Loading...
PZ - Revised Exterior Elevations TEMPERED GLAZING REQ'S c ) \lk G.C.TO PROVIDE AS NOTED BELOW,TYP. C H I P M A N D E S I G N ARCHITECTURE GROUP PC 1. AT PANELS ADJACENT TO DOORS, WITHIN 24" OF DOOR EDGE, AND 1 3 5 0 E T 0 U H Y AV E WHERE BOTTOM EDGE IS LESS THAN 60" ABOVE WALKING SURFACE. F I R S T F L O O R E A S T DES PLAINES, IL 60018 2. WHERE AN INDIVIDUAL PANEL IS GREATER THAN 9 SQ.F. T E L 8 4 7 . 2 9 8 6 9 0 0 3. WHERE BOTTOM EDGE IS LESS THAN 18" A.F.F. 1 MTL-1 ES-1 ES-2 4. WHERE TOP EDGE IS GREATER THAN 36"AFF AND WALKING SURFACE IS WITHIN 36" HORIZONTALLY OF THE PLANE OF THE GLAZING. AC-1 5. GLAZING ADJACENT TO STAIRWAYS, LANDINGS AND RAMPS WITHIN 2T-6" 36" HORIZONTALLY OF WALKING SURFACE. T/HIGH PARAPET 6. FIRE DEPT. GLASS ACCESS PANELS SHALL BE TEMPERED GLASS. 22'-0" T/ PARAPET a:�� nooidles & COMPANY CMU WALL ELEVATION GENERAL NOTES 16'-6" S401 1. GC TO ENSURE PHYSICAL BARRIER BETWEEN DISSIMILAR METAL TO T/ ROOF 1 PROTECT AGAINST ELECTROLYTIC ACTION BETWEEN METALS. ES-1 I 2. NEW SIGNAGE UNDER SEPARATE PERMIT. GC TO VERIFY& MANUAL-CLOSING COORDINATE WITH SIGN COMPANY MOUNTING HEIGHTS &SUPPORT 6'-11 5/8" BRICK VENEER WINDOW QUIKSERV REQUIREMENTS PRIOR TO BLOCKING INSTALLATION. GC TO PROVIDE 13'-0" T/OPENING MODEL#BPSC-4836 & INSTALL BLOCKING &ACCESS PANELS AS NECESSARY.ALLOW FOR T/STOREFRONT CAULK AND SEAL AS THRU-BOLTING AT MASONRY WALL CONSTRUCTION. IT SHALL BE REQUIRED. SOLELY THE RESPONSIBILITY OF THE SIGN CONTRACTOR TO FABRICATE SELF-CLOSING WINDOW, AND INSTALL ALL SIGNAGE UNDER SEPARATE PERMIT. SIGNAGE QUIKSERV MODEL#BPSC-4836 SHOWN FOR SCHEMATIC AND COORDINATION PURPOSES ONLY. 9'-6" SHIM W/BACKROD AND B/STOREFRONT 2 SEALANT ON EACH SIDE. 3. GC TO CLEAN, PATCH, PAINT& REPAIR EXISTING EXTERIOR FACADE AS A2.10 1/2" FRT PLYWOOD REQUIRED DUE TO DAMAGE DURING DEMOLITION AND/OR NEW CONSTRUCTION,TYP. � 7'-2" f 1 � 3'-6" T/STOREFRONT T-6" BRICK VENEER INFILL B/OPENING 4. GC TO COORDINATE LOCATION AND TYPE OF KNOX BOX WITH ES-1 B/OPENING TO MATCH I NOODLES & CO PM AND LOCAL FIRE DEPARTMENT. WALL CONSTRUCTION EXTERIOR WALL CONSTRUCTION 5. ADDRESS NEEDS TO BE VISIBLE FROM THE STREET APPROACH. VERIFY 2 4 FLASHING WEEPHOLES LOCATION AND REQUIREMENTS W/LOCAL FIRE DEPARTMENT PRIOR TO THE START OF CONSTRUCTION. 11-11 ------ CONTINUOUS FLASHING 6. GC SHALL COORDINATE WITH SIGN INSTALLER REGARDING LOCATIONS CONTINUOUS 2X BLOCKING. OF INTERIOR STRUCTURAL ITEMS AND ELECTRICAL RUNS&OUTLETS PRIOR TO START OF SIGNAGE INSTALLATION. 0'-0" T/SLAB _ 0'-0" T/SLAB STF-1 ES-2 BK-1 )i r-I KEYNOTES O 0 0 0 1. NOODLES STOREFRONT SIGNAGE CO 4 EXTERIOR ELEVATION - WEST r3 DRIVE THRU WINDOW SECTION 2 DRIVE THRU SILL DETAIL o J10 1/4" = V-0" A2.10 1/4" = V-0" A2.10 1 1/2" = 1'-0" X W LL zW 2 MTL-1 ES-1 ES-2 MTL-1 ES-1 ES-2 Q > 0 MTL-1 AC-1 EXTERIOR FINISH SCHEDULE m 2T-6" 0 0 0 TAG MATERIAL DESCRIPTION T/ HIGH PARAPET U z W 22 -0 AC-1 ALUMINUM SIDING DARK NATIONAL WALNUT J M ~ p� _ oo p T/ PARAPET cn AC-2 ALUMINUM SIDING CANOPY-COLOR TO MATCH DUNN (.f) — ,maxo EDWARDS 6049: "CHAPS" w c J w Q w ES-1 EIFS SYSTEM -SMOOTH CANOPY-COLOR TO MATCH DUNN z STUCCO FINISH EDWARDS 6172: "BUNGALOW TAUPE 0 �: Q Q Q 16'-6" I ES-2 EIFS SYSTEM -SMOOTH CANOPY-COLOR TO MATCH DUNN 0 f� 0 N T/ ROOF STUCCO FINISH EDWARDS 6149. LONELY ROAD 0 0 0 cW � ES-1 ES-1 MTL-1 PREFINISHED METAL COPPER BROWN FINISH Z M C 0 � O O STF-1 ALUMINUM WINDOW SYSTEM MEDIUM BRONZE FINISH PROJECT NUMBER: WITH INSULATED GLASS (G-1) 21-1876.00 CMU-1 CMU 8X8X16 UMBER BROWN, SPLIT FACE, ISSUA NS RUNNING BOND 3 BK-1 BASE ROCK FACE SILL COMMERCIAL GRADE, COLOR: A2.lur WHITE, RICL FACE SILL 8X4X16 WITH AC-2 CHAMFERED EDGE V T/STOREFRONT O ES-1 ES-1 O \\ \\ \\ \\ 00 DRAWN BY: CHECKED BY: 0'-0" JD xx T/SLAB ES-2 BK-1 BK-1 ES-2 STF-1 STF-1 EXTERIOR ELEVATIONS SHEET: 1 EXTERIOR ELEVATION - SOUTH J10 1/4" = V-0" A2elO_ EXTERIOR FINISH SCHEDULE TEMPERED GLAZING REQ'S \lk TAG MATERIAL DESCRIPTION G.C.TO PROVIDE AS NOTED BELOW,TYP. CH I P M A N DESIGN ARCHITECTURE GROUP PC AC-1 ALUMINUM SIDING DARK NATIONAL WALNUT 1. AT PANELS ADJACENT TO DOORS, WITHIN 24" OF DOOR EDGE, AND WHERE BOTTOM EDGE IS LESS THAN 60" ABOVE WALKING SURFACE. 1 3 5 o E T 0 Y A S E 0 R FIRST F L O E A T AC-2 ALUMINUM SIDING CANOPY-COLOR TO MATCH DUNN EDWARDS 6049: "CHAPS" DE S P L A I N E S, I L 60018 2. WHERE AN INDIVIDUAL PANEL IS GREATER THAN 9 SQ.F. T E L : 8 4 7 . 2 9 8 . 6 9 0 0 ES-2 MTL-1 ES-1 AC-1 MTL-1 1 ES-1 EIFS SYSTEM -SMOOTH STUCCO FINISH CANOPY-COLOR TO MATCH DUNN EDWARDS 6172: 3. WHERE BOTTOM EDGE IS LESS THAN 18" A.F.F. 25'-6" "BUNGALOW TAUPE" T/ HIGH PARAPET 4. WHERE TOP EDGE IS GREATER THAN 36"AFF AND WALKING SURFACE ES-2 EIFS SYSTEM -SMOOTH STUCCO FINISH CANOPY-COLOR TO MATCH DUNN EDWARDS 6149: "LONELY IS WITHIN 36" HORIZONTALLY OF THE PLANE OF THE GLAZING. ROAD" 5. GLAZING ADJACENT TO STAIRWAYS, LANDINGS AND RAMPS WITHIN MTL-1 PREFINISHED METAL COPPER BROWN FINISH 36" HORIZONTALLY OF WALKING SURFACE. 22'-0" T/ PARAPET 6. FIRE DEPT. GLASS ACCESS PANELS SHALL BE TEMPERED GLASS. STF-1 ALUMINUM WINDOW SYSTEM WITH INSULATED MEDIUM BRONZE FINISH GLASS (G-1) n ood I es MTL-1 CMU-1 CMU 8X8X16 UMBER BROWN, SPLIT FACE, RUNNING BOND MTL-1 & COMPANY BK-1 BASE ROCK FACE SILL COMMERCIAL GRADE, COLOR: WHITE, RICL FACE SILL 8X4X16 16'-6" WITH CHAMFERED EDGE ELEVATION GENERAL NOTES T/ ROOF ES-1 1. GC TO ENSURE PHYSICAL BARRIER BETWEEN DISSIMILAR METAL TO PROTECT AGAINST ELECTROLYTIC ACTION BETWEEN METALS. 13'-0" 2. NEW SIGNAGE UNDER SEPARATE PERMIT. GC TO VERIFY& T/STOREFRONT COORDINATE WITH SIGN COMPANY MOUNTING HEIGHTS &SUPPORT REQUIREMENTS PRIOR TO BLOCKING INSTALLATION. GC TO PROVIDE & INSTALL BLOCKING &ACCESS PANELS AS NECESSARY.ALLOW FOR THRU-BOLTING AT MASONRY WALL CONSTRUCTION. IT SHALL BE SOLELY THE RESPONSIBILITY OF THE SIGN CONTRACTOR TO FABRICATE 9'-6" / / / / AND INSTALL ALL SIGNAGE UNDER SEPARATE PERMIT. SIGNAGE B/STOREFRONT AC_2 SHOWN FOR SCHEMATIC AND COORDINATION PURPOSES ONLY. 7'-10" 3. GC TO CLEAN, PATCH, PAINT& REPAIR EXISTING EXTERIOR FACADE AS T/CANOPY REQUIRED DUE TO DAMAGE DURING DEMOLITION AND/OR NEW 7'-2" CONSTRUCTION,TYP. T/STOREFRONT 4. GC TO COORDINATE LOCATION AND TYPE OF KNOX BOX WITH NOODLES & CO PM AND LOCAL FIRE DEPARTMENT. 5. ADDRESS NEEDS TO BE VISIBLE FROM THE STREET APPROACH. VERIFY LOCATION AND REQU REM NTS W/OCAL FIRE DE ARTMENT PRIOR TO THE START OF CONSTRUCTION. 6. GC SHALL COORDINATE WITH SIGN INSTALLER REGARDING LOCATIONS 01-01, OF INTERIOR STRUCTURAL ITEMS AND ELECTRICAL RUNS&OUTLETS T/SLAB PRIOR TO START OF SIGNAGE INSTALLATION. ES-2 STF-1 BK-1 ES-2 STF-1 r-I KEYNOTES O o r2-- EXTERIOR ELEVATION - EAST 1. NOODLES STOREFRONT SIGNAGE 00 JOO 1/4" V-0" x x O X o Lu LL 1 MTL-1 zw 2 ES-2 ES-1 MTL-1 AC-1 < > O 25 -6 T/ HIGH PARAPET C cl:� C � m 23'-6" O O 0 T/ HIGH PARAPET U z � W 22'-0" T/ PARAPET J M co _ oo p V) � m U o no I Lu co ul es MTL-1 & COMPANY J w Q w z �� 0 � Q J Q 16-6 I) T/ ROOF _ O O cl:� O 0 Lu ES-1 z M 2 L zz LNrn 13'-0" PROJECT NUMBER: T STOREFRONT 21-1876.00 ISSUANCE/REVISIONS 9'-6" B/STOREFRONT AC-2 7'-10" T/CANOPY \ ^� 7'-2" v T/STOREFRONT // // // // \ O / / / / ES-1 \\ CMU-1 \ i / / o'-o" 0 0 DRAWN BY: CHECKED BY: T/SLAB J D xx STF-1 BK-1 ES-2 BK-1 ES-2T >j c STF-1 EXTERIOR ELEVATIONS SHEET: rj EXTERIOR ELEVATION - NORTH JOO 1/4" = V-0" A2e00