PZ - Applicant's Response To Staff Report
Charlene Way
From:Mike Wardle <mwardle@brightoncorp.com>
Sent:Wednesday, July 5, 2023 12:29 PM
To:Clerks Comment; Chris Johnson
Cc:Sonya Allen; Bill Parsons; Caleb Hood; Kim Warren; Jon Wardle; Joshua Beach
Subject:Driftwood Subdivision CUP PFP H-2023-0021 Staff Report for July 6th Commission
Hearing
Attachments:Driftwood Subdivision CUP PFP H-2023-0021
External Sender - Please use caution with links or attachments.
All,
After reviewing the Driftwood Subdivision staff report and recommended conditions of approval, we express our
concurrence—with the EXCEPTION of the requirement for a public multi-use pathway/easement.
As noted in the attached email/graphics to Kim Warren, City Pathways Project Manager, we have requested that the
pathway requirement be withdrawn.
Thus, we re-state that request for consideration by the Planning & Zoning Commission for the reasons noted in that
email; and that all pathway-related conditions be deleted.
Specifically:
- Conditional Use Permit Conditions 1.8.d and 1.8.i; and
- Preliminary/Final Plat Conditions 2.1.c and 5.
Jon Wardle will attend and present remotely; I will attend in-person to respond to questions.
Respectfully,
Michael D. Wardle, Director of Planning
BRIGHTON CORPORATION
2929 W. Navigator Dr., Suite 400, Meridian, ID 83642
Direct 208.287.0512 l Mobile 208-863.6150
mwardle@brightoncorp.com
From: Sonya Allen <sallen@meridiancity.org>
Sent: Saturday, July 1, 2023 11:32 PM
To: Clerks Comment <comment@meridiancity.org>
Cc: Bill Parsons <bparsons@meridiancity.org>; Caleb Hood <chood@meridiancity.org>; Joshua Beach
<JBeach@brightoncorp.com>
Subject: \[EXTERNAL\] Driftwood Subdivision CUP PFP H-2023-0021 Staff Report for July 6th Commission Hearing
Attached is the staff report for Driftwood Subdivision. This item is scheduled to be on the Commission agenda on July
th
6. The public hearing will be held at City Hall, 33 E. Broadway Avenue, beginning at 6:00 pm. You may attend in person
or virtually via Zoom – the link/phone number to join the meeting is located at the top of the meeting agenda. Please
call or e-mail with any questions.
1
Please submit any written response you may have to the staff report to the City Clerk’s office
(comment@meridiancity.org) and me as soon as possible. If you have a presentation you’d like to present at the public
hearing, please send it to the City Clerk’s office no later than 12:00 pm the day of the hearing.
Thanks,
Sonya Allen | Associate Planner
City of Meridian | Community Development Department | Planning Division
33 E. Broadway Ave., Ste. 102, Meridian, Idaho 83642
Phone: 208-884-5533 | Direct/Fax: 208-489-0578
Built for Business, Designed for Living
All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law,
in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law.
This message was sent by someone outside the organization. Please do not click links or open attachments unless you
recognize the source of this email and know the content is safe.
the
2
Charlene Way
From:Mike Wardle <mwardle@brightoncorp.com>
Sent:Wednesday, July 5, 2023 11:22 AM
To:Kim Warren
Cc:Sonya Allen; Bill Parsons; Steve Siddoway; Jon Wardle; Joshua Beach
Subject:Driftwood Subdivision CUP PFP H-2023-0021
Attachments:Settlers - Driftwood & Wood Rose.pdf; SKM_C550i23070509340.pdf
Kim,
The P&Z hearing for Driftwood Subdivision is tomorrow evening. The staff report was emailed to us late Saturday night
th
and posted on the City’s website Monday morning—a “light” pre-4 work day. Thus, we are addressing issues from that
staff report much later than anticipated.
th
In particular your requirement, posted late Friday afternoon, June 30, for “a public access easement for a pathway
connection from…Cooper Lane through the subject property to the sidewalk at Venable Ave.”
Pathway Requirement Concerns
- There is no pathway denoted in the City’s Master Pathways Plan Map in that area.
- You did, however, require a pathway thru Wood Rose Apartments immediately west of Driftwood as an extension of
an existing pathway.
- Connecting the Wood Rose pathway (approx. 90 feet north of the Ustick Road sidewalk) to Driftwood’s private drive is
challenging and functionally questionable.
To illustrate
st
The 1 attachment, an aerial graphic, shows the relationship of the two projects at their 95’ +/- common boundary. It
also illustrates the “gap” between Wood Rose’s required pathway terminus and Driftwood’s private street which ends
at a storm drainage facility.
nd
The 2 three-page attachment is more specific, with site plans and subdivision plat:
- page 1 is Wood Rose’s site plan showing the pathway location and terminus at a private lane just north of Ustick.
- page 2 is Driftwood’s three-lot final plat showing the “gap” between the two alignments.
- page 3 depicts the cross-access between the two projects at Cooper Lane and the parking lot layout which renders a
smooth pathway transition impractical; particularly so, with the Ustick sidewalk just a short distance from the Wood
Rose pathway terminus.
Thus, we respectfully request that this late, and challenging pathway requirement be withdrawn as a condition of
approval for Driftwood Subdivision.
Michael D. Wardle, Director of Planning
BRIGHTON CORPORATION
2929 W. Navigator Dr., Suite 400, Meridian, ID 83642
Direct 208.287.0512 l Mobile 208-863.6150
mwardle@brightoncorp.com
1
(� � t
� , I
j C .•
t T
�° ` ` -3 DRIFTWOOD SUB + T
Job S j W _-
m �► cs
i
ry tif' ;
o tOOIb t j
WOOD ROSE APTS ti
existing ACHD sidewalk
USTICK ROAD
,..�► r�,,�`` �'•:.,� _ �"—ice� ''` — r ! r r' T
LEGEND KEYNOTES PREL--
SITE FURNISHING SCHEDULE
ut
.................-...................................................................................
M UZZI
-
EA
MIR
x
%bj
WE:
Z,
ay,
zr !-ij
AR
..........................- ........................................-................
GENERAL NOTES..........
...................... ................ ..........
........ ..
wUSTICK RD
jACCESSIBILITY RECAP
..........
UJ lz
SITE PLAN u,
a Ind
0 UJ
240
0
at tu3j
0
0
8MEET NO,
[Al.0
Plat Showing A'
arine Table Driftwood Sub&vision
Curve Lerglh Rdlu ae D.K. Chad searing Chao LepN
CI 2e.10' 89.50' 23'09'Se S7825'OWW z7.91' Situated in the Southeast Quarter of the Southwest Quarter of
C2 5276' 130.5W 23V9'58' S7825'03'W 5241' Section 36, Township 4 North, Range 1 West, Boise Meridian, �C
C3 28.10' 69.50' 23ro9'58' N7825'03-E 27.91' City of Meridian, Ada County, Idaho.
C4 19.61' 69.W 18ro9'4Y' N7454'57'E 19.54' 2023
C5 8.4V 69.50- 7W'11' N8829.56'E 8.49' CPAE No.
CB 5278' 130.50' 23W'58' N787 110073307
S'03'E 52.41' ( I I I I \ C1/4 s.36
Une Table 2W I 28' i i PLS 15,W.C.
Lin. Bearing I L.0 Woodburn )Vest 1 I I I I I .� I I \ 10 60 1ao
1
U NOOro Subdivision No.i'S6'W 36.50' Va i 1 I I I \•\ 0 30 ,zo
L2 N8959'5eW 40.00' I I I I Woodburn Subdivl''sion I 1 Scale: 1" = 60'
m
L3 NOOV7'S8'W 3.00' _
L4 NB959'58'W 9.5W PLS 4431 1 i S89"14'20-E 637.24' I I Legend
i
L5 SOOVI'56' Ca
E 4.00' PLS 1 Pl5 4431 PLS 4/31 No p PLS 10782 PLS 4431 O Farnd 1/2'Iran Pin,ae Noted
—-- PLS 7729 r3.35'_----------' ----_---- 8285' ---5213'-----LB N9H59'S8'W 57.05' w -- -- 109.70'_-------108.76'----.35.5Y_ � 0 Found 5/8'Iron Pin,Marked'ISG PLS 11334'or as Noted
L7 NOO'01'56'W 4.00' Y o 20.2Y ) I 0 Found Braes Cap Monument
L8 NOOro1'S6'W 4.00' --_ I-10' I I 0 Dlmenelon Point Not Found or Set
L9 58959 WE 40.03' PLS 7729 i • Set 1/2'x 24'Iran Pin with Plastic COP,9SG PLS 11334'
I
L11 OO-01.56-W 4.00' I Reset 5/8'x 24PIIran Pin aP.
with Plastic Cap,'ISG PLS 11334'Lil NGDro1'S6'W 4.00' I
L12 5895g'58'E —--—-- g 70'—) a Set 1/2'x 2e Iron PM,with Plastic Cap--ESMT-ISO PLS 113W
L73 9oorol's6'E 39,30' W.C. witness
Corner
L1 S89'59'58'E 9.71' I I 1 O1 Lot Number
L15 S89'59'S8'E 8.50' Subd.War Boundary Line
PLS 7729 Fl
L16 NOOro156'W A00' Lot Une
Centadine
— — Adjacent Property 8—day Line
Woodburn. Nest Tie Line
Subdivision No. 2 /� ( Right-ol-Way Line
91ook 1 1 W Section Lhe
I 'r1 6 ——————— Easement Line(See Note 4)
mI pp ------------------ Irrigation Easement Line(See Note 7)
Sweer a Water Easement Une(See Note 6)
MI I _ — - Z Z -- -- ACHO Permanent U.1-1-Easement Une Sae Note 10�.---- i�--- --N8959'S8'W 209.59' Lg _ I ( )
Ne7&47.W
O 0�
z i 6'66`{ W.Wind Dnitt St. 1
J L2 s� a w m a) 8
u
k L4 TLLI'2"
10 S89'59'58'E n
ro d,'C — 589'SB'SB'E t6l.87' L9_ s
-- L16 L75 r 959'58'E 114.48--——f--OOUnpl¢tted to' I 1
Point of
Beginning
I 11
car L---------------J- a 4- - ma 20
_.337.05'_____ ______--LCHAFE$.6yP
z i N89'09'46'W 616.87'
� —NOOVt'se w i
S.35 5.36 T.4N.,R11I. 48.0I S45745rW See Sheet 2 f
i
___--__ ta96.7,_- 28.07' or notes and additional easement information.
S.2 $.'1... •••ram. R111. —�__—___—___.____—___ 695.a7'
CPAd'N. ......................................................................................W.Ustick Rd. (Public)
---------------5.38 1/4 Book
f09109899 Page
SB9'09'46'E 2662.54'.......................................................................................51
Basta of Bearings CP&F No. IDAHO 9966 W.EMERALD ST.
2017-1200M SURVEY BOISE,IDAH083704
Job No.22-221 (208)84a6570
F:\-1:�s Sane 22-221\1. P 2,-221 x _ /2—3:25:26 P.0 41 GROUP,LLC WWtN.IDAHOSURVEY.COM
Sheet 1 of 4
kk 1
1. -
rTTr
It
-
-_._
M.1
TE E
T Etl
- ' - I M F,.T
I '1
I
_ I
t,
..__ ... ............ - .... ... -,