All of the required street improvements have been completed and driveway locations approved, with the original plat of Silverstone #1. It does not appear that the applicant is proposing any new access points to Silverstone Way or Eagle Road that would contradict what was approved previously for MPP -01 -001 /MCUP01 -002/MAZ-01 -001. 11. Five Year Work Program Overalnd Road, from Linder to Five Mile, is in the Five Year Work Program for roadway and intersection improvements within the next five years. More specifically, Overland Road, from Meridian Road to Eagle Road, is scheduled for improvements in the year 2003 and Overland Road from Eagle Road to Cloverdale Road is scheduled for improvements in 2006. Eagle Road, from Victory Road to Overland Road, is in preliminary development for roadway and intersection improvements. 12. Other Development in Area The Commission recently approved El Dorado Subdivision (MCUP01-037/MAZ01-018) on January 16, 2002. The driveway locations and roadway improvements for this development will not effect those approved locations or improvements. B. Findings for Consideration Right -of -Way District policy requires 70 -feet of right-of-way on collector roadways (Figure 72-F1 B). This right-of- way width allows for the construction of a 3 -lane roadway with curb, gutter, 5 -foot wide detached sidewalks and bike lanes. There is sufficient right-of-way for Silverstone Way abutting this property. The applicant should not be required to dedicate any additional right-of-way for Silverstone Way with this application. District policy requires 96 -feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5 -lane roadway with curb, gutter, 5 -foot concrete detached sidewalks and bike lanes. There is currently 48 -feet of right-of-way from the centerline of Eagle Road abutting this property. The applicant should not be required to dedicate any additional right-of-way for Eagle Road abutting this property. 3 2. Sidewalk District policy requires 5 -foot wide (minimum) concrete sidewalk on all collector and arterial streets (7204.6.5). There are currently sidewalks on both sides of Silverstone Way and on the east side of Eagle Road. The applicant should not be required to construct any additional improvements to Silverstone Way or Eagle Road. 3. Access Points District policy (Figure 72-175), requires driveways located on collector or arterial roadways with a speed limit of 30 MPH to align or offset a minimum of 125 -feet from any existing or proposed driveway and to align or offset a minimum of 440 -feet from a signalized intersection. In addition, District policy 7207.8 states that direct access to arterials and collectors is normally restricted and the developer shall try to use combined access points. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35 -feet. Curb return type driveways with 15 -foot radii will be required for driveways accessing collector and arterial roadways. Access points into this site were previously approved with Silverstone Subdivision #1. Site Specific Condition #9 of Silverstone Subdivision #1 restricts driveway locations on Silverstone Way to be a minimum of 175 -feet from Eagle Road and Overland Road, and to align or offset a minimum of 125 - feet from any proposed driveways. All proposed driveways into this development from Silverstone Way should be a minimum of 175 -feet from Overland Road and offset a minimum of 125 -feet from any proposed or existing driveway on the same side or across the roadway. On March 14, 2001, the Ada County Highway District Commission approved two access points on Eagle Road for this site. The approved accesses are located 400 -feet south of Overland Road and 690 -feet south of the northern driveway. The applicant should be required to utilize these existing driveways and not construct any additional access points to Eagle Road. Other than the access points specifically approved with this application, direct lot or parcel access to Eagle Road and Silverstone Way should be prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35 -feet. Most commercial driveways will be constructed as curb -cut type facilities if located on local streets. Curb return type driveways with 15 -foot radii will be required for driveways accessing collector and arterial roadways. Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave all driveways their full width and at least 30 -feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15 -foot radii abutting the existing roadway edge. C. Special Recommendation to the City of Meridian In order to reduce trips to and from this development it is recommended that tenants occupying the proposed building be required to provide an Alternative Transportation Program for employees and provide an annual report to ACHD on employee participation. Commuteride staff will coordinate the Alternative Transportation Program with the applicant. For more information contact Ms. Catherine Sanchez at 387-6160. 4 2. In order to reduce trips to and from this development, the tenants occupying the proposed building(s) should be required to participate in any Transportation Management Association (TMA) or Transportation Management Organization (TMO) that is formed with a boundary that includes this site or is adjacent to this development. 3. The Overland/Eagle Road and Meridian/Overland Road intersections operate at a Level of Service F (LOS F), and are listed as one of the 100 most critical intersections in Ada County. Access control within the operating area of the intersection is vital to the safe operations of the intersection. The subject site's additional traffic will exacerbate the traffic problems at these intersections. D. Site Specific Conditions of Approval Driveways on Silverstone Way shall be located a minimum distance of 175 -feet from Eagle Road, and shall align or offset a minimum of 125 -feet from any existing or proposed driveways. Pave all driveways to a maximum width of 35 -feet and at least 30 -feet into the site beyond the edge of pavement of Silverstone Way and install pavement tapers with 15 -foot curb radii abutting the existing roadway edge. 2. The following access points on Eagle Road are approved with this application: ♦ A driveway located on Eagle Road approximately 440 -feet south of Overland Road is approved with this application. ♦ A driveway located on Eagle Road approximately 1,150 -feet south of Overland Road (approximately 690 -feet south of the northern driveway) is approved with this application. Both driveways shall be paved a maximum width of 35 -feet and at least 30 -feet into the site beyond the edge of pavement of Eagle Road and install pavement tapers with 15 -foot radii abutting the existing roadway edge. 3. Other than the access points specifically approved with this application, direct lot or parcel access to Eagle Road and Silverstone Way is prohibited. Lot access restrictions, as required with this application, shall be stated on the final plat. 4. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. A 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance. 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLINE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. F. Conclusions of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Preliminary Plat 3. Appeal Guidelines 0 Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply, and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. Appeal Guidelines 7 Development Process Checklist ®Submit a development application to a City or to the County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Division will receive the development application to review ®The Planning Review Division will do one of the following: ❑Send a "No Review" letter to the applicant stating that there are no site specific requirements at this time. ®Send a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also apply to this development application. OWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. OWrite a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. OThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. ®For ALL development applications, including those receiving a "No Review" or "Comply With" letter: • The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. []Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOUREM�1lBER: Construction (Zone) O Driveway or Property Approach(s) • Submit a "Driveway Approach Request" form to Ada County Highway District (ACRD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑ Working In the ACHD Right -of -Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction — Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment & Erosion Submittal • At least one week prior to setting up a Pre -Con an Erosion & Sediment Control ;Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction — Subdivision to be reviewed and approved by the ACHD Drainage Division. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being scheduled. ❑ Flnal Approval from Development Services • ACHD Construction — Subdivision must have received approval from Development Services prior to scheduling a Pre -Con. PLANNING & ZONING DEPARTMENT INSPECTION CHECKLIST COMMERCIAL/CZC SITES This checklist should be attached to the inside cover of the CZC file at ALL times Planner/Inspector Name: b' ,�s , r �(� t� ' `; ��� �h y, I I C1-1�� 1 Project Name: A N n o-• 7 F i✓< CZC File No.: ( o Contractor/Company Name: trr+ Phone No.: 4 First Inspection Date: ! / Second Inspection Date: Third Inspection :Date: _/ /_ (NOTE: If a third inspection is required, a fee of $60 must be submitted to the P&ZDeptbefore the inspection is done.) Landscape Plan Checklist Item I Site Notes t --nw- t,A —I x th of buffer (exclude detachedsfw widths) 2. # of trees — — 3. Caliper/size of trees - (measure 6-8 inches above round) 4. Species mix per plan -- v'� 5. Groundcover (ifseeded, ver! ermination) 6. Right-of-way landscaping 7. Verify no encroachments (e.g. fencing, arking) 8. Berming (mdx. 2.c1 slope,- lope,3 3:1 I z lawn) C Plar;ter rixt L Verify min. Y b/w curbs iYs r.- ----- 2. Verify min. 50 sq. ft. l/ - — -- -V 3. Plantings per plan D Fxistipgtrees/mitigation V 1. Verify existing tree(s) — - retained I' Verifymitigationtrees —� Rev. 5:25; ti i S. tP&Z:6rad.P&Z.4dulir, Deparnrew p0hr, >5 Post -Inspection Checklist *The only instance that a CO maybe released prior to 100% completion of improvement is inclement weather, as determined by the Director. If weather is a factor, follow MCC 12-13-19-2. Rer..5%25it>5 �:irnnevttPolic' ..., <4l, r8r,d7fYctiZ.-ir_ N Date - 1 f a)' $ J Phone -k J O �?7S�l bb -y 0 CD I I I In - I I r I I I I I I m . I I c) 0 a � a 1 I I I i .p DO..:,. i i I 0 0, I I CD I H TAX 8741 RRemived CD _.CD Q' w. W CL W! > =gym m m . z cu r WO N.. H (Yj A ff CLQ N -1w m ED Lo LU F">C) Jm k k llll; :u..'tlVID CITY OP erld4n 33 E. Idaho Ave. T Meridian, ID 83642 Applicant Date - 1 f Address 6 Phone CASHCHF�JC (S 7 7�, NAME ON CHECK IF DIFFERENT THAN APPLICANT I I 1 �?7S�l bb 160 I I I I I I I I I I I I I I 1 I i I 1 I I I i i i I I I I PAYMENT DOES NOT INDICATE ACCEPTANCE OF APPLICATION TAX 8741 RRemived TOTAL 657M ,�vot", Planning Department CERTIFICATE OF ZONING COMPLIANCE Application Checklist Project name: 'u tt 4� File #: bb— 15 (4 Applicant/agent: t)UAA&AU t S All applications are requited to contain one copy of the following unless otherwise noted: Applicant Description Staff � Completed & signed Administrative Review Application Narrative fully describing the proposed use of the property, including the following: ,r V ➢ Information on any previous approvals or requirements for the requested use i.e, applicable conditions ofapproval or Develo went Agreement ta' Recordedwarran deed for thesub•ect ro e f Affidavit of Legal Interest signed & notarized by the property owner (if rnmer is a corporation, submit a copy of the Articles of Incorporation or other evidence to show that the person signing is an authorized agent Scaled vicinity map showing the location of the subject property Sanitary Service Comp--- — —I for hash enclosure & access drive (stamped site plan) A photometric test report for any light fixture(s) with a maximum output of 1,800 lumens lAr or more see UDC 11-3A-11 Site Plan -----4 copies (folded to 8 r/2' x 11" size) The following items must be shown on the siteplan: • Date, scale, north arrow, and proj ect name (scale not less than l"=50') Names, addresses, and telephone numbers of the developer and the person and/or firm preparing the plan Parking stalls and drive aisles • Trash enclosures location ,�"` • Detail of trash enclosure (must be screened on 3 sides) • Location and specifications for underground irrigation (Pressurized iaigation can only be _ waived if you prove no water rights exist to subject property y✓ • Sidewalks or pathways (proposed and existing) ✓'"✓ • Location of proposed building on lot (include dimensions to property lines) • Fencing (proposed and existing) • Calculations table including the following: Number of parking stalls required & provided (specify handicap & compact stalls) ys ➢ Building size (sq. ft.) 0 ➢ Lot size (sq. ft.) ➢ Setbacks ➢ Zoning district rte' Reduction of the site plan 8 %:" x 11" Landscape plan — 3 copies (folded to 8 %" x 11" size) Plan must have a scale no smaller than 1 " = 50'(1 " = 20' is preferred) and be on a standard VZ drawing sheet, not to exceed 36"x 48" (24"x 36" is preferred). A plan which cannot be drmvn in its entirety on a single sheet must be drawn ivith appropriate match lines on two or more sheets. The following items must be included on the landscapeplan: • Date, scale, north arrow, and project name Names, addresses, and telephone numbers of the developer and the person and/or �•, firm preparing the plan 660 E. Watertowcr Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org ACHD Acceptance: Applicant shall be responsible for meeting the requirements ofACHD as they pertain to this application. All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must he made to the site plan to accommodate the ACRD requirements, a new site plan shall be .submitted to the City of Meridian Planning & Zoning Department for approval prior to the issuance ofa building permit. Your building permit will not be issued until ACRD has approved your plans and all associated fees have been paid THIS APPLICATION SHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF IIAS RECEIVED ALL REQUIRED INFORMATION i Existing natural features such as canals, creeks, drains, ponds, wetlands, flood lain, high groundwater areas, and rock outcroppings. + Location, size, and species of all existing trees on site with trunks 4 inches or greater in diameter, measured 6 inches above the ground. Indicate whether the tree will be retained or removed. • A statement of how existing healthy trees proposed to be retained will be ! dam'protected from damage during construction Existing structures, planting areas, light poles, power poles, walls, fences, berms, parking and loading areas, vehicular drives, trash areas, sidewalks, pathways, stormwater detention areas, signs, street furniture, and other man-made elements. Existing and proposed contours for all areas steeper than 20% slope. Berms shall ✓, be shown with one -foot contours. Sight Triangles as defined in 11-3A-5 of this ordinance. Location and labels for all proposed plants, including trees, shrubs, and W�_ groundcovers (trees must not be planted in City water or sewer easements). Scale shown for plant materials shall reflect approximate mature size A plant list that shows the plant symbol, quantity, botanical name, common name, minimum planting size and container, tree class (1, II, or 111), and comments (for spacing, staking, and installation as appropriate). • Planting and installation details as necessary to ensure conformance with all required standards. t • Design drawing(s) of all fencing pro ening purposes Calculations of project components to demonstrate compliance with the requirements of this ordinance, including: ➢ Number of street trees and lineal feet of street frontage ➢ Width of sheet buffers (exclusive of right-of-way) ➢ Width of parking lot perimeter landscape strip ➢ Buffer width between different land uses (if applicable) p.----- �`' ➢ Number of parking stalls and percent of parking area with internal landscaping ➢ Total number of trees and tree species mix ➢ Mitigation for removal of existing trees, including number of caliper inches being removed Reduction of the landscape plan 8 %" x I I" Building elevations showing construction materials '"-- Fee If this project had prior a roval on a site plan, reduced fees may apply) ACHD Acceptance: Applicant shall be responsible for meeting the requirements ofACHD as they pertain to this application. All impact fees, if any, shall be paid prior to the issuance of a building permit. If any changes must he made to the site plan to accommodate the ACRD requirements, a new site plan shall be .submitted to the City of Meridian Planning & Zoning Department for approval prior to the issuance ofa building permit. Your building permit will not be issued until ACRD has approved your plans and all associated fees have been paid THIS APPLICATION SHALL NOT BE CONSIDERED COMPLETE UNTIL STAFF IIAS RECEIVED ALL REQUIRED INFORMATION Planning Department DESIGNREVIEW ■ Application Checklist Project name: '5Q, A5 tl� (k tel` trent File #: Applicant/agent & tD All applications are required to contain one copy of the following: Applicant Description Staff � Provide a detailed statement of how the proposal meets the following standards: vll� 1. Architectural Character: a. Facades: Facades visible from a public street shall incorporate modulations in the facade, roof line recesses and projections along a minimum of twenty percent (20%) of the length of the facade. b. Primary public entrance(s): The primary building entranw(s) shall be clearly defined by the architectural design of the building. Windows, awnings, or arcades shall total a minimum of 30% of the facade length facing a public street. c. Roof lines: Roof design shall demonstrate two or more of the following: a) overhanging eaves, b) sloped roofs; c) two or more roofplanes; d) varying parapet heights; and e) cornices. d. Pattern variations: At least two changes in one (or a combination) of the following shall be incorporated into the building design: color, texture and/ materials. e. Mechanical equipment: All ground -level and rooftop mechanical equipment shall be screened to the height of the unit as viewed from the property line. 2. Color and materials: Exterior building walls shall demonstrate the appearance of high-quality materials of stone, brick, wood or other native materials. Acceptable materials include tinted or textured masonry block, textured architectural coated concrete panels, tinted or textured masonry block, or stucco or stucco -like synthetic materials. Smooth -faced concrete block, tilt -up concrete panels, or prefabricated steel panels are prohibited except as accent materials. 3. Parking Lots: No more than 70% of the off-street parking area for the structure shall be located between the front fagade of the structure and abutting streets, unless the principal buildings) and/or parking is/are screened from view by other structures, landscaping and/or berms. 4. Pedestrian walkways: a. A continuous internal pedestrian walkway that is a minimum of eight feet in width shall be provided from the perimeter sidewalk to the main building entrance. The walkway width shall be maintained clear of any outdoor sale displays, vending machines, or temporary structures. b. The internal pedestrian walkway shall be distinguished from the vehicular driving surfaces through the use of pavers, colored or scored concrete, or bricks. c. Walkways at least eight feet in width, shall be provided for any aisle length that is greater than 150 parking spaces or 200 feet away from the main building entrance. d. The walkways shall have weather protection (including but not limited to an awning or arcade) within 20 feet of all customer entrances. set 'f scaled building elevations, with building materials, colors and textures specified Icomplete ductions of the elevations 8 Y:" x 11"e All requests for design review approval trust meet the procedures set forth in UDC 11-5 and the criteria set,jorth in UDC 11-3A-19 or the document "Downtown Meridian Design Guidelines", as applicable, THIS APPLICA TIONSHALL NOT BE CONSIDERF,D COMPLETE UNTIL S7AFFHAS RECEIVED ALL REQUIRED INFORMATION 660 E. W atertower Lane, Suite 202 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6854 • Website: www.meridiancity.org --_-- ZOSL-- -- 1-q fi—p �aa�oq pays nv...nn a(Z wN•-,e .,-rx r•x .�.w..,,n.r OHtl01 'NtlIOItl3W OtlOtl V(1l l E131N3031VHOdtlOO 3NO1Stl3A�IS IHSNS tlNtlNtlS g i y € W v 'V'd 's}aag?.ya�y uos.ero7 .�u®v.n„raomm,ux..w.,>.,,wxu.nrarc n.ay.a,�.vunu ,w. w.nvr..n,.n ,O.e,,.uw i i 3 1 CA �N p� g - h o � ae ? PM e��� i i i OtlOtl 310VFI 'S § ) _,k+w 7naa¥S ]�.- . 2 a q -. \ - % ]�.- . 2 a q -. \ � ! « ]�.- . 2 a q -. \ \�\ _,#_m mmm JeOIPGN MOIA01beN � / �/ z ,2 (jig I` \ zi m,a \) }zz co 4 o- z O w w W 3:1i 478-1Y,_06V1Z:'L6' '�HOM-SSG N ul 0) nl I .I I II ii 11 I I v ------------ 20888F�952 s T-504 P002/002 F-352 S ICE COMPAW i+a iLLn crg'�c Apra✓+ io K io 2 s - 1Ut6:6:D; `!1 WA i'UUNTYRECURDEn T® "RC1 �+ "Calwgm�yi. AND NAVARRO OVAGA COUNTY It :1 I -Mill - n HOD C-4 94 4.23 an W= SUde Sam / 30ise, Zdah) 9370 (2O6D J36.a7OO: 3131 W, Rifleman S4sne[ / 9nise,.7dahu 33704 WARRANTY DEED (INOIVIOUA6j RECORDED •P,EDUcST OF gEEDE21J i Y 10��i965� Pto9Vs IpAcil,move MIt>(�'=Nr FOR `rALULe RLaCF.tV@O nAVXD W„ "ins" an ullmaar].ad parscao OUWTOR(si Jori (do) trashy IMANT, BARGAIN, SFJJ. and CONVEY untc 5'nD9n"' )NRES11iE1VT9 LTAgZT^,_g PA1tZh1E&HSiE> .v1 bdaftn limited pa.eeaership GRANTEF.(S), whmsa.unrene nddmyx Is. 41(70 alae:rangle. �a=v¢, fls�se, Sdahr¢ 53709 cha Cdaawlnd dsscrihadseml prapersy (n .are mer"eiyiai ly dacrifted st Cdgaw., to wit. Ada EatLor, seta of iuuFio, Sn'E TIM A'id'AOAEH h'ZHML2 '°d" FOR LEGAL UESC1tt2TSOAi, 6fOSCii 37 $dSa" NE.Py SHCE 1S zNCORPORAren EtiRMIl. 7o f . A the 'ajc cO,,m the slid gremhes, e+ith their aotimaaanees anon me'ald Qtrulasom), sod raftua�s(s) l.as and a..iM fu� Wee, And the said : in. Pdd deny (da0 hereby W'a'"c n 4e ;tad with the said Grnntee(sl. die Crsnrer(s) is/are the wna(s) ,u lee .imole ui said premises; nif said a, duties ars frCc tram sit enoemtxmrers, =C'd1xY those re whieh IMrmnvayamce ie eryresly msdn snitiecx sad throe mode, suffinesd.mr dyne by rhe Cru"Mis): and nWi, m art "P ab re tojedaaq, dadirteian., rmtln n. oire tidos a. way Ltd nereenlemd. fif ,aty) of reread, sod exmeral msev arraiand :waes�eyaty, tartness haigmann aea al eAyeasmcmb, (df snY1 for nm wr,er, euren¢ !tour, which are ❑at rex dsxa and otlYaltla, and line Grmntmr(s1 vii! warrant and defend tits mate tram a4 lawful c)mmc 34"ol Ocenhar 4, 2001) . OF ®. Cnuney of ,ao On On this )a. f$La&A Str^ dry of Ocsnhc�® Tan ouch �. 13W, lRolury Ptshliq'?ermntWv . ,� In the year me—o00 l.vejeRme i� %9Pamred _ , . .. $ -i Utawn idn la dM119t c ep awriwtsus^esmme(9) 1s iet9irnm 3�t seissedhed �R R W,— he— Qtanitted the nliire: v— tome`Nidtla yy1 Y.•.� kl ° o �aaaty Ptlhlir: �T rmBls6ya¢l� �� Betiding tae Dais.,, ' March 17. ?Onsru r �1iBfie'f.it,�1'�f?Tff3Si�1N37�liiP/;Njj+,�SOl1�}� — ru 'a - iTl`.71r.�$tr(. 1�1�l�laii'tl4'f�sl!)2x�i`•i IQ/S0t1 i'$hlYS69:O - 'M) 17)hiv(Mnq WT. ).n5°J. 795' 902 Yrd):CT /f, Lk Tn.1it9/nT . FILE NO.; P1194654 E) 2317 A P, 02i®1 THAT PORTUN OF THE WEST HALF' OF THE MORTHOEST QUARTER OF SECTION 21, TOWNSHIP a MONTH, RANGE I EAST OF BOISE MERIDIAN IN ACA COUflr'o IDAHO, DESCRIBED AS FULL3%S: SERIMMIN0 AT THE AORTHWEST CORNER OF SAID SECTION 23 4, THENCE 3600 C HESREE 144460 NEST ALONG THE. WEST LINE. DF SAID SECTION 1376.00 FEET1 THENCE SOU7H 86 UDREES 45'14' EAST 713,00 F'EE73 THENCE NORTH DO OEGREE 14'464 EAST,9076 FE®T' 70 THE 'NORTH LINE OF SAID SECTI01l 21; THENCE WORTH DR DESREER 1.x"29" WEST, ' ALbma SAID NORTH LINE 755.06 FEET TO THE POINT OF BED%!NN LAIR. g2rGap'r THA -r PORTION CONOMANED'By TAKE ALBA COUNT"r HIGHWAY DISTRICT BY INSTRUMENTS RE -CORDED UNOER NOS, 9016546 AND $029569 AND OXCEPT THOSE ;PORTIONS WHICH LIE WITHIN THE SIGHT OF IMAYR FOR EAGLE R®A0 AND OVERLAND ROAD. END OF urffAL masanTlaw )0/900M 'Immoo 'P '00 mmvehms 5M.T. Ines 29r 4aff -ria 1*0-eT MMA Ta/*V.JPAT AFFIDAVIT OF LEGAL INTEREST STATE OF IDAHO COUNTY OF ADA I �undanee timi d pQJ41L'o-PTA:P 9Dr,& lei. 8AdLe&,L dam-�A' (name) lCl dress) 41) (city) (state) being first duly sworn upon, oath, depose and say: That I am the record owner of the property described on the attached, and I grant my permission to: 4. Lr,rlrn 41 <!r1/'feefS alb �%LcY�r ��j e�f t 43015e (name) (address) to submit the accompanying application(s) pertaining to that property. 2. 1 agree to indemnify, defend and hold the City of Meridian and its employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property which is the subject of the application. 3. 1 hereby grant permission to City of Meridian staff to enter the subject property for the purpose of site inspections related to processing said application(s). Dated this / % �-" day of; � —, v >/--- , 20 ' r� (Signature) SUBSCRIBED AND SWORN to before me the day and year first above written. c y � ge�rrs:ee on aaeca �,��i,% � 'ONNA.' A �0. Wyea ,�� Il��°„, (Notary Public for Idaho) C ® 0'r AR f 2 Residing at: I J tI i•yO m My Commission Expires: ®®®�� OF AA