Loading...
PZ - Narrative January 2, 2024 Planning & Zoning Department City of Meridian 33 E Broadway Ave Ste 102, Meridian ID 83642 RE: Keep Subdivsion No 2, Re-Zone and Preliminary Plat Request; Narrative We are submitting the Keep Phase 2 Annexation, Re-Zone and preliminary plat request for review and approval. The subject property is located at 6519 S Raap Ranch Ln and 2625 E Lake Hazel Rd Meridian and consist of 15.76 acres. Existing on site are two single family homes and several outbuildings. The site to the west is zoned Medium Density and the project West is Low Density Residential. We are seeking R-2 Zoning for this project. The low-density zoning allows for 2-4 residential units per acre and the proposed subdivision consists of 22 buildable and 5 non-buildable lots. The minimum lot size will be 14,966 square feet and the average lot size will be 21,780 square feet. The residential gross density will be less than 1 dwelling units per acre which is below the allowed density of Medium Density. The common lots will house an irrigation easement, an emergency access, and also include two community open spaces, one of which will have a sports court. The two open ditch canals to the east and west of the property create a nice perimeter around the site. The Farr Lateral on the west will remain an open ditch canal. The portion of the Farr Lateral irrigation easement on the project will be housed in a common lot (non-qualifying). As part of this project, we are proposing to pipe the entire Grimmet Lateral and back-filling the existing canal ditching. We will create a common lot to house the Grimmet Lateral easement. This common lot will be 25-ft wide, which when combined with the 15- ft easement in Keep Phase 1, will provide the necessary 40-ft easement for the Grimmet lateral piping, on center. The project will be serviced by City sewer and potable water. Maintenance of the common lots, landscaping and private drives will be included in the adopted CC&Rs. The project will be completed with one phase. Access will be limited to one vehicular and pedestrian access via E Wickham St and one Emergency Access onto Lake Hazel with a future vehicular and pedestrian connections to Pinnacle sub to the west. An internal public road network (47' wide right of way with sidewalk easements for a total 59' road section) will service the development. The access points as proposed will mitigate adverse impacts by consolidating access internal to the development where possible. Curb, gutter, sidewalks will be provided along all public roads to remain within compliance with Ada County Highway District requirements. A traffic impact study is not required for this project as there are less than 100 lots. The proposal is consistent with the several comprehensive plan policies, including policies which encourages the development of housing that meets the demand for household sizes, lifestyles and settings. In addition, Policies which calls for working with developers to direct the expansion of sidewalks and pathways throughout Meridian, sidewalks are included within the project providing future neighborhood connectivity. The included connection to City water and sewer is supported by policies where the property is to be annexed into City limits. We will be asking for an exception for both Block Length as our north and south road will continue south and cross the canal to a future phase of Brighton's Pinnacle Subdivision. We will also have a cul-de-sac that exceeds 500' but have provided an emergency access road, which is part of a qualifying open space common lot, out to Lake Hazel to break up that length. Additionally we are providing a pedestrian connection in another qualifying open space common lot to further break up the Block Length. Agency requirements will be fully met and submitted for your review and comment as the project continues. Initial meetings indicate that agencies are in alignment and agreement for the proposed project; however, as additional needs arise, they will be mitigated and incorporated in the project design. The best engineering, architectural, and constructions practices will be employed and implemented by the ownership and consultant team. We greatly appreciate your time and review of our application submittal. In accordance with the submittal checklists, we are submitting electronically all required information. Please contact me at (208)724-6239 or jarronlangston@gmail.com should you have any questions. Sincerely, �Z Jarron Langston Developer 208-724-6239