CC - Staff Report 11-15 STAFF REPORT C:�*%- W IDIAN -- COMMUNITY DEVELOPMENT DEPARTMENT HEARING 11/15/2022 � Legend = DATE: ❑j Project Location TO: Mayor&City Council FROM: Joseph Dodson,Associate Planner 208-884-5533 J � FFR SUBJECT: FP-2022-0031 Jump Creek South Subdivision FP LOCATION: The site is located at the northwest corner of W. McMillian Rd. and N. Black Cat Rd. on Parcel SO428449525 in the SE '/4 _ E of the SE 1/4 of section 28,Township 4N, Range I W. I. PROJECT DESCRIPTION Final Plat consisting of 20 residential building lots and 4 common lots on a portion of 3.57 acres of land in the R-8 zoning district,by Kent Brown Planning. II. APPLICANT INFORMATION A. Owner: Corey Barton, Challenger Development— 1977 E. Overland Road, Meridian, ID 83642 B. Applicant: Kent Brown,Kent Brown Planning—3161 E. Springwood Drive,Meridian,ID 83642 III. STAFF ANALYSIS Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat(H-2022-0006)as required by UDC 11-6B-3C.2. The submitted plat includes the same number of buildable lots permitted with the preliminary plat approval. Furthermore,the submitted plans depict the code compliant street buffer to McMillan Road,the corrected common drive exhibit, and the same amount of common open space as previously approved for this project. Staff finds the proposed final plat is in substantial compliance with the approved preliminary plat as required. IV. DECISION A. Staff: Staff recommends approval of the proposed final plat with the conditions of approval in Section VI of this report. Page 1 V. EXHIBITS A. Preliminary Plat(date: 9/24/2021) E. PIREUMINARY FIAT FOR ]JUMP CHIC HO. a T. • • r —�- . it MEW. .'i�.s �W����R'.. �� • • • a • ♦ • • • a • • • i LJ a ` SVRJNtTSMN ® A7pIdY7 NO 6 sI 1 --- r'� I1-p� .rr wR.r i-.11Y t PLAN SHEET iN6Ex yt "-I 4muuiwuh F"T.Ntl.Rr..o-. T/•LES■IIM PRE —LII1LYiY E MEE!■!L PFS —PEEL—ft SEnFA PPOPRES •P—a —YWCENT WOKE ES lmrtf y i6R l=l--,7M'� w WWI I BOOM � W > a � .......•....�.. 0 0 Q tl J Z W u a it v - W d 0 Page 2 B. Final Plat(date: 9/9/2022) PLAY SHUwINC JUMP C.'RPfrh' .",t..'HbiVISION •LESLMMCM OF LOT T dOCK 20.A MIMMIX■ LOCAWD M THE SE 1/4 Cr TW SE 1/4 OF SECT "28.T,4H..R.1 X.WISE Lem OT7#HER MAN.MA CDMI7,IDIHO 2C22 .D-W% w�xAtl1iwl'�i uwn�.r.�':e e�+kwl ew r y�.�aa.�w rnwr�inrY°. k.ryp..M'�rn x,+.�W R�••"•••ra.•M Op M1 k+r..In mr..w..*krp p Penkkk Fnx,n•�¢ws}�q'<ae'w wa tx H Mwb.Ix nkk wxk enkNLr nrw SCALE IN F[F-r iu[aL���•�..ri..+.r+�W�s�erra4�.r s � t'r6d ron�>w�r r ra>rm�vwr w r,swr�..r�r er x�.rrw.r{..,ram[—.-rl n:rr ice....�.r■..,..r + p.rrw. nr.cake c.w s.om.•Lr�.m�+n mm ac r�r�++.aaw�.r BIDS ter•.�r..u�'anrr.�.rr s...e �`..�rlw r Nr.k�r 4,ry-...fy..h r.Wr..w.nrq.v��in"....ri:nw Mr.ii n�`--t rrrM� K.x.�Y m�s�n�l.t`]x.u•JL Ira Iny4F+r.ti4S.. I.a _r�4ii1 M�.,.�a..r.�-:b.e�.w..�y.s•n.r..�ur r�n�v ariePw*•4�eJhP�w n�ar..,ees.oaa+,w.w 1+�a,n uw!« �96C 1a� r nrbr�.mm of or�o.tv.u'...oia�.oyt..uti kwyr rrrd xrwr�" Y�e1ipR rr n o. x a.��x�irm[�iso.c a�[iwrxr�i[ E AYRi1 eT. i v q.rp v ar cou p . !i�.—7 _.__— +c`:a � r. mr�.hm Tura x•Yrrr.. �� 1 N b.rxna a rrv+rc.v�ir�n oexA e.rtM ire 6 4w wn'fm r~O .�.^pns -_ � p ��A iA i0.w A.YMF lP xi..w�iow aw w?Ee�MHwPHnnAM4.� �z-.._; � � ..�.��✓.rrm,.ri.o<.�. ....r w.. ..rr.wLr,.�� 1k �{{�� � rRaF Rrn'r Or4SN ' F •4rP�wk+1/T!•1-iw..w 59a e:x7 Y� .rr-rriA 1 r / s� � r..rr.4ww "- fm,aRo ® csrrff ^• °Y• W. MCMILLAN RD s�a IR7410AW2 --�... ----.__ ---,..----- axe _a I ftiF111 �•••—_.- _..___. 4�� 533�53k �y�.n rk. n1A56 bP SHEET Gn•LWn ! 1L1 SPN/ID1A--0T -------- r.wlPrwks�•n•Lnrir.cr.�rw 1 of 4 � T sw +¢uwt w' o- as lav.c n .k..nrr rk�.ek- arr. f _____ P[Ar[�r my}K Ya u tY pK' kfiF rx IgTi[G/L NW..• •b ..ir Y/ war[k¢em uLx s r—.pokq r+m1 cl kaea AiT s4C lley Dow" it� car rw G r� uw � sP✓�+1'[ xarm• c4o.a•arks hE nrn .ra+nur krrt r..a�r wnr°wexw:wa.:� a .akv arr av �.�xr .r.nc se;r sur Chu bmw-ImnihmmmICADD car+et k ae�°uko- ma Page 3 C. Landscape Plans(Revision date: 9/21/2022) :mow,�uur c GR LANDSCAPE LEGr;NDu GG ..- • y ;r -_-— —--- —-- �` r r`Y r. r_�� elmanw..nam rler...r�` .nw�.maw,.iw,ww. .__ _-_______ - .II ,.7 r4a wW.-xn•,u wr ' � � .. r ---i __— __� .i__� __ -„i ..ir,m •M I — �MY[F1R liS !Gr � i=n - .�' C/ — wua4aGt9AUH8 PLANT SCHEDULE W.LFJGffrON Sf- i '.•,:uu.c�°...w".m.srs ,•i*+LYYx''�33�3'y' i�lA-1�1.`% Cii.',-':::. M _-... _ N. McM1LLAk u y�.qe. •r�roe v,..rr wl v� •� ... .n. .n..� F SEE SHEET LL-10 FOR OVERALL LANDSCAPE PHASING PLANS, SEE SFTEWr LZIO FOR LANDSCAPE LI.13 ' NOTES. AND PLANTING DETAILS �'- Page 4 LANDSCAPE LEGEND RON IFLOCK PLANT SCHEDULE . a au- t 00 'FYL�.y -!.L r''OSSd •N RDA .�---•-----}----------�----- �~ r�� _~ ;� .�.� 611fi5 - _ �-- ru rr rr •/�{�iYLRi.TG PLM-AM FMM as�r r y tin FOR o►ER►71. �r L210 soa ILAR OGAPS L1.14 a 7AL Ar PLAIMWO nWAUS Page 5 D. Gated Access Exhibit: tATED EMERGENCY ACCESS GATE TO MEET ALL FIFE EPARTIVIENT RE UIREIVIENT . \ LA SIDEWALK T FMAIN CN RI A APRI ST IQEWA K TO REMAIN EMIR p p w L OCK 2 '� W17 I JUMP CREEK SOUTH SUBDIVISION GATED ACCESS EXHIBIT alley Engineering} Inc. C IVIL ENGINEERING i PLANNING I ADD 111'3 E.STATE TM=,SLNTE 21'D TU 208 968 0013 SCALE IN FEET CRAZ ia&a18 Page 6 VI. CITY/AGENCY COMMENTS & CONDITIONS A. Planning Division Site Specific Conditions: 1. Applicant shall comply with all previous conditions of approval associated with this development: A7--14-011 (DA instr. 2014-105206); PP-14-013; FP-2022-0004; H-2022-0006 (PP). 2. The applicant shall obtain the City Engineer's signature on the final plat by July 12,2024, within two(2)years of the date of approval of the preliminary plat findings(July 12,2022), in accord with UDC 11-613-7, in order for the preliminary plat to remain valid or a time extension may be requested. 3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. The final plat shown in Section V.B,prepared by Idaho Survey Group, stamped on September 9,2022 by Cody McCammon, is approved with the following conditions to be completed at the time of Final Plat Signature: a. Plat note#8: add recorded instrument number. b. Plat note#9: add recorded instrument number. c. Plat note#11: add recorded instrument number. d. Add plat note stating the plat is subject to the recorded DA(DA Inst. #2014-105206). 5. The submitted landscape plans,as shown in Section V.C,prepared by South, Beck, &Baird, with a revision date of 9/21/22,is approved as submitted. 6. Staff s failure to cite specific ordinance provisions or conditions from the preliminary plat and/or development agreement does not relieve the Applicant of responsibility for compliance. B. PUBLIC WORKS General Conditions of Approval 1. Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet,if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Per Meridian City Code(MCC),the applicant shall be responsible to install sewer and water mains to and through this development. Applicant may be eligible for a reimbursement agreement for infrastructure enhancement per MCC 8-6-5. 3. The applicant shall provide easement(s)for all public water/sewer mains outside of public right of way(include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility,or 30-feet wide for two. The easements shall not be dedicated via the plat,but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement(on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor,which must include the area of the easement(marked EXHIBIT A)and an 81/2"x I I"map with bearings and distances (marked EXHIBIT B) for Page 7 review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted,reviewed, and approved prior to development plan approval. 4. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water(MCC 9-1-28.C). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to prior to receiving development plan approval. 5. All existing structures that are required to be removed shall be prior to signature on the final plat by the City Engineer. Any structures that are allowed to remain shall be subject to evaluation and possible reassignment of street addressing to be in compliance with MCC. 6. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways,intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. 7. Any wells that will not continue to be used must be properly abandoned according to Idaho Well Construction Standards Rules administered by the Idaho Department of Water Resources. The Developer's Engineer shall provide a statement addressing whether there are any existing wells in the development, and if so,how they will continue to be used, or provide record of their abandonment. 8. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections (208)375-5211. 9. Street signs are to be in place, sanitary sewer and water system shall be approved and activated, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded,prior to applying for building permits. 10. A letter of credit or cash surety in the amount of 110%will be required for all uncompleted fencing, landscaping, amenities, etc.,prior to signature on the final plat. 11. All improvements related to public life, safety and health shall be completed prior to occupancy of the structures.Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. 12. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process,prior to the issuance of a plan approval letter. 13. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 14. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 15. Developer shall coordinate mailbox locations with the Meridian Post Office. 16. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. Page 8 17. The design engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 18. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 19. At the completion of the project,the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 20. A street light plan will need to be included in the civil construction plans. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272. 21. The City of Meridian requires that the owner post to the City a performance surety in the amount of 125%of the total construction cost for all incomplete sewer,water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit,cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 22. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20%of the total construction cost for all completed sewer,water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. Page 9