CC - Pre-App Notes �- i1�'�E PI LAND DEVELOPMENT MEETING NOTES Land Development Staff: Seth Oaks Date: 5/19/2022 Project Name and Location: Fairview Retail (2365 Fairview Ave) Is sanitary sewer available? Yes: ❑X No: ❑ Notes: Proposed flow is 77 gpd greater then Master Plan. Capacity is available at this time but the City makes no guarantee that capacity will be available at the time of application submittal. *Sewer available from the West • Ensure no sewer services cross infiltration trenches • Ensure no permanent structures (trees, bushes, buildings, carports, trash receptacle walls,fences, infiltration trenches, light poles, etc.) are built within the utility easement. Any unused sewer service lines must be abandoned per City Design Standards Any septic systems must to be abandoned per regulatory requirements. Contact Tyson Glock with public works for more information on sewer connection (208) 489-0358 Is domestic water available? Yes: ❑X No: ❑ Notes: Connect water from east property boundary to west property boundary. Plans for new PW water infrastructure must be reviewed by Engineering If a well is located on the site it must be abandoned per regulatory requirements. Contact Kyle Radek with public works for more information on water connection (208) 489-0343 Easements Required? Yes: ❑X No: ❑ NOTE: easements may not overlap any permanent structure including but not limited to carports,trash enclosures, trees, shrubs, buildings, etc.Service lines up to the meter pit must be in ROW or covered by an easement. Notes: If any meters, hydrants, water main, or sewer main is proposed with development, a 20 foot wide easement is required over the mains. 30 foot easement required over both water and sewer if parallel to each other. Any carports,trash enclosures, etc. should not impede the easements. Make sure the site is designed in such a manner that this is not an issue. Is the project within 500 feet No Is this a commercial Yes of a re-use main? project? If both reuse questions are"yes" provide the following information: Building use(manufacturer, carwash,etc.), hours of operation, approximate business water usage and irrigable landscape area: Floodplain or other hazards? Yes: ❑ No: X❑ 11Page C jWE RI 77 Note Irrigation District: Settlers Irrigation District Notes: Surface water must be used as the primary source of irrigation, when available.A secondary connection for year-round irrigation is required—typically a well or City water is used. Public streetlights required? Yes: ❑x No: ❑ Notes: Verify streetlight requirements with Public Works (208)489-0370 Submittal of Civil Infrastructure requirements: Water and sewer infrastructure will be reviewed outside of building permits. Submit infrastructure for review with the final plat. Additional Meeting Notes: See Phasing Memo 2 1 P a g e