June 9, 2023
Trilogy Development
9839 West Cable Car Street, Suite 101
Boise, Idaho 83709
Attention: Shawn Brownlee (shawn(a-)-trilogyidaho.com)
RE: Geotechnical Evaluation
South Eagle Road Development
7355 South Eagle Road
Meridian, Idaho
ALLWEST Project No. 523-087G
Mr. Brownlee,
ALLWEST has completed the authorized geotechnical evaluation for the proposed South Eagle
Road Development to be located at 7355 South Eagle Road in Meridian, Idaho. The purpose of
this evaluation was to characterize the subsurface conditions at the site and prepare the attached
report with the results of our field evaluation and laboratory testing, and our geotechnical
recommendations to assist planning, design, and construction of the proposed development.
We appreciate the opportunity to provide services for this project. If you have any questions or
need additional information, please contact us at (208) 895-7898.
Sincerely,
oQ�pFESSIpN" / O
ALLWEST ��� (o�Q'�2� %let% ' LENS
KEVIN ANDREW ro Q �'4 /g
DYEKMAN
N0. 1727
14253
4pl-or lift
eP
OF to
Kevin Dyekman, P.G. Adrian Mascorro, P.E HAIA
Engineering Services Manager Area Manager
225 N. Linder Rd., Suite#100, Meridian, ID 83642
Phone: 208.895.7898 • Fax: 208.898.3959
Hayden, ID•Lewiston, ID• Meridian, ID•Spokane Valley,WA•Tri-Cities,WA• Missoula, MT
www.allwesftesting.com
GEOTECHNICAL EVALUATION
SOUTH EAGLE ROAD DEVELOPMENT
7355 SOUTH EAGLE ROAD
MERIDIAN, IDAHO
ALLWEST PROJECT NO. 523-087G
June 9, 2023
Prepared for:
TRILOGY DEVELOPMENT
9839 WEST CABLE CAR STREET, SUITE 101
BOISE, IDAHO 83709
Prepared by:
ALLWEST
255 NORTH LINDER ROAD, SUITE 100
MERIDIAN, IDAHO 83642
EXECUTIVE SUMMARY
The following summarizes select geotechnical information/recommendations from this evaluation:
♦ We anticipate approximately 3 to 12 inches of site stripping will be required for most of the
site to remove surficial vegetation and roots (topsoil).
♦ In general, subsurface soils within the observed test pits consisted of sandy lean clays, lean
clays with sand, sandy silts, silts with sand, silty sands, poorly-graded sands, poorly-graded
sands with silt, poorly-graded gravels with sand, poorly-graded gravels with silt and sand,
poorly-graded gravels with sand and cobbles, and poorly-graded gravels with silt, sand, and
cobbles.
♦ Varying amounts and thicknesses of weak to strong cementation and/or induration were
commonly observed within the silty sand soil layers, as well as within select gravel and sand
soil zones.
♦ Surficial undocumented fill soils were observed within test pits TP-6, -19, and -23 to depths
of 1 to 2 feet below existing ground. Undocumented fill is not suitable to support site grading
fill, pavement sections, or structural improvements.
♦ At the time of exploration,we did not observe groundwater within the test pits to the maximum
exploration depth of 13 feet below existing ground.
♦ We recommend stormwater disposal occur within non-cemented/non-indurated poorly-
graded gravel with sand; poorly-graded gravel with silt and sand; poorly-graded gravel with
sand and cobbles; poorly-graded gravel with silt, sand, and cobbles; poorly-graded sand with
silt; or poorly-graded sand soils (i.e., gravel/sand soils), as observed during our field
exploration. A seepage rate of 8 inches per hour (in/hr) may be utilized for stormwater
disposal into gravel/sand soils.
♦ For local roadways: Pavement sections should consist of 2.5-inches of asphalt concrete, over
4-inches of crushed aggregate base, over 11-inches of aggregate subbase.
♦ For collector roadways: Pavement sections should consist of 3-inches of asphalt concrete,
over 6-inches of crushed aggregate base, over 14-inches of aggregate subbase.
Our services were provided in accordance with ALLWEST proposal no. 523-087P dated February
20, 2023. This summary should be used in conjunction with the entire report for design and
construction purposes. It should be recognized that details were not included or fully developed
in this section, and the report must be read in its entirety for a comprehensive understanding of
the items contained herein.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLW EST
AN EMPLOYEE-OWNED COMPANY
GEOTECHNICAL EVALUATION
SOUTH EAGLE ROAD DEVELOPMENT
7355 SOUTH EAGLE ROAD
MERIDIAN, IDAHO
Page
1.0 PROJECT DOCUMENTS.......................................................................................................1
2.0 PROJECT DESCRIPTION......................................................................................................1
3.0 EVALUATION PROCEDURES...............................................................................................1
4.0 SITE CONDITIONS ................................................................................................................2
4.1 Published Geologic and Soil Information ............................................................................2
4.2 Subsurface Soil Conditions .................................................................................................2
4.3 Groundwater Conditions......................................................................................................3
5.0 LABORATORY TESTING.......................................................................................................3
6.0 CONCLUSIONS AND RECOMMENDATIONS.......................................................................4
6.1 Site Preparation...................................................................................................................4
6.1.1 Subgrade Stabilization..................................................................................................5
6.1.2 Utility Trenches.............................................................................................................6
6.2 Excavation...........................................................................................................................6
6.3 Materials..............................................................................................................................7
6.4 Fill Placement and Compaction...........................................................................................8
6.5 Wet Weather Construction ..................................................................................................8
6.6 Cold Weather Construction .................................................................................................9
6.7 Stormwater and Drainage ...................................................................................................9
6.8 Asphalt Pavement .............................................................................................................10
7.0 ADDITIONAL RECOMMENDED SERVICES .......................................................................11
8.0 EVALUATION LIMITATIONS................................................................................................12
Appendix A—Vicinity Map, Exploration Location Map
Appendix B —Test Pit Logs, Unified Soil Classification System
Appendix C — Laboratory Test Results
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST
AN EMPLOYEE-OWNED COMPANY
GEOTECHNICAL EVALUATION
SOUTH EAGLE ROAD DEVELOPMENT
7355 SOUTH EAGLE ROAD
MERIDIAN, IDAHO
1.0 PROJECT DOCUMENTS
The following project documents were reviewed by ALLWEST to help develop our understanding
of the planned development:
♦ LandproDATA Parcel Map, Paragon Ventures, LLC, PSA ID#Brasher 60, dated February 8,
2023.
♦ Phase I Environmental Site Assessment, Coolwater Creek Subdivision, prepared by Atlas
Technical Consultants, LLC, report viability date November 12, 2022.
♦ Cool Water Creek Subdivision Water Right Analysis, prepared by HDR/SPF, dated July 5,
2022.
2.0 PROJECT DESCRIPTION
Based on communication with you and review of the provided documents, we understand that
development will consist of an approximate 60-acre residential subdivision with associated
infrastructure, stormwater disposal facilities, and asphalt-paved roadways. We did not review
grading plans, as they were not available at the time of this proposal, but we anticipate cuts and
fills for general site grading to be 3 feet or less.
3.0 EVALUATION PROCEDURES
To complete this evaluation, we reviewed published geologic/soil information and observed the
advancement of exploratory test pits on-site to evaluate the subsurface conditions. The general
location of the site is shown on Figure A-1: Vicinity Map in Appendix A.
We observed the excavation of 24 test pits (TP-1 through TP-24) on March 29 and 30, 2023,
utilizing a Case 580C backhoe with a 24-inch-wide toothed excavation bucket. Test pits were
advanced to maximum depths of 3 to 13 feet below existing ground. Maximum depths varied due
to caving conditions and excavator refusal on strongly cemented soils encountered in select test
pits. The approximate locations of the test pits are shown on Figure A-2: Exploration Location
Map in Appendix A.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLW EST
AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 2
The soils observed in the test pits were visually described and classified in general accordance
with ASTM D 2488. We logged the subsurface profiles and obtained soil samples at select depths
for further identification and laboratory testing.
We also performed 8 field seepage tests within select test pits throughout the site, where suitable
permeable soils were encountered. Information obtained from the field evaluation, laboratory
testing, and geotechnical analysis was utilized to develop the recommendations presented in this
report.
4.0 SITE CONDITIONS
At the time of exploration, the site consisted of partially developed pastureland and was occupied
by the Coolwater Creek Events Center. The main event center building and outbuilding structures
were located in the southeast corner of the site.Additionally,there were 3 old western-style saloon
structures (each less than 500 square-feet) located near the existing pond in the western portion
of the site. The site is generally bordered by South Eagle Road to the east, residential
developments to the north, and undeveloped farmland to the west and south.
4.1 Published Geologic and Soil Information
The geologic conditions at the site are mapped as Gravel of Amity Terrace (map symbol — Qag)
on the Geologic Map of the Boise Valley and Adjoining Area, Western Snake River Plain, Idaho,
by K.L. Othberg, and L.R. Stanford, 1992. This unit is described as sandy pebble and cobble
gravel approximately 33 feet thick mantled by approximately 2 to 7 feet of loess.
The USDA Natural Resources Conservation Service (NRCS), which classifies the upper 5 feet of
soil, has mapped the site as Elijah silt loam, Pipeline silt loam, and Purdam silt loam. These soils
consist of silt loam, silt clay loam, loam, cemented material, very and extremely gravelly sand,
and stratified sand to loam. The parent materials of these soils include lacustrine deposits, loess,
alluvium, silty alluvium, loess over sandy alluvium, and/or mixed alluvium.
The soils encountered in test pits are generally consistent with published information.
4.2 Subsurface Soil Conditions
At the time of exploration, the site contained approximately 3 to 12 inches of surficial roots and
vegetation at the ground surface. Tree roots were also observed within select test pits down to
depths of 1 to 1.5 feet. In general, subsurface soils within the observed test pits consisted of
sandy lean clays, lean clays with sand, sandy silts, silts with sand, silty sands, poorly-graded
sands, poorly-graded sands with silt, poorly-graded gravels with sand, poorly-graded gravels with
silt and sand, poorly-graded gravels with sand and cobbles, and poorly-graded gravels with silt,
sand, and cobbles.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 3
Varying thicknesses of weak to strong cementation and/or induration were commonly observed
within the silty sand soil layers. Additionally, weak to moderate cementation was observed in
select zones of the poorly-graded sands with silt, the poorly-graded gravels with sand, and the
poorly-graded gravels with silt, sand, and cobbles. Surficial undocumented fills consisting of
poorly-graded gravels with sand or poorly-graded gravels with silt, sand, and cobbles were
observed within test pits TP-6, -19, and -23 to depths of 1 to 2 feet below existing ground. These
fill soils were most likely placed during construction of existing dirt access roads and parking
areas. Undocumented fills are not suitable to support site grading fill, pavement sections, or
structural improvements.
Detailed descriptions of the soils observed are presented on the individual test pit logs in Appendix
B. The descriptive soil terms used on the test pit logs, and in this report, can be referenced by the
Unified Soil Classification System (USCS). A summary of the USCS is included in Appendix B.
The subsurface conditions may vary between exploration locations; such changes in subsurface
conditions may not be apparent until construction.
4.3 Groundwater Conditions
At the time of exploration, we did not observe groundwater within the test pits to the maximum
exploration depth of 13 feet below existing ground. Based on our review of available well driller
report in the site vicinity (from Idaho Department of Water Resources), we anticipate groundwater
may be encountered at depths greater than 30 feet below ground surface. Groundwater in the
area is typically influenced by local irrigation and existing canals, drains, and laterals.
Groundwater may also be influenced by precipitation, on-site construction, and development to
adjacent sites. Groundwater elevations will fluctuate throughout the different seasons of the year
and will likely peak during snowmelt and irrigation seasons (March to October).
We installed slotted PVC pipes within 18 of the test pits for future groundwater monitoring.
ALLWEST is currently performing monthly groundwater monitoring to help establish the presence
or absence of seasonal high groundwater throughout the site.
5.0 LABORATORY TESTING
We performed laboratory testing to supplement field classifications and to assess some of the soil
engineering properties and parameters. Laboratory testing included fines content(ASTM D1140),
moisture content (ASTM D2216), liquid and plastic limits (ASTM D4318), and California bearing
ratio (CBR) (ASTM D1883). The laboratory test results are included in Appendix C, and some
results are also summarized on the test pit logs in Appendix B.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 4
6.0 CONCLUSIONS AND RECOMMENDATIONS
Based on our field observations, testing, and evaluation, in our opinion the site is suitable for the
planned development provided our recommendations are properly implemented. The following
recommendations are presented to assist planning, design, and construction of the development
relative to earthwork, utilities, stormwater disposal, and asphalt pavement section design.
These recommendations are based on our understanding of the proposed development, the
conditions observed within exploration locations, laboratory test results, and engineering analysis.
If the proposed development changes or if unforeseen conditions are encountered during
construction, we should be given the opportunity to review the new information and, if necessary,
update our recommendations.
6.1 Site Preparation
♦ Prior to conducting site grading, surficial soil containing vegetation, roots, and organics
should be removed below proposed site grading fill areas, pavement areas, structural
areas, and any other development areas. In general, we anticipate approximately 3 to 12
inches of site stripping will be required for most of the site to remove surficial vegetation
and roots (topsoil).
♦ Where trees are encountered and will be removed as part of the development, large root
systems should be completely over-excavated and replaced with suitable fill soils. Tree
root depths will not fully be known until construction, but we anticipate approximately 3 to
4 feet of over-excavation will be required to remove large tree root systems.
♦ Organic-rich, loose/soft, and/or wet soils associated with existing irrigation ditches/laterals
are present on-site. These soils are not suitable to support site grading fill, pavement
sections, or structural improvements. Within proposed development areas, these soils
should be completely over-excavated to suitable native soils.
♦ Undocumented fill soils are not suitable to support site grading fill, pavement sections, or
structural improvements. Within proposed development areas, existing undocumented fill
soils should be over-excavated their entire depth down to suitable native soils, and
replaced with site grading fill soils that are moisture-conditioned and compacted in
accordance with the requirements provided in section 6.4 Fill Placement and Compaction.
During exploration, we encountered surficial undocumented fills within test pits TP-6, -19,
and -23 to depths of 1 to 2 feet below existing ground.
♦ Depths and lateral limits of over-excavation associated with unsuitable soils (organic-rich,
loose/soft, and/or wet soils, as well as undocumented fills), may not fully be known until
earthwork begins. The earthwork contractor should have continencies in place to ensure
that these areas are fully over-excavated to suitable native soils within development areas.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 5
♦ Loose test pit backfill will settle with time, so where any test pits are located below
proposed pavement, structural, or any development areas, loose test pit backfill soil
should be re-excavated its entire depth and replaced with suitably moisture-conditioned
and compacted fill soils. Over-excavated soils can be reused to backfill the test pits,
provided the soils are not overly saturated, and they can achieve the required compaction
criteria as provided in section 6.4 Fill Placement and Compaction. Test pit locations
observed by ALLWEST may be identified in the field by white-flagged stakes(if still present
from pre-marking) and/or white PVC pipes (where installed for groundwater monitoring).
Approximate test pit locations are shown on Figure A-2: Exploration Location Map. We
recommend test pit areas be accurately surveyed so that they may be located and
remediated prior to earthwork construction and development.
♦ After site stripping, over-excavations, loose test pit remediation, and prior to site grading,
utility/roadway construction, or any other type of development, the exposed subgrades
should be proof-rolled with a minimum 5-ton vibratory roller,with loaded dump trucks/front-
end loaders, or with a vibratory hoe-pack, to confirm subgrade stability. This will also assist
in identifying any soft subgrade areas. If native subgrades are observed to significantly
deflect or pump, the subgrades should be over-excavated and replaced with properly
compacted fill or stabilized as recommended in section 6.1.1 Subgrade Stabilization.
6.1.1 Subgrade Stabilization
If needed, subgrades may be stabilized using geosynthetic (geogrid) or woven geotextile
reinforcement in conjunction with imported granular structural fill. The required thicknesses of
granular structural fill (used in conjunction with geogrid or woven geotextile reinforcement)will be
dependent on the construction traffic loading (which is unknown at this time), the type of
reinforcement (geogrid or woven geotextile), and subgrade conditions. Therefore, a certain
degree of trial and error may be required during construction to verify recommended stabilization
section thicknesses and reinforcement types.
Geogrid reinforcement should consist of Tensar TX-160 or equivalent. Woven geotextile
reinforcement should consist of Contech C200 or equivalent. Alternatives to these reinforcement
types should be approved by the geotechnical engineer prior to use on site. The following
recommendations are provided for subgrade stabilization using reinforcement materials.
♦ Subgrade soils that are disturbed by construction equipment (caused rutting or pumping)
should be over-excavated down to undisturbed native soils, utilizing a smooth-blade
bucket to limit further disturbance of native soils. Reinforcement materials should be
placed on a properly prepared non-disturbed subgrade with smooth surface.
♦ If geogrid reinforcement is used, a minimum weight 4-ounce, non-woven filter fabric should
first be placed on the properly prepared subgrade. The geogrid reinforcement should then
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 6
be placed directly on top of the filter fabric. The filter fabric and reinforcement materials
should be unrolled in the primary direction of fill placement and should be over-lapped at
least 3 feet or follow manufacturer's recommendations. Filter fabric is not required if a
woven geotextile is used for reinforcement.
♦ The reinforcement materials should be pulled taut to remove slack.
♦ Construction equipment should not be operated directly on reinforcement materials.
Granular structural fill should be placed from outside the excavation to create a pad to
operate equipment on. We recommend a minimum of 12 to 18 inches of granular structural
fill be placed over the reinforcement materials before operating construction equipment on
the fill. Low pressure, track-mounted equipment should be used to place granular
structural fill over the reinforcement materials.
♦ Granular structural fill placed directly over reinforcement materials should be properly
moisture-conditioned prior to placement, and once placed, be statically rolled. This
combination of reinforcement materials and granular structural fill is considered the
"bridge" section over soft subgrades.
♦ After the first"bridge"section has been placed, the remaining structural fill materials above
the "bridge" section should be compacted to structural fill criteria in section 6.4 Fill
Placement and Compaction, utilizing vibratory compaction methods.
♦ Vibratory compaction should be discontinued if it reduces the subgrade stability. If
compaction criterion is not met within the fill lift above the "bridge" section, the "bridge"
section is not thick enough, and subgrade stabilization should be attempted again with a
thicker"bridge" section.
The geotechnical engineer or a representative of the geotechnical engineer should be on-site
during subgrade stabilization to verify our recommendations are followed, and to provide
additional recommendations, as needed.
6.1.2 Utility Trenches
Existing subsurface soils should provide adequate support for utilities, provided utility subgrades
are compacted utilizing vibratory methods, such as with a large vibratory hoe-pack. If utility pipe
subgrades are soft, yielding, and/or saturated at the time of construction, subgrade over-
excavation and replacement with competent structural fill may be required below utilities. If
support soils yield and/or are saturated at the time of construction, we should be notified to
observe these soils and provide additional recommendations, as necessary.
6.2 Excavation
We anticipate the majority of the on-site soils can be excavated with typical excavation equipment.
Excavation refusal due to strongly cemented soils was encountered within test pits TP-3, TP-5,
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 7
and TP-22 at depths of 3 to 5 feet. Excavation of strongly cemented soils may require larger
excavation equipment, hydraulic breakers, and/or other techniques to achieve subgrade depths.
Stability of temporary excavations is a function of many factors, including the presence and
abundance of groundwater, the type and density of various soil strata, the depth of cut, surcharge
loadings adjacent to the excavation, and the length of time the excavation remains open. It is
exceedingly difficult under the variable circumstances to pre-establish a safe and "maintenance-
free" temporary cut slope angle. Therefore, it is the responsibility of the contractor to maintain
safe temporary slope configurations since the contractor is continuously at the job site, able to
observe the nature and condition of the cut slopes, and able to monitor the subsurface materials
and groundwater conditions encountered. Unsupported vertical slopes or cuts deeper than 4 feet
are not recommended if worker access is necessary. The cuts should be adequately sloped,
shored, or supported to prevent injury to personnel from local sloughing and spalling. The
excavation should conform to applicable federal, state, and local regulations. Regarding trench
wall support, the site soil is considered Type C soil according to Occupational Safety and Health
Administration (OSHA) guidelines and therefore should not exceed a 1.5HAV (horizontal to
vertical) temporary slope.
6.3 Materials
Stripped soils containing vegetation or debris are only suitable for use in non-structural landscape
areas. Existing on-site soils may be reused as site grading fill, provided they are stockpiled
separately, they meet the criteria below, and they are moisture-conditioned and compacted as
required in this report. Imported granular soils should be free of organics, debris, and other
deleterious material and meet the following criteria. Import materials should be approved by
ALLWEST prior to delivery to the site.
Fill Type Criteria
Site Grading Fill Maximum size <_ 6 inches; o 0
Retained on 3/4-inch sieve < 30/o; Liquid limit < 50/o
Maximum size <_ 6 inches;
Granular Structural Fill, Retained on 3/4-inch sieve < 30%;
Granular Subbase Passing No. 200 sieve <_ 15%; Non-plastic
Alternatively, meet ISPWC section 801 (6-inch max)
Maximum size <_ 1 inch;
Crushed Base Course
Retained on %-inch sieve < 10%;
Passing No. 200 sieve < 10%; Non-plastic
Alternatively, meet ISPWC section 802 (Type I)
Maximum size <_ 2 inches;
Utility Trench Backfill Retained on 3/4-inch sieve < 30%;
(above pipe bedding) Passing No. 200 sieve <_ 10%; Non-plastic
Alternatively, meet ISPWC section 801 (3-inch max)
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 8
6.4 Fill Placement and Compaction
Fill should be placed in lift thicknesses which are appropriate for the compaction equipment used.
Typically, 8-to 12-inch-thick loose-lifts are appropriate for rubber-tire and steel-drum compaction
equipment. Lift thickness should be reduced to 4 inches for hand-operated compaction
equipment. Fill should be moisture-conditioned to within 2 percentage points of the optimum
moisture content prior to placement to facilitate compaction. Fill should be compacted to the
percentages of the maximum dry density, based on ASTM D 1557 (modified Proctor), presented
in the table below.
Fill Area Compaction
N
Subgrade' Proof-ro112
Site Grading Fill / Granular Structural Fill 95
Granular Subbase / Crushed Base Course 952
Utility Trench Backfill 922
'Subgrade stability should be verified and approved by a representative of the geotechnical engineer prior
to any fill placement or construction.
2For roadway and utility trench construction only, the local governing jurisdiction may provide their own
method of determining the maximum dry density and compaction requirements (including subgrade).
We strongly recommend backfilling utility trench excavations with fill soils which meet the criteria
in section 6.3 Materials, as on-site fine-grained soils (silts and clays) may be difficult to moisture-
condition and compact in utility trenches.
6.5 Wet Weather Construction
We recommend earthwork for the site be scheduled for the drier seasons of the year. If
construction is undertaken in wet periods of the year, it will be important to slope the ground
surface to provide drainage away from construction. If construction occurs during or immediately
after excessive precipitation, it may be necessary to over-excavate and replace saturated
subgrade soil, which might otherwise be suitable.
The on-site soils are sensitive to disturbance when wet. If these soils become wet and unstable,
we recommend construction traffic is minimized where these soils are exposed. Low ground-
pressure (tracked) equipment should be used to minimize disturbance. Soft and disturbed
subgrade areas should be excavated to undisturbed soil and backfilled with structural fill,
compacted to requirements stated in this report.
In addition, it should be noted the on-site soils tend to have notable adhesion when wet and may
be easily transported off-site by construction traffic.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 9
6.6 Cold Weather Construction
The on-site soils are frost susceptible. If site grading and construction are anticipated during cold
weather, we recommend good winter construction practices be implemented. Snow and ice
should be removed from excavated areas and fill areas, prior to additional earthwork or
construction. Pavement and flatwork portions of the construction should not be placed on frozen
ground, nor should the supporting soils be permitted to freeze during or after construction. Frozen
soils should not be used as fill.
If native subgrades, or suitably moisture-conditioned and compacted fill lifts, will be left exposed
to freezing temperatures overnight, those areas should be protected with a minimum of 12 inches
of loose soil, or covered with heated construction blankets, so construction subgrades do not
freeze. Frozen soils should be removed prior to any fill placement or construction of any kind.
Earthwork construction during cold inclement weather will require a higher level of attention and
detail to achieve required construction and compaction criteria, and may lead to additional
earthwork requirements and extended construction schedules.
6.7 Stormwater and Drainage
During our exploration we performed field seepage testing in test pits TP-1, -4, -6, -8, -9, -13, -17,
and -34 within non-cemented/non-indurated poorly-graded gravel- and poorly-graded sand-type
soils (i.e., gravel/sand soils). We obtained field-measured seepage rates of greater than 15 inches
per hour (in/hr) within the non-cemented/non-indurated gravel/sand soils.
Varying thicknesses of weak to strong cementation and/or induration were commonly observed
within the silty sand soil layers. Additionally, weak to moderate cementation was observed in
select zones of the poorly-graded sands with silt, the poorly-graded gravels with sand, and the
poorly-graded gravels with silt, sand, and cobbles. We do not recommend stormwater disposal
be accomplished within cemented/indurated soils, as these soils typically exhibit poor and
inconsistent seepage rates. Refer to the test pit logs in Appendix B to verify depths and contacts
of soils which are not suitable for stormwater disposal.
We recommend stormwater disposal occur within non-cemented/non-indurated poorly-graded
gravel with sand; poorly-graded gravel with silt and sand; poorly-graded gravel with sand and
cobbles; poorly-graded gravel with silt, sand, and cobbles; and poorly-graded sand with silt; or
poorly-graded sand soils (i.e., gravel/sand soils), as observed during our field exploration. Based
on field seepage test results and our experience with similar soil types, we recommend the
following allowable seepage rate be utilized for on-site civil stormwater disposal design into non-
cemented and non-indurated gravel/sand soils.
♦ Gravel/sand soils (non-cemented/indurated) ....................................... 8 in/hr
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 10
Stormwater disposal facilities should be constructed a minimum of 1 foot into the recommended
receiving soil. Filter fabric should be properly utilized to separate native soils from stormwater
disposal facility drain rock and filter sand materials to help prevent fine-soil migration into
drainable/filtering media, as required by civil design.
The proper separation from bottom of stormwater disposal facilities and seasonal high
groundwater should be maintained. As such, groundwater monitoring should be performed to
confirm the presence or absence of seasonal high groundwater.
We installed slotted PVC pipes within 18 of the test pits for future groundwater monitoring.
ALLWEST is currently performing monthly groundwater monitoring to help establish the presence
or absence of seasonal high groundwater throughout the site.
We recommend the final grading plan include slopes that direct stormwater run-off away from
buildings and pavement areas to stormwater management systems. Water should not be allowed
to infiltrate or pond adjacent to foundations or development areas.
6.8 Asphalt Pavement
Prior to pavement section construction, the pavement subgrade should be proof-rolled as
recommended in section 6.1 Site Preparation (or as recommended by local jurisdictions). Local
and collector roadways should be designed for a 20-year Equivalent Single Axle Load (ESAL) of
33,000 and 370,000, respectively, which is equivalent to Traffic Index (TI) values of 6 and 8,
respectively. If actual traffic conditions are different than what is stated, we should be notified so
that we may modify our pavement section design.
Based on existing site grades, we anticipate that the majority of pavement subgrade areas will
consist of sandy lean clays, lean clays with sand, sandy silts, silts with sand, and/or silty sands.
To evaluate pavement section design, we performed CBR testing on a sandy lean clay, where we
obtained a CBR value of 7.3, which is approximately equivalent to an R-value of 15.
The following flexible asphalt pavement sections were designed utilizing the AASHTO pavement
methodology and our experience with local jurisdictions. Based on subgrade preparation
requirements and design assumptions, we recommend the following pavement sections be
utilized for subdivision roadway construction for local and collector roadways.
Asphalt Crushed Granular
Pavement Application Concrete Base Course Subbase
(inches) (inches) (inches)
Local Roadway 2.5 4 11
Collector Roadway 3 6 14
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 11
Base course and subbase should conform to the material recommendations as noted in this report
and should be placed over a properly prepared subgrade. Finished asphalt surfaces should slope
no less than 2% to help reduce the potential for surface water to infiltrate into the underlying
pavement sections and subgrade soils. If the overall site is relatively flat, then finished asphalt
surfaces should be constructed with crowns that slope away at a minimum gradient of 2% toward
stormwater collection areas.
Crack maintenance on pavements should be performed at least every 3 years, or when cracking
is evident. Crack sealing will help reduce surface water from infiltrating into the supporting soils.
7.0 ADDITIONAL RECOMMENDED SERVICES
To maintain continuity and efficiency, we recommend ALLWEST be retained to provide
observations and testing throughout earthwork construction. As an independent testing company,
ALLWEST can document the recommendations included in this report are followed, provide
quality control testing, and observe earthwork for conformance to project specifications. As a
minimum, we recommend the following testing and observations be provided by ALLWEST:
♦ Observe site stripping, over-excavations, test pit remediation, and any other soil over-
excavations and backfills.
♦ Observe subgrade proof-rolling and approve subgrades prior to fill/materials placement or
roadway section/utility construction.
♦ Observe removal of disturbed soil and subgrade stabilization, if required.
♦ Observe stormwater disposal facility subgrades, confirm subsurface seepage rates by
performing large-scale seepage testing within stormwater disposal facility locations, and
observe overall stormwater disposal facility construction.
♦ Conduct compaction testing of any fill soils placed for general site grading, utility backfills,
and pavements.
♦ Observe placement of/test asphalt for compaction, oil content, and gradation.
If we are not retained to provide the recommended construction observation and testing services,
we shall not be responsible for soil engineering-related construction errors or omissions.
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Geotechnical Evaluation ALLWEST Project No. 523-087G
South Eagle Road Development June 9, 2023
Meridian, Idaho Page 12
8.0 EVALUATION LIMITATIONS
This report has been prepared to assist planning, design, and construction of the proposed South
Eagle Road Development located at 7355 South Eagle Road in Meridian, Idaho. Reliance by any
other party is prohibited without the written authorization of ALLWEST. Our services consist of
professional opinions and conclusions made in accordance with generally accepted geotechnical
engineering principles and practices in the local area at the time this report was prepared. This
acknowledgement is in lieu of all warranties, express or implied.
The following appendices complete this report:
Appendix A—Vicinity Map, Exploration Location Map
Appendix B —Test Pit Logs, Unified Soil Classification System
Appendix C— Laboratory Test Results
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Appendix A
A-1 : Vicinity Map
A-2: Exploration Location Map
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLW EST
AN EMPLOYEE-OWNED COMPANY
(f JA
_ -� �- ../�'� � — ray.. •�.•
JIL _ _ ; • '• -
I
HERITAGE GROVE' -'WESTTBOISE. - r-4 gum
: ` r
luko
E 1 184, ■
Now x.�i
wo
_ _ ,i•` �". '_.;� ' BOISE' BENCH
' MAPLE GROVE FRANKL•I N '
84
fr
—i-, '•.w, III, •i. yFe,
i -- �- SOUTHW EA:-,A.
ADA COUNTY ALLIANCE"-
84 s
1 .7 t
. _ W hl �• .'. G[ Y
'f aA
E Lake Hazel Rd
•rw
E Columbia Rd
FIGURE A-1:VICINITY MAP
GEOTECHNICAL EVALUATION
SOUTHALLWEST
ROAD DEVELOPMENT
D. •
MERIDIAN255 N.LINDER ROAD,SUITE 100 CLIENT:TRILOGY DEVELOPMENT
■ • .
PHONE: f: •0: '• NO.: 1: D2023
Base Map:Google Earth .`.
■ TP-3
■ TP-2
■ TP-4 TP-5
■ TP-6
■ TP-1
.ram loop ., .. .....
F TP-12 1. r—
- r
■ TP-10 r r r r.w t� •`- ,.tip.., T
■ TP-7 TP-11 r � d
■ TP-8 r ' "
�.iA ` d
Nor-W
It
TP-14 r
TP-15 ■
TP-13 TP-16 TP-17
- '< �,d"� 1p TP-18 � .-
�,* o
�r R
° TP
TP-ifr
v
v% 0 TP-24
- TP-23"., rE'
FIGURE A-2: EXPLORATION LOCATION MAP
LEGEND N GEOTECHNICAL EVALUATION
0 Approximate location of test pit observed by ALLWEST. -T ALLWEST SOUTH EAGLE ROAD DEVELOPMENT
0 250' 500' MERIDIAN, IDAHO
* Slotted PVC pipe was installed in test pit.
255 N.LINDER ROAD,SUITE 100 CLIENT:TRILOGY DEVELOPMENT
MERIDIAN IDAHO,83642
PHONE:(208)895-7898 FAX:(208)898-3959 PROJECT NO.:523-087G DATE:JUNE 2023
Appendix B
Test Pit Logs
Unified Soil Classification System
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
ALLWEST DATE STARTED: 3/30/2023 TP - 1
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'27.8628"(43.541073°) U
U LONGITUDE(DEGREES):W-116°21'51.1812" (-116.364217°)
U
a u) TOTAL DEPTH:8.5' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native);dark brown,stiff, moist Significant roots and vegetation observed to 6
inches.Tree roots observed to 1.5 feet.
CL
1
Silty SAND;tan,dense to very dense,dry
2
3 sM ...moderate to strong cementation observed throughout soil layer
41H.
Poorly-graded GRAVEL with Silt, Sand,and Cobbles;tan,dense,
moist °
5 ...subrounded gravel and cobbles up to 6 inches in maximum o
dimension
...moderate cementation observed from 4.5 to 6 feet °
0
0
GP-GM
0
7 ° Field seepage test performed at 7 feet.
Field seepage rate> 15 in/hr.
0
0
8 0
Test pit terminated at 8.5 feet due to practical excavation refusal
on dense cobbles.
9 Slotted PVC pipe installed.
1
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/30/2023 TP - 2
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'29.4792"(43.541522°) U
U LONGITUDE(DEGREES):W-116°21'46.2096" (-116.362836°)
U
u) TOTAL DEPTH: 10' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native);dark brown,stiff, moist Significant roots and vegetation observed to 6
cIL
inches.
1 Silty SAND;tan,medium dense to dense,dry to moist
2
3
sM ...weak to moderate cementation observed throughout soil layer
4
5
6—
Poorly-graded GRAVEL with Silt, Sand,and Cobbles; brown,
dense,moist °
7 ...subrounded gravel and cobbles up to 10 inches in maximum o
dimension
0
0
$ GP-GM
DU
0
9 0
DU
0
1 Test pit terminated at 10 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 3
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'30.9408"(43.541928°) U
U LONGITUDE(DEGREES):W-116°21'41.2236" (-116.361451°)
U
u) TOTAL DEPTH:4' = SAMPLE
w Q
DESCRIPTION W NOTES
cL Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
Silty SAND;tan,dense to very dense,moist
1
2
sm ...moderate to strong cementation observed throughout soil layer
3
4 Test pit terminated at 4 feet due to practical excavation refusal on
strong cementation.
5
6
7
8
9
1
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 4
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'29.4684"(43.541519°) U
U LONGITUDE(DEGREES):W-116°21'35.8344" (-116.359954°)
U
u) TOTAL DEPTH: 10' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
cIL
inches.
1 Silty SAND;tan,medium dense to dense, moist
2
Passing No.200 sieve=20%
Bag 2.5'-3' Moisture content= 18%
3 ...weak to moderate cementation observed throughout soil layer
sm
4
5
Poorly-graded GRAVEL with Sand;tan, medium dense,moist
0
6 0
Q
o�
Field seepage test performed at 7 feet.
7
o Field seepage rate> 15 in/hr.
�
GP
Q
$ o�
O
Q
o�
9 0
Q
o�
O
10— Test pit terminated at 10 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 5
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'29.1912"(43.541442°) U
U LONGITUDE(DEGREES):W-116°21'30.7008" (-116.358528°)
U
u) TOTAL DEPTH:3' = SAMPLE
CL
w Q
DESCRIPTION W NOTES
cL Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
Silty SAND; light brown, medium dense to very dense,moist to
dry
1
sm ...weak to strong cementation observed throughout soil lavyer
2
3 Test pit terminated at 3 feet due to practical excavation refusal on
strong cementation.
4
5
6
7
8
9
1
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 6
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'29.2848"(43.541468°) U
U LONGITUDE(DEGREES):W-116°21'26.4708" (-116.357353°)
U
u) TOTAL DEPTH: 10.5' = SAMPLE
w Q
o DESCRIPTION W NOTES
Poorly-graded GRAVEL with Silt and Sand(Fill); brown,medium KXX Significant roots and vegetation observed to 6
dense,moist inches.
FILL
1 Poorly-graded SAND with Silt(Native);tan, medium dense to
dense,moist
Passing No.200 sieve=7%
Bag 1.5'-2' Moisture content=30%
2
sP-sm moderate cementation observed throughout soil layer
3
4—
Poorly-graded GRAVEL with Sand;tan to gray,medium dense,
moist °
5 0
Q
° Bag 5.5'-6' Passing No.200 sieve=4%
o Moisture content=6%
6 O Field seepage test performed at 6 feet.
o Field seepage rate> 15 in/hr.
0
Q
7 0�
GP
Q
o�
8 0
Q
o�
9 Q
o�
0
Q
1 °�
Test pit terminated at 10.5 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/30/2023 TP - 7
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'25.152"(43.54032°) U
U LONGITUDE(DEGREES):W-116°21'51.1452" (-116.364207°)
U
u) TOTAL DEPTH: 10' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native);dark brown,stiff, moist Significant roots and vegetation observed to 6
inches.
CL
1
Silty SAND;tan,dense to very dense,dry to moist
2
sM ...moderate to strong cementation observed throughout soil layer
3
4 Poorly-graded GRAVEL with Silt, Sand,and Cobbles;tan,dense,
dry to moist °
...subrounded gravel and cobbles up to 8 inches in maximum o
dimension
5 ...moderate cementation observed from 4 to 5.5 feet °
0
------------------------------------------------
0
6 0
0
7 GP-GM
0
O
8 o
O
0
9
0
0
10— Test pit terminated at 10 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/30/2023 TP - 8
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'25.0224"(43.540284°) U
U LONGITUDE(DEGREES):W-116°21'46.17" (-116.362825°)
U
u) TOTAL DEPTH:9' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native);dark brown,stiff, moist Significant roots and vegetation observed to 6
cIL
inches.
1 Silty SAND;tan,dense to very dense,dry to moist
2
------------------------------------------------
SM
3
...moderate to strong cementation observed from 2.5 to 4.5 feet
4
Poorly-graded GRAVEL with Silt, Sand,and Cobbles;tan,dense,
moist
5 ...subrounded gravel and cobbles up to 8 inches in maximum o
dimension
o Field seepage test performed at 5.5 feet.
Field seepage rate> 15 in/hr.
0
6
0
GP-GM o
7 0
0
0
0
0
0
9 Test pit terminated at 9 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 9
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'26.2356"(43.540621°) U
U LONGITUDE(DEGREES):W-116°21'40.9356" (-116.361371°)
U
u) TOTAL DEPTH: 10' = SAMPLE
w Q
DESCRIPTION W NOTES
cL Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
Sandy SILT; light brown,stiff, moist
1
ML
2
Silty SAND;tan,medium dense, moist
3
4 ...weak cementation observed throughout soil layer
SM
5
6 Poorly-graded SAND with Silt;tan, medium dense,moist Passing No.200 sieve= 11
Bag 6' 6.5' Moisture content=6%
Field seepage test performed at 6.5 feet.
Field seepage rate> 15 in/hr.
7 SP-SM
8 Poorly-graded GRAVEL with Sand;tan, medium dense,moist
o�
O
Q
9 GP °
O
Q
o�
10— Test pit terminated at 10 feet due to caving.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 10
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'25.278"(43.540355°) U
U LONGITUDE(DEGREES):W-116°21'35.7048" (-116.359918°) 01
U
u) TOTAL DEPTH: 11' = SAMPLE
w Q
DESCRIPTION W NOTES
cL Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
SILT with Sand;light brown,firm, moist
1
MIL
2
3 Silty SAND;tan,medium dense, moist T. Passing No.200 sieve=30%
Bag 3' 3.5' Moisture content= 15%
4
5 sM
6
7 Poorly-graded SAND with Silt;tan, medium dense,moist
8
9 SP-SM
1
1 Test pit terminated at 11 feet due to caving.
Slotted PVC pipe installed.
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 11
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'25.2564"(43.540349°) U
U LONGITUDE(DEGREES):W-116°21'30.6504" (-116.358514°) 01
U
u) TOTAL DEPTH: 11' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
cIL
inches.
1 Silty SAND;tan to light brown,medium dense to very dense,
moist
2
3
4
5
6 sm ...weak to strong cementation observed throughout soil layer
7 Passing No.200 sieve= 19%
Bag 7'-7.5' Moisture content=21%
8
9
1
1 Test pit terminated at 11 feet due to practical refusal on strong
cementation.
Slotted PVC pipe installed.
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 12
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'25.3212"(43.540367°) U
U LONGITUDE(DEGREES):W-116°21'27.1944" (-116.357554°) 01
U
u) TOTAL DEPTH: 13' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
cIL
inches.
1 Silty SAND;tan to light brown,medium dense,dry to moist
2
3
...weak cementation observed from 1 to 7 feet
4
5 sm
6
g ...weak induration observed from 7 to 9 feet
9 Poorly-graded GRAVEL with Sand;tan, medium dense,moist
0
Q
0
Q
1 GP °
O
Q
o�
1 O
°b
0
Q
1 Test pit terminated at 13 feet.
Slotted PVC pipe installed.
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/30/2023 TP - 13
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'21.5376"(43.539316°) U
U LONGITUDE(DEGREES):W-116°21'51.0624" (-116.364184°) 01
U
u) TOTAL DEPTH: 12' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native);dark brown,stiff, moist Significant roots and vegetation observed to 6
cL inches.
Silty SAND; brown,dense to very dense, moist
1
2
3 ------------------------------------------------
...becomes tan at 3 feet
4
5 sM
6 ...moderate to strong cementation observed from 3 to 9.5 feet
7-
8-
9
Poorly-graded GRAVEL with Silt, Sand,and Cobbles;tan,dense Passing No.200 sieve=7%
moist o Bag 9.5' 10' Moisture content=3%
1 o Field seepage test performed at 10 feet.
DG
Field seepage rate> 15 in/hr.
0
GP-GM
O
1
0
0
1 Test pit terminated at 12 feet.
Slotted PVC pipe installed.
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/30/2023 TP - 14
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'22.4988"(43.539583°) U
U LONGITUDE(DEGREES):W-116°21'45.1296" (-116.362536°) 01
U
u) TOTAL DEPTH:8' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native);dark brown,stiff, moist Significant roots and vegetation observed to 12
inches.
1 cL Passing No.200 sieve=53%
Bag 1'-1.5' Moisture content=26%
LL=45, PL= 19,PI=26
2 Poorly-graded GRAVEL with Silt, Sand,and Cobbles;tan,dense,
moist
...subrounded gravel and cobbles up to 10 inches in maximum o
dimension
3 0
0
0
4 ...becomes red-brown at 4 feet o
DG
0
5 GP-GM
DG
DG
6 0
0
0
7
0
0
8 Test pit terminated at 8 feet due to caving.
Slotted PVC pipe installed.
9
1
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 15
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'21.9048"(43.539418°) U
U LONGITUDE(DEGREES):W-116°21'41.1732" (-116.361437°) 01
U
u) TOTAL DEPTH: 11' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
cL
inches.
1 SILT with Sand;light brown,stiff, moist
MIL
2
Silty SAND;tan,dense to very dense,moist
3
sM ...moderate to strong cementation observed throughout soil layer
4
5 Poorly-graded GRAVEL with Sand;light brown,dense, moist
0
O
6
0
O
o�
7 0
O
o�
8 GP Q
o�
O
O
9
0
O
1
O
1 Test pit terminated at 11 feet due to caving.
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 16
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'21.6096"(43.539336°) U
U LONGITUDE(DEGREES):W-116°21'34.3188" (-116.359533°) 01
U
u) TOTAL DEPTH: 10' = SAMPLE
w Q
DESCRIPTION W NOTES
cL Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
Silty SAND;tan,dense to very dense,moist to dry
1
2
sm ...moderate to strong cementation observed throughout soil layer
3
4
5 Poorly-graded GRAVEL with Sand and Cobbles;tan, medium
dense,moist °
...subrounded gravel and cobbles up to 12 inches in maximum o
dimension Q
6
0
Q
o�
7 0
Q
GP
0
$ Q
o�
O
Q
9
0
Q
0
10— Test pit terminated at 10 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 17
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'21.6348"(43.539343°) U
U LONGITUDE(DEGREES):W-116°21'30.24" (-116.3584°) 01
U
u) TOTAL DEPTH: 10' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
CL Passing No.200 sieve=64%
1 Bulk 0.5'-1.5' ILL=37, PL=24,PI= 13
CBR=7.3
Silty SAND;tan,dense to very dense,dry to moist
2
sM ...moderate to strong cementation observed throughout soil layer
3
4 Poorly-graded GRAVEL with Silt and Sand;tan,medium dense,
moist
0
5 0
0
o Bag 5.5'-6' Passing No.200 sieve=6%
Moisture content=6%
6 o Field seepage test performed at 6 feet.
Field seepage rate> 15 in/hr.
0
7—GP-GM O
0
O
8 o
O
0
9
0
0
10— Test pit terminated at 10 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 18
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'21.2316"(43.539231°) U
U LONGITUDE(DEGREES):W-116°21'26.8848" (-116.357468°) 01
U
u) TOTAL DEPTH: 11' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
cIL
inches.
1 Silty SAND;tan,dense,moist
2 Passing No.200 sieve=26%
Bag 2'-2.5' Moisture content= 12%
sm ...moderate cementation observed throughout soil layer
3
4 Poorly-graded GRAVEL with Sand;tan, medium dense,moist
o�
O
O
5
0
O
o�
6 0
O
o�
7 O
o�
GP
O
O
$ o�
O
O
9
O
o�
1
O
o�
0
O
1 Test pit terminated at 11 feet due to caving.
Slotted PVC pipe installed.
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/30/2023 TP - 19
DATE FINISHED: 3/30/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Kevin Dyekman
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'17.9664"(43.538324°) U
U LONGITUDE(DEGREES):W-116°21'46.422" (-116.362895°) 01
U
u) TOTAL DEPTH: 11' = SAMPLE
w Q
DESCRIPTION W NOTES
Poorly-graded GRAVEL with Silt, Sand,and Cobbles(Fill);tan, Significant roots and vegetation observed to 6
medium dense, moist inches.
...subrounded gravel and cobbles up to 12 inches in maximum 00(
dimension 00(
1 FILL 00(
00(
2 Silty SAND(Native); brown, medium dense to very dense,moist
3 Passing No.200 sieve= 18%
Bag 3'-3.5' Moisture content= 17%
4
5 ...weak to moderate cementation observed from 2 to 8 feet
sM
6
7
g ------------------------------------------------
...strong cementation observed from 8 to 9 feet
9 Poorly-graded GRAVEL with Silt, Sand,and Cobbles;red-brown,
dense,moist
0
1 GP-GM
0
O
0
1 Test pit terminated at 11 feet due to caving.
Slotted PVC pipe installed.
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 20
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'18.2328"(43.538398°) U
U LONGITUDE(DEGREES):W-116°21'41.9796" (-116.361661°) 01
U
u) TOTAL DEPTH: 10' = SAMPLE
a o_
Lu
DESCRIPTION W NOTES
Lean CLAY with Sand(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.Tree roots observed to 1 foot.
Passing No.200 sieve=72%
Bag 0.5'-1' Moisture conent=25%
1 cL LL=49, PL= 19,PI=30
2 Silty SAND;tan,dense to very dense,moist
3
Passing No.200 sieve=23%
Bag 3.5' 4' Moisture conent=22%
4 sM ...moderate to strong cementation and induration observed
throughout soil layer
5
6 Poorly-graded GRAVEL with Silt and Sand;tan,dense,moist Passing No.200 sieve= 10%
o Bag 6'-6.5' Moisture conent= 15%
0
7—GP-GM °
O
0
8 Poorly-graded GRAVEL with Sand;tan,dense, moist
o�
O
Q
9 GP °
O
Q
o�
1 Test pit terminated at 10 feet due to caving.
Slotted PVC pipe installed.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 21
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'18.3516"(43.538431°) U
U LONGITUDE(DEGREES):W-116°21'36.234" (-116.360065°) 01
U
u) TOTAL DEPTH: 12' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
1 cL
2 Silty SAND;tan,medium dense to dense,dry to moist
3
4 sm ...weak to moderate cementation observed throughout soil layer
5
6 Poorly-graded GRAVEL with Sand;tan, medium dense,...-.-.
o�
O
O
7 0�
O
O
o�
O
O
o�
9 GP Q
o�
O
O
1
0
O
1
O
o�
1 Test pit terminated at 12 feet.
Slotted PVC pipe installed.
1
1
-75 WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
T AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 22
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'18.924"(43.53859°) U
U LONGITUDE(DEGREES):W-116°21'29.8764" (-116.358299°) 01
U
u) TOTAL DEPTH:4' = SAMPLE
w Q
DESCRIPTION W NOTES
Sandy Lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 6
inches.
1 cL
2 Silty SAND;tan,dense to very dense,dry to moist
3 snn ...moderate to strong cementation observed throughout soil layer
4 Test pit terminated at 4 feet due to practical excavation refusal on
strong cementation.
5
6
7
8
9
1
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 23
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'16.0008"(43.537778°) U
U LONGITUDE(DEGREES):W-116°21'23.9616" (-116.356656°) 01
U
u) TOTAL DEPTH: 12' = SAMPLE
a CL
Lu
DESCRIPTION W NOTES
Poorly-graded GRAVEL with Sand(Fill);tan,medium dense, Significant roots and vegetation observed to 3
moist inches.
00(
00(
1 FILL 00(
00(
— I N
2 Sandy SILT(Native); brown,stiff, moist Passing No.200 sieve=57%
Bag 2'-2.5' Moisture content=23%
MIL
17
3 Poorly-graded SAND with Silt; light brown,very dense to dense,
moist
4
5 Passing No.200 sieve=9%
Bag 5'-5.5' Moisture content= 19%
sP-sM ...strong to weak cementation observed throughout soil layer
6
7
8 Poorly-graded GRAVEL with Sand;tan, medium dense,moist
o�
O
Q
9 GP °
O
Q
o�
1 Poorly-graded SAND;tan, medium dense,moist gag 10'-10.5'
1 SIR
1 Test pit terminated at 12 feet.
Slotted PVC pipe installed.
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
ALLWEST DATE STARTED: 3/29/2023 TP - 24
DATE FINISHED: 3/29/2023 EXCAVATOR: CASE 580C
MERIDIAN,IDAHO OPERATOR:Steve Just
EXCAVATION METHOD:24-inch-bucket
GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc.
TEST PIT LOG LOGGER:Parker Norris
WEATHER:Cloudy
PROJECT:523-087G NOTES:See Figure A-2 in Appendix A for approximate test pit location.
South Eagle Road Development
LATITUDE(DEGREES):N 43°32'16.2276"(43.537841°) U
U LONGITUDE(DEGREES):W-116°21'16.722" (-116.354645°) 01
U
u) TOTAL DEPTH: 10.5' = SAMPLE
a CL
Lu
DESCRIPTION W NOTES
Poorly-graded GRAVEL with Sand and Cobbles(Native);tan, Significant roots and vegetation observed to 3
medium dense, moist ° inches.
...subrounded gravel and cobbles up to 12 inches in maximum o
dimension O
1 ...weak cementation observed from 0.5 to 1.5 feet 0
------------------------------------------------ Q
0
2 0
O
0
3 O
0
O
O
4 °�
O
Bag4.5'-5'
0 Field seepage test performed at 5 feet.
5 GP O Field seepage rate> 15 in/hr.
0
0
6 Q
0
O
O
7 0�
O
O
$ 0
O
O
0
9-
0
O
O
1 °�
Test pit terminated at 10.5 feet due to caving.
1
1
1
1
WATER LEVELS
a WHILE EXCAVATING
Y AT COMPLETION
1 AFTER EXCAVATING Sheet 1 of 1
Unified Soil Classification System
MAJOR DIVISIONS SYMBOL TYPICAL NAMES
Well-Graded Gravel,
CLEAN GW Gravel-Sand Mixtures.
GRAVELS GP Poorly-Graded Gravel,
GRAVELS Gravel-Sand Mixtures.
Silty Gravel,
COARSE GRAVELS GM Gravel-Sand-Silt Mixtures.
GRAINED WITH FINES GC Clayey Gravel,
SOILS Gravel-Sand-Clay Mixtures.
Well-Graded Sand,
CLEAN SW Gravelly Sand.
SANDS Sp Poorly-Graded Sand,
SANDS Gravelly Sand.
SM
Silty Sand, I
SANDS Sand-Silt Mixtures.
I WITH FINES SC Clayey Sand, I
Sand-Clay Mixtures.
ML Inorganic Silt,
SILTS AND CLAYS Silty or Clayey Fine Sand.
Inorganic Clay of Low to
LIQUID LIMIT CL Medium Plasticity,
LESS THAN 50% Sandy or Silty Clay.
FINE OL Organic Silt and Clay of Low
GRAINED Plasticity.
SOILS Inorganic Silt, Elastic Silt,
SILTS AND CLAYS MH Micaceous Silt,
Fine Sand or Silt.
LIQUID LIMIT CH Inorganic Clay of High Plasticity,
GREATER THAN 50% Fat Clay.
OH Organic Clay of Medium to High
Plasticity.
Highly Organic Soils PT Peat, Muck and Other Highly
Organic Soils.
ALLWEST
Appendix C
Laboratory Test Results
GEOTECHNICAL I ENVIRONMENTAL
MATERIALS TESTING I SPECIAL INSPECTION
ALLWEST AN EMPLOYEE-OWNED COMPANY
Table C-1: Summary of Laboratory Test Results
Gradation Atterberg Limits
Depth Test Pit Content Gravel Sand Silt/Clay
De Moisture
p Liquid Plastic Plasticity CBR Sample Classification
o
(Feet) N N N N Limit Limit Index (�o) (USCS)
(/o) (/o) (/o)
TP-4 2.5-3 18 20 Silty SAND (SM)
TP-6 1.5-2 30 7 Poorly-graded SAND with Silt(SP-SM)
TP-6 5.5-6 6 4 Poorly-graded GRAVEL with Sand (GP)
TP-9 6-6.5 6 11 Poorly-graded SAND with Silt(SP-SM)
TP-10 3-3.5 15 30 Silty SAND (SM)
TP-11 7-7.5 21 19 Silty SAND(SM)
TP-13 9.5- 10 3 7 Poorly-graded GRAVEL with Silt, Sand, and Cobbles(GP-GM)
TP-14 1 - 1.5 26 53 45 19 26 Sandy Lean CLAY(CL)
TP-17 0.5- 1.5 1 64 37 24 13 7.3 Sandy Lean CLAY(CL)
TP-17 5.5-6 6 6 Poorly-graded GRAVEL with Silt and Sand (GP-GM)
TP-18 2-2.5 12 26 Silty SAND (SM)
TP-19 3-3.5 17 1 18 Silty SAND(SM)
TP-20 0.5- 1 25 72 49 19 30 Lean CLAY with Sand (CL)
TP-20 3.5-4 22 23 Silty SAND(SM)
TP-20 6-6.5 15 10 Poorly-graded GRAVEL with Silt and Sand (GP-GM)
TP-23 2-2.5 23 57 Sandy SILT(ML)
TP-23 5-5.5 19 9 Poorly-graded SAND with Silt(SP-SM)
255 N. Linder Road, Suite 100• Meridian, Idaho 83642• (208)895-7895• Fax(208)898-3959
www.allwesttesting.com
This report may not be reproduced, except in full,without the permission of ALLWEST.
LIQUID AND PLASTIC LIMITS TEST REPORT
60
Dashed line indicates the approximate
upper limit boundary for natural soils
50 O
�0
' G
40
U
C �
X
W
N— Z_
�
v 30
c F-
LU C/) '
Q i
J /
a: 20
H
U)
LU
J /
J
Q 10
0 ;
c
L-ML ML or OL MH or OH
0
0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT
0 MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS
• Sandy Lean Clay 45 19 26 53% CL
c■ Sandy Lean Clay 37 24 13 64% CL
CD♦ Lean Clay with sand 49 19 30 72% CL
X
m
m
U
7
O
` Project No. 523-087G Client: Trilogy Development Remarks:
aD Project: South Eagle Road Development
c *Location: TP-14 Depth: 1'-1.5'
■Location: TP-17 Depth: 0.5'-1.5'
ALocation: TP-20 Depth: 0.5'-l'
0
cn
ALLWEST
Figure C-1
Tested By: C. Downes Checked By:J.Varozza
California Bearing Ratio
ASTM D1883
Project: South Eagle Road Development Project No.: 523-087G
Client: Trilogy Development Location: TP-17 @ 0.5- 1.5 ft
Date Tested: 4/17/2023 Compaction Method: ASTM D1557
Tested By: C. Downes Classification: Sandy Lean Clay (CL)
165
150
135
120
105
c
0
r
a 90
c
0
y 75
v
L
N
60 PSI @ 0.1 inch penetration = 73
45
30
15
0
0 0.1 0.2 0.3 0.4 0.5
Penetration(inches)
CBR @ 0.1 Inch Penetration: 7.3 Maximum Dry Unit Weight (pcf): 114.7
Swell (%): 2.7 Optimum Water Content (%): 11.7
Dry Unit Weight Before Soak (pcf): 98.8 Remold of Max. Dry Unt Wgt (%): 86
Water Content Before Soak (%): 16.1
Water Content After Soak, Top 1 Inch (%): 29.5
Surcharge (psf): 50
Immersion Period (hrs): 96
Reviewed By: James Varozza
Figure: C-2
ACXLLWEST
255 N Linder Rd,Suite 100•Meridian, ID 83642•(208)895-7898•Fax(208)898-3959
www.allwesttesting.com
This report shall not be reproduced except in full without the permission of ALLWEST.