2022-10-19 ACHD Final Report Development Services Department ACHD &111v�'�vt/�ii Piw to ,]'e/L ciei Project/File: Hadler/MPP22-0029 / H-2022-0064 This is an annexation with rezone and a preliminary plat application to allow for the development of a 156 lot residential subdivision on 21 acres. Lead Agency: City of Meridian g Y� Y Site address: 7200 S. Locust Grove Road 1' Staff Approval: October 18, 2022 Applicant: Laren Bailey Conger Group _ 4824 W. Fairview Avenue s Boise, ID 83706 Staff Contact: Dawn Battles, Senior Planner Phone: 387-6218 y E-mail: dbattles(a)achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval of an annexation with rezone from RUT (Rural-Urban Transition) to R-15 (Medium-High Density Residential) and a preliminary plat to allow for the development of a 156 lot residential subdivision consisting of 145 building lots (52 attached single family lots and 93 detached single family lots) and 11 common lots on 21 acres. The applicant's rezone proposal is consistent with the City of Meridian's future land use map which designates this site as Medium Density Residential. 2. Description of Adjacent Surrounding Area: Direction Land Use Zoning North Medium Density Residential & Medium-Low Density R-8 & R-4 Residential South Rural-Urban Transition RUT East Rural-Urban Transition RUT West Medium-Low Density Residential R-4 3. Site History: ACHD has not previously reviewed this site for a development application. 4. Adjacent Development: The following developments are pending or underway in the vicinity of the site: • Meridian South Fire Station No. 7 consisting of a fire station and a police station building on 4 acres is located northeast of the site was approved by ACHD in December 2021. • Discovery Park Phase 2, an existing regional park is located northeast of the site will consist of additional improvements to include, but not limited to, a concession building, restrooms, 1 Hadler/MPP22-0029 / H-2022-0064 picnic shelters, bocce ball courts, basketball court and a community garden was approved by ACHD in September 2021. • Apex Southeast, a 279 lot mixed use development consisting of 237 residential lots, 2 commercial lots, 30 common lots and 10 other lots on 82 acres is located north of the site was approved by ACHD in August 2020. • Apex Northwest, a 145 lot mixed use development consisting of 120 residential lots, 11 commercial lots and 14 common lots on 42 acres is located northwest of the site was approved by ACHD in August 2020. 5. Transit: Transit services are not available to serve this site. 6. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. 7. New Center Lane Miles: The proposed development includes 0.61 centerline miles of new public road. 8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 9. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Lake Hazel Road is scheduled in the IFYWP to be widened to 5-lanes from Locust Grove Road to Eagle Road in 2022. • Eagle Road is scheduled in the IFYWP to be widened to 5-lanes from Lake Hazel Road to Amity Road and includes a roundabout at the Eagle Road and Taconic Drive intersection in 2024. • The intersection of Lake Hazel Road and Eagle Road is scheduled in the IFYWP to be widened to 5-lanes on the north leg, 4-lanes on the south leg, 3-lanes on the west leg and 4- lanes on the east leg and signalized in 2023. • Lake Hazel Road is listed in the CIP to be widened to 5-lanes from SH-69 to Locust Grove Road between 2036 and 2040. 10. Roadways to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP) was adopted by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features and support encouragement programs and to facilitate coordination and 2 Hadler/MPP22-0029 / H-2022-0064 cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan recommendations. The BMP identifies Locust Grove Road as Level 2 facilities and Lake Hazel Road as Level 3 facilities that will be constructed as part of a future ACHD project. The BMP also identifies level 1 facilities on the new collector roadway abutting the site's north property line. The applicant will construct the new collector consistent with the MSM and the Roadways to Bikeways Master plan. B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 1,420 vehicle trips per day; 141 vehicle trips per hour in the PM peak hour, based on the traffic impact analysis. 2. Traffic Impact Analysis CR Engineering, Inc. prepared an abbreviated traffic analysis for the proposed Hadler Subdivision. The analysis included a turn lane analysis for the Peak Avenue/Via Roberto Lane intersection and an evaluation of the trips anticipated on internal local streets proposed within the development. a. Staff Comments/Recommendations: The traffic impact analysis indicates that the Peak Avenue and Via Roberto Lane intersection is anticipated to operate at an acceptable level of service planning threshold and turn lanes are not warranted under 2025 total traffic conditions. Pinnacle Mixed-Use Uevei0oment _...__., (In-Process) Via Roberto Ln E,xPo CAI-0ul W. IN Internal Local Roadways Traffic Volume Threshold Evaluation The TIS notes that the internal local streets are not anticipated to exceed the allowable 1,000 average daily trips for new local streets with the exception of the entry portion of Peak Avenue, which is anticipated to carry 1,420 trips per day. ACHD policy limits developments with only one access point to 1,000 trips per day for local streets. Although, Peak Avenue exceeds the allowable 1,000 average daily trips threshold for maximum traffic on one access, staff recommends approval of Peak Avenue to be constructed as a local street as the applicant is proposing to construct a secondary emergency access only onto Locust Grove Road. 3. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) 3 Hadler/MPP22-0029 / H-2022-0064 Functional PM Peak Hour PM Peak Roadway Frontage Classification Traffic Count Hour Level of Service Lake Hazel Road None Principal Arterial 351 Better than "E" Locust Grove Road 600-feet Minor Arterial 143 Better than "E" • Acceptable level of service for a two-lane principal arterial is "E" (690 VPH). • Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH). • Acceptable level of service for a two-lane minor arterial is "E" (575 VPH). • Acceptable level of service for a three-lane minor arterial is "E" (720 VPH). 4. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Lake Hazel Road west of Eagle Road was 6,326 on August 29, 2019. • The average daily traffic count for Locust Grove Road south of Lake Hazel Road was 1,485 on May 22, 2018. C. Findings for Consideration 1. Peak Avenue-Maximum Traffic on One Access Point a. Policy: Average Daily Traffic(ADT): District policy 7207.3.1 states that ADT on new and existing local streets should typically be less than 2,000. This ADT applies to both existing and new streets. For new streets that are stubbed to connect to adjacent land that is not fully developed, the allowable ADT for the new street will typically be no more than 1,000 ADT, to accommodate future additional traffic from the adjacent land, depending on the size of the adjacent undeveloped land. When stub streets are connected and properties fully developed, local streets should not exceed 2,000. In developed areas where streets already exceed 2,000 ADT or are close to exceeding 2,000 ADT, the Commission may grant approval to exceed the 2,000 ADT based on existing zoning of undeveloped properties or infill development. The Commission may also consider the need for additional roadway improvements or traffic calming to mitigate the additional traffic if necessary. The ADTs listed above are desirable planning thresholds for local streets, not roadway capacities. Actual roadway capacities are much higher than the planning thresholds. Maximum Traffic on One Access: District policy 7207.3.3 states that if a proposed development only has one access to a public street that is a local street, or if it proposes to extend public streets from existing development with only one local street access to the public street system, the maximum forecast ADT to be allowed at any point on a local street access is 1,000 and is subject to fire department requirements for the provision of a secondary access. This volume may be reduced or increased based on information received from the lead land use agency, the applicable fire department, and/or emergency services. The District will also take into consideration the following items when determining whether or not to reduce or increase the maximum allowable ADT: railroad crossings, canal crossings, topography (foothills vs. flat land), pedestrian connectivity, location of schools, etc. b. Applicant's Proposal: The applicant is proposing to construct a local street entrance, Peak Avenue, to intersect Via Roberto Lane which is anticipated to carry 1,420 trips per day. The applicant is proposing to construct two stub streets to the adjacent parcels. 4 Hadler/MPP22-0029 / H-2022-0064 Staff Comments/Recommendations: The traffic impact analysis indicates that Peak Avenue will exceed the allowable 1,000 average daily trips threshold for maximum traffic on one access. ACHD policy limits developments with only one access point to 1,000 trips per day for local streets. Although, Peak Avenue exceeds the allowable 1,000 average daily trips threshold for maximum traffic on one access, staff recommends approval of Peak Avenue to be constructed as a local street as the applicant is proposing to construct a secondary emergency access only onto Locust Grove Road. 2. Locust Grove Road a. Existing Conditions: Locust Grove Road is improved with 2-travel lanes, 25-feet of pavement and no curb, gutter or sidewalk abutting the site. There is 62-feet of right-of-way for Locust Grove Road (23-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70 feet of right-of-way. This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder 5 Hadler/MPP22-0029 / H-2022-0064 adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Locust Grove Road is designated in the MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 46-foot street section within 78-feet of right-of-way. c. Applicant Proposal: The applicant is proposing to improve Locust Grove Road with 10-foot wide concrete sidewalk and I the dedication of additional right-of-way to 2-feet behind back VIA ROBERTO LANE of sidewalk abutting the site. II The applicant is proposing to construct a 20-foot wide emergency access only onto Locust Grove Road located 435-feet south of the proposed Via Roberto Lane. d. Staff Comments/Recommendations: The centerline of Locust Grove Road abutting the site is not centered on the section line and is offset approximately 14-feet west of the existing centerline of the roadway. Consistent with prior actions in the vicinity of the site, improvements and right-of- way dedication on Locust Grove Road should be measured from the centerline of the roadway abutting the site. However, improvements and right-of-way dedication may need to shift west toward the section line to tie into the improvement being constructed as part of the Apex Southeast Subdivision located directly north of the site. Theapplicant should should coordinate with Development review staff regarding the final location of improvements and right-of-way dedication on Locust Grove Road, prior to plan submittal. The applicant's proposal to improve Locust Grove Road with EMERGE CYI! I _ -_.--- 10-foot wide detached concrete sidewalk abutting the site exceeds District policy which requires the construction of 5-foot wide detached concrete sidewalk and should be approved, as proposed. The applicant should be required to locate the sidewalk a minimum of 32-feet from centerline of Locust Grove Road abutting the site. Consistent with the MSM, the applicant should be required to dedicate additional right-of-way to total 39-feet from centerline of Locust Grove Road abutting the site. The additional dedicated right-of-way is not impact fee eligible for compensation, as this segment of Locust Grove Road is not scheduled in the CIP. The applicant should be required to improve Locust Grove Road with 17-feet of pavement from centerline plus a 3-foot wide gravel shoulder abutting the site. The applicant should be required to provide a permanent right-of-way easement to 2-feet behind back of sidewalk for any sidewalk located outside of the dedicated right-of-way. Sidewalk shall be located wholly within right-of-way or wholly within an easement. The applicant's proposal to construct a 20-foot wide emergency access only onto Locust Grove Road located 435-feet south of the proposed Via Roberto Lane meets District policy and should be approved, as proposed. The emergency access should be restricted with a gate or bollards, located outside of the right-of-way, as determined by the appropriate fire department. 6 Hadler/MPP22-0029 / H-2022-0064 3. Via Roberto Lane a. Existing Conditions: There are no collector roadways adjacent to the site. Via Roberto Lane was approved to be constructed as a full 36-foot wide collector street section with vertical curb and gutter on both sides of the roadway and concrete sidewalk on the north side of the roadway, as part of the Apex Southeast development located on the adjacent parcel directly north of the site. b. Policy: Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for improving all collector frontages adjacent to the site or internal to the development as required below, regardless of whether access is taken to all of the adjacent streets. Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street is designated with a typology on the Master Street Map, that typology shall be considered for the required street improvements. If there is no typology listed in the Master Street Map, then standard street sections shall serve as the default. Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right-of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and width of the sidewalk and the location and use of the roadway. The right-of-way width may be reduced, with District approval, if the sidewalk is located within an easement; in which case the District will require a minimum right-of-way width that extends 2-feet behind the back-of- curb on each side. The standard street section shall be 46-feet (back-of-curb to back-of-curb). This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Residential Collector Policy: District policy 7206.5.2 states that the standard street section for a collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District will consider a 33-foot or 29-foot street section with written fire department approval and taking into consideration the needs of the adjacent land use, the projected volumes, the need for bicycle lanes, and on-street parking. Sidewalk Policy: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all collector streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Half Street Policy: District Policy 7206.2.2 required improvements shall consist of pavement widening to one-half the required width, including curb, gutter and concrete sidewalk (minimum 5-feet), plus 12-feet of additional pavement widening beyond the centerline established for the street to provide an adequate roadway surface, with the pavement crowned at the ultimate centerline. A 3-foot wide gravel shoulder and a borrow ditch sized to accommodate the roadway storm runoff shall be constructed on the unimproved side. 7 Hadler/MPP22-0029 / H-2022-0064 ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. A new collector roadway was identified on the MSM with the street typology of Residential Collector. The new collector roadway should intersect Locust Grove Road and continue through the property stubbing to the east. The Residential Collector typology as depicted in the Livable Street Design Guide recommends a 2-lane roadway with bike lanes, and on street parking, a 36-foot street section within 50 to 70-feet of right-of-way. c. Applicant Proposal: As noted above, Via Roberto Lane is approved to be constructed as a 36-foot wide collector street section (from curb to curb) as part of the Apex Southeast development located directly north of the site. Therefore, the applicant is proposing to complete Via Roberto Lane as a complete 36-foot wide collector street section with the construction of an 8-foot wide planter strip and 10-foot wide detached concrete sidewalk abutting the site. d. Staff Comments/Recommendations: The applicant's proposal to complete Via Roberto Lane as a complete 36-foot wide collector street section with the construction of an 8-foot wide planter strip and 10-foot wide detached concrete sidewalk exceeds District policy which requires the construction of 5-foot wide detached or 7-foot wide attached concrete sidewalk and should be approved as proposed. If Via Roberto Lane, abutting the site, has not been constructed as part of the Apex Southeast development, then the applicant should be required to construct Via Roberto Lane as '/2 of a 36-foot wide collector street section with vertical curb, gutter and 5-foot wide detached or 7-foot wide attached concrete sidewalk on the south side of the roadway plus an additional 12-feet of pavement widening beyond the centerline of the roadway with a 3-foot wide gravel shoulder and borrow ditch sized to accommodate the roadway storm runoff on the north side of the roadway. Dedicate right-of-way to extend to 2-feet behind back of sidewalk on the south side and to 2-feet behind back of borrow ditch on the north side. For detached sidewalk, the applicant may reduce the right-of-way width to 2-feet behind the back of curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind back of sidewalk. 4. Internal Local Streets a. Existing Conditions: There are no local streets within the site. b. Policy: Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of- curb)for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. Reduced Urban Local Street-27-foot Street Section and Right-of-Way Policy: District Policy 7207.5.2 states that the width of a reduced urban local street shall be 27-feet (back-of- curb to back-of-curb) with curb, gutter, and minimum 5-foot concrete sidewalks on both sides and shall typically be within 41-feet of right-of-way. Unless approved in writing by the land use agency, this street section is not allowed by the City of Kuna and City of Star. In some cases 8 Hadler/MPP22-0029 / H-2022-0064 this street width may not accommodate new utilities. A 29-foot street section within 43-feet of right-of-way may be constructed in lieu of a 27-foot street section if the applicant demonstrates that the additional roadway width is necessary to extend the utilities. Although some parking is allowed by the following subsections, the District will further restrict parking on a reduced width street if curves or other physical features cause problems, if actual emergency response experience indicates that emergency vehicles may not be able to provide service, or if other safety concerns arise. One of the following three sets of design conditions shall apply. Design Condition #1: Parking is allowed on one side of a reduced width street when all of the following criteria are met: • The street is in a residential area. • The developer shall provide written approval from the appropriate fire department or emergency response unit in the jurisdiction. • The developer shall install NO PARKING signs on one side of the street, as specified by the District and as specified by the appropriate fire department. • This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 41-feet of right-of-way. • Traffic volumes on the street shall not exceed 1,000 vehicle trips per day. There shall be no possibility that another street may be connected to it in a manner that would allow more than 1,000 vehicle trips per day. Design Condition #2: Parking is allowed on both sides of a reduced width street when the street layout has the qualities of a road grid system. This provides fire trucks and other emergency vehicles alternate routes of access since the ability to pass another vehicle may be compromised by placement of parked vehicles on both sides of the street. The following criteria shall be met: • The street is in a residential area. • The developer shall provide written approval from the appropriate fire department or emergency response unit in the jurisdiction. • The block length of the street shall not exceed 500-feet, measured between centerlines. • Traffic volumes on the street are not forecast to exceed 400 vehicle trips per day. • A minimum of two street connections shall be provided to each end of the street with the reduced width. The two connecting streets shall each connect to the larger street system to provide the intended alternate routes of access. A street system that has one street connection to the larger street network on one end and a loop/circle street on the other end with no outlet shall not be approved. • This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 41-feet of right-of-way. Design Condition #3: Parking is allowed on both sides of a reduced width residential street with passing pockets that are created when two driveways are constructed near the same property line, where a 50-foot segment will not have on—street parking on the side of the street with the driveways. This provides fire trucks and other vehicles areas to move to the side of the street to allow another vehicle to pass when vehicles are parked on the street. Parking is allowed on both sides of a reduced width street when the following criteria are met: • The street is in a residential area. • The developer shall provide written approval from the appropriate fire department or emergency response unit in the jurisdiction. • Driveway locations are predetermined with curb cuts forthe driveways to be installed when the street is constructed. The curb cuts shall be 20-feet wide. Each lot on the street will be 9 Hadler/MPP22-0029 / H-2022-0064 paired with an adjacent lot. If there are an odd number of lots, one lot at either end of the street will not be paired. Each pair of lots shall locate its driveway 5-feet from the shared lot line of the pair. • This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 41-feet of right-of-way. • The lots cannot abut an alley. • Traffic volumes on the street are not forecast to exceed 400 vehicle trips per day. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local streets, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to provide a minimum turning radius of 50-feet; in rural areas or for temporary cul-de-sacs the emergency service providers may require a greater radius. Landscape and parking islands may be constructed in turnarounds if a minimum 29-foot street section is constructed around the island. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. Landscape Medians Policy: District policy 7207.5.16 states that landscape medians are permissible where adequate pavement width is provided on each side of the median to accommodate the travel lanes and where the following is provided: • The median is platted as right-of-way owned by ACHD. • The width of an island near an intersection is 12-feet maximum for a minimum distance of 150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet. • At an intersection that is signalized or is to be signalized in the future, the median width shall be reduced to accommodate the necessary turn lane storage and tapers. • The Developer or Homeowners Association shall apply for a license agreement if landscaping is to be placed within these medians. 10 Hadler/MPP22-0029 / H-2022-0064 • The license agreement shall contain the District's requirements of the developer including, but not limited to, a "hold harmless" clause; requirements for maintenance by the developer; liability insurance requirements; and restrictions. • Vertical curbs are required around the perimeter of any raised median. Gutters shall slope away from the curb to prevent ponding. c. Applicant Proposal: The applicant is proposing to construct the entrance roadway, Peak Avenue, with two 21-foot wide travel lanes, a 9-foot wide center landscape island, vertical curb, gutter an 8-foot wide landscape strip and 5-foot wide detached concrete sidewalk within 81-feet of right-of-way. The applicant is proposing to construct the following streets as 33-foot street sections with curb, gutter and 5-foot wide concrete sidewalk: • Vantage Point Drive from the intersection with Peak Avenue, the entry street, east to the site's east property line. • Steeple Avenue from the intersection with Orion Greens Drive to the site's south property line. The applicant is proposing to construct the other internal local streets as 27-foot wide street sections with curb, gutter and 5-foot wide attached concrete sidewalk within 41-feet of right-of- way. The applicant is proposing to construct three knuckles throughout the site. d. Staff Comments/Recommendations: The applicant's proposal to construct the entrance roadway, Peak Avenue, with two 21-foot wide travel lanes, a 9-foot wide center landscape island, vertical curb, gutter an 8-foot wide landscape strip and 5-foot wide detached concrete sidewalk within 81-feet of right-of-way meets District policy and should be approved, as proposed. The 9-foot wide center landscape island on Peak Avenue should be platted as right-of-way owned by ACHD. The applicant or homeowner's association should enter into a license agreement for any landscaping proposed within the islands. The applicant's proposal to construct the easterly portion of Vantage Point Drive and Steeple Avenue as 33-foot wide local street sections with curb, gutter and 5-foot wide concrete sidewalk meets District policy and should be approved as proposed. The applicant should be required to dedicate right-of-way to 2-feet behind back of sidewalk. The applicant's proposal to construct the other internal local streets as 27-foot wide street sections with curb, gutter and 5-foot wide attached concrete sidewalk within 41-feet of right-of- way meets District policy and should be approved as proposed. The applicant's proposal to construct three knuckles throughout the site meets District policy and should be approved, as proposed. For detached sidewalk, the applicant may reduce the right-of-way width to 2-feet behind the back of curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind back of sidewalk. 5. Roadway Offsets a. Existing Conditions: There are no roadways within the site. b. Policy: 11 Hadler/MPP22-0029 / H-2022-0064 Collector Offset Policy: District policy 7206.4.5, states that the preferred spacing for a new local street intersecting a collector roadway to align or offset a minimum of 330-feet from any other street (measured centerline to centerline). Local Offset Policy: District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125-feet from any other street (measured centerline to centerline). c. Applicant's Proposal: The applicant is proposing to construct one new local roadway, Peak Avenue, to intersect Via Roberto Lane located 670-feet east of Locust Grove Road and in alignment with the approved entrance for Apex Southeast located directly adjacent to the north of the site. The applicant is proposing to construct the local internal streets to align or offset by a minimum of 125-feet. d. Staff Comments/Recommendations: The applicant's proposal to construct one new local roadway, Peak Avenue, to intersect Via Roberto Lane located 670-feet east of Locust Grove Road and in alignment with the approved entrance for Apex Southeast located directly adjacent to the north of the site meet District policy and should be approved, as proposed. The applicant's proposal to construct the local internal streets to align or offset by a minimum of 125-feet meets District policy and should be approved, as proposed. 6. Stub Streets a. Existing Conditions: There are no existing stub streets to and from the site. b. Policy: Stub Street Policy: District policy 7207.2.4.3 states that stub streets will be required to provide circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7207.2.4, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." In addition, stub streets must meet the following conditions: • A stub street shall be designed to slope towards the nearest street intersection within the proposed development and drain surface water towards that intersection; unless an alternative storm drain system is approved by the District. • The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. Temporary Dead End Streets Policy: District policy 7207.2.4.4 requires that the design and construction for cul-de-sac streets shall apply to temporary dead end streets. The temporary cul-de-sac shall be paved and shall be the dimensional requirements of a standard cul-de-sac. The developer shall grant a temporary turnaround easement to the District for those portions of the cul-de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. c. Applicant Proposal: The applicant is proposing to construct two local stub streets in the following locations: • Vantage Point Drive to the east located 150-feet north of the site's south property line (measured centerline to south property line). • Steeple Avenue to the south located 481-feet east of Locust Grove Road. 12 Hadler/MPP22-0029 / H-2022-0064 The applicant is proposing to construct a permanent cul-de-sac turnaround at the terminus of Vantage Point Drive. d. Staff Comments/Recommendations: The applicant's proposal to construct two stub streets meets District policy and should be approved, as proposed. The applicant should be required to install a sign at the terminus of each stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." The applicant's proposal to construct a permanent cul-de-sac turnaround at the terminus of Vantage Point Drive meets District policy as it extends greater than 150-feet in length and should be approved, as proposed. The applicant should be required to construct the permanent cul-de-sac turnaround with a minimum 50-foot radius. 7. Driveways 7.1 Locust Grove Road a. Existing Conditions: There is an existing 16-foot wide unimproved driveway from the site onto Locust Grove Road located at the site's north property line. b. Policy: Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.6 states that direct access to minor arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1 a under District policy 7205.4.6, unless a waiver for the access point has been approved by the District Commission. Successive Driveways: District policy 7205.4.6 Table 1 a, requires driveways located on minor arterial roadways with a speed limit of 50 MPH to align or offset a minimum of 425-feet from any existing or proposed driveway. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re-enter the public street system. c. Applicant's Proposal: The applicant is proposing to close the existing 16-foot wide unimproved driveway onto Locust Grove Road located at the site's north property line with sidewalk, fencing and landscaping. d. Staff Comments/Recommendations: The applicant's proposal to close the existing 16-foot wide unimproved driveway onto Locust Grove Road located at the site's north property line with sidewalk, fencing and landscaping meets District policy and should be approved, as proposed. 7.2 Zenith Avenue, Orion Greens Drive and Cadence Avenue a. Existing Conditions: Zenith Avenue, Orion Greens Drive and Cadence Avenue have not been constructed within the site. b. Policy: Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street intersection, and 150-feet from the nearest collector or arterial street intersection. 13 Hadler/MPP22-0029 / H-2022-0064 Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an intersection shall have no minimum spacing requirements for access points along a local street, but the District does encourage shared access points where appropriate. Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required, residential driveways shall be restricted to a maximum width of 20-feet and may be constructed as curb-cut type driveways. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway. c. Applicant's Proposal: The applicant is proposing to construct three 20-foot wide paved shared access driveways in the following locations: • Onto Zenith Avenue and in alignment with Vantage Pointe Drive • Onto Orion Greens Drive and in alignment with Zenith Avenue • Onto Cadence Avenue and in alignment with Orion Greens Drive d. Staff Comments/Recommendations: The applicant's proposal to construct three 20-foot wide paved share access driveways meet District policy and should be approved, as proposed. 8. Traffic Calming Speed Control and Traffic Calming Policy: District policy 7207.3.7 states that the design of local street systems should discourage excessive speeds by using passive design elements. If the design or layout of a development is anticipated to necessitate future traffic calming implementation by the District, then the District will require changes to the layout and/or the addition of passive design elements such as horizontal curves, bulb-outs, chokers, etc. The District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a passive design element. These alternative methods may require maintenance and/or license agreement. a. Applicant's Proposal: The applicant is proposing to construct a long straight roadway, Vantage Pointe Drive, to be greater than 750-feet in length. b. Staff Comments/Recommendations: The applicant should be required to redesign Vantage Pointe Drive to reduce the length of the roadway or include passive design elements and submit a revised preliminary plat showing the redesigned roadway for review and approval prior to plan submittal for the first final plat. Stop signs, speed humps/bumps and valley gutters will not be accepted as traffic calming. 9. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 10. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop 14 Hadler/MPP22-0029 / H-2022-0064 signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 11. Other Access Locust Grove Road is classified as a minor arterial roadway and Via Roberto Street is classified as a collector roadway. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways and should be noted on the final plat. D. Site Specific Conditions of Approval 1. Redesign Vantage Pointe Drive to reduce the length of the roadway to be less than 750-feet in length or include passive design elements and submit a revised preliminary plat showing the redesigned roadway for review and approval prior to plan submittal of the first final plat. Stop signs, speed humps/bumps and valley gutters will not be accepted as traffic calming. 2. Coordinate with Development review staff regarding the final location of improvements and right- of-way dedication on Locust Grove Road, prior to plan submittal, as improvements and right-of-way dedication may need to shift west toward the section line to tie into the improvements being constructed as part of the Apex Southeast Subdivision located directly north of the site. 3. Dedicate additional right-of-way to total 39-feet from centerline of Locust Grove Road abutting the site. Compensation will not be provided. 4. Improve Locust Grove Road with 17-feet of pavement from centerline, a 3-foot wide gravel shoulder and 10-foot wide detached concrete sidewalk abutting the site. Locate the sidewalk a minimum of 32-feet from centerline of Locust Grove Road abutting the site. 5. Provide a permanent right-of-way easement to 2-feet behind back of sidewalk for any sidewalk located outside of the dedicated right-of-way. Sidewalk shall be located wholly within right-of-way or wholly within an easement. 6. Construct a 20-foot wide emergency access only onto Locust Grove Road located 435-feet south of the proposed Via Roberto Lane, as proposed. Restrict the emergency access with a gate or bollards, located outside of the right-of-way, as determined by the appropriate fire department. 7. Complete Via Roberto Lane as a complete 36-foot wide collector street section with the construction of an 8-foot wide planter strip and 10-foot wide detached concrete sidewalk abutting the site, as proposed. OR, If Via Roberto Lane, abutting the site, has not been constructed as part of the Apex Southeast development, then construct Via Roberto Lane as '/2 of a 36-foot wide collector street section with vertical curb, gutter and 5-foot wide detached or 7-foot wide attached concrete sidewalk on the south side of the roadway plus an additional 12-feet of pavement widening beyond the centerline of the roadway with a 3-foot wide gravel shoulder and borrow ditch sized to accommodate the roadway storm runoff on the north side of the roadway. Dedicate right-of-way to extend to 2-feet behind back of sidewalk on the south side and to 2-feet behind back of borrow ditch on the north side. 8. Construct the entrance roadway, Peak Avenue, to intersect with Via Roberto Lane with two 21-foot wide travel lanes, a 9-foot wide center landscape island, vertical curb, gutter an 8-foot wide landscape strip and 5-foot wide detached concrete sidewalk within 81-feet of right-of-way, as proposed. 15 Hadler/MPP22-0029 / H-2022-0064 9. Plat the 9-foot wide center landscape island on Peak Avenue as right-of-way owned by ACHD. The applicant or homeowner's association should enter into a license agreement for any landscaping proposed within the island. 10. Construct the following streets as 33-foot street sections with curb, gutter and 5-foot wide concrete sidewalk and dedicate right-of-way to 2-feet behind back of sidewalk: • Vantage Point Drive from the intersection with Peak Avenue, the entry street, east to the site's east property line. • Steeple Avenue from the intersection with Orion Greens Drive to the site's south property line. 11. Construct the other internal local streets as 27-foot wide street sections with curb, gutter and 5-foot wide attached concrete sidewalk within 41-feet of right-of-way, as proposed. 12. Construct three knuckles throughout the site, as proposed. 13. For all detached sidewalk, the applicant may reduce the right-of-way width to 2-feet behind the back of curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind back of sidewalk. 14. Construct one new local roadway, Peak Avenue, to intersect Via Roberto Lane located 670-feet east of Locust Grove Road and in alignment with the approved entrance for Apex Southeast located directly adjacent to the north of the site, as proposed. 15. Construct the local internal streets to align or offset by a minimum of 125-feet, as proposed. 16. Construct two local stub street in the following locations, as proposed: • Vantage Point Drive to the east located 150-feet north of the site's south property line (measured centerline to south property line). • Steeple Avenue to the south located 481-feet east of Locust Grove Road 17. Construct a permanent cul-de-sac turnaround with a minimum 50-foot radius at the terminus of Vantage Point Drive. 18. Install a sign at the terminus of each stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 19. Close the existing 16-foot wide unimproved driveway onto Locust Grove Road located at the site's north property line with sidewalk, fencing and landscaping, as proposed. 20. Construct three 20-foot wide paved shared access driveways, as proposed, in the following locations: • Onto Zenith Avenue and in alignment with Vantage Pointe Drive • Onto Orion Greens Drive and in alignment with Zenith Avenue • Onto Cadence Avenue and in alignment with Orion Greens Drive 21. Locust Grove Road is classified as a minor arterial roadway and Via Roberto Street is classified as a collector roadway. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways and should be noted on the final plat. 22. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 23. Payment of impact fees is due prior to issuance of a building permit. 16 Hadler/MPP22-0029 / H-2022-0064 24. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number)for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 17 Hadler/MPP22-0029 / H-2022-0064 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Traffic Analysis Summary 4. Utility Coordinating Council 5. Development Process Checklist 6. Appeal Guidelines 18 Hadler/MPP22-0029 / H-2022-0064 VICINITY MAP E Triwer St � MANIy i s .1. E I-Amint Fr I-spire SI �. _yy , h � - O Imo. f Viri f{ul�e rl cr I li a I I } I r r . 19 Hadler/MPP22-0029 / H-2022-0064 SITE PLAN HADLER SUBDIVISION PRELIMINARY PLAT 3"" 48ffEKmumm Z,--- F TTTT- z------E w ROBERTO m -------------- - ---------------— If ----------- If If T a 6, -z� --------------- -51 . . . . . . . . . . . . - -------------------- Win am I I I -- ------------------------ ---------------------------------------- S"M UC"M OM ArrUNED 90W&R 20 Hadler/MPP22-0029 / H-2022-0064 EIVGIN_XUNG,INC. SUMMARY Based on the TIA results,the proposed development is anticipated to have minimal impacts on Via Roberto Lane. The key findings are: ■ Hadler Subdivision is a proposed residential development with 145 single-family dwelling units ■ The development is estimated to generate 1,420 weekday daily trips, 104 trips in the AM peak hour, and 141 trips in the PM peak hour ■ All site-generated trips will use the proposed Peak Avenue access on Via Roberto Lane to access the roadway network ■ The proposed Peak Avenue and Via Roberto Lane intersection is anticipated to meet minimum operational thresholds under 2025 build-out year total traffic conditions ■ The proposed Peak Avenue and Via Roberto Lane intersection is not expected to warrant turn lanes and 2025 build-out year total traffic conditions ■ Maintain a minimum intersection sight distance of 390 feet at the proposed Peak Avenue and Via Roberto Lane intersection for a 35-mph roadway • Building setback and landscape design should not obstruct intersection sight distance ■ All internal roadways are local roads expected to carry less than 1,000 vpd except for a short segment of Peak Avenue estimated to carry 1,420 vpd • Peak Avenue does not have front-on housing ■ Traffic calming measures should be installed on the east-west internal local road with a straight segment exceeding 750 feet per ACHD Policy S:Iprojects121-58 Hadler Subdivision Woc Wadler Subdivision TIA.docx Page 6 of 6 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5)working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 21 Hadler/MPP22-0029 / H-2022-0064 Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ❑Send a"No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: ❑For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way, including, but not limited to,driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request"form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"to ACHD Construction—Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment&Erosion Submittal • At least one week prior to setting up a Pre-Construction Meeting an Erosion &Sediment Control Narrative&Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ❑ Final Approval from Development Services is required prior to scheduling a Pre-Con. 22 Hadler/MPP22-0029 / H-2022-0064 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10)working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 23 Hadler/MPP22-0029 / H-2022-0064