Parks and Recreation
Reviewer: Kim Warren/ Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Promenade Cottages File No: H-2022-0013, CUP, PP+ Date: 4.17.23
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to Final Approval,the applicant shall provide a 10'wide detached multi-use pathway along
the west side of NE 3rd Street in conjunction with improvements to the public right-of-way that
are required by ACHD. Detached multi-use pathway(10'wide) is also required along E. Fairview
Ave to facilitate safe access to the nearby Fivemile Creek Pathway. Applicant shall dedicate a
public access easement for any portion of the pathway(s)that fall(s) outside of the public right-
of-way. Submit easement documents for Council approval and subsequent recordation. The
easement shall be a minimum of 14'wide(10' pathway+2'shoulder each side).
Use standard City template for public access easement. Submit all easement documents online
through Citizen's Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as
recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final
approval the applicant's engineer shall provide written documentation that the pathway
segment was constructed per the recommended specifications.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.