Loading...
2024-04-02 COMPASS Communities in Motion (CIM) Development Review Checklist Development Name: Burnside Ridge Estates Vie bry Rd 4 CIM Vision Category: Future Neighborhood �® Consistent with CIM Vision? YES - New Households: 263 New Jobs: 0 • Safety Economic Vitality • °"i0 How safe and comfortable is the nearest To what extent does the project major road (minor arterial or above) for enable people, government, and bicyclists and pedestrians? Analysis is businesses to prosper? limited to existing roadway conditions. Victory Road Economic Activity Center 0 Access Pedestrian level of stress Impact on Existing O Surrounding Farmland Bicycle level of stress Net Fiscal Impact iff o Convenience Quality of Life p�p :Q What services are available within 0.5 Checked boxes indicate that miles (green) or 1 mile (yellow) of the additional information is attached. project? Active Transportation ✓ Nearest bus stop Automobile Transportation Nearest public school Public Transportation Nearest public park Roadway Projects t1/ } Improves performance Does not improve or Reduces performance �J Lf reduce performance Comments: Based on the site plan provided, COMPASS has no additional comments. Who we are: The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization for Ada and Canyon Counties. This review evaluates whether land developments are consistent with Communities in Motion, the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document. Past checklists are available online. See the Development Review User Guide for more information on the red, yellow, and green checklist thresholds. ® https://compassidaho.orgL COMPASS ® info@compassidaho.orq �`)k GGMN111NITYPLANNINGASSOCIATIGN Sent: 4/2/24 4 °`s°°h—tid— Complete Network Appendix Checkmarks (J) below indicate suggested changes to a site plan, based on the COMPASS Complete Network Policy (No. 2022-01). Both the Complete Network Policy and site-specific suggestions are intended to better align land use with identified transportation uses in the corridor. Please see the Complete Network map for primary and secondary uses for roadways (minor arterial and above) in Ada and Canyon Counties. Corridor Name: Victory Road Primary Use: N/A Secondary Use: Public Transportation Bicycle and Pedestrian Infrastructure Apply traffic calming measures to discourage speeding on local roads �/ Reduce street lengths to discourage speeding on local roads Fiscal Impact Analysis Below are the expected revenues and costs to local governments from this project. The purpose of this analysis is to help the public, stakeholders, and the decision-makers better manage growth. Capital and operating expenditures are determined based on service and infrastructure needs, including persons per household, student generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip lengths, construction values, income, discretionary spending, and employment densities. Net Fiscal Impact by Agency City County OX Highway District 0 School District Breakeven point across all agencies: 5 Years Disclaimer: This tool only looks out 20 years and does not include replacement costs for infrastructure, public utilities, or unfunded transportation needs in the project area. More information about the COMPASS Fiscal Impact Tool is available at: https://compassidaho.oralfiscal-impact-tool/