2024-04-02 Pathways UPDATED (AWENDIAN�---
Parks and Recreation
Reviewer: Kim Warren/ Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Burnside Ridge File No: H-2023-0055 AZ, PP Date: 11.16.23/rev 4.2.24
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to Final Approval,the applicant shall submit a public access easement for a detached multi-
use pathway along the west side of the proposed north/south collector road where it traverses
the subdivision.
Easement shall also be dedicated for a multi-use pathway along the Calkins Lateral for the full
length of the project. If possible, obtain permission from the irrigation district to construct
pathway within the irrigation easement. If permission may not be obtained, dedicate a
permanent pedestrian easement and construct the pathway in a linear common lot adjacent to
the irrigation easement(north side).
The applicant shall also dedicate easement for detached, multi-use pathway along the north side
of the proposed collector road at the southern edge of the project.
Submit easement documents for Council approval and subsequent recordation. Easements shall
be a minimum of 14'wide(10' pathway+2'shoulder each side),unless located within the public
ROW.
Use standard City template for public access easement. Submit all easement documents online
through Citizen's Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as
recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final
approval the applicant's engineer shall provide written documentation that the pathway
segment was constructed per the recommended specifications.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. 6' high open vision fencing shall be installed between pathways and (live)water irrigation canals
and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other
fence details per UDC 11-3A-7.
Rev.02.11.22
6. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
not(nor are they intended to)override those of the irrigation district having jurisdiction over the
project area.