CC - Engineers Statement ailey Engineering,Inc. CIVIL ENGINEERINGIPLANNINGICADD TO: Meridian Public Works Department DATE: September 22, 2022 PROJECT: PAW Subdivision (BEI Project No. C2020-018) To Whom it May Concern: This letter is to provide certification for PAW Subdivision that all street finished centerline elevations are set a minimum of three (3) feet above the highest established groundwater elevations. This information is based on an Allwest geotechnical report dated 02/22/2021 as well as groundwater update reports, last dated 09/09/2022. It should be noted that the initial readings from 07/29/2022 have been disregarded in design as the adjacent property was being actively irrigated at the time of reading. Sincerely, �S\pNAL & ENSFO 09/22/2022 20218 0 -Z' Jonah Duncan, P.E. "O 9TF OF SOP P� Project Engineer tigiy 8. 0 cc: BEI Project No. C2020-018 1119 E. State Street, Suite 210 ♦ Eagle, Idaho 83616 ♦ Tel.: 208-938-0013