Loading...
ACHD-Meridian FY24 Priorities CombinedUpdates based on ADOPTED FY2024-2028 IFYWP*Design YR ROW YR Const YR1McMillan Rd, Meridian Rd / Locust Grove RdWiden McMillan Rd up to 5-lanes with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, SH 69 (Meridian Rd) / Locust Grove Rd2McMillan Rd, Linder Rd / Meridian RdWiden McMillan Rd up to 5-lanes with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, Linder Rd / SH 69 (Meridian Rd)3Cherry Ln and Black Cat Rd Widen intersection. Address transition from bike-lane to/from MUP.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln and Black Cat Rd4Cherry Ln and McDermott Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln and McDermott Rd5Cherry Ln, Black Cat Rd / McDermott RdWiden Cherry Ln with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln, Black Cat Rd / McDermott Rd6Fairview Ave, SH 55 (Eagle Rd) / Cloverdale RdWiden Fairview Ave with curb, gutter, sidewalk, and bike/pedestrian facilities. Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Fairview Ave, SH 55 (Eagle Rd) / Cloverdale Rd7Fairview Ave, Meridian Rd / Locust Grove Rd Widen Fairview Ave with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Fairview Ave, Meridian Rd / Locust Grove Rd8Ten Mile Rd, Amity Rd / Victory RdWiden Ten Mile Rd with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.Ten Mile Rd, Amity Rd / Victory Rd9Amity Rd and Black Cat Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.Amity Rd and Black Cat Rd10McMillan Rd and Star Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.McMillan Rd and Star Rd11Linder, Pine / CherryWiden Linder Rd to include curb, gutter and pedestrian/bike facilities. Include preferential bike and pedestrian infrastructure with wayfinding signage (several nearby and directly adjacent schools). 12Amity Rd and Linder Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.Amity Rd and Linder Rd13Cherry Ln and Linder Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln and Linder Rd14Ustick Rd and Venable LnInstall full signal or roundabout. 15Meridian/Overland SignalImprove intersection operation. This may mean adding additional lanes. Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Overland Rd and SH 69 (Meridian Rd)16Pine, Linder to Meridian Widen the entire segment to 3-travel lanes with curb, gutter, sidewalks and/or multi-use or mixed-use bikeway.Not ProgrammedNot ProgrammedNot ProgrammedProject would require the removal of on-street parking for existing homes. To be evaluated and prioritized for possible inclusion into future IFYWP updates.Pine Ave, Linder Rd / Meridian Rd17Black Cat, Cherry to Ustick Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Blact Cat Rd, Cherry Ln / Ustick Rd18McMillan Rd and McDermott Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.McMillan Rd and McDermott Rd19Ten Mile Rd and Chateau Dr Improve intersection. Not ProgrammedNot ProgrammedNot ProgrammedDoes not currently meet warrants. ACHD to reevaluate as development occurs in the area.Ten Mile Rd and Chateau Dr20Eagle Rd / Fairview AveImprove intersection operation. This may mean adding additional lanes or a grade-separated roadway. Not ProgrammedNot ProgrammedNot ProgrammedPlease provide addiitonal description of requested improvements.Eagle Rd and Fairview Ave21Lake Hazel / Discovery ParkImprove intersection/entry into City Park. The improvements could be a signal, roundabout, or other, but should include provisions for pedestrians/bicyclists.Not ProgrammedNot ProgrammedNot ProgrammedPlease provide additional information regarding location of request/type of request. Signalized? Enhanced pedestrian crossing?Lake Hazel Rd and Discovery Park22Victory, Ten Mile to Linder Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Victory Rd, Ten Mile Rd / Linder Rd23Black Cat, Ustick to McMillan Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Black Cat Rd, Ustick Rd / McMillan RdRoads & Intersections - CIP Projects (Arterials) OnlyCurrent IFYWP Status2024 Meridian Prioritization Request Form - Not Programmed2024 Priority RankingAgency Project NameAgency Project DescriptionACHD UpdateACHD Implementation Project Name 24Black Cat, McMillan to Chinden Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Black Cat Rd, McMillan Rd / US 20/26 (Chinden Blvd)25McMillan, Black Cat to Ten Mile Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, Black Cat Rd / Ten Mile Rd26McMillan, Ten Mile to LinderWiden with curb, gutter, and pedestrian/bike facilities. Project should include an enhanced pedestrian crossing and curb ramps on McMillan Rd at Pantine Way, near Hunter Elementary. Not ProgrammedNot ProgrammedNot ProgrammedProject scoped in 2022. To be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, Ten Mile Rd / Linder Rd27Locust Grove, Lake Hazel to AmityWiden Locust Grove Rd up to 5 lanes with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Locust Grove Rd, Lake Hazel Rd / Amity Rd28Fairview Ave Corridor Management, Linder Rd / Orchard St Improve safety and traffic operations along Fairview Ave in accordance with the Fairview Avenue Corridor Management Strategy. Project may include bicycle and pedestrian facilities and other access management treatments.Not ProgrammedNot ProgrammedNot ProgrammedProject to be implemented through development. ACHD and Meridian to coordinate implementation as development applications are processed.Fairview Ave Corridor Management, Linder Rd / Orchard St29Locust Grove and McMillan Improve intersection. 30Meridian and McMillan Improve intersection. 31Linder and McMillanImprove intersection. 32Ten Mile and McMillan Improve intersection. 1E. 3rd, Carlton to FairviewExtend roadway and construct streetscape improvements, including curb, gutter, sidewalk, and improved UPRR crossing, from Carlton Ave to Fairview Ave in accordance with several downtown plans and studies.Not Programmed Not Programmed Not ProgrammedExtension to be completed through development. Duplicate request. Recommend combining with other request.East 03rd St Extension, Carlton St / Fairview Ave2Ustick-Cherry Bikeway, Black Cat Road / Chateau DriveInstall bike facilities. Several (likely 5) segments needed. City requests ACHD's assistance in prioritizing and scoping corridor connections (likely east to west.) Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Ustick-Cherry Bikeway, Black Cat Rd / Hickory Way3Cherry Ln, Linder Rd / Meridian RdInstall bike facilities along Cherry Ln from Linder Rd to Meridian Rd Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln, Linder Rd / Meridian Rd4Ten Mile-Linder Bikeway, Linder Road / Chinden BoulevardInstall bike facilities, signing and pavement markings.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Ten Mile-Linder Bikeway, W 08th St / Chinden Blvd5McMillan-Ustick Bikeway, Cool River Avenue / Eagle RoadInstall bike facilities. Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan-Ustick Bikeway (Phase 3), Linder Rd / Eagle Rd)6Broadway Ave / Idaho Ave Extension, East06th St / Locust Grove RdExtend roadway from its current terminus at NE 6th St to Stonehenge Way/ Commercial Dr and construct streetscape improvements, including curb, gutter, sidewalk/MUP. Not Programmed Not Programmed Not ProgrammedDefer. To be considered as properties redevelopment.Broadway Ave / Idaho Ave Extension, 06th St / Locust Grove Rd7W Park Creek Dr, Crosswalk at N Deer Creek LnInstall enhanced crossing with hawk signal or RRFBNot Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates. Project Scoped as part of Black Cat-Ten Mile Bikeway in FY2023 Scoping Effort. North Meridian Improvements B: Park Creek Dr and Deer Creek Ln Pedestrian Crossing8W 7th St, Cedarburg Dr to Washington St.Install sidewalk to fix gap on NW 7th St. This gap prevents connection from the sidewalk from the south and east from connecting to the micro-path at Meridian Middle School/8th St.9Fairview Terrace to Chief JosephPedestrian connection (sidewalk) between Barbara Dr in Fairview Terrace Park to E. Willowbrook Dr and Chief Joseph Elementary on Chateau Drive. Need right-of-way.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Chief Joseph Elementary Pedestrian Improvements10N Naomi Ave, Ustick to PonderosaInstall 20mph school zone signs. Should this be an enhanced crossing or 20mph or both?Not Programmed Not Programmed Not ProgrammedRequest to be shared with our Traffic division. Reponse pendingPonderosa Elementary School Zone Flashers11Locust Grove-Eagle Bikeway, Pine Avenue / McMillan RoadInstall bike facilities. Several (likely 3) segments needed. City requests ACHD's assistance in prioritizing and scoping corridor connections (likely south to north.) Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Locust Grove-Eagle Bikeway, Pine Ave / Chinden Blvd12Nola Rd, south of Pine Ave (Middle School)Construct pedestrian/bicycle faciliteis on Nola Rd from Pine Ave to Crossroads Middle School/RR Tracks. See Priority #19 below; construct concurrently. Not Programmed Not Programmed Not ProgrammedScoped "No Go" in 2018. Sidewalk on east side to be built through development. Nola Rd, Pine Ave / Crossroads Middle School13Stockenham Enhanced Cross-walksRemove mid-block cross-walk by Hillsdale Elementary School and add enhanced cross-walks at Lachlan and near Rockhampton/Hill Park St. Update school zone signs and flashers.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Hillsdale Elementary Pedestrian Crossings and School Zone14Taormina Drive at Maesaia WayInstall sidewalk to fix gap on south side of Taormina Dr near Maesaia Way. Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Taormina Dr at Maesaia Way15Woodbridge Neighborhood Bike StudyStudy the connectivity and bikeability of the Woodbridge neighborhood, between Locust Grove Rd and Eagle Rd, north of I-84.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Woodbridge Neighborhood Bike StudyCommunity Programs - Collectors & Local Roadways 16Watertower St at Rebound SchoolInstall a painted crosswalk on Watertower St at Rebound School.Not Programmed Not Programmed Not ProgrammedACHD Traffic Engineering does not recommend installation. Crossing activity is caused by parent drop off.Watertower St and Rebound School Pedestrian Crossing17St. Ignatius School Pedestrian SignalInstall pedestrian signal on Meridian Rd at Producer Dr.Not Programmed Not Programmed Not ProgrammedProject scoped in 2019. To be evaluated and prioritized for possible inclusion into future IFYWP updates.Meridian Rd and Producer Dr Pedestrian Crossing18West 02nd St, UPRR / Broadway AveComplete sidewalk on both sides of West 02nd St, between the Union Pacific Railroad and Broadway Ave to address parking concerns in this area.Not Programmed Not Programmed Not ProgrammedSidewalk scoped "No Go" in 2015. Agencies to coordinate if other solutions identified.West 02nd, UPRR / Broadway Ave19Nola Rd and Crossroads Middle School Pedestrian CrossingInstall a painted crosswalk on Nola Rd at Crossroads Middle School. See Priority #12 above; construct concurrently.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Nola Rd and Crossroads Middle School Pedestrian Crossing20Gondola-Malta Bikeway, Black Cat Road / Goddard Creek WayInstall bike facilities.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Gondola-Malta Bikeway, W/O Black Cat Rd / Goddard Creek Way21Montague Way, Amity Road / Santo Stefano DriveInstall sidewalk on east side of Montague Way from Amity Rd to Santo Stefano Dr. Not Programmed Not Programmed Not ProgrammedMontague Way is a collector and roadway improvements to be completed through redevelopment.Montague Way, Amity Rd / Santo Stefano Dr22Black Cat-Ten Mile Bikeway, Cherry Lane / Ustick RoadInstall bike facilities along the Black Cat-Ten Mike Bikeway. Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Black Cat-Ten Mile Bikeway (Phase 1), Cherry Ln / Ustick Rd23Locust Grove, Pine to Franklin MUPInstall multi-use pathway, between Pine Ave and Franklin Rd. This would connect the pathway on Pine Ave, west of Locust Grove Rd to Franklin Rd, where the pathway then resumes along the Five Mile Creek. This would replace some existing sidewalk with a multiuse pathway. .24American Fork (Kodiak)/LinderSignalize intersection. Near Victory Middle School and bus stops. Updates based on ADOPTED FY2024-2028 IFYWP*Design YR ROW YR Const YR1Linder Rd, Overland Rd / Franklin RdWiden Linder Rd to 5 lanes and construct a new 4-lane I-84 overpass, including curb, gutter,sidewalk, and bike lanes in accordance with the 2016 CIP. Project would be a joint projectbetween ACHD and ITD.2022-2024 2024-2025 2026-2027Project programmed to be constructed in 2026-2027.Linder Rd, Overland Rd / Franklin Rd2Locust Grove Rd, Fairview Ave / Ustick RdWiden Locust Grove Rd to 3, 4 or 5 lanes with curb, gutter and pedestrian/bike facilities.Consider enhanced crossing at Chateau Dr. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.Locust Grove Corridor B: Locust Grove Rd, Fairview Ave / Ustick Rd3Fairview Ave and Locust Grove RdWiden intersection.2020-2023 2024 2028Project programmed to be constructed in 2028.Fairview Ave and Locust Grove Rd4Victory Rd, Locust Grove Rd / Eagle RdWiden Victory Rd to 3 lanes. Include preferential bike and pedestrian infrastructure.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Victory Corridor B: Victory Rd, Locust Grove Rd / Eagle Rd5Ustick Rd, Ten Mile Rd / Linder RdWiden Ustick Rd to 5 lanes with curb, gutter,and pedestrian/bike facilities. 2022-2023 2025 2026Project programmed to be constructed in 2026.Ustick Corridor A: Ustick Rd, Ten Mile Rd / Linder Rd6Linder Rd, Cherry Ln / Ustick Rd Widen Linder Rd to include curb, gutter and pedestrian/bikefacilities. Include preferential bikeand pedestrian infrastructure with wayfinding signage.2026 2028 FutureProject programmed to be designed in 2026. Concept Study in 2022-2024.Linder Corridor B: Linder Rd, Pine Ave / Ustick Rd7Locust Grove Rd, Amity Rd / Victory RdWiden Locust Grove Rd to a minimum 3 lanes, with preservationfor up to 5 lanes, with curb,gutter and pedestrian/bike facilities. Include pedestrian crossings at Palermo and Wrightwood. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.Locust Grove Corridor B: Locust Grove Rd, Amity Rd / Victory Rd8Victory Rd, Meridian Rd / Locust Grove Rd Widen Victory Rd to 3 lanes. Include preferential bike and pedestrian infrastructure. Completesidewalk/MUP on the south side of Victory Rd adjacent to County outparcel.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Victory Corridor B: Victory Rd, SH 69 (Meridian Rd) / Locust Grove Rd9Ten Mile Rd / Cherry LnWiden intersection. Intersection improvements to include dual left turn lanes.Future Future FutureProject scoped in 2023. Added to program in future for discussion purposes.Cherry Ln and Ten Mile Rd10Eagle Rd / Overland RdWiden intersection. Intersection improvements to include dual left turn lanes.Future Future FutureAdded to program in future for discussion purposes.South Meridian Improvements B: Overland Rd and Eagle Rd11Locust Grove Rd, Ustick Rd / McMillan RdWiden Locust Grove Rd to 3, 4 or 5 lanes; preserve for 5 lanes, with curb, gutter, andpedestrian/bike facilities. Project should include an enhanced crossing (pedestrian hybridbeacon) on Locust Grove Road at Heritage Park Street; accessfor Meridian Technical CharterHigh School.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Locust Grover Corridor A: Locust Grove Rd, Ustick Rd / McMillan Rd12Meridian Rd, Ustick Rd / McMillan Rd Widen Meridian Rd to 3, 4 or 5 lanes; preserve for 5 lanes, withcurb, gutter, andpedestrian/bike facilities. Project should include an enhanced pedestrian crossing of MeridianRd at/near Settlers Park entrance and Sundance Subdivision micropath.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Meridian Corridor A: Meridian Rd, Ustick Rd / McMillan Rd13Ustick Rd and Black Cat RdWiden intersection.2022-2024 2024 2025Project programmed to be constructed in 2025.Ustick Corridor A: Ustick Rd and Black Cat Rd14Ustick, Black Cat to Ten MileWiden Ustick Rd to 5 lanes with curb, gutter,and pedestrian/bike facilities. 2022-2023 2024 2025Project programmed to be constructed in 2025.Ustick Corridor A: Ustick Rd, Black Cat Rd / Ten Mile Rd15Amity Rd, Meridian Rd / Locust Grove RdWiden Amity Rd to minimum 3 lanes with preservation for up to 5lanes. Include preferentialbike and pedestrian infrastructure for Mary McPherson elementary school.2023-2024 2027-2028 FutureProgrammed for design in FY2023-2024.Amity Corridor A: Amity Rd, SH69 (Meridian Rd) / Locust Grove Rd16Black Cat, Franklin to CherryWiden Black Cat Rd with curb, gutter and pedestrian/bike facilities. An interim help could beimprovements north of Franklin to the RR tracks near COMPASS school. 2028-2029 Future FutureProgrammed for design in FY2028-2029. Blact Cat Rd, Franklin Rd / Cherry Ln17Lake Hazel, Locust Grove to EagleWiden Lake Hazel Rd and improve with curb, gutter and pedestrian/bike facilities. 2021 2021 2023-2024Programmed to be constructed in 2023-2024. To be built out as a Coperative Development Agreement (CDA).Lake Hazel Rd, Locust Grove Rd / Eagle Rd18Meridian Rd, McMillan Rd / Chinden Blvd Widen Meridian Rd to 3, 4 or 5 lanes; preserve for 5 lanes, withcurb, gutter, andpedestrian/bike facilities. 2027-2028 Future FutureProject programmed to be designed in 2027-2028.Meridian Corridor A: Meridian Rd, McMillan Rd / US 20/26 (Chinden Blvd)19Lake Hazel Rd and Eagle RdWiden and signalize intersection.2020 2022-2023 2024Project programmed to be constructed in 2024.Lake Hazel Rd and Eagle Rd20Victory, Linder to MeridianWiden Victory Rd to 3 lanes with curb, gutter and pedestrian/bike facilities.2028-2029 Future FutureProject programmed to be designed in 2028-2029.Victory Corridor D: Victory Rd, Linder Rd / SH 69 (Meridian Rd)21Franklin Rd, McDermott Rd / Black Cat RdWiden Franklin Rd to 5 lanes with curb, gutter and pedestrian/bike facilities.2024-2025 2026-2027 2028Project programmed to be constructed in 2028.Franklin Corridor A: Franklin Rd, McDermott Rd / Black Cat Rd22Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St) Widen Linder Rd. with bike and pedestrian facilities as thisis one of only a few river crossingsin the County and connects to nearby Eagle Island State Park.Part of City's envisionedpathway network.2024-2025 2028-2029 FutureProject programmed to be designed in 2024-2025.Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St)23Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd)Widen Fairview Ave to 7 lanes with curb, gutter pedestrian/bike facilities.2020-2021 2023-2024 2028Project programmed to be constructed in 2028.Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd)24McMillan Rd and Black Cat RdWiden intersection.2021-2023 2027 2028Project programmed to be constructed in 2028.McMillan Rd and Black Cat Rd Roundabout25Franklin Rd and McDermott RdWiden intersection. Coordinate design with ITD and the SH-16 improvements.2024-2025 2026-2027 2028Project programmed to be constructed in 2028.Franklin Corridor A: Franklin Rd and McDermott Rd26Ustick Rd and McDermott Rd Widen intersection.2024-2025 2026 2027Project programmed to be designed in 2024-2025.Ustick Corridor B: Ustick Rd and McDermott Rd27Ustick Rd and Star Rd Widen intersection.2027-2028 2028 FutureProject programmed to be designed in 2027-2028.Ustick Rd and Star RdRoads & Intersections - CIP Projects (Arterials) Only2024 Meridian Prioritization Request Form - Programmed2024 Priority RankingAgency Project NameAgency Project DescriptionCurrent IFYWP StatusACHD UpdateACHD Implementation Project Name 28Amity Rd and Locust Grove RdConstruct interim signalized intersection with preservation for future widening to accommodate5-lane roadways in all directions.2023-2024 2027-2028 FutureProject programmed to be designed in 2023-2024.Amity Corridor A: Amity Rd and Locust Grove Rd29Victory Rd and Linder RdWiden intersection.2028-2029 Future FutureProject programmed to be designed in 2028-2029.Victory Corridor D: Victory Rd and Linder Rd30Locust Grove Rd, McMillan Rd / Chinden Blvd (US 20/26)Widen Locust Grove Rd to 3, 4 or 5 lanes; preserve for 5 lanes, with curb, gutter, andpedestrian/bike facilities. 2027-2028 Future FutureProject programmed to be designed in 2027-2028.Locust Grove Corridor A: Locust Grove Rd, McMillan Rd / US 20/26 (Chinden Blvd)31Ustick Rd, McDermott Rd / Black Cat RdWiden Ustick Rd to 5 lanes with curb, gutter and pedestrian/bike facilities.2024-2025 2026 2027Project programmed to be designed in 2024-2025.Ustick Corridor B: Ustick Rd, Owyhee Storm Ave / Black Cat Rd32Amity, Eagle to CloverdaleWiden Amity Rd to 5 lanes with curb, gutter and pedestrian/bike facilities. Include enhancedpedestrian crossing at Ten Mile Creek pathway crossing and install pedestrian/bikeimprovements on Amity Rd near the YMCA and City Park so there are no gaps.2025-2026 2027-2028 FutureProject programmed to be designed in 2025-2026.Amity Corridor B: Amity Rd, Eagle Rd / Cloverdale Rd.33Amity, Locust Grove to EagleWiden Amity Rd to 5 lanes with curb, gutter and pedestrian/bike facilities. Include enhancedpedestiran crossing at Ten Mile Creek pathway crossing.2025-2026 2027 FutureProject programmed to be designed in 2025-2026.Amity Corridor B: Amity Rd, Locust Grove Rd / Eagle Rd34Eagle, Lake Hazel to AmityWiden Eagle Rd to 5 lanes with curb, gutter, and pedestrian/bike facilities. 2021 2023 2024Project programmed to be constructed in 2024.Eagle Rd, Lake Hazel Rd / Amity Rd1Stoddard Rd, Victory Rd / Overland Rd (Stoddard Rd, Victory Rd / Kodiak Dr)Reconstruct Stoddard Rd, between Victory Rd and Overland Rdto 3-lanes, 7' attachedsidewalks and bike lanes. Project includes bridge #2085 andan enhanced pedestrian crossing(pedestrian hybrid beacon) at Victory and Stoddard (CM214-27). Bike lanes may be replacedby a pathway per the Bike Master Plan Update.2023 2024-2025 FutureProject programmed to be designed in 2023.South Meridian Improvements A: Stoddard Rd, Victory Rd / Overland Rd2East 03rd St, Franklin Rd / Carlton Ave (Phase 1)Construct streetscape improvements, including curb, gutter, sidewalk, and improved UPRRcrossing, from Franklin Rd to Carlton Ave in accordance withthe Downtown MeridianNeighborhood Plan.2025-2026 2027 FutureProject programmed to be designed in 2025-2026.Meridian Downtown Improvements A: East 03rd St, Franklin Rd / Carlton St3Linder Rd, Washington St / Maple St Include preferential bike and pedestrian infrastructre near Meridian High School. Completesidewalk on the west side of Linder Rd, between Washington Stand Maple St.These improvements are needed sooner than what is planned with the roadway project.2026 2028 FutureProject programmed to be designed in 2026. Concept Study in 2022-2024. Duplicate Request (see above). Project would be completed with the roadway project. Recommend removal/combining commentsLinder Corridor B: Linder Rd, Pine Ave / Ustick Rd4Linder Road, Maple Avenue / Cherry LaneInclude preferential bike and pedestrian infrastructure for existing schools and City park. These improvements are needed sooner than what is planned with the roadway project.2026 2028 FutureProject programmed to be designed in 2026. Concept Study in 2022-2024. Duplicate Request (see above). Project would be completed with the roadway project. Recommend removal/combining commentsLinder Corridor B: Linder Rd, Pine Ave / Ustick Rd5McMillan Rd, Ten Mile Rd / Linder RdCity requests detached concrete sidewalk with curbing between Goddard Creek Way and WildGoose Way. City requests a pedestrian crossing across McMillan near Hunter Elementary(near Palatine Way). See Priority #18 below; please construct concurrently. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.North Meridian Improvements B: McMillan Rd, Goddard Creek Way / Wild Goose Way6Main St and King Street Pedestrian CrossingInstall an enhanced pedestrian crossing of Main St at King Street. Main Street northbound has3 lanes and creates a safety concern.2026-2027 2027 2028Project programmed to be constructed in 2028.Meridian Downtown Improvements B: Main St and King St Pedestrian Crossing7Bower St, Meridian Rd / E. 03rd St Complete sidewalks and add wayfinding signage on Bower St, between Meridian Rd and E.03rd St.2028-2029 Future FutureProject programmed to be designed in FY2028-2029. North Boise Improvements B: Bower St, Meridian Rd / East 03rd St8Pine Ave and W. 1st St Pedestrian Crossing Install an enhanced pedestrian crossing (rectangular rapid flashing beacon) on Pine Ave at W01st St to improve access to Meridian Elementary School.2026-2027 2027 FutureProject programmed to be designed in 2026-2027.Meridian Downtown Improvements B: Pine Ave and 01st St Pedestrian Crossing9McMillan Rd, Locust Grove Rd / Red Horse WayComplete sidewalk gap on the north side of McMillan Rd, between Locust Grove Rd and RedHorse Way.2026 2027 2028Project programmed to be constructed in 2028.North Meridian Improvements A: McMillan Rd, Red Horse Way / Locust Grove Rd10Locust Grove Rd and Palermo Dr Pedestrian SignalInstall an enhanced pedestrian signal and lighting on the north side of Palermo Dr at LocustGrove Rd.2022-2023 2024 FutureProject programmed to be designed in 2022-2023.South Meridian Improvments A: Locust Grove Rd and Palermo Dr Pedestrian Crossing11Locust Grove Road, Leighfield Drive to Star LaneConnect gap from existing sidewalk on west side of Locust Grove Rd, along with improvingnarrow sidewalk on east side of roadway newar Leighfield Dr and Star Dr; east side of LocustGrove Rd to connect with an existing path to the school near Paradise Ln and Grand CanyonDr; and install an enhanced crossing (PHB) on Locust Grove Rdat Heritage Park St, nearMeridian Technical Charter High School.These improvements are needed sooner than what isplanned with the roadway project. 2027-2028 Future FutureProject programmed to be designed in 2027-2028. Duplicate Request (see above). Project would be completed with the roadway project. Recommend removal/combining commentsLocust Grover Corridor A: Locust Grove Rd, Ustick Rd / McMillan Rd12Linder-Meridian Bikeway, Cherry Lane / Chinden BoulevardInstall bike facilities. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.North Meridian Improvements B: Linder-Meridian Bikeway, Pine Ave / Temple Dr13McDermott Road, Ustick Road to McMillan RoadInstall pedestrian/bike facilities on the west side of McDermott Rd connecting to infrastructureon Ustick Rd and McMillan Rd for connectivity to Owyhee High School. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.McDermott Rd Pedestrian Facilities, Ustick Rd / McMillan Rd14Central Meridian Bikeway, Blue Heron Street / Chinden BoulevardInstall bike facilities along the Central Meridian Bikewayfrom Blue Heron Street to ChindenBoulevard. N/A N/A 2026Project programmed to be constructed in 2026.Bikeway Signage (2026) 15Chinden-McMillan Bikeway, Ten Mile Road / Sedona DriveInstall bike facilities along the Chinden-McMillan Bikeway from Ten Mile Road to SedonaDrive.Note: Most of the stretch already is built or has an alternative pathway; Locust grove toCity Limits still needed.N/A N/A 2026Project programmed to be constructed in 2026.Bikeway Signage (2026) 16Granger Avenue Bikeway, Records Avenue / Cloverdale RoadInstall bike facilities, including signage, near The Village to complete gaps in network.N/A N/A 2024Project programmed to be constructed in 2024.Bikeway Signage Program (2024)Community Programs - Collectors & Local Roadways 17Hollandale-Targee Bikeway, Locust Grove Road / Eagle RoadInstall signage and pavement markings along Hollandale-TargeeBikeway from Locust GroveRd to Eagle Rd.2026-2027 2028 FutureProject programmed to be designed in 2026-2027. Southwest Boise Improvements B: Hollandale-Targee Bikeway, Locust Grove Rd / Entertainment Ave18McMillan Rd and Palatine Way Pedestrian CrossingInstall an enhanced pedestrian crossing and curb ramps on McMillan Rd at Palantine Way.See Priority #5 above; please construct concurrently.2026 2027 FutureProject programmed to be designed in 2026.North Meridian Improvements A: McMillan Rd and Palatine Way Pedestrian Crossing19Broadway Ave, West 07th St / West 04th StComplete sidewalks on the south side of Broadway Ave, between West 07th St and West 04thSt. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.Meridian Downtown Improvements C: Broadway Ave, West 08th St / West 04th St20East 2 1/2 St, Carlton Ave / Fairview AveInstall sidewalk on the west and/or east side of 2 1/2 St, south of Fairview Ave near Cole Valley Christian School.2025-2026 2027 FutureProject programmed to be designed in 2025-2026.Meridian Downtown Improvements A: East 2 1/2 St, Carlton Ave / Fairview Ave21Locust Grove Rd and Woodbridge Dr Pedestrian CrossingInstall an enhanced pedestrian crossing of Locust Grove Rd at Woodbridge Dr or WatertowerSt.2026-2027 2028 FutureProject programmed to be designed in 2026-2027.Meridian Downtown Improvements B: Locust Grove Rd and Woodbridge Dr Pedestrian Crossing22Records Way Bikeway, Pine Avenue / Fernside DriveInstall bike facilities along the Records Way Bikeway from Pine Ave to Florence Dr, and fromUstick Rd to Baldcypress St, and from Baldcypress St to Wainwright Dr.N/A N/A 2024Project programmed to be constructed in 2024.Bikeway Signage (2024)*Programming status is subject to change. Updates based on ADOPTED FY2024-2028 IFYWP*Design YR ROW YR Const YR1McMillan Rd, Meridian Rd / Locust Grove RdWiden McMillan Rd up to 5-lanes with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, SH 69 (Meridian Rd) / Locust Grove Rd2McMillan Rd, Linder Rd / Meridian RdWiden McMillan Rd up to 5-lanes with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, Linder Rd / SH 69 (Meridian Rd)3Cherry Ln and Black Cat Rd Widen intersection. Address transition from bike-lane to/from MUP.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln and Black Cat Rd4Cherry Ln and McDermott Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln and McDermott Rd5Cherry Ln, Black Cat Rd / McDermott RdWiden Cherry Ln with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln, Black Cat Rd / McDermott Rd6Fairview Ave, SH 55 (Eagle Rd) / Cloverdale RdWiden Fairview Ave with curb, gutter, sidewalk, and bike/pedestrian facilities. Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Fairview Ave, SH 55 (Eagle Rd) / Cloverdale Rd7Fairview Ave, Meridian Rd / Locust Grove Rd Widen Fairview Ave with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Fairview Ave, Meridian Rd / Locust Grove Rd8Ten Mile Rd, Amity Rd / Victory RdWiden Ten Mile Rd with curb, gutter, sidewalk, and bike/pedestrian facilities.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.Ten Mile Rd, Amity Rd / Victory Rd9Amity Rd and Black Cat Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.Amity Rd and Black Cat Rd10McMillan Rd and Star Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.McMillan Rd and Star Rd11Linder, Pine / CherryWiden Linder Rd to include curb, gutter and pedestrian/bike facilities. Include preferential bike and pedestrian infrastructure with wayfinding signage (several nearby and directly adjacent schools). 12Amity Rd and Linder Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.Amity Rd and Linder Rd13Cherry Ln and Linder Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln and Linder Rd14Ustick Rd and Venable LnInstall full signal or roundabout. 15Meridian/Overland SignalImprove intersection operation. This may mean adding additional lanes. Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Overland Rd and SH 69 (Meridian Rd)16Pine, Linder to Meridian Widen the entire segment to 3-travel lanes with curb, gutter, sidewalks and/or multi-use or mixed-use bikeway.Not ProgrammedNot ProgrammedNot ProgrammedProject would require the removal of on-street parking for existing homes. To be evaluated and prioritized for possible inclusion into future IFYWP updates.Pine Ave, Linder Rd / Meridian Rd17Black Cat, Cherry to Ustick Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Blact Cat Rd, Cherry Ln / Ustick Rd18McMillan Rd and McDermott Rd Widen intersection.Not ProgrammedNot ProgrammedNot ProgrammedDefer. Operating at a LOS D or better. Reevaluate as conditions change.McMillan Rd and McDermott Rd19Ten Mile Rd and Chateau Dr Improve intersection. Not ProgrammedNot ProgrammedNot ProgrammedDoes not currently meet warrants. ACHD to reevaluate as development occurs in the area.Ten Mile Rd and Chateau Dr20Eagle Rd / Fairview AveImprove intersection operation. This may mean adding additional lanes or a grade-separated roadway. Not ProgrammedNot ProgrammedNot ProgrammedPlease provide addiitonal description of requested improvements.Eagle Rd and Fairview Ave21Lake Hazel / Discovery ParkImprove intersection/entry into City Park. The improvements could be a signal, roundabout, or other, but should include provisions for pedestrians/bicyclists.Not ProgrammedNot ProgrammedNot ProgrammedPlease provide additional information regarding location of request/type of request. Signalized? Enhanced pedestrian crossing?Lake Hazel Rd and Discovery Park22Victory, Ten Mile to Linder Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Victory Rd, Ten Mile Rd / Linder Rd23Black Cat, Ustick to McMillan Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Black Cat Rd, Ustick Rd / McMillan RdRoads & Intersections - CIP Projects (Arterials) OnlyCurrent IFYWP Status2024 Meridian Prioritization Request Form - Not Programmed2024 Priority RankingAgency Project NameAgency Project DescriptionACHD UpdateACHD Implementation Project Name 24Black Cat, McMillan to Chinden Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Black Cat Rd, McMillan Rd / US 20/26 (Chinden Blvd)25McMillan, Black Cat to Ten Mile Widen with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, Black Cat Rd / Ten Mile Rd26McMillan, Ten Mile to LinderWiden with curb, gutter, and pedestrian/bike facilities. Project should include an enhanced pedestrian crossing and curb ramps on McMillan Rd at Pantine Way, near Hunter Elementary. Not ProgrammedNot ProgrammedNot ProgrammedProject scoped in 2022. To be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan Rd, Ten Mile Rd / Linder Rd27Locust Grove, Lake Hazel to AmityWiden Locust Grove Rd up to 5 lanes with curb, gutter, and pedestrian/bike facilities.Not ProgrammedNot ProgrammedNot ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Locust Grove Rd, Lake Hazel Rd / Amity Rd28Fairview Ave Corridor Management, Linder Rd / Orchard St Improve safety and traffic operations along Fairview Ave in accordance with the Fairview Avenue Corridor Management Strategy. Project may include bicycle and pedestrian facilities and other access management treatments.Not ProgrammedNot ProgrammedNot ProgrammedProject to be implemented through development. ACHD and Meridian to coordinate implementation as development applications are processed.Fairview Ave Corridor Management, Linder Rd / Orchard St29Locust Grove and McMillan Improve intersection. 30Meridian and McMillan Improve intersection. 31Linder and McMillanImprove intersection. 32Ten Mile and McMillan Improve intersection. 1E. 3rd, Carlton to FairviewExtend roadway and construct streetscape improvements, including curb, gutter, sidewalk, and improved UPRR crossing, from Carlton Ave to Fairview Ave in accordance with several downtown plans and studies.Not Programmed Not Programmed Not ProgrammedExtension to be completed through development. Duplicate request. Recommend combining with other request.East 03rd St Extension, Carlton St / Fairview Ave2Ustick-Cherry Bikeway, Black Cat Road / Chateau DriveInstall bike facilities. Several (likely 5) segments needed. City requests ACHD's assistance in prioritizing and scoping corridor connections (likely east to west.) Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Ustick-Cherry Bikeway, Black Cat Rd / Hickory Way3Cherry Ln, Linder Rd / Meridian RdInstall bike facilities along Cherry Ln from Linder Rd to Meridian Rd Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Cherry Ln, Linder Rd / Meridian Rd4Ten Mile-Linder Bikeway, Linder Road / Chinden BoulevardInstall bike facilities, signing and pavement markings.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Ten Mile-Linder Bikeway, W 08th St / Chinden Blvd5McMillan-Ustick Bikeway, Cool River Avenue / Eagle RoadInstall bike facilities. Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.McMillan-Ustick Bikeway (Phase 3), Linder Rd / Eagle Rd)6Broadway Ave / Idaho Ave Extension, East06th St / Locust Grove RdExtend roadway from its current terminus at NE 6th St to Stonehenge Way/ Commercial Dr and construct streetscape improvements, including curb, gutter, sidewalk/MUP. Not Programmed Not Programmed Not ProgrammedDefer. To be considered as properties redevelopment.Broadway Ave / Idaho Ave Extension, 06th St / Locust Grove Rd7W Park Creek Dr, Crosswalk at N Deer Creek LnInstall enhanced crossing with hawk signal or RRFBNot Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates. Project Scoped as part of Black Cat-Ten Mile Bikeway in FY2023 Scoping Effort. North Meridian Improvements B: Park Creek Dr and Deer Creek Ln Pedestrian Crossing8W 7th St, Cedarburg Dr to Washington St.Install sidewalk to fix gap on NW 7th St. This gap prevents connection from the sidewalk from the south and east from connecting to the micro-path at Meridian Middle School/8th St.9Fairview Terrace to Chief JosephPedestrian connection (sidewalk) between Barbara Dr in Fairview Terrace Park to E. Willowbrook Dr and Chief Joseph Elementary on Chateau Drive. Need right-of-way.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Chief Joseph Elementary Pedestrian Improvements10N Naomi Ave, Ustick to PonderosaInstall 20mph school zone signs. Should this be an enhanced crossing or 20mph or both?Not Programmed Not Programmed Not ProgrammedRequest to be shared with our Traffic division. Reponse pendingPonderosa Elementary School Zone Flashers11Locust Grove-Eagle Bikeway, Pine Avenue / McMillan RoadInstall bike facilities. Several (likely 3) segments needed. City requests ACHD's assistance in prioritizing and scoping corridor connections (likely south to north.) Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Locust Grove-Eagle Bikeway, Pine Ave / Chinden Blvd12Nola Rd, south of Pine Ave (Middle School)Construct pedestrian/bicycle faciliteis on Nola Rd from Pine Ave to Crossroads Middle School/RR Tracks. See Priority #19 below; construct concurrently. Not Programmed Not Programmed Not ProgrammedScoped "No Go" in 2018. Sidewalk on east side to be built through development. Nola Rd, Pine Ave / Crossroads Middle School13Stockenham Enhanced Cross-walksRemove mid-block cross-walk by Hillsdale Elementary School and add enhanced cross-walks at Lachlan and near Rockhampton/Hill Park St. Update school zone signs and flashers.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Hillsdale Elementary Pedestrian Crossings and School Zone14Taormina Drive at Maesaia WayInstall sidewalk to fix gap on south side of Taormina Dr near Maesaia Way. Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Taormina Dr at Maesaia Way15Woodbridge Neighborhood Bike StudyStudy the connectivity and bikeability of the Woodbridge neighborhood, between Locust Grove Rd and Eagle Rd, north of I-84.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Woodbridge Neighborhood Bike StudyCommunity Programs - Collectors & Local Roadways 16Watertower St at Rebound SchoolInstall a painted crosswalk on Watertower St at Rebound School.Not Programmed Not Programmed Not ProgrammedACHD Traffic Engineering does not recommend installation. Crossing activity is caused by parent drop off.Watertower St and Rebound School Pedestrian Crossing17St. Ignatius School Pedestrian SignalInstall pedestrian signal on Meridian Rd at Producer Dr.Not Programmed Not Programmed Not ProgrammedProject scoped in 2019. To be evaluated and prioritized for possible inclusion into future IFYWP updates.Meridian Rd and Producer Dr Pedestrian Crossing18West 02nd St, UPRR / Broadway AveComplete sidewalk on both sides of West 02nd St, between the Union Pacific Railroad and Broadway Ave to address parking concerns in this area.Not Programmed Not Programmed Not ProgrammedSidewalk scoped "No Go" in 2015. Agencies to coordinate if other solutions identified.West 02nd, UPRR / Broadway Ave19Nola Rd and Crossroads Middle School Pedestrian CrossingInstall a painted crosswalk on Nola Rd at Crossroads Middle School. See Priority #12 above; construct concurrently.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Nola Rd and Crossroads Middle School Pedestrian Crossing20Gondola-Malta Bikeway, Black Cat Road / Goddard Creek WayInstall bike facilities.Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Gondola-Malta Bikeway, W/O Black Cat Rd / Goddard Creek Way21Montague Way, Amity Road / Santo Stefano DriveInstall sidewalk on east side of Montague Way from Amity Rd to Santo Stefano Dr. Not Programmed Not Programmed Not ProgrammedMontague Way is a collector and roadway improvements to be completed through redevelopment.Montague Way, Amity Rd / Santo Stefano Dr22Black Cat-Ten Mile Bikeway, Cherry Lane / Ustick RoadInstall bike facilities along the Black Cat-Ten Mike Bikeway. Not Programmed Not Programmed Not ProgrammedTo be evaluated and prioritized for possible inclusion into future IFYWP updates.Black Cat-Ten Mile Bikeway (Phase 1), Cherry Ln / Ustick Rd23Locust Grove, Pine to Franklin MUPInstall multi-use pathway, between Pine Ave and Franklin Rd. This would connect the pathway on Pine Ave, west of Locust Grove Rd to Franklin Rd, where the pathway then resumes along the Five Mile Creek. This would replace some existing sidewalk with a multiuse pathway. .24American Fork (Kodiak)/LinderSignalize intersection. Near Victory Middle School and bus stops. Updates based on ADOPTED FY2024-2028 IFYWP*Design YR ROW YR Const YR1Linder Rd, Overland Rd / Franklin RdWiden Linder Rd to 5 lanes and construct a new 4-lane I-84 overpass, including curb, gutter,sidewalk, and bike lanes in accordance with the 2016 CIP. Project would be a joint projectbetween ACHD and ITD.2022-2024 2024-2025 2026-2027Project programmed to be constructed in 2026-2027.Linder Rd, Overland Rd / Franklin Rd2Locust Grove Rd, Fairview Ave / Ustick RdWiden Locust Grove Rd to 3, 4 or 5 lanes with curb, gutter and pedestrian/bike facilities.Consider enhanced crossing at Chateau Dr. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.Locust Grove Corridor B: Locust Grove Rd, Fairview Ave / Ustick Rd3Fairview Ave and Locust Grove RdWiden intersection.2020-2023 2024 2028Project programmed to be constructed in 2028.Fairview Ave and Locust Grove Rd4Victory Rd, Locust Grove Rd / Eagle RdWiden Victory Rd to 3 lanes. Include preferential bike and pedestrian infrastructure.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Victory Corridor B: Victory Rd, Locust Grove Rd / Eagle Rd5Ustick Rd, Ten Mile Rd / Linder RdWiden Ustick Rd to 5 lanes with curb, gutter,and pedestrian/bike facilities. 2022-2023 2025 2026Project programmed to be constructed in 2026.Ustick Corridor A: Ustick Rd, Ten Mile Rd / Linder Rd6Linder Rd, Cherry Ln / Ustick Rd Widen Linder Rd to include curb, gutter and pedestrian/bikefacilities. Include preferential bikeand pedestrian infrastructure with wayfinding signage.2026 2028 FutureProject programmed to be designed in 2026. Concept Study in 2022-2024.Linder Corridor B: Linder Rd, Pine Ave / Ustick Rd7Locust Grove Rd, Amity Rd / Victory RdWiden Locust Grove Rd to a minimum 3 lanes, with preservationfor up to 5 lanes, with curb,gutter and pedestrian/bike facilities. Include pedestrian crossings at Palermo and Wrightwood. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.Locust Grove Corridor B: Locust Grove Rd, Amity Rd / Victory Rd8Victory Rd, Meridian Rd / Locust Grove Rd Widen Victory Rd to 3 lanes. Include preferential bike and pedestrian infrastructure. Completesidewalk/MUP on the south side of Victory Rd adjacent to County outparcel.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Victory Corridor B: Victory Rd, SH 69 (Meridian Rd) / Locust Grove Rd9Ten Mile Rd / Cherry LnWiden intersection. Intersection improvements to include dual left turn lanes.Future Future FutureProject scoped in 2023. Added to program in future for discussion purposes.Cherry Ln and Ten Mile Rd10Eagle Rd / Overland RdWiden intersection. Intersection improvements to include dual left turn lanes.Future Future FutureAdded to program in future for discussion purposes.South Meridian Improvements B: Overland Rd and Eagle Rd11Locust Grove Rd, Ustick Rd / McMillan RdWiden Locust Grove Rd to 3, 4 or 5 lanes; preserve for 5 lanes, with curb, gutter, andpedestrian/bike facilities. Project should include an enhanced crossing (pedestrian hybridbeacon) on Locust Grove Road at Heritage Park Street; accessfor Meridian Technical CharterHigh School.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Locust Grover Corridor A: Locust Grove Rd, Ustick Rd / McMillan Rd12Meridian Rd, Ustick Rd / McMillan Rd Widen Meridian Rd to 3, 4 or 5 lanes; preserve for 5 lanes, withcurb, gutter, andpedestrian/bike facilities. Project should include an enhanced pedestrian crossing of MeridianRd at/near Settlers Park entrance and Sundance Subdivision micropath.2027-2028 Future FutureProject programmed to be designed in 2027-2028.Meridian Corridor A: Meridian Rd, Ustick Rd / McMillan Rd13Ustick Rd and Black Cat RdWiden intersection.2022-2024 2024 2025Project programmed to be constructed in 2025.Ustick Corridor A: Ustick Rd and Black Cat Rd14Ustick, Black Cat to Ten MileWiden Ustick Rd to 5 lanes with curb, gutter,and pedestrian/bike facilities. 2022-2023 2024 2025Project programmed to be constructed in 2025.Ustick Corridor A: Ustick Rd, Black Cat Rd / Ten Mile Rd15Amity Rd, Meridian Rd / Locust Grove RdWiden Amity Rd to minimum 3 lanes with preservation for up to 5lanes. Include preferentialbike and pedestrian infrastructure for Mary McPherson elementary school.2023-2024 2027-2028 FutureProgrammed for design in FY2023-2024.Amity Corridor A: Amity Rd, SH69 (Meridian Rd) / Locust Grove Rd16Black Cat, Franklin to CherryWiden Black Cat Rd with curb, gutter and pedestrian/bike facilities. An interim help could beimprovements north of Franklin to the RR tracks near COMPASS school. 2028-2029 Future FutureProgrammed for design in FY2028-2029. Blact Cat Rd, Franklin Rd / Cherry Ln17Lake Hazel, Locust Grove to EagleWiden Lake Hazel Rd and improve with curb, gutter and pedestrian/bike facilities. 2021 2021 2023-2024Programmed to be constructed in 2023-2024. To be built out as a Coperative Development Agreement (CDA).Lake Hazel Rd, Locust Grove Rd / Eagle Rd18Meridian Rd, McMillan Rd / Chinden Blvd Widen Meridian Rd to 3, 4 or 5 lanes; preserve for 5 lanes, withcurb, gutter, andpedestrian/bike facilities. 2027-2028 Future FutureProject programmed to be designed in 2027-2028.Meridian Corridor A: Meridian Rd, McMillan Rd / US 20/26 (Chinden Blvd)19Lake Hazel Rd and Eagle RdWiden and signalize intersection.2020 2022-2023 2024Project programmed to be constructed in 2024.Lake Hazel Rd and Eagle Rd20Victory, Linder to MeridianWiden Victory Rd to 3 lanes with curb, gutter and pedestrian/bike facilities.2028-2029 Future FutureProject programmed to be designed in 2028-2029.Victory Corridor D: Victory Rd, Linder Rd / SH 69 (Meridian Rd)21Franklin Rd, McDermott Rd / Black Cat RdWiden Franklin Rd to 5 lanes with curb, gutter and pedestrian/bike facilities.2024-2025 2026-2027 2028Project programmed to be constructed in 2028.Franklin Corridor A: Franklin Rd, McDermott Rd / Black Cat Rd22Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St) Widen Linder Rd. with bike and pedestrian facilities as thisis one of only a few river crossingsin the County and connects to nearby Eagle Island State Park.Part of City's envisionedpathway network.2024-2025 2028-2029 FutureProject programmed to be designed in 2024-2025.Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St)23Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd)Widen Fairview Ave to 7 lanes with curb, gutter pedestrian/bike facilities.2020-2021 2023-2024 2028Project programmed to be constructed in 2028.Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd)24McMillan Rd and Black Cat RdWiden intersection.2021-2023 2027 2028Project programmed to be constructed in 2028.McMillan Rd and Black Cat Rd Roundabout25Franklin Rd and McDermott RdWiden intersection. Coordinate design with ITD and the SH-16 improvements.2024-2025 2026-2027 2028Project programmed to be constructed in 2028.Franklin Corridor A: Franklin Rd and McDermott Rd26Ustick Rd and McDermott Rd Widen intersection.2024-2025 2026 2027Project programmed to be designed in 2024-2025.Ustick Corridor B: Ustick Rd and McDermott Rd27Ustick Rd and Star Rd Widen intersection.2027-2028 2028 FutureProject programmed to be designed in 2027-2028.Ustick Rd and Star RdRoads & Intersections - CIP Projects (Arterials) Only2024 Meridian Prioritization Request Form - Programmed2024 Priority RankingAgency Project NameAgency Project DescriptionCurrent IFYWP StatusACHD UpdateACHD Implementation Project Name 28Amity Rd and Locust Grove RdConstruct interim signalized intersection with preservation for future widening to accommodate5-lane roadways in all directions.2023-2024 2027-2028 FutureProject programmed to be designed in 2023-2024.Amity Corridor A: Amity Rd and Locust Grove Rd29Victory Rd and Linder RdWiden intersection.2028-2029 Future FutureProject programmed to be designed in 2028-2029.Victory Corridor D: Victory Rd and Linder Rd30Locust Grove Rd, McMillan Rd / Chinden Blvd (US 20/26)Widen Locust Grove Rd to 3, 4 or 5 lanes; preserve for 5 lanes, with curb, gutter, andpedestrian/bike facilities. 2027-2028 Future FutureProject programmed to be designed in 2027-2028.Locust Grove Corridor A: Locust Grove Rd, McMillan Rd / US 20/26 (Chinden Blvd)31Ustick Rd, McDermott Rd / Black Cat RdWiden Ustick Rd to 5 lanes with curb, gutter and pedestrian/bike facilities.2024-2025 2026 2027Project programmed to be designed in 2024-2025.Ustick Corridor B: Ustick Rd, Owyhee Storm Ave / Black Cat Rd32Amity, Eagle to CloverdaleWiden Amity Rd to 5 lanes with curb, gutter and pedestrian/bike facilities. Include enhancedpedestrian crossing at Ten Mile Creek pathway crossing and install pedestrian/bikeimprovements on Amity Rd near the YMCA and City Park so there are no gaps.2025-2026 2027-2028 FutureProject programmed to be designed in 2025-2026.Amity Corridor B: Amity Rd, Eagle Rd / Cloverdale Rd.33Amity, Locust Grove to EagleWiden Amity Rd to 5 lanes with curb, gutter and pedestrian/bike facilities. Include enhancedpedestiran crossing at Ten Mile Creek pathway crossing.2025-2026 2027 FutureProject programmed to be designed in 2025-2026.Amity Corridor B: Amity Rd, Locust Grove Rd / Eagle Rd34Eagle, Lake Hazel to AmityWiden Eagle Rd to 5 lanes with curb, gutter, and pedestrian/bike facilities. 2021 2023 2024Project programmed to be constructed in 2024.Eagle Rd, Lake Hazel Rd / Amity Rd1Stoddard Rd, Victory Rd / Overland Rd (Stoddard Rd, Victory Rd / Kodiak Dr)Reconstruct Stoddard Rd, between Victory Rd and Overland Rdto 3-lanes, 7' attachedsidewalks and bike lanes. Project includes bridge #2085 andan enhanced pedestrian crossing(pedestrian hybrid beacon) at Victory and Stoddard (CM214-27). Bike lanes may be replacedby a pathway per the Bike Master Plan Update.2023 2024-2025 FutureProject programmed to be designed in 2023.South Meridian Improvements A: Stoddard Rd, Victory Rd / Overland Rd2East 03rd St, Franklin Rd / Carlton Ave (Phase 1)Construct streetscape improvements, including curb, gutter, sidewalk, and improved UPRRcrossing, from Franklin Rd to Carlton Ave in accordance withthe Downtown MeridianNeighborhood Plan.2025-2026 2027 FutureProject programmed to be designed in 2025-2026.Meridian Downtown Improvements A: East 03rd St, Franklin Rd / Carlton St3Linder Rd, Washington St / Maple St Include preferential bike and pedestrian infrastructre near Meridian High School. Completesidewalk on the west side of Linder Rd, between Washington Stand Maple St.These improvements are needed sooner than what is planned with the roadway project.2026 2028 FutureProject programmed to be designed in 2026. Concept Study in 2022-2024. Duplicate Request (see above). Project would be completed with the roadway project. Recommend removal/combining commentsLinder Corridor B: Linder Rd, Pine Ave / Ustick Rd4Linder Road, Maple Avenue / Cherry LaneInclude preferential bike and pedestrian infrastructure for existing schools and City park. These improvements are needed sooner than what is planned with the roadway project.2026 2028 FutureProject programmed to be designed in 2026. Concept Study in 2022-2024. Duplicate Request (see above). Project would be completed with the roadway project. Recommend removal/combining commentsLinder Corridor B: Linder Rd, Pine Ave / Ustick Rd5McMillan Rd, Ten Mile Rd / Linder RdCity requests detached concrete sidewalk with curbing between Goddard Creek Way and WildGoose Way. City requests a pedestrian crossing across McMillan near Hunter Elementary(near Palatine Way). See Priority #18 below; please construct concurrently. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.North Meridian Improvements B: McMillan Rd, Goddard Creek Way / Wild Goose Way6Main St and King Street Pedestrian CrossingInstall an enhanced pedestrian crossing of Main St at King Street. Main Street northbound has3 lanes and creates a safety concern.2026-2027 2027 2028Project programmed to be constructed in 2028.Meridian Downtown Improvements B: Main St and King St Pedestrian Crossing7Bower St, Meridian Rd / E. 03rd St Complete sidewalks and add wayfinding signage on Bower St, between Meridian Rd and E.03rd St.2028-2029 Future FutureProject programmed to be designed in FY2028-2029. North Boise Improvements B: Bower St, Meridian Rd / East 03rd St8Pine Ave and W. 1st St Pedestrian Crossing Install an enhanced pedestrian crossing (rectangular rapid flashing beacon) on Pine Ave at W01st St to improve access to Meridian Elementary School.2026-2027 2027 FutureProject programmed to be designed in 2026-2027.Meridian Downtown Improvements B: Pine Ave and 01st St Pedestrian Crossing9McMillan Rd, Locust Grove Rd / Red Horse WayComplete sidewalk gap on the north side of McMillan Rd, between Locust Grove Rd and RedHorse Way.2026 2027 2028Project programmed to be constructed in 2028.North Meridian Improvements A: McMillan Rd, Red Horse Way / Locust Grove Rd10Locust Grove Rd and Palermo Dr Pedestrian SignalInstall an enhanced pedestrian signal and lighting on the north side of Palermo Dr at LocustGrove Rd.2022-2023 2024 FutureProject programmed to be designed in 2022-2023.South Meridian Improvments A: Locust Grove Rd and Palermo Dr Pedestrian Crossing11Locust Grove Road, Leighfield Drive to Star LaneConnect gap from existing sidewalk on west side of Locust Grove Rd, along with improvingnarrow sidewalk on east side of roadway newar Leighfield Dr and Star Dr; east side of LocustGrove Rd to connect with an existing path to the school near Paradise Ln and Grand CanyonDr; and install an enhanced crossing (PHB) on Locust Grove Rdat Heritage Park St, nearMeridian Technical Charter High School.These improvements are needed sooner than what isplanned with the roadway project. 2027-2028 Future FutureProject programmed to be designed in 2027-2028. Duplicate Request (see above). Project would be completed with the roadway project. Recommend removal/combining commentsLocust Grover Corridor A: Locust Grove Rd, Ustick Rd / McMillan Rd12Linder-Meridian Bikeway, Cherry Lane / Chinden BoulevardInstall bike facilities. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.North Meridian Improvements B: Linder-Meridian Bikeway, Pine Ave / Temple Dr13McDermott Road, Ustick Road to McMillan RoadInstall pedestrian/bike facilities on the west side of McDermott Rd connecting to infrastructureon Ustick Rd and McMillan Rd for connectivity to Owyhee High School. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.McDermott Rd Pedestrian Facilities, Ustick Rd / McMillan Rd14Central Meridian Bikeway, Blue Heron Street / Chinden BoulevardInstall bike facilities along the Central Meridian Bikewayfrom Blue Heron Street to ChindenBoulevard. N/A N/A 2026Project programmed to be constructed in 2026.Bikeway Signage (2026) 15Chinden-McMillan Bikeway, Ten Mile Road / Sedona DriveInstall bike facilities along the Chinden-McMillan Bikeway from Ten Mile Road to SedonaDrive.Note: Most of the stretch already is built or has an alternative pathway; Locust grove toCity Limits still needed.N/A N/A 2026Project programmed to be constructed in 2026.Bikeway Signage (2026) 16Granger Avenue Bikeway, Records Avenue / Cloverdale RoadInstall bike facilities, including signage, near The Village to complete gaps in network.N/A N/A 2024Project programmed to be constructed in 2024.Bikeway Signage Program (2024)Community Programs - Collectors & Local Roadways 17Hollandale-Targee Bikeway, Locust Grove Road / Eagle RoadInstall signage and pavement markings along Hollandale-TargeeBikeway from Locust GroveRd to Eagle Rd.2026-2027 2028 FutureProject programmed to be designed in 2026-2027. Southwest Boise Improvements B: Hollandale-Targee Bikeway, Locust Grove Rd / Entertainment Ave18McMillan Rd and Palatine Way Pedestrian CrossingInstall an enhanced pedestrian crossing and curb ramps on McMillan Rd at Palantine Way.See Priority #5 above; please construct concurrently.2026 2027 FutureProject programmed to be designed in 2026.North Meridian Improvements A: McMillan Rd and Palatine Way Pedestrian Crossing19Broadway Ave, West 07th St / West 04th StComplete sidewalks on the south side of Broadway Ave, between West 07th St and West 04thSt. 2028-2029 Future FutureProject programmed to be designed in 2028-2029.Meridian Downtown Improvements C: Broadway Ave, West 08th St / West 04th St20East 2 1/2 St, Carlton Ave / Fairview AveInstall sidewalk on the west and/or east side of 2 1/2 St, south of Fairview Ave near Cole Valley Christian School.2025-2026 2027 FutureProject programmed to be designed in 2025-2026.Meridian Downtown Improvements A: East 2 1/2 St, Carlton Ave / Fairview Ave21Locust Grove Rd and Woodbridge Dr Pedestrian CrossingInstall an enhanced pedestrian crossing of Locust Grove Rd at Woodbridge Dr or WatertowerSt.2026-2027 2028 FutureProject programmed to be designed in 2026-2027.Meridian Downtown Improvements B: Locust Grove Rd and Woodbridge Dr Pedestrian Crossing22Records Way Bikeway, Pine Avenue / Fernside DriveInstall bike facilities along the Records Way Bikeway from Pine Ave to Florence Dr, and fromUstick Rd to Baldcypress St, and from Baldcypress St to Wainwright Dr.N/A N/A 2024Project programmed to be constructed in 2024.Bikeway Signage (2024)*Programming status is subject to change.