Loading...
CC - Staff Report REVISED 4-16 STAFF REPORT E IDIAN�-- COMMUNITY DEVELOPMENT DEPARTMENT p HEARING April 16,2024 Legend DATE: Continued from:March 26, 2024 Prolec= Loco?or TO: Mayor&City Council FROM: Sonya Allen,Associate Planner 'S 208-884-5533 ----- SUBJECT: Reveille Ridge Subdivision—AZ,PP H-2023-0050 _ -{�- ----- LOCATION: 7355 S. Eagle Rd.,in the east'/z of Section 5,T.2N.,R.1E. (Parcels: 51405417400, 51405142100, S1405427800& 51405131500) I. PROJECT DESCRIPTION Annexation of 59.97 acres of land with R-8 (34.69 acres) and R-15 (25.28 acres)zoning districts; and Preliminary Plat consisting of 246 building lots and 38 common lots on 59.77 acres of land in the R-8 and R- 15 zoning districts for the Reveille Ridge Subdivision. II. SUMMARY OF REPORT A. Project Summary Description Details Acreage 59.77 acres Future Land Use Designation Low Density Residential(LDR)(31+/-acres)&Medium Density Residential (MDR)(28+/-acres) Existing Land Use Rural residential/agricultural Proposed Land Use(s) Single-family detached/attached&townhome dwellings Current Zoning Rural Urban Transition(RUT)in Ada County Proposed Zoning R-8(Medium Density Residential)&R-15 (Medium-high Density Residential) Lots(#and type;bldg/common) 246 building/38 common Phasing plan(#of phases) 4 Number of Residential Units(type 170 single-family detached, 14 single-family attached,62 townhome units of units) Density(gross&net) 4.13 units/acre overall(gross)(2.96 units/acre in LDR; 5.3 units/acre in MDR) Open Space(acres,total[%]/ 11.78 acres(or 19.71%) buffer/qualified) Pagel Amenities Pathways,picnic areas,fitness stations. Physical Features(waterways, The Williams Northwest gas pipeline runs through this site within a 75'wide hazards,flood plain,hillside) easement. The Farr Lateral runs along the northern boundary on the east portion of the site. Neighborhood meeting date 6/15/23 History(previous approvals) None B. Community Metrics Description Details Ada County Highway District • Staff report(yes/no) Not yet • Requires ACHD No Commission Action es/no • TIS(yes/no) Yes • Level of Service(LOS) Eagle Road south of Lake Hazel Road is operating at a LOS of better than "D"according to the TIS. • Existing Conditions There is one driveway serving the existing home via S.Eagle Rd.,a 2-lane roadway • CIP/IFYWP No improvements planned directly abutting the site.Lake Hazel Rd. is scheduled in the IFYWP to be widened to 5-lanes from Locust Grove to Eagle Rd.in 2024 and to 5-lanes from Eagle to Cloverdale Rd.in 2025.The intersection of Lake Hazel&Eagle Rd. is scheduled in the IFYWP to be widened to 5-lanes on the north leg,4-lanes on the south,4-lanes on the east, and 3-lanes on the west leg to be reconstructed in 2024. Access(Arterial/Collectors/State One(1)access is proposed via S.Eagle Rd.,a residential arterial street.A Hwy/Local)(Existing and Proposed) north/south and an east/west collector street are proposed. Several stub streets are proposed to adjacent properties for future extension and interconnectivit . Proposed Road Improvements No funded improvements and no planned improvements. Fire Service • Distance to Fire Station 1.0 mile from Station 7 • Fire Response Time Project falls in an area where the FD doesn't have total response times for an effective firefighting force that meet NFPA 1710 standards or current City adopted standards. • Resource Reliability Unknown for Station 7 as it just opened; 77%for Station 4,which doesn't meet the 80%goal • Risk Identification 2(current resources would not be adequate to supply service to this project) • Accessibility Meets all requirements • Special/resource needs Will require an aerial device; can meet this need • Water Supply 1,000 gallons/minute for one hour • Other Resources Police Service No comments received School District(s) No comments received Wastewater • Distance to Sewer Services Page 2 • Sewer Shed • Estimated Project Sewer ERU's See application • WRRF Declining Balance • Project Consistent with WW Yes Master Plan/Facility Plan • Impacts/Concerns Flow is committed. See Public Works Site Specific Conditions Water • Distance to Services Water available at site. • Pressure Zone 5 • Estimated Project Water ERU's See application • Water Quality Concerns None • Project Consistent with Water Yes Master Plan • Impacts/Concerns See Public Works Site Specific Conditions in Section IX.B of this report. C. Project Maps Future Land Use Map Aerial Map Legend 0 Legend � P 3eaiLuca ton �- Prcjec- Lxa=or Id NE lei bw IOU Iw• 'm Y Y 1 -'1 me IU g��flai r _ Ili Low Density 1' Residenfial ! ��W ' _6 Page 3 Zoning Map Planned Development Map Legend 0 Legend Pro" t Locator. 4 Pro" t Luca ff 1� 1� - CityUni�, — Manned Pore's � R_ RUT - i i R-4 '9 R-`1. 5 � II RUT -R= -RR RUT M1 ---- -y}k= III. APPLICANT INFORMATION A. Applicant: Judy Schmidt,Bailey Engineering— 1119 E. State St.,#210,Eagle,ID 83616 B. Owners: Endurance Holdings,LLC— 1977 E. Overland Rd.,Meridian, ID 83642 C. Representative: Shawn Brownlee,Trilogy Development—9839 W. Cable Car St., Ste. 101,Boise,ID 83709 IV. NOTICING Planning&Zoning Posting Date Newspaper notification published in newspaper 1/30/2024 3/10/2024 Radius notification mailed to property owners within 300 feet 1/26/2024 3/l/2024 Public hearing notice sign posted 1/24/2024 3/12/2024 on site Nextdoor posting 1/30/2024 3/4/2024 V. COMPREHENSIVE PLAN ANALYSIS FUTURE LAND USE: Approximately 31-acres of the eastern portion of this property is designated Low Density Residential(LDR)and approximately 28-acres of the western portion is designated Medium Density Page 4 Residential(MDR) on the Future Land Use Map (FLUM)contained in the Comprehensive Plan (see map above in Section II.C). The LDR allows for the development of single-family homes on large and estate lots at gross densities of three dwelling units or less per acre. These areas often transition between existing rural residential and urban properties. Developments need to respect agricultural heritage and resources,recognize view sheds and open spaces, and maintain or improve the overall atmosphere of the area. The use of open spaces,parks,trails, and other appropriate means should enhance the character of the area. Density bonuses may be considered with the provision of additional public amenities such as a park, school, or land dedicated for public services. The MDR designation allows for dwelling units at gross densities of 3 to 8 dwelling units per acre. Density bonuses may be considered with the provision of additional public amenities such as a park, school, or land dedicated for public services. TRANSPORTATION: ACHD's Master Street Map(MSM)depicts an east/west collector street across this property from S. Eagle Rd. to the west property boundary and a north/south collector street along the west boundary of the site. This property is within the area governed by the South Meridian Transportation Plan. No improvements are planned directly abutting the site in the CIP or IFYWP. Lake Hazel Rd. is scheduled in the IFYWP to be widened to 5-lanes from Locust Grove to Eagle Rd. in 2024 and to 5-lanes from Eagle to Cloverdale Rd. in 2025. The intersection of Lake Hazel&Eagle Rd. is scheduled in the IFYWP to be widened to 5-lanes on the north leg,4-lanes on the south,4-lanes on the east, and 3-lanes on the west leg to be reconstructed in 2024. PROPOSED USE: The subject property is proposed to develop with a mix of single-family residential detached and attached dwellings and townhome dwellings at a gross overall density of 4.13 units per acre (2.96 units/acre in LDR and 5.30 units/acre in MDR)consistent with the density desired in the Comprehensive Plan for this area. Goals,Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed use of this property(staff analysis in italics): • "Encourage a variety of housing types that meet the needs, preferences, and financial capabilities of Meridian's present and future residents."(2.01.02D) The proposed single-family attached and detached dwellings and townhome dwellings will provide a mix of housing types to meet the needs,preferences and financial capabilities of present and future residents in the City as desired. • "Permit new development only where it can be adequately served by critical public facilities and urban services at the time of final approval, and in accord with any adopted levels of service for public facilities and services."(3.03.03F) City water and sewer service is available and can be extended by the developer with development in accord with UDC 11-3A-21. • "Require all new development to create a site design compatible with surrounding uses through buffering, screening,transitional densities, and other best site design practices."(3.07.01A) The proposed site design with smaller lot sizes abutting similar size lots to the north planned in Vertex Subdivision and to the west adjacent to Discovery Park, a 75-acre City park, and MDR designated property to the west and south; and larger lots abutting similar size lots to the north in The Keep Subdivision and to LDR designated property to the east will provide a good transition in density and lot sizes to existing and future development. Page 5 • "Encourage compatible uses and site design to minimize conflicts and maximize use of land." (3.07.00) The proposed residential uses and site layout should minimize conflicts and maximize use of land. • "Ensure development is connected to City of Meridian water and sanitary sewer systems and the extension to and through said developments are constructed in conformance with the City of Meridian Water and Sewer System Master Plans in effect at the time of development."(3.03.03A) The proposed development will connect to City water and sewer systems with development of the subdivision;services are required to be provided to and though this development in accord with current City plans. • "Require pedestrian access in all new development to link subdivisions together and promote neighborhood connectivity."(2.02.01D) A 10'wide multi-use pathway is proposed through the site from the south to the north boundary within the Williams Pipeline easement and a 5'wide pathway is proposed along the Farr Lateral on the northeast portion of the site, which should be widened to 10'in accord with the Pathways Master Plan. Other micro paths and internal pathways are proposed for pedestrian connectivity within the development. • "Require urban infrastructure be provided for all new developments,including curb and gutter, sidewalks,water and sewer utilities."(3.03.03G) Urban sewer and water infrastructure and curb, gutter and sidewalks are required to be provided with development of the subdivision. • "Eliminate existing private treatment and septic systems on properties annexed into the City and instead connect users to the City wastewater system; discourage the prolonged use of private treatment septic systems for enclave properties." With redevelopment of the site, the septic system for the existing home should be abandoned. • "Reduce the number of existing access points onto arterial streets by using methods such as cross- access agreements, access management, and frontage/backage roads, and promoting local and collector street connectivity."(6.01.02B) There is currently one(1) access driveway via S. Eagle Rd.for this property, which will be replaced by a collector street that will extend to the west boundary of the site for future extension.Another north/south collector street is proposed along the west boundary of the site for future extension to the north and south. These collector streets should increase connectivity in this area and distribute traffic from the arterial street. Stub streets are proposed to adjacent properties to the north fronting on S. Eagle Rd., which should reduce access points to the arterial street in the future. VI. STAFF ANALYSIS A. ANNEXATION(AZ) The Applicant proposes to annex 59.97 acres of land with R-8 (34.69-acres) and R-15 (25.28-acres) zoning districts and develop the site with a mix of single-family attached and detached and townhome dwellings at densities consistent with the underlying LDR and MDR FLUM designations as discussed above in Section V. A legal description and exhibit map for the overall annexation area is included in Section VIII.A along with individual legal descriptions and exhibit maps for individual zones. This property is within the City's Area of City Impact boundary. Page 6 A preliminary plat and conceptual building elevations were submitted showing how the property is proposed to be subdivided and developed with 246 building lots and associated common area and public streets(see Section VIII). Single-family attached and detached and townhouse dwellings are listed as a principal permitted use in both the R-8 and R-15 zoning districts per UDC Table 11-2A-2. The City may require a development agreement(DA)in conjunction with an annexation pursuant to Idaho Code section 67-6511A. To ensure the subject property develops as proposed, Staff recommends a DA is required with the provisions discussed herein and included in Section IX.A. B. PRELIMINARY PLAT(PP): The proposed preliminary plat consists of 246 building lots and 38 common lots on 59.77 acres of land in the proposed R-8 and R-15 zoning districts as shown on the preliminary plat in Section VIII.B. A mix of front-and alley-loaded single-family detached(170), single-family attached(14) and townhomes (62) are proposed. Building lots range in size from 2,600 square feet(s.f.) (or 0.6-acre)to 14,798 s.f. (or 0.34- acre). Phasing Plan: The subdivision is proposed to develop in four(4)phases per the phasing plan in Section VIII.B. The first phase is located along the southern boundary of the site and includes construction of all of the collector streets within the site. The second phase is the northeast portion of the development. The third phase is centrally located and contains the pond and most of the common open space for the development, including the linear open space in the Williams Pipeline easement. The fourth phase is the northwest portion of the development. Staff recommends the phasing plan is revised to switch Phases 2 and 3 so the open space is provided in an earlier phase for the enjoyment of residents. The phasing plan has been revised as recommended. Existing Structures/Site Improvements: There is an existing home and several other structures on the property that are not being retained that are required to be removed prior to submittal of the final plat for City Engineer's signature.There is also an existing driveway via S. Eagle Rd. that will be replaced with a public street. Dimensional Standards (UDC 11-2): The proposed plat and future development is subject to the dimensional standards listed in UDC Table 11-2A-6 for the R-8 zoning district and Table 11-2A-7 for the R-15 zoning district, as applicable. Zero (0) setbacks should be depicted on the plat where single- family attached and townhome structures are proposed to span across lot lines where no easements will exist.Note: Street setbacks are measured from back of sidewalk,which will affect building placement on lots along collector streets. Subdivision Design&Improvement Standards: The proposed subdivision is required to comply with the design and improvement standards listed in UDC 11-6C-3,including those for streets and alleys. Product Type: A mix of single-family attached and detached and townhome dwellings are proposed to develop on the site as shown on the exhibit map in Section VIII. Access: Public streets and alleys and a common driveway are proposed for access within the development. Two (2)collector streets are proposed in accord with ACHD's Master Street Map as noted above in Section V. Homes fronting on the collector streets do not have access from the collector streets. Public stub streets are proposed to adjacent properties to the northeast,north,west and south for future interconnectivity and to reduce future access points on S. Eagle Rd., in accord with UDC 11-3A-3A.3. A common driveway is proposed on Lot 51,Block 16 for access to Lots 52-54,Block 16; compliance with the standards listed in UDC 11-6C-3D for such is required. A perpetual ingress/egress is required as a note on a recorded final plat or a separate recorded easement. The easement or plat note shall include a requirement for maintenance of a paved surface capable of supporting fire vehicles and Page 7 equipment.A common driveway exhibit that demonstrates compliance with the R-15 dimensional standards is included in Section VIII.F; future development of these lots should be consistent with this exhibit.Fencing is required along Lot 51,Block 16 to distinguish common from private areas as set forth in UDC 11-3A-7A.7a.A 5-foot wide landscape buffer planted with shrubs,lawn or other vegetative groundcover should be provided along the southwest side of the common driveway on Lot 51,Block 16 in accord with UDC 11-6C-3D.5. Pathways: All pathways should be constructed in accord with the standards listed in UDC 11-3A-8. A 10' wide multi-use pathway is required within the Williams Pipeline easement and along the south side of the Farr Lateral in a 14-foot wide public pedestrian easement in accord with the Pathways Master Plan. Other pathways are proposed throughout the site for internal pedestrian connectivity. The 10-foot wide multi-use pathway within the Williams Pipeline easement should be extended through Lot 1, Block 14 for future extension to the south. The 10-foot wide multi-use pathway along the Farr Lateral in Lot 16,Block 2 should also be extended to the northwest to connect to the multi-use pathway in Vertex Subdivision to the north.In order to provide connectivity between the multi- use pathways within the site, Staff recommends a 10-foot wide sidewalk is provided along Taps to between the Williams pipeline pathway and the Farr Lateral pathway. Sidewalks/Parkways(11-3A-17): For public safety, Staff recommends 10-foot wide detached sidewalks are provided along all collector and arterial streets within and adjacent to the site; parkways should comply with the standards listed in UDC 11-3A-17. The plat and landscape plan, should be revised accordingly. Landscaping: A minimum 25-foot wide street buffer is required along S. Eagle Rd., an arterial street, measured from ultimate back of curb location; and 20-foot wide street buffers are required along E. Vantage Pointe and St L, collector streets,per UDC Tables 11-2A-6 and 11-2A-7. The buffer along E. Vantage Pointe on Blocks 12 and 15 needs to be fully landscaped,including the area on the back side of the sidewalk.Landscaping is required within the street buffers and parkways in accord with the standards listed in UDC 11-3B-7C.3; the landscape plan should be revised to include a mix of landscaping materials and a calculations table that demonstrates compliance with the standards.All street buffers should be in a common lot or on a permanent dedicated buffer easement maintained by the property owner or homeowner's association; street buffers should be depicted on the plat accordingly and labeled as such. Landscaping,including trees and shrubs,should be depicted on the landscape plan within the 5' wide landscape strip on each side of all pathways as set forth in UDC 11-3B-12C.Note:Alternative compliance may be requested for the trees along the pathway in the Williams pipeline easement as set forth in UDC 11-5B-5. There are several existing trees on the site—where possible,existing trees should be retained. Mitigation is required in accord with the standards listed in UDC 11-3B-10C.5; calculations demonstrating compliance with the aforementioned standards should be depicted on the landscape plan. Common Open Space& Site Amenities(UDC 11-3G-3): A minimum of 15% (or 8.97-acres)common open space is required to be provided in the R-8 and R-15 zoning districts per UDC Table I1-3G-3. Open space areas are required to comply with the quality standards listed in UDC 11-3G-3A.2. The qualifications for open space are outlined in UDC 11-3G-3B. An open space exhibit was submitted as shown in Section VIII.D that depicts common open space totaling 14.79-acres(or 24.74%); qualified open space consists of 11.77-acres(or 19.69%), exceeding the minimum standard. Qualified areas consist of open grassy areas of at least 5,000 square feet in area, linear open space, a pond with site amenities (i.e.picnic areas), and active and passive open spaces. Page 8 Based on 59.77-acres of development area, a minimum of 12 site amenity points is required to be provided. For projects such as this that are over 40-acres in size,multiple amenities are required from each of the categories listed in UDC Table 11-3G-4. The Applicant proposes amenities in accord with the minimum standards from each of the required categories, as follows: T e Description Points Quality of Life Picnic Areas 3 6 Pedestrian Amenities Multiuse Pathways .5 miles 2 Quality of Life Fitness Course 6 stations 2 Recreation Activity Tot Lot 1 Mutti-modal Bike Repair Station 1 Total 12 The proposed amenities should comply with the associated standards listed in UDC 11-3G-4C, D, E and F. Open Water Pond: An open water pond exists on the site that is proposed to remain on Lot 1, Block 16. The pond is required to have recirculated water and be maintained such that it does not become a mosquito breeding ground as set forth in UDC 11-3G-3B.6. Parking: Off-street parking is required to be provided for each home based on the total number of bedrooms per unit as set forth in UDC Table 11-3C-6. Two(2) off-street parking areas with a total of 16 parking spaces are proposed on Lots 20 and 80,Block 16. Williams Pipeline: The Williams Northwest Gas Pipeline crosses this site within a 75-foot wide easement contained in common lots as depicted on the preliminary plat. Any development and/or improvements within the easement should comply with the Williams Developer's Handbook. Waterways: The Farr Lateral exists along the eastern portion of the northern boundary of the site within a 55-foot wide easement(25-feet on the north side and 30-feet on the south side of the lateral's centerline). All irrigation ditches and laterals crossing this site that aren't being improved as a water amenity or linear open space as defined in UDC 11-1A-1 are required to be piped or otherwise covered as set forth in UDC 11-3A-6B.3,unless otherwise waived by City Council. The Applicant requests a waiver from Council to leave the Farr Lateral open and not pipe it as allowed in UDC 11-3A-6B.3a. To preserve public safety,the Applicant proposes to construct a 6' tall wrought iron fence along the northern boundary of Lot 16,Block 2 outside of the Boise Project Board of Control's easement in accord with UDC 11-3A-6C and the Pathways Master Plan. Fencing: All fencing is required to comply with the standards listed in UDC 11-3A-6C and I1-3A-7, as applicable. The landscape plan depicts a mix of 6' tall vinyl privacy fencing and 5' tall wrought iron fencing. Because there is a common lot with a pathway planned in Vertex Subdivision along the northern boundary of the site,Staff recommends the fencing in this location is changed to 5'tall wrought iron fencing to match that on the north side of the pathway and that proposed on this site to the east along the Farr Lateral in accord with UDC 11-3A-7A.7b. Utilities(UDC 11-3A-21): Connection to City water and sewer services is required in accord with UDC 11-3A-21. Street lighting is required to be installed in accord with the City's adopted standards, specifications and ordinances. A pressure reducing station is proposed on Lot 1,Block 19. Pressurized Irrigation System (UDC 11-3A-I5): Underground pressurized irrigation water is required to be provided to each lot within the subdivision as set forth in UDC 11-3A-15. Page 9 Storm Drainage(UDC 11-3A-18):An adequate storm drainage system is required in all developments in accord with the City's adopted standards, specifications and ordinances.Design and construction shall follow best management practice as adopted by the City as set forth in UDC 11-3A-18. A Geotechnical Evaluation was submitted with this application. Building Elevations: Several conceptual building elevations of 1-and 2-story single-family detached, attached and townhome dwellings were submitted as shown in Section VIII.E. Building materials consist of a variety of horizontal and vertical siding and stucco with stone/brick veneer accents. Because homes on lots that face collector(E.Vantage Pointe& St L) and arterial(S.Eagle Rd.) will be highly visible,Staff recommends the rear and/or sides of structures facing these streets incorporate articulation through changes in two or more of the following: modulation(e.g. projections,recesses, step-backs,pop-outs),bays,banding,porches,balconies,material types,or other integrated architectural elements to break up monotonous wall planes and roof lines that are visible from the subject public streets. Design review is required for all single-family attached and townhome structures; design review is not required for single-family detached structures. VII. DECISION A. Staff: Staff recommends approval of the proposed annexation with the requirement of a Development Agreement, and preliminary plat per the provisions in Section IX in accord with the Findings in Section X. B. The Meridian Planning&Zoning Commission heard these items on February 15t''. At the public hearing,the Commission moved to recommend approval of the subject AZ and PP requests. 1. Summary of Commission public hearing: a. In favor: David Bailey, Bailey Engineering(Applicant's Representative) b. In opposition: Dave White,Jeff Luckey,Brian Miller,Jarron Langston, CraigSmith, mith, Carrie Miller,Matthew Pond c. Commenting None d. Written testimony: Kelli Black,Bailey Engineering(Applicant's Representative)—in agreement with staff report; and several letters of opposition from the public(see public record). e. Staff presenting application: Sonya Allen f. Other Staff commenting on application: None 2. Ke. ids)of public testimony a. Opinion the proposed density is too high for this development with existing infrastructure constraints; b. Concern pertaining to safety of roads in the immediate area; c. Request for a better transition in lot sizes to adjacent properties. 3. Ke, ids)of discussion by Commission: a. Would like to see a better transition in lot sizes to adjacent existing properties,especiallX to The Keep to the north. 4. Commission change(s)to Staff recommendation: a. None 5. Outstandin issue(s)ssue(s) for City Council: a. The Applicant requests City Council approval of a waiver to UDC 11-3A-6B.3a to leave the Farr Lateral open and not pipe it as allowed in UDC 11-3A-6B.3a. To preserve public safety,the Applicant proposes to construct a 6' tall wrought iron fence along the Page 10 northern boundary of Lot 16,Block 2 outside of the Boise Project Board of Control's easement adjacent to the pathway. b. The Commission requested the City Council review the transition of the proposed R-8 zoned lots to the existing R-2 lots in The Keep subdivision along the Farr Lateral and decide if the proposed transition is in the best interest of the City. C. The Meridian City Council heard these items on March 26,2024. At the public hearin .tg�he Council moved to continue the project to April 16t'in order to obtain comments from WASD and for the Applicant to make changes to the plat to provide a better transition in lot sizes to The Keep Subdivision to the north. 1. Summary of the City Council public hearing: a. In favor: David Bailey,Bailey Engineering(Applicant's Representative) b. In opposition:None c. Commenting: Bryan Miller, Carrie Miller,Jeff Luckey,Lori Billaud,Jarron Langston d. Written testimony: Craig Smith: Kelli Wilkins e. Staff presentingApplication: Bill Parsons f. Other Staff commenting on application: None 2. Key issue(s)of public testimony: a. Letter from Craig Smith—Request for a better transition(i.e. larger/fewer lots) abutting his 5-acre property to the east of the site similar to that discussed to The Keep to the north: b. Letter from Kelli Wilkins—Opposed to the density of the proposed development— Mquest for lower density(i.e. larger/fewer lots) abutting her 5-acre property to the east. C. Concern pertainingto the proposed density(too high),not enough transition in lot sizes to existing lots in The Keep subdivision,concern to pertaining to existing roads not being adequate to serve the development. 3. Key issue(s)of discussion by City Council: a. Lot transitions, safety for children with retention of the existing pond and impact on area schools. 4. City Council change(s)to Commission recommendation: a. None Page 11 VIII. EXHIBITS A. Annexation Legal Description and Exhibit Map Description for Annexation September 8, 2023 A parcel of land located in the South 112 of the Northeast 114, and the North 112 of the Southeast 114 of Section 5.Township 2 Norlh, Range 1 East, Boise Me6dian, Ada County, Idaho, more particularly described as follows: Commencing at the iA corner common to Sections 4 ana b, 7.2N.,R.1E., B,M-,from which the Section corner common to Sections 4, 5, 8 and 9, T.2.N., R.1.E, 6-M_,hears South 00'12'47"Wast. 2653.27;thence on the east boundary line of said Section 5, South 00912'47"West, 458.11 feet to the POINT OF BEGINNING; thence continuing, South 0012'47"West, 2 50.04 feet; thenca IQa+ring said oast boundary line,North 74°b8'26"West.800.00 feet; thence North 73°2926"Vest,560.00 feet; thence North 89°18'26"West.500,80 feet: thence South 89°48'34"West, 841.23 feet to the north-south centerline of said Section 5; thence on said north-south centerline, North 00°00'59"East, 332.88 feet to the Center 114 corner of said Section 5: thence continuing on said north-south oentedine. North 00°01'18" East,820.62 feet: thence leaving said north-south centerline. South 78°30'03"East, 191.66 feet; thence North 43"00'19"East, 108.41 feet; thence North 68°36'36"East, 694.84 feet; thence South 46"02'S2"East, �70.M feet: thence South '5921" East,64.51 feet; thence North 00°2NOV West, 30.48 feet to the Southwest corner of Keep Subdivision as filled in Book 119 of Plats at Pages 18374 through 18379,records of Ada County, Idaho; P,� L'1'y0 thence on the south boundary line of said Keep Ns Subdivision the following eight(8)courses and distances; 11779 South 64"48'10"East,6b ��,24 feet; n , r South 79"33'09"East,55.80 feet; - 'f m o, Page 1 of 2 Page 12 North 82"37'W' East, 39.20 feet; North 71 W'4 " East, 41.47 feet; North 8U°45'02" East, 58.56 feet; North 88"5&42" East, 252,30 feet-, North 8503916" East, 60.03 feet; North 671183'39" East, 125.97 feet to the nofthwest corner of Derry Subdivision as filed in Book 108 of Plats at Pages 15160 and 15181, records of Ada County, Waho; thence South 00°13'22"West, 1157.89 feet to the southwest comer of said Derry Subdivision thence on the south boundary line of sad Derry Subdivision and the easterly prolongation of, South 74"06'45" East, 762.45 feet to the POINT OF BEGINNING Containing 59.969 acres, more or less- End of Description- pL LA X D F p Page 2 of 2 Page 13 � R9 & Subvi-�n £ — L | . e L L1 G � 0a m Li w ® � t § Derry \ t5g31139 Acre \ _ . � r \ � Q a ell 1A u S.5 . 4 p Paint of 7 � \ 0 ® � �(. z �amp &B4 'W B4122 H89-1E26■ mm . a , � Line T Ee Line Table % m | e Bouring erg■ LFe B_i uinga | / u SK, q' a04 N& '7 39 ' § L-2 E3E27 1 .6' Q 1'27%yE w.47 /0D U 0'19% 10B«' uo N50-1,5`2 5B.e' #, ; 9 ,% ` 211 NBB'5a 7 30 L5 m=2 2' 3o 4B 2 38'1 E Mm' ° V) US 24'48'1eE 6 24 u3 A 3' % ,.■ ' / 2 3 og"E 8o 1 , � z IN 3 . r . a 799g q | / » E _b2Rd5 '4 0 ,� oko + ---tees # 01002m 400 Boo MJp m=C..»mm ___E-_ , ,,._ IDAHO Eh tOra¥ng or \&e SURVEY eee Winne Annexation Shoe _mr�_ Reveille Ridge Sult>dlivislun 1 GROUP, L[C A procal @ land k,tedHthe 5112ea, 4 the q2of owv. Out. �he SE a -of @, S. TIN- P-1C , Adu C-wnty. a# 9/s/2QZZ Page 14 Description for R-8 Zone September 8, 2023 A parcel of land located in the South 112 of the Northeast 114, and the North 112 of the southeast 114 of section 5, TOwnShip 2 North, Range 1 East, Noise Mendian, Ada County, Idaho, more particularly described as follows: Commencing at the 114 corner common to Sections 4 and 5, T.2N.. R.1E„ B_M., from which the Section corner common to Sections 4, 5, 8 and g, T.2.N., R.1.E, B.M„ begs South 00912'47"West, 2653.27; thence on the east boundary line of said Section 5, South 0012'47'West, 458_11 feet to the POINT DE BEGINNING: thence continuing, South 00"12'41" West, 2 50.04 feet; thence leaving said east boundary line, North 74°08'26"West: 660.06 feet; thence North 73°29'26" West. 408.38 feet; thence North 47°47'31" West, 770.77 feet; thence North 42°12'29" East, 255_26 feet; thence 1 60_79 feet on the arc of a curve to the right having a radius of 300.00 feet, a cantr21 angle of 32"25'39", and a long chord which bears North 64°00'20" West, 167.53 feet; thence North 47°47'31" West, 51 .02 feet; thence 46.08 feet on the are of a curve to the right having a radius of 100.00 feet, a central angle of 26°24'07", and a long chord which bears North 34°35'27"West. 45.67 feet; thence North 21°23'24"1 cst, 28.22 fact: thence South 68°3638"West, 1 _53 feet; thence 8.02 feet on the arc of a curve to the left having a radius of 100.00 feet, a central angle of 04°35'37", and a long chord which bears South 66"18'47"West. 8.02 feet; thence North 47°47'31" West, 150.16 feet; thence North 43°08'1!�" East, �1.57 feet: NL LA C�`° �G thence North 68'36'36" East, 694-84 feet; thence South 46°02'32" East, 375.56 feet; 11779 thence South 64860'21"East, 64.51 feet; of V��� ' McCP ` Page 1 of 2 Page 15 thence North 00°23'06"West, 30.48 feet to the Southwest corner of Keep Subdivision as filled in Book 119 of Plats at Pages 18374 through 18379, records of Ada County, Idaho; thence on the south boundary line of said Keel Subdivision the following eigfit (8) courses and distances; South 64°48'14" East, 66_24 feet; South 79°3S09" East, 55.80 fleet; North 82°37'38" East, 39.29 feet, North 71°27'43" East, 41.47 feet; North 80°45'02" East, 58.58 feet; North 8895B'42" East, 252.30 feet; North 8503816" East, 60,03 feet; North 67003'39" East, 125.97 feet to the northwest comer of Derry BuMvision as filled in Book 108 of Plats at Pages 15160 and 15161, records of Ada County, Idaho; thence South 00'13'22"West, 1157.89 feet to the southwest corner of said [ferry Subdivision thence on the south boundary lire of said perry Subdivision and the easterly prolongation of, South 74"08'45" East, 762.45 feet to the POINT OF BEGINNING. Containing 34.691 acres, more or less. End of Description_ SCE Ng,� ` 1 779 O F 4� McCN Page 2 of 2 Page 16 1 ' Keep Subdivision L4 a�6a ��. L 8Lg L11 �4 I I L2 L12 C,� � L5 Lti L13 F' L10 C3 568'36'36"W 166.53' ,} C N42'12'28"E D G`f IN 255.26' f34.691 N I Acres I a � C1f4 �# 1/4 # g.5 .s-4 Point of I� 574)aa. Beginning ,n l N73���6'gir 800 00KL LA ' I [V �' N5 Line Table Line Table I N Una ne 8eoring {.ength Line Beorrng Lenytti � L1 Sa072'47'w 254-1)4' Lb 57933'49"E 55.✓34' ri i.o CS 9} t L2 N21'23'24`W 28.22' Lg N82'37'38"E 39.29' 0I 0� / C L3 N4747'31"W i AO- L10 H71'27'43"E 41.47` L4 N43'00'19"E 21.57' L11 NBO'45'02'E 58.56' L5 564'59'21"E 64-51' L12 NB8.58'42% 252-30' Scale: 1"=400' L6 N70.23'06"W 30.48' L73 H8538'16"E 60.03' i D 100 200 400 $p. 0 564'48",O"E 56.24 L14 N67ro3'39`E 125.97' Curve Table Curve LenO, Radius Delta Chard Bearing Chord Length C1 159.79' 30100' 32`25'39" N64'00'24'W 167.53' E- Columbia Rd. 5,5 'S.4 C2 46-08' 100.00' 2$'24'k}7" N34'35'27"W 45-67' _——S.B S.9 C3 5.02' 100.00' 435'37" S65-18'47'W 8,02' P:y—4. r(73M Eq',Rd)77-22F dwE%--8 F—E 9 SAOW3 R4553 qY �� �0 ExhibTk drawing for Job "a s954 yr ENEw.Los7. —8 Zone 22-228-112 SURVEY 941SE.O.A+I45}7N Sheet Na. {70HI"&xsz9 Reveille Ridge Subdivision 1 GROUP, LLC A pracd of land located in the S1 2 of the HE1 4 & tho N1 72 Df pxq, poke the SE1/4 of Section 5, TIN„ R,tE., B.A. Ada Coupty, Idaho, 9/4/202Z Page 17 Description for R-1 a Zone September 8, 2023 A parcel of land located in the South 112 of the Northeast 114, and the North 1/2 of the Southeast 114 of Section 5, Township 2 North, Range 1 East, Saise Meridian, Ada County, Idaho, more particularly described as follows; Comrnen6ng at the 114 comer common to Sections 4 and 5_ T.2N., R.1E., B.M." from which the Section corner Common to Sections 4, 5, 8 and 9, T.2.N-, R_1-E, B.M., gears South 00'12'47"West, 2653.27: thence on the east boundary line of said Section 5, South 00'12'47"West, 708.15 feet;thence leaving said east boundary lire, North 74"08'26"West, 800.00 feet; thence North 73"29'26"West, 408.38 feet to the POINT OF 8EGINNING: then cc North 781120'W West, 151.82 feet thence North 89'18'26"West, 660.00 feet; thence South 89d48' 4"West, 841,23 feet to the north-south centerline of said Section 5; thence on said north-south centerline, North 00*00'59" East, 332.88 feet to the Center 114 corner of said Section 5; thence continuing on esid north-south centerline, North 00"01'18" East, 820,62 foot; thence leaving said north-�south centerline, South 78'30'03"East, 191-66 feet; thence North 43°00"19"East, 86.84 feet; thence South 47"47"61" Bast, 150-16 feet; the noe 8.02 feet on the arc of a curve to the right haVIng a radius of 100-00 feet, a central angle of 04'35'37", and a long chord which bears North 66'18'47" East, 8.02 feet; thence North 68°36'36" East. 168,5� feet: thence South 21°23'24" East, 28.22 feet; thence 46.08 feet on the arc of a curve to the left having a radius of 100.00 feet, a central angle of 0 �V 14NO 26°24'07', and a long ohord which.. bears South \GF-NS 34'35'27'' East, 45.57 feet; 11779 thence South 47°4731" East, 512-02 feet; 4�' o f ° Page 1 of 2: Page 18 thence 169.79 feet on the arc of a curve to the left having a radius of 300.00 feet. a central angle of 32025'39", and a long chord which bears South 64'00'20" East, 167.53 feet: thence South 42012'29"West, 255.28 feet, thence South 4704T31" East. 770.77 feet to the POINT OF BEGINNING. Containing 25.275 acres. more or less. End of Descnption- pL LANO 11779 ' MCCN Page 2 of 2 Page 19 I I Keep Sub divisian I I I L2 `3 ( 1-6 C'p G1 0 T- I ro Derry. p Subdmtswn ±25.27 Acres S42'12'29"w I 255.28' C1/4 � 1 f4 ILn Q z 5dQ.Q0' I+ S69'Q'34'W 1341,23' N89'?S'26"w �� 4 Beginning# # 7 9 B} I .0.3, E" $ Qa00, N V, y0 I �aNa Line Table - I � v u Line Deming Length I m 11779 4- L1 N73-29'26"Ih' 151.62' cw r- o a 0 G30 �� � �X, L2 578'30'03'E 191.66' La�� �•(n 01� WON `1 L3 N43'00'1g`E 86,64" + o m L4 S4747'31'E 150.16' L5 N68'36'36"E 166-53' �x $Cole: 1"=400' 1-6 $21'23'24"E 2$,22' 0 100 200 400 Boo Curve Table 1 I Curve Length Radius Delto Chord Bwriny Chord Length C1 13.02' 1flo,00' 4'35`37' N661E{47'E 9.02' E- C41urnbla Rd- 13 `S,4 C2 46,46' 1fl4,Q6' 2624'Q7" 53435'27'E 45.67' --- ---S.8 S-9 C3 i69-19' 300.00' 32 25'39' S64W'20'E 167-53' v�4nd. s{7l55 fops Hq 33.27d�m,pWt•i5 twx f�a.G i/9[5071 aw i sp Exhibit drawing for N8. I DAHO 9a 9 a-ET —I J Dr 22-228-02 90ISE IpA22^ a Sh4■t 144,E {mom"- Reveille Ridge Subdivision 1 GROUP LLD A Prato of land 1walee In ehe S1 2 OF tha 14E1 4 & the N7 W Dwg, Date thr 5E7/4 of Section 5, T2N., R.T.. 6 M„ Ada County, Idaho 9/8/2023 Page 20 B. Preliminary Plat(IA 0/2 4/7/24)&Revised Phasing Plan(dated: 2/21/24) PRELIMINARY PLAT FOR REVEILLE RIDGE SUBDIVISION D: M.e. m• ®v. — =1 E 0 8f1 JECT G I I I ® I PLAN SHEET INDEX ® ® ® ® ® O SHEET DESCRIPTION \_ BL 3 PP-1 NOTER SHEET.INDE%,VIGNf,V IMP, II ES PP-2 -PRELIMARY IN PLAT WEST WYOIIT I'� �� .� PP-3 -P ARr PUT EAST—OUT PaOCEL acEL cuavE PTABLES Hv f` Bt of B A PPS -EXI5,IN0 TOPOORAPHr _____ PP-] -ENGINEERING PI NrIED&STREET SECTION! 4 rt PP-8 -PRELIMINARY SEWER PROFlLES PP R -P RELIMINFRY SEWER PRO ES I I — I v TsV I I al J D — 1 a I � z d > F I / m V Ed® p ® e Z n > Ed Page 21 Revised: PRELIMINARY PLAT FOR REVEILLE RIDGE SUBDIVISION �! Kr X— _ •,_ d �J a�aE � i IV v PLAN SHEET INDEX I m --- - ;FlEEI DESCRIPT I PP-i -cR soR NE.INDEX, Es PP-2 -PREINARY +ncwrn uAP, PUT WEST—UT T pp—j —PRELININ Pus Easy uroVr PP-a -PPROEL&caavE TABLES @ ORO PIP -Mx—EMISTING TPROPEEETIES 2 PP-] -ENGINEERING PUN&STREET SECTIONS PP-9 -PRELIMINARY SEWER PROELES _ I PP-9 -PRELI AKY YIN SEWER PROFlLES ®I a9� f NOi[5 °z --- I I � II I I p w v 1 > w _ a Ld Ed N tt �sV W J Q N r we — W w 0 ® PP-1 Page 22 PRELIMINARY PLAT FOR F—LA REVEILLE RIDGE SUBDrVISION a. BL� 2 ........ OCK 7 . < LOC a gi j z 0 0 z 7 J V) D M Ld V: W • Ld z 0 > Ld A ------ Ld D 0 PP-3 Page 23 ogga PRELIMINARY PLAT FOR REVEILLE RIDGE SUBDIVISION ;e3 wuxm p a.ir arm ire.�IN.wo w LLir or r®sa.i. `g 3 f cm ar.m® owm.m..wo ffi III m w I • r I I I ✓ � � asi l I LLJ z 0 era x is U Q N Z Q — \ I f7 l d > z I� o Z } m W OL III V All T w � L — Ld 5 C) y W i E — so o so so --- -=` _- - - PP-2 Page 24 Phasing Plan: PHASE MAP FOR - REVEILLE RIDGE SUBDIVISION rnr oa axrr,,weo °' Yq s � eoe. eI 1'H.lti�' 1: e 77 Z 0 ----------------------- 0 Z IL 1 ? F 1 N O — — — - _ "- _ L w w — ❑ > � w j PM Page 25 C. Landscape Plan(dated: 12/12/2023) 1 4 t. rk ® m m t 1 ®� r O ® m wa2ys. •m w .r 13 IENSENBQTB REVEILLE RIDGE SUBDIVISION Ov FEBRUARY 12,2024 PRELIMINARY PLAT LANDSCAPE PLAN MERIDIAN, ID Iwo« Page 26 IV �� 7'- C� -!¢.,�.���/rJ�*�`� •R�,N�� _______MATCHLINE L21-•. ______________i �{ UY Ci Mix .-L:". ill_ h .�« �J� •OIU - 7 \ ` o I � N - � n o ] W PLANT PALETTE a NOTE5 ' M�L:rriv�,m"F=iw � p • �� '.©:' .... .w.r.«......r.r..� ....,..,i... a � W _ L Y Z W rI•u. "' ill o.� �- rr-n "li Vim. > J aQ 1� L1 �c v s+ w � t w I MAT_GML E LE J "TCHUNE Li------ , - > F U 0 J n m W O ] 5 PLA L NT PAETTE Z n _ W j a � > yri z u F- fr m o M....�.. a Page 27 PLANT PALETTE ! �� •�"..��,.,�. a �I mix a zIz &'GLE CALL d U Z NOTES > G o• w a N a L MATCHLME LS __:Y ° > I MATClLME L4 — w U � J } Z J U 7 W J JENSE MLa W w p �as p F 1 Iq 11� � c a�� PLANT PALETTE e �°c ®R[I E L6 a. O mee L 051 IQ o TA-` t- 4 ti m Z NOTES g J w a � w rc rew � W p JENSE BELTS - d w ll ll � C L/t Page 28 ohs PLANT FIAL.F77E IN —I- MIR 'TAY"l VINYL PRIVACY FENDE G TREE PLANTING/STAKING eku. ill V,1! N07Ee z SHRUB RL—Tl NO IRON FENCE Z LANDSCAPE CALCULATIONS Yl M, I I I v) _LL V) L w DEVELOPMENT DATA Lj L Li x W < -j >- @) PLANTER CUT BED EO&EImo aye no rza..ev -J 0 0 W L 711-1 JEI E ELTS El' T I 4—E Page 29 D. Qualified Open Space Exhibit(dated: 12/10/2023) OPEN SPACE EXHIBIT FOR REVEILLE RIDGE SUBDIVISION 8€ >--— — = — ----- --- � I \ ® ® ® ® ® ® ® II o 4 n t--------- -- ®� v ® ® ® ® ® m�WDj f L K jL ® v®®I � E n X p Z a. o 7 w a w o p�OS Page 30 E. Conceptual Building Single-family detached: i l 01 .:.rrT On Page 31 i , i - �I I �T 1 f - 4 � r F �• l k ^, - Front-load II . ti f -411 74 Page 33 • � t ' t ti r Alley-loaded townhomes: mm Page 34 F. Common Driveway Exhibit 4� O� 2 r r P ; 0, qOl %r Vl � 1 r! 3,200 iP ti '! _ ♦ f 2,500 sf 3,200QQ sf r 1.602 sf �� !r . • 55�Q, .` 3.200 sf o 1 ti 2. REVEILLE RIDGE PRELIMINARY SHARED—ACCESS EXHIBIT LOT 51 BLOCK 16 FOR LOTS 52 53 & 54 BLOCK 16 alley Engineering, Inc. 20 0 10 20 40 CIVIL ENGINEERING I PLANNING I CADD 1119 E.STATE STREET,SUITE 210 TEL 208-93MO13 SCALE IN FEET EAGLE,ID 83616 www.6aileyengineers.com 1'=20' Page 35 G. Product Type Exhibit Map PRODUCT EXHIBIT MAP FOR REVEILLE RIDGE SUBDIVISION eow � o R-8 ZONE " 34.691 AC 124— STIR GROSS DENSITYo,.,,,� 124/34.691-3.57 I 6 II III, d Z U 0 Z E Lf 0 W li \ N a w 0 R-15 ZONE X 25.278 AC — — 1 ❑ > 62— TOWNHOME — — — ;+�„ __ H w 46— STIR 14— DUETS GROSS DENSITY J 122/25.278-4,83 mm.� .�mm,a,_,m•,., —1-- --- ---��—I: 0 O W wo 011 Page 36 IX. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION 1. A Development Agreement(DA) is required as a provision of annexation of this property. Prior to approval of the annexation ordinance, a DA shall be entered into between the City of Meridian,the property owner(s)at the time of annexation ordinance adoption, and the developer. Currently, a fee of$303.00 shall be paid by the Applicant to the Planning Division prior to commencement of the DA. The DA shall be signed by the property owner and returned to the Planning Division within six(6)months of the date of City Council approval of the Findings of Fact, Conclusions of Law and Decision&Order for the annexation request. A final plat application will not be accepted until the property is annexed(i.e. the ordinance and development agreement are recorded). The DA shall,at minimum, incorporate the following provisions IF City Council determines annexation is in the best interest of the City: a. Future development of this site shall generally comply with the development plans submitted with this application, included in Section VIII, and the provisions contained herein. b. A 10-foot wide detached sidewalk/multi-use pathway shall be provided within the required street buffers along all collector and arterial streets within and adjacent to the site(i.e. S. Eagle Rd.,E. Vantage Pointe and St L). c. The rear and/or sides of homes on lots that face collector(E.Vantage Pointe& St L)and arterial (S. Eagle Rd.) streets shall incorporate articulation through changes in two or more of the following: modulation(e.g.projections,recesses, step-backs,pop-outs),bays,banding,porches, balconies,material types,or other integrated architectural elements to break up monotonous wall planes and roof lines that are visible from the subject public streets. 2. The final plat shall include the following revisions: a. Depict a minimum 20-foot wide street buffer in a dedicated buffer easement on lots adjacent to E. Vantage Pointe and St L,collector streets,labeled accordingly. b. Depict the future curb location as anticipated by ACHD along S. Eagle Rd.; and a minimum 25- foot wide street buffer,measured from the ultimate curb location. c. Depict 10-foot wide detached sidewalks/multi-use pathways within the required street buffers along all collector and arterial streets within and adjacent to the site(i.e. S. Eagle Rd.,E. Vantage Pointe and St L). d. Depict zero(0)setbacks on lot lines where townhomes are proposed to span across where no easements will exist. e. Graphically depict and label the 30-foot wide easement for the Farr Lateral,measured from the centerline of the lateral, located on Lot 17,Block 2. £ Perpetual ingress/egress shall be required either by a recorded easement or as a note on a recorded final plat. The easement or plat note shall include a requirement for maintenance of a paved surface capable of supporting fire vehicles and equipment as set forth in UDC 11-6C- 3D.8. g. Depict 10-foot wide detached sidewalks/pathways along all collector and arterial streets within and adjacent to the site(i.e. S. Eagle Rd.,E.Vantage Pointe and St L). Parkways shall comply with the standards listed in UDC 11-3A-17E. h. Graphically depict the 75-foot wide easement for the Williams Pipeline. Page 37 — i. Depict a 10-foot wide sidewalk along one side of Taps to between the Williams pipeline pathway and the Farr Lateral pathway. 3. The landscape plan submitted with the final plat shall include the following revisions: a. Depict a minimum 20-foot wide street buffer in a dedicated buffer easement on lots adjacent to E. Vantage Pointe and St L,collector streets,labeled accordingly. b. Depict the future curb location as anticipated by ACHD along S. Eagle Rd.; depict a minimum 25-foot wide street buffer,measured from the ultimate curb location. c. Depict landscaping with a mix of materials within the street buffers along S. Eagle Rd.,E. Vantage Pointe and St L,in accord with the standards listed in UDC 11-3B-7C3; include calculations that demonstrate compliance. d. Include mitigation information for all existing trees being removed from the site in accord with the standards listed in UDC 11-3B-IOC 5. e. Depict 10-foot wide detached sidewalks/multi-use pathways within the required street buffers along all collector and arterial streets within and adjacent to the site(i.e. S. Eagle Rd.,E. Vantage Pointe and St L). f. Depict landscaping with a mix of materials along each side of all pathways, in accord with the standards listed in UDC 11-3B-12C.Note:Alternative compliance may be requested for the trees along the pathway in the Williams pipeline easement as set forth in UDC 11-5B-5. g. Change the fencing type along the northern boundary on the western portion of the site adjacent to the common open space with a pathway in Vertex Subdivision to 5-foot tall wrought iron fencing in accord with UDC 11-3A-7A.7b. h. Extend the 10-foot wide multi-use pathway to the south through Lot 1,Block 14 for future extension to the south. i. Extend the 10-foot wide multi-use pathway along the Farr Lateral in Lot 16,Block 2 (in the vicinity of Lot 6, Block 2)to the northwest to connect to the multi-use pathway in Vertex Subdivision to the north. j. Include a detail for the picnic areas on Lot 1,Block 16 that includes tables,benches, landscaping and a structure for shade to demonstrate compliance with UDC 11-3G-4C.5. k. Depict a 10-foot wide sidewalk along one side of Taps to between the Williams pipeline pathway and the Farr Lateral pathway. 1. Depict fencing along Lot 51,Block 16 to distinguish common from private areas as set forth in UDC 11-3A-7A.7a. in. Depict a 5-foot wide landscape buffer planted with shrubs, lawn or other vegetative groundcover along the southwest side of the common driveway on Lot 51,Block 16 in accord with UDC II- 6C-3D.5. n. Depict details for the picnic area,tot lot,bike repair station and fitness course amenities that demonstrate compliance with the standards for such listed in UDC 11-3G-4C D, E and F. 4. All irrigation ditches,laterals, sloughs or canals, including the Farr Lateral, crossing this site shall be piped or otherwise covered as set forth in UDC 11-3A-6B.3,unless waived by City Council. The Applicant requests approval of a waiver from Council to leave the lateral open. 5. All existing structures shall be removed from the site prior to submittal of the final plat for City Engineer signature. Page 38 6. Comply with the subdivision design and improvement standards listed in UDC 11-6C-3. 7. Submit a 14-foot wide public pedestrian easement for the multi-use pathway within the Williams Pipeline easement and along the Farr Lateral,as required by the Park's Dept. in Section IX.G below. 8. Comply with the Williams Developer's Handbook for any development and/or improvements within the Williams pipeline easement. 9. The open water pond on Lot 1, Block 16 shall have recirculated water and be maintained such that it does not become a mosquito breeding ground as set forth in UDC H-3G-3B.6. 10. Future development of Lots 52-54,Block 16 shall be consistent with the common driveway exhibit included in Section VIII.F and the standards listed in UDC 11-6C-3D. 11. Modify the phasing plan to switeh Phases '' ^^a 3. Future development shall comply with the modified phasing plan in Section VII.B. 12. An administrative design review application shall be submitted for the single-family attached and townhome structures to ensure compliance with the design standards listed in the Architectural Standards Manual. 13. Future development shall substantially comply with the product type exhibit in Section VIII.G. 14. Approval of a preliminary plat shall become null and void if the applicant fails to obtain the city engineer's signature on the final plat within two(2)years of the approval of the preliminary plat. Upon written request and filing by the applicant prior to the termination of the period,the director may authorize a single extension of time to obtain the city engineer's signature on the final plat not to exceed two (2)years.Additional time extensions up to two(2)years as determined and approved by the City Council may be granted.With all extensions,the director or City Council may require the preliminary plat,combined preliminary and final plat or short plat to comply with the current provisions of this title. B. PUBLIC WORKS https://weblink.meridiancioy.org/WebLink/Doc View.aspx?id=330721&dbid=0&repo=MeridianCioX C. FIRE DEPARTMENT https://weblink.meridiancity.org/WebLink/Doc View.aspx?id=330723&dbid=0&repo=MeridianCity D. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ) https://weblink.meridiancity.org/WebLink/Doc View.asp x?id=331450&dbid=0&repo=MeridianCity&cr =1 E. ADA COUNTY DEVELOPMENT SERVICES(ACDS) https://weblink.meridiancioy.orglWebLinkIDocView.aspx?id=331625&dbid=0&repo=MeridianCioX F. IDAHO TRANSPORTATION DEPARTMENT(ITD) https://weblink.meridiancit .00rg/WeUink/Doc View.aspx?id=3 3 18 78&db id=0&rep o=Meridia n City G. PARK'S DEPARTMENT https://weblink.m eridian city.org/WebLink/Doc View.aspx?id=333344&dbid=0&repo=Meridian City Page 39 H. BOISE PROJECT BOARD OF CONTROL https://weblink.meridiancity.org/WebLink/Doc View.aspx?id=333138&dbid=0&repo=Meridian City I. ADA COUNTY HIGHWAY DISTRICT(ACHD) https://weblink.meridianciN.orglWebLinkIDocView.aspx?id=337083&dbid=0&repo=MeridianCiU J. COMMUNITY PLANNING ASSOCIATION OF SOUTHWEST IDAHO(COMPASS) https://weblink.meridianciU.org/WebLink/DocView.aspx?id=334422&dbid=0&repo=Meridian City&cr =1 K. WEST ADA SCHOOL DISTRICT(WASD) https://weblink.meridiancity.org/WebLink/Doc View.aspx?id=341674&dbid=0&repo=MeridianCity X. FINDINGS A. Annexation and/or Rezone(UDC 11-5B-3E) Required Findings: Upon recommendation from the commission,the council shall make a full investigation and shall,at the public hearing,review the application. In order to grant an annexation and/or rezone,the council shall make the following findings: 1. The map amendment complies with the applicable provisions of the comprehensive plan; The Commission finds the Applicant's request to annex the subject property with R-8 and R-1 S zoning and develop with a mix of single family attached, single-family detached and townhome dwellings on the site at the densities proposed is generally consistent with the Comprehensive Plan per the analysis in Section V. 2. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; The Commission finds the proposed map amendment to the R-8 and R-1 S zoning districts and development with a mix of housing types generally complies with the purpose statement of the residential districts in that it will contribute to the range of housing opportunities available in the City consistent with the Comprehensive Plan. 3. The map amendment shall not be materially detrimental to the public health, safety, and welfare; The Commission finds the proposed map amendment should not be detrimental to the public health, safety and welfare as the proposed residential uses should be compatible with adjacent existing and future single-family residential homes/uses in the area. 4. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the city including,but not limited to, school districts; and The Commission finds City services are available to be provided to this development. Comments were not received from WASD on this application. 5. The annexation(as applicable)is in the best interest of city. The Commission finds the proposed annexation is in the best interest of the city. Page 40 B. Preliminary Plat(UDC 11-613-6) In consideration of a preliminary plat,combined preliminary and final plat,or short plat,the decision- making body shall make the following findings: (Ord. 05-1170, 8-30-2005, eff. 9-15-2005) 1. The plat is in conformance with the comprehensive plan and is consistent with this unified development code; (Ord. 08-1372, 7-8-2008, eff. 7-8-2008) The Commission finds the proposed plat is in conformance with the UDC and generally conforms with the Comprehensive Plan. 2. Public services are available or can be made available and are adequate to accommodate the proposed development; The Commission finds public services can be made available to the subject property and will be adequate to accommodate the proposed development. 3. The plat is in conformance with scheduled public improvements in accord with the city's capital improvement program; The Commission finds the proposed plat is in conformance with scheduled public improvements in accord with the City's capital improvement program. 4. There is public financial capability of supporting services for the proposed development; The Commission finds there is public financial capability of supporting services for the proposed development. 5. The development will not be detrimental to the public health, safety or general welfare; and The Commission finds the proposed development will not be detrimental to the public health, safety or general welfare. 6. The development preserves significant natural, scenic or historic features. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005) The Commission is unaware of any significant natural, scenic or historic features that need to be preserved with this development. Page 41