Loading...
PZ - Applicant's Response to Staff Report 10-6 Charlene Way From:Becky Yzaguirre <BYzaguirre@to-engineers.com> Sent:Thursday, October 6, 2022 11:25 AM To:Clerks Comment; Charlene Way; Joy Hall; Kurt Starman; Chris Johnson; Joseph Dodson Cc:Bill Parsons; Brady Lasher Subject:FW: Slatestone Sub. Staff Report (H-2022-0039) External Sender - Please use caution with links or attachments. Hi All, Below are my written responses to the staff report. Also below is a link to my PowerPoint for tonight, a revised preliminary plat and landscape plan per the conditions of approval. Slate Stone Sub.pptx 210791-SLATESTONE SUB PRE PLAT-20220921-SIGNED.pdf 210791-LSCP 100422.pdf 210791-DRAINAGE EXHIBIT-20221004.pdf Staff Report Comments: Add a 5-foot wide sidewalk to either side of the Lot 14 common drive to connect it to the local street sidewalk and proposed micro-path in Lot 15 common lot. We have removed the proposed pathway, therefore a sidewalk on the common drive is not needed. We ask that this condition be removed from the staff report. Depict the required 10-foot wide multi-use pathway along S. Stoddard Road and place it at least four (4) feet outside of the ultimate curb and gutter location to allow for landscaping on both sides of the pathway. Prior to the City Engineer’s signature on the final plat for Phase 1, a 14-foot wide public pedestrian easement shall be submitted to the Planning Division and recorded for the multi-use pathway as required by the Park’s Department, unless ACHD requires one. We ask that the condition gets revised to match the existing pathway widths on Stoddard, so our development blends in nicely with the existing developments. Prior to the Commission hearing, the Applicant shall verify the location of the irrigation ditch along the south boundary to determine if it is on the subject property; if the said ditch is proven to be on the subject property, the Applicant should revise any relevant plans to depict this ditch as being piped prior to the City Council hearing in accord with UDC 11-3A-6B. We have revised the preliminary plat drawings and corrected the location and future plans for the irrigation ditch. Attached is an exhibit showing the solution. Please let me know if you need anything else. Thank you, BECKY YZAGUIRRE | Land Use Planner 2471 S. Titanium Place | Meridian, Idaho 83642 1 O 208-323-2288 www.to-engineers.com From: Joseph Dodson <jdodson@meridiancity.org> Sent: Tuesday, September 27, 2022 2:02 PM To: Becky Yzaguirre <BYzaguirre@to-engineers.com>; Alec Egurrola <AEgurrola@to-engineers.com>; Brady Lasher <brady@lasherenterprises.com>; Bill Nary <bnary@meridiancity.org>; Charlene Way <cway@meridiancity.org>; Chris Johnson <cjohnson@meridiancity.org>; Joy Hall <jhall@meridiancity.org>; Kurt Starman <kstarman@meridiancity.org> Cc: Bill Parsons <bparsons@meridiancity.org> Subject: Slatestone Sub. Staff Report (H-2022-0039) Hello, Attached is the staff report for Slatestone Subdivision. This item is scheduled to be on the Commission agenda on October 6, 2022. The public hearing will be held at City Hall, 33 E. Broadway Avenue, beginning at 6:00 pm. You may attend in person or virtually via Zoom – the link/phone number to join the meeting is located at the top of the meeting agenda. Please call or e-mail with any questions. Please submit any written response you may have to the staff report to the City Clerk’s office (comment@meridiancity.org) and me as soon as possible. If you have a presentation you’d like to present at the public hearing, please send it to the City Clerk’s office no later than 12:00 pm the day of the hearing. Thank you, Joseph Dodson | Current Associate Planner City of Meridian | Community Development 33 E. Broadway Ave., Meridian, Idaho 83642 Phone: 208.884.5533 | Built for Business, Designed for Living All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law. 2