Project Final Acceptance Letter - Modern Craftsman Black Cat Apartments
◼
◼◼
September 21, 2022
Mr. Matt Riggs - Partner
Black Cat Apartments, LLC
1404 17th Street, Suite 700
Denver, CO 80014
RE: Modern Craftsman Black Cat Apartments aka Detached Baron at Black Cat – Final
Acceptance
Dear Mr. Matt Riggs:
Installation of this project’s sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian’s Unified Development Code §11-5C-3, and the City of
Meridian’s Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, Current Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two-years from the date
of this letter.
Sincerely,
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
File