Loading...
PZ - Geotechnical Report Geotechnical Engineering Report McDermott — Villagio Development Boise, Idaho PREPARED FOR: Schultz Development, LLC PREPARED BY: Innovate Geotechnical Innovate Geotechnical Project No. 320027 January 12, 2021 INNOVATE GLOTLCHNICAL mEn INNCIVATE GEUTECHNICAL Page 1 of 10 January 12, 2021 Attention: Matt Schultz Subject: Geotechnical Engineering Report McDermott -Villagio Development Boise, Idaho Innovate Geotechnical Project No. 320027 Matt, Submitted herewith is the report of our geotechnical engineering evaluation for the subject site. This report contains the results of our findings and an engineering interpretation of the results with respect to the available project characteristics. It also contains earthwork and site improvement recommendations necessary for development of the property. On August 13, 2020, Innovate Geotechnical staff was on-site and completed 3 test pits up to 10 feet below the existing ground surface. On December 11, 2020, 5 more test pits were completed up to 12 feet below the existing ground surface. Soil samples were obtained during the field operations and were then transported to our office for further testing. Based on the findings of the subsurface investigation and other information, site earthwork and development recommendations are provided. A detailed discussion of observed conditions is presented in this report. We appreciate the opportunity to work with you on this project. If we can be of further assistance or if you have any questions regarding this project, please do not hesitate to contact us at (208) 484-1090. Sincerely, � EENS' �'®�� Innovate Geotechnical 1, % 7 t�0 IDw, Sierra Hyde Seth P. Olsen, P.E. Engineering Intern Senior Geotechnical Engineer GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNFIVATF oEOTEOHNICAL Page 2 of 10 Table of Contents Attention: Matt Schultz................................................................................................................... 1 1.0 INTRODUCTION .................................................................................................................... 3 2.0 PROJECT UNDERSTANDING .............................................................................................. 3 3.0 SCOPE OF SERVICES............................................................................................................ 3 4.0 SITE CONDITIONS AND FIELD EVALUATION................................................................ 3 4.1 Surface Conditions.................................................................................................................... 3 4.2 Field Evaluation........................................................................................................................ 4 4.3 Subsurface Soil Profile .............................................................................................................4 4.4 Groundwater ............................................................................................................................. 4 4.5 Site Subsurface Variations........................................................................................................ 5 4.6 Seismic Setting.......................................................................................................................... 5 5.0 CONCLUSIONS AND RECOMMENDATIONS ................................................................... 5 5.1 Site Preparation and Earthwork................................................................................................ 5 5.2 Structural Fill ............................................................................................................................ 6 5.3 Fill Placement and Compaction................................................................................................ 7 5.4 Slopes........................................................................................................................................ 7 5.5 Foundation Support................................................................................................................... 7 5.6 Floor Slabs................................................................................................................................ 8 5.7 Drainage.................................................................................................................................... 8 5.8 Pavement................................................................................................................................... 9 6.0 QUALITY CONTROL............................................................................................................. 9 7.0 LIMITATIONS....................................................................................................................... 10 8.0 REFERENCES ....................................................................................................................... 10 List of Figures Appendices Figure 1 —Vicinity Map Appendix A— Boring Logs Figure 2 —Site Map Appendix B— Laboratory Test Results GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNFIVATF oEOTEOHNICAL Page 3 of 10 1.0 INTRODUCTION Innovate Geotechnical (IGEO) is pleased to present this report which presents the results of our geotechnical engineering evaluation for the proposed McDermott—Villagio Development in Ada County, Idaho. The project area is located approximately as shown in the Vicinity Map, Figure 1. 2.0 PROJECT UNDERSTANDING The proposed development is on the west side of McDermott between McMillan Rd and Chinden Rd.The project entails developing the approximately 20-acre property into 99 lots. The proposed project includes evaluating the site for subsurface characteristics and providing pavement recommendations. The site will be developed as residential. IGEO was asked to provide geotechnical recommendations for this development. We understand the proposed residential construction will consist of one and two-story, wood- framed structures supported by shallow foundations. Wall loads are expected to range from 2 to 3 kips per lineal foot. If the construction conditions are different than we have observed, please notify us so that any appropriate modifications to our conclusions and recommendations contained herein may be made. A site plan is presented in Figure 2. 3.0 SCOPE OF SERVICES The purpose of our geotechnical engineering evaluation was to provide recommendations for site development based on our site evaluation, laboratory testing, and engineering analyses. Our specific scope of services included: • Exploration of soil and groundwater conditions underlying the proposed development by completing 8 test pits, and collecting samples for testing • Laboratory testing to assess pertinent physical and engineering properties of the soil observed. • Engineering analysis and preparation of this report. 4.0 SITE CONDITIONS AND FIELD EVALUATION Existing surface and subsurface conditions associated with the subject property are presented in this section. 4.1 Surface Conditions The site is in Meridian, Idaho (see Figures 1 and 2). Topographically, the site is relatively level sloping gently downward from southeast to northwest towards Chinden Road. The elevation drop is approximately 3 feet across the property from approximately 2515 feet above Mean Sea GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNIJVATF GEUTECHNICAL Page 4 of 10 Level (MSL) to approximately 2512 feet above MSL. A portion of McDermott Road forms the eastern boundary. Agriculture crops (corn fields) makeup the observed vegetation on the site. Existing residential homes and agriculture surround the property. 4.2 Field Evaluation The subsurface soil conditions were determined by performing eight (8) Test Pits (TP-1 through TP-8)at the locations shown on Figure 2. Test pits were advanced using a backhoe subcontracted to IGEO. Soil samples were obtained at significant changes of strata and in general accordance with ASTM D-420 and ASTM D-2488. The subsurface conditions observed during the field evaluation are discussed in Section 4.3. Logs of the explorations, including a description of all soil strata encountered, are presented in Appendix A. After completion of the field evaluation, soil samples were tested for their engineering properties. The results of the laboratory testing are presented in Appendix B and shown on the test pit logs in Appendix A. In addition, groundwater will be monitored in all the test pits monthly for 12 months. 4.3 Subsurface Soil Profile The results of our field evaluation and our laboratory testing indicate a fairly uniform subgrade across the site. In general, the existing ground surface predominantly overlies brown moist, medium stiff sandy silt to a depth of up to 9 feet(TP-3,TP-5, and TP-7 to TP-8)or a medium dense silty sand below the existing ground surface. The other test pits had brown loose to medium dense sand with varying amounts of silt to a depth of approximately up to 6 feet (TP-1, TP-4,TP- 6) below the existing ground surface. Only one of the test pits had a medium stiff sandy lean clay (TP-2) up to 8 feet below the existing ground surface. This layer is underlain predominantly by poorly graded sand with gravel with some cobbles (TP-1 to TP-4) or a layer of gravel with sand with cobbles (TP-5 to TP-8) to the full depth explored (approximately 12 feet below the existing ground surface). Some cementation was observed in the subsurface (TP-3). For a detailed description of the soil profiles observed in this evaluation, see the test pit logs in Appendix A. See Figure 2 for the approximate test pit locations. 4.4 Groundwater Groundwater was observed in one of the test pits during the field evaluation (TP-3). Numerous factors such as heavy precipitation, irrigation practices, and other unforeseen factors may influence groundwater elevations at the site. The detailed evaluation of these and other factors, which may be responsible for groundwater fluctuations, is beyond the scope of this study. PVC pipe was installed in each of the 8 test pits to act as piezometers and allow for groundwater observation to take place. IGEO will submit groundwater reading results as a part of this project over the next 12 months from the time of the field evaluation. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNIJVATE oEOTEOHNICAL Page 5 of 10 4.5 Site Subsurface Variations Based on the results of the subsurface exploration and our experience, variations in continuity and nature of subsurface conditions should be anticipated. Due to the heterogeneous characteristics of soils, care should be taken in interpolating or extrapolating subsurface conditions between or beyond the exploratory explorations. Seasonal fluctuations in groundwater conditions may also occur. 4.6 Seismic Setting According to the findings of our subsurface evaluation and the guidelines of the International Building Code (IBC, 2018) the Site Classification is D (IBC, 2018, section 1613). The following values should be used for site structural coefficients: Short Period Spectral Response Acceleration SS = 0.29g One Second Period Spectral Response Acceleration SI = 0.106g Short Period Spectral Response Design Acceleration SIDS = 0.3039 One Second Period Spectral Design Acceleration SDI = 0.1699 Liquefaction of a soil is defined as the condition when a saturated, loose, cohesion-less, (fine sand-type) soils have a sudden, large decrease, in their ability to support loads. This is because of excessive pore water pressure which develops during a seismic event. Cohesive (clay type) and dense sand and gravel soils typically do not liquefy during a seismic event. Because of the soils observed and the depth of the groundwater at the site, it is our opinion that the potential for liquefaction at this site is low under seismic conditions. 5.0 CONCLUSIONS AND RECOMMENDATIONS Based on the results of our site exploration, laboratory testing, and engineering analyses, it is our opinion that the proposed site may be improved as envisioned. Specific recommendations for the proposed improvements are presented in the following sections of this report. 5.1 Site Preparation and Earthwork 5.1.1 Initial Preparation We recommend that proposed areas for improvements be prepared by clearing and grubbing of both the surface and subsurface of all debris, deleterious and organic matter, and roots greater than %inch diameter. We estimate that the depth of stripping required to remove organic topsoil GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEUTECHNICAL Page 6 of 10 will range from approximately 2 to 4 inches across the site. We recommend an average topsoil stripping depth of 3 inches be used for planning and cost estimating. 5.1.2 Grading, Excavations, and Subgrade Preparation Current site grades within the proposed improvements slope gently toward the southwest. We anticipate excavation depths to be fairly consistent across the site. In order to provide uniform bearing conditions for the proposed structures and pavements,we recommend the following site preparation activities: • Within foundation limits, the native soils are to be proof-rolled and compacted to establish final foundation elevations. • Within the roadway limits, the on-site sandy soils should be proof-rolled prior to placing the aggregate for the proposed roadway section. In the event earthwork activities cause excessive subgrade disturbance, replacement with structural fill may be necessary. A greater depth of disturbance of the subgrade soil may be expected if site preparation work is conducted during periods of wet weather when the moisture content of the soil exceeds optimum. Any soft, loose, wet or otherwise unsuitable soil encountered is to be over-excavated to firm soil, or a depth of 2 feet, whichever is less, and replaced with structural fill, as described below. 5.1.3 Temporary Excavations For temporary excavations less than five feet deep, side slopes should not be made steeper than 0.5:1 (horizontal to vertical). Temporary excavations extending more than five feet and up to ten feet in depth should not be made steeper than 1:1. If unstable conditions or groundwater seepage are encountered, flatter slopes, shoring, or bracing may be required for all conditions. All excavations should be made following OSHA safety guidelines. 5.2 Structural Fill Soil used to support the foundations is classified as structural fill for the purposes of this report. 5.2.1 Structural Fill Structural fill shall consist of granular soils free of organics, debris, or other deleterious materials and no particles larger than four inches in maximum dimension. Structural fill shall meet the specifications described below: • Structural fill placed below structural foundations should consist of well-graded, sand and gravel material with no more than 12% passing the #200 sieve. Equivalent specifications may be used if approved by the project geotechnical engineer. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATE GEDTECHNICAL Page 7 of 10 5.2.2 Use of on-site Soil The on-site sandy soils observed in our test pits may be reused as structural fill, provided it is reworked and meets the requirements set forth above. 5.3 Fill Placement and Compaction The various types of compaction equipment have their limitations as to the maximum lift thickness that can be compacted. For example, hand operated equipment is limited to lifts of about four inches and most "trench compactors" have a maximum, consistent compaction depth of about six inches. Large rollers, depending on soil and moisture conditions can achieve compaction at eight to twelve inches. The full thickness of each lift should be compacted to at least the following percentages of the maximum dry density (MDD) as determined by ASTM D- 1557: 1. Compacted fill/native soils, supporting foundations 95% 2. Compacted fill/native soils, below floor slabs 95% 3. Compacted fill/native soils, below pavement 95% 4. Backfill of trenches a. Below foundations 95% b. Below pavement 95% c. Others 90% Field density tests should be performed on each lift as necessary to ensure that compaction is being achieved. Conditions of the structural fill, site grading fill, and compacted native soil should be evaluated by in-place density tests, visual evaluations, probing and proof-rolling as these materials are prepared to determine compliance with the contract documents and recommendations in this report. Over compaction should be avoided as increased compaction effort will result in lateral pressures higher than those provided in this report. 5.4 Slopes For permanent re-worked slopes on the property, we recommend slopes of no more than 2Horizontal : 1Vertical. Shallower slopes may be needed where loose, soft,or otherwise unstable slopes are encountered. 5.5 Foundation Support We anticipate that the proposed footings will be established at a minimum elevation of two feet below the existing ground surface.To establish uniform bearing conditions the proposed footings GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEOTECHNICAL Page 8 of 10 should be established entirely on a specific zone of compacted native soils, as described previously. Foundations may be designed using a maximum allowable bearing pressure of 2,000 psf. In addition to the fill recommendations presented previously in this report, the following recommendations should be implemented: • Continuous footing width should be maintained at a minimum of 18 inches. • Spot footings should be a minimum of 30 inches in width. • Exterior footings should be placed a minimum of 24 inches below final grade for frost protection, and interior footing shall be placed a minimum of 16 inches below grade. • Drainage around the site should be created so that water is not allowed to flow into the excavation during or after construction. The allowable bearing pressure may be increased by 1/3 for temporary loads such as wind and seismic forces. Based on the preliminary maximum foundation loads, as presented above, and given that the foundations are supported as described in this report, we estimate that total settlement will be less than about 1 inch. Differential settlement is estimated to be less than about % of the total settlement. Post-construction settlement should be minor. Loose soil or otherwise unsuitable soil not removed from footing excavations, or disturbance of soil at foundation grade during construction could result in larger settlements than estimated. 5.6 Floor Slabs Floor slabs may be supported on structural fill overlying the on-site soils as recommended in the previous sections of this report. We recommend the slab be designed using a modulus of vertical subgrade reaction (k) of 100 pounds per cubic inch (pci). To help control normal shrinkage and stress cracking, the floor slabs should have the following features: • Adequate reinforcement for the anticipated floor loads with the reinforcement continuous through interior floor joints • Frequent crack control joints • Non-rigid attachment of the slabs to foundation walls and bearing slabs 5.7 Drainage All soils can experience some volume change when exposed to water. Therefore, adequate site drainage is always important. Site grading design and construction should be implemented to assure that all surface water is directed away from the foundation bearing soils. We recommend the following actions be taken: GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNI]VATE oEOTEOHNICAL Page 9 of 10 1. All areas around the buildings should be sloped to provide drainage away from the structures. We recommend a minimum slope of 6 inches in the first 10 feet away from the structure. 2. All roof drainage should be collected in rain gutters with downspouts designed to discharge well beyond the backfill limits or the stormwater drainage system, if applicable. 3. Adequate compaction of the foundation backfill should be provided. We suggest a minimum of 90% of the maximum laboratory density as determined by ASTM D-1557. Water consolidation methods should not be used under any circumstances. 4. Sprinklers should be aimed away from the foundation walls. The sprinkling systems should be designed with proper drainage and be well-maintained. Over watering should be avoided. 5. Other precautions may become evident during construction. 5.8 Pavement The flexible pavement evaluation was performed using the Gravel Equivalence (GE) method. In our evaluation we analyzed a roadway classification of local road and collector road. In general, the thickness of the asphalt pavement is predominantly controlled by the traffic and the thickness of the base and sub-base layers is predominantly controlled by the subgrade conditions. The total thickness analysis was developed based on an estimated R-value of the subgrade soil (35) and traffic data recommended by Ada County Highway District (ACHD). ACHD recommends using a traffic index (TI) of 6 for local roads and 7 for collector roads. The recommended total design pavement section for the flexible pavement of the development is presented in Table 1. TABLE 1-Flexible Pavement Sections Flexible Subbase Total Flexible Pavement Pavement Base Thickness Thickness Thickness Section Thickness (inches) (inches) (inches) Local Road 2.5 4 6 12.5 Collector Road 3 5 6 14 6.0 QUALITY CONTROL Our recommendations in this report are based on the assumption that adequate quality control testing and observations will be conducted during construction to verify compliance. GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 mEn INNEIVATF GEDTECHNICAL Page 10 of 10 7.0 LIMITATIONS The recommendations provided herein were developed by evaluating the information obtained from the subsurface investigation and our experience in the area. The exploration data reflects the subsurface conditions only at the specific locations at the particular time designated on the logs. Soil and ground water conditions may differ from conditions encountered at the actual exploration locations.The nature and extent of any variation in the explorations may not become evident until during the course of construction. If variations do appear, it may become necessary to re-evaluate the recommendations of this report after we have observed the variation. Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. This warranty is in lieu of all other warranties, either expressed or implied. 8.0 REFERENCES AASHTO Guide for Design of Pavement Structures, American Association of State Highway and Transportation Officials, 1993. ASTM, American Society for Testing and Materials Ada County Highway District. Policy Manual. Asphalt Institute. The Asphalt Handbook. Manual Series No. 4 (MS-4) 1989 edition. IBC, International Building Code, 2018 Edition Idaho Standards for Public Works Construction 2017 Edition. Fundamentals of Geotechnical Analysis— Dunn, Anderson, and Kiefer (1980) Essentials of Soil Mechanics and Foundations— David F. McCarthy (2007) GEOTECHNICAL ENGINEERING 1550 S Cloverdale Rd Suite#201 BOISE,ID (208)484-1090 Villagio Development w. rt Meridian Idaho f � El .���r iri i' `- ♦rLU r• , K.' L r ' !� awR Elf SITE I '.. �~ FFFi n 2U2U�'CDt7gle • - - . s , k M J�` r AN INNIIVA-, ® Approximate Test Pit Locations GEOTECHNIEAL Villagio Development Date: 13-Aug-20 Figure: Site Map Project No: 320027 Drawn By: S. Hyde 2 Locations are approximate Client: Schultz Development mEn INNnVATE GEHTECHNICAE Appendix A INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-1 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHNICAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 8/13/20 COMPLETED 8/13/20 GROUND ELEVATION 2512 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Creighton GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Clara Klamm CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG I w w a LIMITS w U �� >- cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � o U ILz 0.0 o w SILTY SAND,(SM)brown,moist,medium dense d c� Ui 0 0 J d U) W H O c� 2.5 a J J_ GB 20 20 LU (SM)20%fines a- O W 0 0 cD J J 1 VI Z 5.0 LU (SM) U O i GB Y 2 Q K Q J U GB w SILT,(ML)brown,moist,stiff 3 6 7.5 GB POORLY GRADED SAND WITH GRAVEL,(SP)brown,moist,dense 4 o GB (SP)Piezometer Installed at 10' 5 Z 10.0 .:•: Bottom of test pit at 10.0 feet. Z z J 0 U 2 m 2 U W F O w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-2 mEn1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHMEAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 8/13/20 COMPLETED 8/13/20 GROUND ELEVATION 2514 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Creighton GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Clara Klamm CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG I w w a LIMITS w U �� >- cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � D U ILz 0.0 o w SANDY LEAN CLAY,(CL)brown,moist,medium stiff d c� Ui c� 0 J d w H O c� 2.5 a J_ F z w 2 o GB (CL) 1 w 0 0 CD GB CLAY,(CL) 2 P 5.0 z w U O Q Y K LU U (CL)59%fines,stiff 36 21 29 21 8 59 6 7.5 a N 0 POORLY GRADED SAND WITH GRAVEL,(SP)moist,dense GB (SP) 4 GB (SP)Piezometer Installed at 10' 5 z 10.0 .:•: Bottom of test pit at 10.0 feet. Z z J 0 U 2 m 2 U W F O w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-3 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHNICAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 8/13/20 COMPLETED 8/13/20 GROUND ELEVATION 2515 ft TEST PIT SIZE inches EXCAVATION CONTRACTOR Creigton GROUND WATER LEVELS: EXCAVATION METHOD Backhoe -Z AT TIME OF EXCAVATION 10.00 ft/Elev 2505.00 ft LOGGED BY Clara Klamm CHECKED BY Seth Olsen AT END OF EXCAVATION -- NOTES Agriculture on Surface.Groundwater Observed at 10'. AFTER EXCAVATION -- ATTERBERG I w w a LIMITS w U �� >- cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 OS m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � o U ILz 0.0 o w SANDY SILT,(ML)light brown,dry,stiff d GB 9 50 U) (ML)50%fines 1 0 J d U) W H O c� 2.5 a J J F GB LU (ML)moist 2 a- 0 J W O GB ° SANDY SILT WITH GRAVEL,(ML)brown,moist,stiff 3 z 5.0 U o O < o J Y Q GB SILTY SAND WITH GRAVEL,(SM)brown,moist,medium dense, 4 Some Cementation at 7' w 6 7.5 .: a POORLY GRADED SAND WITH GRAVEL,COBBLES,(SP) saturated,dense GB (SP) 5 GB POORLY GRADED GRAVEL WITH SAND,(GP)wet,dense, 6 ~ 10.0 0 � Piezometer Installed at 10' z _ Bottom of test pit at 10.0 feet. Z z J 0 U 2 co 0 U W 0 O w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-4 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHNICAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 12/11/20 COMPLETED 12/11/20 GROUND ELEVATION TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Sierra Hyde CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG � w w a LIMITS w U �� > cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � o U ILz 0.0 o w SILTY SAND,(SM)moist,very loose,Bulk Sample at 1' d c� Ui 0 0 J d U) W H O 2.5 J J F z w a- ° GB 17 42 LU (SM)2%gravel,56%sand,42%fines 1 W 0 0 0 J J 1 H z 5.0 W o GB POORLY GRADED SAND WITH GRAVEL,(SP)dry,loose 2 J Y K LU U CC 7 b 7.5 GB N (SP)Piezometer Installed at 9.5' 3 0 ° J VI Bottom of test pit at 9.5 feet. r z Z z J ° U 2 m 2 U W F O w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-5 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHNICAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 12/11/20 COMPLETED 12/11/20 GROUND ELEVATION TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Sierra Hyde CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG I w w a LIMITS w U �� >- cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � o U ILz 0.0 o w SANDY SILT,(ML)brown,dry,loose d c� Ui 0 0 J d GB (ML)63%fines 1 16 63 a 2.5 J J F z w a- o GB (ML)moist 2 0 0 c� a J_ 1 H z 5.0 w U O i GB Y WELL GRADED GRAVEL WITH SILT AND SAND,COBBLES, 3 7 9 • (GW-GM)55%gravel,36%sand,9%fines,brown,moist,loose J � LU U CC 7 � 6 7.5 • GB N (GW-GM)light brown,moist,loose,Piezometer Installed at 9' 4 • 0 0 °i Bottom of test pit at 9.0 feet. 0 r z Z z J 0 U 2 m 0 U W 0 O w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-6 mEn1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHMEAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 12/11/20 COMPLETED 12/11/20 GROUND ELEVATION TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Sierra Hyde CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG I w w a LIMITS w U �� >- cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � o U ILz 0.0 o w WELL GRADED SAND WITH SILT,(SW-SM)brown,dry,very loose U 0 0 a- 0 (SW-SM)5%gravel,87%sand,8%fines GB 32 8 cD 2.5 J F z a- 0 w w 0 O 0 Q J 1 z 5.0 GB COBBLES,(SW-SM) 2 0 0 i J Y K J U GB W WELL GRADED GRAVEL WITH SAND,COBBLES,(GW)light 3 6 7.5R brown,moist,loose,Piezometer Installed at 9.5' 0 R H R J • sec. Bottom of test pit at 9.5 feet. r z Z z J O U 2 m 0 U W 0 O w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-7 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHNICAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 12/11/20 COMPLETED 12/11/20 GROUND ELEVATION TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Sierra Hyde CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG � w w a LIMITS w U �� > cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � D U ILz 0.0 o w SANDY SILT,(ML)brown,moist,loose d c� Ui 0 0 J d U) W H O c� 2.5 a J J_ LU (ML)62%fines GB 29 62 a- 0 J W Uj O 0 Q J_ 1 H Z 5.0 W U O Q J Y Q GB (ML) 2 LU w 6 7.5 a N H Q J VI GB WELL GRADED GRAVEL WITH SAND,COBBLES,(GW)53% 3 3 0 Z 10.0 � gravel,47%sand,0%fines,moist,loose,Piezometer Installed at o �. U _ �.�A co 2 0 . is o Bottom of test pit at 11.5 feet. w INNOVATE ""'ateGeotechnical TEST PIT NUMBER TP-8 min1150 S Cloverdale Road,Ste.201 PAGE 1 OF 1 Boise,Idaho 83709 GEOTECHNICAL Telephone:(208)484-1090 CLIENT Schultz Development PROJECT NAME Villagio Development PROJECT NUMBER 320027 PROJECT LOCATION McDermott DATE STARTED 12/11/20 COMPLETED 12/11/20 GROUND ELEVATION TEST PIT SIZE inches EXCAVATION CONTRACTOR Wagner GROUND WATER LEVELS: EXCAVATION METHOD Backhoe AT TIME OF EXCAVATION --- LOGGED BY Sierra Hyde CHECKED BY Seth Olsen AT END OF EXCAVATION --- NOTES Agriculture on Surface.No Groundwater Observed. AFTER EXCAVATION -- ATTERBERG I w w a LIMITS w U �� >- cn w d =U m Lu �ZJ Hw H� DZ U Z w� Q O MATERIAL DESCRIPTION J� >� O�Q Lu j 0. U)W o� �� U x O� p 0 Ov m0> Y U) Hp U� O QZ w Uz O Q �O �� <- Qz wv � o U ILz 0.0 o w SANDY SILT,(ML)brown,dry,loose,Bulk Sample at 1' d c� Ui 0 0 J d (ML)52%fines 24 52 a 2.5 J J F z w a- d O J W LU 0 O 0 Q J_ 1 H z 5.0 W U O Y WELL GRADED GRAVEL WITH SAND,COBBLES,(GW)78% 2 0 ! gravel,22%sand,0%fines,light brown,moist,loose W U 6 7.5 N SANDY,(GW)dry,Piezometer Installed at 9.5' o .19 J • � Bottom of test pit at 9.5 feet. r z Z z J U 2 co 2 U W F O w mEn INNnVATE GEHTECHNICAE Appendix B U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w } 60 m 0 Z 50 U) Q a 40 Z w 0 30 w a 20 10 L L 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE INNOVATE Villagio Development Boring/ Depth Content Gravel Sand Fines USCS Test Pit (feet) (%I__ o) ) (%I Class Soil Classification--- I U L U GECTECHNICAL Date: TP-1 3 20 20 SM Silty Sand Sieve Analysis 1/12/2021 ❑ TP-2 7 21 59 CL Sandy Lean Clay Results Figure. TP-2 9 3 - - - SP Poorly Graded Sand with Project: At 320027 Gravel Ada County, X TP-3 1 9 50 ML Sandy Silt Idaho Client: Schultz B 1 • TP-4 3.5 17 2 56 42 SM Silty Sand Development U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w 60 m 0 ❑. Z 50 Q a 40 w U 30 w a 20 10 0 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE ---------------------------------------------------------------------------------------------------------------- INNOVATE Villagio Development Boring/ Depth Content Gravel Sand Fines USCS H] Ell Symbol Test Pit M) M o) Class Soil Classification I U L U GECTECHNICAL TP-5 2 16 - - 63 MIL Sandy Silt Date: Sieve Analysis 1/12/2021 ❑ TP-5 6 7 55 36 9 GW-GM Well Graded Gravel with Silt Results Figure. . and Sand Project: TP-6 2 32 5 87 8 SW-SM Well Graded Sand with Silt 320027 X TP-7 3 29 - - 62 ML Sandy Silt Ada County, - B -2 0 TP-7 9.5 3 53 47 0 GW Well Graded Gravel with Sand Idaho Client: Schultz Development U.S. STANDARD SIEVE SIZE 3" 1.5" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100 90 80 70 w } 60 m 0 Z 50 U) Q a 40 Z w U 30 w a 20 10 0 1000 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL I SAND SILT OR CLAY COARSE I FINE COARSE MEDIUM FINE lun INNOVATE Villagio Development GECTECHNICAL Sample Moisture Date: Boring/ Sieve Analysis 1/12/2021 Symbol est_Pit_ _(feet) %) -(0/.) 6) Class Soil Classification Results Figure: TP-8 2 24 - 52 ML Sandy Silt Project: 320027 ElTP-8 6 2 78 22 0 GW Well Graded Gravel with Sand Ada County, - B -3 Idaho Client: Schultz Development 60 , , O 50 ' , , , x w ; 0 40 ' z U 30 0 i i 20 - G MH or OH 10 , .CLW6 ML or OL 0 0 10 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT(LL) iprn INNOVATE Villagio Development GEGTEEHNIEAL Sample Liquid Plastic Date: DepthSymbol Location USCS Atterberg 1/12/2021 Index(131) Class Limits Results Figure: TP-2 7 29 21 8 CL Sandy Lean Clay Project:320027 Ada County, B -4 Idaho Client:Schultz Development *Based on Sieve Analysis Results A M E R I C A N American Geotechnics J1 J Project Information T I C H N I C S Report to: Innovate Geotechnical Project: Villagio Report Date: 12/31/2020 File No.: 02787.47 Material Information Date Sampled: 12/11/2020 Sampled By: Client Date Received: 12/17/2020 Date Tested: 12/17 - 12/31/2020 SUMMARY OF LABORATORY RESULTS Lab Sample Depth Water %Passing Liquid Plasticity Soil Number Borehole Type (ft) Content #200 Limit Index Type Remarks (%) Sieve (%) 20-0972 TP-04 Bulk 1.0'-3.0' 18.6 86.3 35 10 ML -- Prepared By: Kelli Browning American Geotechnics ATTERBERG LIMITS REPORT rCRr�: TECHNICS CLIENT: Innovate Geotechnical PROJECT NAME:Villagio FILE NUMBER:02787.47 PROJECT LOCATION:Ada County, Idaho 60 CL CH 50 x 40 w 0 z_ 30 U) Q J a 20 10 CL-ML ML MH 0 0 20 40 60 80 100 LIQUID LIMIT(%) Specimen Identification MC LL PL PI Fines Classification • TP-04 Bulk 1.0 18.6 35 25 10 86 SILT (ML) Prepared By: Kelli Browning American Geotechnics PARTICLE-SIZE DISTRIBUTION REPORT %R I ( A N TECHNICS CLIENT: Innovate Geotechnical PROJECT NAME:Villagio FILE NUMBER:02787.47 PROJECT LOCATION:Ada County, Idaho U.S.SIEVE OPENING IN INCHES I U.S.SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 3/4 1/23/8 3 6 810 1416 20 30 40 50 60 100 140 200 100 95 90 85 80 75 70 65 (D 60 w >_ 55 m w w 50 z LL 45 z w 40 w 0 35 30 25 20 15 10 5 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL SAND SILT OR CLAY coarse fine coarse I medium fine Specimen Identification Classification D10 D30 D60 • TP-04 Bulk 1.0 SILT (ML) -- -- -- Specimen Identification %Gravel %Sand %Fines D15 D50 D85 Cc Cu MC LL PI • TP-04 Bulk 1.0 0.0 13.7 86.3 -- -- -- -- -- 18.6 35 10 Prepared By: Kelli Browning American Geotechnics American Geotechnics A M E R I C A N 5260 Chinden Blvd. r Boise, Idaho 83714 Phone:(208) 658-8700 J �W Fax: (208) 658-8703 T E C H N I C S Report To: Innovate Geotechnical Report Date: 12/31/2020 Project: Villagio Date Sampled: 12/11/2020 Project No.: 02787.47 Date Received: 12/17/2020 Sample ID: TP-4, Bulk; 1.0'-3.0' Tested By: PC Soil Description: Silt(ML) Lab Number: 20-0972 R-VALUE IDAHO T-8 Point 1 Point 2 Point 3 Drainage Description Zero Zero Zero R-Value @ 200 PSI Dry Density, PCF 97.4 98.3 98.6 Exudation Pressure Moisture Content, % 24.0 23.3 22.7 Exudation, PSI 101 146 233 35 R-Value(Corrected) 5 22 43 Expansion, PSI 0.03 0.40 0.62 R-Value 200 psi Expansion Gradation: AASHTO T-11, T-27 4.0 9000 Screen %Passing %Passing 8000 Sizes As Received As Tested 4" 3.0 7000 3" h J 2" a 6000 L 1„ W Vl d 2.0 5000 d 3/4" o a. 1/2" . 4000 ° y 3/8" C l6 No. 4 100 100 w 1.0 3000 w No. 8 2000 No. 16 No. 30 0.0 1000 No. 50 90 80 70 60 50 40 30 20 10 0 R-Value(Corrected) No. 100 No. 200 "This report covers only material as represented by this sample and does not necessarily cover all soils from this layer or source. Reviewed By: Travis Thomsen Ir INNOVATE G L 0 GEOTECHNICAL